ML17229A615

From kanterella
Jump to navigation Jump to search
Rev 0 to ISI-PSL-1, St Lucie Nuclear Plant Unit 1 ISI Plan.
ML17229A615
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/12/1998
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17229A612 List:
References
ISI-PSL-1-PLAN, NUDOCS 9802090250
Download: ML17229A615 (640)


Text

,St. Lucie Nuclear Plant Unit 1 XSX Plan i a he a e. LKIAtFJ~ I>> ~ Pi> Prepared by Florida Power & Light Company

"'= '.'Nuclear Engineering -Department Codes and Component Program Group 700 Universe Blvd.

Juno Beach, Florida 33408 for St. Lucie Nuclear Plant 6501 South Highway A1A Jensen Beach, Florida 34957 Commercial Service Date: 21 December 1976 NRC Docket Number  : 50-335 Document No. XSX-PSL-1-PLAN Rev. 0 prepared by:

Inservice Inspection Specialxs Reviewed by: r P'pproved by:

S pervxsor Code P ograms S c ion Reviewed by:

Authorized Nuclear Xnservice Xnspector 980209'0250 980202 t PDR ADOCK 05000335 8 PDRL

St. Lucie Unit 1 ISI Plan January 9, 1998 Document No. ISI-PSL-1-PLAN Revision 0 Record of Revision

'Revision "'"' Dat'e "' " Reason'or Revision No.

~

0 ~ Januar 9, 1998 initial Issue

St; Lucie Unit 1 ISI Plan January 9, 1998 Document No. ISI-PSL-1-PLAN Revision 0 List of Effective Pages Description Pages Date Cover Page January 9, 1998 Record of Revision January 9, 1998 List of Effective Pages January 9, 1998 Abstract January 9, 1998 Plan 5 thru 639 January 9, 1998

St. Lucie Unit 1 ISI Plan January 9, 1998 Document No. ISI-PSL-1-PLAN Revision 0 Abstract This document contains the proposed schedule for the Third Ten-Year Interval Inservice Inspection Plan for St. Lucie Nuclear Power Plant,. Unit 1.

This'schedule'as developed and prepared to meet the requirements of the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section XI, 1989 Edition, and is subject to the limitations and modifications of 10 CFR 50.55a(b)(2). It identifies those components which are subject to examination/

those scheduled for examination, and examined components.

Additions, deletions, and changes occur continuously during the Inservice Inspection interval. As the Inservice Inspection interval progresses, the number of examinations may be adjusted to account for these changes. This document shows those areas currently planned for examination and must be checked against the ISI Program for completeness.

Scheduled examinations and augmented examinations are included within this text. As this document is updated, completed examinations are identified.

The status of examinations is shown as follows:

X Scheduled C Completed AAugmented p Partial B Baseline E Expanded Scope No Status Other codes may be used as necessary.

St. Lucie Unit 1 ISI Plan January 9, 1998 Document No. ISI-PSL-1-PLAN Revision 0 ISI PLAN

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 6 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAH CLASS 1 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD ZONE NUHBER: 1.001 ASHE PERIOD PERIOD PERIOD Pl ~ %W SEC. XI SUHNARY EXAHIHATIOH AREA CATGY HDE -OUTAGE- INSTRUCTIONS HUNBER IDEHT IF I CAT IOH ITEH NO NETH 1 2 3 1 2 3 1 **CALIBRATIOHBLOCK<<<<

REF. DMG. HO. 01-001-A 000060 204-02 8-A VOL 3- X Examine essentially 100X of Dollar Plate Meld 81.21 weld length; vendor manual no.

RCB 8770-5156

<<*UT-1, UT-4**

REF. DMG NO. 01-001-B 000100 204-03-A 8-A VOL 3 - - - - - - X Peel Segment Meld 8 30 Deg 81.22 RCB

    • UT-4**

000200 204-03-8 8-A VOL 3 - - - - X Peel Segment Meld 8 90 Dcg 81.22 RCB

<<<<UT-4*<<

000300 204.03.C 8-A VOL 3 - - - - - - X Peel Segment Weld 8 150 Dcg 81.22 RCB

  • <<UT 4**

000400 204-03-D 8-A VOL 3 - - - - - - X Peel Segment Meld 8 210 Deg 81.22 RCB

    • UT 4*<<

000500 204-03 E 8-A VOL 3 - - - - - X Peel Segment Meld 8 270 Deg 81.22 RCB

<<*UT 4<<<<

000600 204-03-F 8-A VOL 3 - - - - - - X Peel Segment Meld 8 330 Dcg 81.22 RCB

    • UT 4**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 7 REVI SION: 0 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD ZOHE HUHBER: 1-001 ASHE PERIOD PERIOD PERICO s ~ ~ ~ 4'g 'r1h' ~

SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE ------OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICAT10N ITEH NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK<<<<

REF. DWG. NO. 01-001-A V

000700 10-203 8-A VOL 3 - - - - - - X Bottom Mead to Lower Shell 81.21 Girth Weld RCB **UT-3A, UT4<<<<

REF. DWG. NO. 01-001-C 000800 3.203C 8-A VOL 3- X LOWER SHELL LONGITUDINAL WELD 81.12 9 15 Deg RCB **UT-1, UT-2**

000900 3-203A 8 A VOL 3 . X LOWER SHELL LONGITUDINAL WELD 81.12 9 135 Deg RGB <<*UT 1, UT-2**

001000 3-2038 8-A VOL 3 - - - - - - X LOWER SHELL LOHGITUDINAL WELD 81.12 Q 255 Deg RCB *<<Ul'-1 ~ UT-2**

REF. DWG. MO. 01-001-A 001100 9-203 8-A VOL 3 - - - - - - X LOWER SHELL TO IHl'ERHEDIATE 81.11 SHELL RCB <<*UT-1( UT-2**

REF. DWG. NO. 01-001-C 001200 2-203A B.A VOL 3- X INTERN SHELL LONGITUDINAL 'WELD 81.12 9 15 Dcg RCB <<*UT-1( UT-2**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 8 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD ZONE NUMBER: 1-001 ASME PERIOD PERIOD PERIOD gc'c 'u rc.trsuwrsus .<<>> r% ~ a ~ i ~ ~~ ~

SEC. XI

SUMMARY

EXAMIHATIOH AREA CATGY HDE - - - - - - 0 U T A G E - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 '1 2 3 **CALIBRATIOHBLOCK*~

REF. DWG. NO. 01-001-C r

001300 2-203B 8-A VOL 3-INTERN SHELL LONGITUDINAL WELD B1.12 9 135 Deg RCB **UT.1, UT-2**

001400 2-203C 8-A VOL 3- X IHTERM SHELL LOHGITUDIHAL WELD 81.12 9 255 Deg RCB ~*UT-1( UT-2**

REF. D'WG. NO. 01-001-A 001500 8-203 B-A VOL 3 - - - - - - X INTERMEDIATE SHELL TO UPPER B1 ~ 11 SHELL RCB **UT-1( UT-2**

REF. DWG. NO. 01-001-C 001600 1-203B 8-A VOL 3- X UPPER SHELL LONGITUDINAL WELD B1.'l2 9 15 Deg RCB **UT-1**

001700 1-203C 8-A VOL X UPPER SHELL LONGITUDINAL WELD 81.12 9 135 Deg RCB **UT 1**

001800 1-203A B-A VOL 3- X UPPER SHELL LONGITUDIHAL WELD B1.12 9 255 Deg RCB **UT 1**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 9 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD

~ ~ ~ I y1 ZONE NUHBER:

\ %LIVIA(4 w ~~ 1.001 a,

- SUHHARY EXANIHAT ION AREA

~

ASHE SEC. XI PERIOD PERIOD


OUTAGE----

PER I CO CATGY NDE INSTRUCTIONS NUHBER IDEHT IF I CATION ITEN HO NETH ( 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK<<<<

REF. DMG. NO. 01-001-A 1

001900 7-203 8-A VOL 3 X - - - - - X Examine from flange face UPPER SHELL TO FLANGE GIRTH 81.30 during 1st period and from MELD shell side during 3rd period RCB <<*UT-1<<<<

REF. DMG. NO. 01-001-8 002100 10-205-A 8-D VOL 3 - - - - - - X OUTLET NOZZLE TO SHELL 8 0 Deg 83.90 RCB

<<<<UZ 10**

002200 4-205.C 8-D VOL 3 - . - - - X IHLET NOZZLE TO SHELL 9 60 Deg 83.90 RCB

  • <<UT 9**

002300 4-205-A 8-D VOL 3- X INLET HOZZLE TO SHELL 8 120 83.90 Deg RCB **MT 9*<<

002400 10-205-8 8-D VOL 3 . X OUTLET NOZZLE TO SHELL 0 180 83.90 Deg RCB **UT-10**

002500 4-205-8 8-D VOL 3- X INLET NOZZLE TO SHELL 9 240 83.90 Deg RCB <<<<UT 9**

002600 4-205-D 8-D VOL 3 - - - - - - X INLET NOZZLE TO SHELL 8 300 83.90 Deg RCB *<<UT 9<<*

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 10 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOHD THIRD ZONE NUMBER: 1-001 ASHE PERIOD PERIOD PER I CO M N <a,A SEC. XI SUNHARY EXAHINATION AREA CATGY NDE ------OUTAGE-.---- INSTRUCTIONS HUHBER IDENT IF I CATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

REF. DUG. NO. 01-001-A J

002700 OH-IR-A 8-D VOL 3- X INNER RADIUS OUTLET NOZZLE Q 0 83.100 Deg RCB *CUT 1**

002800 IN-IR-C 8 D VOL 3 X INNER RADIUS INLET NO22LE Q 60 83.100 Deg RCB 002900 IN-IR-A 8-D VOL 3- X INNER RADIUS INLET NOZZLE Q 83.100 120 Deg RCB **UT 1**

003000 ON-IR-8 8-D VOL 3- X INNER RADIUS OUTLET HOZZLE 83.100 Q180 Oeg RCB *fUT 1**

003100 IH- I R-8 B.D VOL 3- X IHHER RADIUS INLET HOZZLE Q 83.100 240 Deg RCB tAUT 1**

003200 IH-IR-D 8-D VOL 3- X INNER RADIUS INLET NOZZLE Q 83.100 300 Deg RCB AtUT 1%*

REF. DHG. NO. 01-001-8 003220 4-205-C IA 3 Ho examination required, weld Inlet Hotzie Q 60 Deg Integral is outside the IHB boundary Attachmen RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 11 REVISION: 0 INSERVICE INSPECTION LOHG TERN PLAH CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOHD THIRD ZONE HUNGER: 1 001 ASHE PERIOD PERIOD PERIOD Br JR SEC. XI

~

SUHMARY EXAHIHATION AREA CATGY HDE ------OUTAGE------ IHSTRUCT IOHS NUHBER IDEHTIF I CAT IOH ITEN NO NETH i 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK**

REF. DNG. NO. 01-001-8 003240 10-205.B IA 3 Ho examination required, Meld Outlet Nozzle 9 180 Deg is outside the IMB boundary Integral Attachm RCB 003260 4-205-D IA 3 Ho examination required, veld Inlet Nozzle Q 300 Deg is outside the IMB boundary Integral Attachme RCB REF. DUG. NO. 01.001.C 007800 FL-01 THRU 54 B.G-1 VOL 3 - - - X Examine 1/3 of the flange Threads in Flange Base B6.40 threads e

Material RCB *~UT-8**

REF. DllG. NO.01-001 F 007810 RPV Interior 8-H-1 VT-3 3 X - - X - - X Examine areas made accessible General Accessible Areas 813.10 by removal of cccponents once RCB each period REF. DNG. NO.01-001 C 007820 Reactor Vessel Hating Surface 8-N-1 VT-3 3 X X X Examine once each period Flange on Vessel 813.10 RCB 007830 Reactor Vessel Keyway 1 B-H-2 VT-3 3- X Keyway at 0 Deg B13.60 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 12 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD ZONE NUMBER: 1-001 ASME PERIOD PERIOD PERIOD SEC. Xl

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE------ INSTRUCTIONS NUMBER,=- IDENT I F I CAT ION ITEH NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

I REF. ONG. NO. 01 001-C 007840 Reactor Vessel KeyMay 2 8 N 2 VT-3 3- X Keyway at 90 Deg 813.60 RCB 007850 Reactor Vessel Ke~ay 3 B.N.2 VT-3 3- X KeyMay at 180 Deg 813.60 RCB 007860 Reactor Vessel Keyway 4 8-N-2 VT-3 3 - - - - . - X Keyway at 270 Deg 813.60 RCB REF. DUG. NO. 01-001-A 007870 FB-01 8-H-3 VT-1 3 - - - - - X FLOU BAFFLE 813.50 RCB REF. DIE. NO.01-001 F 007900 MSH-01 8-H-2 VT-1 3- X MATERIAL SURVEILLANCE HOLDER 9 813.50 85 Deg RCB 007910 MSC-01 10CFR50 3 Verify withdrawal schedule MATERIAL SURVEILLANCE CAPSULE APP. H with Haterials Programs Prior 0 83 Deg to issuing outage schedule.

RCB Standby not scheduled.

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 13 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COHPONENTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND 'HIRD 2ONE NUMBER: 1-001 ASME PERIOD PERIOD PERIOD A' SEC. XI

~

SUMMARY

EXAMINATION AREA CATGY NDE - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDEHTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 <<<<CALIBRATIOH BLOCK<<<<

REF. DUG. NO. 01-001-F 008000 HSH.02 8-H-2 VT-1 3- X HATERIAL SURVEILLANCE HOLDER 9 813.50 97 Deg RCB 008010 HSC.02 10CFR50 3- 83 Verify withdrawal schedule HATERIAL SURVEILLANCE CAPSULE APP. H with Materials Programs prior 9 97 Deg to issuing outage schedule RCB 008100 MSH.03 8-N-2 VT-1 3- X MATERIAL SURVEILLANCE HOLDER Q B13.50 104 Deg RCB 008110 MSC.03 10CFR50 3- 90 Verify withdrawal schedule HATERIAL SURVEILLAHCE CAPSULE APP. M with Materials Programs prior 9 104 Deg to issuing outage schedule.

RCB 008200 MSH-04 8-H-2 VT-1 3- X MATERIAL SURVEILLANCE HOLDER 9 813.50 263 Deg RCB 008210 MSC-04 10CFR50 3 X Verify withdrawal schedule MATERIAL SURVEILLAHCE CAPSULE APP. M with Materials Programs prior 9 263 Deg to issuing outage schedule.

RCB Scheduled to be withdrawn and tested at 21 EFPY (2004).

008300 MSH 05 B-N-2 VT-1 3- X HATERIAL SURVEILLANCE MOLDER 9 B13.50 277 Deg RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 14 REVISION: 0 INSERVICE INSPECTION LOHG TERH PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL F IRST SECOND THIRD ZONE NUMBER: 1-001 ASHE PER ICO PERIOD PERIOD SEC. XI

SUMMARY

EXAHINATION AREA CATGY NDE OUTAGE--- --- INSTRUCTIONS NUMBER IDENT IF ICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 *iCALIBRATIONBLOCK~*

REF. DUG. NO. 01-001-F 008310 MSC-05 10CFR50 3- X Verify withdrawal schedule MATERIAL SURVEILLANCE CAPSULE APP. H with Materials Programs prior 9 277 Deg to issuing outage schedule.

RCB Scheduled to be withdrawn and tested in year 32 008400 MSH 06 8-N-2 VT.1 3-MATERIAL SURVEILLANCE HOLDER 9 813.50 284 Deg RCB 008410 MSC-06 10CFRSO 3 Verify withdrawal schedule MATERIAL SURVEILLANCE CAPSULE APP. H with Materials Programs prior 8 284 Deg to issuing outage schedule.

RCB Scheduled to be withdrawn a tested at 18 EFPY (2000).

REF. DWG. NO. 01-001-E 008500 208-02-A B.H 2 VT-1 3 - - - - - - X CORE STABILIZING LUG 9 0 Oeg '813.50 RCB 008600 208.02-8 8-H-2 VT-1 3 . - - - - - X CORE STABILIZIHG LUG 9 60 Deg 813.50 RCB 008700 208-02-C 8-H-2 VT.1 3 - - - - - - X CORE STABILIZIHG LUG 9 120 Deg 813.50 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 15 REVISIOH: 0 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS CONPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD ZONE HUNBER: 1-001 ASHE PERIOD PERICO PERIOD SEC. XI

~

SUNNARY EXANIHATIOH AREA CATGY HDE -----OUTAGE- INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO HETN 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~*

REF. DUG. NO. 01-001-E 3-1 008800 208-02-D 8-H 2 VT-1 X CORE STABILIZIHG LUG 9 180 Deg 813.50 RCB 008900 208-02-E B.H.2 VT-1 3 - - - - - - X CORE STABILIZING LUG 9 240 Deg 813.50 RCB 009000 208.02-F B.H.2 VT-1 3 - - - - - - X CORE STABILIZIHG LUG 9 300 Deg 813.50 RCB 009100 204.08 A 8-H-2 VT-1 3 - - - - - - X CORE STOP LUG 9 10 Deg 813.50 RCB 009200 204-08.8 B-H.2 VT-1 3 - - - - - - X CORE STOP LUG 9 40 Deg 813.50 RCB 009300 204-08-C CORE STOP LUG 9 85 Deg B-N-2 813.50 VT-1 3... -i - - X RCB 009400 204-08-D B-N-2 Vr-1 3 - - - - - - X CORE STOP LUG 9 130 Deg 813.50 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 16 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSE FIRST SECOND THIRD ZONE NUMBER: 1-001 ASME PERIOD PERICO PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE INSTRUCTIONS NUMBER IDENTIFICATIOH ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK**

REF. DUG. NO. 01-001-E 1

I 009500 204-08-E 8-N-2 VT-1 3 - - - - - - X CORE STOP LUG 9 160 Deg 813.50 RCB 009600 204-08-F 8-N-2 VT-1 3- X CORE STOP LUG 9 205 Deg 813.50 RCB 009700 204-08.0 8 H 2 VT 1 3- X CORE STOP LUG 9 250 Deg 813.50

~ RCB 009800 204-08.H B.H.2 VT 1 3 - - - - - - X CORE STOP LUG Q 280 Deg B13.50 RCB 009900 204-08-J 8-H-2 VT-1 3- X CORE STOP LUG Q 325 Deg 813.50 RCB 010000 RPV Bottom Head 8-H-1 VT-3 3- X Bottom Head Accessible Areas 813.10 RCB REF. DLIG. NO. 01-001-G 010010 Core Barrel Al fgreent Key 8-N-3 VT-3 3 - - - - - - X at 0 Deg 813.70 RCB

DATE: 01/09/98 SI'. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 17 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS IHSPECTIOH INTERVAL PLAN'TATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD 20NE HUHBER: 1-001 ASHE PERIOD PERIOD PERIOD SEC. XI

'UHHARY EXAHINATIOH AREA CATGY HDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 ~~CALIBRATIOH BLOCK~*

REF. DUG. HO. 01-001-G 010020 Core Barrel Aliganent Key 8-N-3 VT-3 3- X at 90 Deg 813.70 RCB 010030 Core Barrel Alignment Key B-H.3 VT.3 3 - - - - - - X at 180 Deg 813.70 RCB 010040 Core Barrel Aiigreent Key B.N.3 VT-3 3 - - - - - - X at 240 Deg 813.70 RCB 010050 Core Barrel Guide Lug 8-N-3 VT-3 3 - . - - - - X at 36 Deg 813.70 RCB 010060 Core Barrel Guide Lug 8-H-3 VT-3 3- X at 126 Dcg 813.70 RCB 010070 Core Barrel Guide Lug 8-N-3 VT-3 3- X at 216 Deg 813.70 RCB 010080 Core Barrel Guide Lug 8-H-3 VT-3 3- X at 306 Deg 813.70 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 18 REVISION: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD ZONE HUHBER: 1.001 ASHE PERIOD PERIOD PERIOD

~ ~ %'%e,N r ie SEC. XI SUHHARY EXAHINATION AREA CATGY HDE OUTAGE IHSTRUCTIOHS HUHBER IDENTIFICATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK

  • REF. DHG. NO. 01 001-G 010090 Core Shroud Boltfng B.H-3 VT-3 3 - - - - - - X 8 bolts Bolting 813.70 RCB 010100 Core Shroud 8-H-3 VT-3 3 - - - X 813.70 RCB 010110 Upper Gufde Hold Down Ring B-H-3 VT-3 3 - - - - - - X 813.70 RCB 010120 Upper Gufde Hating Surface 8-N-3 VT-3 3 - - - - - - X 813.70 RCB 010130 Core Barrel Girth Ueids B-N-3 VT-3 3- X 813.70 RCB REF. DllG. HO. 01-001-A 010140 OH IE-A B-N-1 VT-3 3 X X X Examine accessible areas once Outlet Hozzle Projection 8 0 813.10 each period Degrees RCB 010150 OH- IE-8 B-H-1 VT-3 3 X X X Examine accessible areas once Outlet Nozzle Projection 9 180 813.10 each period Degrees RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 19 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD ZONE NUMBER: 1-001 ASHE PERIOD PERIOD PERIOD SEC. Xl

~

SUHHARY EXAHIHATION AREA CATGY NDE -----OUTAGE------ INSTRUCT IOHS HUHBER IDEHTIFICATIOH ITEH NO HETH 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK**

REF. DUG. NO. 01-001-0 010160 Core Shroud Nelds 8-N-3 VT-3 3- X 813.70 RCB 010170 Lower Core Support Plate 8-H-3 VT-3 3- Suppport plate is inaccessible 813.70 RCB 010180 Snubber Block 9 0 Deg 8-N-3 VT-3 3 - - - - - - X 813.70 RCB

'0190 Snubber Block Q 60 Deg 8-N-3 VT-3 3 - - - - - - X 813.70 RCB 010200 Snubber Block 8 120 Deg 8N3 VT3 3- - - - -, X 813.70 RCB 010210 Snubber Block 8 180 Deg B-N-3 VT-3 3 - - - - - - X 813.70 RCB 010220 Snubber Block 9 240 Deg B.H-3 VT-3 3- X 813.70 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 20 REVISION: 0 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD 2ONE NUMBER: 1-001 ASME PERICO PERIOD PERIOD SEC. XI

- - - - - - 0 - - - - --

SUMMARY

EXAMIHATIOH AREA NUMBER IDENTIFICATION CATGY NDE ITEM NO METH I 1 2 3 1 2 3, U T A 0 E 1 2 3 INSTRUCTIONS

    • CALIBRATIOHBLOCK
  • REF. DUG. HO. 01.001-G 010230 Snubber Block 9 300 Deg 8-H-3 VT-3 3- X 813.70 RCB 010240 Lover Core Support Structure 8-H-3 VT-3 3- Support structure is 813.70 inaccessible RCB 010250 Top Surface of Core Support 8-N-3 VT-3 3 - - - - - - X Plate 813.70 RCB 010260 Peripheral Control Element Shroud RCB 8-H-3 813.70 VT-3 3 - - - - - - X

,0 010270 Fuel Aiigreent Plate 8-N-3 VT-3 3- X Keyxay 9 36 Deg 813.70 RCB 010280 Fuel Alignment Plate 8-N-3 VT-3 3- X Keyway 8 126 Deg 813.70 RCB 010290 Fuel Aligwent Plate, 8-N-3 VT-3 3- X Keyway 9 216 Deg 813.70 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 21 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTIOH IHTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD ZONE HUHBER: 1.001 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIOHS NUHBER IDENTIFICATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 >>>>CALIBRATION BLOCK>>>>

REF. DIJG. NO. 01 001-G 010300 Fuel Aligrwent Plate B-N-3 VT-3 3 X - - X - . X Relook at 2 rub marks above KeyMay 8 306 Deg 813.70 "8" outlet opening on the RCB inside surface of core support barrel per CR 96-1235 010310 Top of Fuel Aligreent Plate B-H-3 VT-3 3 - - - - - - X 813.70 RCB 010460 CSB-01 B-H-3 VT-3 3- X Component shall be removed Core Support Barrel 813.70 from the RPV. Examine all RCB repaired CSB areas, to include plugs and patches 10470 UGS.01 8-N-3 VT-3 3- X COHPOHEHT SHALL BE REHOVED Upper Guide Structure 813.70 FROH THE RPV FOR EXAHIHATION RCB REF. DNG. NO. 01-001-C 010480 AK 01 8-N-1 VT-3 3 X X X Examine accessible areas once UGS Support Plate and Keyway 8 813.10 each period 0 Deg RCB 010490 AK-02 B-H-1 VT-3 3 X X X Examine accessible areas once UGS Support Plate and Keyway 9 813.10 each period 90 Deg RCB 010500 AK-03 B-N-1 VT-3 3 X X X Examine accessible areas once UGS Support Plate and Keyway 9 813 ~ 10 each period 180 Deg RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 22 REVISION: 0 INSERVICE INSPECTIOH LONG TERN PLAH CLASS 1 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR PRESSURE VESSEL FIRST SECOND THIRD ZONE NUHBER: 1-001 ASHE PERICO PERIOD PERIOD ILC'g J,p,'ISAAC ere' \Vs * ~ ~

SEC. XI

'SUHHARY EXAHINATION AREA CATGY HDE - - - - - -OUTAGE INSTRUCTIONS HUNGER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK**

sow REF. DHG. NO. 01-001-C 010600 AK-04 B.N-1 VT-3 3 X X X Examine accessible areas once UGS Support Plate and Keyway 0 813.10 each period 270 Deg RCB

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 23 REVISIOH: 0 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR Reactor Pressure Vessel Closure Head FIRST SECOND THIRD ZONE NUNBER: 1-002 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHATION AREA CATGY HDE - - - - - - OUTAGE - - - - -- IHSTRUCTIOHS NUNBER IDEHT IF I CATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>>

REF. DIJQ. NO. 01-001-C 010700 M-01 thru 54 B-G.1 VT-1 3 - - - X Set <<C<< washers installed RPV Mashers 1 thru 54 86.50 during 1996 outage RCB 010800 N-01 thru 54 8.0-1 SUR 3 - - X Set <<C<< nuts installed during RPV Huts 1 thru 54 86.10 VOL '1996 outage RCB

    • 10.562-7-8-CS-SL*>>

010900 S-01 thru 54 8-G 1 SUR 3 - - - X Set <<C" studs installed during RPV Studs 1 thru 54 86.30 VOL 1996 outage RCB

    • 7-1.125-8-CS-52-SLC**

REF. DMG. NO. 01.002 8 011000 209.03F B-A VOL 3 X Peel Segment Meld 0 0 Degrees 81.22 RCB

    • UT-3A>>>>

011100 209.03A 8-A VOL 3 X Peel Segment 'Weld 8 60 Degrees 81.22 RCB

    • UT-3A>>*

011200 209-038 8-A VOL 3 X Pccl Segment Meld 8 120 81.22 Dcgrces RCB *>>UT-3A**

011300 209.03C 8-A VOL 3 X Peel Segment Meld 9 180 81.22 Degrees RCB **UT-3A>>>>

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 24 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Reactor Pressure Vessel Closure Head FIRST SECOND THIRD ZONE NUHBER: 1-002 ASHE PERIOD PERIOD PERIOD II tj ht & 4'RIA Su!

SEC>> XI

~ SUHHARY EXAHINATION AREA CATGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

REF. DMG. NO. 01-002-8 011400 209-03D 8-A VOL 3 X Peel Segment Meld 8 240 81.22 Degrees RCB 1lUT 3'*

011500 209-03E 8-A VOL 3 X Peel Segment Meld 9 300 81.22 Degrees RCB *~UT-3A~*

REF. DMG. NO. 01-002-A 011600 011700 209-04 Dome RCB 209-02 Head RCB Meld to Flange Meld 8 A 81.21 8-A 81.40 'OL SUR 3

3 X Meld is beneath shroud inaccessible, see request no. 5

  • ~UT-2( UT-3A**

UT-2 for 70 degree

    • UT-3A, UT-2~~

relief only and t

is 012100 CHHS B-N-1 VT-3 3 X . - X - - X Examine once each period, Closure Head Hating Surface 813.10 0-Ring must be removed prior RCB to examination

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 25 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAH STATUS YEAR STEAN GENERATOR 1A PRIHARY FIRST SECOHD 3'RESERVICE THIRD ZONE HUHBER: 1-003 ASHE PERIOD PERIOD PERIOD

~ JV'P;4+ 'Al Nhtt> t%P It Pt I V!few 4 SEC. XI.

SUMHARY EXAHINATIOH AREA CATGY NDE ------OUTAGE--.-.- INSTRUCTIONS HUHBER IDENTIFICATION ITEN HO NETH 1 2 3 1 2 3 1 2 **CALIBRATION BLOCK**

REF. DUG. HO.01-003 012400 1A-3-111 3 Iield was removed free service Stay Base to Primary Head during the steam generator RCB replacement outage in 1997 012500 Steam Generator Tubes 3 Tubes were removed from U-Tube Design service during the steam RCB generator replacement outage in 1997 012600 1A 1 104A 3 Meld was removed from service Heridional II 66 Degrees during the steam generator RCB replacement outage in 1997 12700 1A.1.1048 3 Weld was removed free service Meridional 9 138 Degrees during the steam generator RCB replacement outage in 1997 012800 1A.1-104C 3 lleld was renoved from service Heridional 9 210 Degrees during the steam generator RCB replacement outage fn 1997 012900 1A.1.104D 3. Iield was removed from service Heridional 9 282 Degrees during the steam generator RCB replacement outage in 1997 013000 1A-1-104E 3 X lleid was renoved from service Heridional 9 354 Degrees during the steam generator RCB replacement outage in 1997

    • UT-2~*

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 26 REVI SION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR STEAM GENERATOR 1A PRIHARY FIRST SECOND THIRD ZONE NUHBER: 1-003 ASHE PERIOD PERIOD PERIOD l SEC. XI

- SUHHARY EXAHIHAT ION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- IHSTRUCTIOHS NUHBER IDENTIFICATION ITEH NO NETH 1 2 3 1 2 3 1 2 3 <<*CALIBRATIOH'LOCK<<*

REF. DMG. NO.01-003 013100 1A-4-102 3 X Meld was removed from service PRIHARY EXT. RING-TO-HEAD during the steam generator RCB replacement outage in 1997

    • UT 2**

013200 1A-4-104 3 X Meld was removed from service PRIHARY EXT. RIHG-TO-TUBESHEET during the steam generator RCB replacement outage in 1997

    • UT 2**

013300 1A-5-111C 3 Meld was removed from service INLET NOZZLE-TO HEAD during the steam generator RCB replacement outage in 1997

  • <<UT 2*<<

013400 1A-5-111A 3 Meld uas removed from ser OUTLET NOZZLE-TO-HEAD Q 45 Deg during the steam generator RCB replacement outage in 1997

~ <<UT 2**

013500 1A-5-1118 3 Meld was removed from service OUTLET NOZZLE TO HEAD Q 315 during the steam generator Deg replacement outage in 1997 RCB <<*UT 2**

013600 1A-4-102A 3 X Meld was removed from service Extension Ring Heridional Meld during the steam generator Q 0 Deg replacement outage in 1997 RCB **UT 2**

013700 1A-4-102B 3 X Meld was removed from service Extension Ring Heridional Meld during the steam generator Q 90 Deg replacement outage in 1997 RCB <<UT 2**

DATE: . 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 27 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECT IOH INTERVAL PLAH STATUS PRESERVICE YEAR STEAN GENERATOR 1A PRIHARY FIRST SECOND THIRD ZONE NUHBER: 1.003 ASHE PERIOD PERIOD PERIOD SEC. XI

'UHHARY EXAHIHATION AREA CATGY HDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUHBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK"*

REF. D'MG. NO.01-003 013800 1A.4.102C 3- X Meld was removed from service Extension Ring Heridional Meld during the steam generator 9 180 Deg replacement outage in 1997 RCB 013900 1A-4-102D 3 X Meld was removed from service Extension Ring Meridional Meld during the steam generator 9 270 Deg replacenent outage in 1997 RCB **MT P*t 014000 IH-IR A Inner radius was removed fran INLET NOZZLE INNER RADIUS service during the steam RCB generator replacement outage in 1997

  • ~UT.2,UT 3A~~

014200 ON- IR-8 3 Inner radius was removed from OUTLET NOZZLE IHHER RADIUS 9 service during the steam 315 Oeg generator replacenent outage RCB in 1997

    • UT-2, UT-4A~*

014400 ON- IR A 3 Inner radius was removed from OUTLET NOZZLE IHHER RADIUS 9 service during the steam 45 Deg generator replacement outage RCB in 1997

    • UT-2, UT-4A*~

014500 1A-4-111 3 Meld Mas removed fran service STAY BASE-TO-STAY CYLINDER during the steam generator RCB replacement outage in 1997

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 28 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR STEAH GENERATOR 1A PRIHARY FIRST SECOND THIRD 2ONE NUMBER: 1 003 ASHE PERIOD PERIOD PERIOD

~ IA A4eht SEC. XI SUHHARY EXAMINATION AREA CATGY HDE OUTAGE-- INSTRUCTIONS HUHBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK*~

REF. DWG. NO.01-003 014600 1A.2-102 3 Held was removed from service STAY CYLINDER-TO-STAY CYL. during the steam generator EX'CB replacement out'age in 1997 014700 1A-16-104 3 Iield was renoved from service STAY CYL. EXT. to TUBESHEET during the steam generator RCB replacement outage in 1997 014800 1A-PHS A 3 Studs were removed from Cold Leg Primary Manway Studs service during the steam 9 0 Oeg generator replacement outage RCB in 1997 014900 1A-PMH-A 3 Studs were removed from Cold Leg Primary Hanway Huts 8 service during the steam 0 Deg generator replacement outage RCB in 1997 015010 1A-PHS.B 3- Studs were removed from Not Leg Primary Hanway Studs Q service during the steam 120 Deg generator replacement outage RCB in 1997 015020 '1A.PHH-B 3 X Nuts were removed from service Hot Leg Primary Hanway Nuts 9 during the steam generator 120 Deg replacement outage in 1997 RCB 015030 1A-PED 3 Huts were removed from service Stay Base during the steam generator RCB replacement outage in 1997

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 29 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAM STATUS PRESERVICE YEAR Steam Generator 1A Primer Side FIRST SECOND THIRD ZOHE NUMBER: 1.003. ASHE PERIOD PERIOD PERIOD SEC. Xl

'UMMARY EXAHIHAT ION AREA CATGY MDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEK HO METH I 1 2 3 1 2 3 1 2 3 **CAI.IBRATIONBLOCX**

REF. DUG. MO. 01-003-A 015100 1-SGA.M22 8-8 VOL 3 - - - - X - - 97 Mead to Tubesheet 82.40 RCB

    • 20T-133**

015110 1 SGA-II4 8-8 VOL 3 - - - . - . X - - 97 Head to Stay Cylinder 82.31 RCB

    • 20T-133**

015120 1-SGA-M3 B-B VOL 3 - . - - - - X - - 97 Stay Cylinder to Tubesheet 82.40 RCB

    • 20T-120**

015130 1.SGA-N5 B.D VOL 3 - - - - - X - - 97 Inlet Nozzle to Shell 83.130 1 RCB

~*20T-167**

015140 1.SGA-MS IRS 8-D VOL 3 . . - . - - X - - 97 Inlet Nozzle Inside Radius 83.140 Section RCB <<*20T-133**

015150 1.SGA-II6 8-D VOL 3 - - - - - - X - - 97 Outlet Nozzle 1A1 to Shell 83.130 RCB

.*2OT-167

  • 015160 1-SGA-M6 IRS 8-D VOL 3 - - - - - - X - - 97 Outlet Nozzle 1A1 Inside 83.140 Radius Section RCB **20T-133*>>

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 30 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN Sj'ATUS PRESERVICE YEAR Steam Generator 1A Primer Side FIRST SECOND THIRD ZONE NUMBER: 1-003 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE ------OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK~*

REF. DUG. NO. 7612E021 015180 1-SGA-M7 8-D VOL 3 - - - - - X - - 97 Outlet Nozzle 1A2 to Shell 83.130 RCB

    • 20T-16/*

015190 1-SGA-M7 IRS 8-D VOL 3 - - - - - - X - - 97 Outlet Nozzle 1A2 Inside 83.140 Radius Section RCB **20T-133**

015200 1-SGA-HB 8-K SUR 3 - - - - - - X - - 97 Integral Attachment 810.10 RCB

~~20T-102**

015210 1-SGA.Support F.A VT.3 3 - - - - - - X - - 97 St. Generator Support F 1.40 RCB 015220 1-SGA-Inlet Bolting 8-0-2 VT 1 3 - - - - - X - - 97 Hot Leg Primary Manway Studs 87.30 and Huts RCB 015230 1-SGA-Outlet Bolting 8-G-2 VT-1 3 - - X - - 97 Cold Leg Primary Manway 87.30 Bolting RCB 015260 Steam Generator Tubes 8-A VOL 3 - - - . - - - - - 97 Examine in accordance with 816.20 plant technical specs RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHI'NIT 1 PAGE: 31 REVISION: 0 INSERVICE INSPECTION LONG TERK PLAN CLASS 1 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1B Primer Side FIRST SECOND THIRD ZOHE NUMBER: 1-004 ASHE PERIOD PERIOD PERIOD SEC. XI

~

SUHHARY EXAHIHATION AREA CATGY NDE ------OUTAGE INSTRUCTIONS.

HUNGER IDEHT IF I CATION ITEN HO HETK 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~>>

REF. DMG. HO.01-004 015480 18.3.111 3 Meld Has removed from service Stay Base to Primary Head during the steam generator RCB replacement outage in 1997 O'I5490 Steam Generator Tubes 3 Tubes vere removed from U-Tube Design service during the steam RCB generator replacement outage in 1997 015500 18-1-104A 3 Meld was removed frcm service HERIDIOHAL 8 66 Deg during the steam generator RCB replacement outage in 1997 015600 18.1.1048 3 Meld was removed from service HERIDIOHAL 0 138 Deg during the steam generator RCB replacement outage in 1997 015700 18-1-104C 3 Meld was removed from service HERIDIOHAL 0 210 Deg during the steam generator RCB replacement outage in 1997 015800 18.1-1040 3 I Meld Has removed from service HERIDIOHAL 8 282 Deg during the steam generator RCB replacement outage in 1997 015900 18-1-104E 3 Meld was removed from service HERIDIOHAL Q 354 Deg during the steam generator RCB replacement outage in 1997

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 32 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 18 Primer Side FIRST SECOND THIRD ZONE NUMBER: 1-004 ASHE PERICO PERIOD PERIOD SEC. XI

~

SUNNARY EXAHIHATIOH AREA CATGY HDE ------OUTAGE- INSTRUCTIONS HUHBER IDENTIFICATION ITEN HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK

  • REF. DMG. NO.01-004 016000 18-4-102 3 Meld was removed from service PRIH. EX'ING-TO-HEAD during the steam generator RCB replacement outage in 1997 016100 18-4.104 3 Meld was removed from service Primary Extension Ring to during the steam generator Tubesheet replacement outage in 1997 RCB 016200 18.5-111C 3 Meld was removed from service INLET NOZZLE to HEAD during the steam generator RCB replacement outage in 1997
  • OUT 2*0 016300 18-5-111A 3 Meld was removed from serv Outlet Nozzle to Head 8 225 during the steam generator Deg replacement outage in 1997 RCB **UT 2+*

016400 18-5-1118 3 Meld uas removed from service Outlet Nozzle to Head 8 135 during the steam generator Deg replacement outage in 1997 RCB ABUT 21*

016500 18-4-102A 3 Meld was removed from service Extension Ring Heridional Meld during the steam generator 8 0 Deg replacement outage in 1997 RCB 016600 18 4-1028 3 Meld was removed from service Extension Ring Neridional Meld during the steam generator 9 90 Deg replacement outage in 1997 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 33 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1B Primer Side FIRST SECOND THIRD ZONE NUHBER: 1 004 ASHE PERIOD PERICO ~ PERIOD

~ ~ thea t llbg\kea W4t~ R W 4 ~

SEC. Xl

~

SUHHARY EXAHI NATION AREA CATGY HDE ---OUTAGE- -- I NS'TRUCT I ON S NUHBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK ~

REF. DMG. NO.01-004 016700 1B-4-102C Meld was removed from service Extension Ring Heridional Meld during the steam generator 9 180 Deg replacement outage in 1997 RCB 016800 18-4-1020 3 Meld Mas removed from service Extension Ring Heridfonal Meld during the steam generator 9 270 Deg replacement outage in 1997 RCB 016900 IH- IR-A 3 Inner radius section was INLET NOZZLE IHHER RADIUS removed from service during RCB the steam generator replacement outage in 1997

    • 9-CSCL-38, UT-3A**

017100 ON. IR 8 3 Inner radius section was Outlet Nettle Inside Radius 9 rcmovcd from service during 135 Deg thc steam generator RCB replacement outage in 1997

~~9-CSCL-38,UT-4A**

017200 OH-IR-A 3 Inner radius section was OUTLET NOZZLE (225 D) INNER removed from service during RAD IUS the steam generator RCB replacement outage in 1997

    • 9-CSCL-38,UT-4A~*

017500 18.4-111 3 Meld Mas removed from service STAYBASE-TO-STAY CYLINDER durfng the steam generator RCB replacement outage in 1997

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 34 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 18 Primar Side ASHEN'EC. FIRST SECOND THIRD ZONE NUMBER: 1.004 PERIOD PERIOD PERIOD g "\' Ã8 Wvh&'f&ltP; ~ \'4, 'I I XI

~

SUMMARY

EXAMIHATIOH AREA CATGY, NDE OUTAGE------ IHSI'RUCTIOHS NUMBER IDENT I F I CATION ITEM NO METH I 1 2 3 1 2 3 '1 2 3 **CALIBRATIONBLOCK~*

REF. DHG. NO.01-004 017600 18-2-102 3 Meld was removed from service Stay Cylinder to Stay Cylinder during the steam generator Extension replacement outage in 1997 RCB 017700 18-16-104 3 lleld was removed from service STAY GYLE EXT.-TO TUBESHEET during the steam generator RCB replacement outage in 1997 017800 18-PMS A 3 X Studs vere removed from Hot Leg Primary Manway Studs 9 service during the steam 0 Deg generator replacement outage RCB in 1997 017900 1B.PMN-A 3 X Nuts vere removed from ser Hot Leg Primary Man~ay Huts 8 during the steam generator 0 Deg replacement outage in 1997 RCB 018000 18-PMS-8 3 X Studs vere removed from Cold Leg Primary Man~ay Studs service during the steam 9 120 Deg generator replacement outage RCB in 1997 018100 18-PMN-8 3 X Cold leg nuts vere removed Cold Leg Primary Manway Huts 9 from service during the steam 120 Deg generator replacement outage RCB in 1997 018110 18-PED 3 Support Has removed from STAY BASE service during the steam RCB generator replacement outage in 1997

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 35 REVISIOH: 0 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS CCMPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 18 Primar Side FIRST SECOND THIRD

,ZONE NUMBER: 1-004 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE IHSTRUCTIOHS NUMBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 1 2 3 >><<CALIBRATION BLOCX>>>>

REF. DMG. NO. 7612E021 018120 1.SGB.M22 B-B VOL 3 - - - - - - - - . 97 Head to Tubesheet 82.40 RCB

    • 20T 133**

018130 1-SGB-M4 B.B VOL 3- 97 Head to Stay Cylinder 82.31 RCB

  • >>20T 133**

018140 1.SGB-M3 8-8 VOL 3 - - - - - - - - - 97 Stay Cylinder to Tubesheet 82.40 RCB

    • 20T-120**

18150 1-SGB.M5 B.D VOL 3 X . - - . - - - - 97 Inlet Nozzle to Shell 83.130 RCB

<<*20T-167 >>

018160 1.SGB-M5 IRS 8-D VOL 3 X - - - - - - - - 97 Inlet Nozzle Inside Radius 83.140 Section RCB <<*20T.133*>>

018170 1-SGB-M7 8-D VOL 3 X - - - - - - - - 97 Outlet Hozzle 181 to Shell 83.130 RCB

<<>>201'-167

  • 018180 1.SGB.M7 IRS 8-D VOL 3 X - . - - . - - - 97 Outlet Nozzle 181 Inside 83.140 Radius Section RCB **201-133**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 36 REVISIOH: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTIOH INTERVAL PLAH STATUS PRESERVICE YEAR Steam Generator 18 Primer Side FIRST SECOND THIRD ZOHE NUHBER: 1-004 ASHE PERIOD PERIOD PERIOD SEC XI

'UHNARY EXAHI NATION AREA CATGY

~

NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER ID EH I I F I CATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

REF. DNG. NO. 7612E021 018190 1-SGB.W6 B.D VOL 3 X - - - - - - - - 97 Outlet Nozzle 182 to Shell 83.130 RCB

    • 20T-167>>>>

018200 1-SGB-1I6 IRS 8-D VOL 3 X - - - - - - - - 97 Outlet Nozzle 1B2 Inside 83.140 Radius Section RCB **20T-133*>>

018210 1-SGB.MB 8-K . SUR 3 - - - - - - - - - 97 Integral Attachment 810.10 RCB

018220 1-SGB-Support F.A VT-3 3- 97 St. Generator Support F1.40 RCB 018230 1-SGB-Inlet Bolting B-G-2 VT-1 3 - - - - - X - - 97 Hot Leg Primary Hanway Bolting 87.30 RCB 018240 1-SGB-Out let Bolting B-G.2 VT 1 3 - - - - X - - 97 Cold Leg Primary Hanway 87.30 Bolting RCB 018270 Steam Generator Tubes B.Q VOL 3- 97 Examine in accordance with 816.20 plant technical spec, tubes RCB are scheduled to be installed during the steam generator replacement

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 37 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER FIRST SECOND THIRD ZONE NUHBER: 1-005 ASHE PERICO PERIOD PERICO

~ i %~ SViJ\ i ~ ~

SEC. XI

. SUNHARY EXAHIHATION AREA CATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIOHS NUHBER IDENT I F I CAT ION ITEH HO NETH 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

REF. DMG. NO. 01-005-B 018300 PRZ.4.405 8-D VOL 3 . - - X SPRAY NOZZLE TO UPPER HEAD 83.110 MELD RCB **UT-4A**

018400 PRZ-SP-IRS B-D VOL 3 - - - X SPRAY NOZZLE INHER RADIUS 83.120 RCB

    • UT-6, UT-17
  • 018500 PRZ-3-415A 8-D VOL 3 - - - X SAFETY VALVE HOZ. TO HEAD 83.110 MELD(180)

RCB ~~UT-6, UT-17 ~

REF. DMG NO. 01 005 A 018600 PRZ-SV.A.IRS 8-0 VOL 3 - - - X SAFETY VALVE HOZZLE INHER 83.120 RADIUS RCB oaUT-6i UT-17 a 018700 PRZ-3-A B-F SUR 3 X SAFETY VALVE NOZZLE TO FLANGE 85.40 VOL MELD RCB **UT-17**

018750 V-1200 3- 93 Safety Valve RCB 018800 V-1200 Bolting 8-G-2 VT-1 3 - - - X - - - - - 94 Flange Bolting to Safety Valve 87.50 RCB

DATE: 01/09/98 ST ~ LUCIE HUCLEAR PLANT UNIT 1 PAGE: 38 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER FIRST SECOND THIRD ZONE NUMBER: 1-005 ASME PERIOD PERIOD PERIOD

  • ~ ~ 'I'p "4g 'll V Itic +%~ mf + ~

SEC. XI

SUMMARY

EXAMIHATION AREA CATGY NDE -OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK"<<

REF. DUG. NO.01-005 8 018900 PRZ-405-14 8-D VOL 3- X RELIEF VLV. NOZ.-TO-UPPER HEAD 83.110 HELD(225)

RCB *<<UT 4A**

REF. DWG. NO. 01-005-A 019000 PRZ-RV-IRS 8-D VOL 3 - - - X RELIEF VALVE NOZZLE IHNER 83.120 RADIUS RCB **UT-4A**

REF. DUG. NO. 01-005-8 019100 PRZ-3-4158 8 0 VOL 3 o X SAFETY VLV. NOZ.-TO-UPPER HEAD 83.110

'MELO(270)

RCB *<<UT-4A**

REF. DMG. NO. 01 005-A 019200 PRZ-SV.B-IRS 8-D VOL 3 . - - X SAFETY VALVE NOZZLE INNER 83.120 RADIUS RCB <<<<UT-6, UT.17**

019300 PRZ-3-8 8-F SUR 3 - . . X SAFETY VALVE NOZZLE TO FLANGE 85 '0 VOL HELD RCB <<*UT-17**

019350 V-1201 3- - - - - - - - - 93 Valvebody4" or less insize, Safety Valve no examination required RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANI'NIT 1 PAGE: 39 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS IHSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER FIRST SECOND THIRD ZONE NUHBER: 1.005 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATIOH AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUNBER IDENTIFICATION ITEN HO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK ~

REF. DUG. HO. 01-005-A

, 019400 V.1201 Bolting B-G.2 VT-1 3- X 93 8 bolts in flange Flange Bolting to Safety Valve 87.50 RCB REF. 01JG. NO. 01-005-8 019500 PRZ-3-415C B-D VOL 3- X SAFETY VLV. NOZ. TO UPPER HEAD 83.110 HELD(305)

RCB **UT-4A**

REF. DHG. NO. 01-005-A 019600 PRZ-SV C-IRS B.D VOL 3 - - - X SAFETY VALVE HOZZLE INNER 83.120 RADIUS RCB *iUT-6, UT 17 ~

019700 PRZ-3-C 8-F SUR 3- X SAFETY VALVE NOZZLE TO FLANGE 85.40 VOL HELD RCB +*UT 17++

019800 V-1202 3- 93 Crosby Valve, ANSI 831.7, 1969 SAFETY VALVE S/H Edftion HB¹ 1878 N54495-00-0002 RCB 019900 V-1202 Bolting 8-G-2 VT-1 3 - - . X - - . - - 93 8 bolts on flange Flange Bolting to Safety Valve 87.50 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 40 REVISION: 0 INSERVICE IHSPECTION I.OHG TERH PLAN CLASS 1 ALL STATUS COHPOHENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER FIRST SECOND THIRD ZONE NUHBER: 1-005 ASHE PERIOD PERIOD PERIOD SEC. XI

'SUHHARY EXAHINATION AREA CATGY NDE -OUTAGE INSTRUCTIONS NUHBER IDENT IF I CATION ITEH HO NETH ) 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK~*

REF. DMG. NO. 01-005-8 020000 PRZ-S Bolting 8-G-2 VT-1 3- X - - - - - 93 20 studs and nuts Hanway Studs and Nuts 87.20 RCB REF. DMG. NO. 01-005-A 020100 PRZ-8-411 8-8 VOL 3 X TOP HEAD TO UPPER SHELL CIRC. 82.11 MELO RCB **UT-4A**

020200 PRZ-L1 8-8 VOL 3 X Examine 1 ft. of weld UPPER SHELL LONGITUDINAL MELD 82.12 8 0 DEG RCB **UT-4A~*

020300 PRZ-L2 8 8 VOL 3- Examine 1 ft. of weld UPPER SHELL LONGITUDINAL MELD 82.12 9 180 DEG.

RCB **UT 4A*k 020400 PRZ-L3 B-B VOL 3 . - - X Examine 1 ft. of weld LOMER SHELL LONGITUDIHAL MELD 82.12 8 90 DEG.

RCB **UT-4A~>>

020500 PRZ-L4 8-8 VOL 3-LOMER SHELL LONGITUDINAL MELD 82.12 8 270 DEG.

RCB **UT-4A**

020600 PRZ-C1 3 Ho examination required per INTERHEDIATE SHELL TO VESSEL Table IMB-2500-1 MELD RCB **UT-4A**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 ,

PAGE 41 REVI SION: 0 IHSERVICE INSPECTION LONG TERN PLAH CLASS 1 ALL STATUS COHPONENTS IHSPECTIOH INTERVAL PLAH STATUS PRESERVICE YEAR PRESSURIZER FIRST SECOND THIRD ZONE NUHBER: 1 005 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHAT ION AREA CATGY NDE ------OUTAGE.----- IHSTRUCTIONS HUNGER IDEHT IF I CAT ION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK

  • REF. DMG. HO. 01-005-A 020700 PRZ C2 B-8 VOL 3 - - X Examine 1 ft. of Meld LOWER SHELL TO LOWER HEAD MELD 82.11 RCB
    • UT 4A**

020BOO PRZ-410-02 B-K SUR 3 - - - X The extent of the examination SUPPORT SKIRT TO LOWER HEAD B10.10 includes essentially 100X of

'WELD the length of the attach. weld RCB at each attachment subject to exam 020900 PRZ-SKT FA VT3 3 X SUPPORT SKIRT F1.40V RCB REF. DWG. NO. 01-005-B 021000 PRZ-4-404 B-D VOL 3 X The examination volunes shall SURGE NOZZLE TO LOWER HEAD B3.110 apply to the applicable Figure MELD show in Figs. IWB-2500-7(a)

RCB through (d)

>>*UT-4A>>>>

REF. DWG. NO. 01-005-A 021100 PRZ-SRG-IRS B-D VOL 3 X The examination voiuaes shall SURGE NOZZLE INNER RADIUS 83.120 apply to the applicable Figure RCB shown in Figs. IMB-2500-7(a) through (d)

>>>>UT-6( UT-3A*>>

WATER SPACE NOZZLES REF. DMG. NO. 01-005-A 021200 404.07, TE-1101 LER VT-1 3 Per JPH-ESI-93-135, Perform TEHPERATURE NOZZLE 93-04 visual examination of as much RCB of base metal as possible for signs of leakage each outage, insulation must be removed

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 42 REVISION: 0 IHSERVICE INSPECTIOH LOHG TERM PLAH PRESSURIZER ZONE NUMBER:

'hi>> ~

1-005 INSPECTION INTERVAL ASHE CLASS I ALL STATUS COMPONENTS FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD PRESERVICE YEAR 0

~

SEC. XI

SUMMARY

EXAMIHAT ION AREA CATGY NDE ------OUTAGE------ INSTRUCTIOHS NUMBER IDENT IF I CATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>>

'WATER SPACE NOZZLES REF. OIJG. NO. 01 005-C 021300 404-12A, RC-130 to V-1209 LER VT-1 3 Per JPN-ESI-93-135, perform a LEVEL NOZZLE Q 0 DEGREES 93-04 visual examination of as aach BOTTOM HEAD of the base material as RCB possible for signs of leakage during each outage, insutation must be removed 021400 404-12B, RC 105 to V.1208 LER VT-1 3- Per JPH-ESI.93-135, perform a LEVEL NOZZLE 9 180 DEGREES 93-04 visual examination of as amch BOTTOM HEAD of the base material as RCB possibte for signs of Leakage during each outage, insulation must be removed REF. DUG. NO. 01-005-C 021500 A1 TKRU HH4 LER VT-1 3 Examine the externaL surfa 120 HEATER PEHETRATIONS 93.04 of the 120 heater RCB penetrations, examination to be performed each outage, insulation does not have to be removed STEAM SPACE NOZZLES REF. DllG. NO. 01-005-B 021600 404-10A, RC-105 to V-1436 LER VT-1 3- Pcr JPH-ESI-93-135, perform a LEVEL NOZZLE II 0 DEGREES 93.04 visual examination of as nach RCB of the base meterfaL as possible for signs of teakage during each outage, insulation must bc removed 021700 404-10B, RC-130 to V-1437 LER VT-1 3- Per JPH-ESI-93-135, perform a LEVEL HOZZLE 9 180 DEGREES 93-04 visual examination of as much RCB of the base material as possible for signs of leakage during each outage, insulation must be removed

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 43 REVISION: 0 INSERVICE IHSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER FIRST SECOHD THIRD ZOHE NUMBER: 1-005 ASHE PERIOD PERIOD PERIOD SEC. XI

'UMMARY EXAMINATION AREA CATGY HDE -----OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH 1 2 3 1 2 3 1 2 **CALIBRATIONBLOCK~*

STEAM SPACE NOZZLES REF. DNG. HO. 01-005-B 021800 404.10C, RC-104 to V.1204 LER VT-1 3- Per JPH-ESI-93-135, perform a PRESSURE TAP NOZZLE 9 195 93.04 visual examination of as arch DEGREES of the base material as RCB possible for signs of leakage during each outage, insulation aust be removed 021900 404-10D, RC.107 to V-1435 LER VT 1 3- Per JPN.ESI-93-135, perform a PRESSURE TAP NOZZLE 0 345 93-04 visual examination of as each DEGREES of the base material as RCB possible for signs of leakage during each outage, insulation must be removed

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 44 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPONEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A FRON RPV TO SG 1A FIRST SECOND THIRD I p Af ZOHE NUMBER:

.WI PRAM <<<<<< ~ 1-006 SUHHARY EXAHIHATION AREA ASNE SEC. XI CATGY NDE PERIOD PERIOD OUTAGE-PERIOD INSTRUCTIONS NUNBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK**

V I-42-RC-114 REF. DWG. NO. 01 006 021920 205-07-A B.J SUR 3- X Perform volunetric examination RPV OUTLET NOZZLE TO EXTENSION 89.11 VOL instead of surface examination 8 0 DEG on the outside surface of the RCB weld in accordance with Relief Request Ho. 16

<<*UT-1 UT-4*~

021940 RC-114-FH-1-500G 8-J SUR 3 - - - - - - X Perform voiunetric examination EXTENSION TO PIPE 9 0 DEG 89.11 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request Ho. 16

  • ~UT-I,UT-4, UT-6~~

021950 RC-114-500G-LS-A 8 J SUR 3 - - - - - X Perform volunetric examinat PIPE LOHGITUDIHAL SEAN 89.12 VOL instead of surface examin RCB on the outside surface of weld in accordance with Relief Request Ho. 16

  • ~UT-1, UT-4( UT-6~*

021975 RC-114-5000-LS-8 8-J SUR 3 - - - - - X Perform volmetric examination Pipe Longitudinal Seam 89.12 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request No. 16

    • U'I 1, UT-4, UT-6**

022000 RC-114-7-503 8-J SUR 3 . C.S. PIPE-"'I"=3 ~ 75" HIN. C.S.

Pipe to Elbo~ 89.11 VOL ELBDN "T"-"4"HIH.

RCB

    • UT 4**

022100 RC-114-7-503-LS-A 8-J SUR 3 Elbow Longitudinal Seam 89.12 VOL RCB

  • OUT 4**

DATE: 01/09/98 ST ~ LUCIE HUCLEAR PLANT UNIT 1 45 REVISIOH: 0 COHPOHEHTS'AGE:

IHSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS IHSPECTIOH INTERVAL PLAN Sl'ATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A FROH RPV TO SG-1A FIRST SECOND THIRD ZONE HUNBER: 1 006 ASHE PERIOD PERIOD PERIOD SEC. XI

- SUNHARY EXAHIHATIOH AREA CATGY NDE ------OUTAGE------ INSTRUCTIONS HUNBER IDEHTIFICATIOH ITEN HO NETH I 1 2 3 1 2 3 1 2 3 <<<<CALI BRAT ION BLOCK<<<<

I-42-RC.114 REF. DUG. NO.01-006 022200 RC-114-7.503.LS.B 8-J SUR 3-Elbow LongitudinaL Seam 89.12 VOL RCB

  • <<UT 4**

022420 RC-114.FH-2000 8-J SUR 3-Elbow to Safe-End 89.11 VOL RCB

  • <<UI 4<<<<

022440 1-SGA-M16 B.J SUR 3-Safe-End to SG inlet Nozzle 89.11 VOL RCB

<<<<20T-1?3<<<<

022500 RC-114.14-509 8-J SUR C S PIPE aT<<=3 ?5<< HIH i 2 12<< Branch Connection - Safety 89.32 NOZZLE FORGING NATL.

Injection A105,GR.II RCB 1.12-RC-114 REF. DUG. NO.01-006 022600 RC-114.8.509 8-J SUR 3- C.S.PIPE-"T"=3.75" IIIH., 12" 2<< Branch Connection - Drain 89.31 VOL NOZZLE FORGING Line NATL'105,GR.II RCB <<<<UT 4*<<

I-2 RC-114 REF. DUG. HO.01-006 022700 RC-114-19-509 B.F SUR 3- HOZZLE FORGING NATL.

Branch Connection to Safe-End 85.140 A105,GR.II RCB

DATE: Ol/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 46 REVISIOH: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A FROM RPV TO SG-1A FIRST SECOND THIRD ZONE NUMBER: 1-006 ASME PERIOD PERIOD PERIOD SEC. Xl

'UMMARY EXAMINATIOH AREA CATGY NDE ------OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK

  • I 2-RC-145 REF. DMG. NO.01-006 022 750 RC-145-FW-2000 B-J SUR 3-Safe-End to Reducer 89.21 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 47 REVISION: 0 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP 8 FROW RPV TO SG-1B FIRST SECOND THIRD ZONE NUMBER: 1.007 ASHE PERICO PERIOD PERIOD SEC. XI

'UHHARY EXAHIHATIOH AREA CATGY HDE ------OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CAI.IBRATIOHBLOCK>>>>

I-42-RC-123 REF. DUG. NO.01-007 023020 205-07-8 8-J SUR 3- X Perform voiunetric examination RPV Outlet Nozzle to Extension 89.11 VOL instead of surface examination 8 180 Deg on the outside surface of the RCB weld in accordance with Relief Request No. 16

<<*UT-1( UT-4<<*

023040 RC-123 Fll-1-500A 8 J SUR 3- X Perform volunetric examination Extension to Pipe 89.11 . VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request No. 16

<<*UT-1, UT-4, UT-6**

023050 RC-123 500A-LS-A 8 J SUR 3 - - - - - - X Perform voiunetric examination Pipe Longitudinal Seam 89.12 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request No. 16

  • UT 1, UT-4, UT-6 023075 RC-123-500A LS-8 8-J SUR 3- X Perform voiwetric examination Pipe Longitudinal Seam 89.12 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief

. Request Ho. 16

    • UT-1, UT-6<<*

023100 RC-123-1-503 8-J SUR 3- Gogo PIPE T 3e75 HIH~ ~ Cog ~

Pipe to Elbow 89.11 VOL ELBOM-"Ta>>4" NIH RCB

<<<<UT 4<<*

023200 RC-123-1.503.LS-A 8-J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB

    • UT-4A<<>>

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 48 REVISIOH: 0 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP 8 FROM RPV TO SG-18 FIRST SECOND THIRD ZONE NUMBERt 1 007 ASME PERIOD PERIOD PERIOD

, ~ Al gA P,& SEC. XI

= SUKHARY EXAHINATIOH AREA CATGY NDE -- - - --OUTAGE- IHSTRUCTIOHS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK~*

I-42-RC-123 REF. DWG. HO.01-007 023300 RC-123-1-503-LS-8 8-J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB

    • UT-4A~*

023520 RC-123.FW-2000 8-J SUR 3 - - - - - X Elbow to Safe-End 89.11 VOL RCB

    • UT 4A*>>

023540 1-SGB-U16 8-J SUR 3 - - - - - - X Safe-End to SG Inlet Nozzle 89.11 VOL RCB

<<~20T.173**

I-12-RC-123 REF. DUG. NO.01-007 023600 RC-123.1-509 8-J SUR 3-12" Branch Connection - Surge 89.31 VOL Line RCB l1UT 61P 023700 RC-123-8-509 8-J SUR 3-12" Branch Connection - Safety 89.31 VOL Injection RCB *+UT 4*a

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 49 REVISION: 0 INSERVICE IHSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS IHSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A SG-1A TO RCP 1A2 FIRST SECOND THIRD ZONE HUHBER: 1 008 ASHE PERIOD PERIOD PERIOD

~ ~ V QIA>>~, t>>e>> %>> SEC. XI

~ SUHHARY EXAHIHATIOH AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUHBER IDEHT IF I CAT ION ITEN NO NETH ) 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

I-30-RC-115 REF. DMG. NO.01-008 023940 1-SGA M17 B.J SUR 3 X SG Outlet Nozzle to Safe-End 89.11 VOL RCB

    • 20T.174**

023960 RC.115 FM.2000 8-J SUR 3 X C.S. ELBOM, EXTENSION PIECE Safe-End to Elbow 89.11 VOL HATL. SA533,GR.B,CL.1, Meld is RCB scheduled to be installed during the steam generator replacement

  • IUT 541 024000 RC-115-3-503-LS-A 8-J P

SUR 3 - - - X Elbow Longitudinal Seam 89.12 VOL RCB

    • UT 5 I%

024100 RC-115-3-503-LS.B 8-J SUR 3 - - - X Elbow Longitudinal Seam 89.12 VOL RCB

    • UT.5**

024200 RC-115-3-503 8-J SUR 3-Elbow to Pipe 89.11 VOL RCB

  • ~UT-6*~

024300 RC-115-2-500F-LS.A 8-J SUR 3-Pipe Longftudfnal Seam 89.12 VOL RCB

  • OUT 6**

024400 RC.115-2-500F-LS.B 8-J SUR 3-Pipe Longitudinal Seam 89.12 VOL RCB

    • UT 6%*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 50 REVISIOH: 0 INSERVICE IHSPECTIOM LONG TERN PLAN CLASS 1 AIJ. STATUS COMPONENTS INSPECTIOM INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A SG-1A TO RCP-1A2 FIRST SECOND THIRD ZONE NUMBER: 1-008 ASHE PERIOD PERIOD PER IOO h'l,)t Q h~ P' SEC. XI

SUMMARY

EXAHI HAT I OH AREA CATGY NDE OUTAGE INSTRUCTIONS HUNGER I DENT I F I CAT I ON ITEN HO NETH 1 2 3 1 2 "3 1 2 3 **CALIBRATIONBLOCK~*

I-30-RC-115 REF. DUG. NO.01-008 3-

~ ~ ~

024500 RC-115-FII-2-500F 8-J SUR Pipe to Elbow 89.11 VOL RCB

    • U7 64*

024600 RC-115-3-505-LS-A 8-J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB

    • UT-y 024700 RC-115-3-505-LS-8 8-J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB
  • aUT 6**

024900 RC.115-3.505 8-J SUR 3 Elbe~ to Pipe 89.11 VOL RCB

    • UT-6**

025000 RC-115-2-500E-LS-A 8 J ASSUR 3-Pipe Longitudinal Seam 89.12 VOL RCB

  • lUT 6**

025100 RC-115-2-500E-LS-8 8-J SUR 3-Pipe Longitudinal Seam 89.12 VOL RCB

  • ~UT-6**

025400 RC-115-FM-2-500E 8-J SUR 3-Pipe to Elbow 89.11 VOL RCB

    • UT 6**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 51 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A SG-1A TO RCP-1A2 FIRST SECOND THIRD ZONE NUHBER: 1-008 ASHE PERIOD PERIOD PERIOD P.V 44 ~ 0 SEC. XI


OUTAGE-----.

~ ~

SUHHARY EXAHIHAT ION AREA CATGY NDE INSTRUCT IONS NUMBER IDENTIFICATION ITEM NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK

  • I-30-RC-115 REF. DWG. NO.01-008 025500 RC 115-6-503 LS-A 8-J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB 44UT 025600 RC-115-6.503-LS-B 8-J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB
    • UT 6**

025700 RC-115-6-503 B.F SUR 3 - - - X SAFE-END NATL. SA351,CFBH, Elbow to Safe-End 85.130 VOL C.S.ELBOM RCB

    • UT-6,UT-59
  • 25800 RC-115.FW-3-500F 8-J SUR 3 - - - X SAFE-END TO PUHP 1A2 89.11 VOL RCB
    • UT 59~*

I-2-RC-115 REF. DWG. NO.01-008 025900 RC.115.16-507 8-J SUR 3- 2" HOZZLE FORGING 2" Branch Connection - Drain 89.32 Line RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 52 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A FROH RCP-1A2 TO RPV FIRST SECOND THIRD ZONE NUHBER: 1-009 ASHE PERIOD PERIOD PERIOD IP<<, Q'Pwj'Lrtll,~ V'tt<<%Mr VrW 8\Vp ~ ~ ~ w ~ SEC. XI SUHHARY EXAHINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO HETH I 1 2 3 1 2 3' 2 3 **CALIBRATIONBLOCIC

  • I-30-RC-115 REF. DWG. NO.01-009 026000 RC-115-FII-3.500E 8-J SUR 3- X Reactor Coolant Pump 1A2 to 89.11 VOL Safe-End RCB >>*UT 59**

026100 RC-115.8-504 8-F SUR 3 - - - X SAFE-END HATL. SA351,GR. CFBH, Safe-End to Pipe 85.130 VOL C.S. PIPE RCB

>><<UT-59*>>

026200 'C-115.8-504-LS-A 8-J SUR 3 - - - X Pipe Longitudinal Seam 89.12 VOL RCB

  • <<UT 6>>*

026300 RC.115-8-504-LS-B B.J SUR 3 - - - X Pipe Longitudinal Seam 89.12 VOL RCB

<<<<UT 6<<>>

026400 RC-115-4-504 8 J SUR 3-Pipe to Elbow 89.11 VOL RCB

<<UT-6<<>>

026500 RC-115-4-504.LS-A 8-J SUR 3- X Perform voiunetric examination Elbow Longitudinal Seam 89.12 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request No. 16 UT-1, UT-5*>>

026600 RC-115-4-504-LS-8 8-J SUR 3- X Perform voiunetric examination Elbow Longitudinal Seam 89.12 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request No. 16

    • UT-1, UT 5<<<<

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 53 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLAHT PIPING LOOP A FROM RCP-1A2 TO RPV FIRST SECOND THIRD ZONE HUHBER: 1-009 ASNE PERIOD PERIOD PERIOD

~ 4V ~ ~

SEC. XI SUHMARY EXAHIHAT ION AREA CATGY HDE -----OUTAGE--- INSTRUCTIONS NUHBER IDEHTIFICATIOH ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

1-30-RC.115 REF. DNG. NO. 01.009

'I 026620 RC-115-FW-1-500J 8-J SUR 3 - - - - - - X Perform voluretric examination Elbow to Extension 89.11 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request Ho. 16

    • UT-1, UT-5**

026680 205-03-D B-J SUR X Perform volunetric examination Extension to RPV Inlet Nozzle 89.11 VOL instead of surface examination 0 300 Deg on the outside surface of the RCB weld in accordance with Relief Request Ho. 16

    • UT-1, UT.6**

I 2 RC 115 REF. DWG. NO.01-009 026700 RC-115-4-507 B-J SUR 3- 2" NOZZLE FORGING NATL.

2a Branch Connection- B9.32 A105,GR.II Charging Line RCB I-12-RC-115 REF. DWG. HO.01-009 026800 RC-115-4-508 B-J SUR 3- X 12a NOZZLE FORGING 12" Branch Connection - Safety 89.31 VOL NATL'105,GR.II Injection RCB ltUT 61*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 54 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN 0

CLASS 1 ALL STATUS CONPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP 8 SG-18 TO RCP-181 FIRST SECOND THIRD 20HE NUHBER: 1-010 ASHE PERIOD PERIOD PERIOD SEC. XI ~

SUNMARY EXANIHATIOH AREA CATGY HDE OUTAGE------ INSTRUCTIONS NUHBER IDENT IF ICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK<<>>

I-30-RC-121 REF. DMG. NO.01-010 027040 1-SGB-'N17 8-J SUR 3-SG Outlet Nozzle to Safe-End 89.11 VOL RCB

<<*20T-174<<*

027060 RC-121-FW-2000 8-J SUR 3-Safe-End to Elbow 89.11 VOL RCB

<<<<UT-5*>>

027100 RC-121-1-500D-LS-A 8-J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB

    • UT 5**

027200 RC-121-1-5000.LS-B 8-J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB

<<>>UT 5**

027300 RC-121-3-503 8-J SUR 3-Elbow to Pipe 89.11 VOL RCB

    • UT 6**

027400 RC-121-3-503-LS-A 8-J SUR 3-Pipe Longitudinal Seam 89.12 VOL RCB

    • O'I 6>>*

027500 RC-121-3-503-LS-8 8-J SUR 3-Pipe Longitudinal Seam 89.12 VOL RCB

    • Ur-6**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 55 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAH CLASS 1 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP 8 SG-18 TO RCP-181 FIRST SECOND THIRD ZONE HUHBER: 1 010 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHATION AREA CATGY HDE 0 U T A G E- INSTRUCTIONS HUNGER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK**

I-30-RC 121 REF. DLIG. NO.01-010 027600 RC 121-FM-2-5008 8-J SUR Pipe to Elbow 89.11 VOL RCB

    • UT 64*

027700 RC-121-2.5008- LS-A 8-J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB

  • OUT 6**

027800 RC-121-2-5008-LS-8 8-J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB 4*UT 6PI 27900 RC-121-17-503 B.J SUR 3-Elbow to Pipe 89.11 VOL RCB

    • UT 6*4 028000 RC.121-17-503.LS-A 8-J SUR 3-Pipe Longitudinal Seam 89.12 VOL RCB
  • aUT.y*

028100 RC-121-17-503-LS-8 8-J SUR 3 Pipe Longitudinal Seam 89.12 VOL RCB 4*UT 64*

028200 RC-121.FH.2.500A 8-J SUR 3-Pipe to Elbow 89.11 VOL RCB

    • UT 6**

DATE: 01/09/98 ST. LUCIE HUCLEAR PLAHI'NIT 1 PAGE: 56 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS V

INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP B SG-1B TO RCP-1B1 FIRST SECOND THIRD ZONE NUMBER: 1-010 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE-- INSTRUCTIONS NUHBER IDENTIFICATION ITEM NO KEIH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

I.30-RC.121 REF. DUG. NO.01-010 028400 RC-121-2-500A-LS.A 8-J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB ABUT P*

028500 RC.121-2-500A-LS-B 8-J SUR 3-Elbo~ Longitudinal Seam B9.12 VOL RCB

<<*UT 6**

028600 RC.121-5-503 8-F SUR 3 - - - - X SAFE-END NATL~ SA351,GR.CFBK ElboH to Safe-End B5.130 VOL RCB

    • UT-6, UT 59
  • 028700 RC.121-FII-3-5008 8-J SUR 3 - - - - - X Safe-End to Pvmp 181 89.11 VOL RCB
    • UT 59**

I-2-RC-121 REF. DHG. HO.01-010 028800 RC-121-16-507 8-J SUR 3- X C.S. PIPE, 2" NOZZLE FORGIHG 2" Branch Connection - Letdown 89.32 and Drain RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 57 REVI S ION: 0 INSERVICE IHSPECTIOH LONG TERN PLAH CLASS 1 ALL STATUS CONPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPIHG LOOP 8 FRON RCP-181 TO RPV FIRST SECOND " THIRD ZONE NUNBER: 1-011 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXANIHATIOH AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 <<<<CALIBRATIOH 'BLOCK<<<<

I I-30-RC-121 REF. DUG. NO.01-011 028900 RC.121 FN-3-500A 8-J SUR 3- X Reactor Coolant Pump 181 to 89.11 VOL Safe-End RCB **UT-59

  • 029000 RC-121-6-504 8-F SUR 3- X SAFE-EHD NATL. SA351,GR.CFBH, Safe-End to Pipe 85.130 VOL C.S. PIPE RCB

<<<<UT-6, UT-59

  • 029300 RC-121-6-504-LS-A B.J SUR 3 - - . - - X Pipe Longitudinal Seam 89.12 VOL RCB
    • UT 6**

029400 RC.121.6.504-LS.B B.J SUR 3- X Pipe Longitudinal Seam 89.12 VOL RCB

<<<<UT 6<<*

029500 RC-121-2-504 B.J SUR 3-Pipe to Elbow 89.11 VOL RCB

<<<<UT 6**

029600 RC.121.2.504-LS-A 8-J SUR 3 - - - - - - X Perform voiunetric examination Elbow Longitudinal Seam 89.12 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request No. 16

  • <<UT-1, UT-5<<*

029700 RC-121-2-504-LS-8 8-J SUR 3- X Perform voiunetric examination Elbow Longitudinal Seam 89.12 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request Ho. 16

  • <<UT-1 UT-5<<<<

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 58 REVISION: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP B FROM RCP-1B1 TO RPV FIRST SECOND THIRD ZONE NUMBER: 1-011 ASHE PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 2 3 1 2 3 1 2 3 *~CALIBRAT ION BLOCK~*

I-30-RC.121 REF. DUG. NO.01-011 029750 RC.121-FM-1-500C '-J SUR 3- X Perform volunetric examination Elbow to Extension 89.11 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request Ho. 16

  • ~UT-1, UT-5**

029760 205-03 A B-J SUR 3- X Perform volunetric examination Extension to RPV Inlet Hozzle 89.11 VOL instead of surface examination 0 120 Deg on the outside surface of the RCB weld in accordance with Relief Request Ho. 16

  • ~UT-1, UT-5~~

I 12 RC 121 REF. DUG. NO.01-011 029800 RC-121-4-508 B.J SUR 3 . NOZZLE FORGIHG MATL.

12" Branch Connection - Safety 89.31 VOL SA105 ~ GR.II Injection RCB *eUT 6am I-3-RC-121 REF. DHG. NO.01-011 029900 RC-121-10-507 8-J SUR 3- 3" NOZZLE FORGING MATL.

3a Branch Connection - Spray 89.32 SA105,GR.II Line RCB I-2 RC-121 REF. DWG. NO. 01 011 030000 RC-121.4.507 B-J SUR 3- NOZZLE FORGINGS 2" Branch Connection- 89.32 Charging Line RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 59 REVI SIGH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHI'S INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A SG-1A TO RCP 1A1 FIRST SECOND THIRD ZONE NUMBER: 1-012 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHATION AREA CATGY NDE - . - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENT IF I CATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 <<<<CALIBRATIOH BLOCK<<<<

I 30-RC-112 REF. DWG. NO.01-012 030240 1-SGA.II18 8-J SUR 3 X SG Outlet Hotxle to Safe-End 89.11 VOL RCB

    • 20T-174**

030260 RC-112-FW-2000 8-J SUR 3-Safe-End to Elbow 89.11 VOL RCB

<<*UT-6**

030300 RC-112-1 500L-LS-A 8-J SUR 3 X Elbow Longitudinal Seam 89.12 VOL RCB

<<<<UT 6<<*

30400 RC 112-1-500L-LS-8 B.J SUR 3 X Elbow Longitudinal Seam 89.12 VOL RCB

  • <<UT 6**

030500 RC-112-3-503 8-J SUR 3X Elbow to Pipe 89.11 'OL RCB

<<<<UT 6<<*

030600 RC-112-3-503.LS-A 8-J 'SUR 3 X Verify location of weld Pipe Longitudinal Seam 89.12 VOL RCB

<<<<UT 6*<<

030700 RC-112.3-503-LS-B 8-J SUR 3 X Verify location of weld Pipe Longitudinal Seam 89.12 VOL RCB

    • UT-6<<*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 60 REVISION: 0 INSERVICE IHSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A SG-1A TO RCP-1A1 FIRST SECOND THIRD 20NE NUMBER: 1-012 ASME PERIOD PERIOD PERIOD SEC.. XI

SUMMARY

EXAMINATION AREA CATGY NDE - -OUTAGE- -- INSTRUCTIONS NUMBER IDENTIFICATIOH ITEM HO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~*

I-30-RC-112 REF. DNG. NO.01-012 030800 RC-112-FW-2-500G BJ SUR 3-Pipe to Elbow B9.11 VOL RCB

    • 0T P*

030900 RC-112-2-500G-LS-A B-J SUR 3-Elbo~ Longitudinal Seam 89.12 VOL RCB

%*UT 6**

031100 RC-112-2-500G-LS-B B.J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB

    • UT-6**

031200 RC-112-17-503 B-J SUR 3 Elbow to Pipe B9.11 VOL RCB

  • 1UT 6**

031300 RC.112-17-503-LS-A B.J SUR 3-Pipe Longitudinal Seam 89.12 VOL RCB

  • IUT 6**

031400 RC-112-17-503,-LS-B B.J SUR 3 .

Pipe Longitudinal Seam B9.12 VOL RCB

    • UT 6**

031500 RC.112.FU-2-500M B.J SUR 3 Pipe to Elbow 89.11 VOL RCB

    • UT-6**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 61 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A SG-1A TO RCP-1A1 FIRST SECOHD THIRD ZOHE NUMBER: 1 012 ASME PERIOD PERIOD ~ PERIOD

" SEC. XI

SUMMARY

EXAMINATIOH AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIOHS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK<<<<

I-30 RC-112 REF. DNG. NO.01-012 031600 RC-112-2-500H-LS-A B.J SUR 3 X Elbow Longitudinal Seam 89.12 VOL RCB

<<*UT 6**

031700 RC.112.2.500H.LS-B 8-J SUR 3 X Elbow Longitudinal Seam 89.12 VOL RCB

    • UT 6<<<<

031800 RC-112-5.503 8-F SUR 3 X SAFE-END NATL. SA351,GR.CFBM Elbow to Safe-End 85.130 VOL RCB

<<*UT-59,UT-6<<<<

32000 RC-112-FW-3-500G BJ SUR 3X Safe-End to Reactor Coolant 89.11 VOL Pump 1A1 RCB <<*UT-59

  • I-2-RC-112 REF. DWG. NO.01-012 032100 RC-112-16.507 8-J SUR 3X 2" HOZZLE FORGING NATL.

2" Branch Connection - Drain 89.32 SA105,GR ~ II Line RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 62 REVISION: 0 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A FROH RCP-1A1 TO RPV FIRST SECOND THIRD ZONE NUHBER: 1-013 ASHE P,ERIOD PER I CO PER I CO

~ VI <<JW 4 ~

SEC. XI SUHHARY EXAHINATIOH AREA CATGY NDE OUTAGE INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO NETH ] I 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK<<<<

I-30-RC-112 REF. DiJG. NO.01-013 032200 RC-112- FII-3-5008 8-J SUR 3 X Reactor Coolant Pump 1A1 to 89.11 VOL Safe-End RCB <<*UT-59

  • 032300 RC-112-5-504 8-F SUR 3 X SAFE.END HAI'LE SA351,GR ~ CFBHg Safe-End to Pipe 85.130 VOL C.S. PIPE RCB

<<*UT-59,UT-6**

032400 RC-112-5-504-LS-A 8-J SUR 3 X Pipe Longitudinal Seam 89.12 VOL RCB

<<<<UT 6<<*

032500 RC-112.5.504-LS-B 8 J SUR 3 X Pipe Longitudinal Seam 89.12 VOL RCB

  • <<UT 6*<<

032600 RC-112-1-504 8-J SUR Pipe to Elbow 89.11 VOL RCB

<<*UT 6**

032700 RC-112-1-504- LS-A 8-J SUR 3 - - - - - - X Perform volunetric examination Elbow Longitudinal Seam 89.12 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request Ho. 16

<<<<Ul', UT-5**

032800 RC-112-1-504-LS-8 8-J SUR 3- X Perform voiunetrlc examination Elbow Longitudinal Seam 89.12 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request No. 16 UT-5<<* '<<UT.1,

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 63 REVISIOH: 0 IHSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP A FRON RCP-1A1 TO RPV FIRST SECOHD THIRD ZONE HUHBER: 1 013 ASNE PERIOD PERICO PERIOD 1'V SEC. XI SUHHARY EXANIHATION AREA CATGY NDE - - - - 0 U T A G E - - - - -- IHSTRUCTIOHS NUHBER IDENT IF I CAT ION ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

I-30.RC-112 REF. DIJG. NO.01-013 032820 RC-112- FM-1-500N B-J SUR 3 - - - - - - X Perform voiunetric examination Elbow to Extension B9.11 VOL instead of surface examination RCB on the outside surface of the Meld in accordance with Relief Request Ho. 16

~~UT-1, UT-5~~

032880 205-03-C B-J SUR 3 X Perform volwetric examination Extension to RPV Inlet Hotzle B9.11 VOL instead of surface examination 9 60Deg on the outside surface of the RCB Neid in accordance Hith Relief Request No. 16

  • '~UT 1) UT 5++

I-12-RC-112 REF. DUG. NO. 01.013 032900 RC-112.4.508 12" Branch Connection - Safety 89.31 Injection B-J VOL'AFE-EHD SUR 3-12" NOZZLE NATL. SA351,GR ~ CFBHg FORGING RCB 41UT 611

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 64 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS IHSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP 8 SG-18 TO RCP-182 FIRST SECOND THIRD 2ONE NUHBER: 1-014 ASHE PERIOD PERIOD PERIOD SEC. XI SUNDRY EXAHIHATION AREA CATGY NDE - - - 0 U T A G E - - - - .- IHSTRUCTIOHS NUNBER IDENTIFICATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

I-30.RC 124 REF. D'MG. NO.01-014 033140 1.SGB.M18 8-J SUR 3 sg Outlet Nozzle to Safe-End 89.11 VOL RCB

    • 20T-174~~

033160 RC-124-FII-2000 B.J SUR 3-Safe-End to Elbow 89.11 VOL RCB

    • UT 5m*

033200 RC-124-1-500E-LS-A 8 J SUR 3-Elbow Longitudinal Seam 89.12 VOL RCB IOUT P*

033300 RC-124-1.500E.LS.B 8-J SUR 3-Elbo~ Longitudinal Seam 89.12 VOL RCB 4*UT 64*

033400 RC 124-3-503 8 J SUR 3-Elbow to Pipe 89.11 VOL RCB

    • UT 6%*

033500 RC-124-3-503.LS.A 8-J SUR 3- X Pipe Longitudinal Seam 89.12 VOL RCB

    • UT 64*

033600 RC-124-3-503-LS-8 8-J SUR 3 - - - X Pipe Longitudinal Seam 89.12 VOL RCB

    • UT-6*>>

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 65 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP 8 SG-18 TO RCP-18 FIRST SECOND THIRD ZONE HUHBER: 1.014 ASHE PERIOD PERIOD PERIOD VIP o'I SEC. XI SUHHARY EXAHIHAT ION AREA CATGY HDE OUTAGE-- INSTRUCTIONS NUHBER IDENTIFICATION ITEH HO NETH 1 2 3 1 2 3 1 2 3 **CALI BRAT ION 8LOCKt t 1-30-RC.124 REF. DUG. NO.01-014 033700 RC-124.FN-2-500C 8-J SUR 3- X Pipe to Elbow 89.11 VOL RCB

    • UT 6**

033800 RC.124.2-500C-LS-A 8-J SUR 3- X Elbow Longitudinal Seam 89.12 VOL RCB

    • UT 6**

033900 RC 124 2 500C-LS.B BJ SUR 3- X Elbow Longitudinal Seam 89.12 VOL RCB

  • 1UT 6**

034000 RC-124.17 503 8-J SUR 3-Elbow to Pipe 89.11 VOL RCB

  • tUT 6tt 034100 RC.124-17-503- LS.A 8-J SUR 3-Pipe Longitudinal Seam 89.12 VOL RCB
  • tUT 6tt 034200 RC.124-17.503.LS-B 8-J SUR 3-Pipe Longitudinal Seam 89.12 VOL RCB
  • tUT 6t*

034300 RC.124- FII-2-5000 8-J SUR 3-Pipe to Elbow 89.11 VOL RCB

    • UT.6*t

'll DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 66 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAH CLASS 1 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP 8 SG-18 TO RCP-182 FIRST SECOND THIRD ZONE NUMBER: 1-014 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMIHATIOH AREA CATGY HDE --- ---OUTAGE-- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

I-30-RC-124 REF. DWG. NO.01-014 034500 RC-124.2.500D-LS-A 8-J SUR 3- X Elbow Longitudinal Seam 89.12 VOL RCB

  • ~UT 6**

034600 RC-124.2-500D.LS-B 8-J SUR 3- X Elbow Longitudinal Seam 89.12 VOL RCB

  • IUT 6*P 034700 RC-124-5.503 8-F SUR 3 -, X SAFE-END NATL. SA351,GR.CFBM Elbow to Safe-End 85. 130 VOL RCB
  • ~UT.59
  • 034800 RC-124.FII-3.500C 8-J SUR 3 X Safe-End to Reactor Coolant 89.11 VOL Putp 182 RCB *IUT 59%I I-2-RC-124 REF. DWG. HO.01-014 034900 RC.124-16.507 8-J SUR 3- 2" NOZZLE FORGING 2" Branch Connection - Drain 89.32 Line RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 67 REVISION: 0 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP 8 FROH RCP-1B2 TO RPV FIRST SECOND THIRD ZONE NUHBER: 1-015 ASME PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATIOH AREA CATGY NDE ..-..OUTAGE- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK

  • I-30-RC-124 REF. DUG. NO.01-015 035000 RC-124.FN.3.5000 B-J SUR 3- X Reactor Coolant Pump 1B2 to B9.11 VOL Safe-End RCB **UT-59<<*

035100 RC-124-7 504 8-F SUR 3 - - - - - X SAFE-END NATL. SA351,GR.CFSH, Safe-End to Pipe B5.130 VOL C.S. PIPE RCB

<<<<UT-59**

035200 RC-124.7-504-LS.A 8-J SUR 3- X Pipe Longitudinal Seam 89.12 VOL RCB

~ *<<UT 6*<<

035300 RC-124.7-504-LS-B B.J SUR 3 - - - - - - X Pipe Long l tudlnal Seam B9.12 VOL RCB

'<<*UT 6**

035400 RC-124-3-504 B-J SUR 3-Pipe to Elbow B9.11. VOL RCB

<<*UT 6<<*

035500 RC-124-3-504-LS-A B.J SUR 3 - - - - - X Perform volunetric examination Elbow Longitudinal Seam B9.12 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request Ho. 16

    • UT 1, UT-5<<*

035600 RC-124-3-504-LS-B B-J SUR 3 . . . - - X Perform voiunetric examination Elbow Longitudinal Seam B9.12 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request No. 16

<<*UT-1( UT-5**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 68 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PIPING LOOP B FROH RCP-182 TO RPV FIRST SECOND THIRD ZOHE HUNGER: 1-015 ASNE PERIOD PERIOD PERIOD SEC. XI SUNNARY EXANIHATION AREA CATGY NDE - - - - - - 0 U T A G E - .. - -- INSTRUCTIOHS HUNBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~~

1-30.RC-124 REF. DNG. NO. 01 015 035620 RC.124. FN-1-500F BJ SUR 3- - - - - - X Perform voiunetrlc examination Elbow to Extension 8 240 Deg B9.11 VOL instead of surface examination RCB on the outside surface of the weld in accordance with Relief Request No. 16

  • kUT 64*

035680 205-03-B 8-J SUR 3- X Perform voiunetric examination Extension to RPV Inlet Hozzle B9.11 VOL instead of surface examination Q 240 Deg on the outside surface of the RCB weld in accordance with Relief Request Ho. 16

'~~UT-1i UT-5~*

I 12 RC-124 REF. DUG. NO.01-015 035700 RC-124-4.508 B.J SUR 3- 12" NOZZLE FORGING NATL.

