ML17354A750

From kanterella
Jump to navigation Jump to search
Provides Notification of Completion of Actions Identified in Ifi 50-250/97-08 & 50-251/97-08,per GL 89-10 Closure Insp
ML17354A750
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/30/1997
From: Hovey R
FLORIDA POWER & LIGHT CO.
To: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
50-250-97-08, 50-250-97-8, 50-251-97-08, 50-251-97-8, GL-89-10, L-97-318, NUDOCS 9801080094
Download: ML17354A750 (4)


Text

CATEGORY j.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9801080094 FACZL:50-250 Turkey Point DOC.DATE: 97/12/30 Plant, Unit 3, Florida NOTARIZED: NO Power and Light C DOCKET 05000250 I

50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251

't AUTH. NAME HOVEY,R.'J.~

~

RECZP.NAME

~

'loridaAUTHOR AFFILIATION Power & Light Co.

RECIPIENT AFFILIATION REYES, Region 2 (Post 820201)

SUBJECT:

Provides notification of completion of actions identified in DISTRIBUTION CODE: IEOID COPIES RECEIVED'LTR l ZFI 50-250/97-08 & 50-251/97-02,per GL 89-10 closure insp.

TITLE: General (50 Dkt) -Insp Rept/Notice of Violation Response NOTES:

ENCL 8 SIZE: l RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD CROTEAU,R 0 INTERNAL: AEOD/SPD/RAB TC DEDRO FILE CENTE NRR/DRCH/HHFB ECB NRR/DRPM/PERB NUDOCS-ABSTRACT OE DIR OGC/HDS3 RGN2 FILE 01 XTERNAL: LITCO BRYCE,J H NOAC NRC PDR NUDOCS FULLTEXT D

DP 5F.Siq~

RE0 Qgi RK~ j3sl 'P48 N

t NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY'YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR

)

ENCL 17 CONTROL

/

OEC 3O ~99/r L-97-318 10 CFR 50.4 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Atlanta Federal Ccntcr 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30323

Dear Mr. Reyes:

Rc: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Generic Letter 89 Closure Ins ection Follow-U Items The NRC Closure Inspection of Generic Letter (GL) 89-10, "Safety-Related Motor-Operated Valve Testing and Surveillance," for Turkey Point Units 3 and 4 was conducted during the period of July 14 through July 18, 1997. Thc results of the Closure Inspection are documented by NRC Integrated Inspection Report Nos. '50-250/97-08 and 50-251/97-08. The NRC inspectors concluded that the GL 89-10 implementation for Turkey Point Units 3 and 4 meets thc intent of the GL in verifying the design-basis capabilities of its motor operated valves. However the inspectors identified weaknesses in the documented justifications for assumptions applied in calculations, in evaluations of stem friction coefficients, and in extrapolations of dynamic test data.

FPL committed to update the affected documentation, and to notify NRC Region II of the completion status by the end of the year. An Inspector Followup Item (IFI) 50-250, 251/97-08-02 was opened to track the completion of FPL's actions.

The purpose of this letter is to notify>ou that FPL's actions to update the affected documentation (addressed by IFI 50-250, 251/97-08-02) have been completed.

Please contact us ifthere are any questions about this submittal.

/

Very truly yours,

+My@/ /u R. J. Hovcy Vice Prcsidcnt Turkey Point Plant 9801080094 97i230 OIH PDR ADOCK 05000250 P PDR cc: Document Control Desk, USNRC, Washington, D.C. (y~

)%

Senior Rcsidcnt Inspector, USNRC, Turkey Point Plant

.>v~B IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII an FPL Group company

'l

)1 W ~

'l