December 7, 2017

Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Ameren Missouri

Callaway Plant

P.O. Box 620

Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - RESPONSE TO NOTICE OF VIOLATION

(NRC INSPECTION REPORT 05000483/2017007)

Dear Mr. Diya:

On August 28, 2017, the U.S. Nuclear Regulatory Commission (NRC) cited Union Electric

Company for failure to restore compliance for a Technical Specification 5.4.1.a. violation

associated with the failure to perform preventative maintenance procedures to verify the

operation and timing of the engineered safety feature transformer XNBOl load tap changer

at the Callaway Plant. The Notice of Violation (Notice), enclosed within NRC Inspection

Report 05000458/2017007 (ML17283A392), required you to respond in writing within 30 days.

You responded to the Notice by letter, dated November 1, 2017 (ML17306A103). In your

response, you stated that the timing of engineered safety feature transformer XNBOl load tap

changer was successfully tested on October 20, 2017, thus resolving the technical issue

associated with the violation for not previously verifying the operation and timing of the load

tap changer. You also responded that timing testing of engineered safety feature

transformers XNBOl and XNB02 load tap changers will continue to be performed on a routine

basis, going forward. The letter also indicated that you are reviewing any NRC violations

received since October 2015 for jobs that you are crediting for restoring compliance. The basis

for selecting October 2015 was that this was the last time a comprehensive pre-Problem

Identification and Resolution (Pl&R) inspection self-assessment was performed. In that

assessment, the timeliness of corrective actions for NRC violations prior to October 2015 had

been evaluated.

We have reviewed your response letter and find that it meets the requirements of

10 CFR 2.201. The adequacy of your corrective actions to the Notice will be reviewed and, if

found acceptable, will be closed in the resident inspector integrated inspection report.

F. Diya 2

This letter will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No. 50-483

License No. NPF-30

Electronic Distribution for Callaway Plant

ML17341B170

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: RAK Yes No Publicly Available Sensitive NRC-002

OFFICE SRI/EB1 C/EB1 C/PBB C:EB1

NAME RKopriva TFarnholtz NTaylor TFarnholtz

SIGNATURE /RA/ TRF for /RA/ /RA/ /RA/

DATE 12/7/17 12/7/17 12/7/17 12/7/17