12" Branch Connection - Safety $ 9.31 VOL A102,GR.II Injection RCB t1UT 64*

I-3-RC 124 REF. DUG. NO.01-015 035800 RC-124-10-507 8-J SUR 3- 3" HOZZLE FORGIHG NATL.

3w Branch Connection - Spray B9.32 SA105,GR.II Line RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 69 REVISION: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS IHSPECTIOH INTERVAL PLAH SI'ATUS PRESERVICE YEAR PRESSURIZER SURGE LINE FIRST SECOND THIRD ZOHE NUMBER: 1-016 ASHE PERICO PERIOD PERIOD

~ /j W ~

SEC. XI SUHMARY EXAHIHATIOH AREA CATGY NDE ------OUTAGE----.- IHSTRUCTIOHS HUHBER IDENT IF I CAT IOH ITEH NO NETH 1 2 3 1 2 3 1 2 3 <<<<CALIBRATION BLOCK

  • I-12-RC-108 REF. D1IG. NO. 01.016 035900 RC-6-509 B-F SUR 3- X SURGE HOZZLE NATL.

12" Branch Connection to 85.130 VOL SA105,GR-II., USE C.S. SIDE OF Safe-End UT-16 FOR C.S. SIDE OF IIELD S RCB UT23 FOR S.S. SIDE

  • <<UT-16,UT-23*<<

036000 Surge Line General Examination AUG VT-3 3 X - - X . - X Perform visual examination per Surge Line NRC Bulletin 88-11 on the RCB entire line for general mechanical and structure conditions each period, reference letter ESI-CPS-93-362 036100 H18 F-A VT-3 3 - - - X Per JPN-PSLP-93-0087, Dual Spring Can Hanger F1.10C measurement should be 7.5" RCB (1586 lbs), as measured from the bottcm of indicator to base of can. NRC Bulletin 88-11 applicable 036200 H28 F-A VT-3 3- X Per JPH-PSLP-93-0087 Dual Spring Can Hanger F1 ~ 10C measurement should be 7.7" RCB (1337 lbs), as measured from the bottom of indicator to base of can. HRC Bulletin 88-11 applicable 036300 RC-108-FM-3 8-J SUR 3-Safe-End to Elbow 89.11 VOL RCB

    • UT-23**

036400 RC-1-505-A B-J SUR 3 - - - X Elbow to Pipe B9.11 VOL RCB

<<<<UT 23**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 70 REVISIOH: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER SURGE LINE FIRST SECOND THIRD ZONE NUMBER: 1 016 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMIHATIOH AREA CATGY HDE ------OUTAGE- INSTRUCTIOHS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~*

I.12-RC-108 REF. O'IIG. NO.01-016 1

036500 RC-1-505-8 8-J SUR 3-Pipe to Pipe 89.11 VOL RCB

    • UT 23**

036600 RC-1-505 C 8-J SUR 3-Pipe to Elbow 89.11 VOL RCB

<<*UT.23*>>

036700 RC 108-FW-2 8-J SUR 3-Elbow to Pipe 89.11 VOL RCB

  • ~UT 23**

036800 RC.2.505-C 8-J SUR 3-Pipe to Pipe 89.11 VOL RCB 11UT 23**

036900 RC.2.505-8 8-J SUR 3 X Pipe to Elbow 89.11 VOL RCB

  • +UT 23**

037000 RC-2-505-A B.J SUR 3-Elbow to Pipe 89.11 VOL RCB

  • tUT 23**

037100 RC-108-FW-1 8-J SUR 3-Pipe to Safe-End 89.11 VOL RCB

  • IUT 234*

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 71 REVI SIGH: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECT IOH INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER SURGE LINE FIRST SECOND THIRD ZONE HUHBER: 1.016 ASHE PERIOD PERIOD PERIOD

~ ~ /) '4+ %1~ SEC..XI SUHMARY EXAMINATION AREA CATGY HDE OUTAGE - - - - -- INSTRUCTIONS HUHBER IDEHTIFICATIOH ITEN NO NETH ) 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK**

I-12-RC-108 REF. DMG. HO. 01.016 037200 H38 F-A VT-3 3-SPRING CAN HANGER F1.10C RCB 037300 514.671 B-F SUR 3 X USE C.S. SIDE OF UT-16 FOR C.

SAFE EHD-TO-PRESS'URGE 85.40 VOL S. SlOE OF MELD 4 UT23 FOR S.

NOZZLE S. SIDE.

RCB UT-16,UT-23

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UHIT 1 PAGE: 72 REVISIOH: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PUMP 1A1 FIRST SECOND THIRD ZONE NUMBER: 1 017 ASME PERIOD PERIOD PERIOD

,l 'C. g;kl I~4IW ~ JlP W gH 0 VIA, ~

SEC. XI

SUMMARY

EXAMIHATION AREA CATGY HDE ----OUTAGE---.-- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 <<<<CAL I BRAT ION BLOCK*"

REF. DWG. NO. 01.017 037500 01.017-001 8-L-1 VT-1 3- Visually examine external UPPER SCROLL WELD 812.10 surface of weld near end of RCB interval 037600 01.017-002 8-L-1 VT-1 3- Visually. examine external LOWER SCROLL WELD 812.10 surface of weld near end of RCB interval 037700 01-017-003 8-L-2 VT-3 3 X Examine when disassembled for PUMP CASING INTERNAL SURFACE 812.20 maintenance or repair RCB 037800 01.017.004 8-K SUR 3-SUPPORT LUG ¹2 810.30 RCB 037900 RPH 2 F-A VT-3 3 X Any one of the spring supports SPRING SUPPORT 9 LUG ¹2 F1.40C on pm@ 1A1 may be examined RCB 038000 01-017-005 B.K SUR 3-SUPPORT LUG ¹3 810.30 RCB 038100 RPH-3 F-A VT-3 3-SPRING SUPPORT 9 LUG ¹ 3 F1.40C RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT'NIT 1 PAGE: 73 REVISION: 0 IHSERVICE IHSPECTIOH LOHG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS IHSPECTIOH IH'TERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PUMP 1A1 FIRST SECOND THIRD 20HE NUMBER: 1 017 ASHE PERICO PERIOD PERIOD v)j SEC. Xl

SUMMARY

EXAHIHAT IOH AREA CATGY NDE .-----OUTAGE------ IHSTRUCTIOHS NUMBER IDENTIFICATION ITEH HO HETK I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK"*

REF. DWG. HO.01-017 038200 01.017-006 B K SUR SUPPORT LUG ¹4 810.30 RCB 038300 RPH.4 F-A VT-3 3-SPRIHG SUPPORT <<I LUG ¹ 4 F1.40C RCB 038400 01-017-007 B-K SUR 3-SUPPORT LUG ¹1 810.30 RCB 38500 RPH-1 F-A VT-3 3-SPRIHG SUPPORT 9 LUG ¹ 1 F1.40C RCB 038600 01.017.009 RG 1.14 SUR 3 Voluaetric exam areas of high FLYNHEEL VOL stress at the bore 8 keyMay RCB approximately every 3 years, surface exam of exposed surfaces 8 complete volunetric exam at approximately every 10 years

<<<<FLYNHEEL ~ 2 8500**

038800 01-017-8-001 THRU 016 B-G.'I VOL 3 - . - - - - X Exams limited to components REACTOR COOLANT PUHP STUDS 86.180 selected under B-L-1, shen (16) disassembled or end of RCB interval.

    • UT-58R**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 74 REVISION: 0 IHSERVICE IHSPECTION LONG TERN PLAN 0

CLASS 1 ALL STATUS COHPOHEHTS INSPECT IOH INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PUMP 1A1 FIRST SECOND THIRD ZONE HUHBER: 1-017 ASHE PERIOD PERIOD PERIOD

~ ~ t. g; . t~w r r v ~ ~ ~ ~

SEC. XI .

SUHHARY EXAHIHATION AREA CATGY NDE - - - - - OUTAGE INSTRUCTIONS HUHBER IDENT IF I CATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

REF. DNG. NO.01-017 039100 01-017-N-001 TO 016 B.G-1 VT-1 3 X Exam limited to coaponent REACTOR COOL. PUHP HUTS (16) B6.200 selected under B-L-1, shen RCB disassembled or end of interval.

039200 01-017-L IG B-G-1 VT-1 3 X Examination of the flange Flange Surface B6.190 surface is required only when RCB the connection is disassembled, includes 1" of annular surface of flange surrounding each stud

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 75 REVISION: 0 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PUMP 1A FIRST SECOND THIRD ZONE HUMBER: 1-018 ASME PERIOD PERIOD PERIOD

'l'I 1) WU

$ SEC. XI

SUMMARY

EXAMIHATION AREA CATGY HDE ------OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

REF. DNG. HO.01-018 039300 01-018.001 8-L-1 VT-1 X Insulation support bracket Upper Scroll lleld 812.10 must be moved for coagulate RCB access I 039400 01-018-002 8-L-1 VT-1 3 - - - - X Insulation support bracket Lower Scroll Iield 812.10 must be moved for complete RCB access 039600 01-018-003 B-L-2 VT-1 3 X Examine when disassembled for PUMP CASING INTERNAL SURFACE 812.20 maintenance or repair RCB 39700 01.018.004 8-K SUR 3-SUPPORT LUG ¹2 810.30 RCB 039800 RPN-6 F-A VT-3 3-SPRING SUPPORT 9 LUG ¹ 2 F1.40C RCB 039900 01-018-005 8-K SUR 3-SUPPORT LUG ¹3 810.30 RCB 040000 RPK.7 F-A VT-3 3-SPRING SUPPORT 9 LUG ¹ 3 F1.40C RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 76 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN'STATUS PRESERVICE YEAR REACTOR COOLANT PUMP 1A2 FIRST SECOHD THIRD ZONE HUHBER: 1-018 ASHE PERIOD PERICO PERIOD I Q pl 1 ~ WAvpwPjllMcv ~ t& WI 4 ~ a ~

SEC. XI

SUMMARY

EXAHINATIOM AREA CATGY MDE ------OUTAGE-- INSTRUCTIONS NUHBER IDENT IF ICATION ITEH NO NETH I 1 2 3 1 2 3 1 2 3 *~CALIBRATIOM BLOCK**

REF. DWG. MO. Of-018 040100 01-018-006 B-K SUR 3 SUPPORT LUG ¹4 B10.30 RCB 040200 RPH-8 F-A VT-3 3-SPRING SUPPORT 9 LUG ¹ 4 F1.40C RCB 040300 01.018-007 B-K SUR 3-SUPPORT LUG ¹1 810.30 RCB 040400 RPH-5 F-A VT-3 3-SPRIHG SUPPORT Q LUG ¹ 1 F1.40C RCB 040500 01-018-009 RG 1.14 VOL 3- Examination required by USHRC FLYWHEEL C.4.8 Reg. Guide 1.14, surface RCB examination of ail exposed surfaces and cerpiete volunetric examinaton are required

    • FLYWHEEL, Z-8500~~

040700 01-018-S-1 thru 16 B-G 1 VOL 3- 16 studs REACTOR COOLANT PUMP STUDS B6.180 RCB

'*UT-58R**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 77 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS INSPECT IOH IN'TERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PUMP 1A2 FIRST SECOHD THIRD ZONE NUMBER: 1-018 ASME PERIOD PERIOD PERIOD

.SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE ------OUTAGE---"-- INSTRUCTIONS NUMBER IDENT I F ICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 ~*CALIBRATIOH BLOCK

  • REF. DNG. HO.01-018 041000 01-018-N-1 thru 16 B.G.1 VT-1 3- Exam limited to pumps selected Reactor Coolant Punp Nuts B6.200 under Code Category B-L-1, 16 RCB nuts Si1100 01-018.L IG B-G-1 VT-1 3 X Examination of the flange Flange Surface B6.190 surface is required only vhen RCB the connection is disassembled, includes 1" annular surface of flange surrounding each stud

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 78 REVISION: 0 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PUMP 181 FIRST SECOND THIRD ZONE NUMBER: 1-019 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAHIHATION AREA CATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK~*

REF. DWG. NO.01-019 041200 01-019-001 8-L-1 SUR 3-UPPER SCROLL HELD 812. 10 VOL RCB 041400 01-019-002 8-L-1 SUR 3-LONER SCROLL MELD 812.10 VOL RCB 041500 01-019-003 8-L-2 VT-1 3 X Examine vhen disassembled for PUMP CASING INTERHAL SURFACE 812.20 maintenance or repair RCB 041600 01.019-004 8-K SUR 3 . - - X Limitation due to a nut 1/

SUPPORT LUG f/2 810.30 from toe of weld RCB 041700 RPH-10 F-A VT-3 3 SPRING SUPPORT 9 LUG 2 F1.40C RCB 041800 01.019.005 8-K SUR 3 .

SUPPORT LUG f/3 810.30 RCB 041900 RPH-11 F-A VT-3 3 - ,-

'I SPRING SUPPORT 9 LUG ¹' F1.40C RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 79 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PUMP 181 FIRST SECOND THIRD ZONE NUMBER: 1 019 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMIHAT IOH AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENT IFI CATION ITEM HO METH 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK

  • REF. DUG. NO.01-019 042000 01-019.006 B.K SUR 3-SUPPORT LUG ¹4 810.30 RCB 042100 RPH-12 F-A VT-3 3-SPRING SUPPORT <<I LUG ¹ 4 F1.40C RCB 042200 01-019-007 BK SUR 3- Limitation due to nut 1/2" SUPPORT LUG ¹I 810.30 free toe of weld.

RCB 42300 RPH-9 F.A VT-3 3-SPRING SUPPORT 0 LUG ¹ 1 F1.40C RCB 042400 01.019.009 RG 1.14 VOL 3- Volunetric exam areas of high F lywheei stress at the bore 4 keyway RCB approximately every 3 years, surface exam of exposed surfaces 8 conpiete voiunetric exam at approximately every 10 years

    • FLYNHEEL, Z-8500**

042600 01-019-S-1 thru 16 B-G-1 VOL 3 16 studs REACTOR COOLANT PUMP STUDS 86.180 RCB

<<*UT-58R**

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 80 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAH CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN'STATUS PRESERVICE YEAR REACTOR COOLANT PUMP 1B1 FIRST SECOND THIRD 20NE NUMBER: 1-019 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAHINATI ON AREA CATGY NDE - - --OUTAGE INSTRUCTIONS NUHBER IDENT I F I CATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK**

REF. DWG. NO.01-019 043000 01-019-H-1 TO 16 B-G-1 VT-1 3- Examine all nuts REACTOR COOL. PUHP HUTS 86.200 RCB 043100 01-019- L I G B.G.1 VT-1 3 X Examination of the flange Flange Surface B6.190 surface is required only shen RCB the connection is disassembled, includes 1" annular surface of flange surrounding each stud

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT" UNIT 1 PAGE: 81 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PUMP 182 FIRST SECOND THIRD ZONE NUMBER: 1.020 ASME PERICO PERIOD PERIOD SEC. XI


OUTAGE------

~ 'L

'UMMARY EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALI BRAT I OH BLOCK**

REF. D'W. HO.01-020 043200 01-020-001 I

B.L-1 SUR 3-UPPER SCROLL llELD 812.10 VOL RCB 043300 01-020.002 B-L-1 SUR 3-LONER SCROLL llELD 812.10 VOL RCB 043400 01-020-003 8-L-2 VT-1 3 X Examine shen disassembled for PUMP CASING INTERNAL SURFACE B12.20 maintenance or repair RCB 43500 01.020.004 8 K SUR 3-SUPPORT LUG ¹2 810.30 RCB 043600 RPH-14 F-A VT-3 3-SPRING SUPPORT 0 LUG ¹ 2 F1.40C RCB 043700 01.020.005 B.K SUR 3-SUPPORT LUG ¹3 810.30 RCB 043800 RPH.15 F A VT-3 3-SPRING SUPPORT 9 LUG ¹ 3 F1.40C RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE! 82 REVISIOH! 0 IHSERVICE INSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PUMP 1B2 FIRST SECOND THIRD ZONE NUMBER! 1-020 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAHIHATION AREA CATGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK

  • REF. DUG. NO.01-020 043900 01-020.006 8-K SUR 3-SUPPORT LUG ¹4 810.30 RCB 044000 RPH-16 F-A VT-3 3-SPRING SUPPORT 8 LUG ¹ 4 F1.40C RCB 044100 01-020-007 8-K SUR 3 SUPPORT LUG ¹1 810.30 RCB 044200 RPH-13 F-A VT-3 3-SPRIHG SUPPORT 9 LUG ¹ 1 F1.40C RCB 044300 01-020.009 RG 1.14 SUR 3 Volunetric exam areas of high FLYNHEEL VOL stress at the bore 8 keyuay RCB approximately every 3 years, surface exam of exposed surfaces 8 complete volunetric exam at approximately every 10 years

~*FLYNHEEL, 2-8500*~

044500 01-020-8-1 TNRU 16 B-G-1 VOL 3 . 16 studs Reactor Coolant Pwp Studs 86.180 RCB

    • UT 588**

DATE: 01/09/98 ST. LUCIE NUCLEAR'PLAHT UHIT 1 PAGE: 83 REVISION: 0 INSERVICE INSPECTION LOHG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR REACTOR COOLANT PUHP 182 FIRST SECOND THIRD ZONE NUHBER: 1-020 ASHE PERIOD PERIOD PERIOD

' SEC. XI "

1$

~

SUHHARY EXAHIHAT ION AREA CATGY NDE - - - - - - 0 U T A G E - - - - INSTRUCTIONS NUNBER IDENT IF I CAT IOH ITEN NO NETH ( 1 2 3 1 2 3 1 2 3 ~iCALIBRATIOH BLOCK**

REF. DVG. NO.01-020 044800 Ol-020-H-1 TO 16 B.G-1 VT-1 3- 16 nuts REACTOR COOLANT PUHP HUTS 86.200 RCB 044900 01-020-LI G B.G-1 VT-1 3 X Examination of the flange Flange Surface 86.190 surface is required only vhen RCB the connection is disasserhled, includes 1" anwlar surface of flange surrounding each stud

DATE: 01/09/98 REVISION: 0 ST. LUCIE NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOMB TERH PLAN PAGE: '4 CLASS 1 ALL STATUS COHPONEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY IMJECTIOM PIPING INSIDE CTHT. FIRST SECOND THIRD ZONE NUMBER: 1-021 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHAT ION AREA CATGY HDE - 0 U T A G E - - - - -- IHSTRUCTIOHS NUHBER IDENT IF I CATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 *<<CALIBRATIOH BLOCK<<*

1-6-81-112 REF. DMG. NO. 01-021-8 3-045100 EL.34'-J SI-112-FM-7 PENETRATIOH RCB

¹37-TO.PIPE 89.11 SUR VOL COHTAINHENT PENETRATION

  • <<UT 38**

¹37 045200 EL.34'-J S I -112-6-SM-3 Pipe to Elbow RCB 89.11 SUR VOL 3 X ELBSI HATL. A312,lIP304

  • <<UT-38*<<

045300 Sl 112-6-SM-2 8-J SUR 3 X ELBSI HATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

  • <<UT-38**

045400 SI-112-6-SM-1 8-J SUR 3 X ELBSI NATL A312,MP304 Pipe to Elbow 89.11 VOL RCB

<<<<Ul'-38*<<

045500 SI-112- FM-8 8-J SUR 3 X ELBSI HATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

  • <<UT-38**

045600 SI-112.7.SM.1 8-J SUR 3- ELBSI HATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

<<<<UT-38*<<

045700 SI.112-FM.9 8-J SUR 3- ELBSI HATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

<<*UT-38*<<

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 85 REVISIOH: 0 INSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY INJECTION PIPING INSIDE CTMT. FIRST SECOND THIRD ZONE HUHBER: 1-021 ASNE PERIOD PERIOD PER ICO SEC. Xl SUHMARY EXAHIHATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUHBER IDENT IF I CAT IOH ITEH HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK

  • I-6.SI-112 REF. DUG. HO.01-021 B 045800 SI 112-8-SW-1 B-J SUR 3-Pipe to Pipe 89.11 VOL RCB
    • UT-38**

045900 SI.112-FW-10 B-J SUR 3-Pipe to Pipe B9.11 VOL RCB

~*UT-38~*

046000 SI-112-9.SN.1 8-J SUR Pipe to Pipe B9.11 VOL RCB

~~UT-38**

46100 SI-112.FW 11 B-J SUR 3-Pipe to Pipe 89.11 VOL RCB

  • ~UT-38*~

046200 SI-112-10.SII-1 B-J SUR 3-Pipe to Pipe 89.11 VOL RCB

    • UT-38**

046300 SI-112-F1I-12 B-J SUR 3-Pipe to Pipe B9.11 VOL RCB

+~UT 38**

046400 SI.112.11-SW-1 B-J SUR 3-Pipe to Pipe 89.11 VOL RCB t

1 U'I 38**

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 86 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL Sj'ATUS COHPOHEHTS INSPECTION IN IERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY INJECTION PIPING INSIDE CTHT. FIRST SECOND THIRD ZONE NUHBER: 1-021 ASHE PERIOD PERIOD PERIOD

<<g>l 8 ~ SEC. XI SUHHARY EXAHINATION AREA CATGY NDE - . - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEN HO NETH 2 3 1 2 3 1 2 3 <<<<CALIBRAT ION BLOCK<<<<

1-6.SI-112 REF. DMG. NO.01-021 8 046500 SI-112.FM-13 B.J SUR 3-Pipe to Pipe 89.11 VOL RCB

  • <<UT 38*<<

046600 S I-112-12.SM.1 8-J SUR 3-Pipe to Pipe 89.11 VOL RCB

    • UT-38*<<

046700 Sl -112-FM.14 8-J SUR 3-Pipe to Pipe 89.11 VOL RCB

  • <<UT 38*<<

046800 S I-112-13.S'M.1 8-J SUR 3-Pipe to Pipe 89.11 VOL RCB

    • UT 38*<<

046900 SI.112- FM-15 B.J SUR 3-Pipe to Pipe 89.11 VOL RCB

  • <<UT 38<<*

047000 SI-112-14-SM.1 8-J SUR 3-Pipe to Pipe 89.11 VOL RCB

<<<<UT-38<<<<

I-6-Sl-112 REF. DMG. NO. 01 021-A 047100 S I.112. FM-16 8-J SUR 3- ELBOM NATL~ A312,MP304 Pipe to Elbow 89.11 VOL RCB

<<*UT-38<<*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 87 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY INJECTION PIPING INSIDE CTHT. FIRST SECOND THIRD ZONE NUHBER: 1.021 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATION AREA CATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO NETH 1 2 3 1 2 3 1 2 3 ~~CALIBRATION BLOCK**

I 6 SI-112 REF. D'MG. NO. 01-021-A 047200 SI-112-FM.17 8-J SUR 3- ELBOM HATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

  • ~UT-38**

I.6-SI-148 REF. DMG. NO. 01-021-A 047400 SI-148-2-SM-2 8-J SUR 3 X ELBOM HATL. A312,MP304 Pipe to Elbow B9.11 VOL RCB

    • MT 38+*

047500 SI -148.2.SM-3 B-J SUR 3 X ELBOM HATL. A312,MP304 Elbow to Pipe B9.11 VOL RCB

  • +UT-38+*

047600 SI-148.2.SM.4 Pipe to Tee B-J 89.11 SUR VOL 3X - - - - - - - '2a X12a X6e HATL. A403,MP304 REDUCINGTEE RCB

  • ~UT-38~*

1.12-SI-148 REF. DMG. NO. 01-021-A 047700 V-3624 Bolting B-G-2 VT-1 3 X Group 2 Gate Valve Bolting 87.70 RCB 047800 V.3624 B.H-2 VT-3 3 X Group 2, examine when Gate Valve Internal Surface 812.50 disassembled for maintenance RCB or repair

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 88 REVISION: 0 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY INJECTION PIPING INSIDE CTNT. FIRST SECOND THIRD ZONE NUHBER: 1-021 ASNE PERIOD PERIOD PERIOD

'V

~

SEC. XI SUNNARY EXANINATIOH AREA CATGY NDE - - - - - 0 U T A G E - -- INSTRUCTIONS NUMBER IDEHTI F I CATION ITEH HO METH 1 2 3 ~ 1 2 3 1 2 3 ~~CALIBRATION BLOCK*~

I-12-SI-148 REF. DMG. NO. 01 021-A 1

047900 SI-148-FM-1 8-J SUR 3 X Valve V-3524 to Pipe 89.11 VOL RCB ttUT 35'*

048000 SI-148-1-SM-1 B.J SUR 3- L/R M/ELL ELBOM, 60 &c 45 Pipe to Elbow 89.11 VOL DEGREE, NATL. A403,'MP304 RCB

    • UT-35**

048100 S I -148-1-SM-2 8-J SUR 3- L/R M/ELL ELBOM IIATL.

Elbow to Pipe 89.11 VOL A403,MP304 RCB

    • UT-35**

048200 SI-148-FM-2 8-J SUR 3- 12" X 12" X 6" REDUCING TE Pipe to Tee 89.11 VOL NATL. A403,MP304 RCB

~~UT-35**

048300 SI-148-2-SM-5 8-J SUR 3- L/R M/ELL ELBOM, 12" X 12" X Tee to Elbow 89.11 VOL 6" REDUCING TEE) Limitation RCB due to welded tag (.7ex4.0")

  • 1UT 35*0 048400 S I -148- FM-3 8 J SUR 3- L/R M/ELL ELBOM NATL.

Elbow to Pipe 89.11 VOL A403,MP304 RCB

    • MT 35**

048500 SI-148-3-SM-1 8-J SUR 3-Pipe to Pipe 89.11 VOL RCB

    • UT-35**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 89 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAH CLASS 1 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY INJECTION PIPING INSIDE CTMT. F IRST SECOND THIRD ZONE HUHBER: 1-021 ASNE PER I CO PERIOD 'ERIOD SEC. XI SUNNARY EXANIHAT ION AREA CATGY HDE --- ---OUTAGE- INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>>

I-12-SI-148 REF. DMG. NO. 01-021-A 048600 SI-148-3-SM-2 B.J SUR 3- L/R M/ELL ELBOW NATL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB

  • 'UT-35**

048700 SI-148-FM.4 8-J SUR 3- L/R M/ELL ELBOM NATL.

Elbow to Pipe 89.11 VOL A403,MP304 RCB

>>>>UT 35**

048800 SI -148-4-SM.1 8-J SUR 3- L/R M/ELL ELBOW NATL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB

>>>>UT.35**

'8900 SI-148-FM-5 8-J SUR 3 X L/R M/ELL ELBOM ELBOM to VALVE V-3227 89.11 VOL RCB

~ >>UT 35 049000 V-3227 Bolting 8-G-2 VT-1 3 X Group 1 Check Valve Bolting 87.70 RCB 049100 V-3227 8-H-2 VT-3 3 X GROUP 1, examine when Check Valve Internal Surface 812.50 disasseahled for maintenance RCB or repair I-12.RC-151 REF. DWG. NO. 01-021-A 049200 RC-151-FW.1 8-J SUR 3 X L/R M/ELL ELBOW VALVE (V-3227)-TO-ELBOW 89.11 VOL RCB

    • UT 35**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 90 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY INJECTION PIPING INSIDE CTHT. FIRST., SECOND THIRD ZONE HUHBER: 1-021 ASHE PERIOD PERIOD PERIOD SEC. Xl SUHHARY EXAHIHAT IOH AREA CATGY NDE -----OUTAGE INSTRUCTIONS HUHBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

I-12-RC-151 REF. DWG. HO. 01-021-A 049300 RC-151-1.S'W-1 BJ SUR 3X L/R W/ELL ELBOW Elbow to Elbow 89.11 VOL RCB .

  • 'UT-35**

049400 FITTING ¹ 1 88-08 UT 3 Examined for USHRC Information ELBOW BETWEEN RC-151-1-SW-1 8 SUPP 3 VT Notice 88.08 FW-2 RCB **UT-SO**

049500 RC 151 FW.2 B.J SUR 3 X SAFE-EHD NATL'A351,GR.CFBHg Elbow to Safe-End 89.11 VOL L/R W/ELL ELBOW RCB

    • UT 35**

049600 RC-6-508A 8-F SUR 3 X SAFE EHD HATL. SA351,GR.CF SAFE-EHD TO SAFETY INJECTION 85.130 VOL NOZZLE RCB **UT 16, UT-23**

1-6-81-112 REF. DWG. NO. 01-021-8 049900 Sl-969.6202 F-A VT-3 3-RIGID SWAY STRUT F1.10 34'0" RCB 050000 SI-969-277 F-A VT-3 3-RIGID S'WAY STRUT F1.10 32'9" RCB 050100 S I -969-1277 F.A VT-3 3-RIGID SWAY STRUT F1.10 32i3w RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 91 REVI SION: 0 IHSERVICE INSPECTION LONG TERN PLAH CLASS 1 ALL STATUS CONPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY INJECTION PIPING INSIDE CTNT. FIRST SECOND THIRD ZOHE NUMBER: 1-021 ASHE PERIOD PERIOD PERIOD 6 4\ SEC. XI SUHHARY EXAHINATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIOHS HUHBER IDENT IF ICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 <<ICALI BRAT ION BLOCK ~

1-6-SI-112 REF. DUG. NO. 01-021-8 050200 SIH.201 FA VT3 3-SPRING BASE SUPPORT F1.10C 14'Oa RCB 050250 SI-969-6201 F-A VT-3 3-Snubber 1.062 F1.10S RCB 050300 S I -969.1201 F-A VT-3 3-RIGID SHAY STRUT F1.10 14'0" RCB 50350 SI.969-6217 F-A VT-3 3- Exemlne per plant procedures Snubber 1-063 F1.10S RCB 050500 SIH.200 F-A VT-3 3 X SLIDIHG BASE SUPPORT F'I.10 14'0" RCB 050600 SI-969.6200 F A VT.3 3 .

RIGID STRUT F1.10 14'Oa RCB 050700 S1.969-6199 F.A VT.3 3-RIGID STRUT F1.10 14'0" RCB

DATE: 01/09/98 ST+ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 92 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONEHTS IHSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY INJECTION PIPING INSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-021 ASME PERIOD PERIOD PERIOD

- SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCT lOllS NUMBER IDEHT IF I CAT IOH ITEH NO METH I 1 2 3 1 2 3 1 2 3 *iCALIBRATIOH BLOCK<<*

I-6-SI-112 REF. DNG. NO. 01-021-B 050800 S I H-199 F-A VT-3 3 X SLIDING BASE SUPPORT F1.10 14>0<< RCB 050900 S I H-198 F-A VT-3 3 X SLIDING BASE SUPPORT F1.10 14'0<< RCB 051000 S I -969-1198 F-A VT-3 3-RIGID STRUT F1.10 14'0<< RCB 051100 S I -969-6198 F A VT-3 Snubber 1-061 F1.10S 14'0<< RCB 051200 S I H-197 F.A VT.3 3 X SLIDING BASE SUPPORT F1.10 14'0<< RCB 051300 S I -969-6197 F-A VT-3 3 X RIGID SIIAY STRUT F1.10 14'0<< RCB 051400 S I H-196 F-A VT-3 3 X SLIDING BASE SUPPORT F1.10 14'0<< RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 93 REVISIOH: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY INJECTION PIPING INSIDE CTHT. SECOND 'IRST THIRD ZONE NUHBER: 1-021 ASHE PERIOD PERIOD PERIOD

~ ~ l)%1 %V SEC. XI SUMHARY EXAMIHAT ION AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUMBER IDENT I F ICATION ITEN HO HETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~*

I-6-SI-112 REF. D'WG. NO. 01-021-B I'51500 S I.969-6196 F.A VT-3 3-RIGID STRUT F1.10 14'0" RCB 051600 S I H.195 F-A VT-3 3 X SLIDIHG BASE SUPPORT F1.10 14'0" RCB 051700 S I -969-1195 F.A VT-3 RIGID SHAY STRUT F1.10 14'0" RCB 51800 S I.969-6195 F-A VT-3 3-Snubber 1-060 F1.10S 14'0" RCB 051900 S I H-194 F-A VT 3 3 X SLIDING BASE SUPPORT F1.10 14'0" RCB 052000 S I -969.6194 F.A VT-3 3 X RIGID SHAY STRUT F1.10 14'0" RCB 052100 S I H.193 F.A VT-3 3 X SLIDIHG BASE SUPPORT F1.10 14'0" RCB

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 94 REVI S ION: 0 INSERVICE INSPECTION LOHG TERH PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY INJECTION PIPING IHSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1.021 ASME PERICO PERIOD PERIOD SEC. XI

SUMMARY

EXAHIHATIOH AREA CATGY NDE OUTAGE----- INSTRUCTIONS NUMBER'DENTIFICATION ITEM HO METN I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK*>>

I-6-SI-112 REF. DUG. NO. 01-021-8 052200 SI-969-1193 F-A VT-3 3-RIGID SHAY STRUT F1.10 14'0" RCB 052300 SI-969-6193 F-A VT-3 3-Snubber 1-059 F1.10S 14'0" RCB 052400 S I.969-1192 F-A 'T-3 3 X RIGID RESTRAINT F1.10 14'0" RCB 052500 SI.969.6192 F A VT-3 3-RIGID RESTRAINT F1.10

'14'0" RCB I-12-Sl-148 REF. DUG. NO. 01-021-A 052600 SIH-217 F.A VT-3 3-

'PRING BASE SUPPORT F1.10C 20'2".RCB 052800 S I -969.6191 F-A VT-3 3 BOX RESTRAINT F1.10 14'0" RCB 052900 SI H-190 F-A VT-3 3 X SPRING BASE SUPPORT F1.10C 14'0" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 95 REVISION: 0 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 SAFETY INJECTION PIPING INSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-021 ASHE PERIOD PERIOD PERIOD gbH ~ SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~*

1-12.SI.148 REF. DUG. NO. 01.021.A

\

053100 S I.969.6190 F.A VT-3 3-RIGID RESTRAINT F1.10 14'04 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 96 RE V I SION: 0 IHSERVICE IHSPECTION LONG TERH PLAH CLASS 1 ALL STATUS COHPONEHI'S INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A2 SAFETY INJECTION PIPING INSIDE CTHT. FIRST SECOND THIRD ZONE HUHBER: 1-022 ASHE PERIOD PERIOD PERIOD

~ Pg 1 ~ SEC. XI SUNHARY EXAHIHATION AREA CATGY HDE - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEH HO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~*

1-6-SI.113 REF. DMG. NO. 01-022-B 053200 S1.113-FM-7 8-J SUR 3- COHTAIHHENT PENETRATION ¹36 PENETRATIOH ¹36-TO PIPE 89.11 VOL RCB

    • UT-38*'+

053300 S1-113.6-S'M-3 8-J SUR 3- ELBOM NATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

  • ~UT-38**

053400 SI -113-6-SM-2 8-J SUR 3- ELBOM HATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB 4+UT 38IA 053500 SI -113-6-SM.1 B.J SUR 3- ELBOM HATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

  • 1UT 38**

053600 S1-113- FM-8 BJ SUR 3- - - X ELBOM NATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

~*UT-38**

053700 SI-113-7-SM.2 8-J SUR 3 - - - X ELBOM NATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

~*UT-38**

053800 S1-113-7-SM.1 8-J SUR 3 - - - X ELBOM NATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

    • UT.38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 97 REVI SION: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECTIOH IHTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A2 SAFETY INJECTION PIPING IHSIDE CTHT. FIRST SECOND THIRD ZONE NUNBER: 1-022 ASNE PERIOD PERIOD PERIOD

~ 'I ~ I SEC. XI SUNNARY EXANIHATION AREA CATGY HDE ------OUTAGE------ INSTRUCTIONS NUNBER IDENT IF ICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

I-6-SI-113 REF. DWG. NO. 01.022.B 053900 SI-113-FW-9A B.J SUR 3 Weld is located in the trench, Pipe to Pipe 89.11 VOL covered Inaccessible RCB

-UT-38**

054000 SI-113-8-SW-1 B-J SUR 3-Pipe to Pipe B9.11 VOL RCB

    • UT-38**

054100 SI-113-FW-10 B.J SUR 3-Pipe to Pipe B9.11 VOL RCB

    • UT-38**

54200 S 1-113.9.SW-1 B.J SUR 3-Pipe to Pipe $ 9.11 VOL RCB OtU[ 381*

054300 SI -113-FW-11 B-J SUR 3-Pipe to Pipe B9.11 VOL RCB

    • U'f.38**

054400 Sl-113.10.SW 1 B-J SUR 3-Pipe to Pipe B9.11 VOL RCB

  • ~UT-38~*

054500 S I -113- F W-11A B-J SUR 3-Pipe to Pipe B9.11 VOL RCB A*UT 38'*

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 98 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A2 SAFETY INJECTION PIPING IHSIDE CTNT. FIRST SECOHD THIRD ZONE HUNBER: 1-022 ASHE PERIOD PERIOD PERIOD I\'i SEC. XI

~

SUIMARY EXANIHATION AREA CATGY HDE - - - - - 0 U T A'G E - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEN HO NETH i 1 2 3 1 2 3 1 2 3 *>>CALI BRAT ION BLOCK>>>>

I-6-SI-113 REF. DMG. NO. 01-022-B II 054600 S I-113-11-SM-1 B-J SUR 3-Pipe to Pipe 89.11 VOL RCB

    • UT-38**

054700 SI-113-FM-12 8-J SUR 3- ELBOM IIATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

>>>>UT-38**

054800 SI.113-12.SM.3 B.J SUR 3- ELBOM HATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

  • >>UT 38**

054900 SI-113-12.SM-2 B-J SUR 3- ELBOM NATL. A312,MP304 Pipe to Elbou B9.11 VOL RCB

>>>>UT-38>>*

055000 SI-113-12-SM-1 8-J SUR 3- ELBOM NATL. A312,MP304 Elbow to Pipe B9.11 VOL RCB

    • UT 38>>*

055100 S I -113- FM.13 8-J SUR 3 - - - X 12" X 12" X 6" REDUCING TEE Pipe to Tee 89.11 VOL NATL. A403,MP304 RCB

>>>>UT.38>>>>

I-12-SI 149 REF. DMG. HO. 01-022-A 055200 V-3614 Bol ting B-0-2 VT-1 3 X Group 2 Gate Valve Bolting B7.70 RCB

PAGEOS DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIl' 99 REVI SI OH: 0 IHSERVfCE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR LOOP 1A2 SAFETY INJECTION PIPING INSIDE CTMT. FIRST SECOND THIRD ZONE HUHBER: 1-022 ASME PERIOD PERIOD PERIOD SEC. XI.

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE------

INSTRUCTIONS HUHBER IDENTIFICATION ITEH HO HETH 1 2 3 2 3 1 2 3 **CALIBRATIOHBLOCK**

1-12-SI-149 REF. DMG. NO. 01-022-A 055300 V.3614 B-H-2 VT-3 3 X GROUP 2, examine when Gate Valve Internal Surface 812.50 disassembled for maintenance

'/R RCB or repair 055400 SI.149-FM-1 8-J SUR 3 - - - X VALVE V-3614 to PIPE 89.11 VOL RCB

  • OUT 354*

055500 Sl.149.1-SM-1 BJ SUR 3- M/ELL ELBOM HAIL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB

++UT 35*'+

055600 S I -149.1.SM.2 B.J SUR 3- L/R M/ELL ELBOM HATL~

Elbow to Pipe 89.11 VOL A403,MP304 "RCB

  • +UT 35**

055700 S1-149. FM-2 8 J SUR 3- I./R M/ELL ELBOM NATL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB

~~UT.35**

055800 Sl-149-2-SM-1 8-J SUR 3 - - - X L/R M/ELL ELBOM, 12" X 12" X Elbow to Tee 89.11 VOL 6" REDUCING TEE RCB

~~UT 50 055900 S1-149.2.SM-2 8-J SUR 3 - - - X 12" X 12" X 6" REDUCIHG TEE Tee to Pipe 89.11 VOL HATL. A403,lIP304 RCB

~~UT-35~~

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 100 REVISION: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPONEH'IS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A2 SAFETY INJECTION PIPING INSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-022 ASHE PERIOD PERIOD PERIOD A g Q, ~ Mj A WAR ~ J SEC. XI SUHHARY EXAHIHATIOH AREA CATGY HDE OUTAGE INSTRUCTIONS NUHBER IDENT IF I CATION ITEN NO NETH I 1 2 1 2 2 3 **CALIBRATIONBLOCK~*

I-12-SI-149 REF. D'MG. NO. 01-022-A 056000 S I -149-2-SM-3 8-J SUR 3-Pipe to Pipe 89.11 VOL RCB

  • IUT 35**

056100 S I -149-2-SW-4 8-J SUR 3- ELBOW NATL. A403,MP304I Exam Pipe to Elbow 89.11 VOL requires SIH-210 hanger clsap RCB to be removed, inaccessible

  • ~UT-35**

056200 S I -149- FW-3 8-J SUR 3- L/R M/ELL ELBOW NATL.

Elbow to Pipe 89.11 VOL A403,MP304 RCB

  • 1UT 35**

056300 SI.149-3-SW-2 8-J SUR 3- L/R W/ELL ELBOM NATL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB ssUT.35**

056400 SI-149.3-SW-1 8-J SUR 3- L/R W/ELL ELBOW HAT Elbow to Pipe 89.11 VOL A403,WP304 RCB

~~UT.35**

056500 SI-149-FW-4 8-J SUR 3-PIPE to VALVE V-3217 89.11 VOL RCB

    • UT 354*

I-12-RC-154 REF. DWG. NO. 01-022-A 056600 V-3217 Bolting 8-G-2 VT-1 3 X Group 1 Check Valve Bolting 87.70 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 101 REVISION: ' IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A2 SAFETY INJECTION PIPING INSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-022 ASHE PERICO PERIOD PERIOD SEC. XI

SUMMARY

EXAMIHATION AREA CATGY NDE ------OUTAGE.----- IHSTRUCTIOHS HUMBER IDENT IF I CATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

I-12-RC-154 REF. DUG. NO. 01.022-A 056700 V-3217 B.M-2 VT-3 3 X GROUP 1 examine uhen Check Valve Internal Surface 812.50 disasseahled for maintenance RCB or repair 056800 RC-154-FM-1 B-J SUR 3-VALVE V-3217 to ELBSI 89.11 VOL RCB

    • UT-50+*

056900 FITTING ¹ 2 88.08 UT 3- Examined for USHRC information ELBSI BETUEEN RC.154.FW 1 8 SUPP 3 VT Notice 88-08 SN-1 RCB *tUT 500*

057000 RC-154 1-SU-1 B.J SUR 3-Elbow to Pipe 89.11 VOL RCB

    • UT.35**

057100 RC-154- FN-2 8 J SUR 3 - - X SAFE-EHD MATL. SA351,GR.CFBMg Pipe to Safe-End 89.11 VOL UT-23 - use Cai notch both RCB sides.

    • UT 23**

057200 RC.6-5088 8 F SUR 3 - . X SAFE-EHD NATL. SA351,GR.CFBM SAFE EHD TO-Sl NOZZLE 85.130 VOL RCB

~~UT-23,UT-16~*

1.6-SI-113 REF. DUG. NO. 01-022-B 057400 SI-968-203 F-A VT-3 3-RIGID SHAY STRUT F1.10 34'0" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 102 REVISION: 0 IKSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A2 SAFETY INJECTION PIPIHG INSIDE CTHT. FIRST SECOHD THIRD ZONE NUMBER: 1-022 ASHE PERICO PERIOD PERIOD Hb ~ SEC. Xl SUNHARY EXAHINATIOH AREA CATGY NDE ---OUTAGE- INSTRUCTIOHS NUNBER IDENTIFICATION ITEM HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

I I-6-SI-113 REF. DMG. NO. 01-022-B I

057500'l-968-6203 F-A VT-3 3-RIGID SHAY STRUT F1.10 34'0" RCB 057700 Sl -968-620C F-A VT-3 3- X BOX RESTRAINT F1.10 19'6" RCB 057800 SI-968-205 F A VT-3 3-RIGID SHAY STRUT F1.10 19'6" RCB 057900 SI-968-1205 F.A VT-3 3-Snubber 1-055 F1.10S 19'6" RCB 058000 Sl-968-6205 F-A VT-3 3-BOX RESTRAINT F1.10 19'6" RCB 058100 S I -968-206 F-A VT-3 3-RIGID SHAY STRUT F1.10 19'6" RCB 058200 SI-968.6206 F-A VT-3 3-BOX RESTRAIHT F1.10 19'6" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 103 REVISIOH: 0 INSERVICE IHSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A2 SAFETY INJECTION PIPING INSIDE CTMT. FIRST SECOND 'HIRD ZONE NUMBER: 1 022 ASME PERICO PERIOD PERIOD

~ 'VP 1t SEC. XI

SUMMARY

EXAMIHAT I OH AREA CATGY NDE -----.OUTAGE------ INSTRUCTIONS NUMBER IDENT IF I CATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 BLOCK ~

'*CALIBRATION 1-6.SI-113 REF. D'LIG. NO. 01-022-8 058300 SI-968-207 F-A VT-3 3-RIGID SHAY STRUT F1.10 19'64 RCB 058400 S I -968-1207 F.A VT-3 3-Snubber 1-056 F1.10S 19'6" RCB 058500 SI-968.6207 F.A VT-3 3-BOX RESTRAIHT F1.10 19'6" RCB 058600 S IH 208 F-A VT-3 3-RESTRAINT F1.10 19'64 RCB 058700 Sl-968.6208 F-A VT.3 3 - - - X Support located In the trench RIGID SHAY STRUT F1.10

'19'6" RCB 058800 Sl H.209 F-A VT-3 3-RESTRAINT F1. 10 19'6" RCB I-12-SI-148 REF. O'WG. HO. 01-022-A 058900 S I H-212 F-A VT-3 3-BOX RESTRAINT F1.10 20'2" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 104 REVISION: 0 IHSERVICE IHSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A2 SAFETY INJECTION PIPING INSIDE CTHT. FIRST SECOND THIRD ZONE NUHBER: 1 022 ASHE PERICO PERIOD PERIOD

\I l f 4 A ~ al SEC. XI SUMHARY EXAHIHATION AREA CATGY NDE OUTAGE-- INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK"*

1.12-SI-1CB REF. DUG. NO. 01-022-A 059000 Sl 968-6212 F-A VT-3 3 - - - X RESTRAINT F1.10 20'2" RCB 059100 S IH.211 F-A VT-3 3-RIGID RESTRAINT F1.10 16'6" RCB 059200 S I H-210 F-A VT-3 3 - - - - - X SPRING BASE SUPPORT F1.10C 16'6" RCB 059300 S I -968 210 F-A VT-3 3-Snubber 1-053 F1.10S 16'6" RCB 059400 Sl-968-6210 F A VT-3 3-RESTRAINT F1.10 16'64 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PACE: 105 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPOHEHTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR LOOP 1B1 SAFETY IHJECTIOH PIPING INSIDE CTMT. FIRST SECOND THIRD ZONE HUHBER: 1-023 ASNE PERIOD PERIOD PERIOD SEC. XI SUNHARY EXANIHATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK>>>>

1-6-SI-I11 REF. DMG. NO.01-023 059500 SI-111-FM-9A 8-J SUR 3- X COHTAIHKEHT PENETRATION ¹38 PEHETRAT IOH ¹38-TO.PIPE 89.11 VOL RCB

    • UT 38**

059600 SI.111-FM-98 8-J SUR 3-Pipe to Pipe B9.11 VOL RCB

>>>>UT.38>>>>

059700 S I -111.8-SM-3 B.J SUR 3- ELBOM NATL~ A312,MP304 Pipe to Elbow 89.11 VOL RCB

>>*UT-38**

59800 SI-111-8-SM-2 B-J SUR 3- ELBOM NATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

    • O'I 38*>>

059900 Sl-111-8-SM-1 8-J SUR 3- ELBOM NATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

    • UT-38**

060000 SI.111-F'M-10 8 J SUR 3- ELBOM NATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

    • UT 38>>>>

060100 SI.111-9.SM-S 8-J SUR 3- ELBOM NATL. A312,MP304 Pipe to Pipe 89.11 VOL RCB

    • UT-38*>>

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 106 REVISION: 0 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 181 SAFETY INJECTION PIPING INSIDE CTMT. FIRST SECOND THIRD ZONE HUHBER: 1-023 ASHE PER ICO PERIOD PERIOD I i ~ I SEC. XI SUHHARY EXAHIHATION AREA CATGY NDE OUTAGE- -- INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK**

I-6-SI-111 REF. DMG. NO.01-023 060200 S I -111-9-SM.1 8-J SUR 3- ELBOM NATL. A312,MP304 Pipe to ElboM 89.11 VOL RCB

    • UT-38~*

060300 Sl-111-9-SM-2 8-J SUR 3- ELBOM HATL. A403,MP304 Elbow to Pipe 89.11 VOL RCB

~~UT-38~*

060400 SI -111-FM-11 8-J SUR 3- 0 12" X 12" X 6" REDUCING TEE Pipe to Tee 89.11 VOL HATL. A403,MP304 RCB

  • fUT 38I1 1-12.SI 150 REF. DMG. NO. 01.023 060500 V-3634 Bolting 8-G-2 VT 1 3 X e e O O Group 2 Gate Valve Bolting 87.70 RCB 060600 V-3634 8-M-2 VT-3 3 X GROUP 2, examine Mhen Gate Valve Internal Surface 812.50 disasserhled for maintenance RCB or repair 060700 S 1.150- FM-1 8-J SUR 3 X L/R M/ELL ELBOM Valve V-3634 to Elbog 89.11 VOL RCB
    • UT-35~*

060800 SI-150-1-S'M-1 8 J SUR 3- L/R M/ELL ELBOM, 12" X 12" X Elbow to Tee 89.11 VOL 6" REDUCING TEE RCB

    • UT-35*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 107 REVISION: 0 IHSERVICE INSPECTION LONG'ERH PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 181 SAFETY INJECTION PIPING INSIDE CTHT. FIRST SECOND THIRD 2ONE HUHBER: 1-023 ASHE PERIOD PERIOD PERIOD A - >> V(l1IPIIW Jl ~,A 8 Iw I~

SEC. Xl SUHHARY EXAHIHATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUHBER IDEHI'IF ICATION ITEN NO HETH I 1 2 3 1 2 3 1 2 3 >>>>CAL I BRAT ION BLOCK>>>>

1-12-S1-150 REF. DIIG. NO.01-023 061000 SI-150.1.SM-2 8-J SUR 3 . L/R M/ELL ELBOM, 12" X 12" X Tee to Elbow 89.11 VOL 6" REDUCIHG TEE RCB

>>>>UT 35**

061100 SI-150-1-SM-3 8-J SUR 3- L/R M/ELL ELBSI HATL.

Elbow to Pipe 89.11 VOL A403,MP304 RCB

  • >>UT 35>>*

061200 SI.150-F'M-2 8-J SUR 3- L/R M/ELL ELBSI HATL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB

>>>>UT.35*>>

061300 S I.150-2.SM 4 8-J SUR 3 L/R M/ELL ELBSI HATL.

Elbow to Pipe 89.11 VOL A403,MP304 RCB

>>*UT 35**

061400 SI-150-2-SM-3 8-J SUR 3- L/R M/ELL ELBSI HATL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB

  • >>UT 35**

061500 S1.150.2-SM-2 8-J SUR 3- L/R M/ELL ELBSI HATL.

Elbow to Pipe 89.11 VOL A403,lIP304 RCB

>>>>UT-35>>>>

061600 SI-150.2-SM-1 8-J SUR 3- L/R lI/ELL ELBSI NATL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB

  • >>UT 35**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 108 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 181 SAFETY INJECTION PIPING INSIDE CTMT. FIRST SECOND THIRD ZONE NUHBER: 1.023 ASHE PERIOD PERIOD PERIOD

~ \ I)'Al'I~IILP t W ' i At I 1 ~

SEC. XI

'UHHARY EXAHINATI ON AREA CATGY NDE - - - - - - 0 U T A G E- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETN 1 2 3 1 2 3 1 2 3 <<<<CALIBRATION BLOCK<<<<

I 1-12-SI-150 REF. DUG. NO.01-023 061700 SI-150-FW-3 8-J SUR 3- L/R U/ELL ELBM HATL~

Elbow to Pipe 89.11 VOL A403,UP304 RCB

    • UT-35<<*

061800 S I -150-3-SN-1 8 J SUR 3 L/R ll/ELL ELBSI MATL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB

<<<<UT-35**

061900 SI-150-FW-4 8-J SUR 3 L/R U/ELL ELBSI ELBSI to VALVE V-3237 89.11 VOL RCB

  • <<UT 35<<*

I-12-RC-152 REF. DUG. NO. 01.023 062000 V-3237 Bolting 8-0-2 VT-1 3 X Group 1 Check Valve Bolting 87.70 RCB =

062100 V-3237 B-H.2 VT-3 3 X GROUP,1, examine when Check Valve Internal Surface 812.50 disassembled for maintenance RCB or repair 062200 RC-152-FU-1 8-J SUR 3- X VALVE V-3237 to PIPE 89.11 VOL RCB

  • <<UT-35**

062300 RC-152-1-SW-2 8-J SUR 3- X L/R ll/ELL ELBSI HATL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB

  • <<UT 35*<<

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHI'NIT 1 PAGE: 109 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 181 SAFETY INJECTION PIPING INSIDE CTHT. FIRST SECOND THIRD ZONE NUHBER: 1-023 ASHE PERIOD PERIOD PERIOD tt; 'i 'li lit ~ ~ Ark SEC. XI SUHHARY EXAHIHAT ION AREA CATGY HDE ------OUTAGE-. INSTRUCT IOHS NUMBER IDENTIFICATION ITEH NO NETH I 2 3 1 2 3 1 2 3 ~ICALI BRAT ION BLOCK**

I-12-RC-152 REF. DWG. NO.01-023 062400 FITTING ¹3 88-08 UT 3 Exam3ned for USNRC Information ELBOW BETWEEN RC-152-1-SW-2 8 SUPP 3 VT Notice 88-08 S'W 1 RCB ttUT 50**

062500 RC.152-1-SW-1 B-J SUR 3 - . - - - X L/R W/ELL ELBOW NATL.

Elbow to Pipe 89.11 VOL A403,WP304 RCB

  • 1UT 351*

062600 RC-152-FW-2 B-J SUR 3 - - . - - - X SAFE-END NATL. SA351,GR.CFBH Pipe to Safe-End 89.11 VOL RCB

  • iUT-35+*

062800 RC.6-508C 8-F SUR 3 - - - - - - X SAFE-END NATL. SA351,GR.CFBH SAFE-END to Sl NOZZLE B5.130 VOL RCB

  • iUT-16'*

l-6.SI-111 REF. DWG. NO.01-023 063000 SI-972-246 F A VT-3 3 RIGID SWAY STRUT F1.10 34'0" RCB 063100 SI-972-6246 F-A VT-3 3-RIGID SWAY STRUT F1.10 32'4" RCB 063200 SIH-245 F-A VT-3 3- X SPRING BASE SUPPORT F1.10C 18'10" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 110 REVISION: 0 IHSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B1 SAFETY INJECTION PIPING INSIDE CTHT. FIRST SECOND THIRD ZOHE HUHBER: 1-023 ASHE PERIOD PERIOD PERIOD

~ ~ a;z sq tl,'I !1Ãlc JP Ae'tsH'wwJ'i ~v v~ ~ ~ p i ~ ~ ~

SEC Xl SUHHARY EXAMINATION AREA CATGY NDE OUTAGE- INSTRUCTIONS NUN BER I DENT I F I CAT ION ITEM HO NETH ( 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK*~

I 12-SI 150 REF. DUG. NO.01-023 063600 SI H-241 F-A VT-3 3- X RIGID STRUT F1.10 16'6" RCB 063700 SIH.240 F-A VT-3 3-SPRING BASE SUPPORT F1.10C 16'6" RCB 063800 SI.972-1240 F-A VT-3 3-RIGID STRUT ASSY. F1.10 16'6" RCB 063900 S1.972.6240 F-A VT-3 3-Snubber 1-073 t 1-114 F1.10S 16'6" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHI'NIT 1 PAGE: 111 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION, INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 SAFETY INJECTION PIPING INSIDE CTMT. FIRST SECOND THIRD ZONE NUHBER: 1-024 ASHE PERIOD PERIOD PERIOD

~$ $ ~ ~ ~~

SEC. Xl SUHHARY EXAHINATION AREA CATGY NDE - - - -OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK**

1-6.S1-110 REF. DMG. NO. 01-024-8 064000 SI-110-FM-9A 8-J SUR 3-Penetration 39 to Pipe 89.11 VOL RCB

~*UT-38**

064100 S1-110.8-SM-5 8-J SUR 3- ELBSI NATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

    • UT-38~*

064200 S I -110-8.SM-4 8-J SUR 3- ELBSI HATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

  • ~UT.38**

64300 Sl-110-8-SM-3 8-J SUR 3- ELBSI NATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

  • ~UT-38**

064400 S I -110-8-S'M-2 8-J SUR 3- ELBSI NATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

    • UT-38**

064500 S1-110-8-S'M-1 8-J SUR 3 . ELBSI NATL. 'A312,MP304 Pipe to Elbow 89.11 VOL RCB

~~UT-38**

064600 Sl-110-FM-10 8-J SUR 3- ELBOM NATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

    • UT-38*'

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UHIT 1 PAGE: 112 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 SAFETY INJECTION PIPING INSIDE CTHT. F IRST SECOND THIRD ZONE NUMBER: 1-024 ASHE PERICO PERIOD PERIOD I, 4V *4 SEC. Xl SUHHARY EXAHIHATIOH AREA CATGY HDE -----OUTAGE INSTRUCI'IOHS NUMBER IDENT IF I CAT ION I >> 1>> ITEN H

HETH I 1 2 3 1JVjkf*811t '4k1 2 3 ol '

1 2 4<<

3 *>>CALIBRATION BLOCK>>>>

1-6-81-110 REF. DMG. NO.01-024.8 064700 SI-110-9-SM-1 8 J SUR 3 X ELBOM HATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

<<>>UT-38**

064800 Sl-110-FM-1'I B.J SUR 3 X ELBOW HATL~ A312,MP304 Elbow to Pipe 89.11 VOL RCB

"<<UT 38>>>>

064900 Sl-110-10-SM-2 8-J SUR 3- ELBOW HATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

<<>>UT 38>>>>

065000 SI-110.10-SM-1 B.J SUR 3- ELBOW HATL A312,MP304 Elbow to Pipe 89.11 VOL RCB

    • UT-38>>*

065100 S I -110. FM-12 8-J SUR 3 . ELBOW HATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

<<*UT 38*>>

065200 S1-110-11 SM 1 8-J SUR 3 . - - X ELBOW HATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

  • <<UT-38**

065300 S I -110- FM-13 B.J SUR 3 - - - X Pipe to Pipe 89.11 VOL RCB

    • UT-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 113 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPOHENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 SAFETY INJECTION PIPING INSIDE CTNT. FIRST SECOND THIRD ZOHE NUNBER: 1-024 ASNE PERIOD PERIOD PERIOD

)~ Pt 44IVPh'l <<VIA~~ SEC. XI SUNNARY EXAMINATION AREA CATGY HDE - - - - - 0 U T A G E - - -- INSTRUCTIONS NUNBER IDENTIFICATION ITEN NO METH i 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK**

4 t'ai ' <JS Al' ~ 4 '4111 a le A 1-6-SI-110 REF. DMG. NO. 01-024-8 065400 SI-110-12-SM-1 8-J SUR 3 X ELBOM NATL. A312,MP304 Pipe to Elbow 89.11 VOL RCB

    • UT-38~+

065500 SI 110-FM-14 B.J SUR 3 - - - X ELBOM NATL. A312,MP304 Elbow to Pipe 89.11 VOL RCB

    • UT-38~~

I-12-SI 151 REF. DMG. NO. 01-024-8 065600 S I -151-1-SM-9 B.J SUR 3- X 12a X 6" COHC. REDUCER Pipe to Reducer 89.11 VOL NATL'403,MP304 RCB

    • MT-38*~

I-12-SI-151 REF. DMG. NO. 01.024.A 065700 V-3644 Bol ting 8.0-2 VT-1 3 X Group 2 Gate Valve Bolting 87.70 RCB 065800 V.3644 8-N-2 VT-3 3 X GROUP 2, examine when Gate Valve Internal Surface 812.50 disassembled for maintenance RCB or repair 065900 SI-151-FM-1 B.J SUR 3 - . - X VALVE V-3644 to PIPE 89.11 VOL RCB

  • aUT 35**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 114 REVISION: 0 INSERVICE INSPECTIOH LONG TERM PLAH CLASS 1 ALL Sl'ATUS COHPOHEH'IS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 SAFETY IHJECTIOH PIPING INSIDE CTHT. FIRST SECOND THIRD ZONE NUHBER: 1.024 ASHE PERIOD PERICO PERIOD

<< l<<i Jll\IVt Al W ( ~ P i 8 4 ~ ' )' i SECy X SUHHARY EXAHIHATION AREA CATGY NDE - - - - - -OUT A G E - - - -- INSTRUCTIONS HUHBER IDENTIFICATION ITEH HO HETH I 1 2 3 '

2 3 1 2 3 <<<<CALIBRATIOH BLOCK<<<<

I.12-SI-151 REF. DMG. NO. 01-024-A 066100 Sl.151-1.SM-4 8-J SUR 3- 12<< X 12" X 124 TEE HATL.

Pipe to Tee 89.11 VOL A403,MP304 RCB

  • <<UT 35<<*

I-12-SI-151 REF. DMG. NO. 01.024-8 066200 Sl -151.1-SM-3 8-J SUR 3- 12" X 6" CONC. REDUCER, 12" X Reducer to Tee 89.11 VOL 12" X 12" TEE RCB

<<*UT 50<<

I 12-SI.151 REF. DMG. NO. 01-024-A 066300 Sl-151-1-SM.2 8-J SUR 3- 12" X 12" X 12" TEE HATL.

Tee to Pipe 89.11 VOL A403,MP304 RCB

<<<<UT 35**

066400 Sl -151.1-SM-1 B.J SUR 3- L/R M/ELL ELBOM HATL.

Pipe to Elbow 89..11 VOL A403,MP304 RCB

    • UT 35**

066500 SI-151.FM-2 B.J SUR 3- L/R M/ELL ELBOM Elbow to Elbow 89.11 VOL RCB

    • UT-50**

066600 S I -151-2-SM-3 8 J SUR 3- L/R M/ELL ELBOM HATL.

Elbow to Pipe 89.11 VOL A403,MP304 RCB

    • UT-35**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 115 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 SAFETY INJECTION PIPING INSIDE CTHT. FIRST SECOND THIRD ZONE NUHBER: 1 024 ASHE PERIOD PERIOD PERICO SEC. XI SUHHARY EXAHI NATION AREA CATGY NDE OUTAGE- -- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETH I 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK>>>>

I.12-SI.151 REF. DMG. NO. 01-024-A

~ h 066700 Sl-151-2.SM.2 B.J SUR 3-Pipe to Pipe 89.11 VOL RCB

    • MT 35*>>

066800 SI.151-2-SM.1 8-J SUR 3- L/R M/ELL ELBOM HATL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB

>>>>UT 35*>>

066900 Sl-151 FM 3 B.J SUR 3 L/R M/ELL ELBOM Elbow to Elbow 89.11 VOL RCB UT 35**

067000 S I -151-3-SM-3 8-J SUR 3 L/R M/ELL ELBOM HATL~

Elbow to Pipe 89.11 VOL A403,MP304 RCB

>>>>U'f-35**

067100 SI -151.3-S'M.2'ipe 8-J SUR 3- L/R M/ELL ELBOM HATL.

to Elbow 89.11 VOL A403,MP304 RCB

>>*UT 35**

067200 Sl-151-3-SM-1 8-J SUR 3- L/R M/ELL ELBOM HATL~

Elbow to Pipe 89.11 VOL A403,MP304 RCB

>>>>UT-35>>>>

067300 Sl -151.FM-4 8-J SUR 3 PIPE to VALVE V-3247 89.11 VOL RCB

>>>>UT-35**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 116 REVISION: 0 IHSERVICE INSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECTIOH IN'IERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 SAFETY INJECTION PIPING INSIDE CTHT. FIRST SECOND THIRD ZONE HUHBER: 1-024 ASHE PER ICO PERIOD PERIOD t 4 h ~ I*% L ~

'SEC. XI SUHHARY EXAHIHATION AREA CATGY HDE 'OUTAGE INSTRUCTIOHS HUHBER I DEHT I F I CAT ION ITEH NO HETH I 1 2 3 1 2 3 1 2 3 <<<<CALIBRATIOH BLOCK<<<<

~ ' 'Kidd ~ J ' '

I-12-RC-153 REF. D'MG. NO. 01-024-A 067400 V-3247 Bolting 8-0-2 VT-1 3 X Group 1, 16 studs and nuts Check Valve Bolting 87.70 RCB 067500 V-3247 8-N-2 VT-3 3 X GROUP 1, examine when

. Check Valve Internal Surface 812.50 disassembled for maintenance RCB or repair 067600 RC-153. F'M.1 8-J SUR 3-VALVE V-3247 to PIPE 89.11 VOL RCB

    • UT-35<<>>

067700 RC-153-1.SM-1 8 J SUR 3- L/R M/ELL ELBSI NATL.

Pipe to Elbow 89.11 VOL A403,MP304 RCB

    • MT 35**

067800 FITTIHG 4 ¹ 88-08 UT 3 Examined for USNRC Information ELBSI BETMEEH RC-153-1-SM-1 & SUPP 3 VT Notice 88-08 FM.2 RCB **Ul'0**

067900 RC-153-FM-2 8-J SUR 3- SAFE-EHD NATL. SA351,GR.CFBH, Elbow to Safe-End 89.11 VOL L/R M/ELL ELBSI RCB

<<*UT-35**

068000 RC-6-5080 B.F SUR 3- X SAFE-EHD NATL. SA351,GR.CFBH SAFE-END to Sl NOZZLE 85.130 VOL RCB

    • UT-16,UT.23<<*

DATE: 01/09/98 ST. LUCIE NUCI.EAR PLANT UNIT 1 PAGE: 117 REVISION: 0 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B2 SAFETY INJECTION PIPING INSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-024 ASKE PERIOD PERIOD PER I CO SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIOHS NUMBER IDENT IF ICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

I.6.SI-110 REF. DWG. NO. 01-024-B l

068300 Sl -971 262 F-A VT-3 3-SPRING HANGER F1.10C 34'0" RCB 068400 Sl.971-235 F.A VT-3 3 X RIGID SWAY STRUT F1.10 32'0" RCB 068500 Sl -971-6235 FA VT3 3-RIGID SWAY STRUT F1.10 32'0" RCB 068600 S I H.234 F.A VT 3 3-SPRIHG HANGER F1.10C 32'0" RCB 068700 SI-971-6233 F-A VT-3 3 RESTRAINT F1.10 16'6" RCB 068800 S I H.233 F.A VT-3 3 - - . X SLIDING BASE SUPPORT F1.10 16'6" RCB 068900 SI-971-6234 F-A VT-3 3-BOX RESTRAINT F1 ~ 10 32'0" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 118 REVI S ION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTIOH INI'ERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B2 SAFETY INJECTION PIPING INSIDE CTHI'. FIRST SECOND THIRD 20NE NUHBER: 1 024 ASME PERIOD PERIOD PERIOD

~ i ~

SEC. XI SUHHARY EXAHINATION AREA CATGY NDE OUTAGE-- IHSTRUCT IONG NUHBER IDENTIFICATION ITEN NO METH i

'i 1 2 3 44j 4'jA '4 1 2 3 4

1 2 3 **CALIBRATIONBLOCK ~

I-6-SI-110 REF. DNG. NO. 01.024-B 069000 SIH-232 F.A VT-3 3-SLIDING BASE SUPPORT F1.10 16'6" RCB 069100 S I -971-6232 F A VT-3 3-RIGID SIIAY STRUT F1.10 16'6" RCB 069200 Sl H.231 F-A VT-3 3-SPRING HANGER F1.10C 16'6" RCB I 12-Sl 151 REF. DOG. NO. 01-024-A 069300 SIH-236 F-A VT3 3-PIPE HANGER F1.10 19'6" RCB 069400 S I -971.6236 F-A VT-3 3-Snubber 1-071 II 1-113 F1.1OS 19'64 RCB 069500 SIH-230 F-A VT-3 3-SPRING BASE SUPPORT F1.10C 16'6" RCB 069600 SIH-229 F.A VT-3 3-SPRING BASE SUPPORT F1.10C 16'6" RCB

DATE: 01/09/98 ST. LUCIE HUCLEAR PLAHT UNIT 1 PAGE: 119 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COHPONEH'IS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B2 SAFETY INJECTION PIPING INSIDE CTHT. F,IRST SECOND THIRD ZONE HUNBER: 1-024 ASHE PERIOD PERIOD PERIOD SEC. XI SUHMARY EXAHIHAT I ON AREA CATGY HDE OUTAGE.-.--- INSTRUCTIONS NUHBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK

  • I-12 SI-151 REF. DUG. NO. 01-024-A 069900 S I.971-6 F-A VT-3 3-Snubber 1-060 F1.10S 24'6" RCB

DATE: 01/09/98 ST. 'LUCIE NUCLEAR PLANT UHIT 1 PAGE: 120 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED PRESSURIZER SPRAY LINE FIRST SECOND THIRD ZONE HUHBER: 1-025 ASHE PERIOD PERIOD PERIOD N<<< <IIAW'l lk~

Xl SUHHARY EXAHINATIOH AREA SEC.

CATGY NDE - --- - -OUTAGE- INSTRUCTIONS NUHBER IDENT IF I CAT IOH ITEH HO HETH 2 3 1 2 3 1 2 3 <<*CALI BRAT ION BLOCK<<<<

I-4-RC-103 REF. DMG. NO.01-025 070000 RC-103A.SM-3 8-J SUR 3- 3" X 4" CONC. REDUCER, 4<< X 4" Reducer to Tee 89.11 VOL X 4" TEE RCB

<<*UT-39**

070100 RC-103A-SM-4 8-J SUR 3- 3" X 4"COHC, REDUCER, 4" X 4" Reducer to Tee 89.11 VOL X 4" TEE RCB

<<<<UT 39*<<

070200 RC-103A-S'M-2 8-J SUR 3- 4" X 4<< X 4" TEE HATL.

Tee to Pipe 89.11 VOL A403,MP316 RCB

    • Ul'-40**

070300 RC-103A-SM.1 8-J SUR 3 ELBOM HATL. A403,MP316 Pipe to Elbow 89.11 VOL RCB

  • 1UT 40**

070400 RC-103-FM-1 8-J SUR 3- ELBOM HATL. A403,MP316 Elbow to Pipe 89.11 VOL RCB 070500 RC.1038-SM-1 Pipe to Elbow RCB 8-J 89.11 SUR VOL

'LBOM 3-

  • 1U'f 40**

HATL. A403,MP316

    • UT.401<<

070600 RC-1038-SM-2 8-J SUR 3- ELBOM HATL. A403,MP316 Elbow to Pipe 89.11 VOL RCB

<<*UT-40**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 121 REVI SIGH: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED PRESSURIZER SPRAY LINE FIRST SECOND THIRD ZONE NUHBER: 1 025 ASHE PERIOD PERICO PERIOD SEC. XI SUHHARY EXAHINATION AREA CATGY NDE - - - - - 0 U T A G E - - - - -- IHSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK<<<<

I-4-RC-103 REF. DWG. NO.01-025 070700 RC-1038-SW-3 8-J SUR 3- ELBOW NATL. A403,WP316 PIPE BEND-TO-ELBOW 89.11 VOL RCB

  • <<UT-40**

070800 RC-103-FW-2 8-J SUR 3- ELBOW NATL. A403,WP316 Elbow to Pipe 89.11 VOL RCB

    • UT.40**

070900 RC-103C-SW-1 8-J SUR 4" X 4" X 4" IHCONEL TEE NATL Pipe to Tee 89.11 VOL ASTH 8-366,GR.WPNCL RCB

  • <<UT 40<<<<

71000 RC-103C-SW-3 8-J SUR 3 . 4" X 4" X 4" INCONEL TEE, 4" X Tee to Reducer 89.11 VOL 2" CONC REDUCER, TEE NATL.

RCB ASTH,8-366,GR.WPNEL

    • UT 40<<*

071200 RC-103C-SW-2 8-J SUR 3- 4" X 4" X 4" INCONEL TEE NATL.

Tee to Pipe 89.11 VOL ASTH,B 366,GR.WPNCL, SS PIPE RCB

  • <<UT 40<<<<

071300 RC-103-FW-3 8-J SUR 3 SAFE-END NATL. A351,GR.CFBH Pipe to Safe-End 89.11 VOL RCB

  • <<UT 19<<*

071400 15-405 8-F SUR 3 X 4" SPRAY HOZZLE SAFE-END to SPRAY NOZZLE 85.40 VOL RCB

<<<<UT 19**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 122 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS IHSPEC'TIOH INTERVAL PLAN STATUS PRESERVICE YEAR COMBIHED PRESSURIZER SPRAY LINE FIRST SECOHD THIRD ZONE NUHBER: 1.025 ASNE PERIOD PERIOD PERIOD

~ \i ~. ~ V S ~

SECo XI

SUMMARY

EXAMINATION AREA CATGY HDE -OUTAGE------ INSTRUCTIOHS NUMBER IDENT I F I CAT ION ITEM NO METH I 1 2 3 1 2 3 1 2 3 *~CALIBRATIOH BLOCK~*

I-4 RC-103 REF. DWG. NO. 01 025 071500 SPH-768 F.A VT-3 3 . X Per JPN-PSLP-93-0087, Set at 0 COHSTANT SPRING HANGER F1.10C or 10 mark depending on the CTMT 80'3" RCB vertical pipe movement.

Allowable variance is +/- 1/4" as long as it doesn't fall outside the 0 to 10 mark range.

071600 SPS-777 F.A VT.3 3- Extent and frequency in Snubber 1-093 F1.10S accordance with Technical.

RCB Specifications.

071700 SPS-797 F.A VT3 3-RIGID SHAY STRUT ASSEMBLY F1.10 RCB 071800 SPS-787 F-A VT-3 3-RESTRAINT F1 ~ 10 RCB 071900 SPH-808 F.A VT-3 3-VARIABLE SPRING HANGER F1.10C RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 123 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B1 SPRAY LINE FIRST SECOND THIRD ZONE NUHBER: 1.026 ASKE PERICO PERIOD PERIOD

~ ~

SEC. XI SUHHARY EXAHIHATIOH AREA CATGY NDE - - - - - . 0 U T A G E - - - - -- IHSTRUCTIONS NUHBER IDENT IF ICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK**

I-3-RC-109 REF. DMG. NO. 01-026-A

  • 0 072000 12.507.181 8-F SUR 3 - - - X SAFE END NATL. A182,TP316,'S NOZZLE-TO SAFE-END 85.140 RCB 072100 RC-109- FM-1A 8-J SUR 3- SAFE-END NATL. A182,TP316 Safe-End to Pipe 89.21 RCB 072200 RC-109A-SM-2 8-J SUR 3 - - - X ELBOM NATL. A312,TP316 Pipe to Elbow 89.21 RCB 072300 RC.109A-SM-1 8-J SUR 3 ELBOM NATL. A312,TP316 Elbow to Pipe 89.21 RCB 072400 RC-109-FM 1 8-J SUR 3-PIPE BEND-TO.PIPE BEND 89.21 RCB 072500 RC.109-FM-2 8-J SUR 3- ELBOM NATL. A312,MP316 PIPE BEND-TO ELBOM 89.21 RCB 072600 RC-109C-SM-1 8-J SUR 3 - - - X ELBOM NATL. A312,MP316 Elbow to Pipe 89.21 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 124 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR LOOP 181 SPRAY LINE FIRST SECOND THIRD ZONE HUNBER: 1-026 ASNE PERIOD PERIOD PERIOD SEC. XI SUNNARY EXANIHATIOH AREA CATGY 'DE - 0 U T A G E - - - - -- INSTRUCT IOHS NUHBER IDENTIFICATION ITEN HO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK

  • I-3-RC-109 REF. DMG. HO. 01 026-A 072700 RC-109C-SM-2 8-J SUR 3- X ELBSI HATL. A312,MP316 PIPE BEND-TO-ELBOM 89.21 RCB 072800 RC.109-FM-3 8-J SUR 3- ELBSI HATL. A312,TP316 ElboM to Pipe 89.21 RCB 072900 RC.109-FM.4 8-J SUR 3 - - - - - - X Pipe to Valve V-1250 89.21 RCB 072950 V-1250 3 No examination required, v Valve is 4" or tess in size RCB 073000 RC-109-FM-5 8-J SUR 3-Vatve V-1250 to Pipe Bend 89.21 RCB 073100 RC-109-FM.6 8-J SUR 3-Pipe Bend to Valve V-1249 89.21 RCB 073150 V-1249 3 Ho examination required, valve Vatve is 4" or less in size RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 125 REVISIOH: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONEH'IS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 181 SPRAY LINE FIRST SECOND . THIRD ZONE NUMBER: 1-026 ASME PERICO PERICO PERIOD

~c C 4J ~ IL I ~

SEC XI

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER I DEMI' F ICATION ITEM HO METH 1 2 3 1 2 3 1 2 3 ~~CALIBRATION BLOCK**

I-3-RC-109 REF. DNG. NO. 01 026-A 073200 RC.109-Fll-7 8-J SUR 3 - - - - - - X Valve V-1249 to Pipe Bend 89.21 RCB I-3.RC-109 REF. DUG. NO. 01-026-8 073300 RC.109F-SN.2 8-J SUR 3- 3" X 3" X 1 1/4" REDUCIHG TEE Pipe Bend to Tee 89.21 MATL. A403,NP316 RCB 073350 RC-109F.SN-1 8-J SUR 3-Tee to Reducing Insert 89.40 RCB 073400 RC-109F.SM-3 8-J SUR 3- High Radiation Area; 3" X 3" X Tee to Pipe 89.21 1 1/4" REDUCING TEE NATL.

RCB A403,NP316, Alara Concern, would require system flush.

073700 RC-109-Fll.B 8-J SUR 3- Support SPA-550 covers the PIPE to VALVE PCV-1100F 89.21 weld RCB 073750 PCV 1100F 3 Support SPA-550 covers the Valve valve, valve body is 4" or RCB less in size, no examination required 073800 RC-109-FN-9 8-J SUR 3- Support SPA-550 covers the VALVE PCV-1100F to PIPE 89.21 weld RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 126 REVISION: 0 INSERVICE INSPECTIOH LOHG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 181 SPRAY LINE FIRST SECOND THIRD ZONE HUHBER: 1-026 ASHE PER I CO PER ICO PER I OD SEC. XI SUHHARY EXAHINATION AREA CATGY NDE OUTAGE- INSTRUCTIONS NUHBER I DENT IF I CATION ITEH NO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

e v ew\ss v vs ~ v s m << ~

I-3-RC-109 REF. DMG. NO. 01-026-8 073900 RC-109G.SM-1 8-J SUR 3- Mhip restraint around weld Pipe to Elbow 89.21 RCB I

074000 RC-109G-SM-2 8-J SUR 3- Very difficult access Elbow to Elbow 89.21 RCB 074100 RC-109G.SM-3 8-J SUR 3- Very difficult access Elbow to Pipe 89.21 RCB 074200 RC 109-FM 10 B.J SUR 3 - - - - - . X Pipe Bend to Valve V.1253 89.21 RCB 074250 V-1253 3 No exenination required, valve Valve is 4" or less in size RCB 074300 RC.109-FM.11 8-J SUR 3-Valve V-1253 to Pipe Bend 89.21 RCB 074400 RC-109-FM-12 8-J SUR 3- 4" X 3" REDUCER PIPE BEND-TO-REDUCER 89.21 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 127 REVISION: 0 INSERVICE IHSPECTIOH LOHG TERH PLAN CLASS 1 ALL STATUS CCMPONEH'TS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR LOOP 181 SPRAY I.INE FIRST SECOND THIRD ZONE NUMBER: 1-026 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMIHAT IOH AREA CATGY NDE .-----OUTAGE IHSTRUCTIONS NUMBER IDENT IF I CAT IOH ITEM NO METH I 1 2 3 1 2 3 2 3 **CALIBRATIONBLOCK**

I-3-RC-109 REF. DUG. NO.01-026.A 074500 SPH.327 F-A VT-3 3-VARIABLE SPRING SUPPORT (2) F1.10C 39'8" RCB 074600 SPS-338 F-A VT-3 3-BOX RESTRAINT F1.10 40'10" RCB 074700 SPS.347 F A VT-3 3-RIGID SHAY STRUT'ASSEMBLY (2) F1.10 42'6" RCB 074800 SPS.367 F.A VT-3 3-BOX RESTRAINT F1.10 42'6" RCB 074900 SPH-378 F.A VT.3 3-VARIABLE SPRING SUPPORT F1.10C 47'0" RCB 075000 SPS-417 F A VT-3 3- Exanlne in accordance with Snubber 1-091 F1.10S plant procedures RCB 075100 SPS-407 F.A VT-3 3-RIGID SHAY STRUT ASSEMBLY F1.10 49'2" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 'I PAGE: 128 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B1 SPRAY LINE FIRST SECOND THIRD 2ONE HUHBER: 1 026 ASHE PERIOD PERIOD PERIOD SEC. XI SUHNARY EXANI NATION AREA CATGY NDE ----.OUTAGE----- INSTRUCTIONS NUHBER IDENT IF I CAT IOH ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

I A ~ ~I I-3-RC-109 REF. DWG. NO. 01-026-A 075200 SPS.427 F-A VT-3 3-BOX RESTRAINT F1.10 66'0<< RCB 075250 SPS.427 IA 8 K SUR 3 . 2 attachments, 1<<x3/8<<x3<<

Integral Attachment 810.20 66'0<< RCB 075300 SPS-448 F A VT-3' X RIGID SIJAY STRUT ASSEHBLY (2) F1.10 73'6<< RCB 075400 SPS-467 F-A VT-3 3- Examine in accordance with Snubber 1.240 & 1.241 F1.10S plant procedures RCB 075500 SPS-472 F-A VT-3 3 X RESTRAIHT F1.10 75'0<< RCB I-3-RC-109 REF DUG. NO.01-026 B 075600 SPS-478 F.A VT-3 3-RIGID SHAY STRUT ASSEHBLY F1.10 75'0<< RCB 075700 SPS-497 F-A VT-3 3-RIGID SHAY STRUT ASSEHBLE F1.10 75'0<< RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: . 129 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS IHSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B1 SPRAY LINE FIRST SECOND THIRD 20NE NUNBER: 1-026 ASHE PERICO PERICO PERICO SEC. Xl SUHHARY EXANIHATION,AREA CATGY NDE - - - - - - 0 U T A G E - -' - -- IHS'IRUCTIOHS NUHBER IDEHT IF I CAT ION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 ~~CALIBRATIOH BLOCK~*

I-3-RC 109 REF. DWG. NO. 01-026-B 075800 SPS.508 F-A VTi3 RIGID SWAY STRUT ASSEHBLE F1.10 75'0" RCB 075900 SPS-524 F-A VT-3 3-RIGID SWAY STRUT ASSEHBLY F1.10 75'0" RCB 076000 SPA 550 F A VT-3 3- X BOX RESTRAINT F1.10 75'0" RCB 076100 SPS.617 FiA VT-3 3 i RIGID S'WAY STRUT ASSENBLY F1.10 74'3" RCB 076200 SPN-628 F-A VT 3 3-VARIABLE SPRING HANGER F1.10C 78'6 'CB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 130 REVISION: 0 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 SPRAY LINE FIRST SECOHD THIRD ZONE NUNBER: 1-027 ASNE PERIOD PERIOD PERIOD

~

SEC. XI

~

SUNNARY EXANIHATIOH AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUMBER IDENT IF I CATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK ~

I.3-RC-141 REF. DMG. NO.01-027 076300 12-507.182 8-F SUR 3- X SAFE-END NATL. A182,TP316 NOZZLE TO SAFE EHD 85.140 RCB 076400 RC-141-FM-1A 8-J SUR 3- SAFE-END IIATL. A182,TP316 Safe-Erxl to Pipe 89.21 RCB 076500 RC-141A-SM-2 8-'J SUR 3- ELBOM NATL.'312,MP316 Pipe to Elbow 89.21 RCB 076600 RC-141A.SM-1 8 J SUR 3- ELBOM NATL. A312,MP316 Elbow to Pipe 89.21 RCB 076700 RC-141-FM.1 8-J SUR 3-PIPE BEND-TO-PIPE BEND 89.21 RCB 076800 RC-141-FM-2 8-J SUR 3-PIPE BEHD-TO PIPE 89.21 RCB 076900 RC-141C-SM-1 8-J SUR 3- ELBOM NATL. A312,MP316 Pipe to Elbow 89.21 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 131 REVISION: 0 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 SPRAY LINE FIRST SECOND THIRD ZONE NUHBER: 1-027 ASHE PERIOD PERIOD PERICO

~ '0 lg lg ~ vs ~ IP J M Al SEC. XI SUHHARY EXAHIHAT ION AREA CATGY NDE ------OUTAGE------ INSTRUCTIONS NUHBER IDENT IF ICATION 1TEH NO HETH I 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK~*

I-3-RC-141 REF. DMG. NO.01-027 077000 RC-141-FM-3 8-J SUR 3 ELBOM NATL. A312,MP316 Elbow to Pipe 89.21 RCB 077100 RC-141-FM-4 B.J SUR 3-PIPE-TO.VALVE (V-1251) 89.21 RCB 077200 RC.141-FM.5 8-J SUR 3-VALVE (V-1251)-TO-PIPE BEND 89.21 RCB 077300 RC-141-FM.6 8-J SUR 3-PIPE BEND-TO-VALVE (V 1248) 89.21 RCB 077400 RC.141-FM-7. 8 J SUR 3-VALVE (V-1248)-TO-PIPE 89.21 RCB 077500 RC-141F-SM-1 8-J SUR 3- 3" X 3" X 1 1/4" REDUCING TEE Pipe to Tee 89.21 NATL. A403,MP304 RCB 077600 RC-141F-SM-2 8 J SUR 3- 3" X 3e X 1 1/4" REDUCING TEE Tee to Pipe 89.21 NATL. A403,MP304 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 132 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 SPRAY LINE FIRST SECOHD THIRD ZONE NUMBER: 1-027 ASME PERIOD PERIOD PERIOD Pyt fgHhVIR '

  • SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE OUTAGE INSTRUCTIONS NUMBER IDENT IF ICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK~*

I-3-RC-141 REF. DUG. NO.01-027 V

077900 RC.141-FM-8 8-J SUR 3- ALARA Concern, High Radiation PIPE TO VALVE PCV-1100E 89.21 Area, requires system flush RCB 078000 RC-141- FW-9 8-J SUR 3- ALARA Concern, High Radiation VALVE (PVC-1100E)-TO-PIPE 89.21 Area, system flush required to RCB reduce exposure.

