REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9008200052 DOC.DATE: 90/08/17 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 NOTES'OCKET AUTH. NAME BOHLKE,W.H.

RECIP.NAME

SUBJECT:

AUTHOR AFFILIATION Florida Power & Light Co.

RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

Forwards fitness-for-duty program performance data for Jan-June 1990.

DISTRIBUTION CODE: A001D COPIES RECEIVED:iLTR ENCL SIZE:

TITLE: OR Submittal: General Distribution, RECIPIENT COPIES ,'RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 EDISON,G 2 2 NORRIS,J 2 2 INTERNAL: ACRS 6 6 NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC 1 0 OGC/HDS2 1 0 FILE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL'PDR 2 2 NRC PDR 1 1 NSIC 1 1

~<</pg iZ g5 PP TOTAL NUMBER OF COPIES REQUIRED: LTTR ~AC'4ENCL

4 J

F

]

)'

P.O. Box14000, Juno Beach, FL 33408-0420 AUGUST 1 7 19gQ L-90-286 10 CFR 26. 71 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Semi-Annual Fitness For Duty Pro ram Performance Data In accordance with 10 CFR 26.71(d), please find attached the fitness-for-duty program performance data for the six (6) month period ending June 30, 1990.

Should you have any questions, please contact us.

Very truly yours, W. H. Bohlke Vice President Nuclear Engineering and Licensing WHB/DMB/lef Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant

,pl 9008200052 900817 PDR . ADOCK 05000250 R PDC an FPL Group company

~ ~

/

Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 FLORIDA POWER & LIGHT JUNE 30, 1990 Company 8 Months Ending TURKEY POINT PLANT Locatton D. A. BRODNICK 407 6 4-3615 Contact Name Phone Number Cutoffa: Screen/Conf lrmatlon (ng/ml) Appendix A to 10CFR 2B MarlJuana 50/10 Amphetamines 300/500 Barbiturates 300/200 Cocaine 300/150 Phencyclldlne 25/25 Benzodlazeplnes 300/300 Oplates 300/200 Alcohol (% BAC) .04% Methaqualone 300'/Z00

'Testing Results for Contractor Long Term contractor Short Term Contractor Testing Results Personnel 8 Licensee Employees Personnel Personnel Average Number with Unescorted Access 3576 Referred to EAP Access Restored

¹ ¹ ¹ Categories Teated Poaltfve Tested Posltfve Tested Posltlve Prew mployment N/A Pre-badglng 2029 42 Periodic N/A For cause <<',4 0 Post accident 0 Random 2033'20 Follow-up 74 Other N/A Total 4140 64 0

  • Random Program does not dlstlngulsh between Contractor Personnel 8 Ucensee Employees wlthln ellglble population
    • All confirmed posltlves were above DHHS/NRC conf lrmatlon cutoff levels.
)'1~ g'1 t ' L

/fr

TURKEY POINT PLANT Random Testing Program Results Individuals Tested 1991 4 Positive 20 4 Tested 2033

% Positive .98%

Graph of

% PosItive.

Confirmed Positive Tests for Specific Substances Marijuana Cocaine 10 Oplates Amphetamines Phencyclidine Alcohol Refusal to Test

~

11'i

~

'qadiI I yy

MANAGEMENT ACTIONS

1) The random selection was changed from a daily to weekly process to increase the personnel selected/tested ratio and to facilitate testing across all shifts and days of week.
2) The initial blind sample vendor was changed based on an analysis of test results.
3) The number of weekly random tests was scheduled to reach 1004 in eleven months.
4) An industry survey was conducted to determine performance standards for HHS certified laboratories. The data collected will be used to evaluate contract bid proposals if a change in certified laboratories is required.

EVENTS REPORTED Unsatisfactory performance testing results from blind test specimens submitted to Roche Biomedical Laboratories were reported to the NRC on May 29, 1990.

Fitness for Duty Program Performance Data Personnel Subject to iOCFR 26 PLORIDA, BONER 6 LIGHT JUNE 30% 1990 Company 8 Months Ending ST. LUCIE PLANT Location Dz A. BRODNICK (407)694-3615 Contact Namo Phono Numbor Cutoffs: Screen/Conf lrmatlon (ng/ml) P Appendix A to 10CFR 28 MarlJuana 50/10 Amphetamines 300/500 Barbiturates 3 0p/200 Cocaine 300/150 PhencyclIdIne 25/25 Benzodlazeplnes 3pp/3pp 0 plates 300/200 Alcohol (% BAC) . 04% Methaqualone 300/200

'esting Results for Contractor Long Term contractor Short Term Contractor Testing Results Personnel 8 Ucensee Employees Personnel Personnel Average Number with 2082 Unescorted Access

¹ ¹ Categories

¹ Referred to EAP Access Restored

¹ ¹ Tested Posltlve Tested Posltlve Tested Positive Pre-employment N/A

\

Pre-badglng 1589 44 Perlodlc N/A Forcause Post accident 0 '-~ ~e "Ie 54~

Random 1392 Follow-up 0 Other N/A Total '987 51 0

  • Random Program does not dlstlngulsh between Contractor Personnel 8 Ucensee Employees wlthln ellglble population "Allconfirmed posltlves were above DHHS/NRC conf lrmatlon cutoff levels.

~ 4\ I/ ~ ~ ~

ST. LUCIE PLANT Random Testing Program Results individuals Tested 1989 1991 4 Positive 4 Tested 1392

% Positive .43%

Graph of

% Positive Confirmed Positive Tests for Specific Substances Marijuana Cocaine I Oplates Amphetamines

'2'lcohol Phencyclidine Refusal to Test

l C

S L

I pt T.

~ ~

MANAGEMENT ACTIONS

1) The random selection was changed from a daily to weekly process to increase the personnel selected/tested ratio and to facilitate testing across all shifts and days of week.
2) The initial blind sample vendor was changed based on an analysis of test results.
3) The number of weekly random tests was scheduled to reach 100~

in eleven months.

4) An industry survey was conducted to determine performance standards for HHS certified laboratories. The data collected will be used to evaluate contract bid proposals a change in certified laboratories is required.

if EVENTS REPORTED

1) On June 18, 1990, St. Lucie notified the NRC Operations Center to report a confirmed positive test for alcohol on a contract supervisor.
2) Unsatisfactory performance testing results from blind test specimens submitted to Roche Biomedical Laboratories were reported to the NRC on May 29, 1990.