ML17250B172

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Summary Exam Rept for 1990 Steam Generator Eddy Current Insp. Rept Summarizes Observations & Corrective Actions Resulting from Insps Performed During 1990 Outage
ML17250B172
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/18/1990
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
Office of Nuclear Reactor Regulation
Shared Package
ML17250B173 List:
References
NUDOCS 9005310498
Download: ML17250B172 (2)


Text

ACCELERATED DISTRIBUTION DEMONSTPA,TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9005310498 DOC. DATE: 90/05/18 NOTARIZED: NO DOCKET FACIL:50-244 Robert, Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R. Project Directorate I-3

SUBJECT:

Forwards Rev 1 to "Summary Exam Rept for 1990 Steam Generator Eddy Current Insp."

DISTRIBUTION CODE: A001D COPIES RECEIVED LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution 8

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244

/

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 1 PD1-3 PD 1 1 D JOHNSON,A 5 5 INTERNAL: NRR/DET/ECMB 9H D 1 1 NRR/DOEA/OTSB11 NRR/DST 8E2 1 1 NRR/DST/SELB 8D NRR/DST/SICB 7E 1 1 NRR DST/SRXB 8E NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 G FILE Ol RES/DS IR/E BI 1 1 EXTERNAL: LPDR 1 1 NRC PDR NSIC 1 1 MPo p zyoys7z9.7 R D

S A

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENI'ONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19

I////////I/

0 l ) 0 t PZZZZ(ZZZ ll//// /// /////////////

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N Y. 14649 0001 May 18, 1990 TCLCPHONC ARCA COOC 7ld 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-3 Washington, D.C. 20555

Subject:

1990 Steam Generator Eddy Current Examination Summary Report R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Johnson:

In accordance with Appendix B paragraph 1.12.2.1 of the Ginna Station Quality Assurance Manual and Section 6.9.3.4 of the Ginna Station Technical Specifications, we are submitting Revision 1 of the 1990 Steam Generator Eddy Current Examination Summary Report for R.E. Ginna Nuclear Power Plant. This report summarizes observations and corrective actions resulting from inspections performed during the 1990 outage and identifies the tubes inspected, the location and extent of each indication and the tubes which have been plugged or sleeved. The only changes made in this revision are to Table 1 to more clearly identify the examination extents.

Very truly yours, Robert C. Me ed Division Manager Nuclear Production GJWK106 xc: Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I qg)g9 475 A'llendale Road King of Prussia, PA 19406 gl Ginna Senior Resident Inspector 90053~049, 8 900518 05000244 pDR @DOC~ PDC 0