078100 RC-1410-SH-3 8-J SUR 3- ALARA Concern, High Radiation Pipe to Elbow 89.21 Area, requires a system flush RCB to reduce exposure. ELBSI MATL. A312,HP316 078200 RC-141G-SM-2 B-J SUR 3-Elbow to Elbow 89.21 RCB 078300 RC-141G-SM-1 8-J SUR 3- ELBSI NATL. A312,llP316 Elbow to Pipe 89.21 RCB 078400 RC-141-FW.10 B-J SUR 3-PIPE BEND-TO-VALVE (V-1252) 89.21 RCB 078500 RC-141-FW-11 B-J SUR 3 - - - X VALVE (V-1252)-TO.PIPE 89.21 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 133 REVISION: 0 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECT IOH INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 SPRAY LINE FIRST SECOND THIRD ZOHE NUHBER: 1-027 ASHE PERIOD PERIOD PERIOD I* J ~ valvtA w SEC. XI SUHHARY EXAMINATION AREA CATGY NDE -----OUTAGE----- INSTRUCTIOHS NUHBER IDENT IF ICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **GALI BRAT ION BLOCK**

I-3-RC-141 REF. D'NG. NO.01-027 078600 RC.141-FW-12 8-J SUR 3 - - - X 4" X 3a REDUCER Pipe to Reducer B9.21 RCB 078700 SPS-27 F.A VT-3 3- Examine in accordance Mith Snubber 1-090 F1.10S plant procedures RCB 078800 SPH-37 F-A VT-3 3-VARIABLE SPRIHG HANGER (2) F1.10C 46'10a RCB 78900 SPS-48 F-A VT-3 3-RIGID SIIAY STRUI'SSEHBLY F1.10 47'Oa RCB 079000 SPH-37A F A VT-3 3-VARIABLE SPRING HANGER F1.10C 52'3" RCB 079100 SPS-67 F.A VT-3 3 - - - - - X BOX RESTRAINT F1.10 52'3" RCB 079200 SPH-58 F-A VT-3 3- X SPRING HANGER F1.10C 52'3" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 134 REVISION: 0 IHSERVICE IHSPECTION LOHG TERM PLAN 0

CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B2 SPRAY LINE FIRST SECOND THIRD ZONE NUMBER: 1-027 ASME PERIOD PER100 PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - --OUTAGE INSTRUCTIONS NUMBER I DENT I F I CAT I OH ITEM NO METH 1 2 3 1 2 3 1 2 3 *~CALIBRATIOH BLOCK*>>

I-3-RC.141 REF. DMG. NO.01-027 079300 SPS-77 F-A VT-3 3-BOX RESTRAINT F1.10 2'3n RCB 079400 SPS-78 F.A VT 3 3 - - - - - - X RIGID S'WAY STRUT ASSEMBLY F1.10 52'3" RCB 079500 SPH-88 F-A VT-3 3-SPRING HAHGER F1.10C 52'3" RCB 079600 SPS-97 F.A VT-3 3-BOX RESTRAINT F1.10 52'3" RCB 079700 SPS-'107 F-A VT-3 3-BOX RESTRAINT F1.10 57'3" RCB 079800 SPS-117 F-A VT 3 3- X RIGID TIE BAR ASSEMBLY F1.10 65'6" RCB 079900 SPS-127 F.A VT-3 X RIGID RESTRAINT F1.10 73'0" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 135 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B2 SPRAY LINE FIRST SECOND THIRD tP 4V 4J ZONE NUHBER:

I IA'Mt Al'l 1-027 . ASHE SEC. XI PERIOD PERICO PERIOD SUHHARY EXAHINATION AREA CATGY NDE ------OU,TAGE INSTRUCTIONS NUMBER IDENT IF ICATION ITEH NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~~

I.3.RC-141 REF. DUG. NO. 01.027 080000 SPS-128 F-A VT-3 3-=-

RIGID SHAY STRUT ASSEHBLY F1.10 73'34 RCB 080100 SPS.148 F-A VT-3 3-BOX RESTRAINT F1.10 75'0" RCB 080200 SPA-180 F-A VT-3 3-BOX RESTRAINT F1 ~ 10 75'0" RCB 0300 SPS.237 F-A VT-3 3-RESTRAINT F1.10 73'0" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 136 REVISIOH: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B SHUTDOWN COOLING LINE FIRST SECOHD THIRD ZONE NUMBER: 1-028 ASME PERIOD PERIOD PERIOD a guava~ w SUHHARY EXAHINATI OH AREA CATGY NDE OUTAGE INSTRUCTIONS HUHBER IDENTIFICATION ITEH HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK

  • 1.12-RC-147 REF. DUG. HO.01-028 080500 10-509-A 8-F , SUR 3- X Hoztle to Safe-End 85.130 VOL RCB
    • UT-23>>>>

080600 RC-147-FW-1 B-J SUR 3- X SAFE-EHD HATL. A351,GR.CRBH Safe-End to Elbow 89.11 VOL RCB

    • UT-35*>>

080800 RC-147-1-SU-4 8-J SUR 3- L/R 90 DEG. ll/ELL ELBOW NATL.

Elbow to Pipe 89.11 VOL A403 1IP304 RCB t>>UT 35>>*

080900 RC-147-1-SIJ-3 8-J SUR 3 12<<X 10<<conical reducer, Pipe to Reducer 89.11 VOL branch connection 1.5<< from RCB weld at 180 deg.

~ >>UT-35**

081000 RC-147.1-SW-2 8 J SUR 3- 12<<X 10<<CONC. REDUCER NATL.

Reducer to Elbow 89.11 VOL A403, i@304, L/R II/EL L RCB

    • UT-37>>*

I-10-SI-147 REF. DWG. NO.01-028 081050 SIH-247 F-A VT-3 3-SPRING BASE SUPPORT F1.10C 24'7<< RCB I-12-RC-147 REF. DUG. NO.01-028 081100 RC-147-1-SU-1 8-J SUR 3- L/R ll/ELL ELBOW ELBSI TO PIPE 89.11 VOL NATL'403,WP304 RCB

  • >>UT-37**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 137 REVISIOH: 0 INSERVICE INSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS IHSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 18 SHUTDONN COOLING LINE FIRST SECOND THIRD ZONE NUMBER: 1-028 ASME PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHATIOH AREA CATGY HDE OUTAGE------ INSTRUCTIONS NUMBER IDEHTIFICATIOH ITEM NO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

I-10-SI-130 REF. DIlG. NO.01-028 081200 SI-130-FN-1 8-J SUR 3-PIPE-TO.VALVE (HV-3652) 89.11 VOL RCB

  • ~UT-37R**

081300 V-3652 8-M-2 VT-3 3 X Group 3, Examine when Gate Valve Internal Surface 812.50 disassembled for maintenance RCB or repair 081400 V-3652 Solting 8-G 2 VT-1 3 X Group 3, bolting is to be Gate Valve Bolting 87.70 examined if valve is opened RCB for maintenance or repair 081500 S1.130-FIl 2 8 J SUR 3 L/R U/ELL ELBNl HATL.

VALVE HV-3652 to ELBOII 89.11 VOL A403,llP304 RCB

    • UT 3741 081600 S I -130-1.S11-1 B.J SUR 3 L/R II/ELL ELBOM HATL.

Elbog to Pipe 89.11 VOL A403,llP304 RCB

  • ~UT-37**

081700 S1-130-1-S'N-6 8 J SUR 3- SOCKOLET 2" BRANCH CONNECTION 89.32 RCB 081800 SI-130-1-SI1-2 8-J SUR 3- L/R II/ELL ELBOM HATL.

Pipe to ElboM 89.11 VOL A403,llP304 RCB

~*UT-37

  • DATE: 01/09/98 ST ~ LUCIE HUCLEAR PLANT UNIT 1 PAGE: 138 REVISION: 0 INSERVICE INSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B SHUTDOWH COOLING LINE FIRST SECOND THIRD ZONE NUMBER: 1-028 ASME PERIOD PERIOD PERIOD 1)l %VS Jl~ I hl&AVree W ~ 'I SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE----.- INSTRUCTIONS NUHBER IDENTIFICATION ITEM NO METH ( 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK**

I-10-SI-130 REF. DWG. NO.01-028 081900 SI-130.1.SW-3 B-J SUR 3- L/R W/ELL ELBOW NATL Elbow to Pipe 89.11 VOL A403,WP304 RCB

~~UT-37

  • 081920 SI 970.6210 F.A VT-3 3 - - - X WHIP RESTRAINT F1.10 34'3" RCB 081940 SI -970-1210 F-A VT-3 3-Snubber F1.10S 33'0" RCB 081960 S I.970.210 F A VT-3 3-RIGID SWAY STRUT (2) F1.10 32'0" RCB 082000 SI.130-FW-3 B.J SUR 3 - - - X Pipe to Valve MV-3651 89.11 VOL RCB

~~UT-37R**

082100 V-3651 B-M-2 VT-3 3 X GROUP 3, examine when Gate Valve Internal Surface 812.50 disasserhled for maintenance RCB or repair 082200 t V-3651 Bol ing B.G.2 VT-1 3 X Group 3, 16 BOLTS and NUTS Gate Valve Bolting 87.70 RCB

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 139 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B SHUTDOW COOLING LIN FIRST SECOHD THIRD ZONE NUMBER: 1-028 ASME PERIOD PERICO 'ERIOD SEC. XI

SUMMARY

EXAMI HAT I OH AREA CATGY NDE ------OUTAGE---- IHSTRUCTIONS NUMBER I D EHT I F I CAT I ON ITEM HO METH 1 2 3 1 2'3 1 2 3 **CALI BRAT ION BLOCK**

1-2.SI-153 REF. DUG. NO.01-028 082300 Sl-153-Fll-1 BJ SUR 3- - - - - - X SOCKOLET NATL. A182,F304 BRANCH CONNECTION to PIPE 89.40 RCB 082500 Sl-153 Fll-2A B.J SUR 3 - - - - - - X OLD AND PIPE CAP ADDED PER Pipe to Pipe 89.40 PCM 119-188.

RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 140 REVI 8 ION: 0 'NSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A SHUTDOMN COOLING LINE F IRST SECOND THIRD ZONE NUMBER: 1-029 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATION AREA CATGY NDE OUTAGE------ INSTRUCTIOHS NUHBER IDENT IFI CAT IOH ITEN NO NETH 2 3 2 3 2 3 *>>CALIBRATIOH BLOCK>>>>

) 1 1 1 I-12-RC-162 REF. DMG. NO.01-029 083100 10-5098 8-F SUR 3 X 12" SHUTDOMN COOLING NOZZLE NOZZLE-TO-SAFE-END 85.130 VOL RCB

    • UT-16,UT-23>>>>

083300 RC-162-FM-1 8-J SUR 3 X SAFE-END NATL. A351,GR.CFBH Safe-End to Elbow 89.11 VOL RCB

>>>>UT 35**

083500 RC-162-1-SM-4 8-J SUR 3- Entire weld covered by 3" pipe Elbow to Pipe 89.11 VOL clamp. L/R 90 DEG. M/ELL ELBOM RCB NATL. A403,MP304

>>>>UT 35**

083600 RC-162-1'-SM-5 8-J SUR 3- SOCKOLET BRANCH COHNECTION (2") 89.32 RCB 083700 RC-162-1-SM-3 B.J SUR 3- 12" X 'IO" COHC. REDUCER HATL~

Pipe to Reducer 89.11 VOL A403,MP304 RCB

    • UT-35**

083800 RC-162.'1-SM-2 8-J SUR 3- 12" X 10" CONC. REDUCER NATL.

Reducer to Elbow 89.11 VOL A403,MP304,L/R M/ELL RCB

    • UT-37
  • 083900 RC-162-1.SM-1 8-J SUR 3 ELBOM NATL. A403,MP304 Elbow to Pipe 89.11 VOL RCB

>>>>UT-37**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 141 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS IHSPECTION INI'ERVAL PLAN STATUS PRESERVICE YEAR Loop 1A sNUTDDNN cooLING LINE FIRST SECOND THIRD ZOHE HUNGER: 1-029 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAMINATION AREA CATGY HDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEH HO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~*

I-10-SI-127 REF. DWG. HO.01-029 084050 S I-127. FM.602 B.J SUR 3 - - - - - - ,

- - - 94 Pipe to Pipe 89.11 VOL 34'CB

  • OUT 37RA*

084200 SI-127.FII-600 B.J SUR 3 - - - - - - - - - 94 Pipe to Valve V-3480 89.11 VOL 34'-075 RCB

~*UT-37R**

084300 V-3480 8-H-2 VT-3 3 X - - - - . - - - 94 GROUP 3, examine ken Gate Valve Internal Surface 812.50 disassembled for maintenance 34'CB or repair 084400 V-3480 Bolting 8-G-2 VT-1 3 X - - . - . - - - 94 Group 3 Gate Valve Bolting 87.70 34'CB 084455 SI-127.FH.601 8-J SUR 3 - - - - - - - - - 94 L/R II/ELL ELBON Valve V-3480 to Elbow 89.11 VOL 30'CB

    • UT 37R**

084600 SI-127.FW-3 B.J SUR 3 - . - - - - X L/R II/ELL ELBOM Elbow to Valve V-3481 89.11 VOL RCB

  • ~UT-37
  • 084700 V.3481 B.H-2 VT-3 3 X GROUP 3, llhen disassembled for Gate Valve Internal Surface 812.50 maintenance RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 142 REVISION: 0 INSERVICE INSPECTIOH LONG TERM PLAN 0

CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A SHUTDOWN COOLING LINE FIRST SECOND THIRD ZOHE NUMBER: 1-029 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE--- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH i 1 2 3 1 2 3 1 2 3 BLOCK~*

'*CALIBRATIOH 1-10-SI-127 REF. DWG. HO.01-029 084800 V-3481 Bolting 8-G-2 VT-1 3 X Group 3, examine bolting When Gate Valve Bolting 87.70 valve is opened for RCB maintenance or repair 1-2 RC-106 REF. D'WG. NO.01-029 084900 RC-106.FII-1 8-J SUR 3- 2" SOCKOLET NATL. A182,F304 Branch Connection to Pipe 89.40 RCB 085000 RC-106-SW 3 Pipe to Valve V-1215 RCB 085200 RC-106-SW.3 3 Weld to be removed from Valve V-1215 to Pipe service per PC/M 282-192 RCB 085300 RC-106.SW-4 3 Weld to be removed from Pipe to Flange service per PC/M 282-192 RCB 085320 RC-106-FW-2000 8-J SUR 3-Branch Connection to Reducing 89.32 Coupling RCB 1-10-81.127 REF. DWG. NO.01-029 085500 S1-127.1-SW-1 8-J SUR 3- 2" SOCKOLET BRANCH CONNECTION 89.32 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHI'NIT 1 PAGE: 143 REVISION: 0 INSERVICE IHSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN PRESERVICE YEAR STATUS'ECOND LOOP 1A SKUTDOMN COOLING LINE FIRST THIRD ZOHE HUHBER: 1 029 ASHE PERIOD PERIOD PERIOD

~~ I ~~ V~

'EC. XI SUHHARY EXAHIHATIOH AREA CATGY NDE -OUTAGE--- INSTRUCTIONS NUHBER IDENT IF I CATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~>>

I-2-SI-152 REF. DMG. NO.01-029 085600 Sl-152-FM-1 8-J SUR 3- 2" SOCKOLET NATL. A182,F304 BRANCH CONHECTIOH TO PIPE 89.21 RCB 085700 SI-152.SM-2 8-J SUR 3- 2" X 2" X 2" TEE NATL. TP304, Pipe to Tee 89.40 SS RCB 085800 SI-152 FM-3 B.J SUR 3- 2" X 2" X 2" TEE NATL. TP304, Tee to Pipe 89.40 SS RCB 86000 Sl.152-FM.4A 8-J SUR 3- MELD ADDED PER PCH 119-188 Pipe to Pipe 89.40 RCB 086200 SI-152-SM-5 8-J SUR 3- 2" X 1" CONC. REDUCER, 2" X 2" Tee to Reducer 89.40 X 2" TEE RCB I-10.RC-162 REF. DMG. NO.01-029 086300 Sl-973-205 F-A VT-3 3-SPRING BASE SUPPORT F1.10C 24'7" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 144 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAH CLASS 1 ALL STATUS COHPONENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER AUXILIARY SPRAY FIRST SECOND THIRD ZONE NUHBER: 1-030 ASHE PERIOD PERIOD PERIOD II

~,

SEC. XI SUHHARY EXAHIHATIOH AREA CATGY NDE - - - - 0 U T A G E - - - - .- INSTRUCTIOHS NUMBER IDENTIFICATION ITEH NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

'o 'A bl 1 4 4AmA " v 'viiv r ooA s A" w V i i ~

I-2-CH-146 REF. DWG. NO. 01.030-B 087000 CH-146-FW-28R 8-J SUR 3- SOLENOID VALVES VALVE (I.SE.02.03).TO-PIPE 89.21 RCB 087100 CH.146-FW-27R 8-J SUR 3- 2" X 2e X 2" TEE NATL.

Pipe to Tee B9.40 A182, F304 RCB 087200 CH.146-FW-26 8-J SUR 3- 2" X 2u X 2n TEE, 2n X 3/4" TEE-TO-REDUCING INSERT 89.40 REDUCIHG INSERT RCB 087300 CH-146-FW-25R 8-J SUR 3- 2e X 2" X 2e TEE NATL.

Tee to Pipe 89.40 A182, F304 RCB 087400 CH-146-FW-24B 8-J SUR 3- 2" X 2" X 2" TEE HATL.

Pipe to Tee 89.40 A182,F304 RCB I-2-CH-347 REF. DWG. NO. 01-030-B 087900 CH-347-FW-2 B.J SUR 3- SOLENOID VALVES VALVE (I.SI-02-04)-TO.PIPE B9.21 RCB 088000 CH-347-FW-3 8-J SUR 3- 2" X 2" X 2e TEE HATL.

Pipe to Tee 89.40 A182, F304 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 145 REVISIOH: 0 INSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER AUXILIARY SPRAY FIRST SECOND THIRD ZONE NUHBER: 1-030 ASHE PERICO PERICO PERIOD "r ~ I'I j SEC. XI SUHNARY EXAHINATIOH AREA CATGY NDE ------OUTAGE------

INSTRUCTIOHS NUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 2 3 1 2 3 **CALIBRATIOHBLOCK**

I-2-CH-146 REF. DiJG. NO.01-030.8 088100 CH.146-FU-24A BJ SUR 3- 2" X 2" X 2" TEE NATL.

Tee to Pipe 89.40 A182, F304 RCB 088200 CH 146- SM-24 8-J SUR ELBDM NATL. A182,F304 Pipe to Elbow 89.40 RCB 088300 CH 146.SU-23 B.J SUR 3- ELBOI NATL. A182,F304 Elbow to Pipe 89.40 RCB 088400 CH.146- Fll-22 8-J SUR 3- 0 ELBOU NATL~ A182, F304 Pipe to Elbow 89.40 RCB 088500 CH.146-SN.21 B J SUR 3- ELBOW HATL. A182,F304 Elbow to Pipe 89.40 RCB I-2-CH 146 REF. DUG. NO. 01.030-A 088600 CH-146-SM-20 B.J SUR 3- ELBSl NATL. A182,F304 Pipe to Elbow 89.40 RCB 088700 CH-146-Fll-19 8-J SUR 3- ELBOW NATL. A182,F304 Elbow to Pipe 89.40 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHI'NIT 1 PAGE: 146 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER AUXILIARY SPRAY FIRST SECOND THIRD ZONE NUMBER: 1-030 ASME PERIOD PERICO PERIOD SEC XI

SUMMARY

EXAMINATION AREA CATGY HDE -- - - " -OUTAGE- IHSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

I-2-CH-146 REF. DIJG. NO. 01-030-A 088800 CH-146.SM-18 8-J SUR 3- ELBSJ MATL. A182,F304 Pipe to Elbow 89.40 RCB 088900 CH.146-Sll-17 8 J SUR 3- ELBSJ NATL~ A182, F304 Elbow to Pipe 89.40 RCB 089000 CH-146-S'M.16 8-J SUR 3- ELBQI NATL. A182,F304 Pipe to Elbow 89.40 RCB 089100 CH-146.SW-15 8-J SUR 3 ELBQI MATL~ A182,F304 Elbow to Pipe 89.40 RCB 089200 CH-146-SU.14 8-J SUR 3- COUPLIHG MATL. A182, F304 PIPE-TO COUPLIHG 89.40 RCB 089300 CH-146- F1j-13 8-J SUR 3- COUPLIHG NATL. A182,F304 COUPLING TO PIPE 89.40 RCB 089400 CH-146 S'N-12 8-J SUR 3 - - - - - - X Pipe to Elbow 89.40 RCB

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT'HIT 1 PAGE: 147 REVI S ION: 0 IHSERVICE INSPECTION LONG TERM PLAH CLASS 1 ALL STATUS COMPONENTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER AUXILIARY SPRAY FIRST SECOND THIRD ZONE NUMBER: 1-030 ASME PERIOD PER ICO PER I CO SEC. XI

SUMMARY

EXAHINATION AREA CATGY NDE OUTAGE - - - - -- IHSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK~*

I-2.CH-146 REF. DUG. NO. 01-030-A 089500 CH-146.SN 11 8-J SUR 3- ELBSI NATL. A182,F304 Elbow to Pipe 89.40 RCB 089600 CH-146- FW-10 8-J SUR 3 . ELBON NATL. A182,F304 Pipe to Elbow 89.40 RCB 089700 CH-146-SN-9 8-J SUR 3 X ELBON NATL. A182,F304 Elbow to Pipe 89.40 RCB 089800 CH.146.FN-8B B.J SUR 3- COUPLIHG NATL. A182,F304 PIPE TO.COUPLIHG 89.40 RCB 089900 CH-146 FN BA 8-J SUR 3- COUPLIHG NATL. A182,F304 COUPLIHG- TO-PIPE '9.40 RCB 090000 CH-146-FW.B 8-J SUR 3- ELBON NATL. A182,F304 Pipe to Elbow B9.40 RCB 090100 CH.146.SN.7 8-J SUR 3- ELBON MATL. A182,F304 Elbow to Pipe 89.40 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 148 REVISION: 0 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COHPOHEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER AUXILIARY SPRAY FIRST SECOND THIRD ZONE NUHBER: 1-030 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHI NATION AREA CATGY HDE OUTAGE- INSTRUCTIONS NUHBER IDEHI'IF I CATION ITEH HO NETH I 1 2 3 1 2 3 1 2 3 *~CALIBRATIOH BLOCK**

I-2.RC-149 REF. DWG. HO. 01-030-A 090200 RC-149-FW-3 8-J SUR 3- SOLENOID VALVES PIPE-TO-VALVE (I-V-2431) . 89.40 RCB 090300 RC.149-FW-2 BJ SUR 3- - X SOLENOID VALVES VALVE I-V-2431 to PIPE 89.40 RCB 090400 RC-149-FW-4 8 J SUR 3-Pipe to Pipe B9.21 RCB 090500 RC-149.FW 5 B J SUR 3 - X Pipe to Pipe 89.21 RCB 090600 RC 149-FW-1 B-J SUR 3 . - . X 2" X 4" REDUCER Pipe to Recfucer B9.21 RCB I-2-CH-146 REF. DWG. NO. 01-030-S 090700 CH-128-403 F-A VT-3 3-RIGID BASE SUPPORT F1.10 RCB 090800 CH-128-425 F-A VT-3 3 .

RIGID RESTRAINT F1.10 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 149 REVISIOH: 0 IHSERVICE IHSPECTION LOHG TERH PLAN CLASS ALL STATUS COHPOHEHTS

'LAN 1

INSPECTION INTERVAL STATUS PRESERVICE YEAR PRESSURIZER AUXILIARY SPRAY FIRST SECOND THIRD ZOHE NUHBER: 1-030 ASHE PERIOD PERICO PERIOD SEC. XI SUHHARY EXAHIHATION AREA CATGY NDE ------OUTAGE------ INSTRUCTIONS NUHBER IDENT IF ICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK

  • 1-2-CH.146 REF. DIJG. NO.01-030.B 090900 CH-128.426 F-A VT-3 3 - - . - - - X RIGID RESTRAINT F1.10 RCB 091000 CH-128 431 F-A 'T-3 3 . X RIGID RESTRAINT F1.10 RCB 091100 CH-128.488 F-A VT-3 3-BOX RESTRAINT F1.10 RCB I-2-CH 146 REF DUG. NO. 01-030-A 091200 CH.124.445 F-A VT-3 3-RESTRAIHT F1.10 RCB 091300 CH-124-450 F-A VT-3 3 .

BOX RESTRA)HT F1.10 RCB 091400 CH-124-456 F-A VT-3 3-BOX RESTRAINT F1.10 RCB 091500 CH-124-459 F-A VT-3 3 RESTRAINT F1.10 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 150 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERH PLAN PRESSURIZER AUXILIARY SPRAY ZONE HUHBER:

A 5'p Xi( Jgl%AP kl 1.030 INSPECTION INTERVAL ASKE CLASS 1 ALL STATUS COHPOHEHTS FIRST PERICO PLAH STATUS SECOHD PERIOD THIRD PERIOD PRESERVICE YEAR 0 SUHHARY EXAHIHAT ION AREA SEC.

CATGY Xl HDE --. ---OUTAGE-- -- --

'1 INSTRUCTIONS HUHBER IDENTIFICATION ITEH HO HETH I 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

1-2 CH-146 REF. DUG. NO. 01-030-A 091600CH-124.463 F-A VT-3 3-SUPPORT F1.10 RCB 091700 CH-124-465 F-A VT-3 3-BOX RESTRAINT F1.10 RCB 091800 CH.124-65A F-A VT3 3 BOX RESTRAINT F1.10 RCB 1-2-RC.149 REF. DMG. HO.01-030.A 091900 RC.S ~ 471 F.A VT 3 3 - - - X BOX RESTRAINT F1.10 RCB 092000 RC-5 '75 F-A VT 3 3-Snubber 1-121 F1.10S RCB 092100 RC-5-475A F-A VT3 3-SPRIHG CAH F1.10C RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 151 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 1B1 F IRST SECOND THIRD 2OHE HUHBER: 1-031 ASHE PER I CO PERIOD PERIOD SEC. XI SUHMARY EXAHIHAT IOH AREA CATGY NDE ------OUTAGE------ INSTRUCTIONS HUHBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 '

2 3 *ICALI BRAT IOH BLOCK~i I-2.CH-148 REF. DUG. NO.01-031 092500 SE-02-1 3 Sotinofd Valve, no examination Valve required, valve is 4e or Less RCB in size 092600 CH-148 F1I-2IR B.J SUR 3- SOLENOID VALVE Valve SE-02-1 to Pipe 89.21 RCB 092700 CH-148.SN-20R 8-J SUR 3- 2" X 2" X 2" TEE Pipe to Tee 89.40 NATL'182,F304 RCB 092800 CH.148-SN.19 8-J SUR 3- 2"X 3/4" REDUCING INSERT TEE-TO REDUCING INSERT 89.40 RCB 092900 CH-148-SW-18 B-J SUR 3- X 2a X 2" X 2a TEE Tee to Pipe 89.40 NATL'182, F304 RCB 093000 CH-148.SII-17 8-J SUR 3- 2" X 2" X 2" TEE NATL.

Pipe to Tee 89.40 A182,F304 RCB 093100 CH-148-SW-16 B-J SUR 3- 2" X 2" X 2" TEE, 2" X 3/4" TEE TO.REDUCING INSERT 89.40 REDUCING INSERT RCB

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 152 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN 0

CLASS 1 ALL STATUS COHPONEN'IS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CNARGING I.INE TO LOOP 181 FIRST SECOND THIRD ZONE NUHBER: 1-031 ASHE PERIOD PER I CO PERIOD

~ 4h lltvw JlhhAetrwawfcsw v,v s ~ ~ ~

Set vl I v~

SUHHARY EXAHIHAT ION AREA CATGY NDE - - - - - -OUTAGE- - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETM I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

I-2-CH-148 REF. DMG. NO.01-031 093200 CMv148-FMv15 8-J SUR 3- 2e X 2" X 2" TEE NATL.

Tee to Pipe- 89.40 A182, F304 RCB 093300 CH.148.SM-14 8-J SUR 3- ELBSI HATL A182, F304 Pipe to Elbow 89.40 RCB 093400 CH.148-SM-13 8-J SUR 3- ELBSI HATL. A182,F304 Elbow to Pipe 89.40 RCB 093500 CH.148.SM.12 8-J SUR 3- v ELBOM HATL. A182,F304 Pipe to Elbow 89.40 RCB 093600 CH.148.S'M.11 8-J SUR 3- ELBSI HATL. A182,F304 Elbow to Pipe 89.40 RCB 093700 CH-148-FM-10 8-J SUR 3- ELBSI HATL. A182,F304 Pipe to Elbow 89.40 RCB 093800 CH-148- FM.9 8-J SUR 3- ELBOM HATL. A182,F304 Elbow to Pipe 89.40 RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 153 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 181 FIRST SECOND THIRD ZONE NUHBER: 1-031 ASHE PER I CO PERIOD PERIOD SEC. XI SUHMARY EXAHIHATION AREA CATGY NDE OUTAGE INSTRUCTIONS NUHBER IDENT IF I CAT IOH ITEH NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>>

I-2-CH-148 REF. DUG. NO.01-031 093900 CH-148-Fll-8 8-J SUR 3- ELBOM MATL. A182,F304 Pipe to Elbow 89.40 RCB 094000 CH-148-SM-7 8-J SUR 3- ELBOM NATL'182,F304 Elbow to Pipe 89.40 RCB 094100 CH.148.S'W.6 B.J SUR 3 - - - - - X ELBOM HATL. A182,F304 Pipe to Elbow 89.40 RCB 094200 CH-148-SH-5 8-J SUR 3 ELBSI NATL. A182,F304 Elbow to Pipe 89.40 RCB 094300 CH 148 SH-4 8-J SUR 3- 2¹ X 2¹ X 2¹ TEE NATL.

Pipe to Tee 89.40 A182, F304 RCB 094400 CH-148-SM-3 B.J SUR 3- 2¹ X 2¹ X 2¹ TEE, 2¹ X 3/4¹ TEE-TO-REDUCIHG INSERT 89.40 REDUCING INSERT RCB 094500 CH.148.QI-2 8-J SUR 3- 2¹ X 2¹ X 2¹ TEE HATL.

Tee to Pipe 89.40 A182, F304 RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 154 REVISIOH: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEN'IS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 181 FIRST SECOND THIRD ZONE HUNGER: 1-031 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATION AREA CATGY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 *>>CALIBRATIOH BLOCK>>>>

I-2-RC-150 REF. DMG. NO.01-031 094600 RC-150-FW-5 8-J SUR 3-Pipe to Valve V-2432 89.40 RCB 094650 V-2432 3 No examination required, valve Valve is 4" or less in size RCB 094700 RC-150.FU-4 8-J SUR 3 Valve V2432 to Pipe 89.40 RCB 094800 RC-150-FW-3 8 J SUR 3 ELBOM NATL. A182,F304 Pipe to Elbow 89.40 RCB 094900 RC-150-SM-2A 8-J SUR 3 . ELBOM NATL. A182,F304 Elbow to Pipe 89.40 RCB 095000 RC- 150-FH-'I 8-J SUR Pipe to Safe-End 89.21 RCB 095100 4-507-8 8-F SUR 3 - - - X SAFE-END TO NOZZLE 85.140 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 155 REVISION: 0 IHSERVICE INSPECTIOH LONG TERH PLAH CLASS 1 ALL STATUS COHPONEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 1B1 FIRST SECOND , THIRD ZONE NUHBER: 1-031 ASHE PERIOD PERIOD PERIOD SEC+ Xl SUHHARY EXAHINATIOH AREA CATGY NDE - - - - - - 0 U T A G E - -- INSTRUCTIONS NUHBER IDENT I F ICATION ITEH NO NETH I 1 2 3 1 2 3 1 2 3 ~*CALIBRATION BLOCK~~

I-2-CH-148 REF. DNG. NO.01-031 095200 CH-129-316 F-A VT-3 3 X VARIBLE SPRING SUPPORT F1.10C RCB 095300 CH.129 99 F-A VT-3 3- Examine per plant procedures Snubber 1-122 F1.10S 32'6" RCB 095400 CH-129-329 F A VT-3 3 .

RIGID RESTRAINT F1.10 RCB 095500 CH.129.104 F.A VT-3 3 - - - X BOX RESTRAINT F1.10 RCB 095600 CH-129-339 F-A VT-3 3-Snubber 1-134 B 1-137 F1.10S 3010" RCB 095700 CH.125.117 F-A VT.3 3-RIGID RESTRAINT F1.10 RCB 095800 CH-125-356 F-A VT-3 3-Snubber 1-132 F1.10S RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 156 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR CNARGING LINE TO LOOP 'IB1 FIRST SECOND THIRD ZONE NUHBER: 1-031 ASHE PER I CO PER I CO PERIOD

'i i ~ IA V \ SEC. XI SUHHARY EXAHIHATION AREA CATGY HDE -OUTAGE- INSTRUCTIONS NUHBER IDENT IF I CATION ITEN NO NETH ) 1 2 1 2 3 1 2 3 *~CALIBRATIOH BLOCK">>

1-2-CH.148 REF. DWG. HO.01-031 095900 CH-125 128 F-A VT-3 3-RIGID RESTRAINT F1.10 RCB 096100 CH-3-345 F-A VT-3 3-VARIBLE SPRING SUPPORT F1.10C RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 157 REVISIOH: 0 IHSERVICE IHSPECTIOH LOHG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 1A2 FIRST SECOND THIRD ZONE NUMBER: 1-032 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMIHATIOH AREA CATGY NDE -----OUTAGE------ INSTRUCT IOHS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 ~~CALIBRATIOH BLOCK

  • I 2-CH-149 REF. DUG. NO. 01-032-C 096200 CH-149-SIJ.6 8-J SUR 3- OR NATL. A312,TP304 VALVE (V.2435)-TO-PIPE 89.40 RCB 096300 CH-149.SH-5 8-J SUR 3 - - - . X OR NATL. A312,TP304, ELBSI Pipe to Elbow 89.40 NATL. A182,F304 RCB 096400 CH 149-SM 4 8-J SUR 3- 'Neid is partially obstructed Elbow to Pipe 89.40 by permanent support RCB 096500 CH-149-Sll-3 8-J - SUR 3- lleld is located inside a Pipe to Valve V-2434 89.40 locked high radiation area RCB 096550 V.2434 3 Valve is located inside a Valve locked high radiation area, no RCB examination required, valve is 4" or less in size 096600 CH.149.SW-2 8-J SUR 3- OR NATL. A312,TP304 Valve V-2434 to Pipe 89.40 RCB 096700 CN 149- FII-1 8-J SUR 3 - - - - - - X OR MATL. A312,TP304, 2" X 2" X Pipe to Tee 89.40 2" TEE NATL. A182,F304 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 158 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAH CLASS 1 ALL STATUS COMPONENTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 1A2 FIRST SECOHD THIRD ZONE NUHBER: 1-032 ASME PER I CO PERIOD PERIOD IP ~ SEC'I

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE. --- INSTRUCTIOHS NUMBER IDENTIFICATION ITEH NO METH 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK

  • I-2-CH-147 REF. DUG. NO. 01-032-C 096800 CH-147-FW-2R 8-J SUR 3- OR NATL. A312,TP304 Valve I-S-02-2 to Pipe 89.21 RCB 096900 CH-147-SU-3R 8-J SUR 3- OR NATL. A312,TP304, 2" X 2" X Pipe to Tee 89.40 2<< TEE NATL. A182,F304 RCB 097000 CH-147-SW.4 8-J SUR 3- OR NATL~ A312~TP304~ 2n X 2n X Tee to Pipe 89.40 2" TEE NATL. A182,F304 RCB 097100 CH-147-SW.5 8-J SUR 3 X OR NATL~ A312,TP304, 2" X Pipe to Tee 89.40 2" TEE NATL. A182,F304 RCB 097200 CH-147-SU-6 8-J SUR 3 . 2" X 2" X 2" TEE, 2" X 3/4" TEE TO-REDUCIHG INSERT 89.40 REDUCING INSERT RCB 097300 CH.147-SM-7 8-J SUR 3- OR NATL. A312,TP304, 2" X 2" X Tee to Pipe 89.40 2" TEE NATL. A182,F304/

RCB 097400 CH-147-SH-8 8-J SUR 3- OR NATL. A312,TP304 ~ 2" X 2" X Pipe to Tee 89.40 2" TEES NATL. A182,F304

. RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 159 REVISION: 0 IHSERVICE IHSPECTIOH LOHG TERH PLAN CLASS 1 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LIHE TO LOOP 'IA2 FIRST SECOND THIRD ZONE NUHBER: 1-032 ASHE PERIOD PERIOD PERIOD SEC. XI SUHNARY EXAHIHAT ION AREA CATGY NDE - OUTAGE - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH [ 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK**

I-2-CH-147 REF. DUG. NO. Ol-032-C 097500 CH-147-SM.9 . B.J SUR 3- 2w X 2" X 2" TEE, 2" X 3/4" TEE-TO.REDUCIHG INSERT 89.40 REDUCIHG INSERT RCB 097600 CH-147-SN.10 B.J SUR 3- OR NATL. A312,TP304, 2" X 2" X Tee to Pipe 89.40 2" TEE NATL. A182,F304 RCB 097700 CH.147-SW-11 8-J SUR 3- OR NATL. A312,TP304, ELBSl Pipe to Elbow 89.40 NATL. A182, F304 RCB 97800 CH.147-SN.12 B.J SUR 3- OR NATL. A312,TP304, ELBOM Elbow to Pipe 89.40 NATL. A182,F304 RCB 097900 CH 147-SN-13 BJ SUR 3- OR NATL. A312,TP304, ELBOM Pipe to Elbow 89.40 NATL. A182,F304 RCB 098000 CH.147-FM-,14 B.J SUR 3- OR NATL. A312,TP304, ELBOM Elbow'to Pipe 89.40 NATL. A182,F304 RCB 098'Ioo CH-147-S'N-15 B.J SUR 3- OR NATL., A312,TP304, ELBOM Pipe to Elbow B9.40 NATL. A182,F304 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 160 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 1A2 FIRST SECOND THIRD ZONE NUHBER: 1-032 ASHE PERIOD PERIOD PERICO SEC. XI SUHHARY EXAHINATIOH AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER I DENT IF I CATION ITEN NO NETH ) 1 2 3 1 2 3 1 2 3 <<<<CALIBRATION BLOCK

  • I-2-CH-147 REF. DWG. NO. 01 032-C 098200 CH-147-SM.16 8-J SUR 3- OR HATL. A312,TP304, ELBSl Elbow to Pipe 89.40 NATL. A182, F304 RCB 1-2-CH.147 REF. DWG. NO. 01.032-8 098300 CH.147-FW-17 B.J SUR 3- X OR NATL. A312,TP304, ELBOM Pipe to Elbow 89.40 HATL. A182,F304 RCB 098400 CH-147.SM.18 B.J SUR 3 . OR HATL. A312,TP304, ELBOM Elbow to Pipe 89.40 NATL. A182,F304 RCB

'98500 CH-147.S'N 19 8 J SUR 3- OR HATL A312,TP304, ELBOM Pipe to Elbow 89.40 NATL. A182, F304 RCB 098600 CH-147-SW-20 8-J SUR 3- OR HATL. A312,TP304, ELBSI Elbow to Pipe 89.40 NATL. A182,F304 RCB 098700 CH-147.FW-21 8 J SUR 3 OR NATL. A312,TP304, ELBOW Pipe to Elbow 89.40 NATL. A182,F304 RCB 098800 CH-147-SW-22 B.J SUR 3- X OR NATL. A312,TP304, ELBDM Elbow to Pipe 89.40 NATL. A182, F304 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 161 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 1A FIRST SECOND THIRD ZONE NUHBER: 1.032 ASHE PERIOD PERIOD PER ICO SEC. XI

~ ~ ~

SUNHARY EXAHIHAT I OH AREA CATGY HDE - -OUTAGE- INSTRUCTIONS NUHBER IDENTIFICATION" ITEH HO,HETK 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

1-2-CH.147 REF. DMG. NO. 01-032-8

~ ~

098900 CH-147-SII-22A B.J SUR 3- OR HATL. A312,TP304, ELBSI Pipe to Elbow 89.40 HATL. A182,F304, weld is RCB located inside a locked high radiation area 099000 CH.147-SM-228 8 J SUR 3 OR NATL. A312,TP304, ELBOM Elbow to Pipe $ 9.40 NATL. A182,F304, weld is RCB Located inside a locked high radiation area 099100 CN-147-SM-22C 8-J SUR 3- OR HATL. A312,TP304, ELBSI Pipe to Elbow $ 9.40 HATL. A182,F304, weld is RCB located inside a locked high radiation area 099200 CH.147.SM-220 8-J SUR 3- OR HATL. A312,TP304, ELBSI Elbow to Pipe $ 9.40 NATL. A182,F304, weld is RCB Located inside a locked high radiation area 099300 CH-1C7-SM-23A 8-J SUR 3- OR HATL. A312,TP304, ELBSI Pipe to Elbow 89.40 HATL. A182,F304, weld is RCB located inside a Locked high radiation area 099400 CH-147-SlI-238 8-J SUR 3- OR HATL. A312,TP304, ELBSI Elbow to Pipe 89.40 HATL. A182,F304, weld is RCB Located inside a Locked high radiation area 099500 CH-147- FM-24A 8-J SUR 3- OR HATL. A312,TP304, ELBSI PIPE to COUPLING $ 9.40 HATL. A182,F30C, weld is RCB located inside a locked high radiation area

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 162 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CMARGIMG LINE TO I.OOP 1A2 FIRST SECOMD THIRD

.ZONE.PUIIBEQ 1.:,032. ASHE PERIOD PERIOD PERl SEC. XI

SUMMARY

EXAHIMATIOMAREA CATGY NDE - - - - - - 0 U T A G E - - -- INSTRUCTIONS NUMBER IDENTIFICATION.. Ne ITEH

~

NO NETH I 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCV:*

~

I-2-CM.147 REF. DUG. NO.01-032.B 099600 CH-147.SM 24B B.J SUR 3- o OR HATL. A312,TP304, COUPLIMG COUPLING TO.PIPE B9.40 HATL. A182,F304, weld is RCB Located inside a Locked high radiation area 099700 CN-147 SN 25A B J SUR 3- OR NATL~ A312, TP304, COUPLING PIPE-TO.COUPLING B9.40 NATL. A182,F304 RCB 099800 CM-147-FM-258 B-J SUR 3- OR HATL. A312, TP304, COUPLIMG COUPLING-TO.PIPE 89.40 NATL. A182, F304 RCB 099900 CN.147 Sl 26A B-J SUR 3- OR NATL~ A312, TP304, P IPE-TO-COUPLING 89.40 HATL. A182,F3D4 1

RCB 100000 CH.147 FW-26B B.J SUR 3- OR NATL. A312,TP304, COUPLING COUPLING TO-PIPE 89.40 NATL. A182,F304 RCB I 2-CN 147 REF. DUG. NO. 01.032.A 100'IOD CH-147 SN-26C B-J SUR 3- OR HATL. A312,TP304, COUPLING PIPE-TO COUPLING 89.40 NATL. A182,F304 RCB 100200 CK-147-FN 260 B.J SUR 3- OR NATL. A312,TP304<< COUPLING COUPLING-TO-PIPE 89.40 NATL. A182,F304 RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 163 REVISION: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 1A2 FIRST SECOND THIRD ZONE HUHBER: 1-032 ASHE PERIOD PERICO PERIOD SEC. XI SUHHARY EXAHIHATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO NETH 1 2 3 1 2 3 1 2 3 ~~CALIBRATION BLOCK**

4A ' J 4 V'Vases' W O ~ V WO Iv I-2-CN-147 REF. DUG. NO. 01-032-A 100300 CH-147-SII-27A 8-J SUR 3- X OR MATL. A312,TP304, COUPLING PIPE- TO. COUPLING 89 40 NATL. A182, F304 RCB 100400 CH-147-Fll-278 BJ SUR 3- OR NATL. A312,TP304, COUPLING COUPLING TO-PIPE 89.40 HATL. A182,F304 RCB 100500 CH.147.SW-28 B.J SUR 3- OR NATL. A312,TP304, ELBSI Pipe to Elbow 89.40 HATL. A182,F304 RCB 100600 CH.147-FN.29 B.J SUR 3- OR NATL. A312,TP304, ELBOM Elbow to Pipe 89.40 MATL. A182,F304 RCB 100700 CH-147.$ 'N-30 8 J SUR 3 - - - X OR NATL. A312,TP304, 2<<X 2<<X Pipe to Tee 89.40 2<< TEE NATL. A182,F304 RCB 100800 CH.147-SII-31 8-J SUR 3 2<< X 2<< X 2<< TEE~ 2<< X 3/4<<

TEE TO.REDUCING IHSERT 89.40 REDUCING INSERT RCB 100900 CH-147.SU.32 8 J SUR 3- OR NATL A312,TP304, 2<<X 2<<X Tee to Pipe 89.40 2<< TEE NATL. A182,F304 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 164 REVISIOH: 0 INSERVICE IHSPECI'IOH LONG TERN PLAN CLASS 1 ALL STATUS CONPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 1A FIRST SECOND THIRD ZOHE NUMBER: 1.032 ASHE PERIOD PERIOD PERIOD SEC. Xl SUNNARY EXANINATION AREA CATGY NDE OUTAGE - - - - -- INSTRUCT IONG NUHBER IDENTIFICATION ITEN NO HETH I 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK**

I 2 CH 147 REF. DMG. NO. 01-032-A 101000 CH-147-F'N-33 8 J,SUR 3- OR NATL. A312,TP304, COUPLING PIPE-TO COUPLING 89.40 NATL. A182,F304 RCB 101100 CH-147-SH-34 B.J SUR 3- OR NATL. A312,TP304, COUPLING COUPLING TO-PIPE 89.40 HATL. A182, F304 RCB 101200 CH-147.Sll-35 8-J SUR 3- OR HATL. A312,TP304, ELBSI Pipe to Elbow 89.40 NATL. A182, F304 RCB 101300 CH-147-FlI-36 8-J SUR 3- OR NATL. A312,TP304, ELBSI Elbow to Pipe 89.40 NATL. A182,F304 RCB 101400 CH-147-SII.37 B.J SUR 3- OR NATL. A312,TP304, ELBSI Pipe to Elbow 89.40 NATL. A182,F304 RCB 101500 CH.147-FH.38 8-J SUR 3- OR NATL. A312,TP304, ELBSI Elbow to Pipe 89.40 NATL. A182,F304 RCB I-2-RC-148 REF. DUG. NO. 01-032-A 101600 RC.148-FW-3 8-J SUR 3 -. OR NATL. A312,TP304 PIPE-TO.VALVE (V-2433) 89.40 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 165 REVISION: 0 IHSERVICE INSPECTION LOHG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGIHG LINE TO LOOP 1A2 FIRST SECOHD THIRD ZONE HUHBER: 1-032 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHAT I OH AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO NETH ) 1 2 3 1 2 3 1 2 **CALIBRATIOHBLOCK~*

I-2-RC-148 REF. DUG. NO. 01-032-A 101650 Valve V-2433 3 No examination required, valve Valve is 4>> or less in size RCB 101700 RC-148-FW 2A B-J SUR 3- OR NATL. A312,TP304 VALVE (V-2433)-TO-PIPE 89.40 RCB 101800 RC.148- FW.1 8-J SUR 3- OR HATL. A312,TP304, SAFE.END Pipe to Safe-End B9.21 MATL. A182,F316 RCB 101900 4-507A B.F SUR 3 - - - X NOZZLE HATL. A105,GR.II SAFE END-TO-NOZZLE 85.140 RCB I-2-CH-147 REF. DUG. NO. 01.032-C 102300 CH-130.58 F-A VT 3 3- X RESTRAINT F1.10 RCB 102400 CH-141.44A F-A VT-3 3-Snubber 1-190 8 1-191 F1.10S 29i3n RCB 102600 CH-141-36C F-A VT-3 3-Snubber 1-147 and Spring F1.10CS Hanger RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHI'NIT 1 PAGE: 166 REVISIOH: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 'I ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING INE TO LOOP 1A2 FIRST SECOHD THIRD ZONE NUMBER: 1-032 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE.----- INSTRUCTIONS NUMBER IDENT IF ICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK

  • I-2-CH-147 REF. DUG. NO. 01-032-C 102700 CH.141-78 . F.A VT-3 3- ALLOllABLE SETTINGS (MIN 114 VARIBLE SPRING BASE SUPPORT F1.10C LBSg MAX 126 LBS), MIH 2 1/4' RCB MAX 4 3/8")

102800 CH-141-74 F-A VT-3 3-Snubber 1.142 F1.10S RCB 102900 CH-141-69 F-A VT 3 3 X CONSTANT VERTICAL SUPPORT F1.10C RCB I-2.CH.147 REF. DUG. NO. 01.032-B 103000 CH.142-09 F-A VT 3 3-Snubber 1-125 F1.10S RCB 103100 CH-142-45 F-A VT-3 3 .

RESTRAINT F1.10 RCB 103200 CH.142-18 F-A VT-3 3-Snubber 1-158 8 1-160 F1.10S 20'9" RCB 103300 CH-142-17 F-A VT-3 3-Snubber 1-151 F1.10S RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 167 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 1A2 FIRST SECOND THIRD ZONE NUHBER: 1-032 ASNE PERIOD PERIOD PERIOD SEC. XI SUNHARY EXAHIHATIOH AREA CATGY HDE -OUTAGE INSTRUCTIONS HUHBER IDENTIFICATION ITEN HO NETH 2 3 'I 2 3 2 3 **CALIBRATIOHBLOCK>>>>

I 1 1 I 2-CH-147 REF. DMG. NO. 01-032-8 103400 CH-142-17A F-A VT-3 3 X RIGID STRUT ASSEHBLY F1.10 RCB 103500 CH-142-55 F-A VT-3 3 X VARIABLE SPRIHG SUPPORT F1.10C RCB 103600 CH-143-38 F A VT-3 3-RIGID RESTRAINT F1.10 RCB 103700 CH-143-36 F-A Vl'-3 3-RIGID RESTRAINT F1.10 RCB 103800 CH-143-34C F-A VT-3 Snubber 1-145 F1.10S 16'9" RCB 103900 CM-143-348 F-A VT.3 3 .

RIGID RESTRAINT F1.10 RCB 104000 CH-143-34A F-A VT-3 3 .

RIGID STRUT ASSEHBLY F1.10 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 168 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING LINE TO LOOP 1A2 FIRST SECOND THIRD ZONE NUHBER: 1-032 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATIOH AREA CATGY HDE OUTAGE--- INSTRUCTIONS I CAT IOH 3 <<<<CALIBRATIOH BLOCK <<

NUMBER IDENT IF ITEH

<<8 'j<<<<<<

NO METH 1 2

'Vsakloa 1 2 Ab 'oft\

3 1 0'\t h b1 2

V 3

I-2-CH-147 REF. DUG. NO. 01-032-B 1

104100 CH-143-32 F-A VT-3 3-RIGID RESTRAINT F1.10 RCB 104200 CH-143-30C F-A VT-3 3-Snubber 1-126 F1.10S 16'9" RCB 104300 CH.143-30B F-A VT-3 X RIGID RESTRAIHT F1.10 RCB 104400 CH.143-30A F.A VT.3 3-RIGID STRUT ASSEMBLY F1.10 RCB 104500 CM-143-28 F-A VT3 3-RIGID RESTRAINT F1.10 RCB I-2-CH-147 REF. DNG. NO. 01-032-A 104600 CH-143.26C F-A VT-3 3-Snubber 1-141 F1.1OS RCB 104700 CH-143-26B F-A VT3 3 RIGID RESTRAINT F1.10 RCB

DATE: 01/09/98 ST ~ LUCIE HUCLEAR PLANT UNIT 1 PAGE: 169 REVI SIGH: 0 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOHD THIRD ZONE HUKBER: 1-032 ASNE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHATIOH AREA CATGY NDE ------OUTAGE---.-- INSTRUCT IOHS NUHBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

I-2-CK-147 REF. DUG. NO. 01-032-A 104800 CK-143-26A F-A VT-3 3- X Rigid Strut Aassembly F1.10 RCB 104900 CH-143-24 F A VT-3 3-RIGID RESTRAIHI'CB F1.10 105000 CH-143.22 F.A VT-3 3-RESTRAINT F1.10 RCB 05100 CH-143-17 F-A VT-3 3-RIGID RESTRAINT F1.10 RCB 105200 CH.143.16 F-A VT-3 3- Restraint is located fn the RIGID RESTRAINT F1.10 trench and is inaccessible RCB 105300 CH-143-13A F-A VT-3 3-BOX RESTRAINT F1.10 RCB 105400 CH.143-11 F-A VT-3 3 - - - X BOX RESTRAINT F1.10 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 170 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 PRIMARY DRAIN FIRST SECOND THIRD ZONE NUMBER: 1-033 ASME PERIOD PERIOD PERIOD

'EC. XI

SUMMARY

EXAMIHATION AREA CATGY NDE OUTAGE INSTRUCTIONS NUMBER IDEHTIFICATIOH ITEM NO METH i 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK

  • I-2-RC-113 REF. DUG. NO. 01.033 105500 18-507.A 8-F SUR 3 X SAFE END - SS, MATL.

NOZZLE-TO-SAFE EHD 85.140 SA182,TYPE F316 RCB 105600 RC.113- FN.1 8-J SUR 3 SAFE-EHD - SS, MATL.

Safe-End to Pipe 89.21 SA182,TYPE F316, PIPE, SS RCB 105700 RC-113-SW-2 8-J SUR 3- PIPE, ELBSl - SS Pipe to Elbow 89.40 RCB 105710 RC-113-FII.2000 8 J SUR 3- 97 Elbow to Pipe 89.40 RCB 105720 RC-113-FII-2001 8-J SUR 3- 97 Pipe to Valve V-1235 89.40 RCB 105725 V-1235 3 - - - - - - - - - 97 Anchor Darling valve Valve RCB 105730 RC-113-FM-2002 8-J SUR 3 - - - - - - - - . 97 Valve V-1235 to Pipe 89.40 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 171 REVI SION: . 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A1 PRIHARY DRAIH FIRST SECOND THIRD ZONE HUHBERt 1-033 ASHE PERIOD PER ICO PERIOD SEC, Xl SUHHARY EXAHINATIOH AREA CATGY HDE -OUTAGE'------ IHSTRUCT IOHS HUNGER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK"*

I-2-RC.113 REF. DUG. NO.01-033 105740 RC.113-FII.2003 8-J SUR 3 . 97 Pipe to Flange 89.40 RCB 105800 RC.113.SH.3 3 ELBSI, PIPE - SS Elbow to Pipe RCB 105900 RC-113-SM.4 3 PIPE - SS, VALVE - 2" PIPE-TO-VALVE (V-1235)

RCB 106000 RC-113-SN.5 3 0 VALVE - 2", PIPE - SS VALVE (V-1235) TO.PIPE RCB 106100 RC-113.SH.6 3 PIPE - SS, FLANGE - 2" PIPE-TO-FLANGE RCB 106200 2-RC-113-FB 8-G-2 VT-1 3 - - - X 8 studs and 16 nuts FLANGE BOLTIHG 87.50 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1

<<'AGE: 0 172 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COKPONEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A2 PRIKARY DRAIN FIRST SECOHD THIRD ZONE HUKBER: 1.034 ASKE PERIOD PERIOD PERIOD I

SEC. XI SUKKARY EXAKIHATION AREA CATGY HDE - - - - 0 U T A G E - - - - .- INSTRUCTIONS HUNGER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 <<<<CALIBRATION BLOCK<<*

<<' 4 <<

I-2-RC.116 REF. DUG. NO.01-034 106300 18.507-8 8-F SUR 3 X SAFE-END - SS, NATL.

NOZZLE-TO SAFE-EHD 85.140 SA182,TYPE F316 RCB 106400 RC-116-FII.1 8-J SUR 3 SAFE-EHD - SS( NATL.

Safe-End to Pipe 89.21 SA182,TYPE F316, PIPE - SS RCB 106450 RC-116-SM.2 3 SS Pipe to Elbow RCB 106500 RC-116-FM-2004 B.J SUR 3 Pipe to Elbow 89.40 RCB 106510 RC-116-FII-2000 B.J SUR 3-Elbow to Pipe 89.40 RCB 106520 RC.116-FW-2001 B.J SUR 3-Pipe to Valve V-1234 89.40 RCB 106530 V-1234 3 Ho examination required, valve Valve >s ~ 4" RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 173 REVISIDH: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A2 PRIMARY DRAIN FIRST SECOHD THIRD ZONE NUMBER: 1-034 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE-- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK~*

I.2.RC-116 REF. DUG. HO. 01.034 106540 RC.116 FII-2002 B.J SUR 3-Valve V.1234 to Pipe 89.40 RCB 106550 RC-116.FN-2003 8 J SUR 3-Pipe to Flange 89.40 RCB 106600 RC-116-Sil-3 B.J SUR 3- ELBOU, PIPE SS Elbow to Pipe 89.40 RCB I

06700 RC-116.S'M.4 B.J SUR 3-Pipe to Valve V-1234 89.40 RCB 106750 V-1234 3 No examination reqUired, valve Valve V-1234 is 4" or less in size RCB 106800 RC.116-SH-5 8-J SUR 3-Valve V-1234 to Pipe 89.40 RCB 106900 RC-116-SH-6 B.J SUR 3- PIPE - SS, FLANGE - ?

PIPE-TO-FLAHGE 89.40 RCB

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 174 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1A2 PRIMARY DRAIN FIRST SECOHD THIRD ZONE NUMBER: 1-034 ASNE PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A G E -- INSTRUCTIONS NUMBER IDEHTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 <<<<CALIBRATION BLOCK<<*

I-2-RC-116 REF. DHG. NO.01-034 107000 2.RC-116-FB 8-G-2 VT-1 3 X 8 studs and 16 nuts FLANGE BOLTIHG 87.50 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 175 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAH CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 PRIMARY DRAIN FIRST SECOND THIRD ZONE NUMBER: 1-035 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

, EXAMINATION AREA CATGY NDE - OUTAGE - . - - -- IHSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH ) 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK~*

I-2-RC-125 REF. DUG. HO.01-035 107100 18-507.C 8-F SUR 3 X SAFE-END - SS, NATL.

NOZZLE-TO-SAFE-EHD 85.140 SA182,TYPE F316 RCB 107200 RC-125-FW 1 8-J SUR 3 SAFE-END - SS( NATL.

Safe-End to Pipe 89.21 SA182,TYPE F316, PIPE - SS RCB 107300 RC-125-SN-2 B.J SUR 3- PIPE, ELBOM - SS Pipe to Elbow 89.40 RCB 107310 RC-125-Fll.2000 8 J SUR 3 - - - - - - - - 97 Elbow to Pipe 89.40 RCB 107320 RC-125-Fll-2001 8-J SUR 3 - - - - - - - - - 97 Pipe to Valve V-1232 89.40 RCB 107330 V-1232 3 - - - - . - . - - 97 Ho examination required, valve Valve is 4e or less in size RCB 107340 RC-125-Fll-2002 8-J SUR 3- 97 Valve V-1232 to Pipe 89.40 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: '176 REVI SION: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS CONPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 182 PRIHARY DRAIN FIRST SECOND THIRD ZONE HUHBER: 1.035 ASNE PERIOD PERIOD PERICO SEC. XI SUHMARY EXAMINATION AREA CATGY NDE OUTAGE- INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 *ICALI BRAT ION BLOCK~*

I-2-RC-125 REF. DUG. HO. 01 035 107350 RC-125-Fll-2003 8-J SUR 3 - - - - - - - - - 97 Pipe to Flange 89.40 RCB 107360 2-RC-125.FB 8-G-2 VT-1 3- X Flange Bolting 87.70 RCB 107400 RC-125-S'N-3 3 ELBOM, PIPE - SS Elbow to Pipe RCB 107500 RC.125-SU-4 3 Pipe to Valve V-1232 RCB 107600 RC-125-SN-5 3 Valve V-1232 to Pipe RCB 107700 RC-125-SN-6 3 PIPE - SS, 1500¹ (SM) FLANGE PIPE-TO-FLANGE NATL. TP316 SS RCB

DATE: 01/09/98 ST LUCIE NUCLEAR PLANT UNIT 1 PAGE: 177 REVISION: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 181 PRIMARY DRAIN SECOND

'IRST THIRD ZOHE NUMBER: 1-036 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA , CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUMBER IDENTIFICATION ITEN HO METH 1 2 3 2 3 2 3 **CALIBRATIOHBLOCK~*

AVkiVoJ1 '

1 4 '1 'dd'al 1 4 '4'le I ' ' 4 I-2-RC-122 REF. DUG. HO.01-036

\

107900 18 507-D 8-F SUR 3 - - - - - X SAFE EHD - SS, NATL.

Nozzle to Safe-End 85.140 SA182,F316 RCB 108000 RC-122-Fll.1 8 J SUR X Safe-End to Pipe 89.21 RCB 108100 RC.122- FN.1A 8-J SUR 3 PIPE ~ ELBOHS - SS Pipe to Elbow 89.40 RCB 108200 RC.122 FW-18 8-J SUR 3 ELBOHS, PIPE - SS EIbou to Pipe 89.40 RCB 108300 RC-122.FW-IC 8-J SUR 3- PIPE, ELBOUS - SS Pipe to Elbow 89.40 RCB 108400 RC-122- Fll-10 8-J SUR 3 - - - - - X ELBOIS, PIPE - SS Elbow to Pipe 89.40 RCB 108500 RC-122 SM.2 8 ' SUR 3 . PIPE, 2" X 2" X 2" TEE - SS Pipe to Tee 89.40 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 178 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 181 PRIMARY DRAIN FIRST SECOND THIRD ZONE NUNBER: 1-036 ASNE PERIOD

~ ( ~ ~ t.,t vwa'v<<<<<<<<+<<i<<<<w <<<<<<<<<<t .i ~

EC<< YI ScP PERIOD PERIOD SUHHARY EXAMINATION AREA CATGY HDE - - - - 0 U T A G E - -- INSTRUCTIONS NUNBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

<<J'<<j '<<<<<<'IJJ 4 '( <<

(

'<<<<<<b<<<< V<<<< "' 1 s '"<< <<'<< <<<<A<<

I-2-RC-122 REF. DMG. NO.01-036 108600 RC.122-SM-3 8-J SUR 3 X 2" X 2" X 2" TEE, PIPE - SS, Tee to Pipe 89.40 weld is to be removed from RCB service and replaced by weld RC-122-FM-2001 per PC/H 282-192-6044 108700 RC-122-SM-4 8-J SUR 3 X PIPE - SS, weld is to be Pipe to Valve V-1233 89.40 removed from service and RCB replaced by weld RC-122-FM-2001 per PC/H 282-192-6044, weld is obstructed by whip restraint 108800 RC-122-SM-5 8-J SUR 3 X PIPE - SS, weld is to be Valve V-1233 to Pipe 89.40 removed from service and RCB replaced by weld RC-122-FM-2001 per PC/H 282.192-6044 108900 RC-122-SM-6 8-J SUR 3 X PIPE . SS, 1500¹ RF BLD FLANGE Pipe to Flange 89.40 NATL. TP304, weld is to be RCB removed from service and replaced by RC-122-FM-2000 per PC/H 282-192-6044 108910 RC-122- FM-2000 iB-J] SUR 3 X Hew weld installed per PC/H Tee to Pipe 89.40 282-192, baseline examination RCB required 108920 RC-122- FM-2001 IB-J] SUR 3 X New weld installed per PC/H Pipe to Valve V-1233 89.40 282-192, baseline examination RCB required

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 179 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERM PLAH CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LOOP 1B'I PRIMARY DRAIN FIRST SECOND THIRD ZONE NUMBER: 1-036 ASME PERIOD PER ICO PERIOD 1 ~ hAIVV lA \s 6 W hl i a 0 P $ h SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE -OUTAGE- IHSTRUCTIOHS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK *

~~

I-2-RC.122 REF. DWG. NO.01-036 108930 RC-122-FH-2002 [B.J] SUR 3 X Hew weld to be installed per Valve V-1233 to Pipe B9.40 PC/M 282-192, baseline RCB examination required 108940 RC-122.FII-2003 [B-J] SUR 3 X Hew weld to be installed per Pipe.to Flange 89.40 PC/M 282-192, baseline RCB examination required 109000 2 RC.122.FB B-G-2 VT-1 3 X 8 studs and 16 nuts, bolting FLANGE BDLTIHG 87.70 may be replaced per PC/M RCB 282-192, baseline examination required

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 180 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION ilNTERVAL PLAN STATUS PRESERVICE YEAR LETDOMN LINE FROM LOOP 1B1 FIRST SECOND THIRD ZONE NUHBER: 1-037 ASHE PERIOD PERIOD PER 1 00 SEC. XI SUHHARY EXAHIHAT I ON AREA CATGY NDE - - - -OUTAGE- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 1 2 3 ~*CALIBRATION BLOCK**

i tS' ' "- <<A<<>>>>d~>><<v ~ ~ ->>>>>><<>><< . v>>>><<<<>> v ~ ~ <<v I-2-RC-142 REF. DMG. NO. 01-037-8 109100 RC-142-SM-1 8-J SUR 3- OR HATL~ A312,TP304 ~ 2 X 2" X Tee to Pipe 89.40 2w TEE NATL A182,F304 RCB 109200 RC-142-FM-1A 8-J SUR 3- OR NATL. A312,TP304, COUPLING PIPE TO-COUPLING B9.40 NATL. A182, F304 RCB 109300 RC-142-FM-18 8-J SUR 3- OR HATL~ A312, TP304, COUPLING COUPLING-TO-PIPE 89.40 NATL. A182,F304 RCB 109400 RC-142-SM-2 8-J SUR 3- << >> OR HATL. A312,TP304, ELBOM Pipe to ELbow 89.40 NATL. A182,F304 RCB 109500 RC-142-SM-3 8-J SUR 3 . OR HATL. A312,TP304, ELBOM Elbow to Pipe B9.40 NATL. A182,F304 RCB 109600 RC-142-SM-4A B-J SUR 3 . OR NATL. A312,TP304, ELBOM Pipe to Elbow B9.40 HATL. A182,F304 RCB 109700 RC-142-FM<<5 8-J SUR 3 X OR HATL. A312,TP304, ELBOM Elbow to Pipe 89.40 HATL. A182,F304 RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 181 RE V I SION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LETDSIH LIHE FROH LOOP 1B1 FIRST SECOHD THIRD 20HE NUHBER: 1 037 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHATION AREA CATGY HDE -OUTAGE. INSTRUCTIONS HUHBER IDENTIFICATION ITEH NO HETH i 1 2 3 1 2 3 1 2 3 *>>CALIBRAT ION BLOCK*>>

I 2 RC-142 REF. DWG. NO. 01.037-B 109800 RC-142-FW-5A 8-J SUR 3- OR HATL. A312,TP304, COUPLIHG PIPE TO-COUPLIHG 89.40 HATL. A182,F304 RCB 109900 RC-142-FM-58 B.J SUR 3- OR NATL. A312,TP304, COUPLIHG COUPLIHG-TO-PIPE 89.40 HATL. A182,F304 RCB 110000 RC-142-FH.6 8-J SUR 3 X OR HATL. A312,TP304, ELBSI Pipe to Elbow 89.40, NATL. A182,F304 RCB 3-

'10100 RC-142-SM-7 8-J SUR OR HATL. A312,TP304, ELBSI Elbow to Pipe 89.40 HATL. A182,F304 RCB 110200 RC.142-QI.B B.J SUR 3 . OR HATL~ A312,TP304, ELBSI Pipe to Elbow 89.40 HATL. A182,F304 RCB 110300 RC-142-Fll-BA B.J SUR 3- OR NATL. A312,TP304, ELBSI Elbow to Pipe 89.40 HAIL. A182,F304 RCB 110400 RC-142.FN.88 8 J SUR 3 OR NATL. A312,TP304, ELBSI Pipe to Elbow 89.40 HATL. A182,F304 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 182 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAH CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LETDOWN LINE FROM LOOP 181 FIRST SECOHD THIRD 20NE NUMBER: 1-037 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE OUTAGE----- INSTRUCTIONS NUMBER IDENTI F I CAT I OH ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

I-2-RC-142 REF. DIJG. NO. 01-037-8 110500 RC-142-FIJ-9A B.J SUR 3- OR MATL. A312,TP304, ELBOW Elbow to Pipe 89.40 NATL A182, F304 RCB 110600 RC-142- FW-10A 8-J SUR 3- OR NATL. A312,TP304, ELBSl Pipe to Elbow 89.40 NATL. A182,F304 RCB 110700 RC-142-Ql-11 8-J SUR 3 OR NATL. A312,TP304, ELBSI Elbow to Pipe 89.40 NATL. A182,F304 RCB I-2-RC-142 REF DG. HO. 01-037-A 110800 RC.142-FM-11A B.J SUR 3 - - - - - X PIPE TO VALVE V-2519 89.40 RCB 110900 RC-142-FM-118 8-J SUR 3- OR NATL. A312,TP304 VALVE (V-2519)-TO-PIPE 89.40 RCB 111000 RC-142-SW-12 B.J SUR 3- OR NATL. A312,TP304, ELBOM Pipe to Elbow 89.40 NATL. A182,F304 RCB, 111100 RC-142-S}}.13 8-J SUR 3 OR MATL. A312,TP304, ELBOU Elbow to Pipe 89.40 NATL. A182,F304 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 183 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LETDOWN LINE FROH LOOP 1B1 FIRST SECOHD THIRD ZONE HUHBER 1-037 ASHE PERIOD PERIOD PERIOD ~ SEC. XI

 ~
                                                                     ------OUTAGE.-----

SUHHARY EXAHINATION AREA HUHBER IDENT I F I CAT ION i " CATGY NDE ITEN NO METH 2 3

                                                      '"4"':"AJ4'A1'4 i 'ts I 1          1  2 3
                                                                                       'dwC'v 1

2 3

                                                                                                   i 4 o INSTRUCTIONS
                                                                                                              *~CALIBRATION BLOCK+*

l-2-RC.142 REF. DMG. HO. 01-037-A 111200 RC.142.F1( 13A 8-J SUR 3 X OR NATL. A312,TP304, 2" X 2" X Pipe to Tee 89.40 2a TEE NATL. A182,F304 RCB 111300 RC-142.FN-13C B.J SUR 3- 2a X 2" X 2" TEE, 2" X 3/4" TEE-TO.REDUCIHG INSERT 89.40 REDUCIHG INSERT RCB 111400 RC.142.FM-138 8-J SUR 3- OR NATL. A312,TP304, 2" X 2" X Tee to Pipe 89.40 2" TEE RCB 111500 RC-142-FW-14 8-J SUR 3 OR NATL. A312,TP304 PIPE TO-VALVE (V 2515) 89.40 RCB 111550 V-2515 3 No examination required Valve RCB 111600 RC-142. FW-15 8-J SUR 3- OR NATL. A312,TP304 VALVE (V-2515).TO PIPE 89.40 RCB I-2-CH-145 REF. DWG. NO. 01-037-A 111700 CH-145.FN-1 8-J SUR 3- OR NATL. A312,TP304, ELBOW Pipe to Elbow 89.40 NATL. A182,F304 RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 184 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LETDOWN LINE FROM LOOP 181 FIRST SECOND THIRD ZONE NUHBER: 1.037 ASME PERIOD PERIOD PERIOD SEC.'I

SUMMARY

EXAHINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- IHSTRUCTIONS NUHBER IDENTIFICATION ITEH NO METH 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK << P I-2-CN-145 REF. DUG. NO. 01-037-A 111800 CN.'f45-FW-2 8-J SUR 3- OR MATL~ A312,TP304, ELB(Q Elbow to Pipe 89.40 HATL. A182,F304 RCB 111900 CH-145-FH-3 8-J SUR 3- OR NATL. A312,TP304, ELBSI Pipe to Elbow B9,40 MATL. A182,F304 RCB 112000 CH.145.FH-4 B-J SUR 3- OR NATL. A312,TP304, ELBSI Elbow to Pipe 89.40 MATL. A182,F304 RCB 112100 CH-145- FH-5 B.J SUR 3 OR HAIL. A312,TP304, ELBOM Pipe to Elbow 89.40 MAIL. A182,F304 RCB 112200 CH-145-FW 6 8-J 'UR 3- OR NATL. A312,TP304, ELBSI Elbow to Pipe 89.40 HATL. A182,F304 RCB 112300 CH-145.FN.7 8-J SUR 3 OR MAIL. A312,TP304, ELBOI Pipe to Elbow 89.40 NATL. A182,F304 RCB 112400 CH-145-FM.B 8-J SUR 3- OR NATL. A312,TP304, ELBSI Elbow to Pipe 89.40 NATL. A182,F304 RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 185 REVISION: 0 IHSERVICE IHSPECTIOH'LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS IHSPECT IOH INTERVAL PLAN STATUS PRESERVICE YEAR LETDOWN LINE FROM LOOP 181 FIRST SECOND THIRD ZONE NUHBER: 1-037 ASHE PERIOD PERICO PERIOD SEC. XI SUHHARY EXAHINATION AREA CATGY NDE - - - - - -OUTAGE- - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH 2 3 2 3 2 3 **CALIBRATIONBLOCK ~

                                                              ) 1            1            1 I-2-CN-145    REF. DWG. NO. 01-037-A 112500   CH  145-FW-9                      B-J       SUR     3-                                         OR  NATL. A312,TP304, ELBOW Pipe to Elbow                     89.40                                                        NATL. A182, F304 RCB 112600    CH-145-FW-10                     8 J        SUR     3                                          OR NATL. A312,TP304~ ELBOW Elbow to Pipe                    89.40                                                         NATL. A182,F304 RCB 112700   CN-145-FW-11                      B.J       SUR      3-                                         OR HA'TL. A312,TP304g ELBOW Pipe to Elbow                     B9.40                                                         NATL. A182, F304 RCB 112800   CH 145-FW-12                      8-J       SUR                                                 OR NATL. A312,TP304, ELBOW Elbow to Pipe                     89.40                                                         NATL. A182,F304 RCB 112900   CH-145-FW-13                      B-J       SUR     3-                                         OR NATL. A312,TP304, ELBOW Pipe to Elbow                     89.40                                                        NATL. A182,F304 RCB 113000   CH-145-FW-14                      B-J       SUR     3-                                         OR NATL. A312,TP304, ELBOW Elbow   to Pipe                   89.40                                                        NATL. A182,F304 RCB 113100   CH-145.FW.15                      B-J       SUR     3-                                         OR NATL. A312,TP304, ELBOW Pipe to Elbow                     89.40                                                        NATL. A182,F304 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 186 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEH'TS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LETDDNN LINE FRDH L00P 1B1 FIRST SECOHD THIRD ZONE NUHBER: 1-037 ASHE PERIOD PERIOD PERIOD ~ ~ ~ SEC. XI SUHHARY EXAHINATIOH AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUHBER I DENT IF ICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 ~*CALIBRATIOH BLOCK

  • I-2-CH-145 REF. DUG. NO. 01 037-A 113200 CH-145- FU-16 8-J SUR 3- OR NATL. A312,TP304, ELBOM Elbow to Pipe B9.40 NATL. A182,F304 RCB 113300 CH-145-FW-17 B.J SUR 3 X OR NATL. A312,TP304 Pipe to Valve V-2516 89.40 RCB I-2-RC-142 REF. DUG. NO. 01.037.B 113400 RC-1-BA F-A VT-3 3- X Per JPH-PSLP-93-0087, VARIBLE SPRIHG HANGER F1.10C Allowable cold settings (High RCB 91 lbs 17/32") - (Low 83 lbs 1/8")

113500 RC-1-8B F-A VT3 3-RESTRAINT F1.10 RCB 113600 RC-1-110 F-A VT-3 3 - - - X Per JPN-PSLP-93-0087, This CONSTANT SPRING HANGER F1.10C hanger set at 0 or 10 mark RCB depending on vertical pipe movement. The allowable variance is +/- 1/4" as long as it doesn't fall outside the 0 to 10 mark 113700 RC-1-124A F A VT-3 3- Examine per plant procedures Snubber 1-148 F1.10S RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 187 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEKTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LETDOuN LINE FROH LOOP 181 FIRST SECOHD THIRD ZONE NUHBER: 1 037 ASHE PERIOD PERIOD PERIOD

    '\ WltVV I JVPWl ~ lht ed tel lt A  ~ "-- --   SEC. XI SUHHARY EXAMINATION AREA                           CATGY     NDE       - - - - - - 0  U T A G E - - - - --     IHSTRUCTIOHS NUHBER      IDENTIFICATION                         ITEH  NO NETH    (  1  2  3      1  2  3     1  2  3       **CALI BRAT ION BLOCK**

I-2-RC-142 REF. DWG. NO. 01-037-B 113800 RC.1.124B F.A VT-3 3- Examine per plant procedures Snubber 1-118 F1.10S 18'0" RCB 113900 RC-1-124C F-A VT-3 3- Examine per plant proced'ures Snubber 1-129 F1.10S 18'0" RCB 114000 RC.1-17 F-A VT 3 3 VARIABLE SPRING HANGER F1.10C RCB 14100 RC-1-192A F-A VT-3 3 Examine per plant procedures Snubber 1-120 F1.10S 19'0" RCB 114200 RC-1-1928 F-A VT-3 3-RESTRAIHT F1.10 RCB 114300 RC.1-221A F-A VT-3 3- Examine per plant procedures Snubber 1-117 F1.10S 29'9" RCB 114400 RC-1-222 F-A VT-3 3 - - - X Per JPH-PSLP-93-0087, VARIBLE SPRING HANGER F1.10C Allowable cold setting (High RCB 212 lbs 31/32") - (Low 174 lbs 7/16" )

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 188 REVISIOH: 0 IHSERVICE INSPECTION LONG TERH PLAN 0 CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LETDOW LINE FROM LOOP 1B1 FIRST SECOND THIRD ZONE NUHBER: 1 037 ASME PER I CO PERIOD PERIOD

                                          -  SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE- INSTRUCTIONS ~ NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* I-2-RC-142 REF. D'}G. NO. 01-037-B 114500 RC-1-221B F-A VT-3 3-RESTRAIHT F1.10 RCB 114600 RC-1-25A F A VT-3 3 - - - X Per JPN-PSLP-93-0087, VARIBLE SPRING BASE SUPPORT F1.10C AlloHable cold settings (High RCB 123 lbs 1-1/32") - (Lo}} 101 Ibs 1/2") 114700 RC-1-258 F-A VT-3 3-RESTRAINT F1.10 RCB 114800 RC-1-25C F-A V'I-3 3-Snubber 1.146 F1.10S 31'0" RCB I-2-RC-142 REF. D}}G. NO. 01-037-A 114900 RC-2.3333 F A VT-3 3-RIGID RESTRAINT F1.10 RCB I 2-CH-145 REF. DUG. NO. 01-037-A 115000 CH-187-5788 F-A VT-3 3-RESTRAINT F1.10 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 189 REVISIOH: 0 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR LETDOWN LINE FROM LOOP 1B1 FIRST SECOND THIRD ZONE NUMBER: 1.037 ASNE PERIOD PERIOD PERIOD SEC. Xl

SUMMARY

EXAMINATIOH AREA CATGY HDE ------OUTAGE- INSTRUCTIOHS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 2 3 **CALIBRAT IOH BLOCK~~ I-2-CN-145 REF. DUG. NO. 01-037-A 115100 CH.187-578A F-A VT-3 3-VARIABLE SPRING BASE F1.10C RCB 115200 CH-187-3444 F-A VT-3 3-RESTRAINT F1.10 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 190 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS INTERVAL PLAN STATUS YEAR PRESSURIZER RELIEF LIN SECOND THIRD

                                                                                                    'RESERVICE ZONE NUHBER:    1-038                       ASHE                   I ZONE NUHBER". ICATION'NSPECTION 1 038                       ASHE
                                                                " PERIOD     PERIOD       PER I 00 SEC. XI  NETH'IRST SUHHARY EXAHIHATION AREA                    CATGY    NDE                   OUTAGE-       - - -   -.       INSTRUCTIONS NUHBER  'DENT I F                     ' "'ITEH'NO"           I"1"-2 '3" -'1 -2 "3'- '1'""3- -             **CALIBRATIONBLOCK>>>> '

I-4-RC-101 REF. DIJG. NO. 01-038 115300 19-405 8 F SUR 3 - - - - - - X PZR RELIEF NOZZLE TO SAFE END 85.40 VOL RCB

                                                                                                          *<<UT-17>>*

115400 RC-101-FIJ-1 8-J SUR 3 - - - - - - X Safe-End to Pipe 89.11 VOL RCB

                                                                                                         *<<UT  39**

115500 RC-156-2-SW-5 B.J SUR 3- X 4" X 4" X 4" TEE NATL. Pipe to Tee 89.11 VOL A403,llP304 RCB

                                                                                                         <<*UT 39>>>>

115600 RC-156-2-SH.6 8-J SUR 3- 4" X 4" X 4" TEE, 45 DEGREE Tee to Elbow 89.11 VOL ELBOM RCB

                                                                                                         **UT-39
  • 115700 RC-156-2-SH-7 B.J SUR 3- 45 DEGREE ELBOM, 4" X 2 1/2" Elbow to Reducer 89.11 VOL CONC. REDUCER RCB
                                                                                                         <<>>UT-39>>*

1-2.5-RC 156 REF. DMG. NO. 01 038 115800 RC.156.2-SH-B B.J SUR 3 - X 4" X 2 1/2" CONC. REDUCER Reducer to Pipe 89.21 NATL. A403,HP304 RCB 115900 RC-156-2-SH-9 8-J SUR 3 - . - X 90 DEGREE L/R ELBOM NATL. Pipe to Elbow 89.21 A403,HP304 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHI'HIT 1 PAGE: 191 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COKPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER RELIEF LINE FIRST SECOHD THIRD ZONE HUNGER: 1.038 ASKE PERICO PERICO PERIOD SEC. XI SUKKARY EXAKIHATION AREA CATGY NDE -----OUTAGE------ INSTRUCTIONS HUNGER IDENT IF I CAT IOH ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOH BLOCK

  • I 2.5-RC.156 REF. DMG. NO. 01-038 116000 RC-156-2.S'M-10 8-J SUR 3 - - - X 90 DEGREE L/R ELBOM NATL.

Elbow to Pipe 89.21 A403,MP304 RCB 116100 RC-156 2 SM.11 8-J SUR 3- 90 DEGREE L/R ELBOM KATL~ Pipe to Elbow 89.21 A403,MP304 RCB 116200 RC-156.2.S'M-12 B.J SUR 3- 90 DEGREE L/R ELBOM NATL. Elbow to Pipe 89.21 A403,TP304 RCB 116300 RC-156.FM 1 B.J SUR 3 PIPE TO-VALVE (V-1403) 89.21 RCB 116500 RC-156-FM-2 8-J SUR 3 - - - - X VALVE V-1403 TO PIPE 89.21 RCB 116600 RC-156.1.S'M.1 B.J SUR 3- L/R ELBOM NATL. A403,MP304 Pipe to Elbow 89.21 RCB 116700 RC-156-1.SM-2 8-J SUR 3 L/R ELBOM NATL. A403,MP304 Elbow to Pipe 89.21 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 192 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPOHEHTS IHSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR PRESSURIZER RELIEF LINE FIRST SECOND THIRD 20HE NUNBER: 1-038 ASNE PERIOD PERIOD PERIOD SEC. XI

  ~ ~

SUHHARY EXANIHATIOH AREA CATGY HDE OUTAGE- IHSTRUCTIOHS HUNBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK<<* 1-2.5-RC-156 REF. DMG. HO. 01 038 116800 RC-156.1.SM-3 8 J SUR 3-,- L/R ELBOM NATL. A403,MP304 Pipe to Elbow 89.21 RCB 116900 RC-156-1-S'M.4 8-J SUR 3 . L/R ELBOM, 2500¹ M/H FLANGE Elbow to Flange 89.21 NATL. A182,F304

        'RCB 117000    1-2.5-RC-156-FB                   B.G.2     VT-1   3-            X                          2500¹ M/H    FLAHGE Flange Bolting at V-1402          87.50 RCB 117200 I-4-RC-101 RC.156-2-SM-4 Tee  to Pipe REF. DMG. NO. 01 038 8-J 89.11 SUR VOL 3-                                         w X 4w X 4w TEE NATL A403,MP304 0

RCB

                                                                                                    <<*UT-39 <<

117300 RC-156-2-SM-3 8-J SUR 3 4" X 2 1/2a COHC. REDUCER Pipe to Reducer 89.11 VOL NATL. A403,MP304 RCB

                                                                                                    <<*UT I-2.5.RC-156    REF. DMG. NO. 01-038 117400  RC-156-2-SM-2                       B.J      SUR     3     - -     - - -        X            4"   X 2  1/2"  CONC. REDUCER, 90 Reducer to Elbow                    89.21                                                    DEGREE    L/R  ELBOM RCB

DATE: 01/09/98 ST LUCIE HUCLEAR PLANI'NIT 1 PAGE: 193 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURI2ER RELIEF LINE FIRST SECOND THIRD ZONE NUHBER: 1 038 ASHE PERIOD PERIOD PERIOD

                                 - -- -   SEC.'XI SUHHARY EXAHIHAT ION AREA                  CATGY     NDE       - - - - - - 0  U T A G E  - - - - --     INSTRUCTIONS HUHBER   IDENTIFICATION                    ITEH NO NETH      I 1   2  3     1  2  3      1  2  3       **CALIBRATIONBLOCK
  • jj '

4 '04' 'obH'rv

         -2.5-RC 156   REF. DMG. NO. 01.038 117500   RC-156-2-SM-1                     8-J       SUR    3  - - -        - - -        X             L/R  ELBOM  NATL. A403,MP304 Elbow to Pipe                     89.21 RCB I-2.5-RC.157   REF. DMG. NO. 01-038 117600  RC   157-FM-1                      8-J       SUR    3-Pipe to Valve V 1405               89.21 RCB 11?800  RC   157-FM-2                      8-J       SUR    3-Valve V-1405 to Pipe               89.21 RCB 117900  RC.157-1-SM-4                     8-J        SUR    3-                                         L/R  ELBOM HATL~   A403,MP304 Pipe to Elbow                     89.21 RCB 118000  RC.157-1-SM-3                    8-J         SUR    3 X                                        L/R  ELBOM  HATL. A403,MP304 Elbow to Pipe                    89.21 RCB 118100  RC-157-1-SM-2                    8-J         SUR    3 X                0                       L/R  ELBOM  NATL'403,MP304 Pipe to Elbow                    89.21 RCB 118200  RC.157.1 SM 1                    8-J         SUR    3  X                                       L/R  ELBOM,  2500 M/N  FLAHGE Elbow to Flange                  89.21                                                         NATL. A182,F304 RCB
       'I DATE:     01/09/98                                      ST. LUCIE NUCLEAR PLANT UNIT 1                                         PAGE:  194 REVISIOH:          0                                  IHSERVICE INSPECTION LONG TERN PLAH CLASS 1 ALL STATUS COHPOHEHTS INSPECTION INTERVAL                      PLAN STATUS             PRESERVICE YEAR PRESSURIZER     RELIEF LINE                                          FIRST      SECOND       THIRD ZONE HUNBER:     1.038                      ASHE                     PERIOD     PERIOD       PERIOD
                                          'EC. XI
                                                                  - - - - - - 0           - - - -  --
                                                       klv SUNMARY EXAHIHAT ION AREA                   CATGY      NDE                      U T A G E                INSTRUCTIONS NUHBER     IDENTIFICATION                    ITEN NO NETH      (  1  2  3     1  2  3     1  2  3        ~ICALI BRAT ION BLOCK~>>
                                            4' "I'4 1-2.5-RC-157   REF. DUG. MO. 01 038 118300     1.2.5-RC-157-FB                  8-G-2     VT-1    3 X                                        2500¹ M/H   FLAHGE FLANGE BOLTIHG                   B7.50 RCB I-2.5-RC-156   REF. DWG. NO. 01-038 118500    RC-005-88A                       F-A        VT-3   3-RIGID STRUT ASSEHBLY             F1.10 78i11a   RCB 118600     RC-005-88B                       F-A        VT-3   3-SPRING HANGER                    F1.10C 78'1'I" 0

RCB 118700 RC-005-89 F-A VT-3 3- Examine in accordance with Snubber 1-030 F1.10S plant procedures 78'11" RCB 118800 RC.005.90 F-A VT-3 3- Examine in accordance arith Snubber 1-031 F1.10S plant procedures 78'11" RCB 118900 RC-005-51A F-A VT-3 3-SPRING HANGER F1.10C 78'11" RCB I-2.5.RC.157 REF. DUG. NO. 01-038 119000 RC-005-53A F-A VT-3 3 X RIGID STRUT ASSEHBLY F1.10 78'11" RCB 0

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 195 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR PRESSURIZER RELIEF LINE FIRST SECOND THIRD ZONE HUNBERt 1-038 ASHE PERIOD PERIOD PERIOD SEC. XI SUHMARY EXAHIHATIOH AREA CATGY HDE ------OUTAGE-----. INSTRUCTIONS HUHBER IDENTIFICATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK

  • I.2.5.RC.157 REF. DWG. NO. 01-038 119100 RC-005-55A F.A VT.3 3 .

