ML17354B001

From kanterella
Jump to navigation Jump to search
Notification of FPL Shipment of Proposed Exams,Operating Tests & Supporting Ref Matls Requested by 980423 Ltr,To C Payne at Region Ii.Exam & Ref Matls Are Being Shipped to Region II on 980625.Index of Matl Is Attached
ML17354B001
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/25/1998
From: Hovey R
FLORIDA POWER & LIGHT CO.
To: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-98-171, NUDOCS 9806300077
Download: ML17354B001 (4)


Text

~ CATEGORY 10 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) t ACCESSION NBR:9806300077 DOC.DATE: 98/06/25 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME 'UTHOR AFFILIATION HOVEY,R.J. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION PEEBLES,T.A. Region 2 (Post 820201)

SUBJECT:

Notification of FPL shipment of proposed exams,operating 'C tests &. supporting ref matls requested by 980423 ltr, to C Payne at Region II.Exam 6 ref matls are being shipped to NOTES:

Region ZI on 980625.Index of matl is attached.

DISTRIBUTION CODE: IE42D COPIES RECEIVED: LTR Operator Licensing Examination Reports

] ENCL j SIZE:

oL'ITLE:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2- PD 1 1 JABBOUR, K 1 1 INTERNAL: 1 1 NRR/DRCH/HOHB 1 1 Y RGN2 FILE 01 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL 7,

'I

Mr. Thomas A. Peebles, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety, Region

'U. S. Nuclear Regulatory Commission II Atlant Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, GA 30323

Dear Mr. Peebles:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Operator License Examinations l W This letter is notification of the Florida Power & Light Company (FPL) shipment of the proposed written examinations, operating tests and the supporting reference materials requested by NRC letter dated April 23, 1998, to the examiner and address listed below:

Attn: Mr. C. Payne U. S. Nuclear Regulatory, Commission, Region II Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, GA 30323 The examination and reference materials are being shipped to NRC Region II, on June 25, 1998. An index of the materials is attached for your information.

Should you require any additional information, please contact Ms. Maria Lacal at (305) 246-6476.

/

er < uly yours, Robert . Hovey Vice President Turkey Point Plant OIH

~l(

Attachment cc: L. A. Reyes, Regional Administrator, Region II, USNRC Document Control Desk, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant

'rr80b300077 980b25 PDR ADOCK 05000250 V . PDR an FPL Group company

Attachment to L-98-171 INDEX OF EXAMINATIONAND REFERENCE MATERIAL SRO Written Exam Book ¹1, Volume 1 of 2 (SRO written exam questions 1 50 and associated reference material)

SRO Written Exam Book ¹2, Volume 2 of 2 (SRO written exam questions 51 100 and associated reference material)

RO Written Exam Book ¹1, Volume 1 of 2 (RO written exam questions 1 50 and associated reference material)

RO Written Exam Book ¹2, Volume 2 of 2 (RO written exam questions 51 100 and associated reference material)

Simulator Scenarios, Volume 1 of 1 JPM Set, Volume 1 of 1 (RO and SRO JPM Sets, JPM questions and associated reference material)

Administrative Exam, Volume 1 of 1 (RO and SRO administrative exam and associated reference material)

0