Letter Sequence Acceptance Review |
---|
|
|
|
Similar Documents at Fermi |
---|
Category:Acceptance Review Letter
MONTHYEARML23199A2472023-07-14014 July 2023 Acceptance Review License Amendment Pertaining to ECCS Strainer Performance Evaluation ML21266A4342021-09-20020 September 2021 Acceptance of DTE Request for Exemption from 10 CFR 72.44(d)(3) for Fermi 2 ML17297A7132017-10-25025 October 2017 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications to Elimate Main Steam Line Radiation Monitor Reactor Trip and Primary ML13329A4522013-11-15015 November 2013 Acceptance Review of IST Program Relief Request PVRR-001 ML13099A2312013-04-12012 April 2013 LIC-109 Acceptance of License Amendment Request for Measurement Uncertainty Recapture ML12335A0802012-11-29029 November 2012 E-mail - LIC-109 Acceptance Review - Fermi 2 - LAR to Revise TS to Adopt TSTF-522 (Tac No. ME9906) ML1203404452012-02-0303 February 2012 LIC-109 Acceptance Review - Fermi 2 - LAR - Modify TS SRs for Safety Relief Valves - ME7829 ML1203404332012-02-0303 February 2012 LIC-109 Acceptance Review - Fermi 2 - LAR - Revise the RHR Suppression Pool Cooling Flow Rate in TS - SR 3.6.2.3.2 - ME7828 ML1124402372011-08-31031 August 2011 LIC-109 Acceptance Review - Fermi 2- LAR for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML1006213282010-03-0303 March 2010 Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Third Ten-Year Interval - TAC ME3116 - TAC ME3119 ML0934900022009-12-14014 December 2009 E-mail to A. Hassoun and R. W. Johnson - Submittal of the Inservice Testing Program Relief Requests for Pumps and Valves - Third Ten-year Interval (TAC Nos. ME2548 - ME2559) 2023-07-14
[Table view] Category:Letter
MONTHYEARIR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23248A2242023-09-0707 September 2023 Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance ML23223A2242023-08-29029 August 2023 Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) ML23237B4332023-08-25025 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23219A1792023-08-0707 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 ML23216A1872023-08-0404 August 2023 Submittal of Relief Request RR-A25 for Extended License Period ML23206A1272023-07-26026 July 2023 NOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat Sink ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis IR 05000341/20230012023-06-28028 June 2023 Integrated Inspection Report 05000341/2023001 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements IR 05000341/20220102023-06-21021 June 2023 Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23158A1332023-06-0808 June 2023 Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink ML23130A1032023-05-17017 May 2023 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency IR 05000341/20234022023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23118A3612023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23114A1172023-05-0101 May 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23115A4152023-04-25025 April 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML23124A2032023-04-10010 April 2023 DTE Electric Company Submittal of Fermi 3 Periodic Reports ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter IR 05000341/20230112023-04-0606 April 2023 Triennial Fire Protection Inspection Report 05000341/2023011 IR 05000341/20234012023-03-17017 March 2023 Security Baseline Inspection Report 05000341/2023401 ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 IR 05000341/20220062023-03-0101 March 2023 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22325A2992023-02-24024 February 2023 Audit Plan in Support of Review of License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency ML23039A1552023-02-14014 February 2023 Integrated Inspection Report 05000341/2022004 IR 05000341/20224032023-02-13013 February 2023 Security Baseline Inspection Report 05000341/2022403 ML23200A2162023-01-20020 January 2023 Outline Submittal Letter 2024-02-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 25, 2017 Mr. Keith J. Polson Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 260 TAC 6400 North Dixie Highway Newport, Ml 48166 SUBJECT FERMI 2 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE:
LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ELIMINATE MAIN STEAM LINE RADIATION MONITOR REACTOR TRIP AND PRIMARY CONTAINMENT ISOLATION SYSTEM GROUP 1 ISOLATION FUNCTIONS (CAC NO. MG0228, EPID L-2017-LLA-0274)
Dear Mr. Polson:
By letter dated August 24, 2017, DTE Electric Company (DTE) submitted a license amendment request for Fermi 2 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17237A176). The proposed amendment would eliminate the main steam line radiation monitor (MSLRM) functions for initiating: (1) a reactor protection system automatic reactor trip and 2) the associated (Group 1) primary containment isolation system (PCIS) automatic closure of the main steam isolation valves and main steam line drain valves.
Specifically, the proposed technical specification (TS) changes remove requirements for the MSLRM trip function from TS Table 3.3.1.1-1, "Reactor Protection System Instrumentation."
The proposed changes also remove requirements for PCIS Group 1 isolation from TS Table 3.3.6.1-1, "Primary Containment Isolation Instrumentation."
By letter dated October 10, 2017 (ADAMS Accession No. ML17271A220), the U.S. Nuclear Regulatory Commission (NRG) staff notified you that we would not be able to begin our detailed review until additional information requested in the enclosure to the letter was provided. You responded to the NRC staff's request by letter dated October 18, 2017 (ML17298A185). The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request following your submittal of additional information.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRG staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the
K. Polson environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 1, 100 hours4.167 days <br />0.595 weeks <br />0.137 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is August 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact the David J. Wrona, at (301) 415-2292.
Sincere!
Project nager g Branch Ill Division of erating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341 cc: Distribution via Listserv
, ML17297A713 OFFICE NRR/DORL/LP3/PM NRR/DORULPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME SGoetz SRohrer DWrona Sgoetz DATE 10/24/2017 10/24/2017 10/24/2017 10/25/17