SPRIHG HANGER F1 '0C 78~11a RCB 119200 RC-005.558 F-A VT-3 3- Examine in accordance Mfth . Snubber 1-027 F1.10S plant procedures RCB 119300 RC-005.55C F A VT-3 3- Examine in accordance with Snubber 1.028 F1.10S plant procedures RCB I-2.5-RC-156 REF. DUG. HO. 01-038 119400 RC.005-86 F-A VT-3 3 - - - - - - X SPRING HANGER F1.10C RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 196 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED Sl PIPING LOOPS 1A1 & 1A2 OUTSIDE CTMT. F IRST SECOHD THIRD ZONE NUMBER: 1-039 ASME PERIOD PERIOD

 ~ I                                     - "- SEC     Xl

SUMMARY

EXAMIHATIOH AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUMBER IDENT IF I CATION ITEM NO METH 1 2 3 1 2 3 1 2 *~CALI BRAT IOH BLOCK** a J h

                                                         -'       I
                                                                     'svovo I-2-SI   132   REF. D1JG. NO. 01-039-8 119450   Valve V-3123                                            3-                                     Ho examination required, valve Valve                                                                                          is c 4<< NPS and contains no RAB                                                                                            body Maids, Anchor Darling, model 2"-l8223870 I-2-Sl-143      REF. DUG. HO. 01-039.8 119500   SI-143-SW-2                          8-J         SUR    3-VALVE V-3123 TO PIPE                 89.40 RAB 119600    SI-143-FW.3                          8-J        SUR     3 X                                   3"  X 2"  CONC. REDUCER Pipe to Reducer                      89.40                                                                             NATL'403,MP304 RAB I-3-SI-139     REF. DUG. HO. 01-039.8 119700   SI-139- I-SM-2                        8-J        SUR    3 X                                    3"  X 2" CONC. REDUCER Reducer     to Pipe                   89.21                                                                            NATL'403,MP304 RAB 119800   SI-139-1-SW-1                         BJ         SUR    3X                                     Floe Edifice FE-3321 Pipe to Flange                        89.21 RAB 119900   FE-3321    Bolting                    8-G-2      VT-1   3   X FLANGE BOLTING                        87.50 RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 197 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED SI PIPING LOOPS 1A1 & lA2 OUTSIDE CTHT. FIRST SECOND THIRD 1 ZONE NUHBER: 1-039 ASKE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHAT IOH AREA CATGY HDE - - - - - - OUTAGE - - - - -- INSTRUCTIONS HUHBER IDENT IF I CAT IOH ITEHNOHETH I 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK** LC '4 ~ "4' 'I ' J 's'At4%A1QA A'l VVI 414 ' \ I-3 SI-139 R F. DWG. NO. 01-039-8 120000 SI-112-1.SW.9 B-J SUR 3 X Flow EdIFIce FE-3321 Flange to Pipe B9.21 RAB 120050 S I H-171 F-A VT-3 3 X SLIDING BASE SUPPORT F1.10 1'2" RAB 120100 SI-112-1.SW-S B-J SUR 3 X ELBOW NATL. A403,WP304 Pipe to Elbow B9.21 RAB 20200 SI-112-1.SW 7 B-J SUR 3 X 6" X 3" CONC. REDUCER Elbou to Reducer B9.21 RAB I.6-SI-112 REF. DWG. NO. 01.039-B 120300 SI-112-1.SW-6 B-J SUR 3 X 6" X 3" CONC. REDUCER, 6" X 6" Reducer to Tee B9.11 VOL X 6" TEE RAB

                                                                                                               *1UT 3B**

120400 SI-112-FW-1 8-J SUR 3 X 6" X 6" X 6" TEE Tee to Pipe B9.11 VOL RAB 41UT 3B** 120500 SI-112.FW-1B 8 J SUR 3 X Pipe to Valve V-3124 89.11 VOL RAB teUT 3@a

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 198 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPOHEHTS INSPECTION IN'TERVAL PLAN STATUS PRESERVICE YEAR COHBINED Sl PIPIHG LOOPS 1A1 8 1A2 OUTSIDE CTHT. FIRST SECOND THIRD ZOHE NUHBER: 1-039 ASNE PERIOD PERIOD PERIOD SEC. Xl SUHHARY EXAHIHATION AREA CATGY HDE - - - -OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> 1-6-SI-112 REF. DUG. NO. 01-039-8 120600 V;3124 B-II-2 VT-3 3 X Group 4, examine uhen Check Valve internal Surface 812.50 disassembled for maintenance RAB or repair, Velan Valve Corp., model P-35423.8 120700 V-3124 Bolting B.G.2 VT-1 3 X Group 4 Check Valve Bolting 87.70 RAB i 120800 S I -112-1-SM-5 B.J SUR 3 X 6" X 6" X 6" TEE NATL. Tee to Pipe 89.11 VOL A403,MP304 RAB

                                                                                                   *>>UT 38>>*

120850 Sl-868.115 F-A VT-3 3-RESTRAINT F1.10 3'0" RAB 120900 S1-112- FW-1A 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                   >>>>UT  38**

121000 S I-112- I-SW 4 8-J SUR 3 X ELBSI NATL. A403,NP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                   *>>UT 38>>*

121100 SI -112-1-SW-2 8-J SUR 3 X ELBOM NATL. A403,NP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                   *>>UT-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 199 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN'LASS 1 ALL STATUS COHPONENTS INSPECTIOH INTERVAL PLAH STATUS PRESERVICE YEAR CONBINED SI PIPING LOOPS 1A1 & 1A2 OUTSIDE CTMT. FIRST SECOND THIRD ZONE ~ ~ '9 NUHBER: 1-039 hl,V Jlfv i '9%'h -" ASKE "SEC. Xl PERIOD PERIOD

                                                                   ------OUTAGE------

PERICO SUHMARY EXAHIHATION AREA CATGY HDE IHSTRUCTIONS NUMBER IDENTIFICATION ITEH HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCX~~ 1-6-81.1'12 REF. DUG. NO. 01.039.8 121200 SI-112.1-siI-3 8-J SUR 3 X ELBOM NATL. A403,iIP304 Pipe to Elbow 89.11 RAB

                                                                                                                **UT-38~*

121300 SI -112 1-SH-1 8-J SUR 3 X ELBOU NATL. A403,MP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                                **UT-38**

121400 S1-112.FN-2 B.J SUR 3 X ELBNI NATL. A403,iIP304 Pipe to Elbow 89.11 VOL RAB i~UT-38** 21500 SI -112-2.SU-I BJ SUR 3X e Elbow to Elbow 89.11 VOL RAB 1AUT 38'* 121600 S I -112-2-$ iI.2 B.J SUR 3 X EL85I NATL. A403,I@304 Elbow to Pipe 89.11 VOL RAB iiUT-38*~ 121620 S I -868-122 F-A VT-3 3-RIGID RESTRAINT F1.10 12'6" RAB 121640 SIH 50 F.A VT-3 3-HANGER F1.10 12'6" RAB

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UHIT 1 PAGE: 200 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBIHED Sl PIPIHG LOOPS 1A1 8 1A2 OUTSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-039 ASME PERIOD PERIOD PERIOD IJ - -- SEC. XI

                                                                       -----OUTAGE- ..           -.-

'I ~ ~ I ~

SUMMARY

EXAMINATION AREA CATGY HDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* 1.6-SI-112 REF. DHG. NO. 01-039-B 121660 Sl -868-126 F A VT-3 3- X TRUNNION F1.10 12'6" RAB 121680 S1-868-126 IA B K SUR 3 - - - X 2 attachments Integral Attachment B10.20 12'6a RAB 121700 SI-112.2.SU.3 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                        **UT-38*i 121750      SIN 49 HANGER 12'6"    RAB F-A F1.10 VT-3 3 X 0

121800 SI -112- FU-3 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                       *~UT-38**

121820 S I -868-1295 F-A VT-3 3 X BOX RESTRAINT F1.10 12'6" RAB 121840 SIH-48 F-A VT-3 3-HANGER F1.10 12'6" RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 201 REVI SIGH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED Sl PIPING LOOPS 1A1 & 1A2 OUTSIDE CTMT. FIRST SECOHD THIRD ZOHE NUHBER: 1-039 ASHE PERIOD PERIOD PERIOD SEC. XI SUNNARY EXANINATIOH AREA CATGY NDE - - - 0 U T A G E - - - - -- INSTRUCTIONS NUNBER IDEHTIFICATIOH ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK** I-6-SI-112 REF. DMG. NO. 01-039-B 121860 S I -868-131 F-A VT-3 3-RIGID SHAY STRUT F1.10 12'6" RAB 121880 S I H.47 F-A VT-3 3-SPRING HANGER F1.10C 12'6" RAB 121900 SI-112-3-SM.1 B-J SUR 3 X ELBOM NATL. A403,MP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                     **UT 38**

2000 SI-112-FM-4 B-J SUR 3 X ELBOM NATL'403,MP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                     **UT-38+*

122100 Sl-112-4-SM-1 8-J SUR 3 X ELBOM NATL. A403,MP304 Pipe to Elbow B9.11 VOL RAB

                                                                                                     **UT-38**

122200 SI-112-4-SM-2 B-J SUR 3 X ELBOM NATL. A403,MP304 Elbow to Pipe B9.11 VOL RAB

                                                                                                     **UT-38**

122250 S I -868-7381 F-A VT-3 3-RIGID STRUT F1.10 31'0" RAB

DATE 01/09/98 ST+ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 202 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 1A1 8 1A2 OUTSIDE CTMT. FIRST SECOND THIRD ZONE NUHBER: 1-039 ASHE PERIOD PERIOD PERIOD SEC. XI SUHMARY EXAMINATION AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> I 6-SI-112 REF. DWG. NO. 01-039-8 122300 SI-112-FW.5A BJ SUR 3X Pipe to Pipe 89.11 VOL RAB

                                                                                                    >>>>UT-38>>>>

122350 S I -8968-1381 F-A VT-3 3-RIGID S'WAY STRUT F1 ~ 10 31'6" RAB 122400 Sl-112-FW.5 B-J SUR 3 X ELBOW HATL. A403,WP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                    >>*UT-38>>>>

122600 SI-112-5-SW-3 8-J SUR 3- ELBOW NATL. A403,WP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                    **UT 38*>>

122650 SIH-46 FA VT3 3- X Spring Hanger F1.10C 34~0>> RAB 122700 SI -112-5-SW-2 8-J 'UR 3 X ELBOW HATL. A403,WP304 Pipe to Elbow B9.11 VOL RAB

                                                                                                    **UT-38**

122800 SI-112-5-SW-1 B-J SUR 3- ELBOW NATL. A403,WP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                    **UT-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 203 REVI SION: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 1A1 & 1A2 OUTSIDE CTMT. FIRST SECOHD THIRD ZONE NUMBER: 1-039 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE OUTAGE - -- INSTRUCTIONS HUMBER IDENT IF I CATION ITEM HO METH I 1 2 1 2 3 1 2 3 <<*CALI BRAT ION BLOCK** I 6 SI-112 REF. DHG. NO. 01-039-B 122850 SIH-45 F-A VT 3 3 SPRING HANGER F1.10C 34'0" RAB 122900 SI -112- FW.6A B-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                          **UT-38**

123000 SI 112-FII.6 B-J SUR 3- CONTAIHMEHT PENETRATION PIPE-TO-PEH. ¹37 89.11 VOL RAB

                                                                                                          **UT-38**

I-2-SI-126 REF. DHG. NO. 01-039-A 123050 Valve V-3113 3 No examination required, valve Valve is c 4a NPS and contains no RAB body weids, Anchor Darling, model 2<<-l$ 223870 123090 SI-126-FW-2001 3 Valve V-3113 to Pipe RAB 123100 S I -126- FIJ-2002 8-J SUR 3 . - - - - - - - 97 Valve V-3113 to Pipe 89.40 RAB 123200 SI-126-FH-3 B-J SUR 3 - - - X 3" X 2a CONC. REDUCER NATL. Pipe to Reducer B9.40 A403,MP304 RAB

, DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 204 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 1A1 & 1A2 OUTSIDE CTMT. FIRST SECOHD THIRD ZONE NUMBER: 1-039 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE -OUTAGE- - - - -- INSTRUCTIONS NUMBER IDENT IF ICATION ITEM HO METH I 1 2 3 1 2 3 1 2 **CALIBRATIOHBLOCK~* I-3-SI-140 REF. DIJG. HO. 01-039-A 123300 SI -140-1-SW-2 8-J SUR 3- 3" X 2a COHC ~ REDUCER NATL. Reducer to Pipe 89.21 A403,MP304 RAB 123400 SI-140-I-SW-1 8-J SUR 3 - - - X Floe Edifice FE-3311 Pipe to Flange 89.21 RAB 123500 FE-3311 Bolting 8-G-2 VT-1 3 - - . X Flange Bolting 87.50 RAB I-3-SI-113 REF. DUG. NO. 01-039-A 123600 S I -113- I -SM-9 8-J SUR 3 - - - X Flow Edifice FE-3311 Flange to Pipe 89.21 RAB 123650 S I H-170 F-A VT-3 3-SLIDIHG BASE SUPPORT F1.10 1'2" RAB 123700 SI-113-1-SW.8 BJ SUR 3- - X ELBSl NATL. A403,NP304 Pipe to Elbog 89.21 RAB 123800 SI-113-1-SW-7 8-J SUR 3- 6" X 3" CONC. REDUCER Elbow to Reducer 89.21 RAB

. DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 205 REVI SION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED SI PIPING LOOPS 1A1 & 1A2 OUTSIDE CTMT. FIRST SECOND THIRD ZONE HUHBER: 1-039 ASHE PERIOD PERIOD PERIOD SEC. XI SUNNARY EXAHIHAT I ON AREA CATGY HDE - - - - - - 0 U T A G E- INSTRUCTIONS NUHBER IDENT IF ICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK<<>> I.6.SI-113 REF. DMG. HO. 01-039-A 123900 SI.113.1.SM.6 8-J SUR 3- 6" X 3>> CONC. REDUCER, 6" X 6" Reducer to Tee 89.11 VOL X 6" TEE RAB 124000 SI-113-FW-1 8-J SUR 3-Pipe to Valve V-3114 89.11 VOL RAB

                                                                                                     <<*UT-38*>>

124100 S I -113- FW-1C 8-J SUR 3- 6" X 6" X 6" TEE Tee to Pipe 89.11 VOL RAB

                                                                                                     **UT-38*>>

200 V-3114 8-N-2 VT-3 3 X Group 4, examine shen Check Valve Internal Surface 812.50 disassembled for maintenance RAB or repair, Velan Valve Corp., model P-35423.8 124300 V-3114 Bolting 8-G-2 VT-1 3 X Group 4 Check Valve Bolting 87.70 RAB 124350 S I.868.414 F-A VT-3 3-RESTRAINT F1.10 3'0" RAB 124400 SI -113 1-SW-5 8-J SUR 3- 6" X 6" X 6" TEE HATL. Tee to Pipe 89.11 VOL A403,'WP304 RAB

                                                                                                     <<*UT-38**

DATE:. 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 206 REVISION: 0 INSERVICE IHSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR COHBINED SI PIPING LOOPS 1A1 & 1A2 OUTSIDE CTMT. FIRST SECOND THIRD ZOHE NUHBER: 1-039 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAHIHATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEN HO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> I-6-SI-113 REF. DMG. HO. 01-039-A 124500 S I -113- FM-1A 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                     **Ul'-38**

124600 SI-113-1-SM-4 8-J SUR 3 - - - X ELBOM HATL. A403,MP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                     **UT-38**

124700 SI-113-1-S'M-3 8-J SUR 3 - - - X ELBOM HATL. A403,MP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                     **UT.38**

124800 SI-113-1-SM-2 B.J SUR 3 - - - X ELBOM HATL~ A403,MP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                     >>>>UT-38*>>

124900 SI-113-1-SM-1 8 J SUR 3 - - - X ELBOM HATL~ A403,MP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                     **UT-38**

125000 S1-113- FM-18 B.J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                     *>>UT 38>>>>

125100 S I -113- FM-2 8 J SUR 3- r ELBOM HATL. A403,MP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                     **MT 38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 207 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED Sl PIPING LOOPS 1A1 8 1A2 OUTSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-039 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATIOH AREA CATGY NDE ------OUTAGE------ INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 ~*CALIBRATION BLOCK

  • I-6-SI-113 REF. DUG. HO. 01-039-A 125200 SI-113-2-SW-1 8-J SUR 3-Elbow to Elbow B9.11 VOL RAB
                                                                                                   **UT-38**

125300 SI -113-2-SW-2 B-J SUR 3- ELBOM MATL. A403,MP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                   *AUT  38**

125320 S I -868.422 F-A VT-3 3-RIGID SHAY STRUT F1.10 16'0" RAB 340 SIH.43 F-A VT-3 3 X Per JPH-PSLP-93-0087, SPRING HANGER F1.10C Allowable cold settings (High 16'0" RAB 622 lbs 25/32") - (Low 509lbs 9/324) 125360 SIH-42 F-A VT-3 3-HANGER F1.10 16'0" RAB 125380 S I -868-226 F-A VT-3 3-TRUHHION F1.10 16'0" RAB 125390 S I -868-226 IA 8-K SUR 3- 2 attachaents Integral Attachaent B10.20 16'0" RAB

DATE 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 208 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 1A1 8 1A2 OUTSIDE CTHT. FIRST SECOND THIRD ZONE NUMBER: 1-039 ASHE PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAHINATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCT IOHS NUMBER IDENT IF ICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 <<*CALIBRATIOH BLOCK<<<< 1-6-SI-113 REF. DWG. MO. 01-039-A 125400 SI-113-2-SW-3 8 J SUR 3 - - X Limitation due to support Pipe to Pipe 89.1'I VOL Sl-868-226, 2.5" from toe of RAB weld

                                                                                                     <<*UT-38**

125500 S I -113- FW-3 B J SUR 3 - - - X Pipe to Pipe 89.11 VOL RAB

                                                                                                     *<<UT.38*>>

125520 SIH-41 F.A VT-3 3 . - - X HANGER F1.10 16'0" RAB 125540 Sl-868-228 F-A VT-3 3 . RIGID SWAY STRUT F1.10 16'0" RAB 125560 S I -868-2311 F-A VT-3 3 - - - X RIGID S'WAY STRUT F1.10 16'0" RAB 125580 SIH-40 F-A VT-3 3-SPRING HANGER F1.10C 16'0" RAB 125600 S I-113-3-SW.1 8-J SUR 3 - - X ELBOW NATL. A403,WP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                     **Ul'-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 209 REVI SION: 0 IHSERVICE INSPECTION LONG TERN PLAH CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 1A1 8 1A2 OUTSIDE CTHT. FIRST SECOND THIRD ZONE NUHBER: 1-039 ASHE PERIOD PERIOD PERIOD -~ I ~ SEC. XI SUHHARY EXAHIHATION AREA CATGY HDE - - - - -OUTAGE- INSTRUCTIONS NUMBER IDENT IF I CATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 <<>>CALIBRATION BLOCK>>>> I-6-SI-113 REF. DWG. NO. 01-039-A 125700 S I -113- FW.4 B-J SUR 3- ELBOW NATL. A403,WP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                             **UT-38**

125800 SI-113-4-SW.1 8-J SUR 3- ELBOW NATL. A403,WP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                             *>>UT  38**

125900 SI-113-4-SW-2 B-J SUR 3- ELBOW NATL. A403,WP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                             **UT-38**

5950 S I -868-236 F-A VT.3 3-RIGID SWAY STRUT F1.10 31'0" RAB 126000 S I-113-FW-5 8 J SUR 3- ELBOW NATL. A403,WP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                             *<<UT 38*>>

126100 SI-113-5-SW-2 B-J SUR 3 - - - X Elbow to Elbow 89.11 VOL RAB

                                                                                                             **0T 38**  ~
      '126200   SI-113.5-S'W-1                     B-J      SUR    3 -     -  -     X                        ELBOW  NATL. A403,WP304 Elbow to Pipe                      B9.11    VOL RAB
                                                                                                             *<<UT  38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 210 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED SI PIPING LOOPS 1A1 5 1A2 OUTSIDE CTHT. FIRST SECOND THIRD ZONE NUHBER: 1-039 ASNE PERIOD PERIOD PERIOD SEC. Xl SUHHARY EXAHINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- IHSTRUCTIONS NUHBER IDENT IF I CATION ITEH HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK** 1-6-SI-113 REF. DHG. NO. 01-039-A 126220 SIN-44 F-A VT-3 3-SPRING HANGER F1.10C 34'Oa RAB 126240 SIH-39 F-A VT-3 X Spring Hanger F1.10C 34'0" RAB 126300 S I -113- FM.6 8-J SUR 3 - - - X COHTAINHENT PEHETRATIOH Pipe to Penetration ¹36 89.11 VOL RAB UT 38*+

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 211 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR OMBINED SI PIPING LOOPS 181 8 182 OUTSIDE CTMT. FIRST SECOND THIRD 20NE NUMBER: 1-040 ASME PERIOD PERIOD

                                      '  SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE OUTAGE-- INSTRUCTIONS NUMBER IDEHTIFICATIOH ITEM NO METH I 1 2 3 1 2 3 1 2 3 >>*CALIBRATION BLOCK~* I-2-SI-147 REF. DMG. NO. 01-040-A 129000 Valve V-3143 3 No examination required, valve Valve is < 4>> NPS and contains no RAB body welds, Rockwell International / Nordstrom, model 2-3674F316T 129100 SI-147-FH-2A BJ SUR 3- X Valve V-3143 to Pipe 89.40 RAB 129200 8 I.147- FH.3A 8-J SUR 3- X 3>> X 2>> COHC. REDUCER NATL. Pipe to Reducer 89.40 A403,llP304 RAB I-3-SI-137 REF. DWG. HO. 01-040-A 129300 SI-137-1-SH-2 8-J SUR 3- 3>> X 2>> CONC. REDUCER NATL. Reducer to Pipe 89.21 A403,NP304 RAB 129400 SI-137-1-SN-1 B.J SUR 3- 1500¹ R/F, U/N ORIFICE FLANGE PIPE to FLANGE 89.21 NATL. A182,F304, FE-3341 is RAB located at flange 129500 FE-3341 Bolting B-G.2 VT-1 3- X Flange Bolting 87.50 RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 212 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 1B1 8 1B2 OUTSIDE CTMT. FIRST SECOHD THIRD 2ONE NUMBER: 1-040 ASME PERIOD PERIOD PERIOD "SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENT IF ICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* I-3-SI-110 REF. DWG. NO. 01-040-A 129600 SI-110-1-SW.6 8-J SUR 3- X FE-3341 attached to flange Flange to Pipe 89.21 RAB 129650 SIN-168 F-A VT-3 3-SLIDING BASE SUPPORT F1.10 1'2" RAB 129700 SI-110-1-SW-5 B-J SUR 3- ELBOW NATL. A403,WP304 Pipe to ElboM 89.21 RAB 129800 SI-110-1-SW-4 8-J SUR 3- 64 X 3" CONC. REDUCER Elbow to Reducer 89.21 RAB I-6-SI-110 REF. DWG. NO. 01-040-A 129900 SI-110-1-SW-3 8-J SUR 3- 6" X 3" CONC. REDUCER, 6" X 6" Reducer to Tee 89.11 VOL X 6" TEE RAB

                                                                                                     **UT-38**

130000 SI-110-FW-1 8-J SUR 3- 6a X 6" X 6" TEE Tee to Valve V-3144 89.11 VOL RAB

                                                                                                     **UT-38**

130'IOD V-3144 B-M-2 VT-3 3 X Group 4, examine shen Check Valve Internal Surface B12.50 disassembled for maintenance RAB or repair, Velan Valve Corp., model P-35423-8

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 213 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPIHG LOOPS 1B1 & 182 OUTSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-040 ASME PERIOD PERIOD PERIOD SUMHARY EXAHINATIOH AREA SEC. XI CATGY NDE -OUTAGE- - ---- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETH ( 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> I 4 4 'abs I 1-6-81-110 REF. DWG. NO. 01-040-A 130200 V-3144 Bolting B.G-2 VT-1 3 X Group 4 Check Valve Bolting 87.70 RAB 130300 S1-110 ~ 1.SW-2 8-J SUR 3- 6>> X 6" X 6" TEE HATL. Tee to Pipe 89.11 VOL A403,MP304 RAB

                                                                                                  **UT-38*>>

130350 S1-868-1661 F-A VT.3 3- X Rigid Tie Bar Assembly F1.10 8'0" RAB 0400 SI-110-1-SW-1 8-J SUR 3- ELBOW HAIL. A403,WP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                  **UT-38>>*

130500 S1.110-FW.2 8-J SUR 3- ELBOM MATL. A403,MP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                  **UT 381>>

130600 S1-110-2-SW.1 8-J SUR 3- ELBOW HATL. A403,MP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                  >>*UT-38**

130700 SI-110-2-SW-2 B-J SUR 3- ELBOW HATL. A403,WP304 Elbow to Pipe B9.11 VOL RAB

                                                                                                  **Ul'-38**

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 214 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 101 8 1B2 OUTSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-040 ASME PERIOD PERIOD PERIOD

                                        'EC. XI

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE..---- INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3' 2 3 **CALI BRAT ION BLOCK~* 1-6-SI-110 REF. DWG. NO. 01-040-A 130720 S I H.38 F-A VT-3 3- X Restraint F1.10 9'0" RAB 130750 S I -868-1711 F-A VT-3 3-RIGID SWAY STRUT F1.10 9'0" RAB 130780 S I -868-174 F-A VT-3 3-RIGID SWAY STRUT F1.10 9'Oa RAB 130800 S I -110- FW.3 B J SUR 3-Pipe to Pipe B9.11 VOL RAB

                                                                                                  *~UT.38**

130850 SI H-37 F.A VT-3 3- X Restraint F1.10 9'0" RAB 130900 SI -110-3-SW-4 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                  <<~UT-38**

131000 SI -110.3-SW-1 B-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                  **UT-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 215 REVISIOH: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED Sl PIPING LOOPS 181 8 182 OUTSIDE CTHT. FIRST SECOHD THIRD 20HE NUMBER: '1-040 ASHE PERIOD PERIOD PERIOD SEC. Xl

SUMMARY

EXAMINATION AREA CATGY HDE -OUTAGE- INSTRUCTIONS NUMBER IDENT IF ICATION ITEH NO HETN 'I 2 3 1 2 3 1 2 3 **CALIBRATION [ BLOCK~*'-6-81-110 REF. DWG. NO. 01-040-A 131050 S I -868-177 F-A VT-3 3-RIGID RESTRAINT F1.10 9'0" RAB 131060 SI -868-177 IA 8-K SUR 3- 4 at tachments, .5 "x1/2"x7-1/2a Integral Attachments 810.20 9'0" RAB 131'100 S1-110- F'W.4 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                   **UT-38**

150 S I -868-180 F-A VT-3 3-RIGID SWAY STRUT F1.10 9'0" RAB 131200 Sl -110-4-SW-1 8-J SUR 3- ELBOW NATL. A403,WP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                   *tUT  3P*

131300 SI-110-4-SW-2 8-J SUR 3-Elbow to Elbov 89.11 VOL RAB

                                                                                                   **UT 38**

131400 SI-110-4-SW-3 8-J SUR 3- ELBOW HATL. A403,WP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                   *~UT-38**
'DATE: 01/09/98                                          ST. LUCIE NUCLEAR PLANT UNIT 1                                       PAGE: 216 REVISION:        0                                    INSERVICE INSPECTION LOHG TERM PLAN CLASS   1 ALL STATUS COMPOHENTS INSPECT I OH INTERVAL                   PLAN STATUS              PRESERVICE YEAR COMBINED   SI PIPING    LOOPS 181 8 182 OUTSIDE CTMT.                 FIRST      SECOND        THIRD ZONE  NUMBER: '1-040                         ASME                     PERIOD     PERIOD        PER IOO SEC. XI-

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCT IONG NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 <<<<CALIBRATION BLOCK<<<< I-6-81-110 REF. DUG. NO. 01-040-A 131450 8 I H-34 F-A VT-3 3-SPRING HANGER F1.10C 10'6<< RAB 131500 S I -110- FH-5 8 J SUR 3 ELBOW NATL. A403,i@304 Pipe to Elbow 89.11 VOL RAB

                                                                                                           <<UT-38*

131600 SI-110-5-SII-1 8-J SUR 3- ELBml NATL~ A403,IIP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                          **UT-38**

131700 S I-110-5-SW-2 8-J SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                          <<<<UT 38<<*

131800 SI-110-5-S1J-3 8-J SUR 3- ELB(N NATL. A403,HP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                          **UT-38**

131820 SIH-33 F-A VT-3 3-RIGID RESTRAINT F1.10 16'6" RAB 131850 S I -868-188 F-A VT-3 3-RIGID STRUT F1.10 16'6" RAB

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 217 RE V I S ION: 0 INSERVICE INSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBIHED Sl PIPING LOOPS 1B1 & 182 OUTSIDE CTMT. FIRST SECOND THIRD 20NE NUMBER: 1-040 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHATIOH AREA CATGY HDE - - - - - OUTAGE- INSTRUCTIONS HUHBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 1 2 3 <<*CALI BRAT ION BLOCK<<>> 1-6-S1-110 REF. DWG. NO. 01-040-A 131880 S I -868-188A F.A VT-3 3- X Rigid Sway Strut F1.10 16'6" RAB 131900 SI.110-5-SW.6 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                    **UT 38*>>

132020 S I H.32 F.A VI'-3 3-RIGID RESTRAINT F1.10 16'6" RAB 2100 S I -110-5-SW-4 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                    <<*UT-38*>>

132150 S I H-31 F-A VT-3 3-WHIP RESTRAINT F1.10 16'6" RAB 132200 SI 110-FW-6 8-J SUR 3- ELBOW HATL. A403,WP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                    <<>>UT-38**

132300 S1-110.6-SW-1 8-J SUR 3- ELBOW MATL. A403,WP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                    **UT 38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 218 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 'I, ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 1B1 8 182 OUTSIDE CTMT. FIRST SECOHD THIRD ZONE NUMBER: 1-040 ASME PERIOD 'ERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* I-6-SI-110 REF. DWG. HO. 01-040-A 132400 SI -110.6-SW-3 B-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                  **UT-38**

132500 SI-110-FW-7 8-J SUR 3- ELBOW NATL. A403,WP304 Pipe to Elbow B9.11 VOL RAB

                                                                                                  **UT-38**

132600 SI-110-7-SW-1 8 J SUR 3- ELBOW NATL. A403,WP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                  *~UT-38~>>

132650 S I H-30 F-A VT-3 3-Spring Hanger F1.10C 34io>> RAB 132700 SI-110-FW-8 8-J SUR 3- COHTAINMENT PENETRATION ¹39 PIPE-TO-PEN. ¹39 89.11 VOL RAB

                                                                                                  **UT-38**

I-2-SI-145 REF. DWG. NO. 01-040-C 132750 Valve V-3133 3 No examination required, valve Valve is < 4>> NPS and contains no RAB body welds, Rockwell International / Hordstrom, model 2-3674F316T

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 219 REVISION: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED SI PIPING LOOPS 1B1 & 1B2 OUTSIDE CTHT. FIRST SECOHD THIRD ZONE NUHBER: 1-040 ASHE PERIOD PERIOD PERIOD SEC. XI SUHMARY EXAHIHATIOH AREA CATGY NDE - - - 0 U T A G E - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>> 1-2-SI.145 REF. DIIG. NO. 01-040.C 132800 SI-145.SH.2 8-J SUR 3 - - - X Valve V-3133 to Pipe 89.40 RAB 132900 SI -145- FII-3 B-J SUR 3 - - - X 3" X 2>> CONC. RECUCER NATL. Pipe to Reducer 89.40 A403,HP304 RAB I 3 SI-138 REF. DMG. NO. 01-040-C 133000 SI-138-I-SIJ-2 B-J SUR 3 - - - X 3" X 2" CONC. REDUCER HATL. Reducer to Pipe B9.21 A403,HP304 RAB 133050 SIH-169 F-A VT-3 3- X SLIDING BASE SUPPORT F1.10 1'2" RAB 133100 SI.138-1-S'N-1 B.J SUR 3 . - - X Flow Edifice FE-3331 Pipe to Flange B9.21 RAB 133200 FE-3331 Bolting B-G-2 VT-1 3 - - - X Flange Bolting 87.50 RAB 1-3-SI-111 REF. DUG. HO. 01-040-C 133300 SI-111-1-SII.6 8 J SUR 3. - - X Flow edifice FE-3331 Flange to Pipe 89.21 RAB

.DATE: 01/09/98                                           ST. LUCIE NUCLEAR PLANT UHIT 1                                                   PAGE:    220 REVISIOH:         0                                    INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPONEHTS INTERVAL                           PLAN STATUS                PRESERVICE YEAR COMBINED   SI PIPING LOOPS 1B1      8 182 OUTSIDE CTHT.         I'NSPECTION FIRST      SECOND            THIRD ZONE HUNBER:     1-040                        ASNE                             PERIOD     PERIOD            PERIOD SEC. XI SUNNARY EXANIHATIOH AREA                       CATGY    HDE                 - - - - - - 0 U T A G   E-                 INSTRUCTIONS NUNBER    IDENT  IF I CAT IOH                  ITEM HO NETH                    2   3    1  2  3         1   2  3      **CALIBRATIONBLOCK**
                                                                                ~    4    S   w +I I ~   I I-3-SI-111       REF. DWG. NO. 01-040-C 133400   SI-111.1.SW.5                         8-J      SUR    3-                                                     ELBOW   NATL. A403,WP304 Pipe to Elbow                        89.21 RAB 133500   SI -111-1-SW-4                       8-J       SUR    3-                                                     6"  X  3" CONC. REDUCER HATL.

Elbow to Reducer 89.21 A403,WP304 RAB I-6-SI-111 REF. DWG. NO. 01-040-C 133600 S I -111-1-SM.3 B.J SUR 3 . 6" X 3" CONC. REDUCER, 6" X 6" Reducer to Tee 89.11 VOL X 6" TEE RAB

                                                                                                                     **UT-38**

133700 S I.111- FW.1 8 J SUR 3- 6" X 6" X 6" TEE; CRV achieved Tee to Valve V-3134 89.11 VOL 72X pipe, OX valve. RAB

                                                                                                                     **UT-38**

133800 V-3134 8-N-2 VT-3 3 X Group 4, examine when Check Valve Internal Surface 812.50 disassembled for maintenance RAB or repair, Velan Valve Corp., model P-35423-8 133900 V-3134 Bolting 8-G-2 VT-1 3 X Group 4 Check Valve Bolting 87.70 RAB 134000 SI-111-1-SW-2 8-J SUR 3 X 6" X 6" X 6" TEE NATL. Tee to Pipe 89.11 VOL A403,MP304 RAB

                                                                                                                     **UT-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: '21 REVISION: 0 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPOHENI'S INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CONBINED Sl PIPING LOOPS 181 8 1B2 OUTSIDE CTNT. FIRST SECOND THIRD ZONE HUNGER: 1-040 ASNE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATION AREA CATGY NDE OUTAGE IHSTRUCTIOHS HUMBER IDEHT I F I CAT ION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-6-SI-111 REF. DWG. NO. 01-040-C 134100 SI.111.1-S'W-1 8-J SUR 3 X ELBOW NATL. A403,WP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                     **UT 38*+

134200 SI-111-FW.2 8-J SUR 3 X ELBOW NATL. A403,WP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                     *aUT  38**

134250 8 I H-29 F-A VT-3 3-SPRING HANGER F1.10C 7'6" RAB 300 Sl -111.2-SW-1 8-J SUR 3 X ELBOW NATL. A403,WP304 Pipe to ELbow 89.'11 VOL RAB

                                                                                                     **UT.38*~

134400 SI-111-2-SW-2 B.J SUR 3- ELBOW NATL. A403,WP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                     *AUT  38' 134440  S I -868.72                          F-A       VT-3   3-RIGID    SWAY STRUT                  F1.10 7'6"    RAB 134460  SI H-28                              F-A       VT-3   3-                         X RESTRAINT                            F1.10 7'6"    RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 222 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 1B1 8 1B2 OUTSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-040 ASME PERIOD PERIOD PERIOD SEC." XI

SUMMARY

EXAMINATION AREA CATGY HDE OUTAGE - - - - -- INSTRUCT IOHS HUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2'3 **CALI BRAT ION BLOCK~* I-6-SI-111 REF. DN. HO. 01-040-C 134500 SI-111-2-SW-3 B-J SUR 3-Pipe to Pipe B9.11 VOL RAB

                                                                                                   **UT-38**

134550 SI-868-75 F-A VT-3 3 . Rigid Sway Strut F1.10 7'6" RAB 134600 SI-111-FW-3 8-J SUR 3 . Pipe to Pipe 89.11 VOL RAB

                                                                                                   *~UT-38~*

134620 SIH-27 F-A VT-3 3-RESTRAINT F1.10 RAB 134640 S1-868.77 F-A VT-3 3-RIGID RESTRAINT F1.10 7'6" RAB 134650 S I -868-77 IA B-K SUR 3- 2 attachnents, 8"x1/2"x6" Integral Attachment 810.20 7'6" RAB 134660 S I H-26 F-A VT-3 3-RESTRAINT F1.10 7'6" RAB

, DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE:, 223 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 'I ALL STATUS COMPONEHTS IHSPECTIOH IHTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 181 8 182 OUTSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1 040 ASME PERIOD PERIOD PERIOD SEC'I

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE------ IHSTRUCTIOHS NUMBER IDENT IF I CAT IOH ITEM HO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** 1-6-SI-111 REF. DWG. HO. 01-040-C 134680 S I -868-80 F A VT-3 3-RIGID SWAY STRUT F1.10 7'6" RAB 134700 Sl -111-3-SW-4 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                        **UT-38**

134750 SI H-25 F A VT-3 3-RESTRAINT F1.10 7'6" RAB '134800 Sl-111-3-SW-1 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                        **UT 38**

134900 SI-111-FW.4 B-J SUR 3-Pipe to Pipe B9.11 VOL RAB

                                                                                                        *~UT-38**

135000 SI-111-4-SW-1 B.J SUR 3- ELBOW MATL. A403,WP304 Pipe to Pipe 89.11 VOL RAB

                                                                                                        **IIT-38**

'l35040 S I -868-83 F-A VT-3 3- 93 RIGID SWAY STRUT F1.10 7'6" RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 224 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 181 8 182 OUTSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-040 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - .- INSTRUCTIONS HUMBER IDENTIFICATION ITEM NO METH I

                                                           'I 2   3     1  2  3. 1  2   3           >>>>CALIBRATION BLOCK>>>>

I-6-SI-111 REF. DWG. NO. 01-040-B 135060 SIH.24 F-A VT-3 3-RESTRAINT F1 ~ 10 7'6" RAB 135100 SI-111-4-SM-2 B.J SUR 3- ELBSJ NATL. A403,I@304 Pipe to Elbow 89.11 VOL RAB

                                                                                                        **UT-38>>>>

135200 SI-111-4-S'N-3 8-J SUR 3- ELBOW NATL. A403,llP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                        *'UT-38**

135300 S I -111- FN-5 8-J SUR 3- ELBSl MATL. A403,NP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                        >>>>UT-38>>>>

135400 SI -111-5-SM.1 B-J SUR 3- ELBOM NATL. A403,MP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                        >>>>UT  38**

135420 S I -868-862 F A VT-3 3-RIGID SHAY STRUT F1.10 11'0" RAB 135440 SI H-23 F.A VT-3 3 - - - X - . - - - 93 RESTRAINT F1 ~ 10 11'0" RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 225 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONEHI'S INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 1B1 8 1B2 OUTSIDE CTMT FIRST , SECOND THIRD ZONE NUMBER: 1-040 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE -----OUTAGE- INSTRUCT IOHS NUMBER IDENTIFICATION ITEH NO METH i 1 2 3 1 2 3 2 3 **CALIBRATIONBLOCK>>>> 1-6 SI-111 REF. DUG. NO. 01-040-8 135460 S I -868-87 F-A VT-3 3-RIGID S'NAY STRUT F1.10 11'0" RAB 135500 SI -111.5-SW-2 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                    *>>UT 38*>>

135600 SI-111-5-SN-3 8-J SUR 3- ELBSI NATL. A403,lP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                    >>>>UT-38>>>>

5700 SI.111-5-Sll-4 8-J SUR 3- ELBSJ NATL. A403,llP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                    **UT 38*>>

135800 SI-111-F'N-6 8-J SUR 3- ELBSI NATL. A403,MP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                    **UT 38**

135900 S I -111-6-SM-3 8-J SUR 3- ELBSl NATL. A403,NP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                    **UT 38*>>

135950 SIH.22 F-A VT-3 3-SPRING HANGER F1.10C 14'3" RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 226 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED SI PIPING LOOPS 181 8 182 OUTSIDE CTMT. FIRST SECOND THIRD ZONE NUMBER: 1-040 ASHE PERIOD PERIOD PERIOD SEC ~ XI

SUMMARY

EXAMINATION AREA CATGY NDE ---OUTAGE INSTRUCTIOHS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 *>>CALIBRATION BLOCK

  • I-6-SI-111 REF. OWG. NO. 01-040-8 136000 SI -111-6-SW-2 8-J SUR 3- ELBOW MATL. A403,WP304 Pipe to Elbow 89.1'I VOL RAB
                                                                                                    **UT-38**

136100 SI.111-6-SW-1 8-J SUR 3- ELBOW MATL. A403,WP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                    <<*UT 38*<<

136150 S I -868-950 F-A , VT-3 3-RIGID SWAY STRUT F1.10 28'9" RAB 136200 SI.111.6.SW.5 8-J SUR 3-Pipe to Pipe 89.11 VOL RAB

                                                                                                    <<*UT-38*>>

136250 SI-868-95 F-A VT-3 3-RIGID STRUT F1.10 30'9" RAB 136300 SI.111-FW-7 8-J SUR 3- ELBOW MATL. A403,WP304 Pipe to Elbow 89.11 VOL RAB

                                                                                                   **UT-38*'>>

136400 SI-111-7-SW-1 8-J SUR 3- X ELBOW NATL. A403,WP304 Elbow to Pipe 89.11 VOL RAB

                                                                                                   **UT-38**

DATE:, 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 227 REVI SIOH: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS INSPECT IOH INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED SI PIPING LOOPS 181 & 1B2 OUTSIDE-CTHT. FIRST SECOND THIRD ZONE NUHBER: 1-040 ASHE PERIOD PERIOD PERIOD

                                          'EC. XI SUHHARY EXAHIHATION AREA                     CATGY    NDE                - 0 U T A G E  - - - - --    INSTRUCTIONS HUNGER   IDENTIFICATION                      ITEH HO NETH    I 1  2  3     1  2  3      1  2  3       **CALIBRATIONBLOCK**

4 I-6-SI-111 REF. DUG. NO. 01-040-B 136450 SI H 21 F-A VT-3 3- Per JPN-PSLP-93-0087, SPRING HANGER F1.10C Allowable cold settings (High 34'0" RAB 1595 lbs 2-1/16") - (Low 1322 lbs 1-1/16") 136500 S I -111- FW.8 B-J SUR 3- X Check configuration, this may Pipe to Penetration ¹38 B9.11 VOL be an integral attachment RAB which would require different examinations to be performed

                                                                                                     **UT-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 228 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1A Seconder Side FIRST SECOND THIRD 20HE NUMBER: 1-041 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE - . - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENT IF ICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRAT I OH BLOCK>>>> REF. DWG. HO. 01-041 140000 SG-1A-3-104 3 T=S 5/8" MIN, weld is TUBESHEET TO EXT RING 'MELD scheduled to be removed from RCB service during the steam generator replacement, PC/M 151-193

                                                                                                 **UT 25**

140100 SG-1A-7 3 T=S 5/8" MIH~, LONER SHELL Extension Ring to Lower Shell NATL. SA-516, GR-70, T=4 7/16" RCB MIH, weld is scheduled to be removed from service during the steam generator replacement, PC/M 151-193

                                                                                                 **UT-25**

140200 SG-1A-5 3 T=5 5/8" MIH., INTERMEDIATE INTER. SHELL-TO.CONE IIELD SHELL MATL. SA-533, GR-A, RCB CL.-1, T=4 7/16" MIH, weld is scheduled to be removed from service during the steam generator replacement, PC/M 151-193

                                                                                                 >>*UT-25>>>>

140300 SG-1A-4 3 T= 5 5/8" MIH., UPPER SHELL CONE-TO-UPPER SHELL IIELD NATL. SA-533, GR-A, CL-1, T=4 RCB 7/Ba MIN, weld is scheduled to be removed from service during the steam generator replacement, PC/M 151-193

                                                                                                 >>*UT 25>>*

140400 SG-1A-3 3 T=3-1/4" MIN., UPPER SHELL UPPER SHELL TO HEAD ASSY ~ IIELD NATL. SA-533, GR-A, CL-1, T=4 RCB 7/8" MIN, weld is scheduled to be removed from service during the steam generator replacement, PC/M 151-193

                                                                                                 **UT-7
  • DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 229 REVISIOH: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1A Secondar Side FIRST SECOHD THIRD ZONE NUMBER: 1-041 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE------ " INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> REF. D'WG. NO. 01-041 140500 SG-1A-2 3 T=3-1/4" MIN., DOME MATL. Torus to Dome Weld SA-533, GR-B(CL-1, T=4 1/2>> RCB MIN, veld is scheduled to be removed from service during the steam generator replacement, PC/M 151-193

                                                                                                  **UT-7 >>

140600 SG-1A-1 3 T=4 1/2" MIH, veld is DOME TO DEFLECTOR ASSY. WELD scheduled to be removed from RCB service during the steam generator replacement, PC/M 151-193

                                                                                                  **UT-7,UT-25**

0700 SG-1A-MS 3 T=4 1/2" MIH, weld is STEAM NOZZLE to HEAD WELD scheduled to be removed from RCB service during the steam generator replacement, PC/M 151-193

                                                                                                  *>>UT-25*>>

140900 SG-1A-MS IR 3 Weld is scheduled to be INNER RADIUS AT STEAM NOZZLE removed from service during RCB the steam generator replacement, PC/M 151-193

                                                                                                  **UT 25*>>

141000 SG-1A.BF 3 Weld is scheduled to be FEEDWATER HOZZLE-TO-SHELL WELD removed from service during RCB the steam generator replacement, PC/M 151-193

                                                                                                  >>>>UT-25(UT-4A>>>>

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 230 REVISION: 0 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPOHENTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1A Secondar Side FIRST SECOND THIRD ZONE NUMBER: 1-041 ASHE PERIOD PERIOD PERIOD SEC. Xl

SUMMARY

EXAHINATIOH AREA CATGY NDE - -OUTAGE- -- INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK** REF. DMG. NO. 01-041 141200 SG-1A-BF- IR 3 Meld is scheduled to be FEEDMATER NOZZLE IHHER RADIUS removed from service during RCB the steam generator replacement, PC/H 15'1-193

                                                                                                  **UT-25**

141400 SG-1A-SS 3 Perform each outage SECONDARY SIDE EXAMINATION RCB t 141600 SG-1A-e 3 Meld is scheduled to be STAY GYLE DOHE-TO-TUBESHEET removed fran service during MELD the steam generator RCB replacement, PC/H 151-193

                                                                                                  **UT-7
  • 141700 SG-1A-S1 3 Meld is scheduled to be KEY BRACKET 0 0 DEGREES removed from service during RCB the steam generator replacement, PC/H 151-193 141800 SG-1A-S5 3 Meld is scheduled to be KEY BRACKET 9 180 DEGREES removed from service during RCB the steam generator replacement, PC/H 151-193 141900 SG-1A-S2 3 Meld is scheduled to be CLEVIS BRACKET 9 45 DEGREES removed from service during RCB the steam generator replacement, PC/H 151-193 141920 SG-1A-S3 3 Meld is scheduled to be SUPPORT BRACKET 9 90 DEGREES removed from service during RCB the steam generator replacement, PC/H 151-193

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE 231 REVISION: 0 INSERVICE IHSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR Steam Generator 1A Seconder Side FIRST SECOND THIRD ZONE NUHBER: 1-041 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATION AREA CATGY NDE ------OUTAGE---- INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO METH I 1 2 3 1 2 3 1, 2 3 **CALIBRATIOHBLOCK~~ REF. DMG. NO. 01-041 141930 SG-1A-S4 3 Meld is scheduled to be CLEVIS BRACKET 8 135 DEGREES removed from service during RCB the steam generator replacement, PC/H 151-193 141940 SG-1A-S6 3 Meld is scheduled to be CLEVIS BRACKET 9 225 DEGREES removed from service during RCB the steam generator replacement, PC/H 151-193 141950 SG-1A-S7 3 Meld is scheduled to be SUPPORT BRACKET 0 270 DEGREES removed from service during RCB the steam generator replacement, PC/H 151-193 960 SG-1A-SB 3 Meld is scheduled to be CLEVIS BRACKET 9 315 DEGREES removed from service during RCB the steam generator replacement, PC/H 151-193 REF. DMG. NO. 7612E021 142000 C-A VOL 3 - - - - - X 1-SGA-M65'ubesheet to Thickshell C1.30 RCB

                                                                                                         **20T-103**

142010 1-SGA-M77 3. X Thickshell to Shell Can ¹1 RCB

                                                                                                         **20T-102**

142020 1-SGA-'MBO 3 Shell Can ¹1 to Loger Cone RCB

                                                                                                         **20T-102**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 232 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1A Seconder Side, FIRST SECOND THIRD ZONE HUNBER: 1-041 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHIHAT IOH AREA CATGY HDE . - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENT IF I CATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~~ REF. D'MG. NO. 7612E021 142030 1-SGA-M76 3 Lower Cone to Upper Cone RCB

                                                                                                       **20T-103**

142040 1 SGA-M160 3 Upper Cone to Steam Drua Can

        ¹1 RCB                                                                                            "20T-103**

142050 1-SGA-M167 3 Steam Drun Can ¹1 Longitudinal Seam RCB **20T-134** 142060 1-SGA.M168 3 Steam Drun Can ¹1 Longitudinal Scam RCB **20T-134** 142070 1-SGA.M161 3 Stcam Drun Can ¹1 to Steam Drama Can ¹2 RCB *~20T-134** 142080 1-SGA-M237 3 Steam Drama Can ¹2 Longitudinal Seam RCB *+20T-134** 142090 1-SGA-M238 3 Steam Drum Can ¹2 Longitudinal Seam RCB **20T-134**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 233 REVISIOH: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1A Secondar Side FIRST SECOND THIRD ZONE NUMBER: '1-041 ASHE PERIOD PERIOD PERIOD SEC. XI SUNNARY EXAHIHAT IOH AREA CATGY HDE ------OUTAGE INSTRUCTIONS HUNGER IDENT IF I CAT ION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK<<<< REF. DWG. NO. 7612E021 142100 1-SGA-MI62 CA VOL 3 St. Drama Can ¹2 to Lower Steam C1.20 Drun Head RCB **2OT-125** 142110 I-SGA-9164 3 Lower Steam Drua Head Longitudinal Seam RCB <<<<20T-125<<<< 142120 1-SGA-'N165 3 Lower Steam Drama Head Longitudinal Seam RCB **20T-125** 2130 1-SGA-QI66 3 Lower Steam Orts Head Longitudinal Seam RCB **20T-125*<< 142140 1-SGA-N163 3 Lower St Drua Head to Upper St Dran Head RCB **20T-125** 142150 'I-SGA-HS- IRS C B VOL 3 X Hain Steam Nozzle Inner Radius C2.22 Section RCB **20T-133** 142160 1-SGA-Q169 C-B SUR 3 X Feedwater Nozzle to Shell C2 ~ 21 VOL RCB

                                                                                                         **20T-103*"

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: '34 REVISION: 0 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAH STATUS 'PRESERVICE YEAR Steam Generator 1A Seconder Side FIRST SECOND THIRD ZONE HUMBER: 1-041 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMIHATION AREA CATGY NDE - - OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> REF. DWG. NO. 7612E021 142170 1-SGA-FW-IRS C-B VOL 3 X Feedvater Nozzle Inner Radius C2.22 Section RCB >>>>20T-120>>>> REF. DWG. NO. 7612E430 142190 1-SGA-Snubber ¹1 F-A VT-3 3-Snubber F1.40S RCB 142200 1-SGA-'W194 C-C SUR 3- X Integral Attachment C3.10 RCB 142210 1-SGA-Snubber ¹2 F-A VT-3 3 . Snubber F1.40S RCB 142220 1-SGA-Snubber ¹3 F-A VT-3 3-Snubber F1.40S RCB 142230 1-SGA-W202 C-C SUR 3-Integral Attachment C3.10 RCB 142240 1-SGA-Snubber ¹4 F-A VT-3 3-Snubber F1.40S RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 235 REVISION: 0 INSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1A Seconder Side FIRST SECOND THIRD ZONE HUNGER: 1-041 ASME PERIOD PERIOD PERIOD SEC. Xl SUNNARY EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>> REF. DNG. NO. 7612E430 142250 1.SGA-M191 C-C SUR 3-Integral Attachment C3.10 RCB 142260 1-SGA-Snubber ¹5 F.A VT-3 3 . Snubber F1.40S RCB 142270 1-SGA-U188 C-C SUR 3-Integral Attachment C3.10 RCB 2280 1-SGA-Snubber ¹6 F-A VT-3 3-Snubber F1.40S RCB 142290 1-SGA-Snubber ¹7 F-A VT-3 3-Snubber F'1.40S RCB 142300 1-SGA-W197 C-C SUR 3-Integral Attachment C3.10 RCB 142310 1.SGA-Snubber ¹8 F-A VT-3 3-Snubber F1.40S RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 236 REV I SION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1A Seconder Side FIRST SECOND THIRD ZONE NUMBER: 1-041 ASME PERIOD PERIOD PERIOD

                                       ~ ~

SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A G E- INSTRUCTIONS NUMBER IDENT I F ICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **GALI BRAT ION BLOCK"* REF. DWG. NO. 7612E430 \ 142320 1-SGA-W185 C-C SUR 3-Integral Attachment C3.10 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 237 REVISION: 0 INSERVICE INSPECTIOH LONG TERH PLAH CLASS 2 ALL STATUS COMPONENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1B Secondar Side FIRST SECOND THIRD ZONE NUHBER: 1-042 ASHE PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAHINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- IHSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> REF. DWG. NO. 01-042 142500 SG-18-3-104 3 Weld is scheduled to be TUBESNEET TO EXT. RING WELD removed from service during RCB the steam generator replacement, PC/H 152-193

                                                                                                  *>>UT-25( UT-4A**

142600 SG-1B-7 3 T<5-5/8" MIN., LOWER SHELL EXT. RING-TO-LOWER SHELL MELO HATL. SA-516, GR-70, T<4-7/16" RCB HIN., NO EXAM REQUIRED, veld is scheduled to be removed from service during the steam generator replacement, PC/H 152-193

                                                                                                  *>>UT-25**

2700 SG-18-5 3 T=5-5/8" MIN., INTERHEDIATE INTER. SHELL-TO-CONE WELD SHELL NATL. SA-533, GR A, RCB CL-1, T=4-7/16>> HIN., NO EXAH REQUIRED, veld is scheduled to be removed from service during the steam generator replacement, P

                                                                                                  **UT 25*>>

142800 SG-1B-4 3 T=5 5/8" MIH., UPPER SHELL CONE-TO-UPPER SHELL WELD MATL. SA 533, GR-A, CL-1, RCB T<4 7/8" HIN., NO EXAH REQUIRED, weld is scheduled to be removed from service during the steam generator replacement, PC/M

                                                                                                  **UT 25**

142900 SG-18-3 3 T=3 1/4>> MIN., UPPER SMELL UPPER SHELL TO MEAD ASSY. WELD NATL. SA-533, GR-A, CL 1, T 4 RCB 7/8" MIN, weld is scheduled to be removed from service during the steam generator replacement, PC/M 152-193

                                                                                                  *>>UT  7**

DATE 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 238 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1B Seconder Side FIRST SECOND THIRD ZONE NUMBER: 1-042 ASME PERIOD PERIOD PERIOD SEC. XI SUHMARY EXAHINATION AREA CATGY NDE -OUTAGE- - - - -- INSTRUCTIONS NUMBER IDENT I F I CATION ITEM NO METH 1 2 3 'I 2 3 1 2 3 <<*CALIBRATION BLOCK>>>> I REF. DUG. NO. 01-042 143000 SG.18-2 3 T=3 1/4<< HIN., DOME HATL TORUS TO DOME IIELD SA-533, GR-B, CL-1, T-4 1/2<< RCB MIN weld is scheduled to be removed from service during the steam generator replacement, PC/M 152-193

                                                                                                      **UT 7<<<<

143100 SG-18-1 3 lleld is scheduled to be DOME TO DEFLECTOR ASSY. iIELD removed from service during RCB the steam generator replacement, PC/H 152-193

                                                                                                      <<*UT-7,UT-25*>>

,.143200 SG-1B.MS 3 T-4 1/2" MIN, veld is STEAM NOZZLE to HEAD MELD scheduled to be removed fr RCB service during the steam generator replacement, PC/M 152-193

                                                                                                      **UT 25>>*

143300 SG-1B-MS- IR 3 Meld is scheduled to be STEAM NOZZLE INNER RADIUS removed from service during RCB the steam generator replacement, PC/H 152-193

                                                                                                      **UT 25*<<

143400 SG-1B-BF 3 UT.4A used for 70 deg, 24" on FEEDWATER HOZZLE TO SHELL bottom of nozzle, no exam due RCB to insulation ring, veld is scheduled to be removed from service during the steam generator replacement, PC/H 152-193

                                                                                                      *>>UT-25,UT-4A>>*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE:, '39 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 18 Seconder Side FIRST SECOND THIRD ZOHE HUNGER: 1-042 ASNE PERIOD PERIOD PERIOD SEC. XI SUNMARY EXAHIHAT ION AREA CATGY NDE ------OUTAGE- INSTRUCTIONS NUMBER IDEHTIFICATION ITEN HO NETH 1 2 3 1 2 3 1 **CALIBRATIOHBLOCK~* REF. DWG. NO. 01-042 143500 SG-18-BF-IR 3 Weld is scheduled to be FEEDWATER NOZZLE INHER RADIUS removed from service during RCB the steam generator replacement, PC/N 152-193

                                                                                               %*UT  25**

143700 SG-1B-SS 3 Perform each outage, examine SECOHDARY SIDE EXAMINATION can deck areas, can deck RCB support brackets, steam separator 'cans, dryer chevrons, holes in separator, swirl vanes, marmon clamps, dryer drain pipes, fee 143900 SG-18-8 3 See zone 1-004 for additional STAY CYLINDER DONE TO stay cylinder welds, weld is TUBESNEET WELD scheduled to be removed from RCB service during the steam generator replacement, PC/N 152-193

                                                                                               **UT P*

144000 SG-18-81 3 Weld is scheduled to be KEY BRACKET 9 0 DEGREES removed from service during RCB the steam generator replacement, PC/N 152-193 144100 SG-18-SS 3 Weld is scheduled to be KEY BRACKET 8 180 DEGREES removed from service during RCB the steam generator replacement, PC/N 152-193 144200 SG-18-S2 3 Meld is scheduled to be CLEVIS BRACKET 9 45 DEGREES removed from service during RCB the steam generator replacement, PC/N 152-193

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 240 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1B Seconder Side FIRST SECOHD THIRD ZONE NUMBER: 1-042 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E.- - - - -- INSTRUCTIONS NUMBER IDENT I F I CAT I OH ITEM NO METH I 1 2 3 1 2 3 1 2 <<<<CALIBRATIOH BLOCK** REF. DWG. HO. 01-042 144300 SG-18-83 3 Weld is scheduled to be SUPPORT BRACKET 9 90 DEGREES removed from service during RCB the steam generator

           /                                                                                            replacement, PC/M 152-193 144310  SG-1B-S4                                               3                                        Weld is scheduled to be CLEVIS BRACKET 8 135 DEGREES                                                                     removed from service during RCB                                                                                              thc steam generator replacement, PC/M 152-193 144320  SG-18-$ 6                                              3                                        Weld is scheduled to be CLEVIS BRACKET 9 225 DEGREES                                                                     removed from service during RCB                                                                                              the steam generator replacement, PC/M 152-193 144330  SG-1B-S7                                               3                                        Weld is scheduled to be SUPPORT     BRACKET    9 270  DEGREES                                                           removed from service during RCB                                                                                              the steam generator replacement, PC/M 152-193 144340  SG-IB-SB                                               3                                        Weld is scheduled to be CLEVIS BRACKET g 315 DEGREES                                                                    removed from service during RCB                                                                                             the steam gcncrator replacement, PC/M 152-193 REF   DWG. NO.      7612E021 144400  1-SGB-W65                               C-A     VOL    3-Tubesheet      to Thickshell            C1.30 RCB
                                                                                                       **20T-103**

144410 1-SGB-W77 3 Thickshel l to Shell Can ¹I RCB

                                                                                                       '*20T-102**
  ,DATE: 01/09/98                                           ST. LUCIE NUCLEAR PLANT UNIT 1                                 PAGE '41 REVI SION:       0                                     IHSERVICE IHSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL                PLAN STATUS           PRESERVICE YEAR Steam Generator      1B  Seconder     Side                           FIRST      SECOND       THIRD ZONE NUMBER:     1-042                           ASHE                PERIOD     PERIOD       PERIOD

~ L SEC. XI SUHHARY EXAHINATION AREA CATGY HDE ------OUTAGE------ INSTRUCT IOHS HUHBER IDENTIFICATION ITEM HO HETK I 1 2 3 1 2 3 1 2 3 *>>CALIBRATION BLOCK>>>> REF. DWG. NO. 7612E021 144420 1-SGB-NBO 3 Shell Can ¹1 to Lower Cone RCB

                                                                                                        **20T-102**

144430 1.SGB.M76 3 Lower Cone to Upper Cone RCB

                                                                                                        **20T-103**

144440 1-SGB-'IJ160 3 Upper Cone to Steam Drum Can

           ¹1 RCB                                                                                          **20T-103**

4450 1-SGB-'N67 3 Steam Drum Can ¹1 Longitudinal Seam RCB **20T-134** 144460 1-SGB-M168 3 Steam Drum Can ¹1 Longitudinal Seam RCB t *'201'-134** 144470 1-SGB-W161 3 Steam Drum Can ¹1 to Steam Drum Can ¹2 RCB *>>20T-134** 144480 1.SGB-W237 3 Lo~er St Dren Can ¹2 Longitudinal Seam RCB **20T-134**

.,DATE: 01/09/9B ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 242 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1B Seconder Side FIRST SECOND THIRD ZONE NUHBER: 1-042 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATION AREA CATGY NDE - - - - . - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENT IF I CAT I OH ITEH NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> REF. DMG. NO. 7612E021 144490 1-SGB-M238 3-Lour St Drum Can ¹2 Longitudinal Seam RCB **20T-134** 144500 1-SGB-M162 C-A VOL 3-Steam Drun Can ¹2 to Steam C1.20 Drun Head RCB **20T-125** 144510 'I-SGB-M164 3 Upper Steam Drun Head Longitudinal Seem RCB **20T-125*>> 144520 1-SGB.M165 3 Upper Steam Orun Head Longitudinal Seam RCB **207-125** 144530 1-SGB-M166 3 Upper Steam Drun Head Longitudinal Seam RCB **20T-125** 144540'-SGB-M163 3 Lower St Drun Head to Upper St Drun Head RCB **20T-125*>> 144550 1-SGB-HS-IRS C-B VOL 3-Hain Steam Nozzle Inner Radius C2.22 Section RCB >>*20T 133**

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLAHI'HIT 1 PAGE: 243 REVISION: 0 INSERVICE IHSPECTIOH LOHG TERM PLAH CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1B Seconder Side FIRST SECOND ,THIRD ZONE NUMBER: 1-042 ASME PERIOD PERIOD PERIOD

                                      ~ ~

SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE -----OUTAGE------ INSTRUCTIONS NUMBER IDEHTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK ~ P g REF. DWG. NO. 7612E021 144560, 1-SGB-N169 CB SUR 3-Feedvater Nozzle to Shell C2.21 VOL RCB

                                                                                                  **20T-103**

144570 1-SGB-FII-IRS C-B VOL 3 Feedvater Nozzle Inner Radius C2.22 Section RCB **20T-120** REF. DUG. HO. 7612E430 144580 1-SGB-Snubber ¹1 F-A VT-3 3-Snubber F1.40S e RCB 144590 1-SGB-IJ194 C-C SUR 3-Integral Attachment C3.10 RCB 144600 1-SGB-Snubber ¹2 F-A VT-3 3-Snubber F1.40S RCB 144610 1-SGB-Snubber ¹3 F-A VT-3 Snubber F1.40S RCB 144620 1-SGB-M202 C-C SUR 3-Integral Attachment C3.10 RCB

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 244 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1B Seconder Side FIRST SECOHD THIRD ZONE NUMBER: 1 042 ASHE PERIOD PERIOD PER I OO SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUMBER IDENT I F I CAT ION ITEM HO METH I 1 2 3 1 2 3 1 2 3 ~~CAL I BRAT IOH BLOCK** REF. DWG. NO. 7612E430 144630 1-SGB-Snubber ¹4 F-A VT-3 3-Snubber F1.40S RCB 144640 1-SGB-lJ191 C-C SUR 3-Integral Attachment C3.10 RCB 144650 1-SGB-Snubber ¹5 F-A VT-3 3-Snubber F1 '0S RCB 144660 1-SGB-F188 C-C SUR 3-Integral Attachment C3.10 RCB 144670 1-SGB-Snubber ¹6 F-A VT-3 3-Snubber F1.40S RCB 144680 1-SGB-Snubber ¹7 F-A VT-3 3-Snubber F1.40S RCB 144690 1-SGB-W197 C-C SUR 3-Integral Attachment C3.10 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 245 RE V I SION: 0 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR Steam Generator 1B Secondar Side FIRST SECOND THIRD ZONE NUHBER: 1-042 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAMIHATIOH AREA CATGY NDE - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUHBER IDENT IF I CATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 <<<<CALIBRATION BLOCK<<<< REF. DMG. NO. 7612E430 144700 1-SGB-Snubber PB F-A VT-3 3 Snubber F1.40S RCB 144710 1-SGB-F185 C-C SUR 3-Integral Attachment C3.10 RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 246 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A 8 1B DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE NUMBER: 1 043 ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE -OUTAGE- -- INSTRUCTIONS HUHBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I 10 SI 417 REF. DUG. NO. 01 043 A 144800 SI-417-1-SW-1 C-F-3 SUR 3 FLANGE-8"- 400II R/F M.V. NATL~ LPSI 1A Flange to Elbow A-182 F304 144900 S1.417.1.SN.2 C.F 3 SUR 3- CONC. REDUCER 8" X 10" Elbow to Reducer 145000 S I -417-1-SIJ-3 C-F-3 SUR 3- CONC. REDUCER 8" X 10" Reducer to Elbow 145100 S I -417- FW-1A C.F.3 SUR 3- ELBSl MATL. A-403 MP304 Elbow to Pipe 145200 SI-417-1-SW-5 C.F-3 SUR 3- ELBSl NATL. A-403 MP304 Pipe to Elbow 145300 SI-417-FII-1 C.F-3 SUR 3-ELBDN-To-YALYE (cv-3106> 145400 si-417-Fw-2 C-F-3 SUR 3-VALVE (CV-3106) TO.PIPE

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 247 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A 8 1B DISCHARG E HEADER PIPING FIRST SECOND THIRD ZOHE NUMBER: 1.043 ASME PERIOD PERIOD PERIOD SEC XI

SUMMARY

EXAMINATIOH AREA CATGY HDE - - - - - - 0 U T A G E - - - -- INSTRUCTIONS P NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-10.SI.417 REF. DWG. HO. 01-043-A 145500 SI-417.FW-3 C-F.3 SUR 3-PIPE-TO-VALVE (V-3206) 145600 SI-417.FW.4 C-F.3 SUR 3-VALVE (V-3206)-TO-ELBOW 145700 SI-417-2-SW-1 C-F-3 SUR 3- ELBOW MATL. A-403 WP304 Elbow to Pipe 5800 SI-417-2-SW-2 C-F-3 SUR 3- ELBOW NATL. A-403 WP304 Pipe to Elbow 145900 S I -417-2-SW-3 C-F-3 SUR 3- ELBOW NATL. A-403 WP304 Elbow to Pipe 146000 SI-417-FW-5 C-F-3 SUR 3 . Pipe to Pipe 146100 S I-417-3-SW-1 C-F-3 SUR 3- CONC. REDUCER 12" X 10"- MATL. Pipe to Reducer A403-WP304 ~ SCH 30

DATE: 01/09/98 'ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 248 REVISIOH: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A 8 1B DISCHARGE MEADER PIPING FIRST SECOND THIRD ZOHE NUMBER: 1.043 ASME PERIOD PERIOD PERIOD SEC XI.

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUMBER IDENT I F I CAT ION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* I-12-SI-417 REF. DWG. HO. 01-043-A 146200 SI-417-3-SW-2 C-F-3 SUR 3- CONC. REDUCER 12" X 10", TEE Reducer to Tee SCH-20 12"X 12"X 10" RAB 146300 SI -417-3-SW-3 C-F-3 SUR 3-Tee to Elbow RAB 146400 S I-417-3-SW-4 C-F-3 SUR 3-Tee to Pipe RAB 146500 SI-417.3-SW-5 C-F-3 SUR 3 . ELBOW NATL. A403,WP304 Pipe to Elbow 1-10-SI-419 REF. DWG. NO. 01-043-A 146600 S I -419- FW-4 C.F-3 SUR 3 . Elbow to Valve V-3207 146650 Valve V-3207 3 Ho examination required, no Valve valve body welds 146700 SI-419-FW-3 C-F-3 SUR 3 . Valve V-3207 to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE 249 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR PSI PUMP 1A & 1B DISCHARGE HEADER PIPING FIRST SECOHD THIRD ZONE NUMBER: 1-043 ASME PERIOD PERIOD PERIOD g SEC. XI

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A G E - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 *>>CALI BRAT ION BLOCK>>>> I-10-SI-419 REF. DWG. NO. 01-043-A 146800 S I -419-FW-2 C-F-3 SUR 3-Pipe to Valve V-3107 146850 Va l ve V-3107 3 No examination required, no Valve valve body wetds 146900 S1-419- FW-1 C-F-3 SUR 3-Valve V-3107 to Elbow 7000 SI-419.1-SW-S C-F-3 SUR 3 . 'IPE MATL. A358,TP304 Elbow to Pipe 147100 S1.419-1-SW-4 C-F-3 SUR 3- ELBOW MATL. A403,WP304 P,ipe to Elbow 147200 SI-419 1 SW-3 C-F-3 SUR 3-Elbow to Reducer 147300 SI -419-1-SW-2 C-F-3 SUR 3-Reducer to Elbow

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 250 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A 8 1B DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE HUHBER: 1-043 ASHE PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATIOH AREA CATGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* I-10-SI-419 REF. DWG. NO. 01-043-A 147400 SI-419-1-SW-1 C-F-3 SUR 3- FLANGE NATL. A182,F304 Elbow to Flange 1.12-SI.475 REF. DWG. NO. 01-043-A 147500 SI.475-FW.1 C F-3 SUR PIPE NATL. A358,TP304 Elbow to Pipe I-12-SI-475 REF. DWG. NO. 01-043-D Sl-475-1-SM-2 3-0 147600 C-F-3 SUR ELBOW NATL. A403,MP304 Pipe to Elbow 147700 SI-475-1-SM-1 C.F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 147800 Sl-475-FW-1A C.F-3 SUR 3-Pipe to Pipe 147900 SI-475-FM-18 C-F-3 SUR 3- TEE NATL. A403,WP304 Pipe to Tee

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 251 REVISION: 0 IHSERVICE IHSPECTIOH LOHG TERM PLAH CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A Er 1B DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE NUMBER: 1-043 ASME PERICO PERIOD PERIOD W 4 ALA 'V " -- ""* SEC" EXAMINATION AREA CATGY XI'UMMARY NDE - - - - - - 0 U T A G E - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-12-SI-475 REF. DUG. NO. 01-043-D F ~ 148000 S I.475- FH-1C C-F-3 SUR 3- PIPE NATL. A358,TP304 Tee to Pipe 148100 S 1.475- FH-2 C-F-3 SUR 3- ELBOH NATL. A403,'I@304 Pipe to Elbow 148200 SI-475-2-SH-4 C-F-3 SUR 3-Elbow to Elbow 48300 SI-475-2.SM-3 C-F-3 SUR 3- PIPE MATL. A358,TP304 Elbow to Pipe 148400 SI-475.2.SM-2 C-F-3 SUR 3- 12" TEE, NATL: A-403, HP 304 Pipe to Tee RAB I 12-SI-410 REF. D'LJG. NO. 01-043-B 148500 SI-475.2.SW.8 C F 3 SUR 3- ECC. REDUCER, 12" X 10" Tee to Reducer RAB 148600 Sl-475.2.SH-1 C-F-3 SUR 3- 12" TEE, NATL. A-403, NP304 Tee to Pipe RAB

 ~   DATE: 01/09/98                                           ST. LUCIE NUCLEAR PLANT UNIT 1                                          PAGE:    252 REVI SION:        0                                    IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL                         PLAN STATUS               PRESERVICE YEAR LPSI PUHP 1A 8 1B DISCHARGE HEADER PIPING                              F I R ST    SECOHD         THIRD ZONE NUHBER:     1-043                      ASHE                       PERIOD      PERIOD         PERIOD SEC. XI--

SUHHARY EXAHIHATIOH AREA CATGY HDE - - - - - 0 U T A G E - - - - -- INSTRUCTIOHS IDENTIFICATION 3 2 3 2 3 **CAI.IBRATIONBLOCK~* r NUHBER

                     ~   <<        t 0 ~   0 ITEN tt NO NETH 1% 6'0 k 0 e4

( 1 0 2 1 1 1 i%1 thehi1 ~1 I t 'E\,I 0%,, g, 1 I ~ \ q p I 12-SI-410 REF. DMG. NO. 01-043-B 148700 SI-475-FM-3 C-F-3 SUR Pipe to Valve V-3658 148750 Valve V-3658 3 Ho examination required, no Valve valve body weids I-12-SI.410 REF. DMG. HO. 01-043-C 148800 S I.410- FM-1 C-F-3 SUR 3 Valve V-3658 to Pipe 148900 S I.410-1.SM-1 C F 3 SUR ELBOM HATL. A403,MP304 Pipe to Elbow 149000 SI-410.1-SM-2 C-F-3 SUR 3- PIPE HA'IL. A358,TP304 Elbow to Pipe 4 149100 SI-410-1.SM.3 C.F-3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 149200 SI-410-1-SM.4 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 253 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION IHTERVAL PLAH STATUS PRESERVICE YEAR LPSI PUNP 1A 8 18 DISCHARGE HEADER PIPING FIRST SECOND THIRD 20NE NUHBERt 1-043 ASHE PERIOD PERIOD PERIOD XI-SUHHARY EXAHINATION AREA SEC CATGY NDE - - - - - 0 U T'A G E - - - - -- INSTRUCTIONS NUHBER IDEHTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* I-12-SI-410 REFT DUG. NO. 01-043-C 149300 SI-410-1-SIJ.5 C-F 3 SUR ELBOM NATL. A403,MP304 Pipe to Elbow 149400 SI-410.FW.2 C-F-3 SUR Inaccessible, requires Elbow to Pipe chipping away permanent RAB insulation 8 grouting in RAB wall pen. Elbow,(90) NATL. A-403 MP.304, welded. 149500 SI.410-2.SM-3 C F-3 SUR 3- 93 12" STD. TEE, NATL. A-403 Pipe to Tee MP-304, Located near anchor RAB I 12 SI-814 REF. DUG. NO. 01-043-C 149600 SI -814-FW-1 C-F-3 SUR 3 TEE NATL. A403,MP304 Tee to Pipe I-12-SI.410 REF. DUG. ND. 01-043-C 149700 SI-410.2.SM-2 C.F-3 SUR 3- TEE NATL. A403,MP304 Tee to Pipe 149800 SI-410-2-SH.1 C-F-3 SUR 3- ELBOM NATL. A403,lP304 Pipe to Elbow

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 254 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN 0 CLASS 2 ALL STATUS COHPOHEHTS IHSPECTIOH IHTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUNP 'IA !L 18 DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE HUNBER: 1-043 ASNE PERIOD PERIOD PERIOD

      %v 14                                   SEC;  XI-SUNHARY EXANIHATION AREA                      CATGY    NDE                -OUTAGE                     IHSTRUCTIONS HUNBER    IDENTIFICATION                      ITEN HO NETH    ( 1  2  3    .1  2   3     1 2  3      ~*CALI BRAT IOH BLOCK~~

I-12-SI-814 REF. OMG. HO. 01-043-C 149900 SI-814-FM-5 C-F-3 SUR 3-Elbow to Elbow 150000 SI-814-3-SM-1 C-F-3 SUR 3- PIPE IIATL. A358,TP304 Elbow to Pipe 150100 S I -814.3.SM-2 C-F-3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 150200 S I.814. FM-5A C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbo~ to Pipe ~ 150300 SI-814-FM-5B C-F-3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 150400 SI.814.3-SM-4 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 150500 SI-814-FM-6 C-F-3 SUR 3- ELBOM HATL. A403,MP304 Pipe to Elbow

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 255 REVISION: 0 IHSERVICE IHSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A & 1B DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE NUMBER: 1.043 ASME PERIOD PERIOD PERIOD t à '4tr PA 8 I ~ SEC

SUMMARY

EXAMIHAT I ON AREA CATGY HDE ------OUTAGE------ IHSTRUCTIOHS NUMBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK**

       ~                a>>a   a  ~  o       oe     aw I 12-SI-814       REF. DWG. NO. 01-043-C 150600    SI.814.4-SM-6                         C.F-3    SUR    3-                                        PIPE NATL. A358,TP304 Elbow to Pipe 150700    S I -814-4-SN-5                       C-F-3   SUR     3-                                        ELBSJ NATL. A403,NP304 Pipe to Elbow 150800    Sl -814-4-SN.4                        C.F 3   SUR     3-                                        PIPE NATL. A358,TP304 Elbow to Pipe 150900   SI-814-4.$ I-3                         C-F-3   SUR     3-                                        ELBSI NATL. A403,llP304 Pipe to Elbow 151000   SI-814-4-SN-2                          C-F.3   SUR    3-                                         PIPE NATL. A358,TP304 Elbow to Pipe 151100   SI-814.4-SW-1                          C-F-3   SUR    3-                                         REDUCER NATL. A403,NP304 Pipe to Reducer 151200   Sl-814-FN-7                            CF3     SUR    3-Reducer      to Valve V-3453

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 256 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAH STATUS PRESERVICE YEAR LPSI PUMP 1A & 1B DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE NUMBER: 1-043 .(,wSEC.w ASME PERIOD PERIOD PERIOD ~

  <,  ) .s,,y'c, P.,'L, . q   w e; ','ta 8 st ~, l~              XI    ~   ~

SUMMARY

EXAMINATION AREA CATGY HDE .-----OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION

                  !    I'LAN '4'A,kAhll'4 ITEM NO METH J .\14 'L 'V      ')       1   2  3 dN 0 ~ 4'4 0 1  2
                                                                                             ~'4odl ki 3

0 I 1 2

                                                                                                                 'A 3
                                                                                                                           **CALIBRATIOHBLOCK**

I-12-SI-814 REF. DUG. NO 01-043-C 151250 Valve V.3453 3 Ho examination required, no Valve valve body welds 151300 S I -814- FII.8 C-F-3 SUR 3-Valve V-3453 to Tee RAB 151400 SI-814-FII-3A C F-3 SUR 3-Tee to Valve V-3452 RAB 151450 Valve V.3452 3 Ho examination required, Valve valve body ueids RAB 151500 SI-814-FIJ.3 C-F-3 SUR 3-Valve V-3452 to Reducer 151600 SI.814-2-SU.1 C-F-3 SUR 3 PIPE NATL. A358,TP304 Reducer to Pipe 151700 S I -814- FM-2A C-F-3 SUR 3 . ELBSJ MATL. A403,NP304 Pipe to Elbow

 'DATE:      01/09/98                                                    ST. LUCIE NUCLEAR PLANT UNIT 1                                     PAGE: 257 REVISION:            0                                              IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL                          PLAN STATUS             PRESERVICE YEAR LPSI PUHP 1A 8 1B DISCHARGE HEADER PIPING                                         FIRST        SECOND      THIRD ZONE NUHBER:        1-043                                  ASHE                   PERIOD       PERIOD      PERIOD
       'tv  v  ) rtt tt, I tel  ~ vtvh 'r v ~ \  ~ ~ . ~" SECv SUGARY EXAHIHAT ION AREA                                   CATGY      NDE-     ------OUTAGE------                       INSTRUCTIONS NUHBER       IDENTIFICATION                                ITEN   NO NETH    I 1  2  3       1  2   3    1 2  3         **CALIBRATIOHBLOCK**

rVVe a>> y ~ ~ .. gc r err r v m ~ I-12-SI-81C REF. DIJG. NO. 01-043-C 151800 SI.814-2.SM.3 C F-3 SUR 3-Elbow to Elbow 151900 S I-814.2-SI}.4 C.F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 152000 SI-814-FII.2 C.F-3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 152100 SI-814-I.SII ~ 1 C.F-3 SUR 3-Elbow to Elbow 152200 SI-814-1.SM-2 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 152300 S 1-814- Fll. IA C-F.3 SUR 3-Pipe to Pipe 152400 S I -814-1-SI}-3 C-F-3 SUR 3- ELBm} NATL. A403,MP304 Pipe to Elbow

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 258 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A 8 18 DISCHARGE HEADER PIPING FIRST SECOND THIRD 20NE NUMBER: 1-043 ASKE PERIOD PERIOD PERIOD

.(p'4 ~Lgg'l\    f't i/%i tP'I ~ ~ '4 1J'P J 'I ~ 0, ~  \~ ~

SEC O'XI

SUMMARY

EXAMINATIOH AREA CATGY HDE -OUTAGE INSTRUCTIONS HUHBER IDENTIFICATION 'TEM NO METH I 1 2 1 2 3 1 2 3 **CALIBRATIONBLOCK ~ I-12-SI-814 REF. DUG. NO. 01-043-C 152500 SI-814-1-SN-4 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe I-10 SI-475 REF. DUG. HO. 01-043-B 152600 SI 475-FII.4 C-F-3 SUR 3-Reducer to Valve V-3306 152650 Valve V-3306 3 No examination required, no Valve valve body voids 152700 SI-475-FM.S C-F-3 SUR 3-Valve V.3306 to Reducer 1-12-SI-408 REF. DUG. HO. 01-043-B 152800 S I -475-3-SU-1 C-F.3 SUR 3-Reducer to Tee 152900 SI.475-FM.6 C-F-3 SUR 3-TEE-TO-VALVE (HCV-3657)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 259 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A 8 18 DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE NUMBER: 1-043 ASHE PERIOD PERIOD PERIOD q  %,~ I w '-' SEC; XI

                                                                   -. - - -OUTAGE
~    ~

SUMMARY

EXAMINATION AREA CATGY NDE - INSTRUCTIOHS NUMBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* 1-12-SI.475 REF. DUG. NO. 01-043-B 153000 Sl-475-3-SM.2 C-F-3 SUR 3- PIPE NATL. A358,TP304 Tee to Pipe 153100 SI-475 3-SM.3 C-F-3 SUR 3- ELBSl NATL. A403,WP304 Pipe,to Elbow 153200 S I -475- Fll.6A C-F-3 SUR 3 . PIPE NATL. A358,TP304 Elbow to Pipe 153300 Sl-475.FII.68 C F-3 SUR 3- 0 TEE MATL~ A403,llP304 Pipe to Tee 153400 SI-475.FW.6C C-F-3 SUR 3- PIPE NATL. A358,TP304 Tee to Pipe 153500 S I -475- Fll-7 C-F-3 SUR 3-Pipe to Pipe 'l53600 SI-475-FH-7A C-F-3 SUR 3-Pipe to Pipe

DATE: 01/09/98 ST. LUCIE'NUCLEAR PLANT UNIT 1 PAGE: 260 REVISIOH: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A 8 18 DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE NUMBER:

'pJ i ~ Q Q+

1-043 rraee ~, SUMHARY EXAHINATIOH AREA L r., s w ~ ~, ASHE SEC CATGY r.XI HDE PERIOD PERIOD

                                                                          ----OUTAGE PERIOD INSTRUCTIONS NUHBER      IDENTIFICATION                       ITEH   NO HETH     I  1 2   3   1  2  3      1 2  3      **CALIBRAT  ION BLOCK~*

I-12-Sl-C75 REF. DMG. NO. 01 043-8 153700 Sl-475-FM-78 C-F-3 SUR 3-Pipe to Pipe RAB 153800"'1-475-4.SM.1 C-F.3 SUR 3- Near IBP (anchor), Flow Pipe to Flange Edifice FE-3306 RAB I-12-Sl-366 REF. DMG. HO. 01 OC3-D 153900 SI-366-FM-1 C-F-3 SUR 3 . PIPE HATL. A358,TP304 Tee to Pipe 154000 SI-366-FM-2 C.F-3 SUR 3- ELBOM HATL. A403,MP304 Pipe to Elbow 154100 Sl-366-FM-3 C-F.3 SUR 3-Elbow to Reducer 1-10'-SI-366 REF. DMG. NO. 01-043-D 154200 SI-366-FM.4 C-F-3 SUR 3-REDUCER-TO.VALVE (MV-03.2)

DATE: 01/09/98 ST ~ LUCIE HUCLEAR PLANT UH IT 1 PAGE: 261 REVISION: 0 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A & 1B DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE NUMBER: 1-043 ASME PERIOD PERIOD PERIOD l>> s>>v,e r>> a t >>. ~ >>>> ~~ ~ ~ .~ SEC Xl

                                                                      ----.-OUTAGE------
                                                      ~

SUMMARY

EXAMIHAT ION, AREA CATGY NDE INSTRUCTIONS NUMBER IDENT IF I CATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 *~CALI BRATIOH BLOCK** 1-10-SI.367 REF. DUG. NO. 01.043.D 154300 SI-367 F'N-1 C-F-3 SUR 3-VALVE (MV-03-2)-TO-REDUCER 1.12-SI-367 REF. DUG. NO. 01-043-D 154400 SI-367-FII-2 C-F-3 SUR 3-Reducer to Elbow 154500 S1-367-FW.3 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 154600 SI-367 FM.4 C-F-3 SUR 3- ELBSI NATL. A403,NP304 Pipe to Elbow 154700 SI-367-FII.5 C-F-3 SUR 3-Elbow to Tee I-10-SI-417 REF. DWG. NO. 01.043.A 154800 SI H-83, F.A VT-3 3-VARIABLE SPRING BASE SUPPORT F1.20C RAB

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 262 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR LPSI PUXP 1A & 1B DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE HUHBER: 1-043 ASHE PERIOD PERIOD PERIOD 'i 'a'+ N YRly SEC."XI-SUHHARY EXAHIHAT ION AREA CATGY NDE --- - - -OUTAGE INSTRUCTIONS HUHBER IDENTIFICATION ITEM NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK ~ 1-10.SI.417 REF. DUG. HO. 01-043-A 154900 Sl -678 9 F-A VT-3 3-RIGID SHAY STRUT ASSY. F1.20 (8) 155000 SIH.175 F-A'T-3 3-CLEVIS HANGER F1.20 155100 S I -678.12 F-A VT-3 3 SLEEVE RESTRAINT F1.20 155200 S I H-174A F-A VT-3 3 - - - X RIGID SMAY STRUT ASSY ~ F1.20 (12) RAB I.10-SI-419 REF. DUG. NO. 01-043-A 155300 Sl H-84 F-A VT-3 3-VARIABLE BASE SPRING SUPPORT F1.20C RAB 155400 SI-678.93 F-A VT-3 3-RIGID SIIAY STRUT ASST'8) F1.20 1-12-SI.475 REF. DMG. NO. 01-043-A 155500 SI-678-16 F-A VT-3 3- PSA 1 Snubber 1-199 F1.20S

DATE: 01/09/98 ST. I.UCIE NUCLEAR PLANT UNIT 1 PAGE: 263 REVISIOH: 0 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A B 1B DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE NUMBER: 1-043 ASME PERIOD PERIOD PERIOD V'IN \ %J SEC; XI.

SUMMARY

EXAMINATION AREA CATGY NDE -OUTAGE INSTRUCT IOHS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **GALI BRAT I OH BLOCK~* 1-12-SI-475 REF. DUG. NO. 01.043.A 155600 SIH.174 F-A VT-3 3-RESTRAINT F1.20 I 12 Sl-475 REF. DUG. NO. 01 043-D 155700 S I H.173 F-A VT-3 3-SPRING HANGER F1.20C I-12-SI-366 REF. DUG. NO. 01-043 D 155800 S I -678-1952 F-A VT-3 3 - - - X RIGID SHAY STRUT ASSY. F1.20 (7) RAB 155900 SI.678.1953 F-A VT-3 3-RIGID BASE RESTRAINT F1.20 I-12-SI-367 REF. DWG. NO. 01-043-D 156000 SI-678-1955 F A VT-3 3-RIGID BASE RESTRAINT F1.20 1.12-SI-475 REF. DWG. NO. 01.043-B 156100 SI-678-168 FA .VT3 3- X BOX RESTRAINT F1.20 RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 264 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A 8 1B DISCHARGE HEADER PIPING FIRST SECOND THIRD ZONE NUMBER: 1-043 ASHE PERICO PERIOD PERIOD

                                         -SEC..-XI" SUMNARY EXAHI NATION AREA                  CATGY   NDE         - - - - - 0 U T A G E  - - - - --    IHSTRUCTIOHS NUHBER   IDENTIFICATION                    ITEN HO NETH    I 1  2   3    1  2  3      1  2  3       *~CALI BRAT IOH BLOCK*

1.12-SI-814 REF. DWG. NO. 01-043-B 156300 SIH.181 F-A VT-3 3-CLEVIS RESTRAIHT F1.20 RAB l-12-SI-410 REF. DWG. NO. 01-043-C 156400 Sl-678-25 F-A VT-3 3-VARIABLE SPRING BASE F1.20C 156500 SI.678.32 F-A VT-3 3 - . - X RIGID SWAY STRUT ASSEHBLE F1.20 ~ RAB I 12-SI-814 REF. DWG. HO. 01-043-C 156600 Sl-678-671 F-A VT-3 3-RIGID SWAY STRUT ASSY. (8) F1.20 156700 SIH-178 F-A VT-3 3-SPRING HANGER F1.20C 156800 SIH-78 F-A VT-3 3-RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE HUCLEAR PLAHT UHIT 1 PAGE: 265 REVI SIM: 0 INSERVICE INSPECTIM LOHG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS IHSPECTIM INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A 8 1B DISCHARGE HEADER PIPING FIRST SECOHD THIRD ZONE HUNBER: 1-043 ASKE PERIOD PERIOD PERIOD JV h SEC." XI SUHHARY EXAHIHATION AREA CATGY HDE -OUTAGE------ INSTRUCTIOHS HUHBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* 1-12-SI-814 REF. DUG. NO. 01-043-C 156900 Sl-678-36 F A VT-3 3-RIGID SMAY STRUT ASSY. F1.20 (8) 157000 Sl-678-380 F-A VT-3 3-RIGID SHAY STRUT ASSY. F1.20 (8) 157100 SIN.179 F-A VT-3 3-VARIABLE SPRING HANGER F1.20C RAB 57200 Sl-678-385 F-A VT-3 3- 0 RIGID S'WAY STRUT ASSY. F1.20 (8)

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 266 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A FIRST SECOND THIRD ZONE NUMBER: 1-044 ASME PERIOD PERIOD PERIOD

                                           - SEC.'I-

SUMMARY

EXAMINATION AREA CATGY HDE ------OUTAGE INSTRUCTIONS NUMBER IDENT IF ICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* I-12-Sl-475 REF. DMG. NO. 01 OCC-C 157300 SI -475-5-SM-3 C-F-3 SUR 3- 12".300¹ R/F M/H FLG Flange to Pipe NATL.A-182 F-304, MELDED PIPE, Flow Edifice FE-3306 I-12-SI-475 REF. D'MG. NO. 01-044-A 157500 Sl-475-5-SM-1 C-F-3 SUR 3- MELDED PIPE, 12"X 12"X 12" Tee to Pipe TEE NATL. A-403 MP304 157600 SI-477-FM-2 C-F 3 SUR 3- MELDED PIPE, ELBOM NATL. A-403 Pipe to Elbow MP304 157800 Sl-477-3-SM-6 C.F-3 SUR 3- MELDED PIPE, ELBOM NATL. A-403 Elbow to Pipe MP30C 1-12-SI-C77 REF. DMG. HO. 01-044-A 157850 S I H-71 F A VT-3 3-CLAMP HANGER F1.20 I-12-SI-475 REF. DMG. HO. 01-044 A 157900 Sl-477-FM-6 C-F.3 SUR 3- MELDED PIPE, 12"X 12a BY 6" Pipe to Tee TEE NATL. A-403 MP304

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 267 REVISION: 0 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION IN'IERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A2 FIRST SECOHD THIRD ZOHE NUHBER: 1-044 ASNE PERICO PERIOD PERIOD I Ygh'V ),M i'0t IT H I 1 tt +i,'i V 8 l ( i SEC+'l

                                                ~

SUHHARY EXAHIHATIOH AREA CATGY HDE - - - - - - OUTAGE - - - - IHSTRUCTIOHS NUHBER I DENT IF I CAT IOH ITEN HO NETH i 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK *

                 ~       0'IA  At 6       0          H   q   wf 11 $ H 47(l1   P  0 Itl   $ I1 4        y   I  0      1      ow 1-12-SI.475        REF. DMG. HO. 01-044-A 158000     Sl-477-FM-7                                   C-F-3    SUR     3-                                            12"X 12" BY  6"  TEE  NATL.

Tee to Pipe A 403 MP304 158100 SI-477.FM.8 C-F.3 SUR 3- 12"X 12" BY 6" TEE, 12"X 6" Pipe to Reducer COHC. REDUCER I 6 SI 464 REF. DMG. NO. 01-044-A 158200 Sl-464-FM-1 C F-3 SUR 3- PIPE NATL. A312,TP304 Reducer to Pipe e 158300 Sl 464 Pipe to Pipe 1 SM 2 C-F.3 SUR 3-158350 S I -868-155 F-A VT-3 3 . SADDLE RESTRAINT F1.20 158360 SI -868-155 I A C-C SUR 3- Verify existence Integral Attachment C3.20 158370 Sl H-98 F-A VT-3 3-RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 268 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAH CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUHP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A2 FIRST SECOND THIRD 20NE NUHBER: 1-044 ASHE PERIOD PERIOD PER ICO ~ gq 1 ppp pp 't)g tv& I 5 J'ttn H 4 ~ ~ trh% w FC (Qi Scp ~ SUHHARY EXAHIHAT ION AREA CATGY HDE - - - - - -OUTAGE INSTRUCTIONS I IDENTIFICATION 3 3 NUHBER i'' w ITEH HO NETH oh>'" "\Eii'>>0 <'w)A "' hl%1+5 ( 1 2 JA'i st wh 1 2 i 'iia 4i 1 2 AL>> 3

                                                                                                                    ~

(

                                                                                                                        ~ I%C
                                                                                                                               **CALIBRATIONBLOCK>>>>

o ar h ~ i ~ I-6-SI-464 REF. DMG. NO. 01 044-A 158400 S I-464-1-SM-1 C-F.3 SUR 3- FLANGE NATL. A182,F304 PIPE-TO-FLANGE (FE-3342) 158500 S I -464-2-SM-5 C-F-3 SUR 3- PIPE NATL. A312,TP304 FLANGE (FE-3342)-TO-PIPE 158600 S 1.464-2-SM.4 C-F-3 SUR 3 . ELBOM HATL. A403,MP304 Pipe to Elbow 158700 S I -464-2.SM.3 C.F.3 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe 158800 Sl-464-2-SM.2 C-F-3 SUR 3- ELBOM HATL~ A403,MP304 Pipe to Elbow '158900 SI-464.2.SM-1 C-F-3 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe 159000 S1.464.FM-2 C-F-3 SUR 3-PIPE-TO-VALVE (HCV-3645)

                                                                                                                              >>*UT-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 269 REVI SION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP DISCHARGE HEADER PIPING TO LOOPS 1A1 'IA2 SECOHD 'IRST THIRD ZOHE NUHBER: 1-044 ASHE PERICO PERIOD PERIOD

~, Ay~ 4 pA'  4 tt ~  1'0 >8    (Ih    i h \*     ~

SEC ~ Xl . ~ SUHHARY EXAHIHATION AREA CATGY NDE -OUTAGE------ INSTRUCTIOHS NUHBER IDENTIFICATION ITEH NO NETH 2 3 1 2 3 2 3 **CALIBRATIONBLOCK>>>> I-6-SI-146 REF. DMG. NO. 01.044-A 159200 Sl-146-FM-1 C-F-1 SUR 3 - - - - - - X VALVE NCV-3645 to PIPE C5.11 VOL

                                                                                                                  *>>UT 38>>>>

159300 SI-110-FM-9 C-F-1 SUR 3- X PIPE TO VALVE V-3144 C5.11 VOL

                                                                                                                  >>*UT-38**

I-6-Sl-409 REF. DWG. NO. 01-044 B 159400 SI-409-FW-9 C-F-3 SUR 3-Tee to Elbow 159500 SI 409 FM-8 C.F.3 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe 159600 SI-409-FW-7 C-F-3 SUR 3- ELBOW NATL. A403,MP304 Pipe to Elbow 159700 SI.409-FW-6 C F-3 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe 159800 SI-409-FM-5 C.F.3 SUR 3- ELBOW NATL. A403,MP304 Pipe to Elbow

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 270 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONEHTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR LPSI PUMP DISCHARGE HEADER PIPING TO LOOPS lA1 1A2 FIRST SECOND THIRD ZONE NUMBER: 1-044 ASME PERIOD PERIOD PERIOD PA+lpyQl ~1, 6 tl AVP ~'I J ~ I J J' SEC,i X[, g g ~

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - 0 U T A G E - - - - INS'IRUCTIOHS NUMBER IDENTIFICATION ITEH HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* I 6-SI-409 REF. DWG. NO. 01-044-8 159900 SI.409-FW-4 C-F-3 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe 160000 SI.409-FH-3 C-F-3 SUR 3- ELBSI MATL. A403,MP304 Pipe to Elbow 160100 SI-409-FH-2 C-F-3 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe 160200 S l-868-406 F A VT-3 3 - - - - X WELDED ANCHOR F1.20 5 I 6ll 160300 SI 868 406 IA C-C SUR 3-Integral Attachment C3.20 5 I6a 160400 SI-477-3.SN-4 C-F.3 SUR 3- FLANGE NATL~ A182,F304, Flow Pipe to Flange Edffice FE-3312 160500 Sl 409-1 Ql-5 C.F-3 SUR 3- PIPE MATL. A312,TP304, Flow Flange to Pipe Edifice FE-3312

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE 271 REVISION: 0 INSERVICE IHSPECTION LONG TERH PLAH CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A2 FIRST SECOND THIRD ZONE NUMBER: 1 044 ASHE PERIOD PERIOD PERIOD

                                              - SEC; XI-

SUMMARY

EXAHINATION AREA CATGY NDE -----OUTAGE------ INSTRUCTIONS NUMBER IDENT I F I CATION ITEH NO HETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK

  • I 6 SI 409 REF. DUG. NO. 01-044-B 160600 SI-409.1-SM.4 C-F-3 SUR 3- ELBOJ NATL. A403,I@304 Pipe to Elbow 160700 SI-409-1.QI-3 C-F-3 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe 160800 S I -409-1 -SW-2 C-F-3 SUR 3- ELBSI NATL. A403,MP304 Pipe to Elbow 60900 SI-409-1.SW 1 C.F.3 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe 161000 SI-409.FII-1 C-F-3 SUR 3- Inaccessible for examination Pipe to Valve V-3615 due to permanent pedestal for u-bolt on support SIH-101 161050 Valve V-3615 3 Valve I-6-SI-129 REF. D'LIG. NO. 01-044-B 161100 SI-129- FW.1 C.F-1 .SUR 3 - . - X Valve V-3615 to Pipe C5.11 VOL
                                                                                                        **UT.38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 272 REVISIOH: 0 INSERVICE INSPECTION LOHG TERN PLAN 0 CLASS 2 ALL STATUS COHPONENIS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A2 FIRST SECOND THIRD ZOHE NUMBER: 1-044 ASHE PERIOD PERICO PERIOD J ~, hP% pill Q Pe ~ 6't l H I ~ ~)~ ~ - -- - ~ SECi XI

                                                     ~ ~

SUNNARY EXAHINA'llOH AREA CATGY HDE - - - - - - 0 U T A G E - - " - INSTRUCTIONS NUNBER IDENTIFICATION ITEN HO HETN 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* 1-6-SI-113 REF. DMG. NO. 01 044 8 r ~ 161200 S I -113 FM-9 C-F-1 SUR 3 - - X Pipe to Valve V-3114 C5.11 VOL

                                                                                                                        *IUT 38**

I 12-SI.475 REF. DMG. NO. 01-044-C 161250 S I -475-5-SM-2 C-F-3 SUR 3- MELDED PIPE, 12"X 12"X 12" Pipe to Tec TEE NATL. A.403 MP304 161300 Sl -475-FM-8 C-F-3 SUR MELDED PIPE, TEE NATL'-403 Tec to Pipe MP304 I-12-SI 477 REF. DMG. NO. 01-044-C 161400 SI.477-1-SM-3 C.F.3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 161500 ~ S I -477-1-S'M-2 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 161700 Sl-477.FM-1A C-F-3 SUR 3- ELBOM NATL. A403,MP304 Pipe to ElboM

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 273 REVI S IOH: 0 -INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A2 FIRST SECOHD THIRD ZONE NUMBER: 1-044 ASME PERIOD PERIOD PERIOD

     ~J SEC; XI

SUMMARY

EXAMIHATIOH AREA CATGY NDE ------OUTAGE INSTRUCTIONS HUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* I-12-SI-477 REF. DUG. NO. 01 044 C 161800 Sl -477. FH-1 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe I 161850 S I H-70 F-A VT3 3- X RESTRAINT F1.20 161900 SI.477-fll-3 C-F-3 SUR ~ 3- MELDED PIPE, TEE NATL. A-403 Pipe to Tee UP304 162000 SI.477-fll-4 C-F-3 SUR 3- HELDED PIPE, TEE NATL. A-403 Tee to Pipe lP304 162100 S l.477- Fll 5 C-F-3 SUR COHC. REDUCER NATL' 403 Pipe to Reducer MP304 I-6-SI-463 REF. DUG. NO. 01 044 C 162200 S I -463-FH-1 C.F.3 SUR 3- PIPE MATL. A312,TP304 Reducer to Pipe 1-6-SI-463 REF. DUG. HO. 01-044 C 162300 SI-463-FM.1C C F-3 SUR 3 Pipe to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 274 REVISION: 0 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUHP DISCHARGE HEADER PIPIHG TO LOOPS 1A1 1A2 FIRST SECOND THIRD ZONE HUHBER: 1-044 ASHE PERIOD PERICO PERIOD 4, \ ~ g,\v$ 6 ~ tl bl 0 ~ SEC; Xl SUHMARY EXAHIHAT ION AREA CATGY NDE - - - - 0 U T A G E - - . - -- INSTRUCT IOHS NUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK** aver ~ ve swor l4 I-6-SI-463 REF. DUG. NO. 01-044-C

                          ~ ~

162320 S I -868.57 F-A VT-3 3-SADDLE RESTRAINT F1.20 162330 Sl-868-57 IA C-C SUR 3 . Verify existence Integral Attachment C3.20 162360 S I H-93 F.A VT-3 3-CLEVIS HANGER F1.20 162400 SI.463.1.SM.1 C-F-3 SUR 3 FLANGE NATL. A182,F304 PIPE-TO.FLANGE (FE.3332) 162500 SI-463-2-SW.5 C-F-3 SUR 3- PIPE NATL. A312,TP304 FLANGE (FE-3332)-TO.PIPE 162600 SI-463-2-Ql-4 C-F-3 SUR 3- ELBOM NATL. A403,i@304 Pipe to Elbe@ 162700 SI-463-2-SW-3 C-F-3 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 275 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS INSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP DISCHARGE HEADER PIPING TO LOOPS 1A'I 1A2 FIRST SECOND THIRD ZONE NUMBER: 1-04C ASHE PERICO PERIOD PERIOD

                                            'EC    XI SUHHARY EXAHIHAT I ON AREA                   CATGY     HDE      ------OUTAGE------                    INSTRUCTIONS NUHBER   IDENT IF I CATION                    ITEH NO HETH    I 1  2  3     1  2  3      1 2  3       <<*CALIBRAT ION BLOCK>>"

I-6-SI-463 REF. DMG. HO. 01-044-C 162800 Sl.463.2-SM-2 C-F-3 SUR 3- ELBOM HATL. A403,MP304 Pipe to Elbow 162900 SI-463-2.SM.1 C-F-3 SUR 3- PIPE HATL. A312,TP304 Elbow 'to Pipe 163000 SI.463-FM.2 C-F-3 SUR 3-PIPE TO VALVE NCV-3635 I.6.SI-14C REF. DMG. NO. 01-044-C 163100 S I -144- FM.1 C-F-1 SUR 3- Inaccessible for exam due to VALVE NCV.3635 TO PIPE C5.11 VOL vibration daaper restraining V-3831. Damper would require cutting E reinstallation.

                                                                                                     "UT-38**

1-6-SI-111 REF. DMG. NO. 01.044-C 163200 SI-111-SM.9 C-F-1 SUR 3- Inaccessible for examination Pipe to Valve V-313C C5.11 VOL due to permanent box restraint. Box steel anchored to the floor.

                                                                                                    **UT 60**

I-6-SI-C62 REF. DMG. HO. 01-OC4-D 163300 SI-462-FM-10 C.F-3 SUR 3- TEE HATL. A403,MP304 Tee to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 276 REVISIOH: 0 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS CONPONENTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUNP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A2 FIRST SECOND TNIRD ZONE NUNBER: 1-044 ASHE PER I CO PERIOD PER I CO SEC; XI SUNNARY EXAHIHATIOH AREA CATGY HDE -OUTAGE INSTRUCTIONS NUNBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALI BRAT I OH BLOCK~* I-6-S1-462 REF. DMG. NO. 01 044 D 163400 SI-462-FM-9 C-F-3 SUR ELBOM NATL. A403,MP304 Pipe to Elbow 163500 SI-462-FM-8 C-F-3 SUR 3- ELBOM NATL'403,MP304 Elbow to Pipe 163600 SI-462-FM.7 C-F 3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow f 163700 SI-462-FM-6 C-F-3 SUR 3- PIPE NATL. A312,TP304 Elbo~ to Pipe 163800 SI-462-FM-5 C-F-3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 163900 SI-462-FM-4 C-F-3 SUR 3 . PIPE NATL. A312,TP304 Elbow to Pipe 164000 SI-462-FM-3 C-F-3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 277 REVISIOH: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUNP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A2 FIRST SECOND THIRD ZONE HUHBER: 1-044 ASHE PERIOD PERIOD PERIOD ~ 14 %1&l SEC XI SUHHARY EXAHIHAT ION AREA CATGY HDE OUTAGE - - - - -- IHSTRUCTIOHS NUMBER IDENTIFICATION ITEN NO NETH i 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I 6-SI-462 REF. DMG. NO. 01 044-D 164100 Sl.462.FM-2 C.F-3 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe 164200 Sl-462-2-SM-4 C F-3 SUR 3- FLAHGE NATL. A182,F304, Flow Pipe to flange Edifice FE.3326 164300 S I -462-1-SM-5 C.F.3 SUR 3- FLANGE NATL. A182,F304, Flow Flange to Pipe Edifice FE-3326 64400 SI-462-FM-1E C-F 3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 164500 Sl-462-1.SM-3 C-F 3 SUR 3- PIPE NATL. A312,TP304* Elbow to Pipe 164600 Sl-462-1-SM-2 C.F.3 SUR 3- ELBOM HATL. A403,MP304 Pipe to Elbow 164700 SI -462-1.SM-1 C-F-3 SUR 3- PIPE HATL. A312,TP304 Elbow to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 278 REVI SION: 0 IHSERVICE IHSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A2 FIRST SECOND THIRD 20HE NUMBER: 1-044 ASHE PER ICO PERIOD PERIOD ECe X SUHHARY EXAMINATION AREA CATGY NDE OUTAGE- IHSTRUCTIOHS NUMBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK ~ 4 1-6-S1-462 REF. DUG. NO. 01-044-D 3-1 164800 SI-462-FN-1 C-F-3 SUR Pipe to Valve HCV-3625 164820 Valve HCV-3625 3 Ho examination required, no Valve valve body Holds 164850 S1-868-107 F-A VT3 3- X SADDLE RESTRAINT F1.20 164860 SI -868-107 IA C-C SUR 3- Verfiy the existence of thi Integral Attachment C3.20 integral attachment only, no examination required at this time I-6-SI-142 REF. DUG. NO. 01-044-D 164900 S1-142- FII.1 C-F-1 SUR 3 X Valve HCV-3625 to Pipe CS ~ 11 VOL UT 38+* I-6-SI-112 REF. DUG. NO. 01-044-D 165000 SI-112-FII.9A C-F-1 SUR 3 X Pipe to Valve V-3124 C5.11 VOL

                                                                                                    **UT-38+*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 279 REVISION: 0 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUHP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A2 FIRST SECOND THIRD. 20NE NUHBER: 1-044 ASHE PERIOD PERIOD PER I CO 'I ff% 4 W)at ~ ~

                                                 'EC;    Xl-SUHMARY EXAHINATION AREA                     CATGY    NDE      ------OUTAGE------                     IHSTRUCTIONS NUHBER   IDENTIFICATION                      ITEH  NO NETH   I 1  2  3     1  2  3      1 2  3        **CALIBRATIONBLOCK~*

I 12-SI 475 REF. DUG. NO. 01-044-C 1 165100 SI.868.47 F-A VT-3 3-RIGID SHAY STRUT ASSEHBLY F1.20 I-6-SI-409 REF. DNG. NO. 01 044-8 165400 SI.868.410 ~ F-A VT-3 3- PSA-3 Snubber 1-080 F1.20S 165500 SI-868-411 F-A VT-3 3-RESTRAINT F1.20 165600 S I H-101 F-A VT-3 3-RESTRAIHT F1.20 I 12-SI.477 REF. DUG. NO. 01-044-C 165700 Sl-868-525 F-A VT-3 3-CLAHP RESTRAINT F1.20 I-6-Sl-462 REF. DHG. NO. 01-044-0 166000 S I.868-111 F-A VT-3 3- PSA-10 Snubber 1-078 F1.20S

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 280 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUNP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A2 FIRST SECOND THIRD ZONE NUHBER: 1 044 ASHE PERIOD PERICO PERIOD

v. as ave.,~ <<ra w e sa ~. 'e "i SEC@i XI
                                          ~

~ SUHHARY EXAHIHAT ION AREA CATGY HDE - - - - - - 0 U T A G E - - - - INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~~ I-6-SI-462 REF. DUG. NO. 01-044-0 166100 S I -868-112 F-A VT-3 3 . RESTRAIHT F1.20 166200 S I H-95 F-A VT-3 3-RESTRAINT F1.20 I-6-Sl-464 REF. DMG. NO. 01-044-A 166500 S I.868-158 F-A VT-3 3-RESTRAINT F1.20 166600 S I -868-163 F-A VT-3 3- PSA-3 Snubber 1.079 F1.20S 166700 S I H-99 F A VT-3 3-RESTRAINT F1.20 166800 S I -868.6099 F-A VT-3 RIGID SMAY STRUT ASSY, F1.20 (10) I-6-SI-463 REF. DWG. NO. 01-044-C 167100 S I -868.60 F-A VT-3 3 . BOX RESTRAIHT F1.20

DATE: O'I/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 281 REVISION: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUHP DISCHARGE HEADER PIPING TO LOOPS 1A1 1A2 FIRST SECOND THIRD ZONE HUHBER: 1 8'.%. re 0 ";J~s%w' 044 r SUHMARY EXAHIHAT I OH AREA J' ~ ~ ~ Jt r v r' r ASHE SEC CATGY

                                                             'l   NDE PERIOD      PERIOD
                                                                                ------OUTAGE------

PERIOD INSTRUCTIONS NUHBER IDEHT IF I CAT IOH ITEN HO NETH i 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK**

              ~     ovavsvv       rvvr       r     ver i  r rvv y     WS.s,   . a    r. r r aa,          r . Wvv, v 1-6.SI.463        REF. D'NG. NO. 01-044-C 167200   SIH-92                                       F-A       VT.3 RESTRAINT                                    F1.20 167300   S I.868-64                                   F.A      VT-3       3-                                            PSA-3 Snubber 1-077                                F1.20S 167400   SI-868-66                                    F-A      VT-3      3-BOX RESTRAINT                                F1.20

DA'IE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 282 REVISION: 0 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS CONPOHEN'TS INSPECT IOH INTERVAL PLAN STATUS PRESERVICE YEAR LETDOWN HEAT EXCHAHGE FIRST SECOND THIRD ZONE HUNBER: 046 ASNE PERIOD PERIOD PERIOD 1 'V+%Pt N,ru PION; (he W 1rW.Vq ~. '- ~.- SEC.'Xl

                                     ~

SUNNARY EXAHIHATION AREA CATGY HDE - - - 0 U T A G E - - INSTRUCTIONS HUHBER IDENT I F I CATION ITEK HO NETH TOVo+0 1 2 3 1 2

                                                                                ~

3 1 2 3 **CALIBRATIONBLOCK REF. DUG. HO. 01-046 169600 LHE-1 VOL 3-Channel Flange to Channel Barrel

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 283 REV IS I OH: 0 INSERVICE INSPECTION LONG TERH PLAH CLASS 2 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SKUTDOWN COOLING LIHE A OUTSIDE CONTAINNEHT FIRST SECOND THIRD ZONE NUMBER: 1-049 ASME PERIOD PERIOD PERIOD Pt w4v'4r R ~ > l ~P 4, ~ .n ScP.i EC ~ vI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO HETM 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK *

                                                                                                         ~ VaWm <<

I 10-SI-420 REF. DUG. NO. 01-049-A 169700 SI.420-FII-1 C F.3 SUR 3-Penetration 64 to Pipe RAB 169800 SI 420-FH-1 LS A SUR 3-Pipe Longitudinal Seam RAB 169900 SI.420-Fll.1.LS.B SUR 3-Pipe Longitudinal Seam RAB 70000 SI.420-1.SM.1 C-F-3 SUR 3- PIPE-NELOED, ELBOHS - L/R Pipe to Elbow llELDED, NATL. A403,lP304 170100 SI -420.1-SH-1.LR SUR 3-Elbow Longitudinal Seam 170200 S I.420-1-QI- I.SR SUR 3-Elbow Longitudinal Seam 170300 SI-420 FU-2 C-F-3 SUR 3 PIPE IIELDED, ELBSIS-L/R Elbo~ to Pipe MELDED, NATL. A403,IIP304

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 284 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A OUTSIDE COHTAIHMENT FIRST SECOND THIRD 1-049

 ~

ZOHE HUMBER:

    ~ 'We'hV~   ~  'Ht '%    ' ~U,++M   9 I I h  %

ASME SEC+'IXI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE

                                                                                -OUTAGE---                  INSTRUCT IONS NUMBER     IDENTIFICATION                       ITEH NO METH       1  2           2  3      1 2  3      **CALIBRATIOHBLOCK*~

I 10-SI 420 REF. DWG. NO. 01-049-A 170400 SI-420-F'W-2-LS-A SUR 3-Pipe Longitudinal Seam 170500 SI-420-FW-2-LS-B SUR 3-Pipe Longitudinal Seam 170600 SI.420.2.SW.1 C.F.3 SUR 3- PIPE-WELDED, ELBOWS-L/R Pipe to Elbo~ WELDED, MATL A403,WP304 170700 SI-420-2-SW-1 LR SUR 3-Elbow Longitudinal Seam 170800 SI-420-2-SW-1-SR SUR 3-Elbow Longitudinal Seam 170900 SI.420.FW-3 C.F-3 SUR 3- PIPE WELDED, ELBOWS-L/R Elbow to Pipe WELDED, MATL. A403,WP304 171000 SI-420-FW-3-LS-A SUR 3-Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 285 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A OUTSIDE COHTAINMEHT FIRST SECOHO THIRD ZONE HUMBER: 1-049 ASME PERIOD PERIOD PERICO lV <<Tl V) pkfV I %% ht ~ 'W 'I "-EC'XI:

SUMMARY

EXAMIHAT I OH AREA CATGY NDE - - - - - 0 U T A G E - - - -- INSTRUCTIONS NUMBER IDENT IF I CATION ITEM NO METH i 1 2 3 1 2 3 1 2 3 >>>>CAL I BRAT ION BLOCK>>>> 1-10-SI-420 REF. OHG. NO. 01-049-A 171100 Sl-420-FH-3-LS-B SUR 3-Pipe Longitudinal Seam 171200 SI-420-3.SW.1 C-F-3 SUR 3 . PIPE IIELDED Pipe to Pipe 171300 S I -420.3-Sfl-1-LS-A SUR 3-Pipe Longitudfnaf Seam 71400 SI.420-3.SII 1-LS-8 SUR 3-Pfpe Longitudfnaf Seam 171500 SI.420.3.SW-2 C-F-3 SUR 3- PIPE-l!ELOED( ELBOWS-L/R Pipe to Elbow MELDED, NATL. A403,MP304 171600 SI.420.3-SW.2-LR SUR 3-Elbow Longftudfnaf Seam 171700 SI.420.3.siI.2-SR SUR 3-Elbow Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 286 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOMH COOLING LINE A OUTSIDE CONTAINNENT FIRST SECOND THIRD ZONE NUNBER: 1-049 ASNE PERIOD PERIOD PERIOD j ~~hy p/I v

=
            ~ ~'4N   ~ t   Aft h ~ 'I ~ ~ I ~

ECtA YI Scl SUNNARY EXAHIHAT ION AREA CATGY NDE OUTAGE INSTRUCTIONS NUNBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK

  • I JV4hl'1/j4%U'd JACQ+I bt 0'+' I Jl 'hV4l 0) k 41'h4 AAh'b1 *<1 1 411 %br 1 ' ~

1-10.SI-420 REF. DMG. HO. 01.049-A 171800 SI -420-FM 4 C-F.3 SUR 3- PIPE-MELDED, ELBOMS-L/R Elbow to Pipe MELDED, NATL. A403,MP304 171900 SI-420-FM-4-LS-A SUR 3-Pipe Longitudinal Seam 172000 SI-420.FM-4-LS-B SUR 3-Pipe Longitudinal Seam 172100 SI-420-4-SM-1 C-F-3 SUR 3- PIPE-MELOEO, ELBOMS-L/R Pipe to Pipe MELDED, NATL. A403,MP304 172200 SI-420-4-SM-1-LS-A SUR 3-Pipe Longitudinal Seam 172300 SI-420-4.SM-1.LS-B SUR Pipe Longitudinal Seam 172400 SI-420-4-SM-2 C-F-3 SUR 3- PIPE-MELDED, ELBOMS-L/R Pipe to Elbow MELDED, NATL. A403,MP304

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 287 REVISIOH: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTOOMH COOLING LINE A OUTSIDE COHTAINHEHT F IRST SECOND THIRD ZONE HUHBER: 1-049 ASHE PERIOD PERIOD PERIOD SEC; SUHHARY EXAHIHAT IOH AREA XI'ATGY NDE OUTAGE------ INSTRUCT I OHS NUHBER IDENTIFICATION ITEH NO HETH i 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* 1-10-SI-420 REF. DMG. HO. 01-049-A 172500 Sl-420-4-SM 2 LR SUR 3-Elbow Longitudinal Seam 172600 S1-420.4-S'M.2.SR SUR 3-Elbow Longftudfnal Seam 172700 S1.420.4.SM-3 C-F-3 SUR 3- PIPE-MELDED, ELBOMS-L/R Elbow to Pipe MELDED, HATL. A403,MP304 72800 Sl-420-4.SM-3-LS-A SUR 3-Pipe Longitudinal Seam 172900 SI.420-4-S'M-3-LS-B SUR 3 . Pipe Longitudinal Seam 1-10 '1-420 REF. DMG. NO. 01-049-B 173000 Sl.420.FM.S C-F.3 SUR 3- PIPE-MELOEO Pfpe to Pipe 173100 SI-420-FM.S-LS-A ~ SUR 3-Pipe Longitudfnal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 288 REV I SION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMN COOLING LIME A OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-049 ASHE PERIOD PERIOD PERICO SEC."XI" SUHHARY EXAHIHAT ION AREA CATGY NDE -OUTAGE-- INSTRUCT IOHS HUHBER IDENT IF ICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 ~*CALIBRATIOH BLOCK~* l-10-SI-420 REF. DMG. HO. 01.049-B 173200 Sl-420-FM-5-LS-8 SUR 3-Pipe Longitudinal Seam 173300 Sl-420-5.SM-1 C-F-3 SUR 3- PIPE-MELDED, ELBOMS L/R Pipe to Elbow MELDED, NATL. A403,MP304 173400 Sl-420-5-SM-1-LR SUR 3-Elbow Longitudinal Seam 173500 Sl.420.5.SM-1-SR SUR 3-Elbow Longitudinal Seam 173600 SI-420-FM-6 C-F-3 SUR 3- PIPE-MELDED, ELBOMS-L/R Elbow to Pipe MELDEO, NATL. A403,MP304 173700 Sl-420-FM-6-LS-A SUR 3-Pipe Longitudinal Seam 173800 SI-420-FM-6-LS.B SUR 3 . Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 289 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE 'YEAR SHUTDOMN COOLING LINE A OUTSIDE CONTAIHHEHT F IRST SECOHD THIRD ZONE HUHBER: 1-049 ASHE PERIOD PERICO PERIOD WP SEC XI" SUHHARY EXAHI NATION AREA CATGY HDE - - - - - - 0 U T A G E - - - -- IHSTRUCTIOHS NUHBER IDENTIFICATION ITEH HO HETH I 1 2 3 1 2 3 1 2 ~~CALIBRATION BLOCK** I 10-S1-420 REF. DMG. HO. 01-049 B 173900 SI-420-6-SM-1 C-F-3 SUR 3- PIPE-MELOED, ELBOMS-L/R Pipe to Elbow MELDED, HATL. A403,MP304 174000 SI-420-6.SM-1-LR SUR 3-Elbow Longitudinal Seam 174100 S1-420-6.SM.1-SR SUR 3-Elbow Longitudinal Seam 74200 SI.420.FM-7 C-F-3 SUR PIPE-MELDEO, ELBOMS-L/R Elbow to Pipe MELDED, HATL. A403,MP304 174300 S1-420.FM-7-LS-A SUR 3 Pipe Longitudinal Seam 174400 SI.420-FM.7-LS-B SUR 3-Pipe Longitudinal Seam 174600 SI-420-7.SM-1 C-F.3 SUR 3- PIPE-MELOED, ELBOMS-L/R Pipe to Elbow MELOED, HATL. A403,MP304

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 290 REVISION: 0 IHSERVICE IHSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHENTS IHSPECTION IN'TERVAL PLAH STATUS PRESERVICE YEAR SHUTDOVN COOLING LINE A OUTSIDE CONTA INMENT FIRST SECOND THIRD ZONE NUMBER: 1-049 ASHE PERIOD PERIOD PERIOD SEC; XI SUMHARY EXAHINATION AREA CATGY HDE - OUTAGE - - - - -- INSTRUCTIONS HUMBER IDENT I F I CATION ITEH NO HETK I 1 2 3 1 2 3 1 2 3 <<<<CALIBRATIOH BLOCK** 1-10-SI-420 REF. O'IIG. NO. 01-049 B 174700 SI -420 7 SM-1-LR SUR 3-Elbow Longitudinal Seam 174800 SI-420-7.SU.I-SR SUR 3 . Elbow Longitudinal Scam 174900 SI-420-FII-8 C F-3 SUR 3- PIPE-MELDED, ELBOMS-L/R Elbok to Pipe MELDED, HATL. A403,llP304 175000 Sl-420-FII-B-LS.A SUR 3-Pipe Longitudinal Scam 175100 Sl-420-Fll-8-LS-B SUR 3 . Pipe Longitudinal Seam 175300 S I -420. Fll-9 C F.3 SUR 3- PIPE-MELDED, ELBNS-L/R Pipe to Elbok HELDED, HATL. A403,MP304 175400 S1-420 FII 9 LR SUR 3-Elbok Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 291 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS CONPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOMN COOLING LINE A OUTS IDE COHTAINNEHT FIRST SECOND THIRD ZOHE NUHBER: 1-049 ASHE PERIOD PERIOD PERIOD gd.,y %p, r q NVWL%l  %,1d ~L +J, .<<i ~ ws SEC) HI ~ I SUNHARY EXAHIHAT ION AREA CATGY HDE - - 0 U T A G E - - - - IHSTRUCTIOHS NUNBER IDENTIFICATION ITEN NO NETH i 1 2 3 1 2 3 1 2 3 <<<<CALIBRATIOH BLOCK*<< OOO 04'AV, AA P '1'@hi 4 1++ <<V4%$ +1 Pl Q1 A A, 9 ~ 9W I-10-SI.420 REF. DMG. NO. 01-049-8 175500 SI 420-FM-9.SR SUR 3 Elbow I.ongitudinal Seam 175600 SI-420-9 SM-1 C-F-3 SUR 3- PIPE-MELDEO, ELBOMS-L/R Elbow to Pipe MELDED, NATL. A403,MP304 175700 SI-420-9.SM.1-LS.A SUR 3-Pipe Longitudinal Seam 75800 SI 420 9.SM.1-LS-B SUR 3 Pipe Longitudinal Seam 175900 SI-420.9.S'M-2 C F-3 SUR 3- PIPE-MELDED, ELBOMS-L/R Pipe to Elbow MELDED, HATL. A403,MP304 176000 SI-420 9-SM-2.LR SUR 3-Elbow Longitudinal Seam 176100 SI-420-9-SM-2.SR SUR 3-Elbow Longitudinal Seam

", i, DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 292 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMN COOLING LINE A OUTSIDE CONTAIHNENT FIRST SECOND THIRD 20NE NUNBER: 1-049 ASNE PERIOD PERIOD PERIOD

    ~ >>q syph p pyg fvA IA J t   t     'J1 ~ i ~ ~ ~ ' ~

EC0 wvI SEA SUNHARY EXAMINATION AREA CATGY NDE OUTAGE INSTRUCTIONS NUNBER'DEHTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>> I-10-SI-420 REF. DMG. HO. 01-049-B 176200 SI-420-9-SM-3 C-F-3 SUR 3- PIPE-MELDED, ELBOMS-L/R Elbow to Pipe MELDEO, NATL. A403,MP304 176300 SI.420.9-SM-3-LS-A SUR 3-Pipe Longitudinal Seam 176400 SI-420-9-SM-3-LS-B SUR 3-Pipe Longitudinal Seam 176500 S I -420- FM-10 C-F-3 SUR 3- PIPE-MELOEO, ELBOMS-L/R Pipe to Elbow MELDEO, NATL. A403,MP304 176600 SI-420.FM.10.LR SUR 3-Elbow Longitudinal Seam 176700 SI-420-FM-10-SR SUR 3-Elbow Longitudinal Seam 176800 S I -676-221 F-A VT-3 3 RESTRAIHT F1.20

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 293 REVISIOH: 0 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A OUTSIDE COHTAINMEHT FIRST SECOND THIRD ZONE NUMBER: 1-049 ASME PERIOD PERIOD 'ERIOD ql g Pp Pl,gttP1tl I ~ "-'- 'EC XI

SUMMARY

EXAMIHATION AREA CATGY NDE -OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 1 2 3 <<<<CALIBRATIOH BLOCK<<<<

                                           ~JI     e,  Y~ 6,&     '}

I-10-SI-420 REF. DUG. HO. 01-049-B 176900 SIN-20 F-A VT-3 3 - - - - - X SPRIHG HANGER F1.2OC 177000 SI.676.226 F A VT-3 3-RIGID SHAY STRUT ASSY. F1.20 177100 Sl.676-2275 FA VT3 3- - - - - - X RIGID SHAY STRUT ASSY. F1.20 77200 Sl.676.9230 F-A VT-3 3-RIGID RESTRAINT F1.20 177300 S I -676-2316 F.A VT-3 3-RIGID SHAY STRUT ASSY F1.20 177400 SIH-17 F-A VT-3 3- X CLEVIS HANGER F1.20 177500 Sl-676-2355 F A VT-3 3-BOX RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 294 REVISION: 0 IHSERVICE IHSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A OUTSIDE COHTAINHENT FIRST SECOND THIRD ZONE HUHBER: 1-049 ASKE PERIOD PERIOD PER I CO S rs +a r Pv z~w t't e wttw< s1 ~- sw ~ SEC;"XI SUHHARY EXAMINATION AREA CATGY NDE - - - - - -OUTAGE INSTRUCTIONS HUHBER IDENI'IFICATION ITEH NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

                                                                   ~              KA I-10-SI-420     REF. DWG. NO. 01 049-A 177600     S 1.676.2375                         F-A      VT-3     3-BOX RESTRAINT                        F1.20 177700     Sl-676-2376                          F-A      VT-3     3-PIPE CLAHP RESTRAINT                 F1.20
 .177800      Sl-676-2395                          F-A      VT-3     3-            X BOX RESTRAINT                        F1.20 177900      S I H-14                             F-A      VT.3     3-BASE RESTRAINT                       F1.20 178000      Sl-676.2450                          F-A      VT-3     3-RIGID   SWAY STRUT   ASSY.           F1.20 178100     SI.676.245                           F-A       VT-3    3-RIGID    SWAY STRUT   ASSY.          F1.20 178200     SI-676-2475                          F-A       VT-3    3-                                       PSA-3 Snvbber 1-110                        F1.20S

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 295 REVISION: 0 IHSERVICE INSPECTION LOHG TERN PLAH CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SKUTDOW COOLING LINE A OUTSIDE CONTAINNENT FIRST SECOHD THIRD 20HE HUHBER: 1-049 ASNE PERIOD PERICO PERIOD SEC; XI ~ SUNMARY EXANIHATIOH AREA CATGY NDE - - - - -- 0 U T A G E - - - - -- INSTRUCTIONS HUHBER IDEHTIFICATION ITEH HO NETH 1 2 3 1 2 3 2 3 **CALIBRATIONBLOCK** I-10-SI-420 REF. D'LIG. HO. 01-049-A r 178300 S I-676-2475A F.A VT-3 3- PSA-3 Snubber 1-111 F1.20S 178400 S I H-13 F-A VT-3 3 X SPRING HANGER F1.20C 178500 SI.676-2505 F.A VT-3 3 X RIGID QIAY STRUT ASSY. F1.20 78600 S I H-12 F.A VT-3 3 X SPRING HANGER F1.20C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 296 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOUN COOLING LINE B OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUHBER: 1-050 ASHE PERIOD PERICO PERIOD I IVAAIVpAV g W V - SEC. XI- ' ~ ~ SUNHARY EXANINATION AREA CATGY NDE - - OUTAGE INS'IRUCTIONS HUNBER IDEHTIFICATIOH ITEM NO HETH 1 2 3 1 2 3 1 2 3 ~*CALIBRATIOH BLOCK** e e a r av,+or er w, r I-10-SI-422 REF. D'WG. NO. 01.050-A 178700 SI-422-FW-'1 C.F 3 SUR 3-PENT. A'40-TO-PIPE RAB 178800 SI.422.FU-1-LS-A SUR 3- Long seam is not visible Pipe Longitudinal Seam RAB 179000 SI -422.1-SW-1 C-F-3 SUR 3- ELBOM NATL. A403,llP304 Pipe to Elbow 179100 SI -422.1-SW-1-LR SUR 3-Elbow Longitudinal Seam 179200 SI-422-1-SM-1.SR SUR 3-Elbow Longitudinal Seam 179300 SI-422-1-SW-2 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 179400 SI-422-1-SU-2-LS-A SUR 3-Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 297 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOMN COOLING LINE B OUTSIDE CONTAINMENT FIRST SECOND THIRD ZOHE NUHBER: 1-050 ASNE PERIOD PERIOD PERIOD r+ lr lr ~ SEC~ XI ~ ~ SUNNARY EXANIHATION AREA CATGY NDE -.----OUTAGE INSTRUCTIONS NUNBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 *~CALIBRATIOH BLOCK

  • rkrr r . r I 10-SI-422 REF. DMG. NO. 01-050-A 179500 Sl-422-1-SM-2-LS-B SUR 3-Pipe Longitudinal Seam 179600 Sl 422-FM 2 C-F-3 SUR ELBOM NATL. A403,MP304 Pipe to Elbow 179700 Sl-422-FM-2-LR SUR 3-EIbou Longitudinal Seam 179800 Sl.422-FM-2.SR SUR 3-Eibog Longitudinal Seam 179900 Sl.422-2-SM-1 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbou to Pipe
                                                                                                                             '80000 SI-422.2.SM 1 LS-A                          SUR      3-Pipe Longitudinal Seam 180100    Sl-422-2-SM-1-LS-8                          SUR      3-Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 298 REVISION: 0 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOUN COOLING LINE B OUTSIDE COHTAIHMEHT FIRST SECOND THIRD ZOHE HUHBER: 1-050 ASHE PER 100 PER100 PERIOD A lP% ) ~ IN 4 SEC." Xl-SUHHARY EXAHINATION AREA CATGY HDE - - - - - -OUTAGE- - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO NETH I 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK>>>> I 10-SI-422 REF. DWG. NO. 01-050-A 180200 S1-422.2-SIJ-2 C-F-3 SUR 3- ELBOII (90) HATL. A-403,IIP-304 Pfpe to Elbow MELDEO, IBP RAB 180300 Sl-422-2-SM-2-LR SUR 3- Length of long seam to be Elbow Longitudinal Seam examined fs in accordance with RAB Code Case N-524 180400 SI.422-2-SI1-2-SR SUR 3 -. Length of long seam to be Elbow Longitudinal Seam examined fs in accordance with RAB Code Case N-524 180500 S1-422.FN-3 C-F-3 SUR 3- PIPE HATL+ A358,TP304 Elbow to Pipe 180600 SI-422-FM-3-LS-A SUR 3-Pipe Longitudinal Seam 180700 SI-422-FW-3-LS-B SUR 3 Pipe Longftudinal Seam 181000 SI-422-FII-4 C- F-3 SUR 3 Pipe to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 299 REVISIOH: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOMN COOLING LINE B OUTSIDE CONTAINHEHT FIRST SECOND THIRD ZOHE NUNBER: 1-050 ASHE PERIOD PERIOD PERIOD 4"" A~ vM SEC XI hUHHARY EXAHIHAT I OH AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUHBER IDENT IF I CAT I OH ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** 1-10-SI-422 REF. DMG. HO. 01-050-A 181100 SI 422-FM 4-LS-A SUR 3-Pipe Longitudinal Seam 181200 SI-422-FM-4-LS-8 SUR 3-Pipe Longitudinal Seam 181300 SI-422-4.SM.7 C.F.3 SUR 3-Pipe to Pipe 81400 SI-422-4.SM-7.LS-A SUR 3-Pipe Longitudinal Seam 181500 SI-422.4-SM.7.LS-B SUR 3-Pipe Longitudinal Seam 181600 SI.422-4.SM-1 C F-3 SUR 3 Elbow (90) A-403, MP-304 Pipe to Elbow welded, IBP RAB 181700 SI-422-4-SM-1-LR SUR 3-Elbow Longitudinal Seam RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 300 REVISIOH: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOMN COOLING LINE 8 OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-050 ASHE PERICO PERIOD PERIOD SEC'I SUHNARY EXAHIHATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDEHT IF I CAT IOH ITEM HO METH I 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK~* I-10 SI-422 REF. D'MG. NO. 01-050-A 181800 SI -422-4-SM-1-SR SUR 3- Long seam not visually Elbow Long ftudinal Seam detectable, Length of long RAB seam to be examfned fs fn accordance with Code Case H-524 181900 SI-422-4-SM-2 C-F-3 SUR 3- PIPE HATL. A358,TP304 Elbow to Pipe 182000 SI-422-4-SM-2-LS-A SUR 3-Pipe Longitudinal Seam 182100 SI-422-4-SM-2-LS-B SUR 3-Pipe Longitudfnal Seam 182200 SI-422-4-SM.3 C-F-3 SUR 3 . ELBOM NATL. A403,MP304 Pipe to Elbow 182300 SI-422-4-SM-3-LR SUR 3-Elbow Longitudinal Seam 182400 SI-422-4-SM.3-SR SUR 3 . Elbow Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 301 REVI S IOH: 0 IHSERVICE INSPECTION LONG TERK PLAN CLASS 2 ALL STATUS COKPOHENTS IHSPECTIOH INTERVAL PLAH STATUS PRESERVICE YEAR SNUTDOMH COOLING LINE B OUTSIDE COHTAINKENT F IRST SECOND THIRD ZONE NUKBER: 1-050 ASKE PERIOD PERIOD PER ICO \ -SEC; XI "- "-

                                                                 ------OUTAGE------
    ~ 2

SUMMARY

EXAKINATION AREA CATGY HDE , INSTRUCTIONS NUKBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 <<<<CALIBRATION BLOCK<<<< I-10-SI-422 REF. DMG. HO. 01-050-A 182500 SI.422.4-SM-4 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 182600 SI-422-4-SM.4-LS-A SUR 3-Pipe Longitudinal Seam 182700 SI-422-4-SM-4-LS-8 SUR 3-Pipe Longitudinal Seam 1-10-SI.422 REF. OMG. NO. 01-050.B 182800 SI.422-4-SM-S C-F-3 SUR 3- ELBOM KATL. A403,MP304 Pipe to Elbo~ 182900 SI-422-4-SM-5-LR SUR 3-Elbow Longitudinal Seam 183000 SI.422-4-SM-S-SR SUR 3-Elbow Longitudinal Seam 183100 SI-422-FM-5 C-F-3 SUR 3- PIPE KATL. A358,TP304 Elbow to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 302 REVISION: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMH COOLIHG LINE B OUTSIDE CONTAIHMENT FIRST SECOND THIRD ZONE NUHBER: 1-050 'SNE PERIOD PERICO - PERIOD HV ~ ~ --SEC: "XI SUHHARY EXANIHATION AREA CATGY HDE - - - - - -OUTAGE- - -- INSTRUCTIONS HUHBER IDENT IF I CAT I OH ITEN NO NETH, I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-10-SI-422 REF. DMG. NO. 01.050.8 4 k 183200 SI-422-FM-5-LS-A SUR 3-Pipe Longitudinal Seam 183300 SI-422-FM-5-LS-B SUR 3-Pipe Longitudinal Scam 183400 SI-422-5-SM-1 C-F-3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 183500 SI-422-5-SM-1-LR SUR 3-Elbow Longitudinal Seam 183600 SI-422-5-SM-1-SR SUR 3-Elbow Longitudinal Seam 183700 SI-422-5-SM-2 C.F.3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 183800 SI-422-5-SM-2-LS-A SUR 3-Pipe Longitudinal Seam

BATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 303 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SNUTOONN COOLING LINE B OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-050 .ASME . PERICO PERIOO - PERIOO

'  " ~ lb, 4m4I                                 -SEC   'XI  "

SUMMARY

EXAMIHATION AREA CATGY HOE OUTAGE------ IHSI'RUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* A 0 O4A 4 ' I 10.SI-422 REF. DNG. NO. 01-050.8 h 183900 SI.422-5-SM-2-LS-B SUR 3-Pipe Longitudinal Seam 184000 SI -422- FII.6 C-F-3 SUR 3- ELBSI NATL.- A403,NP304 Pipe to Elbow 184100 SI-422-Fll-6-LR SUR 3-t Elbow Longitudinal Seam 184200 SI.422 Fll.6.SR SUR 3-Elbow Longitudinal Seam 184300 SI-422-6-SN-2 C.F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 184400 SI-422-6-SW-2-LS-A SUR 3-Pipe Longitudinal Seam 184500 SI-422.6-SW-2-LS-B SUR 3-Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 304 REVISION: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOuN COOLING LINE B OUTSIDE CONTAINHENT FIRST SECOND THIRD 20NE HUNBER: 1 050' ASNE I PERIOD PERIOD JIK " 4 " 6 ~ 4 ~ \ I SEC:"'Xl ---" PER CO SUNMARY EXANI NATION AREA HDE 'ATGY

                                                                             ------OUTAGE..----                 INSTRUCTIONS HUNBER    IDENTIFICATION                        ITEN  NO NETH          I 1 ?   3    1  2  3     1 2  3      <<<<CALIBRATIOH BLOCK
  • SI-422 REF. DUG. NO. 01-050-B 184600 SI-422-6-Sll-1 C.F-3 SUR 3-Pipe to Pipe 184700 SI.422-6-SW-1.LS-A SUR 3-Pipe Longitudinal Seam 184800 SI-422-6.SM.1.LS-B 'SUR 3-Pipe Longitudinal Seam 184900 Sl-422 FM 7 C-F-3 SUR 3-Pipe to Pipe 185000 SI-422-FW 7-LS-A SUR 3 Pipe Longitudinal Scam 185100 SI -422-FII.7.LS-B SUR 3-Pipe Longitudinal Seam 185200 SI-422-7-SM.4 C-F.3 SUR 3-Pipe to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 305 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEH'IS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLIHG LINE 8 OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-050 ,, ASME~, PERIOD ...,EERIOO. PERIOD, Ai ~',a, 0',~'IPPA F1%%,'84' ', ~ i V "4 ~ ( ) SEC> HI I

                                                                               ------OUTAGE------

s ~

SUMMARY

EXAMINATION AREA CATGY HDE INSTRUCT IOHS NUMBER IDEHTIFICATIOH ITEM HO METH I 1 2 3 1 2 3 1 2 3 *~CALI BRAT ION BLOCK** I-10-SI-422 REF. DUG. NO. 01-050-B 185300 SI-422-7-SM-4-LS.A SUR 3-Pipe Longitudinal Seam

    ,185400          SI-422-7-SW-4.LS-B                               SUR    3-Pipe Longitudinal Seam 185500          SI.422-7-QI-1                           C-F-3    SUR    3-                                       ELBOU NATL. A403,lP304 Pipe to Elbow 85600        SI-422-7-SU-1   LR                               SUR     3-Elbow  Longitudinal      Seam 185700         SI-422.7-SN.1-SR                                 SUR    3-Elbow  Longitudinal      Scam 185800          Sl-422-FII-8                            C-F-3    SUR    3-                                       PIPE NATL. A358,TP304 Elbow  to Pipe 185900          SI-422-FN-8-LS-A                                 SUR    3-Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 306 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN 0 CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR SNUTDOMN COOLING 20HE NUHBER: Sf's LINE 1-050 B OUTSIDE COHTAINMEHT I: 'l

                                                   - ~ ~ - ~ASHE F IRST PERIOD SECOND PERIOD    '. THIRD PERIOD j  +Qppftgf (J        ~

SUHHARY EXAHIHATIOH AREA 0 tl ~ 8 '0 ~ " + A SECy+ Xl CATGY NDE -OUTAGE- - ---- INSTRUCTIOHS NUHBER IDENTIFICATION ITEH HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* tei @rows p e ot ~ a.a ~, s s w a ~ ~ I-10-S1.422 REF. DMG. NO. 01.050.B 186000 Sl.422-FM.B.LS.B SUR 3 Pipe Longitudinal Seam I.10.SI-422 REF. DMG. NO. 01-050-C 186100 SI-422.8-SM-1 C F 3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 186200 Sl-422-8.SM-1-LR SUR 3-Elbow Longitudinal Seam 186300 Sl-422-8-SM-1.SR SUR 3-Elbow Longitudinal Seam 186400 SI.422-FM-9 C.F-3 SUR 3- PIPE NATL. A358,TP304 MELDED Elbow to Pipe RAB 186500 Sl-422-FM 9-LS-A SUR 3 Pipe Longitudfnai Seam RAB 186600 SI-422-FM-9-LS.B SUR 3 Pipe Longitudinal Seam RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 307 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN

                                                                                             ~

CLASS 2 ALL STATUS COHPONEHTS IHSPECI'IOH INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOMN COOLIHG Pp14tn II '4PcW fl'l4lllu4 L<fJ ~ P LINE

                        ~

B OUTSIDE CONTAINNEHT Awv'IY 'I P ~ t I, 1

                                                ) ~ ~

Lsll~,l Sgp, Qi, I FIRST DPRlls SECOND THIRD co SUHHARY EXAHIHATION AREA CATGY HDE - - - - - 0 U T A G E- INSTRUCTIONS HUMBER IDEHTIFICATIOH ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK** I-10-SI-422 REF. DMG. NO. 01-050-C 186700 SI-422-9-SM-2 C-F-3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 186800 SI-422-9-SM-2-LR SUR 3-Elbow Longitudinal Seam 186900 SI-422-9-SM-2-SR SUR 3-Elbow Longitudinal Seam 87000 SI-422-9.SM-1 C F-3 SUR 3 PIPE NATL. A358,TP304 Elbow to Pipe 187100 SI-422-9-SM-1.LS-A SUR 3-Pipe Longitudinal Seam 187200 SI-422-9-S'M-1-LS-8 SUR 3-Pipe Longitudinal Seam 187300 SI-422-FM-9A C-F-3 SUR 3-Pipe to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 308 REVISION: 0 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS I HSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR "MU OO'M COO IMS l IME S CUTS OE CO~MA lllINT F I RST SECOND 1 HI RD I ZONK HUNBER: 1-050 ASH TA ~ T

  ~ A,         h  AAA,MAJ M rh t t   ~ r "',   ~ A ~ S  A  ' SECOT  XI       'l SUHHARY EXAHINATION AREA                             CATGY     HDE            - - - - 0 U T A 0 E - - - -    --       IHSTRUCTIONS HUNBER       IDENTIFICATION                           ITEN NO NETH      I 1 2    3    1   2   3   1  2   3            **CALIBRATIONBLOCK**

c, ~, ~ rr r ~ r r r r r r I-10.SI-422 REF. DIJG. HO. 01-050-C 187400 SI-422.FII-9A-LS-A SUR 3-Pipe Longitudinal Seam 187500 SI-422.FW-9A-LS-B SUR 3-Pipe Longitudinal Seam 187600 S I 422- FN.10 C-F-3 SUR 3- ELBDM NATL~ A403tllP304 PIPE TO ELBOM 187700 S1-422- FM-10 LR SUR 3-Elbow Longitudinal Seam 187800 SI-422-FH-10-SR SUR 3-Elbow Longitudinal Seam 187900 SI-422-10A.SH.I C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 188000 SI-422 10A-SH.I.LS-A SUR 3-Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 309 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS INSPECTION IN'IERVAL PLAH STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE B OUTS IDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-050 ASME ,PE/100 - PERIOD .~ >PERIOD L/ Atty'Lf l lflC .- " ~" SECi XI

                                                                 ------OUTAGE------

q ~ ~

SUMMARY

EXAMIHAT ION AREA CATGY NDE INSTRUCTIOHS NUMBER IDEHTIFICATIOH ITEM NO METH 1 2 3 1 2 3 1 2 3 ~~CALIBRATION BLOCK** I-10-SI-422 REF. DWG. HO. 01-050-C

'188100    SI.422.10A-Sll-1-LS-B                        SUR    3-Pipe Longitudinal Seam 188200     SI.422-FM-10A                       C-F.3    SUR    3-                                       ELBSI NATL. A403,MP304 Pipe to Elbow 188300     SI-422-FM-IOA LR                              SUR    3-Elbow Longitudinal Seam 88400    SI.422-FH-10A-SR                             SUR     3-Elbow Longitudinal Seam 188500    SI-422-fll.10B                        C.F-3   SUR     3-                                      PIPE NATL. A358,TP304 Elbow    to Pipe 188600    SI-422 FII.10B-LS-A                           SUR    3-Pipe Longitudinal Seam 188700    SI-422-FII-108-LS-8                           SUR    3-Pipe Longitudinal Seam

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 310 REVISION: 0 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOMN COOLING LINE B OUTSIDE CONTAINHENT FIRST SECOND THIRD ZONE NUMBER: 1-050 ' ASNE PERIOD PERIOD PERIOD ~,i g p4IAhh%%' h \ , ~ SeP%l ~~ QI,

                                                 ~

4 pu 'I SUHNARY EXAHINATIOH AREA CATGY NDE - - -OUTAGE INSTRUCTIONS HUNBER IDENT IF I CAT ION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK

  • v a wv I-10-SI-422 REF. DMG. NO. 01 050-C 188800 Sl -422-10-SM-4 C-F-3 SUR 3- ELBOM NATL. A403,MP304 Pipe to ElboM 188900 Sl-422-10.SM-4.LR SUR 3-Elbow Longitudinal Scam 189000 SI-422-10-S'M-4-SR SUR 3-Elbow Longitudinal Seam 189100 SI-422-10.SM.3 C-F-3 SUR 3- PIPE NATL. A358, TP304 ELBOM TO PIPE 189200 S I -422-10.SM-3LS-A SUR 3-Pipe Longitudinal Seam 189300 SI-422-10-SM-3LS-8 SUR 3 .

Pipe Longitudinal Seam 189400 SI-422-FM-11 C-F-3 SUR 3-PIPE TO TEE

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 'AGE: 311 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMH COOLING LINE 8 OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE HUHBER: 1-050 ASHE PERIOD PERIOD - PERIOD ( ~ gv((('Hlh ~ . " "-, SEC:.XI SUHHARY EXAHIHATION AREA CATGY NDE -OUTAGE------ INSTRUCTIONS NUHBER IDENTIFICATION ITEH HO NETH 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK** I 10 Sl 422 REF. DMG. NO. 01-050-C 189500 SI-676.158 F-A VT-3 3-RIGID S1IAY STRUT ASSY. F1.20 RAB 189600 SI.V-1 F-A VT-3 3- PSA-3 Snubber 1-088 8, 1-089 F1.20S 189700 S I H-10 F A VT-3 3-CLEVIS HANGER F1.20 89800 SI-676-224 F-A VT-3 3 - - - X RESTRAINT F1.20 RAB 189900 S I -676-228 A VT-3 3 . RESTRAINI' F1.20 1-10-SI-422 REF. DUG. NO. 01-050-B 190000 SIH.8 F-A VT-3 3-VARIABLE BASE SPRING SUPPORT F1.20C RAB 190100 S I -676-2315 F-A VT-3 3-CLAHP RESTRAINT F1.20 RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 312 REVISION: 0 >IHSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING I.IHE B OUTSIDE CONTAIHHEHT FIRST SECOND THIRD ZONE NUHBER: 1 050 'SHE PERIOD PERIOD PER ICO

    ,>,q,>>>a~>QP>L>l 'll           'i EXAHINATIOH AREA dA. ~    ~  >  +>'SECi CATGY
                                                         >Xl'UHHARY NDE           --- - -OUTAGE-                             INSTRUCTIONS HUHBER      IDENTIFICATION                          ITEM HO NETH               I 1  2  3      1  2  3            1 2  3       *~CALIBRATIOH BLOCK ~

Le ttPh t I ~ ~ > %i P REF. DWG. NO. 01-050-B

                                                                                                    >'-10-SI-422 190200      SI H-7                                 F-A               VT-3      3-CLAHP RESTRAINT                         F1.20 190300     SI-676-233                              F-A              VT-3       3-RIGID    SWAY STRUT   ASSY.             F1.20 190400      SIH-6                                  F-A               VT-3 3 CLAHP RESTRAIHT                        F1.20 190500      S I -676  2345                         F A               VT-3      3-CLAHP RESTRAINT                         F1.20 190600     S I -676.236                            F-A               VT-3     3-RESTRAINT                               F1.20 190700     S I H-5                                 F-A               VT.3 3 RESTRAINT                               F1.20 190800     S I-676.2415                            F-A               VT-3 3 BOX RESTRAIHT                           F1.20

DATE: 01/09/98 ST.'UCIE NUCLEAR PLANT UNIT 1 PAGE: 313 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE B OUTSIDE CONTAINNENT FIRST SECOND THIRD ZONE NUMBER: 1 050 ASHE PERIOD PERIOD  : PERICO SUHHARY EXAHIHATIOH AREA CATGY NDE ------OUTAGE----- IHSTRUCT IOHS HUHBER IDENTIFICATIOH ITEN HO NETH I 1 2 3 1 2 3 1 2 3 *iCALIBRATIOHBLOCK~* I-10-SI-422 REF. DUG. NO. 01.050.A 190900 SIN-3 F.A VT-3 3-VARIABLE SPRING BASE SUPPORT F1.20C 191000 SI-676.246 F A VT-3 3-SLEEVE RESTRAINT F1.20 191100 SI.676.250 F-A VT-3 3- PSA.3 Snubber 1-087 F1.20S 91200 S I-676-2515 F.A VT-3 3-RIGID SHAY STRUT ASSY. F1.20 191300 S I H-1 F-A VT-3 3- Per JPH-PSLP.83.0087, SPRING HAHGER F1.20C Allowable cold settings (High RAB 1217 lbs 2-1/8") - (Low 1043 lbs 1-9/32")

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 314 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN SI'ATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A INSIDE COHTAINHENT FIRST SECOND THIRD ZONE NUHBER: 1-051 ASHE PERIOD PERIOD PERIOD 34 \ l, ~ . SEC- XI --""" SUHHARY EXAHIHATION AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUHBER IDENTIFICATION ITEN HO NETH i 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-10-SI-420 REF. DWG. NO. 01-051-A 191400 Sl -420- FW-11 C-F-3 SUR 3-Valve V-3481 to Pipe VOL 191600 Sl-420-FW-11-LS-A SUR Pipe Longitudinal Seam 191700 SI-420-FW-11-LS-8 SUR 3-Pipe Longitudinal Seam 191800 Sl.420 10-SW-1 Pipe to Pipe C-F-3 SUR 3-0 191900 SI-420-10-SW-1-LS-A SUR Pipe Longitudinal Seam 192000 SI -420-10-SW-1-LS-8 SUR Pipe Longitudinal Seam 192100 S I-420-10-SW-2 C-F-3 SUR 3- ELBOW NATL. A403,WP304, SCH 20 Pipe to Elbou

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 315 REVISION: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS CONPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SKUTOOMN COOLING LINE A INSIDE CONTAINNENT F IRST SECOND THIRD ZONE NUMBER: 1-051 ASHE PERIOD PERIOD 'ERIOD SEC 'XI - ' SUNNARY EXANINATION AREA CATGY NDE - OUTAGE - - - - -- INSTRUCTIONS NUNBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 ~*CALIBRATION BLOCK

  • I-10-SI-420 REF. OMG. HO. 01-051-A 192200 SI-420-10 SM-2-LR SUR 3-Elbow Longitudinal Seam 192300 SI-420-10 SM-2-SR SUR 3-Elbow Longitudinal Seam 192400 SI-420-FM.12 C-F.3 SUR 3 . PIPE NATL. A358,TP304 Elbow to Pipe 192500 SI.420-FM-12 LS-A SUR 3-Pipe Longitudinal Seam 192600 SI.420-FM-12-LS-B SUR 3-Pipe Longitudinal Seam 192700 SI.420.11-SM-1 C-F.3 SUR 3 ELBOM NATL. A403,MP304 Pipe to Elbow 192800 SI-420-11.S'M-1-LR SUR 3-Elbow Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 316 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHIS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOUN COOLING LINE A INSIDE CONTAINMENT FIRST SECOND THIRD ZOHE NUMBER: 1 051 ASKE PERIOD PERIOD PERIOD 1 l Ep pv 'SEC.

SUMMARY

EXAMINATION AREA XI'ATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK

  • I-10-SI-420 REF. DUG. NO. 01-051-A 192900 SI-420-11-$ l-1.SR SUR 3-Elbow Longitudinal Seam 193000 SI-420-FW-13 C-F-3 SUR PIPE NATL'35B,TP304 Elbog to Pipe 193100 SI 420-FII-13.LS.A SUR 3-Pipe Longitudinal Seam 193200 SI-420-FN.13.LS.B SUR 3 Pipe Longitudinal Seam 193300 SI-420.FW-13A C-F-3 SUR 3-Pipe to Pipe 193400 SI-420-F'W 13A LS A SUR 3-Pipe Longitudinal Scam 193500 SI-420-FW.13A.LS-B SUR 3-Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 317 REV I SION: 0 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION IH1'ERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMN COOLING LINE A INSIDE CONTAINNEHT I FIRST SECOND THIRD ZONE HUNBERt 1-051 ASHE I PERIOD PERIOD 'PERIOD

    ~ p, VPJPTI 'L$ ( it)   Jl',.f h V ~ 'I P' "'ECi"XI
                                                                     ------OUTAGE---.-.
  ~

SUHHARY EXAHIHATION AREA, CATGY HDE I INSTRUCTIONS NUHBER IDENT I F I CAT I OH ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK** I-10-SI-420 REF. DMG.'HO. 01-051 A 193600 SI-420.12-SM-1 C.F.3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 193700 SI.420-12-SM-1-LR SUR 3-Elbow Longitudinal Seam 193800 SI-420-12.SM-1 SR SUR 3-Elbow Longitudinal Seam 193900 SI-420-FM.14 C.F.3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 194000 SI.420-FM 14-LS-A SUR 3-Pipe Longitudinal Seam 194100 Sl-420.FM-14-LS-B SUR 3-Pipe Longitudinal Seam 194200 SI-420-13-SM-1 C-F-3 SUR 3-Pipe to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 318 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A INSIDE COHTAIHHEHT FIRST SECOND .THIRD ZONE HUHBER: 1 051 ASHE PERIOD PERIOD , PERIOD ~ \ iq g 0 g e<lkC,l Phl C',4f .fh ~ IC 'I9 I SECy XI 8 )p ~

                                                                                    -----OUTAGE------

L SUNNARY EXAHIHATION AREA CATGY HDE INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** 1%%1.5 ~ P't 0 I P/PI I Opt I 10 Sl 420 REF. DWG. NO. 01-051-A 194300 SI-420-13.SW-1-LS-A SUR 3-Pipe Longitudinal Seam 194400 SI.420-13.SW-1-LS-B SUR 3-Pipe Longitudinal Seam 194500 SI-420-FW-15 CF3 SUR 3 Pipe to Pipe 194600 SI.420.FW.15.LS-A SUR 3-Pipe Longitudinal Seam 194700 SI-420-FW-15-LS.B SUR 3-Pipe Longitudinal Seam 194800 SI-420.14-SW.1 C.F.3 SUR 3-Pipe to Pipe 194900 SI-420.14-S'W-1-LS-A SU R 3. Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 319 REVISION: 0 IHSERVICE INSPECTION LOHG TERN PLAH CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDONN COOLING LINE A INSIDE CONTAINMEHT FIRST SECOND THIRD ZOHE HUNBERt 1-051 ASHE PERIOD PERIOD PERIOD Ahl ht h %N \ o 9 \ SEC( Xl f Ill SUNNARY EXAHIHAT ION AREA CATGY NDE - - - - - - 0 U T A G E - - - - INSTRUCTIONS HUNBER IDENTIFICATION ITEN H HETN I 1 2 3 1 2 3 1 2 3 *~CALI BRAT IOH BLOCK** V ~ ~ I-10-Sl 420 REF. DUG. HO. 01-051-A 1 195000 SI -420-14-SH-I.LS-B SUR 3-Pipe Longitudinal Seam 195100 SI 420-FN-16 C.F-3 SUR 3-Pipe to Pipe 195200 SI-420-FM-16-LS-A SUR 3-Pipe Longitudinal Seam 95300 SI-420-FII.16.LS-B SUR 3-Pipe Longitudinal Seam I-10-SI-420 REF. DWG. NO. 01-051-B 195400 S I-420-15.SN-1 C-F-3 SUR 3-Pipe to Pipe 195500 SI-420-15-SW-I-LS-A SUR 3-Pipe Longitudinal Seam 195600 SI-420.15-SM-1-LS-B SUR 3-Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 320 REV IS ION: 0 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COMPOHEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDONH COOLING LINE A INSIDE COHTAINMEHT FIRST SECOND THIRD ~ k>>>>>>>>>>>> ZONE NUMBER: 1-051 f >> c PA1't ~ >>ll>>l >>, f>>>> ~ >> \ ~ '>>>> ASME

                                                                   %$ gpl, 1>>>>i. J   I 4v PERIOD       PERIOD      PERIOD

SUMMARY

EXAMIHATIOH AREA CATGY NDE - - - - - - 0 U T A G E INSTRUCTIONS IDENT I F I CAT I OH ITEMHOMETN 2 3 2'3 3

   ~ ~

NUMBER a w r ss s o. o>> o>> s>> > I 1 o ve 5 1

                                                                                                                 '     '~a'e 1 2 e
                                                                                                                                      **CALIBRATIONBLOCK~*

I 10 SI-420 REF. DWG. NO. 01-051-8 195700 S I.420. FN-17 C-F-3 SUR 3-Pipe to Pipe 195800 SI 420-FW-17 LS-A SUR 3-Pipe Longitudinal Seam 195900 SI-420-FN-17-LS.B SUR 3-Pipe Longitudinal Scam 196000 SI.420-16.S'W.1 C-F-3 SUR 3-Pipe to Pipe 196100 SI-420-16-SU-I LS-A SUR 3-Pipe Longitudinal Seam 196200 SI-420-16-SN-1-LS-B SUR 3-Pipe Longitudinal Seam 196300 SI-420-FN-le CF3 SUR 3 ELBSI NATL~ A403,NP304 Pipe to Elbo}}

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 321 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAH CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A INSIDE CONTAINKENT FIRST SECOHD THIRD ZONE NUKBER: 1-051 ASKE PERIOD PERIOD PERIOD

         ~
  • rrw ~ -- SEC" Xl "" -"

SUKKARY EXAKIHATIOH AREA CATGY NDE -OUTAGE---- INSTRUCTIONS HUNGER IDEHT IF I CAT IOH ITEK HO NETH ) 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** h ~: l ~ 1 4A I-10-SI.420 REF. DWG. NO. 01-051.B 196400 SI-420.FH.18-LR SUR 3-Elbow Longitudinal Seam 196500 SI-420-FH-18-SR SUR 3-Elbow Longitudinal Seam 196600 SI.420-17-S'N-1 C.F.3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 196700 SI-420-17-SM-1-LS-A SUR 3-Pipe Longitudinal Seam 196800 SI.420.17.SII-1-LS-B SUR 3-Pipe Longitudinal Seam 196900 SI-420-17.SW-2 C.F.3 SUR 3- ELBOW NATL. A403,WP304 Pipe to Elbow 197000 SI-420-17-SH-2-LR SUR 3-Elbow Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 322 REVISION: 0 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMN COOLING LINE A INSIDE CONTAINNENT FIRST SECOND THIRD 2ONE HUHBER: 1-051 ASHE PERIOD PERIOD PERIOD 1f'p ))))d)J fV V% l )> ~

                                ~    ~          - ~~  ~

SEC:"XI SUNHARY EXAHINATION AREA CATGY HDE -OUTAGE-- INSTRUCTIONS NUNBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 1 2 3 **GALIBRATIOH BLOCK * ~ ~ 'I 1% 0 0 t HP lg 1-10.SI-420 REF. DMG. NO. 01-051-B 197100 S I -420-17-SM-2 SR SUR 3-Elbow Longitudinal Seam 197200 S I -420-17 SM.3 C-F-3 SUR 3- PIPE HATL. A358,TP304 Elbow to Pipe 197300 Sl.420 17-SM-3 LS-A SUR 3-Pipe Longitudinal Seam 197400 SI.420-17.SM-3-LS.B SUR 3-Pipe Longitudinal Seam 197500 SI-420-17 SM.4 C-F-3 SUR 3- ELBOM HATL~ A403,MP304 Pipe to Elbow 197600 S1-420-17.SM-4-LR SUR 3-Elbow Longitudinal Seam 197700 S1-420.17.SM-4-SR SUR 3-Elbow Longitudinal Seam

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 323 REVI SIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COKPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A INSIDE COHTAINHEHT FIRST SECOND THIRD ZOHE HUKBER: 1-051 ASKE PERIOD PERIOD PERIOD

                                           +ewe n SUKKARY EXAKINATIOH AREA                   CATGY     NDE                   OUTAGE                     IHSTRUCTIOHS HUKBER     IDENTIFICATION                   ITEN HO KETK      i 1 2  3     1  2  3       1 2  3      <<*CALIBRATIOH BLOCK~*

pl h '4 I V I-10.SI.420 REF. DWG. HO. 01-051-B 197800 SI-420.17-SM-5 C F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 197900 SI.420-17-SM-5-LS-A SUR 3-Pipe Longitudinal Seam 198000 SI-420-17-SM-5-LS-8 SUR 3-Pipe Longitudinal Seam 98100 S I.420- FM.19 C-F-3 SUR 3- ELBOW HATL. A403,MP304. Pipe to Elbow WELDED, intermediate break RCB point 198200 SI.420.FM-19-LR SUR 3-Elbow Longitudinal Seam RCB 198300 SI-420-FM-19-SR SUR 3-Elbow Longitudinal Seam RCB '198400 SI-420.18-SW-1 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 324 REVISIOH: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A IHSIDE CONTAIHHEHT FIRST SECOND THIRD ZONE HUNGER: 1 051 ASNE PERIOD PERIOD PERIOD wA 6 P 'l0 ~

                                            "SEC:-XI SUHHARY EXAHIHATIOH AREA                      CATGY     NDE                  OUTAGE       --            INSTRUCTIONS HUHBER   IDENT IF I  CATION                   ITEN N    NETH    I 1 2  3     1  2  3      1  2  3      **CALIBRATIOHBLOCK~*

I-10-SI-420 REF. DWG. NO. 01-051.8 198500 SI -420-18-SW-1-LS-A SUR 3-Pipe Longitudinal Seam 19S600 SI.420-18-SW-1-LS.B SUR 3-Pipe Longitudinal Seam 198700 S I.420-18-SW-2 C-F-3 SUR 3- ELBOW NATL'403,WP304 Pipe to Elbow 198800 S1.420-18-SW-2-LR SUR 3-Elbow Longitudinal Seam 198900 SI-420-18-SW-2-SR SUR 3-Elbow Longitudinal Seam 199000 SI-420-18-SW-3 C-F-3 SUR 3- Intermediate break point Elbo~ to Pipe RCB 199100 S I -420-18-SW-3-LS-A SUR '3-Pipe Longitudinal Seam RCB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 325 REVISION: 0 IHSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR SHUTDSlH COOLING LINE A INSIDE COHTAINHEHT FIRST SECOND THIRD ZONE HUHBER: 1-051 ASHE PERIOD PERICO PER I CO

i. r ~ SEC-'XI. -"
  ~    g EXANIHATION AREA                 CATGY       NDE  'UNNARY     - - - - - - 0 U T A  G E - - - -          IHSTRUCTIOHS HUNGER      IDENTIFICATION                   ITEN NO HETH              I  1  2  3     1  2  3      1  2   3        **CALIBRATION BLOCK~*
                                                     'W 1-10-SI-420    REF. DMG. HO. 01-051-8 199200      SI-420-18-SII-3-LS-8                         SUR          3-Pipe Longitudinal Seam RCB 199300      SI-420.18-SII-4                  C.F.3       SUR          3-                                           ELBOM NATL. A403,MP304 Pipe to Elbow 199400     SI.420.18.SM.4.LR                            SUR           3-Elbow Longitudinal Seam 99500     SI-420 18-SM-4-SR                            SUR           3-Elbow Longitudinal Seam 199600     SI-420-FN.20                      C-F-3      SUR           3-                                           PIPE NATL. A358,TP304 Elbow   to Pipe 199700     SI-420-F'll-20-LS-A                          SUR           3  .

Pipe Longitudinal Seam 199800 SI-420-FN-20-LS-B SUR 3-Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 326 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A INSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-051 ASME PERIOD PERIOD PERIOD

     ~ x    ~, ~ ~, w,v ar iv.    ~  . )    ~-

SEC: EXAMIHAT I OH AREA CATGY

                                                                   -XI'UMMARY HDE          . . - - -  0 U T A G E - - - - --    INSTRUCTIONS NUMBER       IDENTIFICATION                      ITEM HO METH                     2  3        2   3       2  3       **CALIBRATIOHBLOCK~*

~ ~ ~ ~ ~ ss r ~ r s i ~ I 1 i', vo ' 1

                                                                                                           ~

1 10-SI 420 REF. DWG. NO. 01-051-8 199900 SI-420-19.SII-2 C-F-3 SUR 3- ELBOM MATL. A403,I@304 Pipe to Elbow 200000 SI-420.19-81I-2-LR SUR 3-Elbow Longitudinal Seam 200100 SI.420-19-SW-2-SR SUR 3-Elbow Longitudinal Seam

                                                                                                                                                            /

200200 SI -420-19-SN-1 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 200300 SI-420.19-SIJ-1-LS-A SUR 3-Pipe Longitudinal Seam 200400 SI-420-19-SM-1 LS-8 SUR 3-Pipe Longitudinal Seam 200500 SI-420.FN.21 C-F-3 SUR 3-PIPE-TO-PENT. ¹64

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 327 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS r INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOW COOLING LINE A INSIDE CONTAINNENT FIRST SECOHO THIRD ZONE NUHBER: 1.051 ASHE PERIOD PERIOD PERIOD { SEC;"XI SUHNARY EXAHI NATION AREA CATGY HDE OUTAGE INSTRUCTIONS NUHBER IDENT IF ICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK"* 1-10 SI 420 REF. DUG. NO. 01-051 A 200600 SIH.219 F-A VT-3 3 X SPRING HANGER F1.20C 200700 S I.973-1219 F A VT-3 3-RIGID SHAY STRUT ASSY. F1.20 200800 S I.973-6219 F-A VT 3 PSA-10 Snubber 1-075 F1.20S 00900 S 1.973-15 F.A VT-3 3 - - - - - - X RIGID SiJAY STRUT ASSY. F1.20 201000 Sl-973-1220 F-A VT3 3-CLAHP RESTRAINT F1.20 201100 Sl-973-6220 F A VT-3 3 X BOX RESTRAINT F1.20 201200 S I H-221 F-A VT-3 3-BASE RESTRAINT F1.20

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 328 REVISIOH: 0 INSERVICE INSPECTION LOHG TERH PLAH CLASS 2 ALL STATUS COHPONENTS INSPECTIOH IHTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A INSIDE CDNTA NHENT FIRST SECOND THIRD ZONE NUHBER: 1-051 ASHE PERIOD PERICO PERICO j SEC "Xl """ SUNHARY EXAHINATIOH AREA CATGY NDE - - - - - 0 U T A G E - - - - .- INSTRUCTIONS NUNBER IDENTIFICATION ITEH NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK

  • I-10-SI-420 REF. D'LIG. NO. 01 051-A 201300 SIH-222 F A VT-3 BASE RESTRAINT F1.20 201400 Sl-973-6222 F-A VT-3 3-RIGID SHAY STRUT ASSY. F1.20 201500 SIN-223 F-A VT 3 3 - - - X BASE RESTRAINT F1.20 201600 SI-973-6223 F-A VT-3 3-RIGID SHAY STRUT ASSY ~ F1.20 201700 SIH-224 F-A VT-3 3-BASE RESTRAINT F1.20 201800 S I -973-1224 F-A VT-3 3 .

RIGID SHAY STRUT ASSY. F1.20 201900 SI-973-6224 F-A VT-3 3- PSA-3 Snubber 1-076 F1.20S

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE:" 329 REVISION: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COKPOHEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE A INSIDE CONTAIHKENT FIRST SECOHD THIRD 20NE HUNBER: 1-051 ASKE

                                             -SEC:"Xl "    '-        PERIOD
                                                                  - - - - - - 0 PERIOD       PERIOD SUKKARY EXAKIHATION AREA                      CATGY     HDE                     U T A G E                INSTRUCTIONS NUKBER    IDEN/ IF  I CATION                    ITEK  HO KETH   I  I 2 3       I  2  3     1  2  3       <<*CALIBRATION BLOCIC
  • I-IO-SI-420 REF. D'WG. NO. 01-051-B 202000 SIH-225 FA VT3 3- - - - - X BASE RESTRAIHT F1.20 202100 S1.973-6225 F-A VT-3 3-RIGID SWAY STRUT ASSY. F I.20 202200 SIH.226 F-A VT-3 3 BASE RESTRAINT F I.20 202300 Sl-973 6226 F-A VT.3 3 .

RIGID SWAY STRUT ASSY. F1.20 202400 SI-973-240 F-A VT 3 3- PSA-3 Snubber 1-074 FI.20S 202500 SIH.227 F.A VT.3 3 . BASE RESTRAINT FI.20 202600 SIH-228 F-A VT-3 3-BASE RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 330 REVISION: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOW COOLING LINE A INSIDE COHTAINNENT FIRST SECOHD THIRD ZONE NUNBER: 1 051 ASHE PERIOD PERIOD PERIOD

       ,~ y~ wtiw~a rood.v  ~ <<~s    ~ "~ '    ""'i"'~ SEC EXANIHAT ION AREA
                                                           ~iXI'UNMARY CATGY              NDE                   OUTAGE-                 IHSTRUCTIOHS NUHBER     IDENTIFICATION                         ITEH NO NETH                  1 2  3     1  2 3'       2  3      ~~CALIBRATION BLOCK**

~ V ~ ' r s .ee < . r . eWi ~ I-10.SI-420 REF. DIJG. NO. 01-051-B 202700 SI-973-1228 F-A VT-3 3 RIGID SHAY STRUT ASSY. F1.20 202800 SI-973-6228 F-A VT-3 3- X RESTRAINT F1.20

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 331 REVISION: 0 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMM COOLING LINE B INSIDE COMTAINNEMT FIRST SECOND THIRD ZONE NUMBER: 1-052 ASNE PERIOD PERIOD PERIOD ~ . ~ ~ v,p,r yv hE ~ vif .w'w 'I v ,.Ill 0 -w ~ '4 ~ >>CPr~ ' 'Vf 8, SEC c ~ ,=

SUMMARY

EXAMINATION AREA CATGY HDE OUTAGE----.- INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH 11 2 3 1 2 3 1 2 3 <<>>CALIBRATIOH BLOCK>>>> I.10-SI-422 REF. DUG. NO. 01-052-A r 202900 S1-422. FIJ-12 C-F-1 SUR 3- TRANSITION PIECE Valve V-3651 to Pipe C5.11 VOL CTIIT.

                                                                                                                           <<<<Uf 46<<>>

203000 SI.422-FW.12-LS-A C-F.1 SUR 3-Pipe Longitudinal Seam C5.12 VOL CTHT.

                                                                                                                           *'UT-46'*

203100 SI.422-FM-12.LS.B C-F-1 SUR 3-Pipe Longitudinal Seam C5.12 VOL CTHT.

                                                                                                                           *<<UT 46<<>>

03200 Sl-422.11.SM 1 C-F-3 SUR 3 . Transition Piece, machined to Pfpe to Pipe match Sch. 20 203300 SI-422-11-S'N-1-LS-A SUR 3- Transition Piece, machined to Pipe Longitudinal Seam match Sch. 20 203400 SI-422-11-S1I-1-LS-8 SUR 3- Transitfon Piece, machined to Pipe Longitudinal Seam match Sch. 20 203500 SI.422-11-SM-2 C-F-3" SUR 3- ELBOM NATL. A403,llP304 Pipe to Elbow

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 332 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE 8 INSIDE CONTAINMENT FIRST SECOHD THIRD ZONE NUMBER: 1-052 ASME PERIOD PERIOD PERIOD p g, p g giga tt ~ %1 ) lI8rt' ~ ., 1 ~ ~ ' ScP FC vl

SUMMARY

EXAMINATION AREA CATGY HDE -----OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 *~CALIBRATIOH BLOCK** 1-10.SI-422 REF. DUG. NO. 01-052-A v 203600 SI-422-11-S1I-2-LR SUR 3-Elbow Longitudinal Seam 203700 SI-422-11.SQ-2-SR SUR 3-Elbow Longitudinal Seam 203800 SI 422- FII.13 C-F-3 SUR 3 . PIPE NATL. A358,TP304 Elbow to Pipe 203900 SI-422-FU.13.LS-A SUR 3 Pipe Longitudinal Seam 204000 SI-422-FH-13-LS-B SUR 3-Pipe Longitudinal Seam 204100 S I.422.12 SW-1A C-F-3 SUR 3-Pipe to Pipe 204200 SI.422.12-SU-1A-LS-A SUR 3-Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT'UNIT 1 PAGE: 333 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLIHG LINE B INSIDE CONTAINNEHT FIRST SECOND THIRD ZONE HUNBER: 1-052 ASNE PERIOD PERIOD PERIOD ~ ~, ~ w <<~<<+, ) " -'"'"SEC EXANIHATIOH AREA "XI'UNNARY CATGY HDE - - - - - - 0 U T A G E - - - - -- IHSTRUCTIONS NUNBER IDENTIFICATION ITEHNONEI'N ( 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK** H 4 4 k. 4 <<a 4 <<10 I-10-SI-422 REF. DWG. HO. 01-052 A 204300 SI.422-12-SW-1A-LS-B SUR 3-Pipe Longitudinal Seam 204400 SI-422.FW-14 C.F.3 SUR 3- ELBOW NATL. A403,WP304 PIPE TO ELBOW 204500 SI 422-FW-14-LR SUR 3-Elbow Longitudinal Seam 04600 SI 422 FW-14-SR SUR 3-Elbow Longitudinal Seam 204700 SI-422-13-SW-1 C.F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 204800 SI.422.13-SW-1-LS-A SUR 3 . Pipe Longitudinal Seam 204900 SI.422.13-SW-1-LS-B SUR 3-Pipe Longitudinal Seam

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 334 REVISIOH: 0 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEN1'S INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SKUTDOMN COOLING LINE B INSIDE COHTAINKENT F IRST SECOHD THIRD ZONE NUHBER: 1-052 ASKE PERIOD PERIOD PERIOD

         ~,,I tig~Il h   ~  PVVl     8   4  'L  ~  ~

SEC j'XI ~ EXAHIHAT ION AREA CATGY NDE

                                                                   -'*'UHHARY
                                                                                          -OUTAGE--                   INSTRUCTIONS

~ ~ NUHBER IDENI'IF ICAT 0 \ 0 ION

                                 \,0,,      HOtP ITEN  NO NETH            I 1 2   3    1  2  3       1 2  3      **CALI BRAT ION BLOCK**

I-10-SI.422 REF. OMG. NO. 01-052-A 205000 SI-422-13.SM.2 C.F-3 SUR 3- ELBOM NATL A403,MP304 Pipe to Elbow 205100 SI-422-13.SM-2.LR SUR 3-Elbow Longitudinal Seam 205200 SI.422-13.S'M-2-SR SUR 3-Elbow Longitudinal Scam 205300 S I.422-13-SM-3 C F-3 SUR 3- PIPE NATL'358,TP304 Elbow to Pipe 205400 SI.422.13-SM-3.LS A SUR 3-Pipe Longitudinal Seam 205500 S1-422-13-SM-3-LS.B SUR 3-Pipe Longitudinal Seam I-10-SI.422 REF. DMG. HO. 01.052-8 205600 SI.422-13-SM-4 C.F-3 SUR 3- ELBOM HATL. A403,MP304 PIPE TO ELBOM

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 335 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOMN COOLING LIHE B INSIDE COHTAINHENT FIRST SECOND THIRD ZONE HUHBER: 1-052 ASHE PERIOD PERIOD PERIOD

     ~ p%A 4 Tf ~ Lf   lh8'R  ~ ~ ...gi w  - ~    '  v  SECo'I SUHHARY EXAHINATIOH AREA                                CATGY    HDE                       -OUTAGE-----              INSTRUCTIONS NUHBER    IDENT  IF I CAT IOH                           ITEN NO NETH            1   2  3    1  2  3     1 2  3      **CALIBRATIOHBLOCK**

I, i 8 a I! 5t  !! . \ \ s. hF  ! '!,V, I

                                                                             ~    Paw 1-10 SI-422        REF. DUG. HO. 01 052-8 205700    SI-422-13-S'N-4-LR                                    SUR       3-Elbow Longitudinal Seam 205800    SI-422-13-Ql-4-SR                                     SUR      3-Elbow Longitudinal Seam 205900   SI-422.FW-15                                  C.F.3    SUR      3-                                         PIPE NATL. A358,TP304 Elbow to Pipe 06000   SI 422-Fll-15-LS-A                                     SUR      3-Pipe Longitudinal            Seam 206100    SI.422-FW-15-LS-B                                     SUR       3     .

Pipe Longitudinal Scam 206200 SI-422.14-SN-5 C-F 3 SUR 3- ELBSI HATL. A403,MP304 Pipe to Elbow 206300 SI-422-14-S'N-5-LR SUR 3-Elbow Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 336 REVISION: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE B INSIDE CON'TAINNENT FIRST SECOND THIRD ZONE NUNBER:

 .- ~ P h h hP,h hh ~

1-052 VL Ih I', h ~ i~ \ ~ ~ ASNE CCl SEC VIX h..4 ~ PERIOD

                                                                             - - - - - - 0 PERIOD       PERIOD SUNNARY EXANIHAT I OH AREA                            CATGY     NDE                        U T A G E                 INSTRUCTIONS NUNBER        IDENTIFICATION                          ITEN NO NETH           1  2  3     1  2  3     1  2  3        **CALI BRAT ION BLOCK~*

1-10-S1.422 REF. D'WG. NO. 01-052-B 206400 Sl-422-14.SW-5-SR SUR 3 Elbow Longitudinal Seam 206500 SI.422-14.SW.4 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 206600 Sl.422.14-SW-4.LS-A SUR 3-Pipe Longitudinal Seam 206700 S1-422-14.SW.4-LS-B SUR 3-Pipe Longitudinal Scam 206800 S1.422-14-SW-6 C.F-3 SUR 3 . Pipe to Pipe 206900 S I-422-14-SW-6 LS A SUR 3-Pipe Longitudinal Scam 207000 SI-422-14-SW-6.LS-B SUR 3-Pipe Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 337 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE B INSIDE CONTAIHMEHT FIRST SECOND THIRD 1-052 PERIOD PERIOD PERIOD ZOHE NUMBER: Ah ASME SEC:"XI " "

SUMMARY

EXAMINATION AREA CATGY HDE ------OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCI(>>>> 1-10-SI-422 REF. DUG. HO. 01-052 B 207100 SI.422-FW-16 C.F-3 SUR 3- ELBSI NATL. A403,NP304. Elbow Pipe to Elbow (77) A-403, HP-403 welded, IBP CTMT 207200 SI-422 FN-16-LR SUR 3-Elbow Longitudinal Seam CTMT 207300 SI.422.FH.16-SR SUR 3-Elbow Longftudinal Seam CTMT 07400 SI.422.15.SII-1 C-F-3 SUR 3- Elbow (77) NATL. A403,llP304, Elbow to Pipe welded, IBP CTMT. 207500 SI-422 15-S'N-1-LS-A SUR 3-Pipe Longftudinal Seam CTMT. 207600 S1-422-15-SM.I-LS.B SUR 3- Long -seam not visible, length Pfpe Longitudinal Seam of long seam to be examfned fs CTHE in accordance with Code Case H-524 207700 SI-422.15-SN.2 C-F-3 SUR 3 ELBSl NATL. A403,IIP304 Pfpe to Elbow

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 338 REVISION: 0 IHSERVICE IHSPECTIOH LONG YERK PLAN CLASS 2 ALL STATUS COHPONEH'IS INSPECTIOH INTERVAL " PLAN STATUS PRESERVICE YEAR SHUTDOMN COOLING LINE B INSIDE CONTAINNENT FIRST SECOND THIRD 20NE NUHBER: 1-052 ASHE PERIOD PERIOD PERIOD -Cg' -I'f ~ t R~ SEC

SUMMARY

EXAHINAY ION AREA XI'ATGY NDE - - - - - - 0 U T A G E . - - . -- INSTRUCTIOHS NUHBER IDEHT IF ICATION ITEH HO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK*~ a ea sos I 10-SI-422 REF. DMG. NO. 01-052-B

                             ~           ~

207800 SI 422-15-SM 2-LR SUR 3-Elbow Longitudinal Seam 207900 SI-422-15-SM-2-SR SUR 3-Elbow Longitudinal Seam 208000 S I.422-15-SM-3 C-F-3 SUR 3- PIPE NATL. A358,TP304 Elbow to Pipe 208100 SI-422-15-SM-3.LS-A SUR 3-Pipe Longitudinal Scam 208200 SI-422-15-SM-3-LS.B SUR 3 . Pipe Longitudinal Seam 208300 SI-422-15-SM-4 C-F-3 SUR 3- ELBOM HATL. A403,MP304 Pipe to Elbov 208400 SI -422-15.SM-4.LR SUR 3 . Elbow Longitudinal Seam

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 339 REVI SION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING LINE B INSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-052 ASME PERIOD PERICO PERIOD

  ~ A, A                                    SEC;"XI

SUMMARY

EXAHIHATION AREA HDE

                                                     'ATGY
                                                                   ------OUTAGE                        INSTRUCTIOHS NUMBER    IDENTIFICATION                     ITEM HO METH       I  1 2  3     1  2  3     1 2  3       *~CALI BRAT IOH BLOCK~*

I-10-SI-422 REF. DWG. NO. 01-052-8 208500 SI.422.15-SW-4-SR SUR 3-Elbow Longitudinal Seam 208600 SI-422-15.SW-5 C-F-3 SUR 3- PIPE NATL. A358,TP304 ElboM to Pipe 208700 SI-422-15-SW.S.LS-A SUR 3,. Pipe Longitudinal Seam 08800 SI.422-15-S'W-5-LS 8 SUR 3 Pipe Longitudinal Seam 208900 S I -422- FW-17 C.F.3 SUR 3 . Pipe to Penetration 040 CTMT I-10-SI-422 REF. DWG. NO. 01-052-A 209300 S I -970-1248 F-A VT-3 3- PSA-3 Snubber 1.066 F1.20S 209400 SI-970-6248 F-A VT-3 3 X Restraint located in the CLAMP RESTRAIHT F1.20 trench CTMT

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT I PAGE: 340 REVISION: 0 INSERVICE IHSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOWN COOLIHG LINE B INSIDE CONTAINNENT FIRSI'ECOND THIRD ZONE NUHBER: 1-052 ASHE PERIOD PERIOD PERIOD SEC"XI'- SUHHARY EXAHIHATION AREA CATGY HDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUNBER IDENTIFICATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK"* I-10-SI-422 REF. DWG. NO. 01-052-A 209500 SI-970-6249 F-A VT-3 CLANP RESTRAINT F1.20 209600 SIH-249 F-A VT-3 3-BASE RESTRAINT F1.20 209700 SI 970-6250 F-A VT-3 3- X BOX RESTRAINT F1.20 1-10.SI.422 REF. DWG. NO. 01.052.B 209800 SIH-251 F-A VT-3 3 - - X HANGER F1.20 209900 Sl.970-1251 F-A VT-3 3- PSA.3 Snubber 1-067 F I ~ 20S 210000 SI-970-6251 F-A VT-3 3-RIGID SWAY STRUI'SSY. F1.20 210100 S I H-252 F-A VT-3 3 - - - X BASE RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 341 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANGER 1A FIRST SECOND THIRD ZONE HUHBER: 1.055 ASHE PERIOD PERIOD PERIOD 'i, ~,>, q <+v ft)'l, w>, ): '('-':t %*l a t "Iv>> SEC'XI '0'.h SUNHARY EXAHINATIOH AREA CATGY HDE - - - - - . OUTAGE - - - - -- INSTRUCTIOHS IOEHTIF!CATION **CALIBRATIOHBLOCK~* NUHBER rw s v' rr1 er, e ...s ITEN HO NETH r <<wE e+, ~ a 1aM ( 1

                                                                                 'r 2  3     1  2  3     1 2  3 REF. DWG. HO. 01-055 210200      1-2701                                        C-A       VOL      3-                                       WITH SA-240( TP-304   0.125" Flange to Body Meld                           C1.10                                                       CLAD RAB
                                                                                                                       **PL-1.5-CS-49-SLC*>>

210300 1-2702 C-A VOL 3- WITH SA-240, TP-304 0.125" BODY to TUBESHEET MELD C1.30 CLAD RAB

                                                                                                                       **PL-1.5-CS-49 SLC~*

210400 1-2741-1 C;8 SUR 3- SA-240, TP.304 0.125" CLAD. INLET NOZZLE to VESSEL MELD C2.21 VOL RAB

                                                                                                                       *~PL-1.5-CS 49-SLC**

10500 1-2741- IRS 3 Ho examination required per INLET NOZZLE INNER RADIUS Figure IMC.2500-4, nozzle is RAB not greater than 12" HPS

                                                                                                                      **PL-1.5-CS-49-SLC*~

210700 1-2742 1 C-B SUR 3- SA-240( TP-304 0.125a CLAD. OUTLET NOZZLE to VESSEL MELD C2.21 VOL RAB

                                                                                                                      **PL.1.5-CS.49-SLC**

210800 1-2742-IRS 3 Ho examination required per OUTLET'OZZLE INHER RADIUS IMC-2500-4, nozzle is not RAB greater than 12a HPS

                                                                                                                      ~*PL-1.5-CS-49 SLC*~

210900 SCHE.S1 THRU S48 3 No examination required, OUTSIDE FLANGE BOLTIHG bolting is 2" or less in RAB diameter

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 342 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERK PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOW COOLING HEAT EXCHANGER 1A FIRST SECOND THIRD ZOHE HUHBER: 1-055 ASHE PERIOD PERIOD PERIOD hapl AINE'l 0 ~ I'll+h4AlP+PSECrXI ~ SUHHARY EXAHINATIOH AREA CATGY NDE -----OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* ~ p Pl REF. DNG. NO. 01-055 210950 SCHE-H1 THRU N96 3 No examination required, OUTSIDE FLANGE NUTS bolting is 2a or less in RAB diameter

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 343 REVISION: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS CONPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANG'ER 1B FIRST SECOND THIRD ZONE NUHBER: 1 056 ASHE PERIOD PERIOD PERIOD k ~ g >>4AA Vlt " h>> ~ -" -SEC;" 'XI

                                                                       ------OUTAGE------

~ ~ 1 0 SUHNARY EXANIHATIOH AREA CATGY HDE INSTRUCTIOHS NUNBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>> REF. DMG. HO. 01 056 211000 2-2742-1 C-B SUR 3 - - - X SA-240, TP-304 0.125" CLAD-OUTLET NOZZLE to VESSEL WELD C2.21 VOL RAB

                                                                                                           **PL-1'-CS 49    SLC>>>>

211100 2-2742- I RS 3 No examination require per OUTLET NOZZLE IHHER RADIUS Figure IWC-2500.4, nozzle is RAB not greater than 12>> NPS

                                                                                                           >>>>PL-1.5-CS 49 SLC>>*

211300 2 2701 C-A VOL 3 - - - X SA-240, TP 304 0.125" CLAD Flange to Body Weld C1.10 RAB

                                                                                                           *>>PL-1.5-CS-49 SLC**

211400 2-2702 C-A VOL 3 X SA.240( TP-304 0.125" CLAD BCOY to TUBESHEET WELD C1.30 RAB

                                                                                                           *>>PL-1.5-CS-49-SLC*>>

211500 2-2741.1 C-B SUR 3 - - - - X SA-240, TP-304 0.125" CLAD ~ Inlet Nozzle to Vessel Weld C2.21 VOL RAB

                                                                                                           **PL-1.5-CS-49-SLC**

211600 2-2741-IRS 3 Ho examination required per Inlet Hozzle Inner Radius IWC-2500-4, nozzle is not RAB greater then 12" HPS

                                                                                                          **PL-1.5-CS 49 SLC>>>>

211700 SCHE-S1 THRU S48 3 Ho examination required, OUTSIDE FLAHGE BOLTS boLting is 2" or less in RAB diameter

DATE: 01/09/98 ST. LUCIE'NUCLEAR PLANT UNIT 1 PAGE: 344 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPONENTS INSPECT I OH INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMN COOLING HEAT EXCHAHGER 1B FIRST SECOND THIRD 20NE HUNBER: 1-056 ASNE PERIOD PERIOD PERIOD ~ ~ p ph 4.$ ,+c'Avt 'v 0 t: z~ 'x + ' ~ " ~'"'"i SECg XI~ SUHMARY EXAMINATION AREA CATGY NDE ------OUTAGE------ INSTRUCT IOHS HUHBER I DENT IF ICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 <<<<CAL I BRAT ION BLOCK<<<< I h 1 P% \ h Pl PP1 P ~ EO ~ 0 REF. DMG. NO. 01-056

                           .l 211750     SCHE-N1 THRU H96                                                3                                      Ho examination required, OUTSIDE FLANGE NUTS                                                                                    bolting is    2a or less fn RAB                                                                                                    diameter

DATE: 01/09/98 ST. LUCIENUCLEAR PLANT UNIT 1 PAGE: 345 REVI SION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SAFETY INJECTION TANK DISCHARGE PIPE-LOOP 1B1 FIRST SECOND THIRD ZOHE NUHBER: 1-059 ASHE PERIOD PERICO PERIOD ~ q ~ q M Nw~ ~ tJ )c, ~ t, 'v  %,.f' ~ i e 'v 'EC. Nl 0 )~ ~ SUHHARY EXAHIHAT I OH AREA CATGY NDE -----OUTAGE------ INSTRUCTIOHS NUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK

  • ni a lP h I-12-SI-103 REF O'IJG. NO. 01-059 215800 S I -103 FN-1 C-F-1 SUR 3-Valve V-3235 to Pipe C5.11 VOL 215900 S I -150- FII.1A C-F-1 SUR 3-Pipe to Valve V-3634 C5.11 VOL

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 346 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAH CLASS 2 ALL STATUS CONPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SAFETY INJECTION TANK 101 PIPING FIRST SECOND THIRD ZONE NUNBER: 1-059 ASHE PERIOD PERICO PERIOD I V i'd% Uf+k~ ~ SEC:"XI --" SUHNARY EXANIHAT ION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCT IOHS HUHBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK~* V 1-12-SI-460 REF. DMG. NO. 01 059 216200 SI.972-1243 F-A 3 Snubber 1-072 F1.20S

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 347 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SAFETY INJECTION TANK 102 PIPING FIRST SECOHD THIRD 20HE HUHBER: 1-060 ASHE PERIOD PERICO PERIOD q f ~ ~ rv~~ ~ w r .we,e wx ~ a . ~ ~ we. SOP, ECe' YI SUHHARY EXlWIHATION AREA CATGY HDE ------OUTAGE IHSTRUCTIOHS HUNGER IDENT IF I CAT IOH ITEN HO HETH i 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK *" I-12-SI.100 REF. DUG. NO. 01-060 217900 Sl-100-FW-1 C.F.1 SUR 3 Valve V-3245 to Pipe C5.11 VOL 218000 8 I.151 FM-1A C-F-1 SUR 3-Pipe to Valve V-3644 C5.11 VOL

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 348 REVISIOH: 0 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR MPSI PUMP 1A TO HEADER 1A FIRST 'ECOND THIRD ZONE NUMBER: 1-061 ASME PERIOD PERIOD PERIOD

                   ~ ~

SEC: XI

SUMMARY

EXAMINATION AREA CATGY NDE -OUTAGE INSTRUCTIONS HUMBER I DENT IF I CAT ION ITEM NO MEI'M (I 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK*~ I-3-SI-208 REF. DHG. NO. 01 061-A 218900 208-1-1P C-F-1 SUR 3- 3" 900¹ R.F U/H FLANGE, Flange MPSI Pmp 1A to Flange C5.21 VOL SO 03-13

                                                                                                       *~UT-54~*

219000 S I-208-1-SM-1 C-F-1 SUR 3 X 900¹ R F ll/H FLANGE, Flange Flange to Pipe C5.21 VOL SO-03-13 RAB

                                                                                                       ~~3"-SS-160-.434 22 SLC~*

219100 SI-208-1-SH-3 C.F.1 SUR 3 X 3"X 2" 6000¹ SOCKOLET NATL. 2" Sockolet C5.41 A182,F304 219200 S I -208-1-SM-2 C F 1 SUR 3 X ELBOI MATL. A403,UP304 Pipe to Elbow C5.21 VOL RAB tIUT 5441 219300 SI-208-FW-1 C-F-1 SUR 3 X Elbow to Valve V-3427 C5.21 VOL

                                                                                                      ~ 'UT-54+*

219350 Valve V.3427 3 No examination required, no Valve valve body welds or bolting over 2" 219400 SI-208-FW-2 C-F-1 SUR 3- 6" X 3" CONC. REDUCER Valve V-3427 to Reducer C5.21 VOL

                                                                                                      **UT 54**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 349 REVISION: 0 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS COMPONENTS

                                           'NSPECTION INTERVAL                          PLAN STATUS           PRESERVICE YEAR HPSI PUHP 1A TO HEADER IA                                                      FIRST     SECOND       THIRD 2OHE HUHBER: 1-061                               ASHE                          PERICO    PERIOD       PERIOD i ) 4,4@A                                     SEC;  XI  -
                                                                                   -. -OUTAGE- - - - --
  ~

SUHHARY EXAHINATION AREA NDE

                                                               '"'ATGY
                                                                             - - -                                INSTRUCTIONS NUHBER       IDENT I F I CATION                  ITEH NO NETH             I 1  2  3    1  2  3      1 2         *>>CALI BRAT I OH BLOCK*>>

1.6-SI-219 REF. DMG. NO. 01-061-A 219500 SI-219-1.SM-1 C-F-1 SUR 3- 6<< X 3<< CONC.REDUCER, 6<<X 6<<X Reducer to Tee C5.11 VOL 6<< M/TEE, this weld fs fnaccessfble due to permanent hanger

                                                                                                                 *>>UT 54*>>

219550 SI -871.20 F-A VT-3 3-BOX RESTRAINT F1.20 1-3-SI.219 REF. DMG. HO. 01-061-A 219600 SI.219-1-SM-2 C-F-1 SUR 3 X 6<<X 6<<X 6<< M/TEE ~ 6<< X 4<< Tee to Reducer C5.11 VOL CONC. REDUCER

                                                                                                                *>>UT   54**

I-4-SI 10 REF. DMG. NO. 01-061-A 219700 SI -219.1-SM.3 C-F-1 SUR 3- 6<< X 4<< COHC. REDUCER NATL. Reducer to Pfpe C5.11 VOL A403,MP304

                                                                                                                >>>>UT  54*>>

219800 S I -210-FM.1 C-F-1 SUR 3 X Pipe to Valve V-3655 C5.11 VOL

                                                                                                                >>>>UT-54*>>

219850 Valve V.3655 3 Ho examination required, no Valve valve body welds or bolting over 2<<

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 350 REVISION: 0 IHSERVICE INSPECTION LOHG TERM PLAN HPSI PUMP 1A TO HEADER 1A ZONE NUMBER: 1-061 INSPECTION INTERVAL ASME CLASS 2 ALL STATUS COMPONENTS FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD PRESERVICE YEAR 0

                                              -SEC:"XI                                0       4

SUMMARY

EXAMINATION AREA NDE

                                                             ""'ATGY
                                                                            ------OUTAGE------                      INSTRUCTIONS I CATION IF
                                                          'A> cow2 3 ITEN NO METH                                 2 3
                                                                                                    s2 3       **CALIBRATIONBLOCK~*

HUMBER IDENT I 1 1 1 ovs s ' a. v A4 s s dJ '4 w4 'e I-6-SI-212 REF. DWG. NO. 01-061-A 220000 SI-212.FIJ.1A C-F-1 SUR 3 - - - X 6"X 6"X 6" II/TEE NATL. Tee to Pipe c5.11 VOL A403,IIP304

                                                                                                                   *~UT-38*~

220100 SI-212-FW-1 C-F-1 SUR 3 - - - X Pipe to Valve V-3656 C5.11 VOL

                                                                                                                   *~UT-38**

220120 S I H-172-V F-A VT-3 3 . - - X Support is on valve Spring Support F1.20C 220150 Valve V-3656 Ho examination required, Valve valve body welds or bolting ovel 2e 1-6-SI-105 REF. DWG. NO. 01 061-A 220200 S I -105- FN-1 C-F-1 SUR 3 - - - X Valve V-3656 to Pipe C5.11 VOL

                                                                                                                    *UT 38*@

220250 Sr-871-18 F-A VT-3 3 . RIGID SIIAY STRUT F1.20 220300 SI-105-1-SH-2 C F1 SUR 3- ELBOI NATL. A403,MP304 Pipe to Elbow C5.11 VOL

                                                                                                                  ++UT  38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 351 REVISION: 0 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS CDHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUHP 1A TO HEADER 1A FIRST SECOND THIRD ZONE HUHBER: 1-061 ASHE PERIOD PERICO PERIOD

                                            'SEC. "Xl SUNHARY EXAHIHAT IOH AREA                     CATGY    NDE       ------OUTAGE                         INSTRUCTIOHS NUMBER    IDENT  IF ICATION                   ITEN HO NETH    I 1  2    3   1  2  3      1 2         ~~CALIBRATION BLOCK~*

1-6-SI-105 REF. DMG. NO. 01-061-A I 220400 S1-105.1-SM-1 C-F-1 SUR 3- ELBOM NATL. A403,MP304 Elbow to Pipe C5.11 VOL

                                                                                                     *~UT-38**

220500 Sl-105-1-SM-7 C-F-1 SUR 3-Pipe to Pipe C5.11 VOL

                                                                                                     ~~UT-38**

220600 SI-105-1.SM-3 CF1 SUR 3- - - X 2e Sockolet C5.41 220620 Sl H-172 F-A VT-3 3 - - - X SPRING HAHGER F1.20C 220640 S I -871-16 F A VT-3 3-RIGID SMAY STRUT F1.20 220660 SI.871-14 F.A VT.3 3-BOX RESTRAINT F1.20 220700 S1.105-F'M-2 C-F-1 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow C5.11 VOL

                                                                                                    **UT-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 352 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUMP 1A TO HEADER 1A FIRST SECOND THIRD ZONE NUHBER: 1-061 ASHE PERIOD PERIOD PERIOD ~ 0 kl ~ 'I 4 41 ~ -. '- " '""SEC"'XI'"

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A G E - - . - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK** Y 0'0 W C I-6-SI-105 REF. DUG. NO. 01-061-A 220800 SI -105-2.SH 1 C-F-1 SUR 3 - - - X ELBSJ NATL~ A403,NP304 ELbow to Pipe C5.11 VOL

                                                                                                               **UT.38~*

220820 SIH-91 F-A VT-3 3-RIGID RESTRAINT F1.20 220840 S I -871-10 F-A VT.3 3- X RESTRAINT F1.20 220860 S IH-90 F-A VT.3 3-RESTRAINT F1.20 220880 S I -871-955 F-A VT-3 3-BOX RESTRAINT F1.20 221000 S I.105- FII-3 C-F-1 SUR 3-Pipe to Pipe C5.11 VOL

                                                                                                              **UT-38~*

I 6 SI 105 REF. DWG. NO. 01-061-B 221100 SI-105-FH-3A C.F.1 SUR 3-Pipe to Pipe C5.11 VOL

                                                                                                              *~UT-38~*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 353 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUNP 1A TO HEADER 1A FIRST SECOND THIRD ZONE HUNBER: 1-061 ASHE PER I CO PERIOD PERIOD kP h ~ lY ~ -4 45 SEC -XI SUHNARY EXAHINATION AREA CATGY HDE - OUTAGE . - - - -- INSTRUCTIONS NUMBER IDEHT I F I CATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 >>*CALIBRATION BLOCK>>" I-6-SI-105 REF. DMG. NO. 01.061-8 221140 SIH-89 F-A VT-3 3-RESTRAINT F1 ~ 20 221160 SI-871-7 F.A VT-3 3 - - - - . - X BOX RESTRAINT F1.20 221200 SI-105-3-SM.2 C-F-1 SUR 3 - - - - - - X ELBOM HATL. A403,MP304 Pipe to Elbow C5.11 VOL

                                                                                                                        >>>>UT 38>>*

221300 SI-105-3-SM.1 C-F-1 SUR 3 ELBOM NATL. A403,MP304 ElboM to Pipe C5.11 VOL

                                                                                                                       **UT.38>>*

221400 SI.105-FM.4 C.F-'I SUR 3 Pipe to Pipe C5.11 VOL

                                                                                                                       >>>>UT-38**

221500 SI.105-4-SM-2 C-F-1 SUR 3 - - - - - - X ELBOM NATL. A403,MP304 Pipe to Elbow C5. 11 VOL

                                                                                                                       **MT 38**

221600 S I.105.4-S'M-1 C-F-1 SUR 3 - - - - . X ELBOM NATL. A403,MP304 Elbow to Pipe C5.11 VOL

                                                                                                                       **UT-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 354 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUNP 1A TO HEADER 1 FIRST SECOND THIRD ZONE NUMBER: 1-061 ASNE PERIOD PER ICO PER I CO <<-4 6-t Atlg A I P ~ h h>> A SCP'l 6 ~ SUHHARY EXAMINATION AREA CATGY HDE -----OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEN HO NETH ( 1 2 3 1 2 3 1 2 3 <<ICALI BRAT ION BLOCK~* 4 e. " ~ I-6-SI-105 REF. D'MG. NO. 01-061 B 221640 SI -863-200 F-A VT-3 3 RIGID RESTRAINT F1.20 221650 SI -863-200 IA C-C SUR 3- Verify existance Integral Attachment C3.20 221660 SI -863.202 F-A VT-3 3-BOX RESTRAINT F1.20 I 6-SI-128 REF. D'WG. NO. 01 061 B 221700 SI -128-FII-1 C-F-1 SUR 3 Pipe to Pipe C5.11 VOL

                                                                                                                   **UT-38~~

221800 S I-128-1.S'N-6 C.F-1 SUR 3-SOCKOLET C5.41 221900 SI-128-1-SW-4 C-F-1 SUR 3-SOCKOLET C5.41 221950 S I H-86 F-A VT.3 3-CLEVIS HANGER F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 355 REVISION: 0 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS INSPECT IOH INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ZONE NUMBER: 1-061 1 l<ltl p+\6%APV C't1'I,

                     ~                    """

ASME SEC. XI " PERIOD PER IOO PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCT IOHS NUMBER IDENT I F ICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 ~~CAL IBRATIOH BLOCK~* i I-6-SI-128 REF. DUG. HO. 01-061-B 222000 S I-128-1.SN-8 C-F-1 SUR 3-Pipe to Pipe C5.11 VOL ktUT 384* 222020 Sl-863-2040 F-A VT-3 3-BOX RESTRAIHT F1.20 222040 SIH-85 F.A VT.3 3-CLEVIS HANGER F1.20 222060 S I.863-207 VT.3 3 - - - . - - BOX RESTRAINI'.A F1.20 X 222100 S I -128-1-SH-3 C-F-1 SUR 3 X SOCKOLET C5.41 222200 S I-128-1-SW-1 C-F-1 SUR 3- U/CAP NATL. A403,UP304 Pipe to Pipe C5.11 VOL ABUT 54** 222300 SI-128.1-SW-2 C.F-1 SUR 3 - - - - . X NATL. A182, F304 Pipe Cap to Sockolet C5.41

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 356 REVISION: 0 INSERVICE INSPECTION LOHG TERN PLAN ~ CLASS 2 ALL STATUS CONPONEHTS INSPECT IOH INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUMP 1A TO HEADER 1A FIRST SECOND THIRD I ~ -4 ~ p%I' Ol g 4( t~~ 1-061 ZONE NUHBER:

                                    ~

ASHE SEC:"XI 'I I PERIOD PERIOD PERIOD SUHHARY EXAHIHAT I OH AREA CATGY HDE )

                                                                                      - - - - - - 0 U T A G E - - - -    --    INSTRUCI'IONS HUHBER       IDENTIFICATIOH                          ITEN   NO NETH       1   2  3    1  2  3     1    2  3        **CALIBRATIONBLOCK ~

V 1 'hOO 4 4 ( SAsaw I sJoV&v A '" a J ~A 4 v Vv I-2-SI.206 REF. DUG. NO. 01-061.C 222400 S I -206- Fll.14 C.F-1 SUR 3 . - - - - - X Tee to Pipe C5.30 222500 SI.206-SW-13C C- F-1 SUR 3 Pipe to Tee c5.30 t 222600 SI-206-SN-138 C-F-1 SUR 3-Tee to Reducing Insert c5.30 222700 Sl -206 SM 13A C-F-1 SUR 3-Tee to Pipe C5.30 222800 SI-206.SW-13 C.F 1 SUR 3-Pipe to Elbow C5.30 222900 SI-206-SM.2 C F 1 SUR 3-ElboM to Pipe C5.30 223000 SI-206.SN-11 C-F-1 SUR 3-Pipe to Elbow C5.30

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UHIT 1 PAGE: 357 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN t CLASS 2 ALL STATUS COKPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUKP 1A TO HEADER 1A FIRST SECOHD THIRD ZONE NUKBER: 1-061 ASKE PERIOD PERIOD PER I CO

                               .-.~ r; ~.>.SEC+~,XI ..i;~ ~

SUKKARY EXAKINATIOH AREA CATGY HDE -OUTAGE- - -- -- INSTRUCTIONS NUKBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>>

                       <<g << <<<< <<<<      tla        <<r.    <<  5'     <<         %<<r<<<<

I-2-SI-206 REF. DWG. HO. 01-061-C 223100 SI-206-SM<<10 C-F 1 SUR Elbow to Pipe C5.30 223200 SI.18-H1 F-A VT-3 3-Support F1.20 223300 SI-206-SM-9 C-F-1 SUR 3-Pipe to Restricting Orifice C5.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 358 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR NPSI PUHPS 1B S 1C TO HEADER B FIRST SECOND THIRD ZONE NUHBER: 1-062 ASNE PERIOD PERIOD PERIOD 1 "4 g~>> &g h ~ - 'SEC;"XI SUNHARY EXAHIHAT ION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIOHS NUHBER IDENT IF ICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>> I-3-SI-211 REF. DUG. NO. 01-062-A 224200 211-11-1P C-F-1 SUR 3- VerIFy thickness and PUNP 1B TO FLANGE S0-03-14 C5.21 VOL calibration block prior to 8 I 3 II examination

                                                                                                                       <<*To be determined' 224300     S I -211-11-SM-1                         C-F-1    SUR     3-FLANGE       S0.03-14  TO  PIPE          C5.21    VOL BI3II 224400     SI-211-11-SM-3                           C.F.1    SUR     3
              ,2"   BRANCH CONNECTION                   C5.41 8 l3ll 224500    S I -211-11-SM-2                          C.F 1    SUR     3         -     - - -        X  ~-           ELBSl NATL. A403,TP304 Pipe to Elbow                             C5.21   VOL
                                                                                                                      <<*3" SS-160-.434-22-SLC**

224600 SI-21I-FW.21 C-F-1 SUR 3 Elbow to Valve V-3414 C5.21 VOL 224650 Valve V-3414 3 Ho examination required, no Valve valve body welds or bolting greater than 2" 224700 SI-211-F'N.22 C-F-1 SUR 3 Valve V-3414 to Pipe C5.21 VOL

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 359 REVI S ION: 0 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUNPS 1B 8 1C TO HEADER B FIRST SECOND THIRD ZONE HUHBER: 1-062

        %A %APVIP" SUNNARY EXAHIHATION AREA
                        /JP 9      '%f        l ASHE SEQ~ XI CATGY    NDE PERICO
                                                                      - - - - - - 0 PERIOD U T A G E PERIOD
                                                                                              - - - - --     INSTRUCTIONS HUHBER     IDENTIFICATION                        ITEM NO NETH     I   1  2  3     1  2  3     1  2  3       ~~CALIBRATION BLOCK~*

1-3-SI-211 REF. DUG. NO. 01-062-A 224750 S I -871.59 F-A VT-3 3-BOX RESTRAINT F1.20 224800 SI-211-12.SH-1 C-F-1 SUR 3- ELBOI HATL. A403,TP304 Pipe to Elbow C5.21 VOL 225000 SI-211-12.SM.2 C F-1 SUR 3. ELBOM NATL. A403,TP304 Elbow to Pipe C5.21 VOL 225100 S I-211. Fll.22A C-F.1 SUR 3-Pipe to Pipe C5.21 VOL 225200 SI-211-12-SW.3 " C.F.1 SUR 3- ELBOW HATL. A403,TP304 Pipe to Elbow C5.21 VOL 225300 SI.211-12-SH-4 C F 1 SUR 3 . PIPE NATL. A312,TP304 Elbow to Pipe C5.21 VOL 225320 SI-871-55 F-A VT-3 3 RIGID SHAY STRUT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 360 REVISIOH: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION IH1'ERVAL PLAN STATUS PRESERVICE YEAR HPSI PUHPS 1B 8 1C TO HEADER B FIRST SECOND THIRD

  =

ZOHE NUHBER: 1-062 ASME PERIOD PER I CO PERIOD A,lV Al * ~ SEC-. SUHHARY EXAHI NATION,AREA XI'ATGY HDE - OUTAGE- INSTRUCI'IOHS NUHBER IDENTIFICATION ITEM N NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-3-Sl-211 REF. DHG. NO. 01-062-A 225340 Sl-871-550 F-A VT-3 3-RIGID SHAY STRUT F1.20 225360 S I H-162 F-A VT3 3 SADDLE RESTRAINT F1.20 225400 SI-211-12-SW-5 C-F.1 SUR 3- ELBOM NATL. A403,TP304 Pipe to Elbow C5.21 VOL 225600 Sl-211.FH-23 C-F.1 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe C5.21 VOL 225620 SIN-161 F-A VT.3 3-RESTRAINT F1.20 225640 S I -871-48 F-A VT-3 3-RIGID SHAY STRUT F1.20 225660 SIH-160 F-A 'T-3 3-BOX RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 361 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COKPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR NPSI PUKPS 1B B 1C TO HEADER B FIRST SECOND THIRD ZONE HUKBER: 1-062 ASKE PERIOD PERIOD PERIOD h SUKKARY EXAKIHATIOH AREA

                                       '-~~SEC;-XI'"-'ATGY NDE         - - - - - - 0 U T A G E - --          IHSTRUCTIONS NUKBER    IDENTIFICATION                         ITEN HO NETH       (

1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> tt I J ~ \ 1-3-SI-211 REF. DUG. HO. 01-062-A 225700 S I -211- FH-4 C-F.1 SUR 3- ELBSl NATL. A403,TP304 Pipe to Elbow C5.21 VOL 225800 SI-211-13-SW-1 C-F.1 SUR 3- X Calibration block is free unit Elbow to Pipe C5.21 VOL 1 inventory 1 I 10II

                                                                                                             >>>>3".SS-160-.434-22-SLC**

225900 SI-2II-FW.6 C.F.1 SUR 3- ELBOM NATL. A403,TP304 Pipe to Elbow C5.21 VOL 26000 SI-211.FM-7 C-F-1 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe C5.21 VOL 226100 SI-211-FII-8 C-F-1 SUR 3- ELBOM NATL. A403,TP304 Pipe to Elbow C5.21 VOL 226200 SI-211-FW-9 C-F-1 SUR 3 PIPE NATL. A312,TP304 Elbow to Pipe C5.21 VOL 226220 SIH.254 F.A VT-3 3-RES'TRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 362 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUMPS 1B & 1C TO HEADER B FIRST , SECOND THIRD 20NE NUMBER: 1 062 ASME PERIOD PERIOD PERIOD SEC XI

SUMMARY

EXAMINATION AREA CATGY HDE ------OUTAGE------ INSTRUCTIONS NUMBER IDENT IF ICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRAT IOH BLOCK** I-3-SI-211 REF. DNG. NO. 01-062-A 226240 S I H-160A F-A VT-3 3-BASE RESTRAINT F1.20 226300 S I-211 FH-10 C-F-1 SUR 3- ELBSI NATL~ A403, TP304 Pipe to Elbow CS+21 VOL 226400 SI-211-FN.11 C-F-1 SUR 3- PIPE MATL. A312,TP304 Elbow to Pipe C5.21 VOL 226450 S I -871-742 F.A VT-3 3 . RIGID SHAY STRUT F1.20 226500 SI-211-FII.12 C-F-1 SUR 3 - - - X Calibration block is from unit Pipe to Elbow C5.21 VOL 1 inventory 2 I6ll

                                                                                                     ~*3"-SS.160-.434-22-SLC~~

226600 S I -211- Fll-13 C-F-1 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe C5.21 VOL 226700 SI-211-FII ~ 14 C-F-1 SUR 3 - - - X ELBSl NATL. A403,TP304 Pipe to Elbow C5.21 VOL

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 363 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUMPS 1B 8 1C TO HEADER 8 FIRST SECOND THIRD ZONE NUMBER: 1-062 ASME PERIOD PERICO PERICO SEC XI""

SUMMARY

EXAMIHATIOH AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- IHSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-3 SI-211 REF. DWG. NO. 01-062-A 226800 S I -211- FM-15 C-F-1 SUR 6" X 3" CONC. REDUCER Elbow to Reducer C5.21 VOL 304 NATL'403,ln I-6-SI-213 REF. DWG. NO. 01-062-A 226900 S I -213-1.SH-1 C.F.1 SUR 3- 6" X 3a CONC. REDUCER~ 6" X 6a Reducer to Tee C5.11 VOL X 6a TEE; This weld is inaccessible due to a permanent hanger

                                                                                                             **UT 54+*

226920 SI-871-70 F-A VT3 3-BOX RESTRAINT F1.20'26950 SI-213-FII.1 C-F-1 SUR 3 - - - X Verify thickness and Tee to Valve V-3654 C5.11 VOL calibration block prior to examination, weld has extremely limited access for UT examination

                                                                                                             *~UT.54~~

227000 SI-213-1-S'N-2 C-F-1 SUR 3 X 6" X 4" CONC. REDUCER, 6" X 6a Tee to Reducer C5.11 VOL X 6" TEE

                                                                                                            **UT-54**

227100 SI-213-1-SIJ.3 C-F-1 SUR 3 - - - X 6" X 4" CONC, REDUCER NATL. Reducer to Pipe C5.11 VOL A403,IIP304 tkUT 541*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 364 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEN'IS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUHPS 18 K 1C TO HEADER B FIRST SECOND THIRD ZONE HUHBER: 1-062 ASHE PERIOD PERIOD PERIOD SEC:"XI'ATGY SUHHARY EXAHINATIOH AREA NDE - - - - - - 0 U T A G E- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO METH ( 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK** I 4-SI-210 REF. DMG. NO. 01.062.A 227120 S I H-159 F A VT-3 3-SLIDIHG BASE SUPPORT F1.20 227140 S I -871-67 F A VT3 3 SLIDIHG BASE SUPPORT F1.20 227200 S I -210- FM.5 C-F-1 SUR 3 X PIPE TO VALVE V-3653 C5.21 VOL I 4 SI-210 REF. DMG. NO. 01-062-8 227300 Sl-210-FM.4 C.F.1 SUR 3 - - - X VALVE V-3653 TO PIPE C5.21 VOL eaUT 61** 227400 S I -210-2-SM-9A C-F-1 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow C5.21 VOL RAB 227500 SI-210-2-SM-BA C.F-1 SUR 3- PIPE HATL A312, TP304 Elbow to Pipe C5.21 VOL 227600 Sl-210-FM-10 C.F-1 SUR 3- ELBOM HATL. A403,MP304 Pipe to Elbow C5.21 VOL

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 365 REVISIOH: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUMPS 1B & 1C TO HEADER B F IRST SECOND THIRD ZOHE NUMBER: 1.062 ASME PERIOD PERIOD PERIOD Al( <<P ~ -SEC."41"

SUMMARY

EXAMIHATION AREA CATGY HDE OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH [I 2 3 1 2 3 1 2 3 *~CALIBRATIOH BLOCK

  • I-4.SI-210 REF. DUG. HO. 01-062-B 227700 Sl -210-FM.9 C-F-1 SUR 3- 4" X 3" CONC. REDUCER NATL~

Elbow to Pipe C5.21 VOL A403,llP 304 227750 Sl.871-40 F-A VT-3 3-RIGID SHAY STRUT F1.20 227800 SI-210-FH-7 C-F-1 SUR 3- 4a X 3a CONC. REDUCER NATL. Pipe to Tee C5.21 VOL A403,UP 304 I-3-SI.209 REF. DUG. NO. 01-062-B 228350 Valve V.3405 3 No examination required, no Valve valve body voids or bolting

             .7'11"                                                                                    greater than 2" 228400     SI-209 Fll-2                       C-F-1    SUR    3 -   - -     -             X           Calibration block is from unit Valve V-3405 to Pipe               C5.21   VOL                                             1 inventory
                                                                                                       **3".SS-160..434-22-SLC**

228600 SI-209.Fll.3 C-F-1 SUR 3 - - - - - - X 4" X 3" conical reducer, Pipe to Reducer C5.21 VOL calibration block is from unit 1 inventory

                                                                                                       ~~3"-SS-160-.434-22-SLC*~

1-4 SI-210 REF. DUG. NO. 01-062-B 228700 S 1.210. FW.B C-F-1 SUR 3 - - - - - . X 4u X 4a X 4a Il/TEE~ 4<< X 3 Reducer to Tee C5.21 VOL CONC. REDUCER

                                                                                                       **UT-61**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 366 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL ~ PLAN STATUS PRESERVICE YEAR NPSI PUHPS 1B & 1C TO HEADER B FIRST SECOND THIRD ZONE NUHBER: 1-062 ASHE PERIOD PERIOD PER I CO ~ Q9 k, f -SEC: XI SUHHARY EXAMINATION AREA CATGY NDE -- - - -OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETN I 1 2 3 1 2 3 1 2 3 <<<<CALIBRATION BLOCK

  • I-4-SI-210 REF. DWG. NO. 01-062-B 228800 SI-210-FW-6 C-F 1 SUR 3- 4" X 4" X 4" W/TEE HATL.

Tee to Pipe C5.21 VOL A403,1IP304 228820 S I -871-38 F-A VT-3 3-RIGID SWAY STRUT F1.20 228840 SI -871-37 F-A VT3 3-RIGID SWAY STRUT F1.20 228900 SI-210-2-SW-2 CF1 SUR 3- ELBOW NATL. A403,WP304 Pipe to Elbow C5.21 VOL 229000 SI-210-2-SW-1 C-F.1 SUR 3- PIPE HATL. A312,TP304 Elbow to Pipe C5.21 VOL 229100 SI-210-2-SW-11 C-F-1 SUR 3 . ELBOW HATL. A403,WP304 Pipe to Elbow C5.21 VOL 229200 SI-210-2-SW-14 C F 1 SUR 3- PIPE HATL. A312,TP304 Elbow to Pipe C5.21 VOL

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 367 REVISION: 0 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUMPS 1B 8 1C TO HEADER B FIRST SECOND THIRD ZONE HUMBER: 1-062 ASME PERICO PERICO PERICO "~ '}}AQ+y+ ia}} op%'), %>,.vt I

                              ~ "h*.uA'. v q" t      ECQl YI i ir
                                                 ." Se}                r   ~

SUMMARY

EXAMIHATIOH AREA CATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 <<<<CAL I BRAT ION BLOCK<<<<

               .e 'h                                                 A I-4-SI-210   REF. DUG. NO. 01-062.8 229300   SI 210-FN.3                         C F-1     SUR       3-      - -      X                         ELBSI MATL. A403,llP304 Pipe to Elbow                       C5.21     VOL
                                                                                                                   *<<UT 61**

229350 SI-871-32 F A VT-3 3-RIGID SMAY STRUT F1.20 229400 SI-210-1-SW-3 C F 1 SUR 3- PIPE NATL. A312,TP304 Elbow to Pipe C5.21 VOL

                                                                                                                                            '29500 SI -210-1.SU-2                      C-F-1     SUR       3   .                                      ELBSI NATL. A403,MP304 Pipe to Elbov                        C5.21     VOL 229600  SI-210-1-51I.1                       C   F.1   SUR       3                                          PIPE NATL. A312,TP304 Elbow   to Pipe                      C5.21     VOL 229620   S I -871-29                          F-A       VT.3 3        .

SLIDING BASE SUPPORT F1.20 229640 S IH-156 F-A VT3 3-BASE RESTRAINT F1.20

DATE! 01/09/98 ST. LUCIE NUCLEAR PLAHI'NIT 1 PAGE! 368 REVISION! 0 INSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 2 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUMPS 1B 8 1C TO HEADER B FIRST SECOND THIRD ZONE NUNBER! 1 062 ASKE PERICO PERIOD PERIOD ~ - gA A'1 dl SEC;" XI'" J 4 ' 'I SUHNARY EXANIHATION AREA NDE

                                                                'ATGY
                                                                            - - - - - - 0 U T A G E - - - - --      INSTRUCTIOHS HUNBER    IDENTIFICATION W    Ol 0'4  I    4 '

ITEN HO NETH

                                                                    '5 I 1 2  3
                                                                                         <<'A' 2  3
                                                                                                      ' '0 1  2  3 1
                                                                                                                       **CALIBRATIOHBLOCK<<<<

1-4-SI-210 REF. DMG. NO. 01-062-B 229700 SI-210 FM-2 C-F-1 SUR 3- Inaccessible for examination PIPE TO VALVE V-3655 C5.21 VOL due to U-Bolt on SIH-156 can not be removed without removing permanent electrical conduit and support grout

                                                                                                                       <<<<UT-61<<<<

I-6.SI 213 REF. DMG. NO. 01-062-C 229850 SIH-111V F-A VT-3 Supports valve Spring Support F1.20C 229900 SI-213-FM 2 C-F 1 SUR 3- - - X VALVE V.3654 TO PIPE C5.11 VOL

                                                                                                                      **UT-38<<<<

229950 SI-871.78 F-A VT-3 3-RIGID SMAY STRUT F1.20 230000 SI-213-2-SM-1 CF1 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow C5.11 VOL

                                                                                                                      **UT 38<<<<

230100 SI -213-2-SM-2 C-F-1 SUR 3-Elbow to Elbow C5.11 VOL

                                                                                                                      **MT-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 369 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAH STATUS PRESERVICE YEAR HPSI PUMPS 1B 8 1C TO HEADER B FIRST SECOND THIRD ZONE HUHBER: 1.062 ASHE PERIOD PERICO PERIOD

         ,>>ill( 4 lB,%   I~ IA'lJ ',ll W          .-""""SEC""XI"" -'

SUMMARY

EXAMINATION AREA CATGY HDE - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>> ~ >> ) ~ 4 I-6-SI-213 REF. DIJG. NO. 01-062-C 230200 SI-213.2-QI-3 C-F-1 SUR 3- PIPE MATL. Elbow to Pipe C5.11 VOL A312,TP304'>>UT-38*>> 230300 S I.213.2.SW.4 C-F-1 SUR 3- ELBSI NATL. A403,llP304 Pipe to Elbow C5.11 VOL

                                                                                                                        *>>UT  38**

230400 SI.213-FN.3 C-F-1 SUR 3- 0 PIPE NATL. A312,TP304 ElboH to Pipe C5.11 VOL 230420 SIH.110 F.A VT-3 3-RESTRAINT F1.20 230440 SI-871.835 F-A VT-3 3 BOX RESTRAINT F1.20 230460 SI-871-84 F-A VT-3 3-RIGID SHAY STRUT F1.20 230500 Sl-213-3-SII-2 C-F-1 SUR 3 - - . - - - X Verify thfckness and Pipe to Pipe C5.11 VOL calibration block prior to 7 I 6 II examination

                                                                                                                       >>>>UT  54>>*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 370 REVI SION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR HPSI PUHPS 1B 8 1C TO HEADER B F SECOND THIRD IRSI'ERIOD ZONE NUHBER: 1-062 ASHE PERIOD PERIOD ~ %PI ~ I p 4 ~

     ~           ~%   IV                       .SECc  ~

SUHHARY EXAHINATIOH AREA XI'ATGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> I-6-SI-213 REF. DMG. NO. 01-062-C 230550 S I.871.85 F-A VT-3 3-BOX RESTRAINT F1.20 230600 Sl-213-3-5'M.1 C-F-1 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow C5.11 VOL

                                                                                                                    **UT-38>>*

230700 Sl-213-F'M-4 C-F-1 SUR 3- PIPE HATL. A312,TP304 Elbow to Pipe C5.11 VOL

                                                                                                                    **UT.38**

230800 SI-213-4.SM-2 C.F-1 SUR 3 - - - - . X Verify thickness and Pipe to Elbow C5.11 VOL calibration block prior to 7 I 6ll examfnatfon

                                                                                                                   **UT.54**

230900 SI.213.4-SM-1 C.F-1 SUR 3- X Verify thickness and Elbow to Pipe C5.11 VOL calibration block prior to I I 6ll examination

                                                                                                                   *>>UT.54>>>>

230950 Sl-871-905 F-A VT-3 3-RIGID SMAY STRUT F1.20 231000 SI -213- FM-5 C-F-1 SUR 3-Pfpe to Pipe C5.1'I VOL

                                                                                                                   <<>>UT-38>>>>

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 371 REVISIOH: 0 INSERVICE INSPECTION LONG TERN PLAH CLASS 2 ALL STATUS COMPONENTS INSPECTIOH IHTERVAL PLAN STATUS PRESERVICE YEAR NPSI PUMPS 1B 8 1C TO HEADER 8 FIRSI'ECOND THIRD ZONE NUMBER:

           %h  %,l       1-062

SUMMARY

EXAHIHAT ION AREA

                               >','%,'0 vp h l +wan' ASNE SEC< .XI CATGY 6 two HDE r

PERIOD'ERIOD

                                                                                 - - - - - 0 U T A 0 E PERIOD
                                                                                                       - - - - --     INSTRUCTIONS NUMBER     IDEHTIFICATIOH                            ITEN NO NETH         ( 1  2  3     1  2  3     1  2  3       **CALIBRATIOHBLOCK~*

~ 6 4% r ~ P,'. 8 .0 I~ ip  % t ~ 'A %N I-6.SI-213 REF. DUG. HO. 01-062-C 231020 SI.871-93 F.A VT-3 3-BOX RESTRAINT F1.20 231040 SI-871 9955 F-A VT-3 3-BOX RESTRAINT F1.20 231060 S I -871-96 F-A VT-3 3-RIGID SHAY STRUT F1.20 231100 S I -213-5-SW.3 C-F-1 SUR 3- ELBSl NATL. A403,MP304 Pipe to Elbow C5.11 VOL

                                                                                                                    *~UT-38**

231200 SI-213-5-SW-2 C-F-1 SUR 3- PIPE HATL- A312,TP304 Elbow to Pipe C5.11 VOL

                                                                                                                    **UT-38**

231300 SI-213.5.SW-1 C-F-1 SUR 3- ELBSJ NATL'403,HP304 Pipe to Elbow C5.11 VOL

                                                                                                                    **UT-38**

231400 S I -213- FII.6 C-F-1 SUR 3- PIPE HATL. A312,TP304 Elbow to Pipe C5.11 VOL

                                                                                                                    ~~UT-38**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 372 REVI SION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR MPSI PUMPS 1B 8 1C TO HEADER B FIRST SECOND THIRD ZONE NUMBER: 1-062 ASME PERIOD PERIOD PER I CO

                                               -SEC: XI

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK>>>> 1-6-SI-213 REF. DN. NO. 01-062-C

                                 ~ ~

231500 S I -213-6.SM.3 C-F-1 SUR 3-Pipe to Elbow C5.11 VOL

                                                                                                          >>*UT-38>>>>

231600 SI.213-6-SIJ-2 C-F-1 SUR 3 - - - - - - X VerifY thickness and Elbow to Pipe C5.11 VOL calibration block prior to 0 I 9 II examination

                                                                                                          <<>>UT-54>>>>

231650 S I -871-103 F-A VT-3 3-BOX RESTRAINT F1.20 231700 S I -213.6.SM.1 C.F-1 SUR 3-Pipe to Pipe C5.11 VOL

                                                                                                         **UT-38**

231750 S I -863-252 F-A VT-3 3-RIGID RESTRAINT F1.20 231760 S1.863.252 IA C-C SUR 3-Integral Attachment C3.20 I-6-SI-220 REF. DWG. NO. 01-062-C 231800 S1-220-FW.1 C-F-1 SUR 3-Pipe to Pipe C5.11 VOL

                                                                                                         **UT-38**

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 373 RE VISION: 0 INSERVICE INSPECTION LONG TERN PLAH CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR KPSI PUHPS 1B 8 1C TO HEADER B FIRST SECOND THIRD ZONE NUHBER: 1-062 ASHE PERICO PERIOD PERIOD ys, weSEC Xl e,

                                                           ~    ~  ~ ~i   ~

SUHHARY EXAHIHATIOH AREA NDE 'ATGY OUTAGE------ INSTRUCTIONS NUHBER IDEHT IF I CAT IOH ITEN NO NETH I 1 2 3 1 2 3 1 2 3 ~~CALI BRATIOH BLOCK~i I 6-Sl-220 REF. DlJG. NO. 01-062-C 231850 S I.863-2495 F-A VT-3 3-BOX RESTRAINT F1.20 231900 SI-220.1.SN-6 C-F-1 SUR 3 - . - - - . X 2II SOCKOLET C5.41 7 I 6 II 232000 Sl-220.1.SM-5 C-F-1 SUR 3 - - - - - X 2II SOCKOLET C5.41 7 I 6ll 232020 Sl -863.248 F-A VT-3 3-BOX RESTRAINT F1.20 232040 S I H-102 F-A VT.3 3-CLEVIS HANGER F1.20 232060 Sl-863-246 F A VT-3 3-BOX RESTRAINT F1.20 232100 SI-220-1.SM.3 C-F-1 SUR 3-2" SOCKOLET C5.41

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 374 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAH CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUMPS 1B 8 1C TO HEADER B . FIRST SECOHD THIRD ZOHE HUHBER: 1-062 ASHE PERIOD PERIOD PERIOD SEC;-XI

                                                                     --- - --OUTAGE

~,' SUNNARY EXAHIHATIOH AREA NUMBER IDENT

              <<<<<<0            

IF I CAT IOH 4 '<<<<'<<<<<< CATGY ITEN NDE HO NETH i 1 2 3 1 2 3 1 2 3 INSTRUCTIONS

                                                                                                          ~~CALIBRATION BLOCK**

I-6-Sl-220 REF. DMG. NO. 01-062-C I 232200 S I -220-1-SM-1 C-F-1 SUR 3- CAP NATL. A403,MP304 PIPE-TO-CAP C5.11 VOL

                                                                                                          **MT 54**

232300 Sl-220-1-SM-2 C-F-1 SUR 3-2" Sockolet C5.41 I-2-SI-205 REF. DMG. HO. 01-062-0 232400 SI-205-FM-20 C-F-1 SUR 3- X Sockolet to Pipe C5.30 ( )8J6II 232500 SI-205-SM.19C C-F 1 SUR 3-Pipe to Tee C5.30 232600 SI-205-S'M-19B C-F-1 SUR 3- X Tee to Reducing Insert C5.30 232700 Sl -205-SM.19A C-F-1 SUR 3-Tee to Pipe C5.30 232800 Sl -205-SM-19 C-F-1 SUR 3-Pipe to Elbow C5.30 ( )313II

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 375 REVISION: 0 INSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR HPSI PUMPS 1B B 1C TO HEADER B F IRST SECOND THIRD ZONE HUHBER: 1-062 ASHE PER I CO PERICO vh +hh'Svvh tl't Vl ' h i v SCAN'I EC PERIOD SUHHARY EXAHIHAT I ON AREA CATGY NDE OUTAGE - - - - -- INSTRUCTIOHS NUHBER IDENTIFICATION ITEN NO HETH ) 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* vv v v a I-2-SI 205 REF. DUG. NO. 01-062-D 232900 Sl 205.SM 18 C-F-1 SUR 3-Elbow to Pipe C5.30 ( )3 l6ll 233000 S I -205-Sll.17 C-F.1 SUR 3- E Pipe to Reducing Coupling C5.30 ( )3 I6II

DATE: 01/09/98 .ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 376 REVISION: 0 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL'AIN PLAH'TATUS PRESERVICE YEAR STEAM LINE 1A1 IHSIDE CONTAINMENT FIRST SECOND THIRD ZOHE NUMBER: 1-063 ASHE PERIOD PERIOD PERIOD ~ 'I V 1(J Il . '~ .SEC: Xl SUHMARY EXAHIHAT ION AREA CATGY HDE ------OUTAGE------ IHSTRUCTIOHS NUMBER IDENTIFICATIOH ITEH NO HETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK*~ I 36 MS-52 REF. DMG. NO. 01-063 236400 4.114-1A 3 Meld is scheduled to be S/G NOZZLE-TO EXT. PIECE removed from service during steam generator replacement

                                                                                                                    **UT-45**

236600 HS-52-FM 1 3 Meld will be removed fram S/G Ext. Piece to Elbow service during steam generator replacement, PC/H 151-193

                                                                                                                    *IUT 4500 236640        1.SGA-'M173                        C-F-2              SUR     3-Steam Drun Head   to Safe-End      C5.51              VOL
                                                                                                                    **TO BE DETERMINED~~

236650 HS-52-F'M.2000 C-F-2 SUR 3 - - - - . - X Safe-End to Elbow C5.51 VOL

                                                                                                                   *iUT 45++

236700 HS.52.FM-1-LR C-F-2 SUR 3-Elbow Longitudinal Seam C5.52 VOL

                                                                                                                   *iUT 454k 236800       HS-52-FM-1-SR                      C.F.2               SUR Elbow Longitudinal Seam            C5.52               VOL
                                                                                                                   **MT 454t 1.34-MS-28    REF. DMG. NO. 01-063 236900       HS-28.1-SM-1                       C-F.2               SUR    3  . - -      - - -       X Elbow to Reducer                   C5.51               VOL
                                                                                                                   **UT-45~*

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 377 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPONEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAN LINE 1A1 INSIDE CONTAINNENT FIRST SECOND THIRD 2ONE NUNBER: 1 063 ASME PERIOD PERIOD PER I CO SEC "'XI" SUNNARY EXAHIHATION AREA CATGY NDE - - - - - - 0 U T A G E - -- INSTRUCTIONS HUHBER IDEHTIFICATIOH ITEN HO NETH 1 2 3 1 2 3 1 2 3 *~CALIBRATIOH BLOCK

  • I-3C-MS.28 REF. DWG. NO. 01-063 237000 HS-28-1.SM-1-LS-A C.F.2 SUR 3-REDUCER LONG SEAH C5.52 VOL
                                                                                                  **UT-/5**

237100 HS-28.1-SM-1-LS-B C-F-2 SUR 3-REDUCER LONG SEAN C5.52 VOL

                                                                                                  **UT.g5**

237200 NS-28-1-SN-2 C-F-2 SUR 3- PIPE NATL. A155,KC65 Reducer to Pipe C5.52 VOL

                                                                                                 *OUT $ 54*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 378 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR MAIN STEAM LIHE 1A1 INSIDE CONTAINMEHT SUPPORTS FIRST SECOHD THIRD ZOHE NUMBER: 1-063 ASME PERIOD PERIOD PERIOD bl ~ .. -SEC;"XI

                                       ~

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E- IHSTRUCTIOHS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-3C-MS-28 REF. DUG. HO. 01-063 237250 MSH-78 F-A VT-3 3-TRUNNION F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 379 REVISION: 0 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPOKEKTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CONTAINHEHT FIRST SECOND THIRD ZONE NUHBER: 1-063 ASHE PERIOD PERIOD PERIOD ~V P l'4(L, 4 SEC." XI-

SUMMARY

EXAHIHATION AREA

                                                                  "--'ATGY HDE                ------OUTAGE---                      INSTRUCTIONS NUMBER     IDEHT IF  I CAT ION                     ITEM NO HETH             I 1  2 3     1  2  3      1 2  3        *tCALIBRATION BLOCKtt 1-3C-MS.28        REF. O'IlG. HO. 01-063 237300     HSN-78 IA                               C-C      SUR            3-Integral Attachment                     C3.20 237400      HS-28   1   SM.2-LS.A                  C-F-2     SUR            3  .

Pipe Longitudinal Seam C5.52 VOL ttUT 45*t 237500 HS-28-1-SII-2.LS.B C-F-2 SUR 3-Pipe Longitudinal Seam C5.52 VOL ttUT 45*t 37600 HS-28.1.SII-4 C-F-2 SUR 3- ELBOW HATL. A234,NPB Pipe to Elbow C5.51 VOL ttUT 45tt 237700 HS-28-1-SM-4.LR C-F-2 SUR 3-Elbow Longitudinal Seam C5.52 VOL

                                                                                                                      *1UT  45**

237800 HS.28-1-SW-4 SR C.F-2 SUR 3 . Elbow Longitudinal Seam C5.52 VOL

                                                                                                                     **UT 45**

237900 HS.28-FM.l 3 llebd will be removed from Elbow to Pipe service during steam generator replacement, PC/H 151-193

                                                                                                                     **UT-45**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 380 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN 0 CLASS 2 ALL STATUS COMPOHENTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR MAIN STEAM LINE 1A1 INSIDE CONTAINMENT FIRST SECOND THIRD

   'i ZONE NUMBER:

dA 'O'Lang + Nag+ 1-063 rwr ~ ~ r,wv r ~

  • ASME SCPIt ~

PERIOD PERIOD PERIOD

SUMMARY

EXAMINATIOH AREA CATGY NDE OUTAGE------ INSTRUCTIONS IDENTIFICATION ITEM HO METH 'UMBER 2 3 2 3 2 3 **CALIBRATIONBLOCK

  • 0>>

I 1 1 1 ,,J RM ~ ~\ >> e 4 'h 444 1-34.MS-28 REF. DWG. NO. 01-063 237950 MS-28-FW-2000 C.F-2 SUR 3-Elbow to Pipe C5.51 VOL

                                                                                                                              **UT-45*>>

238000 MS.28-FW.1-LS.A C-F-2 SUR 3-Pipe Longitudinal Seam C5.52 VOL

                                                                                                                             *>>UT 45>>>>

238200 MS-28-FW-2 C-F-2 SUR 3-PIPE TO-FLOW ELEMENT C5.52 VOL

                                                                                                                             >>>>UT 45>>>>

238300 MS-28-FW-2-LS-A C-F.2 SUR 3-FLOW ELEMENT LOHG SEAM C5.52 VOL

                                                                                                                            **UT 45>>*

238400 MS-28-FW-2.LS-B C.F-2 SUR 3-FLOW ELEMENT LONG SEAH C5.52 VOL

                                                                                                                            >>>>UT  45**

238500 MS.28-FW-3 C-F-2 SUR 3-FLOW ELEMENT-TO-PIPE C5.51 VOL

                                                                                                                            >>*UT-45>>>>

238600 MSH.79 IA C.C SUR 3 . SHEAR LUGS (4) (1 1/4" T) C3.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 381 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAN LINE 1A1 INSIDE CONTAIHHENT FIRST SECOND THIRD 20NE NUHBER: 1.063 ASHE PERIOD PERIOD PERIOD .Ps@(, tv~ q (~(v r "~ ~ ~ i ieiiv'

                            ~        .< vs rc, ( ~ a     ch".rvI"i
                                                     "~$ ECo X      ~

SUHHARY EXAHIHATION AREA CATGY . NDE - - - - - - 0 U T A G E - - - - -- IHSTRUCTIONS HUHBER IDENTIFICATION ITEH HO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** Ih 4 I 4 ~ V OO W I-34-HS ~ 28 REF. DWG. HO. 01-063 238650 HSH-548.9 F-A 3 Examine in accordance with Snubber F1.20 plant procedures 238700 HSH-548.9 IA C-C SUR 3-SHEAR LUGS (8) (1 1/4" T) C3.20 238800 HS-28-FI1-3-LS.A C-F-2 SUR 3-Pipe Longitudinal Seam C5.52 VOL

                                                                                                                      *OUT 4514 2389DD    HS-28.FM.3-LS-B                          CF2      SUR      3-Pipe Longitudinal Seam                  C5.52    VOL
                                                                                                                     ~~UT-45**

239000 HS-28-3.SI1.1 C-F-2 SUR 3- ELBOII HATL. A234,IIPB Pipe to Elbow C5.51 VOL

                                                                                                                    **UT-45**

239100 HS-28-3-SII-1-LR C-F-2 SUR 3- X Elbow Longitudinal Seam C5.52 VOL

                                                                                                                    *iUT 45**

239200 HS-28-3-SM-1-SR C-F-2 SUR 3- X Elbow Longitudinal Seam C5.52 VOL

  • UT-45**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 382 REVISION: 0 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS INSPECT, ION .INTERVAL PLAN STATUS- PRESERVICE YEAR HAIM STEAN LINE 1A1 INSIDE CONTAINMENT F IRST SECOND THIRD ZONE NUHBER: 1-063 ASHE PERIOD PERIOD PERIOD g,,( pA,sais p t, ws'pr ~ ~ ~ ' to ~ e w, a, ~ ~ vl Sc'I ' SUHHARY EXAHINATION AREA CATGY MDE OUTAGE - - - - -- INSTRUCT I DMS MUHBER IDENTIFICATION ITEH NO METH 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK~* I-34-HS-28 REF. DUG. NO. 01-063 239300 HS-28-FM-4 C-F-2 SUR 3- X PIPE HATL. A155,KC65 Elbow to Pipe C5.51 VOL

                                                                                                                       **UT.45**

239400 HS-28.FH-4-LS-A C-F-2 SUR 3 - - - - - - X Pipe Longitudinal Seam C5.52 VOL

                                                                                                                       **UT 45**

239500 HS-28.Fll-4.LS-B C-F-2 SUR 3-Pipe Longitudinal Seem C5.52 VOL h

                                                                                                                       *~UT.45~*

239600 HS-28.4-SM.1 C-F-2 SUR 3-P.ipe to Pipe C5.51 VOL

                                                                                                                      *~UT 45*a 239650      HSH-80                                  F-A         VT-3 3 Spring Hanger                           F1.20C 239700      HSH-80 IA                              C C         SUR     3 INTEGRAL ATTACHHENT                    C3.20 239800      HS-28.4-SW-I.LS-A                       C.F-2       SUR    3   . - -      - - -       X Pipe Longitudinal           Seam        C5.52      VOL
                                                                                                                      **UT.45*+

DATE: 01/09/98 ~ ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 383 REVI SI OH: 0 INSERVICE INSPECTION LONG TERH PLAH CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

                                                                                                                                 \   ~

HAIN STEAN LINE 1A1 INSIDE CONTAINHENT FIRST SECOND THIRD

                                                                                                                             ~

ZOHE NUHBER: 1-063 ASHE PERIOD PERIOD PERIOD

    'I  (IV( .+ ggA       %If     fM    h      W1' ~ ~ ~

SEC EXAHINATION AREA CATGY

                                                              @X'UHHARY NDE                   OUTAGE                     INSTRUCTIONS NUMBER       IDENTIFICATION                        ITEH      NO NETH       I  1  2  3     1  2  3      1 2  3       <<*CALIBRATIOH BLOCK<<>>

~ 8 N 1-34-HS.28 REF. DWG. NO. 01-063 240000 HS-28-FH 5 C-F-2 SUR 3- X ELBOM NATL. A234,MPB-Pipe to Elbow C5.51 VOL

                                                                                                                           <<>>UT.45*>>

240050 HSH-81 F.A VT-3 3- X DUAL SPRING SUPPORT F1.20C 240100 HSH.81 IA C-C SUR 3 - - - - - - X Integral Attachment C3.20 44 I6tt 240200 HS-28-FH-5-LR C-F-2 SUR 3 - - - - - - X Elbow Longitudinal Seam C5.52 VOL

                                                                                                                          **UT 45>>>>

240300 HS-28-FH-5-SR C-F-2 SUR 3 - - - . . - X Elbow Longitudinal Seam C5.52 Vol.

                                                                                                                         *>>UT.45<<*

240400 HS-28-FH-5A C.F-2 SUR 3-Elbow to Elbow C5.51 VOL

                                                                                                                         <<<<UT 45*>>

240500 HS-28-FH-SA-LR C-F-2 SUR 3-Elbow Longitudinal Seam C5.52 VOL

                                                                                                                         <<<<UT-45<<*

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 384 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS INSPECT IOH IHTERVAL PLANSTATUS PRESERVICE YEAR HAIN STEAM LINE 1A1 INSIDE CONTAINMENT FIRST SECOND THIRD 20NE HUMBER: 1-063 PERIOD PERIOD ll '<<4 ASME PERIOD <<P << FC0 vi << Scf ~ ~ ~ <<v<<

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E INSTRUCTIONS HUHBER IDENI'IFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> I-34-MS-28 REF. DWG. NO. 01-063 240600 MS-28-FW-5A-SR C.F-2 SUR 3-Elbow Longitudinal Seam C5.52 VOL

                                                                                                          **UT-45**

240700 HS-28-5-SW-1 C.F-2 SUR 3 - - - X Elbog to Pipe C5.51 VOL

                                                                                                          *>>UT 45>>*

240800 MS-28-5.SW-1-LS-A C.F.2 SUR 3-Pipe Longitudinal Seam C5.52 VOL

                                                                                                         *>>UT 45>>*

241000 HS-28-FW.6 C.F.2 SUR 3-Pipe to Penetration III C5.51 VOL

                                                                                                         *>>UT  45**

241100 MS-28-F'W.6.LS-A C.F-2 SUR 3 . Pipe Longitudinal Seam C5.52 VOL

                                                                                                         >>>>UT-45>>>>

241200 HS-28-FW.6-LS-B C-F-2 SUR 3-Pipe Longitudinal Seam C5.52 VOL

                                                                                                         **UT-45>>*

241250 HS-28-SW C-F-2 SUR 3- Weld is inside of penetration Pipe to Flued Head C5.51 VOL and is inaccessible

                                                                                                         **O'I 45*>>

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 385 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STA TUS COMP OH EHT S INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAM LINE -1A1 INSIDE CONTAINMENT SUPPORTS FIRST SECOHD THIRD ZONE NUMBER: 1-063 ASME PERIOD PERIOD PERIOD ~ , ~ rs> ~ ~ rg,,k +,ye .~ ~ ~ ' EC0 vis ScP" X ' " r v sws'

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - .- INSTRUCTIONS HUMBER IDEHTIFICATIOH ITEM HO METH i 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~*

                                                                         '0 ~    8    1a    As%4 4           i'a    4      '

I 34.MS-28 REF. DIJG. HO. 01-063 241300 MS-548-5 F A VT-3 3-Snubber 1-034 F1.70S 241400 MSH-79 FA VT3 3-SPRING HANGER F1.20C 241500 MS-548-9 F-A VT-3 3-Snubber 1-040 8 1-041 F1.20S 241600 MS-548.10 F.A VT.3 3-RIGID SHAY STRUT F1.20 241900 MS-548-16A F-A VT-3 3-Snubber 1-039 F1.20S 242000 MS-548-16B F-A VT-3 3 X RIGID SHAY STRUT F1.20 242100 MSH-82 F.A VT-3 3-SPRING HANGER F1.20C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 386 REVISION: 0 INSERVICE INSPECTIOH LOHG TERN PLAN HAIN STEAM LINE 1B1 INSIDE CONTAINMENT ZONE HUHBER: i*A NI,AU ( A,, 1-064

                        ~

IHSPECT IOH . INTERVAL ASHE CLASS 2 ALL STATUS COHPONENTS FIRST PERIOD PLAN STATUS'" SECOND PERIOD THIRD PERIOD PRESERVICE YEAR e SEC. EXAMIHATION AREA CATGY XI'""UHHARY HDE OUTAGE- - - - -- IHSTRUCT IOHS NUHBER I DENT IF I CAT IOH ITEN HO HETK 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK<<<< eh 4 v a4 4 ~ <<e<<a + e ~ I C+ i%\ca I-36-HS-53 REF. DWG. NO. 01-064

                                          'I 242300  4-114.18                                                                3                                         Iield will be removed from S/G NOZZLE-TO-EXT. PIECE                                                                                          service during steam generator replacement,   PC/N 152-193
                                                                                                                                *>>UT-45**

242400 HS.53-FII.1 3 lIeld will be removed from SG Extension Piece to Elbow service during steam generator replacement, PC/H 152-193

                                                                                                                                <<<<UT.45<<>>

242440 1.SGB-MITS C.F.2 SUR 3-Steam Drum Head to Safe-End C5.51 VOL

                                                                                                                                **20T-102>>*

242460 HS-53-FII.2000 C-F 2 SUR 3 Safe-End to Elbow C5.51 VOL

                                                                                                                               **UT I5<<>>

242500 HS-53-FII-1-LR C-F-2 SUR 3-Elbow Longitudinal Seam C5.52 VOL

                                                                                                                               <<>>UT-45**

242600 HS-53-Fii-1-SR C-F-2 SUR 3-Elbow Longitudinal Seam CS ~ 52 VOL

                                                                                                                               *>>UT-45**

I-34-MS-29 REF. DWG. NO. 01-064 242700 HS-29-1-SU.1 C-F-2 SUR 3-Elbow to Reducer C5.51 VOL

                                                                                                                               *>>UT 45*>>

DATE: O'I/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 387 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN C LASS 2 ALL STATUS COMPOKEHTS

                                         !Nbrccvlou-tutcRVA MAIN STEAM LINE     1gl INSIDE   CONTAINMENT
)

20NE NUMBER: 1-064 l(Q ' - " ---'-"'-'SEC - ASHE PERIOD PERICO PERIOD EXAMIHATION AREA CATGY XI'UMMARY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDEHTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 "~CALIBRATION BLOCK** I 34-MS 29 REF. DUG. NO. 01-064 242800 MS.29-1-SN 1-LS-A C-F-2 SUR 3-REDUCER LONG SEAH CS ~ 52 VOL

                                                                                                                      **UT-45**

242900 MSH-74 F-A VT-3 3-TRUNNION F1.20 243000 MSH-74 IA C-C SUR Integrally llelded Attachment C3.20 43100 MS.29-1-SM.2 C-F-2 SUR 3 PIPE NATL. A155,KC65 Reducer to Pipe C5.52 VOL

                                                                                                                     *1UT 45*4 243200     MS-29.1.SW.2.LS-A                   C-F-2              SUR      3   .

Pipe Longitudinal Seam C5.52 VOL INPUT 45** 243300 MS-29-1.SH-2-LS-B C-F-2 SUR 3-Pipe Longitudinal Seam C5.52 VOL

                                                                                                                    **UT 4514 243400     MS-29.1-SN-4                        CF2                SUR      3-                                        ELBON NATL. A234,NPB Pipe to Elbow                       C5.51              VOL
                                                                                                                    *eUT  45**

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 388 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN

                                                                                                  ~TII~

CLASS 2 ALL STATUS COHPONENTS NCPRCIICN IIIZERVAl- PRESERVICE YEAR CONTAINHENT FIRST SECOND THIRD ZONE NUHBERt 1-064 ASHE PERIOD PERIOD PERICO ~ P~ \ 0+%W SEC ~ v SUHHARY EXAHINATION AREA

                                                         '"XI'ATGY NDE          - - - - - -0   UTAGE------          INSTRUCTIONS NUHBER    IDENT I F I CATION                  ITEH NO HETH                    1   2  3     1  2  3  1 2  3       <<<<CALIBRATION BLOCK<<<<

i I 34-HS-29 REF. DMG. NO. 01 064 243500 HS 29-I-SW-4-LR C-F-2 SUR 3-Elbow Longitudinal Seam C5.52 VOL

                                                                                                                     **UT 45**

243600 HS-29-1-SIJ-4-SR C-F-2 SUR 3 Elbow Longitudinal Seam C5.52 VOL

                                                                                                                    <<<<UT   /5**

243700 HS-29-FH-1 3 ueld will be removed from Elbow to Pipe service during steam generator replacement, PC/H 152-193

                                                                                                                    **UT 45**

243750 HS 29.FH.2000 C.F.2 SUR 3-Elbow to Pipe C5.51 VOL

                                                                                                                    *<<UT-45**

243800 HS-29-2-FW-1-LS-A C-F-2 SUR 3 . Pipe Longitudinal Seam CS ~ 52 VOL

                                                                                                                   **UT-45**

244000 HS-29-FN 2 C.F 2 SUR 3-PIPE-TO-FLOW ELEHENT C5.52 VOL

                                                                                                                   <<<<O'I 45*<<

244100 HS-29-FIJ-2-LS-A C-F-2 SUR 3-FLOM ELEHENT LONG SEAH C5.52 VOL

                                                                                                                  *<<U'I-45**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 389 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS INSPECTION ~ INTERVAL PLAN STATUS PRESERVICE YEAR MAIN STEAM LINE 181 INSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUHBER: 1.064 ASHE PERIOD PERIOD PERIOD

  ~ iraq 0 V'                                    SEC  'XI" "-"

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENT I F ICATION ITEM NO METH ( 1 2 3 1 2 3 1 2 **CALIBRATIOHBLOCK~~ 1.34.MS-29 REF. DHG. NO. 01-064 244200 MS-29-FIJ-2-LS.B C.F.2 SUR 3-FLSI ELEMENT LONG SEAM C5.52 VOL

                                                                                                            *OUT   45**

244300 MS-29.FW-3 C-F 2 SUR 3-FLOI ELEMENT-TO.PIPE C5.51 VOL

                                                                                                            **UT-45**

244400 MS.29-FH-3-LS-A C-F-2 SUR 3-Pipe Longitudinal Seam C5.52 VOL

                                                                                                            *eUT-45**

'44550 MSH.75 F-A VT-3 3-SPRING HANGER F1.20C 244600 MSH-75 IA C-C SUR 3 4 lugs Integrally Melded Attachments C3.20 244650 MS-649.314 F-A 3 Examine per plant procedures Snubber F1.20 244700 MS-649.314 IA C-C SUR 3 X MELDED LUGS (8) (T~l 1/2") C3.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 390 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENI'S IHSPECTION INTERVAL PLAN STATUS- PRESERVICE YEAR HAIN STEAM LINE 1B1 INSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-064 ASME PER100 PER100 PER100

*>>&>> ~  >> MN                                      n

SUMMARY

EXAMINATION AREA EC>> CATGY NDE - - -- - -OUTAGE- INSTRUCTIONS NUHBER IDENT IF ICATION ITEH NO HETH I 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK

  • I-34-MS-29 REF. DUG. NO. 01-064 244800 HS-29-3-S'M-1 C-F-2 SUR 3- ELBOM MATL. A234,NPB Pipe to Elbow C5.51 VOL
                                                                                                    **UT.45*<<

244900 MS-29-3-SII-1-LR C-F.2 SUR 3-Elbow Longitudinal Seam C5.52 VOL

                                                                                                    <<<<UT-45**

245000 MS-29-3-SM-1-SR C-F-2 SUR 3-Elbow Longitudinal Seam C5.52 VOL

                                                                                                   *<<UT 45*<<

245100 MS-29-FII-4 CF2 SUR 3- PIPE HATL. A155,KC65 Elbow to Pipe C5.51 VOL

                                                                                                   **UT 45**

245200 MS-29-FH-4-LS-A C.F-2 SUR 3-Pipe Longitudinal Seam C5.52 VOL

                                                                                                   <<*UT-45*<<

245300 MS-29.FM-4-LS-B C.F-2 SUR 3 Pipe Longitudinal Seam C5.52 VOL

                                                                                                   <<*Ul'-45**

245400 MS-29-4.SI1-1 C.F.2 SUR 3-Pipe to Pipe C5.51 VOL

                                                                                                   **UT 45*>>

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 391 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN e CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIM STEAM LINE 181 INSIDE COHTAIMMENT FIRST SECOND THIRD ZONE NUMBER: 1 064 ASHE PERIOD PERIOD .,PERIOD

'> ~:;>rs' ilaw.>or . ~,.  ~ sf c,.w.v" r., vs i.=  's SECiiXI"are rr
                                                       ~

SUMMARY

EXAHIHATIOH AREA CATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>> 1-3C.HS-29 REF. DWG. NO. 01-064 245500 HS-29-4-SII-1-LS-A C F-2 SUR 3-Pipe Longitudinal Seam C5.52 VOL

                                                                                                                        >>*UT.45>>>>

245600 HS.29.4-S'II-1.LS-B C-F-2 SUR 3-Pfpe LongitudinaL Seam C5.52 VOL

                                                                                                                        **UT-45**

245700 HSK-76 IA C-C SUR 3 INTEGRAL IIELD C3.20 245800 HS-29-FW.S C.F.2 SUR 3 Pipe to Pipe C5.51 VOL

                                                                                                                       >>>>UT  45>>*

245900 NS-29-FII.S-LS.A C-F.2 SUR 3 . Pipe Longitudinal Seam C5.52 VOL

                                                                                                                       >>>>UT  45**

246100 NS-29-FII-6 C-F-2 SUR 3- ELBOW NATL. A234,llPB Pipe to Elbow C5.51 VOL

                                                                                                                       *>>UT-45>>*

246200 HSK-77 IA C-C SUR 3-INTEGRAL MELO (T< 3/4") C3.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 392 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR MAIN STEAH LINE 1B1 INSIDE CONTAINHENT FIRST SECOND THIRD ZONE NUMBER: 1-064 ASHE PERIOD PERIOD PER I CO J A HIM'l<< SEC;"'Xl'"-~" SUHHARY EXAHINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 1 2 3 *<<CALIBRATION BLOCK<<* sa 1 ada a <<< 4 < C CV w a sl ~ I-34-HS-29 REF. DWG. NO. 01-064 246300 MS-29-FW-6-LR C.F.2 SUR 3 - - - - - - X Elbow Longitudinal Seam C5.52 VOL

                                                                                                                  <<UT-45**

246400 HS-29-FW.6-SR C F-2 SUR 3 - - - - - X Elbow Longitudinal Seam C5.52 VOL

                                                                                                                <<*UT.45<<<<

246500 HS-29-FW-6A C-F-2 SUR 3- X Elbow to Elbow C5.51 VOL

                                                                                                                **UT-45*<<

246800 HS-29-6-SW-2 C.F.2 SUR 3 . - - - - - X PIPE HATL~ A155,KC65 Elbow to Pipe C5.51 VOL

                                                                                                                *<<UT 45<<*

246900 HS-29-6-SW-2-LS-A C-F-2 SUR 3- Weld was found to be under Pipe Longitudinal Seam C5.52 VOL guard pipe, no examination can be performed, confirmed during 1996 outage

                                                                                                               *<<UT  45**

247100 HS-29-6-SW-1 C-F.2 SUR 3- Weld was found to be under Pipe to Pipe C5.51 VOL guard pipe, no examination can be performed, confirmed during 1996 outage

                                                                                                               <<<<UT-45**

247300 HS-29-6-SW-1-LS-A C-F-2 SUR 3- Weld was found to be under Pipe Longitudinal Seam C5.52 VOL guard pipe, no examination can be performed, confirmed during 1996 outage

                                                                                                               *<<UT 45**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 393 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR MAIN STEAM LINE 181 INSIDE CONTAINMENT FIRST SECOND THIRD ZONE HUMBER: 1 064 ASME PERIOD PERIOD PERIOD e,i'))(,J I ))QJ )Hl h IJ')J' '),1') i~ ) h I cf) SFCe yvI

                                                       ~

X

SUMMARY

EXAMINATION AREA CATGY NDE - - - - . 0 U T A G E - - - - -- INSTRUCTIONS HUMBER IDEHTIFICATIOH ITEM NO METH I

                                                                      )

1 2 0 3 I 1

                                                                                    \ J 2

OO 3 1

                                                                                                    ) 0 2

4 0, 3 j *

                                                                                                                       *~CALIBRATION BLOCK**

I-34-MS-29 REF. DlJG. NO. 01-064 247400 MS-29.6-SM-1-LS-B C-F-2 SUR 3- lleld was found to be under Pipe Longitudinal Seam C5.52 VOL guard pipe, no examination can be performed, confirmed during 1996 outage 4*UT.45** 247600 MS.29-FW-? C-F.2 SUR 3-Pipe to Pipe (Penetration II2) C5.51 VOL

                                                                                                                       ~~UT-45**

247700 MS.29-Fll.7.LS.A C-F-2 SUR 3-Pipe Longitudinal Seam C5.52 VOL

                                                                                                                       ~~UT-45**

. 24?800 MS-29-FII.7 LS-8 C-F-2 SUR 3-Pipe Longitudinal Seam C5 ~ 52 VOL 4*UT 45*4 247900 MS-29.SH C-F-2 SUR 3 . Iield is inside of penetration Pipe to Flued Head C5.51 VOL and is inaccessible tkUT 454* 248000 MS-649-319 F-A VT3 3-Snubber 1-033 F1.20S 248200 MS-649-313 F-A VT-3 3-Snubber 1-108 8 1-109 F1.20S

DATE: 01/09/98 EST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 394 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS INSPECTIOH INTERVAL PLAH STATUS PRESERVICE YEAR MAIN STEAM LINE 181 INSIDE CONTAINMEHT FIRST SECOHD THIRD ZONE NUMBER: 1-064 ASME PERIOD PERIOD PERIOD i(i 4 I'Wg SEC:"XI.

SUMMARY

EXAMINATION AREA CATGY HDE . - - - - - OUTAGE - - - - -- INSTRUCT IOHS NUMBER IDENTIFICATIOH ITEM HO METN 1 2 3 1 2 3 1 2 3 **GALI BRAT ION BLOCK~* 1-34 MS-29 REF. DWG. NO. 01-064 248300 MS-649-314 F-A VT-3 3-Snubber 1-036 8 1-037 F1.20S 248400 MSH-76 F-A VT-3 3-TRUNNION F1.20 248500 MS.649-310 F-A VT-3 3-Snubber 1-038 F1.20S 248600 MS.649.309 F A VT-3 3-RESTRAINT F1.20 248700 MSH.77 F-A VT-3 3-TRUHHIOH F1 ~ 20 248800 MS-649-304A F-A VT-3 3-RIGID SWAY STRUT F1.20 248900 MS-649-3048 F-A VT-3 3-RIGID SWAY STRUT F1.20

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 395 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAM CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAH LINE 1B1 INSIDE COMTAIMHEMT FIRST SECOND THIRD ZONE NUHBER: 1 064 ASHE PERIOD PERIOD PERIOD .O',8'g 4 +:h,V J'hh'7.> l' O'VN J = J ~ J'J SEC ~ XI ~ ~ I V SUHHARY EXAHIMATION AREA CATGY NDE ------OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION " ITEN KO HETK 1 2 3 1 2 3 1 2 3 ~~CALIBRATIOM BLOCK** .. ~ Cte, .0, PJ, I 4 e t, %e Ig I-34-HS-29 REF. DWG. NO. 01-064 249000 HSH-83 F A VT-3 3 . SPRING HANGER F1.20C

DATE: 01/09/98 'T. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 396 REVISION: 0 INSERVICE IHSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAN LINE 1A1 OUTSIDE CONTAINHENT FIRST SECOND THIRD ZONE NUHBER: 1.065 ASHE PERIOD PERIOD PERIOD ~W Pa SEC.

                                                'E                          - - - - - - 0               - - - -
                                                      'XI'ATGY SUHHARY EXAHIHAT ION AREA                                     NDE                        U T A G E                  INSTRUCTIONS NUHBER   IDENTIFICATION                      ITEH NO NETH                1    2   3    1  2  3       1  2  3        **CALIBRATIONBLOCK<<>>

v ' ' "' I-35.5-HS 1 REF. DMG. NO. 01-065 249100 HS-1-SM.P1 C-F-2 SUR 3- X 35.5" O.D. X 2" H/M MELDED Flued Head (Penetration III) to C5.51 VOL Pipe

                                                                                                                      **UT 44**

249200 HS-1.SM-P1-LS-A C-F-2 SUR 3 - - - X Pipe Longitudinal Seam C5.52 VOL

                                                                                                                      <<<<UT-44*"

249400 HS-1-FM-1 C F-2 SUR 3 - - - X 35.5" O.D. X 2" H/M MELDED Pipe to Pipe C5.51 VOL

                                                                                                                      *<<UT.44>>>>

249500 HS-1.FM-1-LS.A C-F-2 SUR 3 - - - X 2" H/M MELDED Pipe Longitudinal Seam C5.52 VOL

                                                                                                                     *<<UT 44*<<

249700 HS-1-1-SM-19 C.F 2 SUR 3- 35.5" X 4" MELDOLET NATL. Me Idol et C5.81 A105, CL- I I 249800 HS-1-1-SM-17 C.F-2 SUR 3- 35.5" X 8" MELDOLET NATL. Meldoiet C5.81 A106, CL-11 I-B.HS-79 REF. DMG. NO. 01 065 249900 HS-1-1.SM-18 C-F-2 SUR 3 - . - X 35.5" X 8" MELDOLET NATL. Meldolet C5.51 VOL A105, CL- I I

                                                                                                                     *<<UT.44*>>

DATE: 01/09/98 ST. LUCIE 'NUCLEAR PLAHT UHIT 1 PAGE: 397 REVISIOH: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL . PLAN SI'ATUS PRESERVICE YEAR ~ MAIH STEAM LINE 1A1 OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-065 ASME PERIOD PERIOD PER I CO ,,t i..',<.yasr<<w ivy r ','ev pv r'ws'.r,",l

                                        ~ +           ~ i'SEC'~.:Xi At<<<<

SUMMARY

EXAMIHATIOH AREA CATGY HDE ------OUTAGE.----- INSTRUCT IOHS HUMBER IDENT IF I CAT IOH ITEM NO METH ( 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK<<<< I-8-MS-79 REF. DUG. NO. 01-065 250000 MS-79.FII.1 C.F.2 SUR 3-Pipe to Valve V-08-114 C5.51 250050 Valve V-08-114 3 Ho examination required, valve Valve body has no Holds 250100 MS-79 Fll 2 C-F-2 SUR 3-Valve V-08-114 to Pipe C5.51 1-35.5.MS 1 REF. DWG. NO. 01 065 250200 MS-1-1 S'N-15 C.F.2 SUR 3- 6" RELIEF NOZZLE NATL. Pipe to Relief Nozzle C5.81 A105, CL- I I I 6.MS.63 REF. DIJG. HO. 01-065 250300 MS I-1-SN-16 C-F-2 SUR 3- 6" RELIEF NOZZLE, 6"-1500II R/F Nozzle to Flange C5.51 VOL LONG U/H FLANGE 1-35.5-MS-1 REF. DUG. NO. 01.065 250500 MS-1-1.SW-25 CF2 SUR 3 35.5" O.D. X 2" M/ll MELDED Pipe to Pipe C5.51 VOL

                                                                                                                          <<<<UT.44<<<<

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 398 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAM LINE 1A1 OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-065 ASME PERIOD PERIOD PERIOD SEC.'XI '" " ~-

SUMMARY

EXAHINATION AREA CATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER'DENTIFICATIOH ITEH NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* I-35.5-MS-1 REF. DUG. NO. 01 065 250700 HS-1-1-S'N.25-LS A C-F-2 SUR 3-Pipe Longitudfnat Scam C5.52 VOL

                                                                                                        **UT-44*>>

250800 MS-1-1-SW-25-LS-B C.F-2 SUR 3-Pipe Longitudinal Seam C5.52 VOL

                                                                                                        *IUT 44**

250900 MS-1-1-SU-13 C-F-2 SUR 3- SRP 6.6 APPLIES ENTIRE LONG Pipe to Relief Nozzle C5.81 SEAMS, 6" RELIEF HOZZLE NATL'105,CL.II I-6-MS-64 REF. DUG. NO. 01 065 251000 MS-1-1-SU-14 C-F.2 SUR 3-Nozzle to Flange C5.51 VOL 1-35.5-MS-1 REF. DUG. NO. 01 065 251100 MSH-7 IA C-C SUR 3-INI'EGRAL MELO C3.20 251200 MS-1-1-SM-11 C-F-2 SUR 3- 6" RELIEF NOZZLE NATL. Pipe to Relief Nozzle C5.81 A105,CL-II

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 399 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN'TATUS PRESERVICE YEAR MAIN STEAM LINE 1A1 OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-065 'SME PERIOD PERIOD PERIOD L: ',w'~ w 'b'nv r r s.'s .;re ~ ~, re@ t wq' ~ arSEC. - NI ' ~

SUMMARY

EXAMINATION AREA CATGY NDE -----OUTAGE------' IHSTRUCTIOHS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 2 3 **CALI BRAT ION BLOCK>>>> I-6-MS 65 REF. DUG. NO. 01-065 251300 MS-1-1.SW-12 C-F.2 SUR 3- 6" RELIEF NOZZLE, 6" 1500¹ R/F Nozzle to Flange C5.51 VOL LOHG II/H FLANGE I 35.5-MS 1 REF. DUG. NO. 01-065 251400 MS-1.1.SW;,9 C-F-2 SUR 3- 6" RELIEF NOZZLE NATL. Pipe to Relief Nozzle C5.81 A105,CL-II

                                                                                                                >>*UT-44>>>>

I 6 MS-66 REF. DNG. NO. 01-065 251500 MS.1-1 Ql-10 C;F-2 SUR 3 6" RELIEF NOZZLE, 6"-1500¹ R/F c5.51 VOL LONG ll/H FLAHGE 1-35.5.MS-1 REF. DUG. NO. 01-065 251600 MS-1.1.SH-7 C-F-2 SUR 3- 6>> RELIEF NOZZLE MATL. Pipe to Relief Nozzle C5.81 A105,CL-II

                                                                                                                              '.6-MS-71 REF. DUG. NO. 01.065 251700       MS-1-1-SN-8                               C-F-2     SUR     3-                                     6"  RELIEF NOZZLE, 6>>-1500¹ R/F Nozzle to Flange                          C5.51     VOL                                            LONG  II/H  FLANGE 1-35.5-MS-1        REF. DUG. NO. 01-065 251800      MS-   I- I-SM-5                            C-F-2     SUR     3-                                     6"  RELIEF NOZZLE Pipe to Relief Nozzle                      C5.81                                                                             NATL'105,CL-II

DATEs 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 400 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR MAIM STEAN LINE 1A1 OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUHBERs 1 065 ASHE PERIOD PERIOD PERICO

                                            .SEC;-XI.

SUMMARY

EXAHINATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- IHSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* I-6-HS-72 REF. DNG. NO. 01-065 251900 HS-I-1-SN-6 C-F-2 SUR 3- 6" RELIEF NOZZLE, 6"-1500¹ R/F Nozzle to Flange C5.51 VOL LOMG II/N FLANGE 1-35.5.HS.1 REF. DNG. NO. 01-065 252000 HS 1 1-SW 3 C-F-2 SUR 3- 6" RELIEF NOZZLE NATL. Pipe to Relief Hozzle C5.81 A105,CL-II

           -6.MS.73    REF. DNG. NO. 01-065 252100   HS-1-1.SII.4                         C-F-2    SUR    3-                                       6" RELIEF NOZZLE, 6".1500¹ R/

Nozzle to Flange CS ~ 51 VOL LONG ll/N FLANGE I 35.5-MS-1 REF. DWG. NO. 01-065 252300 HS.I.I-SW-1 C-F-2 SUR 3- 6" RELIEF NOZZLE NATL. Pipe to Relief Nozzle C5.81 A105,CL-II 252400 MSH-8 IA C-C SUR 3-INTEGRAL IIELD (4) C3.20 I-6-HS.74 REF. DUG. MO. 01-065 252500 HS-1-1-SH-2 C-F-2 SUR 3- 6" RELIEF NOZZLE, 6"-1500¹ R/F Nozzle to Flange C5.51 VOL LONG U/N FLANGE

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 401 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAM LINE 1A1 OUTSIDE CONTAINMENT I FIRST SECOHD THIRD ZONE NUMBER: 1-065 ASHE PERICO PERICO PERIOD SUHHARY EXAHIHATIOH AREA CATGY HDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEH HO HETN i 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK<<<< Cire,i ' fl,l <<8 0 tt P . <<>> 'q,  % i P 5 r r . p'I I 35.5-HS 1 REF. DUG. NO. 01-065 252550 HS-1 FII-2-LS-A C.F-2 SUR 3 X Pipe Longitudinal Seam C5.52 VOL

                                                                                                                       <<UT.44<<<<

252600 HS 1-FW.2 C-F-2 SUR 3 - - X Pipe to Valve HCV-08-1A C5.51 VOL

                                                                                                                     **UT.44**

252800 Valve HCV-08-1A 3 No examination required, no Valve valve body welds STM TRSL 52900 HS-1.1.V.1 C-F-2 SUR 3- 0 Valve HCV-08-1A to Valve C5.51 VOL V-08-117 STH TRSL **UT-44** 253000 HS.33-FII.1 C-F-2 SUR 3 - - - X 34<< X 1.25 H/H PIPE, APCSB Valve V-08-117 to Pipe C5.51 VOL 3.1 APPLIES

                                                                                                                    <<<<UT.44<<*

253100 HS-33.FII-I-LS.A C-F.2 SUR 3 . . . X 34" X 1.25 H/II PIPE, APCSB 3.1 Pipe Longitudinal Seam C5.52 VOL APPLIES

                                                                                                                    <<<<UT 44<<<<

253300 HSH-7A F-A VT-3 3 - ~ X Snubber 1-196/Spring Hanger F1.20CS trestle

              ~  '(

~ ~ ~ ~ . aa i .t i ~ iP saw rA v

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 402 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR MAIN STEAM LINE 1A1 OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 065 ASME PERIOD PERIOD PERIOD 1

                              - '" "" SEC'" Xl-         P

SUMMARY

EXAMIHATION AREA CATGY HDE -OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH ( 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

                         'I I-35.5-MS-1  REF. ONG. NO. 01-065 A

253400 MSH-7 F A VT3 3-TRUNNION F1.20 253450 MSH-7 IA C-C SUR 3- 4 attachments Integral Attachments C3.20 253500 MSH-8 F-A VT-3 3-TRUNNION F1.20 53550 MSH.B IA C-C SUR 3- 4 attachments Integral Attachments C3.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 403 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR rid MAIN STEAM LINE 181 OUTSIDE CONTAINMENT FIRST SECOND THIRD ZONE NUMBER: 1-066 ASHE PERICO PERIOD PERIOD

        <<lk                            6+/<<<<<<CCI                 r<<
                                 'v
      ~     ~               ~    I   ~

wEC ~ %VI X ~ ~ SUHHARY EXAHINATION AREA CATGY NDE - - - - - OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION V 'kl + ITEH NO HETH

                                                       'll  1 I
                                                                   <<>41 1  2
                                                                                 h<<"'I 

3 1 2 3 1 2 3 **CALIBRATIONBLOCK** 1-35.5-HS-3 REF. DLIG. NO. 01 066 C 253600 MS-3-SU.P2 C F-2 SUR 3- X Flued Head (Penetration ¹2) to C5.51 VOL Pipe

                                                                                                                  **UT 44*4 253700     HS-3-SU.P2-LS.A                      C-F-2        SUR       3   - - -       - -    -     X             Examine  entire long seam  for Pipe Longitudinal Seam               C5.52        VOL                                                  SRP  6.6 augmented examination
                                                                                                                  ~~UT-44**

254000 HS-3-FIJ-1 C-F-2 SUR 3-Pipe to Pipe C5.51 VOL

                                                                                                                 **UT-44**

254100 HS-3-FII.1-LS.A CF2 SUR 3-Pipe Longitudinal Seam C5.52 VOL

                                                                                                                 ~ IUT 44%*

254200 HS-3-1-FU-I-LS-8 C-F-2 SUR 3 Pipe Longitudinal Seam C5.52 VOL

                                                                                                                 %*UT  44**

254300 HS-3-I-SU<<19 C F 2 SUR 3 - "- 35.54 X 4" lKLDOLET MATL. Meidolet C5.81 A105,CL-II 254400 S-3-1-SW-17 C-F-2 SUR 3 35.5" X 4" QELDOLET HATL. lie i do let C5.81 A105,CL-II

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 404 REVISIOH! 0 IHSERVICE INSPECTIOH LONG TERN PLAH CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAN LINE 181 OUTSIDE CONTAINHENT FIRST SECOND THIRD ZONE NUMBER! 1 066 ASHE PERIOD PERIOD PERIOD SEC.'I -' SUHHARY EXAHIHAT I OH AREA CATGY HDE ------OUTAGE---. INSTRUCTIONS HUHBER IDENT IF I CAT IOH ITEN HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I 8-MS-80 REF. OWG. NO. 01-066 254500 HS-80 FW 1 C.F.2 SUR 3-PIPE TO VALVE V-08-145 C5.51 254600 HS.BO-FW-2 C-F-2 SUR 3-VALVE V.08-145 TO PIPE C5.51 254700 MS-3-1-SW.18 C F 2 SUR 3 . 35.5e X 8" WELDOLET NATL. Wcidolet C5.51 VOL A105,CL-II 1-35.5.HS.3 REF. DWG. NO. 01-066 254800 HS.3.1-SW 15 C-F-2 SUR 3- 6" RELIEF NOZZLE NATL. Pipe to ReLief Hozzle C5.8'I A105,CL-II I-6-HS-67 REF. DIJG. NO. 01-066 254900 NS-3-1-SW-16 C-F.2 SUR 3 . 6" RELIEF NOZZLE, 6l'1500JJ R/F Nozzle to Flange C5.51 VOL LONG W/H FLANGE I.35.5-NS-3 REF. DWG. NO. 01-066 255000 HS-3-1.SW.26 C-F-2 SUR 3- 35.5" O.D. X 2" H/W WELDED Pipe to Pipe C5.51

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 405 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAN LINE 1B1 OUTSIDE COHTAINHEHT FIRST SECOND THIRD ~ ZONE HUHBER: 1-066 ASNE i PERIOD PERIOD PERIOD PV 'SEC" EXAHINATION AREA CATGY

                                                          'XI'UHHARY NDE                  OUTAGE------                INSTRUCTIONS

,.,r .. hA4400'40&'1'0'0 "18lh'0 HUHBER IDEHTIFICATIOH ITEM NO NETH ( I44 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK*~ 1-35.5-HS-3 R F. DUG. NO. 01-066 l 255100 HS-3.1-SH-26-LS-A C-F-2 SUR 3- 35.5" O.D. X 2" H/ll NELDED Pipe Longitudinal Seam C5.52 VOL

                                                                                                                       **UT-44++

255300 MS-3-1.S1I-13 C-F-2 SUR 3- 6a RELIEF NOZZLE Pipe to ReLief Nozzle C5.81 NATL'105,CL-II I 6.HS-68 REF. DMG. NO. 01-066 255400 HS-3 1-Sll-14 C-F-2 SUR 3- 6" RELIEF NOZZLE, 6"-1500¹ R/F Hozzle to Flange C5.51 VOL LONG ll/N FLANGE 1-35.5 'S.3 REF. DNG. NO. 01-066 255450 HSH-2 F-A VT-3 3-TRUNH I OH F1.20 255500 NSH-2 IA C-C SUR 3- 4 attachments Integral Attachments C3.20 255600 NS-3-1-SW-11 C-F.2 SUR 3- 6" RELIEF NOZZLE NATL Pipe to Relief Nozzle C5.81 A105,CL-II I

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 406 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR MAIM STEAH LIHE 1B1 OUTSIDE COHTAINMEHT F IRST SECOHD THIRD ZONE NUMBER: 1-066 ASHE PERIOD PER I CO PERIOD h \ w II PJ ~ 'i t% 4 ~ hh h vhhh ~ ' 'i hw' hh A ~ t SEC 'XI SUHMARY EXAHIHATIOH AREA CATGY HDE -----OUTAGE--.-- INSTRUCTIONS MUHBER IDENTIFICATION ITEH NO HETH r 1 2 3 1 2 3 1 2 3 *~CALIBRATIOH BLOCX+* 1-6.HS-69 REF. DMG. NO. 01-066 255700 HS-3.1-SHh12 C-F-2 SUR. 3- 6" RELIEF NOZZLE, 6"-1500¹ R/F Nozzle to Flange C5.51 VOL LONG II/H FLANGE 1-35.5.HS-3 REF. D'LIG. MO. 01-066 255800 HS-3.1.SII.9 C-F-2 SUR 3 - - - X 6" RELIEF NOZZLE HATL~ Pipe to Relief Nozzle C5.81 A105,CL-II I 6-MS-70 REF. DUG. NO. 01 066 255900 HS-3.1.SIih10 C-F-2 SUR 3- 64 RELIEF NOZZLE, 6"-1500¹ R/F Hozzie to Flange c5.51 VOL LONG II/O FLANGE 1-35.5-MS-3 REF. DUG. MO. 01 066 256000 HS-3-1.SN-7 C-F-2 SUR 3- 6" RELIEF NOZZLE HATL. Pipe to Relief Nozzle C5.81 A105,CL 11 I-6-MS 75 REF. DUG. NO. 01-066 256100 MS-3-1-SW-8 C.F-2 SUR 3 . 6" RELIEF HOZZLE, 6"-1500¹ R/F Nozzle to Flange C5.51 VOL LONG Ii/H FLANGE 1-35.5.HS.3 REF. DUG. MO. 01-066 256200 HS-3-1-SN.5 C-F-2 SUR 3 X 6" RELIEF NOZZLE HATL. Pipe to Relief Nozzle C5.81 A105, CL- I I

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 407 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAH LINE 1B1 OUTSIDE CONTAINHENT FIRST SECOND THIRD ZONE NUHBER: 1-066 'l,A p, A.,l ., r Il '1 ~ If, ll~ ASHE V%I, k ), 9'I h ~ ~ ll\ tI lh SECt 'XI'

                                                                         ~       V ~

PERIOD PERIOD PERIOD SUHHARY EXAHINATION AREA CATGY NDE - - - - -OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH ) 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-6-MS-76 REF. DMG. NO. 01 066 256300 HS-3-1-SM.6 C-F-2 SUR 3- 6" RELIEF NOZZLE, 6"-1500¹ R/F Nozzle to Flange C5.51 VOL LONG M/N FLANGE 1-35.5-HS-3 REF. DMG. NO. 01.066 256400 HS-3.1.SM-3 C-F-2 SUR 3- 6" RELIEF NOZZLE NATL. Pipe to Relief Nozzle C5.81 A105,CL-II t 1-6.HS.77 REF. DMG. NO. 01-066 256500 HS.3-1-SM.4 C-F-2 SUR 3- 6" RELIEF NOZZLE, 6"-1500¹ R/F Nozzle to Flange C5.51 VOL LONG M/N FLANGE I.35.5-HS-3 REF. DMG. NO. 01-066 256600 HS.3-1-SM.25 C-F-2 SUR 3 X 35.5" O.D. X 2" H/M MELDED Pipe to Pipe C5.51 VOL

                                                                                                                            *~UT-44*~

256700 HS-3-1-S'M-25-LS-A C-F-2 SUR 3- 35.5" O.D. X 2" H/M MELDED Pipe Longitudinal Seam C5.52 VOL

                                                                                                                            ~*UT.44**

256900 MS-3.1.SM-1 C-F.2 SUR 3- 6a RELIEF NOZZLE NATL Pipe to Relief Nozzle C5.81 A105,CL-II

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 408 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAM LINE 181 OUTSIDE CONTAINHEHT FIRST SECOHD THIRD ZOHE HUHBER: 1-066 ASHE PERICO PERIOD PERICO A,) p r ~ ~,tv., ~ L[a r rrr v, v rrra ~a Ir raw'aver ~r iSEC XI',. v vr

                 ~                                                           ~

SUHHARY EXAHIHAT ION AREA CATGY HDE - - - - - - 0 U T A G E - - - - INSTRUCTIONS NUHBER IDENTIFICATION ITEH HO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

~   ...,           ver,  r      v  r,v vv,s v,       v vv     vW I-6-MS-78 REF.        DWG. NO. 01-066 257000       HS.3;1-SW-2                               C.F-2      SUR      3-                                          6" RELIEF   NOZZLE, 6" 1500lt R/F Nozzle to Flange                          C5.51      VOL                                                  LONG W/H FLANGE I 35.5-HS 3        REF. DWG. NO. 01-066 257050       HSH.3                                     FA     "VT-3 TRUNNION                                  F1.20                          r 257100        HSH-3 IA                                 C-C        SUR      3-                                           4 attachments Integral Attachments                     C3.20 257200        HS.3.FW-2-LS-A                           C-F-2      SUR      3-                                           35.5" O.D. X 2"  H/W WELDED Pipe Longitudinal Seam                   C5.52      VOL                                                   SRP 6.6 APPLIES  EHTIRE LOHG STH TRSL                                                                                                  SEAN
                                                                                                                                ~~UT-44**

257400 HS.3.FW.2 C-F-2 SUR 3 X Pipe to Valve HCV-08-18 C5.51 VOL

                                                                                                                               **UT-44~*

257500 HS-3-1-V1 C-F-2 SUR 3-Valve HCV.08-18 to Valve CSr51 VOL V-oev148 STH TRSL 257600 HS-32-FW-1 C-F-2 SUR 3 X ~ 34" X 1.25 H/W, APCSB 3,1 Valve V-08-148 to Pipe C5.51 VOL APPLIES a~UT-45**

DATE: '1/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 409 REVISION: 0 INSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS CCHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN STEAH LIHE 1B1 OUTSIDE CONTAINHENT FIRST SECOND THIRD ZONE NUHBER: 1-066 ASHE PERIOD

     ,i!s .wp <<it
          ~           '  ~~ 'y.  <<<<w.. i.va .<<<<<<.OcP4SEC<<XYI
                                                           ~     ~                   'W PERIOD      PERIOD SUHHARY EXAHIHATION AREA                               CATGY     NDE                   OUTAGE                  INSTRUCTIONS NUHBER       IDENT I F I CATION                        ITEH   NO HETH     1  2  3      1  2  3     1 2  3      **CALIBRATIONBLOCK**

1-35.5-HS-3 REF. DMG. NO. 01 066 257700 HS-32-FM-1-LS-A C-F-2 SUR 3- 34" X 1.25 H/M, APCSB 3.1 Pipe Longftudinal Seam C5.52 VOL APPLIES

                                                                                                              *IUT 454*

257900 HSH-7B F-A VT-3 3-Snubber 1-194/Spring Hanger F1.20CS

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 410 REVI SIGH: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECT IOH INTERVAL PLAN STATUS PRESERVICE YEAR HAIN FEEDMATER TO SG 1A1 INSIDE CONTAINHENT FIRST SECOND THIRD ZONE NUHBER: 1.067 ASHE PERIOD PERIOD PER I CO

                                        ~SEC    'XI" SUHHARY EXAHINATION AREA                  CATGY     HDE       - - - - - - 0 U T A  G E - - - -    --       INSTRUCTIONS NUHBER    IDENTIFICATION                  ITEH NO NETH      I 1  2  3     1  2  3      1   2  3           <<<<CALI BRAT ION BLOCK<<<<

e 0 o 0 ~ 1-20-BF.14 REF. DMG. NO. 01-067 258100 BF-14-SM C.F.2 SUR 3- Meld is inside penetration and Flued Nead to Pipe C5.51 VOL is inaccessible

                                                                                                          <<*UT-41<<<<

258200 BF-14-FM 3 C-F-2 SUR 3-Pipe to Pipe C5.51 VOL

                                                                                                          *<<UT  41**

258300 BF-14 2-SM 1 C-F-2 SUR 3 - - - X ELBOM NATL. SHLS SA-234 Pipe to Elbow C5.51 VOL

                                                                                                          <<<<UT  41**

258400 BFH-81 IA C-C SUR 3 PIPE LUG (T<1<<) C3.20 258500 BF-14-FM.4 C-F-2 SUR 3- ELBOM NATL. SHLS SA-234 Elbow to Pipe C5.51 VOL

                                                                                                         **UT-41**

258600 BF.14-3 S'M 1 C-F-2 SUR Pipe to Pipe C5.51 VOL

                                                                                                         *<<UT 41<<<<

258700 BF-14-FM-5 C-F-2 SUR 3- ELBOM NATL. SHLS SA-234 Pipe to Elbow C5.51 VOL

                                                                                                         <<<<UT-41**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 411 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR MAIN FEEDMATER TO SG 1A1 INSIDE CONTAINNENT FIRST SECOND THIRD ZONE NUHBERt 1-067 ASHE PER ICO PERIOD PERIOD iSEC: XI -'" SUHHARY EXAHINATIOH AREA CATGY NDE -OUTAGE INSTRUCTIONS NUHBER IDENT IF I CATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK<<<< I-20-BF-14 REF. DMG. NO. 01 067 258800 BF-14-4-SM-1 C-F 2 SUR 3 X ELBOM NATL~ SHLS SA-234 Elbow to Pipe C5.51 VOL

                                                                                                      <<<<UT   41**

258900 BF-14-4-SM-2 C-F.2 SUR 3 . 20" X 18" CONC. REDUCER NATL. Pipe to Reducer C5.51 VOL SA.234

                                                                                                      *<<UT 41<<*

259000 BF-14-FM.6 C-F.2 SUR 3- 20" X 18" COHC ~ REDUCER REDUCER-TO-VALVE (V-09-252) C5.51 VOL 4

                                                                                                     *<<UT-41**

I-18 BF 51 REF. DMG. NO. 01 067 259100 BF.51-FM-1 C-F-2 SUR 3-VALVE (V-09-252)-TO-PIPE C5.51 VOL 259200 BF.51-FM-3A C-F-2 SUR 3 X ELBOM NATL. SA-234 Pipe to Elbow C5.51 VOL

                                                                                                     <<*UT-43<<<<

259300 BF-51-FM-28 3 Eibou to Pipe RCB

                                                                                                     **UT-43**

259400 BF.51-FM-18 3 Meld is to be removed from Pipe to S/G Extension service during steam generator replacement, PC/H 151-193

                                                                                                     *<<UT-43**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 412 REVISION: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR MAIN FEEDWATER TO SG 1A1 INSIDE CONTAINMENT FIRST SECOHD THIRD ZOHE HUMBER: 1-067 ASME PERIOD PERIOD PERIOD

.v;l1, i   'L   4bt"h  Jv Nr'     .At;  P     ~    P WSar  ~ YI (

Fl

                                                                  ~      ~

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 ~*CALIBRAT ION BLOCK** h, ~ h Ph 1 ~ '4t I I-18-BF-51 REF. DWG. NO. 01-067 259500 6 114-1A 3 Weld fs to be removed from S/G EXTEHSIOH-TO-NOZZLE service during steam generator replacement, PC/M 151-193 259520 BF-51.FW-2000 C-F.2 SUR 3- Distance between welds 2000 Elbow to Safe-End C5.51 VOL and ll256 are approximately .5" RCB to .75'part, PT exam should be consfdered

                                                                                                                     **UT 43tk 259530        1.SGA-W256                               C-F-1     SUR     3-Safe-End      to    FW Nozzle            C5.11     VOL Transftfon Rfng RCB                                                                                                   ii20T-156, 20T.158~*

259540 1-SGA.W284 C-F-1 SUR 3 FW Nozzle Transftion Ring to C5.11 VOL Nozzle RCB ea20T 156ii 259600 Feedwater Augmented Exam 79-13 VOL 3- Contfnious scen from reap to 1 Nozzle Ramp to Mid-Elbow pipe dfa. on elbow, to be RCB performed on one line each period, basel fne examination required durfng steam

                                                                                                                  . generator replacement
                                                                                                                    **UT.43**

1-20.BF-14 REF. D'WG. NO. 01-067 259700 BFH-81 F-A VT-3 3 . CONSTANT SUPPORT F1.20C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 413 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS CONPONEHTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR HAIN FEEDNATER TO SG 1A1 INSIDE COHTAINMEHT FIRST SECOND THIRD ZOHE NUHBER: 1-067 ASNE PERIOD PERIOD PERIOD

 .u,  wee,>> . pt   ]~   v,>  .sw   ~ .t',e ar . ~ w  e <<r   ScP     ~ vl .  ~

SUHHARY EXAHINATIOH AREA

                                                               ~ 1 CATGY
                                                                   ~

HDE ------OUTAGE------ INSTRUCTIONS NUHBER IDENTIFICATION ITEH HO NETH 1 2 3 1 2 3 1 2 3 <<*CALIBRATIOH BLOCK~* ~ Av a o a r 4 a We i sSV'ee 'o C Ab sVA eA v Ao 'aA s vo "w', ' ' ' ' - g ' hit'-20-BF-14 REF. DiJG. NO. 01-067

                                            /

259800 BF-549-8 F-A VT-3 3-Snubber 1-044 F1.20S 259900 BF-549-7 F-A VT-3 3-Snubber 1-042 F 1-043 F1.20S 260000 BF-549-11 F-A VT-3 3-Snubber 1-045 4 1-046 F1.20S 260100 BF.549-12 F.A VT-3 3-RIGID S'IIAY STRUT F1.20 260200 BFN-84 F-A VT-3 3-SPRING HANGER F1.20C 260300 BF-549-161 F-A VT-3 3 X

               'M}IIP RESTRAINT                             F1.20 260400    BF-549-17                                    F-A           VT-3 3 Snubber 1-052                                F1.20S

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UHIT 1 PAGE: 414 REVISION: 0 INSERVICE IHSPECTIOH LONG TERH PLAH CLASS 2 ALL STATUS COHPONEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN FEEDMATER TO SG 1B1 INSIDE CONTAINMENT FIRST SECOND THIRD 1-068 ZONE HUHBER: ASHE SEC.""XI'" - " 1 PERIOD 4J'44II t PER100

                                                                                     '     1 0 ~

PERIOD SUHHARY EXAMINATION AREA CATGY NDE ------OUTAGE IHSTRUCTIOHS NUHBER IDENTIFICATION ITEN NO NETH 1 2 3 2 3 2 3 **CALIBRATIONBLOCK** ws'wva ss w' er 1 1 1

                                                                                                    'vs I-20-BF-19 REF. DMG. NO. 01-068 260450   BF-19-SM                            C.F.2    SUR    3-                                                   Meld    is located inside pipe Flued Head to Pipe                  C5.51    VOL                                                         sleave and is inaccessable RCB  35'11"
                                                                                                                  *+UT 41+*

260500 BF-19-FM-3 C-F-2 SUR 3- Meld is located inside pipe Pipe,to Pipe C5.51 VOL sleeve and is inaccessable, RCB 35'11" confirmed during 1996 outage

                                                                                                                  *~UT.41**

260600 BF-19-2.SM-1 C-F.2 SUR 3 - - - - - - X ELBOM NATL'HLS SA 234 Pipe to Eibou C5.51 VOL RCB 35'11a 1*UT 4140 I 18-BF 52 REF. DMG. NO. 01-068 260650 BFH 76A F-A VT-3 3 X 93 Replaced the washer plate on CONSTANT SUPPORT F1.20 bottcm side of Lover support channel 260700 BFH-76A IA C-C SUR 3 - - - X . - - - - 93 1 attachment Integrally Melded Attachment C3.20 I-20-BF-19 REF. DMG. NO. 01-068 260800 BF-19-F'M-4 C-F-2 SUR 3 - - - - - - X ELBOM NATL. SHLS SA-234 ElboM to Pipe C5.51 VOL

                                                                                                                 **Ul'-41**

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 415 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAH .STATUS PRESERVICE YEAR MAIN FEEDWATER TO SG 181 INSIDE CONTAINMENT F IRST SECOND THIRD ZONE NUMBER: 1-068 ASME PERIOD PER ICO PERIOD Scr-E ~ XvI '

                                                      ~       ~ i  ~   i      i~ i~ ~

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- IHSTRUCTIOHS NUMBER IDENTIFICATION ITEM HO METH 11 2 3 1 2 3 1 2 3 *<<CALIBRATION BLOCK

  • 40 lib 404 1-20.BF-19 REF. DIJG. NO. 01-068 260900 BF-19-3.SW 1 C-F-2 SUR 3-Pipe to Pipe C5.51 VOL
                                                                                                                  <<<<UT  41>>*

261000 BF-19-FH.S C-F.2 SUR 3 Pipe to Pipe C5.51 VOL

                                                                                                                  *<<UT  41**

261100 BF-19-4-SM-3 C-F-2 SUR 3 Pipe to Pipe C5.51 VOL

                                                                                                                  >><<UT  41>>*

261200 BF-19.FW-6 C.F.2 SUR 3- e ELBOLl MATL~ SMLS SA 234 Pipe to Elbow C5.51 VOL

                                                                                                                 *<<UT 41*>>

261300 BF-19-5-S'N.1 C F-2 SUR 3 . ELBSI MATL. SMLS SA-234 Elbow to Pipe C5.51 VOL

                                                                                                                 *<<UT-41*>>

261400 BF-19-5-SM-2 C-F-2 SUR 3- REDUCER MATL. SA 234 Pipe to Reducer C5.51 VOL

                                                                                                                 *<<UT-41**

261500 BF-19-FW-7 C-F-2 SUR 3-Reducer to Valve V-09-294 C5.51 VOL

                                                                                                                 <<*UT.41<<<<

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 416 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN FEEDMATER TO SG 1B1 INSIDE COHTAINHEHT FIRST SECOND THIRD ZONE HUKBER: 1-068 ASHE PERIOD PERIOD PERIOD ihi <<P'a iw/~ '4 'EC:"XI SUHHARY EXAMINATION AREA 'ATGY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH ( 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK<<* I-20-BF-19 REF. DMG. NO. 01.068 261550 Valve V-09-294 3 No examination required, no Valve valve body welds I-18-BF-52 REF. DMG. NO. 01-068 261600 BF-52-FM-1 C-F-2 SUR 3-Valve V-09-294 to Pipe C5.51 VOL 261700 BF-52-FM-3A C-F.2 SUR 3- ELBOM NATL. SA-234 Pipe to Elbow C5.51 VOL 261800 BF.52-FM-28 3 Meld is to be removed from Elbow to Pipe service during steam generator replacement, PC/K 151-193

                                                                                                         **UT 43*<<

261900 BF-52-FM-2A 3 Meld is to be removed from PIPE-TO-S/G EXTENSION service during steam generator replacement, PC/N 151-193

                                                                                                        *~UT.43<<~

261920 BF 52-FM-2000 C-F-2 SUR 3- Distance between welds 2000 Elbow to Safe-End C5.51 VOL and M256 are approximately 1.25<< to 1.375<< apart, PT exam should be considered

                                                                                                        <<*UT 43*<<

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 417 REVISIOH: 0 INSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INI'ERVAL PLAN STATUS PRESERVICE YEAR MAIN FEEDMATER TO SG 181 INSIDE CONTAINMENT FIRST SECOND THIRD ZONE HUHBER: 1-068 ASHE PERIOD PERIOD PERIOD SUMHARY EXAHIHATION AREA SEC:"XI'ATGY NDE ------OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEH HO HETN I 1 2 3 1 2 3 1 2 3 ~*CALIBRATIOH BLOCK** o ' I-18-BF-52 REF. DMG. HO. 01-068 261930 1-SGB-M256 C-F-1 SUR 3-Safe-End to FM Nozzle C5.11 VOL Transition Ring RCB ~*20T-156, 20T-158~* 261940 1-SGB-MZ84 C-F-1 SUR 3-FM Nozzle Transition Ring to C5.11 VOL Nozzle RCB **20T.156~* REF. D'MG. HO. 01-068 262000 Feeduater Augmented Exam 79-13 VOL 3 Continious scan from ramp to 1 Nozzle Ramp to Hid.Elbow pipe dia. on elbou, to be performed on one line each period, baseline examinati~ required during steam generator replacement

                                                                                                          ~~UT.43**

I-18-BF-52 REF. DIIG. HO. 01-068 262100 6-114-18 3 Meld is to be removed from S/G EXTEHSIOH-TO-NOZZLE service during steam generator replacement, PC/H 151-193 I-20-BF-19 REF. DMG. HO. 01-068 262300 BF-661.415 F-A VT-3 3 RIGID SMAY STRUT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 418 REVISIOH: ,.0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS CONPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR HAIN FEEDlJATER TO SG 1B1 INSIDE CONTAINNENT FIRST SECOND THIRD ZONE HUHBER: 1-068 ASHE PERIOD PERIOD PERIOD ~ p ~ 4 6 IVI' i Ol<< I'i l i >> ~  %% ECO lYI SCI ~ SUNHARY EXAHIHAT ION AREA CATGY NDE - - - - - - OUTAGE . - - - -- INSTRUCTIONS NUHBER IDENT IF I CATION ITEN HO NETH 1 2 3 1 2 3 1" 2 3 **CALIBRATIONBLOCK**

                                                                            ~ ~            e,       a   v" r v        'w%

I 20.BF-19 REF. D'WG. NO. 01-068 k 262400 BF-661-416 F.A VT-3 3-Snubber 1-050 8 1.051 F1.20S 262500 BFH 77A F-A VT-3 3-SPRIHG HANGER F1.20C 262600 BF 661 7409 F-A VT-3 3-RIGID SHAY STRUT F1.20 262700 BF-661.407 F.A VT-3 3-Snubber 1-048 8 1-049 F1.20S RCB 262800 BFH-79 F-A VT-3 3-SPRIHG HANGER F1.20C 262900 BFH-80 F-A VT-3 3-SPRING HANGER F1.20C 263000 BF-661-7402 F-A VT-3 3-RIGID RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 419 REVISIOH: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR MAIN FEEDWATER TO SG 1B1 INSIDE CONTAINMENT FIRST SECOND THIRD ZONE HUMBER: 1-068 ASME PERIOD PERIOD PERIOD kg,-~ ~,g'l '%t 9 4 Vl' jf 'dttb ~; 'l'I 4' ',V Ekl SCl

                                                     ~

ECo 'Vl'

                                                            ~                                   '4 a'

SUMMARY

EXAMIHAT ION AREA CATGY NDE - - - 0 U T A G E - . - - - . INSTRUCTIONS NUMBER IDENTIFICATION V ITEM HO METH Vl 4 A0 1 2 3 4oosh 1 sic bA 2 3 a O',l' 1 2 3

                                                                                                                   ",if..I **CALIBRATIONBLOCK~*

I-20.BF-19 REF. DUG. NO. 01-068 263100 BFH-86 F-A VT-3 3 X SPRING HANGER F1.20C 263200 .BF.661.4020 F A VT-3 3-Snubber 1.047 F1.20S

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 420 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED INLET PIPING TO CS PUNP 1A & 1B FROH RMST FIRST SECOND THIRD ZONE NUNBER: 1-070 ASHE PERIOD PERIOD PERIOD

                                            'SEC;  XI" SUHHARY EXAHIHATION AREA                   CATGY    HDE      ------OUTAGE-                         IHSTRUCTIOHS HUNBER  IDENT I F I CATION                 ITEH NO NETH      1  2  3     1  2  3      1 2  3      ~*CALIBRATIOH BLOCK**

I 24-CS-1 REF. DMG. NO. 01-070-A 263300 CS.1-1-SM-4 C.F-3 SUR 3-Flange to Tee 263400 CS-I-I.SM-3 C.F-3 SUR 3- Long seam on pipe Tee to Pipe 263500 CS.1-1-SM-2 C.F-3 SUR 3- Long seams on elbow and pipe t Pipe to Elbow 263600 CS.I. I-SM-I C-F-3 SUR 3- Long seam on elbow Elbow to Flange 263650 Va l ve HV-07-18 3 No examination required, no Butterfly Valve valve body welds I-24-CS 2 REF. DMG. NO. 01-070-A 263700 CS 2-4-S'M-1 C-F.3 SUR 3- (.250"T) MELDED PIPE, ELBOM Flange to Elbow NATL. A403 MP304 M, 24" 150¹ R.F. M/H FLANGE 263800 CS-2-4.SM-2 C.F-3 SUR 3- (.250"T) MELDED PIPE, PIPE Elbow to Pipe HAIL. A358,TP304

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT I PAGE: 421 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBIHED INLET PIPING TO CS PUMP 1A & 18 FROH RWST FIRST SECOND THIRD ZONE NUHBER: 1-070 ) ~,>> ~ I '4 vie>> y '\ ~ )v e';\ *,l, v + ASHE

                                                              *A]et EC1 YI X

PERIOD PERIOD PERIOD SUHHARY EXAMINATION AREA CATGY HDE OUTAGE- INSTRUCTIOHS NUHBER I DENT I F I CATION ITEN HO NETH [ > 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK *

 ~ l     A %0%                                e a e       s    v e                                                    4            ~

1-24.CS-2 REF. DWG. NO. 01-070-A 3-1 263900 CS-2.4.SW-3 CF3 SUR (.250"T) WELDED PIPE, ELBOW Pipe to Elbow HATL~ A403,WP304 W 264000 CS-2-4.SW-4 C.F-3 SUR 3'- (.250"T) MELDED PIPE, PIPE Elbow to Pipe NATL. A358,TP304 264100 CS.2.FW.S C-F-3 SUR 3 . (.250"T) WELDED PIPE, ELBOW Pipe to Elbow NATL. A403,WP304 W 264200 CS.2-5.SW-1 C.F.3 SUR 3 . (.250"T) WELDED PIPE, PIPE Elbow to Pipe NATL. A358,TP304 264250 SI-676.955 F A VT-3 3-RIGID SWAY STRUT ASSY. F1.20 264300 CS-2-FW-6 C.F-3 SUR 3- (.250"T) MELDED PIPE, ELBOW Pipe to Elbow NATL. A403,WP304 W 264400 CS-2-6-SW.3 C-F-3 SUR 3- (.250"T) MELDED PIPE, PIPE Elbow to Pipe NATL. A338,TP304

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 422 RE V I S ION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS INSPECTIOll INTERVAL PLAN STATUS PRESERVICE YEAR CONBINEO INLET PIPING TO CS PUNP 1A 8 18 FRON RMST FIRST SECOND THIRD 20NE HUNBER: 1-070 ASHE PERICO PERIOD PERIOD

                                       ~ ~       gcP"-'vi'   '        r  w  wvvassa '     av   '  '

SUNHARY EXAHIHATIOH AREA W~ CATGY NDE . - - - - - 0 U T A 0 E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO NETH i 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCj(**

                                                      \iVV bi   0  '0 0441  '    kkh 'Via    k  '        '

41 'O'C 0 j ~

                                                                                                                                                + '     v ~

I-24-CS-1 REF. DMG. NO. 0'I 070-A 264420 S1-676.97 F-A VT-3 3-BOX RESTRAIHT F1.20 264440 YPH-66 F-A VT-3 3-SPRING HANGER F1.20C I.24-CS-2 REF. D'MG. NO. 01.070 C 264500 CS.2.6-SM-2 C.F 3 SUR 3- (.250"T) MELDED PIPE Pipe to Pipe l.24 CS-1 REF. DMG. NO. 01.070-C 264550 SI-676.981 F-A VT-3 3-RIGID STRUT ASSENBLY F1.20 I-24.CS-2 REF. DMG. NO. 01-070.C 264600 CS-2-6.SM-1 C-F-3 SUR 3- (.250"'I) MELDED, PIPE Pipe to Pipe 1-24 CS-3 REF. DMG. NO. 01-070 C 264650 Sl-676-982 F-A VT-3 3-BOX RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 423 REVISION: 0 IHSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 2 ALL STATUS CONPOHEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR CONBINED INLET PIPING TO CS PUNP 1A 8 1B FRON RUST FIRST SECOND THIRD ZONE NUHBER: 1-070 ASHE PERIOD PERIOD PERIOD i'\ ~, gal '%JR ~ ht'uA h%N'w ~w \' Sclmr nvi 8 ~

                                                       ~

SUNNARY EXAHINATION AREA CATGY HDE - - - - - 0 U T A G E - - - - INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO NETH i 1 2 3 1 2 3 1 2 3 ~*CALIBRATIOH BLOCK~* ~, e ~ o . o I-24-CS-2 REF. DMG. NO. 01-070-C 264700 CS-2-FM-7 C-F-3 SUR 3- (.250"T) MELDED PIPE, ELBOM Pipe to Elbcw NATL. A403,MP304 M 264800 CS.2-7-SM-2 C-F-3 SUR 3 (.250"T) MELDED PIPE, PIPE Elbow to Pipe NATL. A358,TP304 264900 CS-2-7-SM-1 C F 3 SUR 3- (.250"T) MELDED PIPE Pipe to Pipe 264920 SI.676-798 F A VT-3 3-Box Restraint F1.20 264940 S I -676-1984 F-A VT.3 3-BOX RESTRAINT F1.20 265000 CS-2-FM.B C-F-3 SUR 3- o (.250"T) MELDED PIPE Pipe to Pipe 265050 SI-676-986 F-A VT-3 3-BOX RESTRAIHT F1.20

DATE: 01/09/9B ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 424 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONEH'IS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED INLET PIPING TO CS PUMP 1A B 1B FROM RUST FIRST SECOHD , THIRD ZONE HUMBER: 1-070 ASME PERIOD PERICO PERIOD "SEC:"XI

SUMMARY

EXAHINATIOH AREA

                                                 "'ATGY NDE            -----OUTAGE------                   IHSTRUCTIOHS NUMBER  IDENTIFICATION                   ITEM NO METH          1  2  3    1  2  3       1 2  3      <<*CALIBRATIOH BLOCK~*

I-24-CS.2 REF. DUG. NO. 01-070-C 265100 CS.2.8-SH-1 C-F-3 SUR 3- (.250"T) HELDED PIPE Pipe to Pipe 265200 CS 2 FU-1 C-F-3 SUR 3- (.2504T) UELDEO PIPE Pipe to Pipe 265400 CS.2.FN-1A C-F-3 SUR 3- (.250"T) IIELDED PIPE Pipe to Pipe 265500 CS-2-1.SH.2 C-F-3 SUR 3- (.250"T) IIELDED PIPE Pipe to Pipe 265550 SIH.51 F-A VT-3 3-RIGID RESTRAINT F1.20 265560 SI-676-1005 F-A VT-3 3-BOX RESTRAINT F1.20 265600 CS 2 FW 2 C-F.3 SUR 3 . (.250"T) MELDED PIPE Pipe to Pipe

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 425 REVISION: 0 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED INLET PIPING TO CS PUKP 1A & 18 FROK RllST FIRST SECOND THIRD 1-070 ~ e>>v ~. 20NE NUHBER: tn.r>>>>. ~ r4,v ~ a si r>>; arri

                                   ~     ~ t,,wi r rri<<v    ~

ASHE

                                                              $ >>r>>

Ir~ lJ 0 PERIOD ibVidrJ 'i'r>> PERIOD v r PERIOD

                                                                                           -----OUTAGE------
                                                                ~

SUHHARY EXAHIHATION AREA CATGY NDE INSTRUCTIONS HUHBER IDENTIFICATION ITEK NO HETH i 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> 141"'\0 'I" Pl '1allV 4 4<@ 'VA ' ' i'r i it 1-24.CS-2 REF. DMG. NO. 01-070-C 265640 SI-676.103 F-A VT-3 3-BOX RESTRAINT F1.20 265660 S1-676.105 F-A VT-3 3- PSA-3 Snubber 1-083 & 1-084 F1.20S 265700 CS-2-2.SII-3 C-F-3 SUR 3- (.250"T) MELDED PIPE Pipe to Pipe 265740 S1.676-1053 F-A VT-3 3 RIGID RESTRAINT F1.20 265760 S I H-52 F-A VT3 3 RIGID RESTRAINT F1.20 265800 CS 2-2-SII-2 C.F-3 SUR 3- (.250"T) MELDED PIPE, ELBOM Pipe to Etbov HATL. A403,MP304 II 265900 CS-2.2-SII-1 C-F-3 SUR 3- (.250"T) WELDED PIPE, PIPE Elbow to Pipe HATL. A338,TP304 Il

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 426 REVISIOH: 0 INSERVICE IHSPECTIOH LOHG TERH PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED INLET PIPING TO CS PUMP 1A B 1B FROM RMST FIRST SECOND THIRD ZONE NUHBER: 1-070 ASHE PERIOD PERIOD PERIOD "SEC hk ke4 1 4 h A4 SUMHARY EXAHIHATIOH AREA Xl-'ATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUHBER IDENTIFICATION ITEM HO HETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I 24-CS-2 REF. DMG. NO. 01-070-C 266000 CS-2-FM-2A C-F 3 SUR 3- (.250"T) MELDED PIPE Pipe to Pipe 266100 CS-2-2-SM.4 C.F-3 SUR 3- (.250"T) MELDED PIPE, ELBOM Pipe to Elbow HATL. A403,MP304 M 266600 CS-2.FM.3 C-F-3 SUR 3- MELDED PIPE Pipe to Vatve V07'119 1-24-CS-1 REF. DMG. NO. 01-070-A 266700 CS-1-1.SM-5 C-F-3 SUR 3- (.250"T) MELDED PIPE, PIPE Tee to Pipe HATL. A358,TP304 M 266800 CS.1-1-SM-6 C-F-3 SUR 3- ( ~ 250"T) MELDED PIPE, ELBOM Pipe to Elbow NATL. A403,MP304 M 266900 CS-1.1.SM 7 C-F-3 SUR 3- (.250"T) MELDED PIPE, 150lt Elbow to Flange R.F. M/N FLAHGE SCH.105 A.182 F-304 266950 VALVE HV-07-1A 3 VALVE

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 427 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CONBINED INLET PIPING TO CS PUMP 1A B 1B FROH RlJST FIRST SECOND THIRD ZONE HUHBER: 1-070 ASHE PERIOD PERIOD PER I CO 1>> .SEC;"XI

                       ~

SUHHARY EXAHINATION AREA CATGY NDE - - - - - - 0 U T A 0 E - - - - INSTRUCTIONS NUNBER IDENTIFICATION ITEN HO NETH I 2 3 1 2 3 1 2 3' **CALIBRATIONBLOCK** Nh ~ I-24-CS-3 REF. DMG. NO. 01-070-A 267000 CS.3.5.SM-1 C-F-3 SUR 3- (.250"T) 'lJELDED PIPE, ELBOM Flange to Elbow NATL. A403,lJP304 M, 24" 150IJ R.F ~ lJ/H FLANGE 267100 CS-3-5-SM.2 C-F-3 SUR 3- (.250"T) IJELDED PIPE, PIPE Elbow to Pipe NATL. A358,TP304 M 267200 CS-3-5-SM-3 C-F-3 SUR 3- (.250"T) MELDED PIPE, ELBOM Pipe to Elbow NATL'403;MP304 IJ 267300 CS-3.5-SlJ-4 C.F-3 SUR 3- (.250"T) MELDED PIPE, PIPE Elbow to Pipe NATL. A358,TP304 M - weld is located inside a pipe sleeve and is inaccessable, confirmed during 1996 outage 267400 CS-3-FM-6 V C.F-3 SUR 3- lJeld is inside pipe sleeve and Pipe to Elbow is inaccessible, confirmed during 1996 outage 267500 CS-3-6-SM.1 C-F-3 SUR (.250"T) MELDED PIPE, PIPE Elbow to Pipe HATL ~ A338, TP304 lJ 267550 SI-676-825 F A VT-3 3 . RIGID SMAY STRUT ASSY. F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 428 REVI S IOH: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEN'IS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR COHBIHED INLET PIPIHG TO CS PUHP 1A 8 1B FROH RUST FIRST SECOND THIRD ZONE NUHBERt 1 070 ASHE PERIOD PERIOD PERIOD h( %1 ..Ylgl ~ ~ 1 QS V rt ~ 'lSr. ~ "-SEC"'Xl" SUHHARY EXAMINATION AREA CATGY NDE OUTAGE-- ~---- INSTRUCTIONS NUMBER IDENTIFICATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~~ I-24-CS.3 REF. DUG. NO. O'I-070-A 267600 CS-3-FII 7 C-F-3 SUR 3- (.250"T) MELDED PIPE, ELBDM Pipe to Elbow NATL. A403,IIP304 II 267700 CS-3-7-Su-3 C-F-3 SUR 3- (.2504T) UELDED PIPE, PIPE Elbow to Pipe NATL. A358,TP304 II 267710 YPH.63 F-A VT-3 3-SPRIHG HANGER F1.20C 267720 CS.3.Sll-2 C-F-3 SUR 3-Pipe to Pipe 267730 SI-676.81 F-A VT-3 3 . BOX RESTRAINT F1.20 I-24 CS-3 REF. DWG. NO. 01 070-B 267740 Sl -676.79 F-A VT-3 3-RIGID STRUT ASSEHBLY F1.20 267750 SI-676-78 F-A VT-3 3-RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 429 REVISION: 0 'IHSERVICE IHSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBIHED INLET PIPING TO CS PUHP 1A 8 1B FROH RMST FIRST SECOND THIRD ZONE NUHBER: 1-070 ASHE PER ICO PERIOD PERIOD

                                       -.SEC:"X P  -'*"-

SUHHARY EXANINATION AREA CATGY NDE ------OUTAGE------ INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO NETH I I 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK<<>> I 24-CS-3 REF. DMG. NO. 01-070-B 267760 CS-3-SM.1 C-F-3 SUR 3-Pipe to Pipe 267800 CS-3.FM-8 C.F-3 SUR 3- (.250"T) MELDED PIPE<<ELBOM Pipe to Elbow NATL. A403,MP304 M 267900 CS.3.8.SM.2 C-F.3 SUR - 3- (.250"I') MELOED PIPE, PIPE Elbow to Pipe NATL. "A358,TP304 M 267950 SI.676-76 F-A VT-3 3- 0 RESTRAINT F1.20 268000 CS-3-8-SM-I C.F-3 SUR 3- (.250"T) MELDED PIPE Pipe to Pipe 268020 Sl.676 675 F-A VT-3 3-BOX RESTRAINT F1.20 268040 S1-676-74 F-A VT3 3 Restraint F1 ~ 20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 430 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE 'YEAR COHBIHED INI.ET PIPING TO CS PUHP 1A 8 1B FROH RMST FIRST SECOND 'HIRD ZONE HUHBER: 1-070 ASHE PERIOD PERIOD PERIOD "SEC;"XI" SUHHARY EXAHIHATIDH AREA NDE

                                                            'ATGY
                                                                          ------OUTAGE------                            INSTRUCTIONS NUMBER    IDENTIFICATION                      ITEN NO NETH             1  2  3       1  2  3       1  2  3          <<<<CALIBRATION BLOCK<<<<

~ 1

                       ~      'was ev o    v  ~  o   rrw           w  >  snow      v <<'<v           '

a s +s ~ woes o s I

                                                                                                                                                        ' k I-24-CS-3   REF. D'MG. NO. 01-070-B 268100   CS-3 FM-9                           C-F-3     SUR           3-                                             (.250"T)   MELOED  PIPE Pipe to Pipe 268200   CS-3-9-SM-2                         C-F-3     SUR          3-                                              (.250"T)   MELDED PIPE Pipe to Pipe 268300   CS-3-9-SM-1                         C-F-3     SUR                                                          (.250 "T)  MELDED 'PIPE Pipe to Pipe 268400   CS.3-FM-1                           C.F-3     SUR         3-                                               ( ~ 250<<T) MELDED  PIPE Pipe to Pipe 268500   CS-3-FM 1A                          C-F-3     SUR                                                          (.250"T)   MELDED PIPE Pipe to Pipe 268520   SIH-167                             F-A       VT-3        3-SADDLE RESTRAINT                    F1.20 268540   SI-676-705                          F-A      VT-3        3-BOX RESTRAINT                       F1 '0

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 431 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED INLET PIPING TO CS PUMP 1A 8 1B FROM RUST FIRST SECOND THIRD ZONE NUMBER: p, I,1 )l4'PI 1-070 I I) \6%, f') ~ I, t ~ 6 %l ASME

                                                    +46$ CI ECo 'Vl             1 PERIOD
                                                                                  'I 1' VS "1

PERIOD h1 PERICO

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-24-CS-3 REF. DUG. NO. 01 070-B ~ ~ 268600 CS.3-fll-1B C.F-3 SUR 3- (.250"T) llELDED PIPE Pipe to Pipe 268700 CS-3-FW-2 C-F-3 SUR 3- (.2504T) HELDED PIPE Pipe to Pipe 268800 CS 3-FM-3 C-F-3'UR 3- (.250"T) HELDED PIPE Pipe to Pipe 268820 SI.676-67 F-A VT-3 3-Snubber 1-081 T 1-082 F1.20S 268840 S I H-166 F A VT-3 3-SADDLE RESTRAINT F1.20 268860 S I -676-66 F-A VT-3 3-RIGID RESTRAINT F1.20 268900 CS-3.3-SM-1 C-F-3 SUR 3- (.250"T) MELDED PIPE Pipe to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 432 REVISIOH: 0 INSERVICE IHSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPOHEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED INLET PIPING TO CS PUMP 1A & 1B FROM RUST FIRST SECOND THIRD ZONE NUHBER: 1-070 ASHE PERIOD PERIOD PERIOD t4 ~ \ Pt I ~ 't 'll v p ~ Jv ~ gf 4Wlt "SEC; 'Xl"

SUMMARY

EXAHINATIOH AREA CATGY NDE ------OUTAGE INSTRUCTIONS NUHBER IDEHT IF ICATION ITEN NO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK

  • I-24 CS 3 REF. DUG. NO. 01-070-B 268950 Sl 676.64 F-A VT.3 3-BOX RESTRAINT F1.20 269000 CS 3-3-SN-2 C-F-3 SUR 3- (.250"T) IKLDED PIPE Pipe to Pipe 269100 CS-3-FN-3A C-F.3 SUR 3- (.250"T) IIELDED PIPE Pipe to Pipe 269150 S I H-165 F.A VT-3 3 SADDLE RESTRAINT F1.20 269160 SI-676-595 F-A VT.3 3- VERIFY SUPPORT Support F1.20 269200 CS 3-4-SIJ-2 C-F-3 SUR 3 . (.2504T) IIELDED PIPE Pipe to Pipe 269250 SIH-61 F-A VT-3 3 .

CLEVIS HAHGER F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 433 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONEHTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR COHBIHED INLET PIPING TO CS PUMP 1A S 1B FROH RlJST FIRST SECOND THIRD ZONE HUHBER: 1-070 ASHE PERIOD PERIOD PERIOD II ~ - -.--- "SEC

                                   ~

EXAHINATION AREA CATGY

                                                'Xl'UHHARY NDE                - OUTAGE                    INSTRUCTIONS NUHBER   IDEHTIFICATION                     ITEH NO NETH             1  2  3     1  2  3      1 2  3       **CALI BRAT IOH BLOCK~*

1-24-CS.3 REF. DIJG. NO. 01-070 B 269300 CS-3-4-SII-1 C-F-3 SUR 3- (.250eT) MELDED PIPE Pipe to Pipe 269400 CS-3-FII-4 C.F-3 SUR 3- IIELDED PIPE Pipe to Valve V07120

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 434 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION IHI'ERVAL PLAH STATUS PRESERVICE YEAR HAIN FEEDWATER TO SG 1A1 OUTSIDE CONTAINHENT FIRST SECOND THIRD 2OHE NUMBER: 1-071 ASHE PERIOD I

                          .-~-., - -                                                          PERIOD PER   CO
      .. ~ .. i.~.     -                           SEC" XI SUHHARY EXANIHATION AREA                         CATGY    NDE                 -OUTAGE                   INSTRUCTIONS HUHBER        IDENTIFICATION                      ITEN HO NETH    I 1  2  3     1  2    3  '

2 3 *>>CALIBRATION BLOCK>>>> I-20.BF-55 REF. DHG. HO. 01-071 / 272600 BF.55-FH-1 C-F-2 SUR 3 X SEAHLESS PIPE Valve V.09.248 to Pipe C5.51 VOL

                                                                                                          *>>UT-42*>>

272650 BFH-6 F-A VT-3 3-BOX RESTRAINT F1.20 272700 BFH.6 IA C-C SUR 3-MELDED LUGS (4) T>>1 1/4" C3.20 72800 BF-55.FM 2 C-F 2 SUR 3 PIPE TO-VALVE HV 09-7 C5.51 VOL

                                                                                                         *>>UT-42**

1-20 BF 14 REF. DWG. NO. 01-071 272900 BF-14. fII-1 C-F-2 SUR 3-VALVE NV.09.7 TO PIPE C5.51 VOL ~

                                                                                                         **UT 41**

273000 BF-14.FH.2 C-F 2 SUR 3 - - - X Pipe to Pipe C5.51 VOL

                                                                                                         *>>UT 41**

273100 BF-14-SH-P3 C-F-2 SUR 3-Pipe to fiued Head C5.51 VOL (Penetration ¹2)

                                                                                                         *>>UT-41**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 435 REVISIOH: 0 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR MAIN FEEDMATER TO SG 1A1 OUTSIDE COHTAIHMEHT FIRST SECOND THIRD 2OHE HUHBER: 1 071 ASNE PERIOD PERIOD PERIOD ,i,,, ~ &At,tl(. ~, L 'li r r4t v.> ~ 9 ~* ~ ~ 'I I ~,. w'>>5s a E It ~ <vl ScP ' < ' o hdav&i 'il SUHHARY EXANIHAT IOH AREA - - - - - - 0 U - - - - --

                                                                                                      'l CATGY
                                                                                                                         'i 'i 

HDE T A G E INSTRUCTIONS NUNBER IDENTIFICATIOH eo'0 ITEN NO NETH i'ii Sk'L i1 2 3 1 2 3 i' 1 2 3 i'd'-' '=

                                                                                                                                        **CALIBRATIOHBLOCK~*

l - /, 1 1.20-BF-14 REF. DMG. NO. 01-071 273200 BF-14-1-SM-2 C-F-2 SUR 3-Meldolet C5.81 273300 BF-14-1-SM.3 C-F-2 SUR 3 . Mcldolet C.5.81

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 436 REVISION: 0 IHSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN FEEDMATER TO SG 1B1 OUTSIDE CONTAINHENT FIRST SECOHD THIRD ZONE NUHBER: 1-072 ASHE PERIOD PERIOD PERIOD l'; '. T.','>>:. I ~,lhf'4t I>> Vda I~ 4V 8, i'l)(hv i SEC( XI, e wr,, 't. 0 8~

      ~ ~                                ~ a ~~                    ~             a SUNHARY EXAHIHATION AREA                                  CATGY     NDE         - - - - - - 0      U T A G E    - - - -             INSTRUCTIONS
        ~~

HUHBER IDENTIFICATION t 0, + t 0 0 h%'0 8 ITEN NO NETH Ide e% I 1

                                                                                           \%%

2 r 3 1

                                                                                                       \I A%>>

2 3 t h \1 1 1 O, 2 3 p ~ y

                                                                                                                                              **CALIBRATIOHBLOCK>>>>
                                                                                                                                                       <<t    P      tl I.20-BF-56     REF. DMG. NO. 01-072 273500     BF-56.FM-1                                     C-F-2     SUR     3 X Valve V-09.280 to Pipe                         C5.51     VOL
                                                                                                                                              *>>UT 42>>*

273540 BFH.2 F-A VT-3 3 - - - . - - X Trunnion F1.20 273560 BFH-2 IA C-C SUR 3- 4 attachments Integral Attachments C3.20 73600 BF-56.FM.2 C-F-2 SUR 3-Pipe to Valve HV-09-8 C5.51 VOL

                                                                                                                                              *>>UT-42>>*

I-20-BF 19 REF. D'MG. NO. 01-072 273700 BF-19-FM.1 C-F-2 SUR 3 X Valve V-09-8 to Pipe C5.51 VOL

                                                                                                                                             >>>>UT 41*>>

273800 BF- 19-FM-2 C-F-2 SUR 3 - - - - - - X Pipe to Pipe C5.51 VOL

                                                                                                                                             **UT 41>>>>

273900 BF-19-1-SM-P4 C-F-2 SUR 3 - - - - - - X Pipe to Flued Head C5 ~ 51 VOL (Penetration II4 )

                                                                                                                                             **UT 41**

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 437 REVISION: 0 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR HAIN FEEDMATER TO SG 181 OUTSIDE COHTAINHENT FIRST SECOHD THIRD ZONE NUHBER: 1-072 ASHE PERIOD PERIOD PERIOD ~ ' pr1 rl ~ '4 Lt 4 rkl r r r' I 'i i l% &e v Ai ~ SEC

                                                                 ~     ~

rxl ~ r SUHHARY EXAHIHATION AREA CATGY HDE OUTAGE - - - - -- IHSTRUCTIOHS HUHBER IDENTIFICATION ITEH NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK* .~s ~ ~ ri a<<e ~r 0 I-20-BF-19 REF. DMG. HO. 01-072 274000 BF-19-1.SW-2 C-F-2 SUR 3-IIe Idol et C5.81 274100 BF.19-1-SW.3 C.F 2 SUR 3 lie ldo let C5.81

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 438 REVISION: 0 INSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS CONPOHENTS INSPECTION IHTERVAL PLAH STATUS PRESERVICE YEAR LPSI HPSI CS PUHPS LOOP 1A INLET PIPING FIRST SECOND THIRD ZOHE HUHBER: 1-073 SUHHARY EXAHINATION AREA ASHE SEC" CATGY Xl'"-" NDE

                                                            '-    PERIOD     PERIOD
                                                                         -OUTAGE------

PERIOD INSTRUCT IOHS NUHBER IDENTIFICATION ITEK NO NETH I 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCI(~~ I-24-SI-504 REF. OMG. NO. 01-073-A 274300 SI 504-FM-2 C.F.3 SUR 3- MELDED ELBOM Valve V07119 to Elbow 274400 SI.504-1-S'M-5 C-F-3 SUR (.250"T) MELDEO ELBOM NATL. Elbow to Pipe A403,MP 304 M, (.250"T) MELOED PIPE 274500 S I -504-1-SM-4 C.F-3 SUR 3- e (.250"T) MELDED ELBOM NATL. t Pipe to Elbow A403,MP 304 'M, (.250"T) MELDEO PIPE 274600 Sl-504-1-SM.3 C-F-3 SUR 3- (.250eT) MELDED ELBOM, 24"X Elbow to Tee 24" X 24" STD MALL TEE 274700 Sl-504-1-SM 2 C-F-3 SUR 3 ( ~ 250"T) MELDED PIPE, 24"X 24" Tee to Pipe X 24" STO MALL TEE NATL. A403,MP304 M 274800 SI-504-1-SM-1 C-F-3 SUR 3- (.250"T) MELDED ELBOM NATL. Pipe to Elbow A403,MP304 M, (.250"T) MELDED PIPE 274900 S I -504- FM-1 C-F-3 SUR 3- (.250"T) MELDED ELBOM ELBOM TO VALVE V.07-174

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 439 REVISION: 0 INSERVICE IHSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUHPS LOOP 1A INLET PIPING FIRST SECOND THIRD ZONE HUMBER: 1-073 ASHE PERIOD PERIOD PERIOD V SEC;"'Xl'"' 4 I j

                                                                      - - - - - -OUTAGE
                                                   'o SUHHARY EXAHINATIOH AREA                     CATGY     HDE                                               INSTRUCT IOHS IDENTIFICATION                                                 3          2   3        3       ~~CALIBRATION BLOCK**

"~ HUHBER b e < ~ski vS' *4' 1 " ITEH

                                             'l" s    NO NETH 4
                                                                   ) 1   2 1

I ' 1 2 I-24-CS-5 REF. DMG. NO. 01-073-A 275000 CS-5-FM-3 C-F-3 SUR 3- (.250"T) WELDED PIPE VALVE V-07-174 TO PIPE 275100 CS.5-2-S'W-1 C-F-3 SUR 3 . (.250"T) MELDED PIPE, 24" 1500 PIPE TO FLANGE R/F M/H FLANGE NATL. A182,F304 I-24.CS-41 REF. DWG. NO. 01-073.A 275200 CS-41-FW-1 C-F-3 SUR 3- (.250"T) WELDED PIPE HATL~ Tee to Pipe A358,TP304, 24"X 24" X 24" STO WALL TEE 275300 CS-41-1-SM-6 CF3 SUR 3 (.250"T) MELDED ELBOW HATL. Pipe to Elbow A403,MP304 II, (.250"T) WELDED PIPE 275400 CS-41-1-SM-9 C.F.3 SUR 3 . (.250"T) WELDED ELBOW, 24eX Elbow to Tee 24eX 10" REDUCING TEE I-24-CS-41 REF. DWG. NO. 01 073-C 275500 CS.41-1-SM-10 C-F-3 SUR 3- 24"X 24"X 10" REDUCING TEE/ Tee to Reducer 10" X 6" SCH 40S CONC. REDUCER

DATE'1/09/98 ST. LUCIE NUCLEAR PLAH'I UNIT 1 PAGE: 440 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPONEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUNPS LOOP 1A INLET P PING FIRST SECOND THIRD 20HE NUNBER: 1-073 ASHE PERIOD PERIOD PERIOD

                                      '"-SEC-     XI"  '

SUHMARY EXAHIHATIOH AREA CATGY HDE - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUNBER IDENTIFICATION ITEM HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>>

                            ~ 'ase s a    a vs   slav" v v" ~ " w   v oso   vr row   r     'I          ~K     t V      0            ~ 1I   \ 6 s I-24-CS-41    REF. DMG. NO. 01.073-A 275600   CS-41-1-SM-8                       C-F-3     SUR     3-                                           (.250"T)  MELDED  PIPE, 24"X Tee   to Pipe                                                                                      24 X 10 REDUCING TEE NATL~

A403,MP304 M. 1.24-CS-41 REF. DMG. NO. 01.073.B 275700 CS-41-1-SM-3 C.F.3 SUR 3- (.250"T) MELDED PIPE Pipe to Pipe s C 275800 CS-41-1 SM-2 C-F-3 SUR 3- (.250"T) MELDED PIPE Pipe to Pipe 275900 CS-41.1-SM.1 C.F.3 SUR 3- (.250"T) MELDED PIPE, 24"X Pipe to Tee 24"X 14" REDUCIHG TEE NATL. A403cMP304 M. 276000 CS-41-FM-2 C.F.3 SUR 3- 24"X 14>> CONC. REDUCER, 24"X Tee to Reducer 24"X 14" REDUCIHG TEE I 14-Sl-511 REF. DMG. NO. 01-073-B 276100 SI-511-1-SM-1 C-F-3 SUR 3 24"X 14" CONC. REDUCERc ( Reducer to Pipe 250>>'I) MELDED PIPE NATL. A358,'TP304.

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 441 REVISIOH: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI NPSI CS PUMPS LOOP 1A INLET PIPING FIRST SECOND THIRD ZONE NUMBER: 1-073 ASNE PERIOD PERIOD PERIOD ~ I 1tl N i i yQ 0

  • I\ ~ SEC

SUMMARY

EXANIHATION AREA CATGY NDE OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK++ 1-14 SI-511 REF. DIJG. NO. 01 073 B 276200 S1-511.FM.1A C-F-3 SUR 3- (.250"T) MELDED PIPE Pipe to Pipe 276300 S1-511.FM.1 C-F-3 SUR 3- (.250'T) MELDED PIPE@ ( ~ 250 T) Pipe to Elbow MELDEO ELBSJ NATL. A403,MP304 M 276400 S1-511-1.SM.1 C-F-3 SUR 3 . (.250"T) MELOEO PIPE NATL. Elbow to Pipe A358,TP304, (.250"T) MELOEO ELBSJ 276500 SI.511-2-SIJ-1 C-F-3 SUR 3- (.250"T) MELDED PIPE NATL. Elbow to Pipe A358,TP304. (.250"I') MELOED ELBSJ 276600 SI-511-FM-2A C-F-3 SUR 3- (.250"T) MELOED ELBOM NATL. Pipe to Elbow A403iMP304 Mi ( ~ 250nT) MELDED PIPE. 276700 SI -511-FM-2 C-F-3 SUR 3,- (.250"T) MELDED PIPE ELBSJ TO VALVE V 3444 276800 SI-511-FM-3 C-F-3 SUR 3- (.250"T) MELOED ELBSJ VALVE V-3444 TO ELBOM

t DATE: REVISION: 9L .9> ~ A4 NUHBER

            ~,

01/09/98 0 LPSI HPSI CS PUHPS I.OOP 1A IHLET PIPING ZONE HUNBER: 1.073 l,vht'vr << 'aw'; SUNHARY EXANI NATION AREA IDENTIFICATION

                                      ~
  • INSPECTION INTERVAL r ~w ~1 ASHE
                                                     >t SEC."

CATGY Hl HDE ITEN NO NETH ST. LUCIE NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG YERN PLAN CLASS 2 ALL STATUS COHPOHEHTS FIRST PERIOD

                                                                           ------OUTAGE

( 1 2 3 PLAN STATUS 1 SECOND PERIOD 2 3 1 THIRD PERIOD 2 3 PRESERVICE YEAR INSTRUCTIONS

                                                                                                                 **CALIBRATIONBLOCK~*

PAGE: 442 lit e ee,rgi I-14-SI-511 REF. DMG. HO. 01 073-8 276900 S I -511-3-SM-2 C-F-3 SUR 3- (.250"T) MELDED PIPE Elbow to Pipe (.250"T) MELDED NATL'358,TP304, ELBOM 277000 Sl-511-3-SM-1 C.F.3 SUR 3- (.250eT) MELDED PIPE, (.250"T) Pipe to Elbow MELDED ELBOM NATL. A403,MP304 M 277100 Sl-511.FM-4 C-F-3 SUR 3- (.250"T) MELDED ELBOM ELBOM TO VALVE V 07-1555 I-14 Sl-424 REF. DMG. NO. 01-073-8 277200 S I 424-FM.1 C.F.3 SUR 3- (.250"T) MELDED ELBOM VALVE V-07.1555 TO ELBOM 277300 Sl.424-3.S'M-1 C-F.3 SUR 3- (.250"T) MELDED ELBOM, 14"X Elbow to Tee 14"X 10" REDUCING TEE 277400 Sl-424.3-SM-2 C-F-3 SUR 3- (.250"T) MELDED PIPE, 14"X Tee to Pipe 14"X 10e REDUCING TEE NATL. A403,MP304 M 277500 Sl-424-3-SM 3 CF3 SUR 3- ( ~ 250eT) MELDED PIPE, 14e 300¹ PIPE-TO.FLANGE (SS-3-1) R/F M/N FLANGE NATL. A182,F304

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT WHIT 1 PAGE: 443 REVISION: 0 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR LPSI HPSI CS PUHPS LOOP 1A INLET PIPING FIRST SECOND THIRD ZONE NUMBER: 1-073 ASME PERIOD PERIOD PERIOD 'lt R.,% . ly,bl,t'C P) '19 tP,'; 'I %A I I'I 8 4&I 'SEC- 'I Xl'l 8 rl

                                                                                   ~

SUHHARY EXAMINATION AREA CATGY NDE - - - OUTAGE - - - - INSTRUCTIONS NUNBER qP IDENTIFICATION tS 0  %,%ti P hO ITEN NO NETH I 1 2 3 1 r 2 3,1 ~ e 2 3 **CALIBRATIONBLOCK~* l-14-SI-424 REF. D'WG. HO. 01-073-B 277600 Sl 424-3-SW 4 C-F-3 SUR 3- 14"X 14"X 10w REDUCING TEE Tee to Elbow 277700 Sl 424-3.SM 5 C-F-3 SUR 3- (.250"T) WELDED PIPE Elbow to Pipe NATL'358,TP304 277800 SI.424-3-SW-6 C-F-3 SUR 3- (.250"T) WELDED ELBOW NATL. Pipe to Elbow A403,MP304 277900 Sl-424.2.SW-1 C-F-3 SUR 3- (.250"T) MELDED PIPE, 14"

             ,  FLANGE-TO PIPE                                                                                            R/F W/H FLANGE NATL.

A182, F304 278000 SI-424-2-SW-2 C-F-3 SUR 3- (.250 T) WELDED PIPE, 14'21I Pipe to Recfucer ECCENTRIC REDUCER NATL. A403,MP304 M 278100 SI-424.FW-1A C-F-3 SUR 3- 12" 400¹ R/F W/H FLANGE NATL. REDUCER-TO-FLANGE (SS 3 11) A182,F304, 14"X 12" ECCENTRIC REDUCER I-14-CS-7 REF. DWG. NO. 01-073-D 278200 CS-7-FW-1 C.F-3 SUR 3- 24"X 24"X 14" REDUCING TEE, Tee to Elbow (.250"I') MELDED ELBOW

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 444 REVISIOH: 0 IHSERVICE IHSPECTIOH LOHG TERN PLAH CLASS 2 ALL STATUS CONPOHENTS INSPECTION INTERVAL PLAN Sj'ATUS PRESERVICE YEAR LPSI HPSI CS PUNPS LOOP 1A INLET PIPING FIRST SECOND THIRD ZOHE HUHBER: 1.073 ASHE PERIOD PERIOD PERIOD

             .. <<a. e~.am      i:<< <<i<<i<<i .r y i.v. <>           i.XI" <<.i~<<

~'. <<r <<<<i.ri

  ~

SUHHARY

                                   ~

EXAHIHAT I ON AREA

                                                        <<, ~

iSEC CATGY NDE -OUTAGE- - ---- IHSTRUCTIOHS NUHBER IDENT I F I CATION ITEN HO NETH i 1 2 3 1 2 3 1 2 3 *~CALIBRATIOH BLOCK~*'-14-CS-7 REF. DMG. NO. 01.073.D 278300 CS-7-FM-1A C-F.3 SUR 3- (.250"T) MELDED PIPE Elbow to Pipe NATL'403,TP304 278400 CS.7-FM.2 C-F 3 SUR 3- (.250"T) MELDED PIPE PIPE-TO-VALVE V-07-1615 278500 CS 7-FM-3 C-F-3 SUR 3- (.250"T) MELDED ELBOM VALVE V-07-1615 TO ELBOM 78600 CS-7-FM.5 C-F-3 SUR 3- (.250"T) MELDED PIPE NATL. Elbow to Pipe A358iTP304i ( 250iiT) MELDED ELBOM 278700 CS-7-2.SM-2 C-F-3 SUR 3- ( 250uT) MELDED PIPE< 14n 300¹ PIPE-TO-FLANGE (SS-3-2A) R/F M/N FLANGE NATL. A182,F304 278800 CS.7.3.SM-1 C-F-3 SUR 3- (.250"T) MELDED PIPE, 14e 300¹ FLANGE (SS.3 2A) TO.PIPE R/F M/H FLANGE NATL. A182,F304 278900 CS-7-3.SM.2 C-F-3 SUR 3- (.250"T) MELDED PIPE, 14"X 12" Pipe to Reducer ECCENTRIC REDUCER NATL'403,MP304 M

DAT fI 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 445 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS LPSI HPSI CS PUMPS LOOP 1A INLET PIPING IHSPECTIOH INTERVAL FIRST PLAN STATUS SECOND

                                                                                                                          'RESERVICE THIRD YEAR ZONE HUMBER:           1-073                                    ASME                    PERIOD        PERICO        PERIOD

~ 'I', ".*,'...'. v,>>c'L;Nt I v.' al 'v its i w 9 ~. 4>> i,~v, e r Stt

                                                                        ~

EC ~avl" 1 i >>' ' eats's<<<< 'a

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A G E INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 I J 4=' 'o <<C<<<<<<<<'a' 1

                                                                                                            'IV '<<s 2    3     1 2  3                           BLOCK
                                                                                                                                                    '<<CALIBRATION I-14-CS-7        REF. DUG. HO. 01-073-D 279000         CS-7-3-SW-3                                      C-F-3     SUR     3-                                        12" 4004 R/F ll/H FLANGE NATL.

REDUCER-TO-FLANGE A182,F304, 14uX 12<< ECCENTRIC REDUCER I-6-Sl-508 REF. DUG. NO. 01-073-C 279100 S I -508- Fll-1 C-F-3 SUR 3- 10" X 6" CONC. REDUCER NATL. Reducer to Pipe A403,IIP304 279200 Sl-508-FN-1A C-F-3 SUR 3-Pipe to Pipe 279300 Sl-508-1.SN-1 C-F-3 SUR 3- ELBSJ NATL. SMLS A403,NP304 Pipe to Elbow 279400 Sl.508-FN-18 C-F-3 SUR 3- ELBON NATL. SMLS A403,llP304 Elbow to Pipe 279500 SI.508-FII-2 C-F-3 SUR 3-Pipe to Valve V-3401 I-6-SI-425 REF. DNG. NO. 01-073-C 279600 Sl-425-FM-1 C-F-3 SUR 3-Valve V-3401 to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 446 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECT ION INTERVAL PLAN STATUS PRESERVICE YEAR INLET PIPING FIRST SECOND THIRD ZONE NUHBER: 1-073 ASNE PERIOD PERIOD PERICO ega ~,h'1 vb', ~, ~ I 9r Jkt v.> P, ~ Iv, tt @hi.4 Aavtll a Scl>

                                                                       ~

EC ~ 'vl . 0< 4 ' ' ~ 'I SUNHARY EXAHIHAT ION AREA CATGY HDE ------OUTAGE------ INSTRUCTIONS HUNGER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK~>> V. A ~ 'L Isa Aoo A so w. b oo <vms r ~ o 4 ~ >>t s~ o o 1-6.SI-425 REF. DMG. NO. 01.073.C I 279700 Sl-425-FM-1A C.F-3 SUR 3- 6"X 6"X 4" TEE, Inaccessible Pipe to Tee . for exam due to T bracket on hanger SI-676.9405, pipe clamp is pinned to the salt due to pipe movement. 279800 S I -425.1-S'M-1 C F-3 SUR 3- 6"X 6"X 4" TEE Tee to Pipe 279900 Sl-425-1-SM.2 C.F-3 SUR 3- 6"X 6"X 4" TEE Tee to Elbow 280000 Sl-425.1-SM-3 C.F.3 SUR 3- 0 PIPE NATL. SNLS A312,TP304 Elbow to Pipe 280100 SI-425-FM.2 C.F.3 SUR 3-PIPE TO VALVE V-3470 280200 SI-425-FM-3 C-F-3 SUR 3-VALVE V-3470 TO PIPE 280300 SI-425-3-SM.1 C-F-3 SUR 3- 300¹ R/F M/H FLANGE NATL. PIPE-TO-FLANGE (SS-3.2A) A182,F304

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 447 REVISIOH: 0 INSERVICE IHSPECTIOH LOHG TERM PLAN CLASS 2 ALL STATUS COMPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUMPS LOOP 'IA INLET PIPING FIRST SECOND THIRD

  <<ia s 20HE NUMBER:
          <<ew <<ew qr'h ~ gv 'e1-073'   '<<<<a <<s.U. << ~ ~ <<>> ~

ASME

                                                             >SEC ~ sXI<<w ~ s<< ~

PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATGY HDE OUTAGE - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 >>>>CALIBRATIOH BLOCK>>>> ~ '<< I 6 SI-425 REF. DWG. NO. 01-073-C 280400 SI-425-2-SM-6 C-F-3 SUR 3- 300¹ R/F II/H FLANGE NATL<< FLANGE (SS.3-2A)-TO.PIPE A182,F304 280500 SI.425.2.SW 4 C-F-3 SUR 3- ELBOM NATL. SMLS A403,QP304 Pipe to Elbow 280600 Sl-425.2.SW-2A C.F.3 SUR 3- 6" X 44 ECC REDUCER Elbow to Rectucer 280700 SI-425-FN.4 CF3 SUR 3- 6" X 4" ECC. REDUCER, 300¹ REDUCER-TO FLANGE M/N FLANGE NATL. A182,F304 280800 SI-425-2-SN.2 C-F-3 SUR 3-FLANGE-TO PUMP l.24.SI.504 REF. DUG. HO. 01-073-A 280900 SI-676-57 F-A VT-3 3-BOX RESTRAINT F1.20 281000 SI-676-50 F-A VT-3 3-BOX RESTRAIHT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 448 REVI SIGH: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COKPOHENTS INSPECTIOH INTERVAL trav PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUKPS LOOP 1A INLET PIPING FIRST SECOND THIRD ZONE HUHBER: 1-073 ASKE PERIOD PERIOD PERIOD v-%;wgwees av SEC.'."HI .'.

                                                           ~
                                                                ~      t SUKKARY EXAHIHATIOH AREA                          CATGY       HDE                    OUTAGE-                   INSTRUCTIONS NUKBER     IDENTIFICATION                         ITEK   HO NETH         I 1 2  3    1  2  3      1 2  3      **CALIBRATIOHBLOCK~*

1-6-SI.425 REF. DIJG. NO. 01-073-A 281100 SIH-58 F-A VT-3 3-BASE RESTRAINT F1.20 I-24-CS-41 REF. D'N. NO. 01.073.A 281200 SI-676.4505 F A VT-3 3- PSA-35 Snubber 1-112 F1.20S l-24-CS.41 REF. DWG. NO. 01-073-B 281300 S I -676 2005 F A VT-3 3 RESTRAINT F1.20 I-14-SI 511 REF. DMG. NO. 01 073 B 281400 Sl-676-2005A F A VT-3 3-RIGID RESTRAINT F1.20 281500 S I H.69 F-A VT-3 3-VARIABLE SPRING BASE SUPPORT F1.20C 281600 SI.676-206 F-A VT-3 3-SLEEVE RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 449 REVISIOH: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI NPSI CS PUMPS LOOP 1A INLET PIPING FIRST SECOND THIRD ZONE NUMBER: 1-073 ASME PERIOD PERIOD PER ICO JlA 'I ( tdf PA I ~ L,;0 .\t v ~ 8 ~ @41 'Q4 1 4404

                                                            ~ W~

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* 44OVO 44K 4 '4 4 ~ I-14-SI-511 REF. DUG. NO. 01-073-B 281700 SI -676-9206 F-A VT-3 3-RESTRAINT F1.20 281800 SI-676-2074 F-A VT-3 3-RESTRAINT F1.20 281900 S I-676-2073 F-A VT-3 3-Rigid Sway Strut Assembly F1.20 282000 SI-676-2076 F-A VT-3 Rigid Sway Strut Assembly F1.20 I-14-SI-424 REF. DWG. NO. 01.073.B 282100 S I H-68 F-A VT-3 3-Rigid Sway Strut Assembly F1.20 I-6-SI-508 REF. DUG. HO. 01-073-C 282200 SI-676-403 F A VT-3 3- X Rigid Sway Strut Assembly F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 450 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAH STATUS PRESERVICE YEAR LPSI HPSI CS PUMPS LOOP 1A INLET PIPING FIRST SECOND THIRD ZONE NUMBER: 1.073 ASME PERIOD PERIOD PERIOD SEC."-XI

SUMMARY

EXAMINATION AREA CATGY NDE -OUTAGE------ INSTRUCTIONS NUMBER IDEHT IF I CAT IOH ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK+* I-6-S1-425 REF. DHG. NO. 01-073.C 282300 SI-676-9405 F-A VT-3 3 - - - X SPRIHG NANGER F1.20C 282400 SIH-164 F A VT3 3-Support F1.20 I-14-CS-7 REF. DUG. HO. 01-073-0 282600 S I -676.217 F A VT-3 3 BOX RESTRAINT F1.20

DATE: 01/09/98 ST ~ LUCIE HUCLEAR PLANT UNIT 1 PAGE: 451 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUHPS lOOP 1B INLET PIPING FIRST SECOND THIRD ZONE NUHBER: 1-074 ASHE PERIOD PERIOD I

                    - """-"'"-"-'-- -"'EC"      Xl"                CE'A U4  '     0444  V I PER   CO SUHHARY EXAHIHAT ION AREA                  CATGY    HDE        ------OUTAGE-----.                           INSTRUCTIONS NUHBER    IDENTIFICATION                   ITEH HO HETH        1 2    3       1   2  3      1 2   3        <<<<CALIBRATIOH BLOCK<<*

VOOllb'44 444 4W 4<< << I-24-SI-506 REF. DMG. NO. 01-074-A 282700 Sl-506-F'M-5 C.F-3 SUR 3- MELDED ELBOM Valve V07119 to Elbow 282800 SI 506-FM.4A C-F-3 SUR 3- (.250<<T) MELDED ELBOM Elbow to Elbow 282900 S1-506-4.S'M.3 C-F-3 SUR 3- (.250"T) MELDEO PIPE HATL. Elbow to Pipe A358,TP304,(.250"T) MELDED ELBOM 283000 SI-506.4-SM-2 C-F-3 SUR 3- (.250"T)MELDED PIPE Pipe to Pipe 283100 Sl-506-4-SM-1 C-F-3 SUR 3 . (.250"T)MELDED PIPE Pipe to Pipe 283200 Sl-506-FM-4 C.F.3 SUR 3- (.250"T) MELDED PIPE, 24"X Pipe to Tee 24"X 24" SID.MALL TEE HATL. RAB A403,MP304, EXAHIHE 2.5T PIPE

                                                                                                         & 100X OF TEE LONG SEAHS. IBP 283300   Sl-506-3-SM-2                    C-F-3    SUR      3-                                            (.250"T)   MELDED PIPE NATL.

Tee to Pipe A358,TP304, 24"X 24"X 24" RAB STD.MALL TEE, EXAHINE 2.5T PIPE & 100X TEE LOHG SEAHS.IBP

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 452 REVISION: 0 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAH STATUS PRESERVICE 'YEAR LPSI NPSI CS PUNPS LOOP 18 INLET PIPING FIRST SECOND THIRD ZONE NUHBER: 1 074 ASHE PERIOD PERIOD PERIOD wE,ww,a,, w csee rr qqerr ~ e e SclEC ~ vI SUHHARY EXAHIHATIOH AREA CATGY NDE OUTAGE------ INSTRUCTIONS HUNGER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRAT I OH BLOCK~* A aoP 4 t ws< ~ 4VCVQ t7ea>> Ae L ~A> VN) I-24-SI-506 REF. DMG. NO. 01-074-A 283400 SI-506.3-SM.I C-F-3 SUR 3- ( 250"T)

                                                                                                             ~       MELDED    PIPE Pipe to Pipe 283500   Sl-506-3-S'M.4                     C-F-3      SUR     3-                                        (.250"T)  MELDEO    PIPE Pipe to Pipe 283600   Sl-506-FM-3                        C-F-3     SUR      3-                                        (.250"T)  MELDED PIPE Pipe to Pipe 283700   Sl-506-2.SM-2                      C-F 3     SUR      3                                         (.250"T)  MELDED    PIPE Pipe to Pipe 283800   Sl-506.2.SM-1                       C-F-3     SUR     3-                                         (.250"T)  MELDEO    PIPE Pipe to Pipe 283900   SI 506-FM-2                         C.F-3     SUR     3-                                        (.250"T)  MELDED ELBOM NATL.

Pipe to EIbo~ A403,MP304 M, (.250"T) MELDED PIPE 284000 SI.506-1-SM-1 C-F-3 SUR 3- (.250"T) MELDEO PIPE Elbow to Pipe (.250"T) MELDED NATL'358,TP304, ELBOM

        . DATE:      01/09/98                                           ST. LUCIE NUCLEAR PLANT'UHIT 1                                             PAGE:              453 REVISION:             0                                    INSERVICE INSPECTION LONG TERH PLAH CLASS 2 ALL STATUS COHPOHEHI'S INSPECTION INTERVAL                       PLAN STATUS                 PRESERVICE YEAR LPSI NPSI CS PUMPS LOOP 1B INLET PIPING                                   FIRST      SECOND        THIRD ZONE NUMBER: 1-074                                 ASME                    PERIOD     PERIOD        PER ICO

, ~, ~ g,paraaa ~a, ~ aa, <<r tqra jr I >> w 'a << 'c.~l SFC vi X << SUHHARY EXAMINATION AREA OUTAGE---.--

                                                                                                                            'r CATGY     HOE                                                     INSTRUCTIONS NUHBER      IDENTIFICATION                         ITEH NO HETH      i   1 2  3     1   2  3      1 2  3             <<*CALIBRAT ION BLOCK~*

ev vva v vva rrrvrv 'rrv rr<<rvv << re vr r r r ' '<<lt r 1-24-S1-506 REF. DMG. NO. 01-074-A 284100 SI.506-FM-1 C-F-3 SUR 3- (.250"T) WELDED PIPE Pipe to Valve V-07-172 I 24-CS-C REF. DMG. NO. 01 074-A 284200 CS-4-FM-3 C-F-3 SUR 3- (.250"T) MELDED PIPE VALVE V-07.172 TO PIPE 284300 CS-4-2-SM-1 C-F-3 SUR 3- (.250"T) WELDED PIPE, 24" 150¹ PIPE-TO-FLANGE R/F M/H FLANGE NATL. A182,F304 I-2C-CS-40 REF. DMG. NO. 01-07C.B 284400 CS.40-FM-1 C-F-3 SUR 3 . (.250"T) MELOED PIPE Tee to Pipe 24"X 24nX 24u NATL'358,TP304, RAB STO.WALL TEE, IBP 284500 CS-40-1-SM-1 C-F-3 SUR 3- (.250"T) WELDED PIPE Pipe to Pipe 284600 Sl-40-FM-1A C-F-3 SUR 3 (.250"T) WELDED ELBOW HATL~ Pipe to Elbow A403,MP304 M, (.250"T) WELDED PIPE

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 454 REVISION: 0 IHSERVICE INSPECTIOH LOHG TERH PLAN CLASS 2 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUHPS LOOP 1B IHLET PIPING FIRST SECOND THIRD 20HE HUHBER: 1-074 ASHE PERIOD PER IOO PERIOD v v r '"'""'rSEC "Xl """'" SUHHARY EXAHIHAT ION AREA CATGY HDE - - - - - 0 U T A G E- INSTRUCTIONS ~ 'svwvvvvvvvvvwsvvvavvvv'rvsvvvv'v;WrVrr'tv HUHBER IDENT IF I CAT IOH ITEH NO HETH i 1 2 3 1 2 3 1 2 3 **GALI BRAT ION BLOCK>>>>

                                                                                                                             ~                'r', ~

I 24 CS-40 REF. DMG. NO. 01-074-B 284700 CS-40-1-SM-3 C F-3 SUR 3- (.250"T) MELOED PIPE NATL. Elbow to Pipe A358,TP304, (.250"T) MELDED ELBSI 284800 CS-40-FM-2 C-F-3 SUR (.250"T) MELDED ELBSI NATL. Pipe to Elbow A403,MP304 M, (.250"T) MELDED PIPE 284900 CS-40-2-SM-3 C F 3 SUR (.250"T) MELDED PIPE HATL. Elbow to Pipe A403,TP304, (.250"T) MELOED ELBOM 285000 CS-40-2-5'M-4 C.F-3 SUR 3- ( ~ 250>>T) MELOED PIPE ~ 24>'X 8 PIPE-TO.MELDOLET MELOOLET HATL. A182,F304 SCH. 20. 285100 CS-40-2-S'M-2 C-F-3 SUR 3- ( ~ 250"I') MELDED PIPE Pipe to Pipe 285200 CS-40-2-SM-1 C F 3 SUR 3- (.250"T) MELOEO PIPE Pipe to Pipe 285300 CS-40-FM-3 C F 3 SUR (.250"I') MELDED PIPE Pipe to Pipe

DATE: 01/09/98 .ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 455 REVI SION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUHPS LOOP 1B INLET PIPING FIRST SECOHD THIRD ZONE HUMBER: 1-074 ASHE PERIOD PERIOD PERIOD ~ s 5'>> w" s<<>>' .>> '>>'(~>>1 W>>>>l>>>>>> ~ 1A>>.SEC Xl-SUNHARY EXAMINATION AREA CATGY NDE ------OUTAGE------ INSTRUCT IOHS NUMBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 <<<<CALIBRATION BLOCK<<* r>>W>>w>> <<>>>> I-24 CS-40 REF. DWG. NO. 01-074-B 285400 CS-40-3-SW-3 C F-3 SUR 3- (.250"T) WELDED PIPE Pipe to Pipe 285500 CS-40-3-SM-2 C-F-3 SUR 3- (.250"T) WELDED PIPE, 24"X Pipe to Tee 24"X 14" REDUCING TEE NATL. RAB A403,WP304, IBP 285600 CS.40-3-SW-1 C-F.3 SUR 3- 24"X 14<< CONC REDUCER, 24"X Tee to Reducer 24"X 14" REDUCING TEE ~ IBP RAB I-14-SI-512 REF. DWG. NO. 01-074-C 285700 S I.512- FW-1 C-F-3 SUR 3- 24"X 14" CONC REDUCERS Reducer to Pipe (.250"T) MELDED PIPE 285800 SI-512-1-SW-4 C-F-3 SUR 3- (.250"T) WELDED PIPE, (.250"T) Pipe to Elbow MELDEO ELBOW NATL. A403,MP304 W 285900 Sl -512-1-SW-3 C-F-3 SUR 3- (.250"T) MELDED PIPE NATL. Elbow to Pipe A358,TP304, ( 250<<T) MELDED ELBOW 286000 Sl-512-1-SM.2 C-F-3 SUR 3- (.250"T) WELDED PIPE, (.250"T) Pipe to Elbow WELDED ELBOW NATL. A403,MP304 W

t f '1 DATE: REVISION:

      ~ V~

NUHBER V IW 01/09/98 0 LPSI HPSI CS PUNPS LOOP 1B INLET PIPING ZONE HUNBER: lgrA, 1.074 6 SUHNARY EXAHIHATION AREA

                             'I%th>>

IDENTIFICATION

                                            '  ~ P ASHE SCP ECo n CATGY ST. LUCIE NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN INSPECTION INTERVAL HDE ITEN HO NETH CLASS 2 ALL STATUS CONPOHENTS I

FIRST PERIOD PLAN STATUS SECOND PERIOD

                                                                         ------OUTAGE----

1 2 3 1 2 3 1 THIRD PERIOD 2 3 PRESERVICE YEAR INSTRUCTIOHS

                                                                                                             **CALIBRATIONBLOCK**

PAGE: 456 o>>'A'-14-SI-512 REF. DMG. NO. 01 074-C 286100 S I -512.1.SM.1 C-F-3 SUR 3 . (.250"T) MELDED PIPE NATL. Elbow to Pipe A358,TP304, (.250"T) MELDED ELBSI 286200 SI.512-FM-2 C-F-3 SUR 3- (.250"T) MELDED PIPE, (.250"T) Pipe to Elbow MELDED ELBSI NATL. A403,MP304 M 286300 SI-512-2-SM-3 C-F-3 SUR 3 . (.250"T) MELDED PIPE IIATL. Elbow to Pipe A358.TP304, (.250"T) MELDED ELBSI 286400 Sl.512.2.SM-2 C F-3 SUR 3- (.250"T) MELDED PIPE, (.250"T) Pipe to Elbow MELDED ELBOM NATL. A403,MP304 M 286500 Sl-512-2-SM-1 C.F.3 SUR 3- (.250"T) MELDED PIPE NATL. Elbow to Pipe A358,TP304, (.250"T) MELDED ELBSI 286600 Sl.512.FM.3 C.F.3 SUR 3- ( ~ 250"T) MELDED PIPE PIPE TO VALVE V-3432 286700 Sl-512-FM-4 C.F.3 SUR 3- (.250"T) MELDED PIPE VALVE V-3432 TO PIPE

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 457 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL Sl'ATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUHPS LOOP 'IB INLET PIPING FIRST SECOND THIRD ZONE HUHBER: 1-074 ASHE PERIOD PERICO PERIOD P '>>, g)4f',hl.v4$ I'l>wP '\0 let ~ 'N>> '7% ~ A i~ 0 wP ~ SEC Xl \ ~" SUHHARY EXAHINAY ION AREA NUHBER 1~ " IDENTIFICATION 4>> l4>> ~ '0>> J>>>> CATGY ITEN 4 HDE HO METH W (

                                                                                           - - - - - - 0 1  2  3 4

1 0 U T A G E 2 3

                                                                                                              +

1 2 3 IHSTRUCTIOHS

                                                                                                                                         **GALI BRAT ION BLOCK>>>>

t, 4 lA I

                                                                                                                                                    +    L '1 i "J ~

1-512 REF. DMG. NO. 01-074-C

                                                                                                                                                                     '-14-$

286800 SI-512-3-SM-1 C-F-3 SUR 3 (.250"T) MELDEO PIPE, (.250"T) Pipe to ElboM MELDED ELBOM NATL. A-403 MP 304 M 286900 SI-512-FM-5 C-F-3 SUR 3- (.250"T) 'MELDED ELBOM ELBOM TO VALVE V 07-001 I-14-$ 1-466 REF. DMG. HO. 01-074 C 287000 Sl.466- FM-1 C-F-3 SUR 3- ( ~ 250"T) MELDEO ELBOM VALVE V.07-001 TO ELBOM 287100 Sl.466-1.SM-1 C.F.3 SUR 3- (.250"T) MELDED ELBOM, 14>>X Elbow to Tee 14"X 10" REDUCING TEE 287200 Sl -466-1-SM-2 C-F-3 SUR 3- ( ~ 250"T) MELDED PIPE NATL. Tee to Pipe A358,TP304, 14"X 14"X 10" REDUCING TEE 287300 SI-466-1-SM-3 C-F-3 SUR 3- (.250"T) MELDEO PIPE, 14" 300¹ PIPE-TO-FLANGE ($ $ -3.18) R/F M/H FLANGE NATL. A182,F304 287400 Sl-466-2-SM-1 C.F-3 SUR 3- (.250"T) MELDED PIPE, 14" 300¹ FLAHGE (SS-3-1B)-TO-PIPE R/F M/H FLANGE NATL. A182,F304

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 458 REVISION: 0 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUMPS LOOP 1B INLET PIPING FIRST SECOHD THIRD ZONE NUMBER: 1.074 ASHE PERIOD PERIOD PERIOD C " O'AC 'II RBI,A AR R A, I 'BAR R. Prw 4K Ii 'Bc ~ BR SEC %,XI Av ~ ~A SNARY EXANIHAT ION AREA CATGY MDE ------OUTAGE------ INSTRUCT IOHS NUMBER IDENT IF I CATION ITEH NO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* A e ~ I I I ~ M 4 hAA IS%SR AA ~ 1-1C-SI.C66 REF. DMG. NO. 01.074-C A 287500 SI 466-2-SM-2 C.F-3 SUR 3 (.250"T) MELDED PIPE, 14"X 12" Pipe to Reducer ECCENTRIC REDUCER NATL A403,MP304 M 287600 Sl-466.2.SM-3 C-F-3 SUR 3- 12" 400¹ R/F M/M FLAHGE NATL. REDUCER-TO-FLANGE A182,F304, 14"X 12" ECCEH'IRIC RAB REDUCER, EXANIHE 100X OF THE REDUCER LONG SEAHS. terminal end I-14-CS-6 REF. DMG. MO. 01-074-8 287700 CS.6-FM.1 C-F-3 SUR 3- 24"X 24"X 14" REDUCIHG TEER Tee to Elbow 14" MELOEO ELBSI, EXANINE 100X RAB OF THE TEE AMD ELBSI LONG SEAHS. IBP;This ueld is inaccessible due to permanent hanger verified in 1990. 287800 CS-6-1-SM-1 C-F-3 SUR 3- (.250"I') MELDED PIPE NATL. Elbou to Pipe A358,TP304, (.250"I') MELOED ELBSI 287900 CS-6-F1I.2 C-F-3 SUR 3- (.250"T) MELOED PIPE PIPE-TO-VALVE (V-07-124) 288000 CS.6.FM 3 C-F-3 SUR 3- (.250"T) MELOED ELBSI VALVE (V.07.124)-TO-ELBOM

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 459 REVI SION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUMPS LOOP 1B INLET PIPING FIRST SECOND THIRD ZONE NUMBER: 1-074 ASHE PERIOD PERIOD PERIOD rvi. i imp'.(,wt i iv:

                               ~

t i i' ~ > SEC 'XIi

             ~     ~                  ~                      ~

SUHHARY EXAHINATION AREA CATGY NDE - --OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION

                                              \

ITEH NO NETH

                                                                     \~%)A g 23       123            2  3      i~CALIBRATION BLOCK*+

Ot Q% 4 po $ $ p p  %%,%,, 0 ( I-14-CS-6 REF. DMG. NO. 01.074-8 288100 CS-6.2-SM-1 C-F-3 SUR 3 (.250"T) MELDED PIPE NATL. Elbow to Pipe A358,TP304, (.250"T) MELDED ELBOM 288200 CS-6-2.SM-2 C-F-3 SUR 3- (.250"T) MELDED PIPE, 300¹ R/F PIPE-TO-FLANGE (SS-07-iB) M/N FLANGE NATL. A182,F304 288300 CS-6-3.SM-1 C-F-3 SUR 3- (.250"T) MELDED PIPE ~ 300¹ R/F FLAHGE (SS-07-18)-TO-PIPE M/N FLANGE NATL. A182,F304 288400 CS-6-3-S'M.2 C F-3 SUR 3- (.250"T) MELDED PIPE, 14"X Pipe to Reducer ECCENTRIC REDUCER HATL. A403,MP304 M 288500 CS-6-3-SM-3 C.F-3 SUR 3- 124 400¹ R/F M/H FLANGE NATL. Reducer to Flange A182,F304, 14"X 12" ECCEHTRIC RAB REDUCER, EXAHINE 100 X OF REDUCER LONG SEAHS.terminal end I B-SI 507 REF. DMG. NO. 01-074-D 288600 S 1.507. FM-1 C-F.3 SUR 3- SEAHLESS PIPE Meidotet

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 460 REVISIOH: 0 INSERVICE IHSPECTIOH LOHG TERH PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUMPS LOOP 1B INLET PIPING FIRST SECOND THIRD 20HE NUMBER: 1 074 ASHE PERIOD PER100 PERICO f>>'L ">>I'El fl >>I ]Ã t'Z 4+>i II -6 V1 <8 SEC'+'XI

SUMMARY

EXAHI NATION AREA CATGY NDE -----.OUTAGE------ INSTRUCTIONS NUMBER IDENT I F ICATION ITEH NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRAT IOH BLOCK>>>> I-B-SI.427 REF. DUG. NO. 01.074.D 288700 S I -427- FM-1 C-F-3 SUR 3- 8>> SCH.40S X 8>> SCH.40S X 8>> VALVE V-3410 TO TEE SCH.20 TEE RAB 288800 S1-427.1-S'LI-1 C-F-3 SUR 3 8>> SCH.40S X 8>> SCH.40S X 8>> Tee to Reducer SCH.20 TEE ~ 8>>X 4>> CONC. RAB REDUCER 288900 S l.427-1.SM 2 C.F.3 SUR 3- SEAHLESS PIPE NATL. Tee to Pipe A312,TP304, 8>>SCH.40S x RAB 8 SCH.40S x 8 SCH.20 TEE 89000 SI.427.1.SH-3 C-F-3 SUR 3- SEAHLESS PIPE, SEAHLESS ELBSJ Pipe to Elbow HATL ~ A403,UP304 289100 SI-427-I-SW.4 C-F-3 SUR 3- SEAHLESS PIPE HATL. Elbow to Pipe A312,TP304, SEAHLESS ELBSI 289200 SI-427-FW.2 C-F-3 SUR 3- SEAHLESS PIPE, SEAHLESS ELB(Q Pipe to Elbow HATL. A403, IIP304 289300 SI-427.2-SU-5 C-F-3 SUR 3- SEAHLESS PIPE NATL. Elbow to Pipe A312,TP304, SEAHLESS ELBOH

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 461 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUMPS LOOP 1B IHLET PIPING FIRST SECOND THIRD ZONE NUMBER: 1-074 ASME PERIOD PERIOD PER I CO >>cs (",>>: e .>>>>>>,>>>>r+ aw>v>>, w>> . ~ ~ ai EC ~ All Sch n v ~

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENT IF I CATION ITEM HO METH 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK**

                                           ~>>v>>>>>>>>>>v                        (

s>>>>w+ o>>vvvaawowvv'sw>> a>>'iver" >>' s s~ I-8-SI-427 REF. DWG. HO. 01 074 0 289400 SI-427-2-SW-4 C-F.3 SUR 3- SEAMLESS PIPE, SEAMLESS ELBOW Pipe to Elbow NATL. A403,WP304 289500 SI-427-2-SW-3 C-F-3 SUR 3- SEAMLESS ELBOW, 8"X 8"X 8" Elbow to Tee TEE, INTERMEDIATE BREAK POINT RAB (IBP) 289600 SI-427-2-SW.2 C-F-3 SUR 3- 8aX 8aX Ba TEE~ BaX 6" CONC. Tee to Reducer REDUCER, INTERMEDIATE BREAK RAB POINT (IBP); Permanent limitation from 8 to 10 o'lock position due to permanent hanger SI-676-35 289700 SI-427-2-SW-1 C-F-3 SUR 3- 8"X 8"X 8" TEE, 8"X 6" CONC. Tee to Reducer REDUCER INTERMEDIATE BREAK RAB POINT (IBP); Permanent limitation from 2 to 4 o'clock due to hanger Sl-676-358 I-8-SI-426 REF. DWG. NO. 01-074-D 289800 SI-426-FW-21 C-F-3 SUR 3 . 8"X 6" CONC. REDUCER, SEAMLESS Reducer to Pipe PIPE NATL. A312,TP304 289900 Sl-426-11-SW-1 C-F-3 SUR 3 . SEAMLESS PIPE, SEAMLESS ELBOW Pipe to Elbow NATL. A403,WP304

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 462 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAH CLASS 2 ALL STATUS COHPONEHI'S INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR LPSI NPSI CS PUHPS LOOP 1B INLET P IP I NG FIRST SECOND THIRD ZONE NUHBER: 1-074 ASHE PERIOD PERICO s '$(>>WP(,AI >>Vh r, ~

           ~           rt   hp%!                '"'   "SEO" Xl""    '"-'                                 PERIOD SUHMARY EXAHINATION AREA                           CATGY      NDE                 -OUTAGE------                     INSTRUCTIONS NUHBER    IDEHTIFICATION                            ITEN NO NETH       I 1 2   3       1    2   3  1 2  3          **CALIBRATIONBLOCK>>>>

I 4 4 0 /. V %00 EW 0 0 %1 OV ~ 8 0  % 'AVt I-8-SI-426 REF. DNG. NO. 01-074-D 290000 SI.426-FW-22 C.F.3 SUR 3- SEAHLESS PIPE NATL. ~ Elbow to Pipe A312,TP304, SEAHLESS ELBOM 290020 Sl 676-9373 F-A VT-3 3-BASE RESTRAINT F1.20 290050 S I -676-374 F A VT-3 3-RIGID SHAY STRUT ASSY. F1.20 290100 S I -426.14-SM.1 C-F-3 SUR 3- SEAHLESS PIPE, SEAHLESS ELBOM Pipe to Elbow NATL. A.403 NP304 290200 SI-426-FW.23 C-F.3 SUR 3- SEAHLESS ELBDM Elbow to Valve V-3402 290250 Valve V-3402 3 Ko examination required VaLve I-6-SI-428 REF. DUG. NO. 01-074-E 290900 SI.428-FN.21 C-F-3 .SUR 3- 8"X 6" CONC. REDUCER, SEAHLESS Reducer to Pipe PIPE NATL. A312,TP304

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 463 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUHPS LOOP 1B INLET PIPING FIRST SECOND THIRD ZONE NUHBERt 1-074 ASHE PERIOD PERIOD PER I CO i$ 41 fflv%8,'I~ 'Is i %%i 8 )o'vs, I wag'4 4 ~ ~ wit Sch ECs

                                                               > vi              '   i iv i'4 ~ eAhiiv14    i ~

SUHHARY EXAHINATIOH AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH i 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK** s<<vaiivaoir ~svv arri r i sv vasiv v avai iced~ ioii i < .ii"irv 1-6-SI.428 REF. DWG. NO. 01.074-E 291000 Sl-428-14-SW-1 C-F-3 SUR 3- SEAHLESS PIPE, SEAHLESS ELBOW Pipe to Elbow HAIL. A-403 IIP304 291100 S I.428- FW-22 CF3 SUR 3 SEAHLESS PIPE NATL. Elbow to Pipe A312,TP304, SEAHLES ELBOW 291200 Sl-428-12-SW-1 C-F-3 SUR 3 . SEAHLESS PIPE, SEAHLESS ELBOW Pipe to Elbow NATL. A403,WP304 291300 Sl-428-FW.23 C F-3 SUR 3. SEAHLESS ELBOW ELBOW TO VALVE V-3411 291400 SI-428-FW-24 C.F-3 SUR 3 . SEAHLESS PIPE VALVE V-3411-TO-PIPE 291500 SI-428-13.SW-1 C F 3 SUR 3- SEAHLESS PIPE, 300¹ R/F W/N PIPE-TO.FLANGE (SS-3 28) FLANGE NATL. A182,F304 291600 SI.428-11-SW.4 C.F-3 SUR 3- SEAHLESS PIPE, 300¹ R/F W/H FLANGE (SS 3-28)-TO PIPE FLANGE HATL. A182,F304

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE 464 REVISION: 0 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECT I OH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUMPS LOOP 1B IHLET P PING F I RST SECOHD THIRD ZONE NUHBER: 1 074 ASHE PERIOD PERIOD PERIOD "SEC. SUHHARY EXAHIHAT IOH AREA Xl'ATGY NDE - - - - --OUTAGE- - - - -- INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK** 1-6-SI.428 REF. DMG. NO. 01.074-E 291700 SI-428 11-SM.3 C-F-3 SUR 3- SEAHLESS PIPE, SEANLESS ELBOM Pipe to Elbow NATL. A403,MP304 291800 SI-428.11-SM-2 C.F.3 SUR 3- SEAHLESS ELBOM, 6<<X 4a Elbow to Reducer ECCENTRIC REDUCER 291900 SI-428-11.SM-1 C.F-3 SUR 3- 6"X 4e ECCENTRIC REDUCERS 4e REDUCER.TO.FLANGE 300¹ R/F M/N FLANGE RAB This veld NATL'182,F304, inaccessible due to permanent hanger. I-24 Sl 506 REF. DMG. NO. 01 074 A 292000 S I -676-107 F-A VT-3 3-BOX RESTRAINT F1.20 292100 SI-676.109 F-A VT-3 3-RIGID SHAY STRUT ASSY. F1.20 292200 SI.676-112 F A VT-3 3-RIGID RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 465 REVI SION: 0 IHSERVICE IHSPECTIOH LOHG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUMPS LOOP 1B INLET PIPING FIRST SECOND THIRD ZONE NUMBER: 1-074 ASME PERICO PERIOD PERIOD SEC:" XI-.-

SUMMARY

EXAMIHATIOH AREA CATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER s IDEHT IF I CATION e v v av s ITEM NO METH s va ( 1 as'~vss'a'sv 2 3 1 v asvse 2 3 V 1 a'se es 2 3 v ~ s 'a **CALIBRATIONBLOCK

                                                                                                                     'v      v '       ssc l-24-SI 506     REF. DNG. NO. 01 074-A 292300    SIH-55                               F-A      VT-3 3 X RIGID RESTRAINT                      F1.20 292400    SI.676 116                          F-A       VT-3    3-BOX RESTRAINT                        F1.20 292500    S I-676-117A                         F-A       VT-3 3 X RIGID RESTRAINT                      F1.20 292600    SIH-57                               F-A       VT-3   3-RIGID RESTRAINT                      F1.20 292700    SI.676-1221                          F-A       VT-3 3    X RIGID RESTRAINT                      F1.20 I-24-CS 40      REF. DUG. HO. 01-074-B 292800    S I.676-125                          F-A       VT-3   3-RIGID SHAY STRUT ASSY.               F1.20 292900    SIH.54                               F-A       VT-3   3-VARIABLE SPRING HANGER               F1.20C

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 466 REVISION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI NPSI CS PUMPS LOOP 1B INLET PIPING FIRST SECOND THIRD ZONE NUHBER: 1 074 ASHE PERIOD PERIOD PERIOD C(> q'+tC', iWIW t W ~ iw v ScP'ivI w e i s ss ws v s ~ r SUHMARY EXAMINATION AREA E ~ CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS HUHBER IDENTIFICATION ITEH NO NETH 1 2 3 1 2 3 2 3 <<*CALIBRATIOH BLOCK~* s v o>>aa r nse s a'o'Saoa>>>a (

                                                                          'w " 've 0 ~Vs        '  l"   v '    <<t' I 24-CS 40    REF. DWG. NO. 01-074-B I

293000 S I -676.127 F.A VT-3 3 PSA-10 Snubber 1-085 F1.20S 293100 SI.676-129 F-A VT-3 3- PSA.3 Snubber 1-086 F1.20S 293200 SIH-62 F A VT-3 3- - - X RESTRAIHT F1.20 RAB 293300 S I.676-1321 F-A VT-3 3-BOX RESTRAINT F1 '0 293400 SI.676.9133 F-A VT-3 3-RIGID SWAY STRUT ASSY. F1.20 293500 SIH-63 F.A VT-3 3-RESTRAIHT F1.20 I-14.SI.512 REF. DWG. NO. 01-074-C 293700 SI-676.9137 F-A VT.3 3-RIGID SWAY STRUT ASSY. F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 467 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN,STATUS PRESERVICE YEAR LPSI HPSI CS PUMPS LOOP 1B INLET PIPING FIRST SECOND THIRD 20NE NUMBER: 1-074 ASME PER ICO PERIOD PER ICO <<. 'v, i<a'. ' '<

               ,    <v ~ ~ ~  w<  v v<<< ~ . ~~    ~    v   Ocr    vI  < ~<

SUMMARY

EXAMINATION AREA CATGY HDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO METH 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK~* I-14-SI-512 REF. DUG. NO. 01-074-C 293800 SIH-64 F-A VT-3 3-RESTRAINT F1.20 293900 SI-676-1375 F-A VT-3 3-BOX RESTRAINT F1.20 294000 SI-676-144 F-A VT-3 3-RIGID SHAY STRUT ASSY. F1.20 294100 SIN.65 F-A VT-3 3-VARIABLE SPRING HAHGER F1.20C 294200 SI-676-146 F-A VT-3 3-BOX RESTRAINT F1 ~ 20 294300 SI -676 149 F-A VT-3 3 PSA-1 Snubber 1-239 F1 '0S 294400 SIN-65A F-A VT 3 3-VARIABLE SPRIHG BASE SUPPORT F1.20C

y, DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 468 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPOHENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUHPS I.OOP 1B INLET PIPING FIRST SECOHD THIRD I, ZONE NUHBER: 1.074 ASHE PERIOD PERIOD PERIOD 4 q'Sv'tp(v /I til,'8 r.t'4T+ 5, Y,ates pwN t sr %v( SECy Xl NN \ tp

                                                         %1 ~

SUHHARY EXANIHAT I OH AREA CATGY NDE - - - - - OUTAGE . - - - IHSTRUCTIOHS NUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** ~ i 'vA 0 5 It%,h%f \ 8 a ~ 0 0 %1I 1% <<E% 4 wM W ~ I-14-SI-512 REF. DMG. HO. 01-074-C 294600 SIH.66 F.A VT 3 3 X VARIABLE SPRING BASE SUPPORT F1.20C I-B-SI-427 REF. DWG. HO. 01-074 D 294700 SI-676-350 F-A VT.3 3-BOX RESTRAINT F1.20 294800 SIN.186 F-A VT-3 3-CLEVIS HANGER F1.20 294900 S I H-187 F.A VT-3 3-RESTRAINT F1.20 295000 SIN.188 F A VT-3 3-RESTRAINT F1.20 295100 SI-676-357 F A VT-3 3-RIGID SHAY STRUT ASSY. F1.20 295200 SI-676-358 F-A VT-3 3-RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANI'NIT 1 PAGE: 469 RE V I S ION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSI CS PUMPS LOOP.18 INLET PIPING FIRST SECOND THIRD ZONE NUMBER: 1.074 ~, i \ ~ '.a-Kr~>h'..t;i l .\ .v'pe:(aa r~>".ii~ w' ~ a ASME wag SEC

                                                                ~

XI'>> aa PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE - - - - -- INSTRUCT IONS NUMBER'DENTIFICATION ITEH HO NETH I 1 2 3 1 2 3 1 2 3 ~~CALIBRATIOH BLOCK** j ~ ~ a %a a a are a a a\aaaa a'a <<a a v vwaaalv vaat aaa aaa a aa a ah v a t ' a 'a 1

                                                                                                                                                     '     w(

I-B.SI-428 REF. DHG. HO. 01.074-E 295300 SIH-124 F.A VT 3 3-CLEVIS HANGER F1.20 295400 SI.676.9362 F-A VT-3 3-BASE RESTRAINT F1.20 295500 Sl.676-364 F-A VT-3 3-RIGID SHAY STRUT ASSY. F1.20 295600 SIH-123 F A VT-3 3-VARIABLE SPRING BASE SUPPORT F1 '0C I-8-SI-426 REF. DUG. NO. 01.074-D 295700 SIH-125 F A VT-3 3-RESTRAINT F1.20 I 24-CS-40 REF. DUG. NO. 01-074-B 296100 S I -676.136 F-A VT 3 3 X BOX RESTRAINT F1.20 RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 470 REV IS I OH: 0 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR LPSI HPSl CS PUMPS LOOP 1B INLET PIPING FIRST SECOHD THIRD ZONE NUMBER: 1 074 ASME PERIOD PERIOD PERICO gl;,V%"ht I,)'4 Pn}$ 5/,,t i go > \ v iy SEC w, XI

SUMMARY

EXAMIHAT ION AREA CATGY HDE OUTAGE------ INSTRUCTIONS NUMBER IDENT I F ICATION ITEM NO METH I 1 2 3 2 3 1 2 3 *~CALIBRATION BLOCK** ~, 8 0 t yt 1tt orye w o ill i

                                                                                                                                          ~

I-14-CS-6 REF. DUG. NO. 01-074-B 296200 SI-676-168 F.A VT.3 3 X SADDLE RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 471 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMN COOLING HEAT EXCHANGER 1B DISCHARGE PIPIN FIRST SECOND THIRD ZONE NUHBER: 1 075 ASHE PERIOD PERIOD PERIOD tl I, l t '4I ,A,t+ ',', <<;>vve'.Ill'0 SUHHARY EXAHIHATION AREA

                                  <<(<< ~,,*v t9'4'9 I   % '4 1r 41 SEC j' XI CATGY
                                                                              ~

NDE ... - - - 0 U T A G E - - - - -- INSTRUCTIONS NUNBER IDENT IF I CAT IOH ITEN NO NETH 1 2 3 1 2 3 1 2 3 <<<<CALIBRATIOH BLOCK<<<< I-10-SI-474 REF. DMG. HO. 01-075 296300 SI-474-FM-I C.F.3 SUR 3-Tee to Valve V-3457 296350 Valve V-3457 3 No examination required Valve 296400 SI-474.FM.2 C-F-3 SUR 3-Valve V-3457 to Pipe 296500 SI-474-FM-2A CF3 SUR 3-Pipe to Pipe 296550 S I.678-122 F-A VT.3 3 . X RIGID SMAY STRUT ASSY. F1.20 296600 SI.474.1-SM-2 C.F-3 SUR 3- ELBOM NATL. A403,MP304 Pipe to Elbow 296700 SI.474.1.SM-1 C-F-3 SUR 3- PIPE NATL 358,TP304 Elbow to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 472 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANGER 1B DISCHARGE PIPIN FIRST SECOND THIRD 2ONE NUHBER: 1.075 ASHE PERIOD PERICO PERIOD >.;>> 'c>'b>'>;t >vp

                     ~ ~     i.t>>t   >>wv. ~   r;w   a    > iwi Scr EC0  Yl.

X SUHHARY EXAHI NATION AREA CATGY HDE - -- - --OUTAGE IHSTRUCTIOHS HUHBER IDENTIFICATION ITEN HO NETH I I 2 3 I 2 3 1 2 3 <<<<CALIBRATION BLOCK<<<<

~   > ~.      >               a>. see    oooo  >  eW  ~               ea W     rt. e    e   e   aw~tr          r          > ea           e 1-10-SI-474      REF. DUG. NO. 01-075 296750          SIH-8I                                F-A       VT 3      3-VARIABLE SPRING HANGER                F1.20C 296800          Sl-474.Fll-3                          C.F.3     SUR       3-                                          ELBOM  NATL. A403,MP304 Pipe to Elbow 296900          SI-474.2-SM.I                        C-F-3      SUR       3-                                          PIPE NATL. A358,TP304 Elbow   to Pipe 96950        SIH-80                                F-A        VT-3 3 CLEVIS HANGER                         F1.20 297000         SI-474-FW.4                           C-F-3      SUR       3-Pipe to Reducer

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 473 REVISIOH: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANGER 1A INLET PIPING FIRST SECOND THIRD ZONE NUNBER: 1-076 ASHE PERIOD PERIOD PERIOD , wl vlvlYplt5 vh, ~ 4 yr).A w A9 '4 a ' 4 ScP vl E00% X SUNNARY EXANINATIOH AREA CATGY HDE 0 UTAGE- INSTRUCTIONS NUNBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK** I-12-CS-15 REF. DWG. NO. 01-076 I 297400 'S-15-1-SW.1 C F 3 SUR 3- 12" X 8" COHC. REDUCER NATL. FLANGE-TO-REDUCER A403,WP304, SCH. 30. 297500 CS-15-FM-18 C-F-3 SUR 3- MELDED PIPE NATL. A358,TP304 Reducer to Pipe 297600 CS.15-FW-1 C-F-3 SUR 3- WELDED PIPE PIPE TO VALVE V-07-1554 297700 CS.9-FW-1 C F-3 SUR 3- MELOED ELBOW VALVE V.07-1554 TO ELBSI 297800 CS-9-FW-2 C.F.3 SUR 3- WELDED ELBSI ELBSI TO VALVE V-07-1514 I-12-SI-412 REF. DWG. NO. 01-076 297900 S I -412- FW.1 C.F-3 SUR 3- MELDED PIPE VALVE V-07-1514 TO PIPE 298000 SI-412-1-SW-1 C-F-3 SUR 3 WELDED ELBSI NATL. A403,WP304 Pipe to Elbow

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANI'NIT 1 PAGE: 474 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COKPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANGER 1A INLET PIPING FIRST SECOND THIRD ZONE HUHBER: 1-076 ASKE PERIOD PERIOD PERIOD

g. c:; ps.v:i q prese s i'..i,,q~, .ir~rra ~ r i ~ air SEC ".XI ~ .~

SUKKARY EXAKIHATION AREA CATGY HDE -----OUTAGE------ INSTRUCT IOHS NUKBER IDEHTIFICATIOH ITEK NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~~ I-12-SI 412 REF. DUG. NO. 01.076 298100 SI.412-FH.2 C-F-3 SUR 3- WELDED PIPE NATL'358,TP304 Elbow to P'ipe 298200 SI-412.2-SN.1 C-F-3 SUR 3 MELDEO PIPE Pipe to Pipe 298300 Sl.412 FN-3 C-F-3 SUR 3- UELDED PIPE Pipe to Pipe 98400 S I-412 FN-5A C-F 3 SUR 3 NELDED PIPE Pipe to Pipe 298500 Sl-412-FII 58 C-F.3 SUR 3- NELDED ELBOM KATL. A403,IIP304 Pipe to Elbow 298600 SI.412-3-SN.1 C.F-3 SUR 3- UELDED PIPE NATL. A358,TP304 Elbow to Pipe 298700 SI.412.FM-4 C-F-3 SUR 3- MELDED ELBOW NATL. A403,IIP304 Pipe to Elbow

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 475 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE 'YEAR SNUTDOMN COOLING HEAT EXCHANGER 1A INLET PIPING FIRST SECOND THIRD ZONE NUHBER: 1-076 ASHE PERIOD PERIOD PER ICO I,vv t'i:%It Pl'ie gq;t,>s v ~ rr} <<y ~ % 1 l vh'ScPI w vl 4w 'eVo' r' I wb's@

                                                                 ~  ~

~ (ep SUHHARY EXAHIHATION AREA NUHBER w IDEHTIFICATIOH

                           '          'r '<<v 'l                 CATGY A1lQ'I HDE ITEN NO HETH i Iil 0+4
                                                                                      - - - - - - 0 1   2   3
                                                                                       '@Ca;VC<<

1 Jill, tJV U T A G E 2 3 sS<<<<C 1 2 i 3

                                                                                                                              ' '  "0   v INSTRUCTIONS
                                                                                                                                          <<<<CALIBRATIOH BLOCK<<*
                                                                                                                                                       ""   . 'g'~'Q       ns 412  REF. DMG. NO. 01-076
                                                                                                                                                                              '-12-SI 298800       S I -412-4 SM-1                             C-F-3       SUR    3                                                      MELDED ELBOM Elbow to Elbow 298900      Sl-412-4-SM-2                                C-F-3       SUR    3-                                                     MELDED  PIPE NATL~ A358,TP304 Elbow       to Pipe 299000      SI-412-4-FM-4A                               C-F-3      SUR    3-                                                      MELDED ELBOM NATL. A403,MP304 Pipe to Elbow 299100      S1-412-4.SM.8                                C-F-3      SUR    3-                                                      MELDED ELBOM,  12" X 12"  X 1 Elbow to Tee                                                                                                           REDUCING TEE 299200      Sl-412.4-SM-9                                 C-F-3     SUR     3-                                                      12" X 12"  X 10" REDUCING TEE/

Tee to Reducer 12" X 10" REDUCER 1-10-$ 1-412 REF. D'MG. NO. 01-076 299300 Sl-412-FM.5 C-F-3 SUR 3 . 10" X 8" REDUCER, MELDED PIPE Reducer to Pipe NATL. A358,TP304 I-12-SI-412 REF. DMG. NO. 01-076 299400 CS-678-89 F-A VT-3 3-BASE RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANI'NIT 1 PAGE:. 476 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMN COOLING HEAT EXCHANGER 1A INLET PIPIHG FIRST SECOND THIRD ZONE NUHBER: 1-076 ASNE PERIOD PERIOD PERIOD

  $ t, '8 ~ 0 ~                               "   "SEC:"XI" .

SUHHARY EXAHIHATIOH AREA CATGY HDE ------OUTAGE-.---- INSTRUCT IOHS NUHBER IDENT IF I CATION ITEN HO HETN 2 3 3 3 <<*CALIBRATIOH BLOCK~* ~~ \ o a s ~ e, a see a ea v v v ~ I 1 awbwsor 5 VP< 1 2

                                                                                             'a 'e 4' 1 2
                                                                                                               >> ll 'i  w1 ~

I-12.SI-412 REF. DUG. NO. 01-076 299500 CSH-23 F-A VT-3 3- X VARIABLE SPRING HANGER F1.20C 299600 CS.678.84 F-A VT-3 3-RESTRAINT F1.20 299700 CS.678-815 F-A VT-3 3-RIGID SHAY Sl'RUT ASSENBLY F1 '0 299800 Sl-678-82 F A VT-3 3- o BOX RESTRAIHT F1.20 299900 Sl.678.791 F-A VT-3 3-BOX RESTRAINT F 1.20 300000 CS-678-77 FA VT3 3- - - - - X RIGID S'IIAY STRUT ASSEHBLY F1.20 300100 CSH-26 F A VT-3 3-VARIABLE SPRING HANGER F1.20C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE! 477 REVISION: 0 INSERVICE IHSPECTION LONG TERM PLAN

                                                                                                                                         ~

CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDONH COOLIHG HEAT EXCHANGER 1A INLET PIPIHG FIRST SECOND THIRD ZONE NUMBER: 1-076 ASME PERIOD PERIOD PERICO ~ Mh ~ N P I 0 wf Ill& i 4 i y SEC

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A 0 E - - - - -- INSTRUCTIONS NUMBER IDEHTIFI CATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

    )   I  '        IAAF 1 11Vhl I    'U  0 SlV     1 1     '55VO%1 1A V't 1OA4                                                             ' 'i' ll 1-12.SI-412    REF. DUG. NO. 01-076 300200     CS.678-74                          F-A       VT-3 3                            X RIGID STRUT ASSEMBLY               F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 478 REVISION: 0 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTIOH IHTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANGER 1A DISCHARGE PIP IN FIRST SECOND THIRD ZONE HUHBER: 1-077 ASHE PERIOD PERIOD PERIOD Ch Yl

                                             +CO EOo Y ~ v  ~  ~  '   ~      ov e a w  so  o r SUHHARY EXAHINATIOH AREA                     CATGY      NDE             - - - - - 0 U T A G E - - - - --     INSTRUCTIOHS NUHBER   IDENTIFICATION                       ITEH NO NETH        t   1  2   3    1  2  3     1  2  3        >>>>CALIBRATION BLOCK*>>

1-10.SI 472 REF. D'MG. NO. 01-077 300300 Sl.472 FM-1 C-F-3 SUR 3- WELDED PIPE PIPE TO-VALVE V-3456 300400 Sl-472-FW 2 C-F 3 SUR 3- 'WELDED PIPE VALVE V-3456 TO PIPE 300500 Sl-472.FM.2A C-F-3 SUR 3- WELDED PIPE Pipe to Pipe 00600 Sl.472.1-SM.2 CF3 SUR 3 WELDED ELBOW NATL. A403/MP304 Pipe to Elbow 300700 S I.472-1.S'W.1 C-F-3 SUR 3- WELDED PIPE NATL~ A358i TP304 Elbow to Pipe 300800 Sl.472-FM.3A C-F-3 SUR 3- 'WELDED PIPE, 12" X 10" REDUCER Pipe to Reducer NATL. A403,MP304 I-12-SI-408 REF. DWG. NO. 01-077 300900 SI-408.FW.3 C-F-3 SUR 3- 12" X 10" COHC. REDUCER, 12" X Reducer to Tee 12>> X 10" REDUCING TEE

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 479 REVISION: 0 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS CONPONENTS IHSPECTIOH IHTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMN COOLING HEAT EXCHANGER 1A DISCHARGE PIPIN FIRST SECOND THIRD ZONE HUHBERt 1-077 ASHE PER I CO PERIOD PERIOD C f1 t, 4N J W ~ "SEC"'XI """- SUHHARY EXAHIHAT ION AREA CATGY HDE -OUTAGE INSTRUCTIONS NUNBER IDENT IF I CAT I OH ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK** I-12-SI-408 REF. DMG. NO. 01-077 30'IOOO SI.408-1-SM-1 C-F-3 SUR 3- 12" X 12a X 10a REDUCING TEE, Tee to Reducer 12" X 10" CONC. REDUCER 301100 SI.408-1-SM-2 C-F-3 SUR 3 12" X 12" X 10" REDUCIHG TEE, Tee to Pipe MELDED PIPE NATL. A358,TP304 301200 SI-408-1-SM-5 C.F-3 SUR 3- MELDED PIPE Pipe to Pipe 301300 SI.408-FM-1 C-F.3 SUR 3- Meld is covered by a fire Pipe to Elbow penetration seal and is inaccessible 301400 SI-408.2-S'M-1 C-F-3 SUR 3 . MELDED ELBOM, MELDED PIPE Elbow to Pipe NATL. A358,TP304 301500 SI-408.2-SM-2 C.F.3 SUR 3- TEE NATL. A403,MP304 Pipe to Tee 301600 Sl-408-2-SM-3 C F 3 SUR 3- MELDED ELBOM Tee to Elbow

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UHIT 1 PAGE: 480 REVISION: 0 INSERVICE INSPECTIOH LONG TERH PLAH CLASS 2 ALL STATUS CONPOHEHTS INSPECTIOH IHTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANGER 1A DISCHARGE PIPIN FIRST SECOND THIRD 20NE HUHBER: 1-077

        'l)l h,p'gllgda,y)  (

SUHHARY EXAHIHAT ION AREA

                                ~ 'M.'l. r   6>>  wsw   vr ASHE SEC.

CATGY

                                                                    'l  NDE PERIOD
                                                                                  ------OUTAGE PERIOD      PERIOD
                                                                                                                      ,INSTRUCTIOHS

~ ~ ~ HUHBER ar t,'iI IDENTIFICATION littPwca I ri ~l ITEN NO NETH sv ~ I 1 2 3

                                                                                           ~ V 1  2 r

3 1 2 3 **CALIBRATIOHBLOCK** I-12-SI-408 REF. DWG. NO. 01-077 301700 Sl 408-FW-2 C.F.3 SUR 3 - - ~- Removable clamp around weld Elbow to Valve HCV-3657 301800 S I -408.2-SW-4 C.F.3 SUR 3- 12" X 12" X 6" REDUCIHG TEE, Tee to Pipe PIPE NATL. SHLS A312,TP304 301900 Sl -408-FW-1 C.F.3 SUR 3-PIPE TO VALVE V-3460 302000 SI.678-171 F A VT-3 3-RIGID SWAY STRUT ASSY. F1.20 302100 S I H.79 F.A VT 3 3-VARIABLE SPRING HANGER F1.20C 1-12-SI 408 REF. DWG. NO. 01 077 302200 SIH.76 F A VT-3 3-CLEVIS HANGER F1.20

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 481 REVISION: 0 IHSERVICE INSPECTION LOHG TERN PLAN t CLASS 2 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANGER 1A DISCHARGE PIPIN FIRST SECOND THIRD i t)t 077

                         'tt t iv t et't i ZOHE HUNGER:          1                                       ASME                            PERIOD             PERICO             PERIOD I<< ttt<<tttff,ttt t                           t'I \ ~ tt tt ~ 'SLtt t, tr ~ vl
                                                                     ~ '

tt t ' t t 'J ~ t '4 4i 'i '0 'L'i'i j SUHHARY EXAHINATIOH AREA CATGY HDE - - -OUTAGE- - - - -- IHSTRUCTIOHS NUHBER IDENTIFICATION ITEHNOHETH 1 2 3 1 2 3 2 3 <<<<CALIBRATIOH BLOCK

  • itsy <<<< 'a ii'oot I "ioi<<Vt~i'Jst><< 'Qw4'kk<<v'P<<i' << 'wi '

1

                                                                                                                                  g' " '  ' tt 'tir  '        <<. i   ~
                                                                                                                                                                         <<    ~  ~   ~

i, ~ I-12-SI-408 REF. DUG. NO. 01-077 t 302300 S l.678.114 F-A VT-3 3-RIGID SHAY STRUT ASSY ~ F1.20 302400 SIH-75 F-A VT-3 3-VARIABLE SPRING HANGER F1.20C 302500 SI-678-111 F A VT-3 3 . RESTRAINT F1.20 302600 S I.678.105 F-A VT-3 3- X Dug. no. 8770-SI-678-105 Nelded Base Restraint F1.20 7 I Otl 302650 SI-678-105 IA C C SUR 3- One attachment Integral Attachment C3.20 7 I pll

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 482 REVISION: 0 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOMN COOLING HEAT EXCHANGER 1B INLET PIPING FIRST . SECOND THIRD ZONE HUNGER: 1-078 ASHE PER IOO PERIOD PERIOD

   ;t-r:a'\',ass'.wjt caw(, )we:  ~   );wow    c ~   ~a~ ScPMe +%I  w  r w' SUHHARY EXAHINATIOH AREA                             CATGY      NDE      - - - - - - 0   U T A G E - - - - --       IHSTRUCTIOHS NUNBER         IDENTIFICATION                         ITEN HO NETH       1  2  3       1  2  3     1  2  3         **CALIBRATIOHBLOCK      *

~ .

                  '       'l>b1    '    At14p1eb      1  P   <<AI WA~'A'SOQlaW          SOW<   A                    h I-12-CS-14    REF. DMG. NO. 01-078 302700         CS.14-1-SM.1                         C-F-3      SUR     3-                                          300¹ R/F M/H   FLANGE Flange to Reducer                                                                                                      8" CONC.

NATL'182,F304,'2"X RAB REDUCER 302800 CS.14.FM-1B C-F-3 SUR 3- 12"X 8" CONC. REDUCER, MELDED Reducer to Pipe PIPE A358, TP304 302900 CS-14.FM-1 C-F-3 SUR 3- MELDEO PIPE Pipe to Vatve V.07-129 1.12.CS-B REF. DMG. NO. 01-078 303000 CS-B. F'M-1 C-F-3 SUR 3- MELDED ELBOM VALVE V 07 129 TO ELBOM 303100 CS-8-FM-2 C-F-3 SUR 3- MELDED ELBDM ELBOM TO VALVE V-07.130 303150 Valve V-07-130 3- No bolting > 2" or body Neids, Valve no examination required I-12-Sl-414 REF. DMG. HO. 01-078 303200 S I -414. FM-1 C-F-3 SUR 3- MELDED PIPE Valve V-07-130 to Pipe

                                                                                        ,n DATE:    01/09/98                                          ST. LUCIE HUCLEAR PLANT UNIT   1                                     PAGE:  483 REVISION:              0                                  INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL                  PLAN STATUS               PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANGER 1B           INLET PIPING             FIRST       SECOND         THIRD ZONE NUXBER:         1-078                       ASHE                 PERIOD      PERICO         PERIOD A  ', ('.:.'"t  ",l  ~JL ~ 5'4,<tpaH.,  r  r>>    t w i wy
                                                    ~     tel.,vI SEC X o

j ~ HUHBER t,,%Wt y ~ ', SUHHARY EXANIHATION AREA IDENTIFICATION

                                  't  i% P5  tf CATGY    NDE ITEN NO METH     I 1 2  3
                                                                                      - 0 1

U T A G E 2 3 1 2 3 INSTRUCT IOHS

                                                                                                                      <<*CALIBRAT ION BLOCK**

I-12-SI-414 REF. OMG. HO. 01-078 303300 Sl-414-FM-1A C F-3 SUR 3 MELDEO PIPE, MELDED ELBOM Pipe to Elbow NATL. A403,WP304 303400 SI-414-FM-2 C-F-3 SUR 3- WELDED ELBOW, WELDED PIPE Elbow to Pipe NATL. A358,TP304 303500 S I -414-2-SM-1 C-F-3 SUR 3- MELDEO PIPE, WELDED ELBOW Pipe to Elbow NATL. A403,MP304 303600 S I -414- FM-3 C F-3 SUR 0 WELDED ELBOW, WELDED PIPE Elbow to Pipe HATL~ A358,TP304 303700 SI -414-3.SM-2 C.F-3 SUR MELOED PIPE, WELDED ELBOW Pipe to Elbow NATL. A403,MP304 303800 SI-414-3-SM-1 C-F.3 SUR 3- WELDED ELBOW, MELDED PIPE Elbow to Pipe NATL. A358,TP304.1BP RAB 303900 SI-414-FW-4D C-F-3 SUR 3- WELDED PIPE Pipe to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 484 REVI SIGH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOMN COOLING HEAT EXCHANGER 1B INLET PIPING FIRST SECOHD THIRD 20HE NUHBER: 1-078 ASHE PERIOD PERIOD PERICO ~ AJW 'I AC SEC: XI'" SUHHARY EXAHIHATIOH AREA CATGY HDE OUTAGE - - - - -- INSTRUCTIOHS NUHBER IDENTIFICATION ITEH NO NETH 1 2 1'2 3 1 2 3 **CALIBRATIOHBLOCK *

                                                                                                          .'I C ~ I    '

i, 'lV/l I-12-Sl-414 REF. DMG. HO. 01-078 304000 SI-414-FM.4 C.F.3 SUR 3- MELDED PIPE Pipe to Pipe 304100 SI.414-4-SM-5 C-F.3 SUR 3- MELDED PIPE, MELDED ELBOM Pipe to Elbow NATL. A403,MP304 304200 SI-414.FM-4E C-F.3 SUR 3- MELDED ELBOM, MELDED PIPE Elbow to Pipe NATL. A358,MP304 04300 SI -414-4-SM-3 C.F.3 SUR 3- MELDED PIPE, MELDED ELBOM Pipe to Elbow NATL. A403,MP304 304400 SI-414-4-SM.2 C-F-3 SUR 3- 12+X 12"X 10" REDUCER TEE, Elbow to Tee IBP RAB 304500 Sl -414.4.SM-1 C.F-3 SUR 3- 12"X 12"X 10" Reducing tee, Tee to Reducer 12"X 10" Conicat reducer RAB 304600 S I -414- FM-5 C.F.3 SUR 3- 12"X 10" CONC. REDUCER REDUCER TO-18 SDCHX RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 485 REVISION: 0 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS CONPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMH COOLING MEAT EXCHANGER 1B INLET PIPING FIRST SECOND THIRD ZONE HUNBER: 1-078 ASNE PERIOD PERIOD PERIOD

 >> (v,g pvf  f l>>p 6   p   ~J  p>>  p>>>>>>         w    .~  SEO  XI SUHHARY EXANIHATION AREA                        CATGY     HDE                  OUTAGE------             INSTRUCTIONS NUMBER   I DENT IF I CAT I OH                    ITEN HO NETH         2  3     1  2  3        2  3      **CALIBRATIOHBLOCK~*

1 v ~ rw <<a>> ( 1

                                                                                                                >>>>>>           a>>>>           ' t'/,

I.12-CS-B REF. DMG. NO. 01-078 304700 CS-678-62 F-A VT-3 3 X MELDED BASE RESTRAINT F1.20 I 12-SI 414 REF. DMG. NO. 01 078 304800 CS-678-57 F A VT-3 3-RIGID S'MAY STRUT ASSY. F1.20 304900 CS.678-54 F-A VT-3 3-RIGID SMAY STRUT ASSY. F1.20 305000 CSH.10 F-A VT-3 3-RESTRAINT F1.20 305100 CS-678-53 F-A VT-3 3-RIGID SHAY STRUT ASSY ~ F1.20 305200 CSH.11 F-A VT3 3X HANGER F1.20 rab 305300 CS-678-471 F-A VT-3 3-RIGID SHAY STRUT ASSY. F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANI'HIT 1 PAGE: 486 REVISIOH: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOW COOLING HEAT EXCHANGER 1B INLET PIPING FIRST SECOHD THIRD . ZONE NUMBER: 1 078 ASME PERIOD PERICO PER I CO

 )lt Ik 1t,l H~                               SEC   'XI           oe<<oV v   <<o   s os     C e

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH 1 2 V 141'H 3 v @Ac 1 2 3 o'J 1 t 4'fA 2 3 6 1h'1

                                                                                                                   **CALIBRATIOHBLOCK~i y      1  v '      ' ',"; I I-12-SI-414   REF. DUG. NO. 01-078
                         'I 305400      CSH-12                          F-A       VT-3 3   .

RESTRAIHT F1.20 RCB 305500 CS.678.47 F-A VT-3 3 . RIGID SHAY STRUT ASSY. F1.20 305600 CSH.13 F-A VT-3 3 X VARIABLE SPRING HANGER F1.20C RAB e 305700 CS-678.46 RIGID SHAY STRUT ASSY. F-A F1.20 VT-3 3-

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 487 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMH COOLING HEAT EXCHANGER 1B TO CS HEADER FIRST SECOND THIRD ZONE NUMBER: 1-079 ASHE PERICO PERIOD PERIOD g, g~,.:irma;r rc~,w.i.g.i<<t ~is r w>> ~ ~ ~ ~ '>v'SEC~" XI SUNNARY EXAHINATIOH AREA CATGY HDE - -- - -OUTAGE- INSTRUCTIONS HUHBER IDEHTIFICATIOH . ITEN NO NETH 1 2 3 1 2 3 2 3 <<*CALIBRATIOH BLOCK *

     ~ >>>>.. i .,         R>>%      I

( 1

                                                                                                                >> A>>

I-12-SI-407 REF. DMG. NO. 01-079-A 305800 SI.407- FM-1 C-F 3 SUR 3-Hozzle to Reducer RAB 305900 SI.407-1-SM-5 C.F-3 SUR 3- 12" X 10" COHC REDUCER, 12" X Reducer to Tee 12" X 10w REDUCING TEE 306000 SI-407.1.SM-4 C-F-3 SUR 3- MELDED PIPE NATL. A358,TP304 Tee to Pipe 306100 SI-407-1-SM-7 C.F-3 SUR 3- MELDED PIPE NATL A358,TP3 BRAHCH COHHECTIOH TO PIPE 306200 SI-407.1-SM-3 C-F-3 SUR 3 . MELDED PIPE, MELDED ELBOM Pipe to Elbow NATL. A430,MP304 306300 SI.407-1-SM-2 C-F-3 SUR 3- MELDED ELBOM, MELDED PIPE Elbow to Pipe NATL. A358, TP304 306400 S I-407-1-SM-1 C-F-3 SUR 3- MELDED PIPE, MELDED ELBOM Pipe to Elbow NATL. A403,MP304

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 488 RFVI SION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SKUTDOMN COOLING HEAT EXCHANGER 1B TO CS HEADER FIRST SECOND THIRD ZONE HUNGER: 1-079 ASHE PERICO PERIOD PERIOD

                                          ~ ~ pA SEC-'gl'"          V <<0   PV<<Al   'I W   <<4>>    ~ ~

SUNHARY EXANIHATION AREA, CATGY HDE ------OUTAGE------ INSTRUCTIONS HUNGER IDENTIFICATION ITEN HO HETH ( 1 2 3 1 2 3 1 2 3 <<*CALIBRATIOH BLOCK<<>> A V 4 <\ ~ 'Ib1 osAOAA1I '%sr I'AI VJ44 9<>> 1I bV1>> I l4'Vb

                                                                                 ~            IA   )0'   1    <<Vh        1        '       r   r   0  r I 12-SI-407    REF. DMG. NO. 01-079 A 306500     S I -407. FM-2                        C.F-3    SUR     3-                                                 MELDED ELBOM, MELOED PIPE Elbow   to Pipe                                                                                           NATL. A358,TP304 306600     Sl-407-2-SM 2                         C-F-3    SUR    3-                                                  MELDED   PIPE Pipe to Pipe 306700     SI-407.2-SM.1                        C.F.3     SUR    3-                                                  MELDED   PIPE, 300¹ RF M/H PIPE-TO-FLANGE    (FE.07-1B)                                                                              ORFICE FLANGE   NATL'182,F304 06800    Sl.407-3.SM-1                        C.F-3     SUR    3-                      0 300¹   RF M/N ORFICE FLANGE, FLANGE (FE-07-18)-TO-PIPE                                                                                MELDED   PIPE NATL. A358,TP304 306900     S I -407- FM-3                        C F   3  SUR     3-                                                 MELDED   PIPE,  MELDED ELBOM Pipe to Elbow                                                                                             NATL. A403,MP304 307000     SI-407-4.SM-1                         C   F-3  SUR                                                        MELDED ELBOM, MELDED     PIPE Elbow to Pipe                                                                                             NATL. A358,TP304 307100     SI-407-FM.4                          C-F-3     SUR     3-                                                 MELDED   PIPE Pipe to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 489 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMN COOLING HEAT EXCHANGER 1B TO CS HEADER FIRST SECOND THIRD ZONE NUHBER: 1 079

      ~~ S ~ t       S    ~ )te ~   r  ~      ~. ~ . ~

ASHE SEC;."Xl ~-" PERICO PERIOD PERICO SUHHARY EXAHINATION AREA CATGY HDE ------OUTAGE------ INSTRUCTIONS NUHBER I DENT IF I CATION ,ITEH NO HETH 1 2 3 1 2 3 I 2 3 **CALIBRATIONBLOCK** ass~ ace sa w sN $ t<wj \ 0 o I-12-SI-407 REF. DMG. NO. 01-079-A ~ ~ k 307200 SI-407-FM-5 C F 3 SUR 3- MELDED PIPE Pipe to Pipe 307300 S I -407- FM.6A C-F-3 SUR 3- MELOED PIPE Pipe to Pipe 1.12-SI-407 REF. DMG. NO. 01.079-8 307400 S I -407- FM-6 C-F-3 SUR l MELDED PIPE Pipe to Pipe 307500 S I-407-7-SM-I C-F-3 SUR 3 MELDED PIPE, MELDED ELBOM Pipe to Elbow HATL. A403,MP304 307600 S1.407-7-SM-2 C-F-3 SUR 3 . MELDED ELBOM, MELDED PIPE Elbow to Pipe HATL. A358,TP304 307700 S1.407.7-SM-3 C-F-3 SUR 3- MELDEO PIPE, MELDED ELBOM 4 Pipe to Elbow NATL. A403,MP304 307800 S1.407-7-SM-6 C-F-3 SUR 3 . MELDED ELBOM, MELDED PIPE Elbow to Pipe HATL. A358,TP304

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE- 490 REVISION: 0 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANGER 1B TO CS HEADER FIRST SECOND THIRD ZONE NUHBER: 1-079 ASHE PERIOD PERICO PERICO i ~ SEC XI"', SUHHARY EXAHIHAT ION AREA CATGY NDE ------OUTAGE----.- INSTRUCTIONS HUHBER IDENTIFICATION ITEN KO NETH I 1 2 3 1 2 3 1 2 3 <<<<CALIBRATION BLOCK<<<< A Oeee was w s s 0~ ~a>> w A'aVt vial VWOSVA's Voansv ~ aber ~ w * @le l-12-SI-407 REF. DWG. NO. 01 079-B 307900 S I -407- FW-7 C-F.3 SUR 3 WELDED PIPE, WELDED ELBOW Pipe to Elbow HATL. A403,MP304 308000 SI.407.8-SM-1 C.F 3 SUR 3 WELDED ELBOM, MELDED PIPE Elbow to Pipe I{ATL. A358, TP304 308100 SI.407-FM-8 C-F-3 SUR 3- WELDED PIPE, MELDEO ELBOW Pipe to ElboM NATL. A403,MP304 308200 SI-407 FW.BA C-F-3 SUR 3 . WELDED ELBOW, MELDED PIPE Elbow to Pipe HATL. A358,TP304 308300 SI-407.FW-9 C-F-3 SUR 3-Pipe to Valve V-07.164 308350 Valve V.07-164 3 Valve I.12.CS-10 REF. DMG. NO. 01-079-B 308400 CS-10-FW-1 C-F-3 SUR 3- MELDED PIPE Valve V-07-164 to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 491 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOQI COOLING HEAT EXCHAHGER 1B TO CS HEADER FIRST SECOND THIRD ZONE NUHBER: 1.079 ASHE PERIOD PERIOD PERIOD

              ~ a      raew~             ~ s ~ w  SSP   YI SUHMARY EXAHINATION AREA                                                      -OUTAGE
                                                                                                                                          ='

CATGY NDE INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 <<<<CAL I BRAT ION 'LOCK<<<< V <<>el a ' Jv wL 'i a ~ = I-12-CS-10 REF. DUG. NO. 01-079-B 308500 CS-10 1 Sll-4 C-F-3 SUR 3-Ueidoiet 308600 CS.10-1.SII.1 C-F-3 SUR 3- LR II/ELBOW NATL. A403,MP304 W. Pipe to Elbow IBP RAB 308700 CS.10-FII.3 C-F-3 SUR 3- EXAHIHE 100X OF THE ELBDM LONG Elbow to Valve FCV-07-18 SEANS, IBP. RAB 308750 Valve FCV-07-18 3 No examination required Valve RAB 308800 CS-10-FII.4 C-F 3 SUR 3- NELDED PIPE Valve FCV-07-18 to Pipe 308820 CS.IO.FII-4LD 3 Longitudinal Seam Meld 308880 CS-10. FII-5LU 3 Longitudinal Seam Iield

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UHIT 1 PAGE: 492 REVISION: 0 IHSERVICE INSPECTIOH LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR 5lat 1B TO CS HEADER FIRST SECOND THIRD ZONE NUMBER: 1-079 ASME PERIOD PERIOD PERIOD $ >~III) 0 I Ptl 'll t t/ f II Scd,, v I

SUMMARY

EXAHIHATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- IHSTRUCTIOHS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 ~~CALIBRATIOH BLOCK ~ a w sea I-12-CS-10 REF. DWG. NO. 01-079-B 308900 CS-10-F'W-5 C-F-3 SUR 3- WELDED PIPE Pipe to Valve MV-07-38 308950 Valve MV-07-38 3 Ho examination required Valve 309000 CS-10-FW.6 C-F-3 SUR 3- WELDED PIPE Valve MV-07-38 to Pipe I.12.SI.407 REF. DWG. NO. 01 079-A 309700 CSH-14 F-A VT-3 3-VARIABLE SPRING HANGER F1.20C 309800 CS.678.133 F-A VT-3 3-RIGID STRUT ASSY. F1.20 309900 CS.678-135 F-A VT-3 3-RIGID STRUT ASSY ~ F1.20 310000 CSH.15 F.A VT-3 3-RIGID SWAY STRUT ASSY. F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 493 REVISION: 0 IHSERVICE IHSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN! COOLIHG HEAT EXCHANGER 1B TO CS HEADER FIRST SECOND THIRD ZONE NUHBER: 1-079 ASHE PERIOD PERIOD PERIOD

       ,  ',li.aver9tig~ .~ h gyves,,w~>>b>>   w ~ ~ ~ ~ 'ii('Sch vl'~<< "w                 v Voa v&w    U'e 1 1s6\4 sa    s ss
                                                                                  'Ce SUHHARY EXAHIHATIOH AREA                              CATGY     NDE             - - - - - - 0   U T A G E  - - - -              INSTRUCTIONS NUHBER       IDENTIFICATION                           ITEN NO NETH          i   1  2 3       1   2   3     1   2   3            **CALIBRATIOHBLOCK~*

'I, -6 ' 041 '>> At aV ' ah'UlPl'6'4 I'i " 41'j'kgV idjPA4 gag ' y 'Q i%+'IN') I-12-SI-407 REF. DUG. NO. 01 079-A 310100 CSH-16 F-A VT-3 3-RESTRAINT F1.20 310200 CS-678-141 F-A VT-3 3-RIGID STRUT ASSY. F1.20 310300 CSH-17 F A VT-3 3X RESTRAINT F1.20 310400 CS-678-1425 F-A VT-3 3 RESTRAINT F1.20 31OSOO CSN-18 F A VT-3 3 . RIGID SHAY STRUI'SSY ~ F1.20 I-12-SI-407 REF. DHG. NO. 01 079-B 310600 CS-678.147 FA VT3 3-RIGID STRUT ASSEHBLY F1.20 310700 CSH-19 F A VT-3 3 X SPRING HANGER F1.20C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 494 REVISION: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOW COOLING HEAT EXCHANGER 1B TO CS HEADER i FIRST SECOND THIRD ZONE NUMBER: 1-079 ASME i PERIOD PERIOD PERIOD Il 8'vl'g PI% ~, N+'4 tvi% tv I'4 8 l)f'chor'vl

                                                        ~a Oe 'X   i ~ e'+        I   v 4 4i    s   a o+       A

SUMMARY

EXAMINATION AREA CATGY NDE i

                                                                             - - - - - - 0  U T A G E    - - . - --         IHSTRUCTIOHS

~ i O' NUMBER IDENTIFICATION

                            ~ I L1'0  b4   0'4        +I ITEM HO METH 4> 'Ai I  1  2   3 4iWP'IKAtl I@<I 0 1   2   3 4 0 1

(4 2 3

                                                                                                                    ~ sw~
                                                                                                                           *~CALIBRATION BLOCK**

or i v s w eve s s . ~ l-12-SI.407 REF. DUG. HO. 01-079-B 310800 RESTRAINI'-A CS-678 152 F1.20 VT-3 3 310900 CS-678-1555 F-A VT-3 PSA 10 Snubber 1-222 F1.20S 311000 CS.678-158 F-A VT-3 3 X RIGID SHAY STRUT ASSY. F1.20 l-12 CS-10 REF. DWG. NO. 01 079-B 311100 CS-678-157 F-A VT.3 3 . BOX RESTRAINT F1.20 311200 CS.678.160 F-A VT-3 3 X VARIABLE SPRIHG BASE SUPPORT F1.20C

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 495 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAH CLASS 2 ALL STATUS COHPONEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMN COOLING HEAT EXCHANGER 1A TO CS NEADE FIRST SECOHD THIRD ZONE HUNGER: 1-080 ASHE PERIOD PER100 PER100 ri,A,nnyrj 'tni;0 ri,i,ire srvn w rri,i r w ~ ' ~ ~ iii,i SEC .iXirr r, <<, SUHHARY EXAHINATION AREA CATGY NDE - - - - - - 0 U T A G E - . - - -- INSTRUCTIONS NUHBER IDENI'IF I CATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 <<<<CAL I BRAT ION BLOCK<<<< ~ i

  • 1-12-S1-406 REF. DMG. NO. 01-080-A 311300 SI-406-FM-1 C.F-3 SUR 3- 10" X 12" CONC. REDUCER NOZZLE-TO-REDUCER 311400 SI-406-1-SM-4 C-F-3 SUR 3- 10" X 12" CONC. REDUCER, 12" X Reducer to Tee 12" X 10" REDUCING TEE 311500 Sl-406-1-SM-3 C-F-3 SUR 3- 12<< X 12" X 10" REDUCING TEE, Tee to Pipe MELOEO PIPE NATL. A358,TP304 311600 SI-406-1-SM-6 C-F 3 SUR 3- 4" MELDOLET SCH ~ 40S<< MELOE BRANCH CONHECTIOH TO-PIPE PIPE 311700 SI-406-1-SM-2 C-F-3 SUR 3 . MELDEO PIPE, MELOED ELBOM Pipe to Elbow NATL. A403,MP304 311800 S I -406-1-SM-1 C.F.3 SUR 3- MELDEO ELBOM, MELDED PIPE Elbow to Pipe HATL. A358,TP304 311900 SI-406-FM-2, Pipe to ElboM'-F-3 SUR 3 MELDED PIPE, NATL. A403,MP304 MELDED ELBOM

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 496 REVISION: 0 IHSERVICE IHSPECTION LONG TERH PLAN CLASS 2 ALL S'IATUS COHPOHENIS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMH COOLING HEAT EXCHANGER 1A TO CS HEADER F IRST SECOND THIRD ZONE NUHBER: 1-080 ASNE PERICO PERIOD PER ICO Pg'III 0 t Jl ~

         ~            tyPAW+IWP-0'4      ~ %9$ EChXI SUHHARY EXANIHAT I OH AREA                   CATGY    NDE      ------OUTAGE------                      INSTRUCTIONS HUNGER    IDENTIFICATIOH                     ITEN NO METH    I 1  2   3     1  2  3      1 2  3       ~*CALIBRATIOH BLOCK~*

I-12-SI-406 REF. DMG. NO. 01-080-A 312000 SI.406-2.S'M.3 C-F-3 SUR 3 . MELDED ELBOM, MELDED PIPE Elbow to Pipe NATL.'358, TP304 312100 S I -406- FM-2A C-F-3 SUR 3- MELDEO PIPE Pipe to Pipe 312200 S I -406-2-SM-1 C-F-3 SUR 3- MELDED PIPE, 300II R/F M/H Pipe to Flange ORFICE FLAHGE NATL. A182,F304 ~ Flow edifice FE-07-1A 12300 S I.406-3.SM.1 C-F-3 SUR 3- 300" R/F M/N ORFICE FLANGE, Flange to Pipe MELDED PIPE HATL~ A358,TP304 SCH 30, Flow edifice FE-07-1A 312400 S I -406- FM.3 C-F-3 SUR 3- MELDEO PIPE, MELOED ELBOM Pipe to Elbow NATL. A403,MP304 312500 S I-406-4.SM-1 C-F.3 SUR 3- MELDED ELBOM, MELDED PIPE Elbow to Pipe NATL. A358,TP304 312600 SI-406.4-SM-2 C-F-3 SUR 3- MELDEO PIPE Pipe to Pipe

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 497 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOMH COOLING HEAT EXCHANGER 1A TO CS HEADER FIRST SECOND THIRD ZOHE HUNBER: 1-080 ASHE PERIOD PER I CO PERIOD '6'0l <<'I+9 ~> 'Its ur v. w ~ SEC- XI" SUNHARY EXANIHATION AREA CATGY NDE OUTAGE----- INSTRUCTIONS HUHBER IDENTIFICATION ITEN N NETH I 1 2 3 1 2 3 1 2 3 *~CALIBRATION BLOCK~~ I-12-SI-406 REF. DMG. NO. 01-080-A 312700 Sl -406- F'M-4 C.F-3 SUR 3- MELDED PIPE Pipe to Pipe 312800 SI-406-5-SM-1 C-F-3 SUR 3- MELDED PIPE, MELDED ELBOM Pipe to Elbow HATL. A403,MP304 312900 S1.406-5-SM-3 C-F-3 SUR MELOEO ELBOM Elbow to Elbow 313000 SI-406-FM-5 C-F-3 SUR 3 e MELDED ELBOM, MELDED PIPE Elbow to Pipe NATL. A358,TP304 1-12-SI-406 REF. DMG. NO. 01-080-B 313100 S I -406. FM-5A C F 3 SUR 3 MELDED PIPE, MELDED ELBOM Pipe to Elbow HATL. A403,MP304 313200 SI-406-FM.6 C-F 3 SUR 3 MELDED ELBOM Elbow to Elbow 313300 SI.406-7-SM-1 C-F-3 SUR 3- MELOED ELBOM, MELDED PIPE Elbow to Pipe NATL. A358, TP304

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 498 REVISION: 0 INSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SNUTDOMN COOLING HEAT EXCHANGER 1A TO CS HEADER FIRST SECOHD 'HIRD ZONE NUMBER: 1-080 ASHE PER ICO PERI CO PERIOD ,~. Y. "(Ql.'evil .Pii'Lear r.Sir.vqy%v~ .}his . ii ~ ulcc ..SEQ w,gl ~, " .v ~ SUHHARY EXAHIHAT ION AREA CATGY NDE -- - - -OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEH HO KETH ) 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK *

% ~ '4z   ~          e '      iAeesro1 Ww      rp        e    s    r      ~        ~        2    . a aea~o I.12-SI-406     REF. O'MG. NO. 01-080-B 313400         S I-406  7-SM.2                          C.F-3     SUR        3-                                            MELDED  PIPE Pipe to Pipe 313500        S I -406- FM.7                            C-F-3     SUR        3-                                            MELDED  PIPE Pipe to Pipe 313600         SI-406-8-SM-1                             C-F-3     SUR        3-                                            MELDED PIPE,  MELDEO ELBOM Pipe to Elbow                                                                                                NATL. A403,MP304 313700         SI.406-FM.8                              C-F-3      SUR       3-                                            MELDED ELBOM, MELDED   PIPE Elbow to Pipe                                                                                               HAIL. A358,TP304 313800         S I-406.9-S'M-2                          C-F-3     SUR        3-                                            MELDED  PIPE,  MELDED ELBOM Pipe to Elbow                                                                                               NATL. A403,MP304 313900        SI.406.9-SM-1                             C.F.3     SUR        3-                                            MELDED ELBOM, MELDED   PIPE Elbow    to Pipe                                                                                             HATL. A358,TP304 314000         SI-406.FM-9                                                    3                                             MELDEO  PIPE, weld will be Pipe to Valve V-07-161                                                                                       renoved from service per PC/H 036.196H

DATE: 01/09/98 'T. LUCIE NUCLEAR PLANI'NIT 1 PAGE: 499 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SMUTDOMN COOLING HEAT EXCHANGER 1A TO CS HEADER FIRST SECOND THIRD ZONE NUMBER: 1-080 ASHE PERIOD PER I CO PERIOD

.tP) v I) "P%vt.,9. <<5 ~ <<E l<<<<v     ~ p, L>> << ~  ~ wc<<tel Sl CO v XI SUHHARY EXAMINATION AREA                                 CATGY     HDE                - - OUTAGE - -      --       IHSTRUCTIONS NUMBER        IDENTIFICATION                             ITEN  HO NETH       1  2  3      1  2   3    1 2  3      *~CALIBRATIOH BLOCK ~

I 12-CS-11 REF. DMG. NO. 01-080-B 314100 CS FH-1 3 HELDED PIPE, weld will be Valve V-07-161 to Pipe removed from service per PC/H 036.196M I-12-SI-406 REF. DWG. NO. 01.080-8 314110 S I -406-2000 C-F-3 SUR 3- Iield to be installed per PC/H Pipe to Pipe 036-196H, baseline examination required 314120 SI.406.2001 C.F-3 SUR 3- Meld to be installed per PC/M Pipe to Valve V-07-161 036-196M, baseline examination I 12-CS-11 REF. DWG. NO. 01.080 B 314140 CS-11-2000 C F-3 SUR 3 . llcld to be installed per PC/H Valve V-07-161 to Pipe 036-196H, baseline examination required 314300 CS FW.2 C.F-3 SUR 3-Pipe to Valve FCV-07-1A 314350 Valve FCV-07-1A 3 Ho examination required Valve

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 500 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANGER 1A TO CS HEADER FIRST SECOND THIRD ZONE NUMBER: 1-080 ASNE PERIOD PERIOD PERIOD 'y> y',tt:s rv,vw;s ~r...r "-SEC-;" XI SUNNARY EXANIHAT ION AREA CATGY HDE -OUTAGE------ INSTRUCTIONS HUHBER IDENT IF I CATION ITEN HO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK*>>

                                                                                               ~V           '~  ~                        aW' ~     < >A~ ~

I 12-CS-11 REF. DWG. NO. 01-080-B 3-P 314400 CS-11-FW-3 'C-F-3 SUR WELDED PIPE Valve FCV..07-1A to Pipe 314650 Vatve NV-07-3A 3 No examination required Valve 314700 CS-11-FM-4 C-F-3 SUR 3- WELDED PIPE Pipe to Valve MV-07-3A 1-12 SI-406 REF. DWG. HO. 01-080-A 315000 CS-678.179 F-A VT-3 3-RIGID SWAY STRUT ASSY. (10) F1.20 315100 CSH-27 F-A VT-3 3 VARIABLE SPRING HANGER F1.20C 315200 CS-678-182 F-A VT-3 3 RIGID STRUT ASSEHBL'Y (2) F1.20 315300 CS-678-188 F-A VT-3 3-RIGID SWAY STRUT ASSY. F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 501 REVISION: 0 INSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COMPONENTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOWN COOLING HEAT EXCHANGER 1A TO CS HEADER FIRST SECOND THIRD ZONE NUMBER: 1-080 ASME PER I CO PERIOD PERIOD JW Ij' ~ < t~ Ik ~ W ' %P SCI EC0 XVI

SUMMARY

EXAMINATION AREA CATGY NDE -OUTAGE- INSTRUCTIONS NUMBER IDEN'TIFICATION ITEH NO METH 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK~*

                                                                                                           <<j% 8 h1 I-12-SI-406        REF. DWG. NO. 01-080-A 315400     CSH-29                                  F-A       VT3     3-ROO HANGER                              F1.20 315500     CS-678-191                              F-A       VT-3   3-RIGID SWAY STRUT ASSEMBLY               F1.20 315600     CS-678-1930                             F-A       VT-3   3-                                              Examine per   plant proced'ures Snubber 1-200                           F1.20S RAB 315700    CSH-30                                  F-A        VT-3   3-VARIABLE SPRING BASE SUPPORT            F1.20C 315800     CS-678-194                              F-A        VT-3   3-              o CLAMP RESTRAINT                         F1.20 I-12-SI-406         REF. DWG. NO. 01 080-B 315900     CS-678.202                              F-A       VT-3 3    . . .         X RIGID STRUT ASSEHBLY                    F1.20 316000     CS-678-205                              F-A       VT-3    3-CLAMP RESTRAIHT                         F1.20

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 502 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONEN'IS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SHUTDOW COOLING HEAT EXCHANGER 1A TO CS HEADER FIRST SECOND THIRD 20NE NUMBER: 1-080 ASME PERIOD . PERIOD PER100

                                     'A %v SEC  4XIA

SUMMARY

EXAMIHATIOH AREA CATGY HDE - OUTAGE - - - - -- INSTRUCTIONS NUMBER IDENT I F I CATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-12-Sl-406 REF. DUG. NO. 01-080-8 316100 CS-678.206 F-A VT-3 3 - - - X RIGID STRUT ASSEMBLY UELDED F1.20 316200 CSH-33 F-A VT 3 3-RIGID SHAY STRUT ASSEMBLY F1.20 316300 CSH-34 F.A VT-3 3-VARIABLE SPRING HANGER F1.20C

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 503 REVISION: 0 IHSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR SKUTDOWN COOLING HEAT EXCHANGER 1A TO CONT. SPRAY FIRST SECOND THIRD ZONE NUMBER: 1-080 ASME PERICO PERIOD PERIOD

                                     - ""SEC.""XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - 0 U T A G E - - - - -- IHSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK>>>> I-12-CS-11 REF. DUG. NO. 01.080.B

                             \

316400 CS-678.2135 F-A VT-3 PSA.3, Examine per plant Snubber 1-201 F1.20S procedures 316500 CSH-52 FA VT3 3- - - X Per JPH-PSLP-93-0087,

      ~ VARIABLE SPRING HAHGER           F1.20C                                                   ALlowable cold settings (High 3448 lbs  2.1/4") - (Low 3103 lbs 1-11/16")

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHI'NIT 1 PAGE: 504 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 1A FIRST SECOHD THIRD ZONE NUMBER: 1-081 ASME PERIOD PERIOD PERIOD

 $V 'Vga      lgb   h  5 lP 'l4   M         ~ >~'SEC;"XI
                                                                  ------OUTAGE------
           ~

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH i 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK**

      ..tt   e<t'%1C 0,,     rttitetor t                                                            0 4t I P                       a "J)t ~~

REF. DUG. NO. 01-081 316600 LPSI-1A.S1 F.A VT.3 3-PUMP PEDESTAL SUPPORT F1.40P 316800 LPS I -1A.S2 F-A VT-3 3-PUMP PEDESTAL SUPPORT '1.40P

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 505 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR LPSI PUMP 18 FIRST SECOND THIRD ZONE NUHBER: 1-082 ASHE PERIOD PERIOD PERIOD

                                ~ 'i""'SEO.""XI" SUHHARY EXAMINATION AREA                 CATGY    NDE               - - 0 U T A 0 E - - - - --    INSTRUCTIONS NUHBER    IDENI'IFICATION                ITEH  NO HETN   I 1  2  3      1  2  3     1  2  3       **CALIBRATIONBLOCK~*

REF. DlJG. NO. 01-082 317300 LPSI-18-S1 F.A VT-3 3 X PUHP PEDESTAL SUPPORT F1.40P RAB 317500 LPSI $ 2 F.A VT-3 3 - - X PUHP PEDESTAL SUPPORT F1.40P RAB

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 506 REVISIOH: 0 IHSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 2 ALL STATUS COHPONENTS

                                            'l INSPECTION INTERVAL                    PLAN STATUS                 PRESERVICE YEAR COMBINED HP AND AUXILIARY KP HEADERS TO LOOP 1A1                    FIRST        SECOND      THIRD ZONE NUHBER: 1-083                             ASHE              I   PERICO       PERIOD      PERICO v )s ev< vwQho'ue tr I,     i .a>> v4     4         9v Stt'l cue vI n   hH'            >>V>>4 ~ '>>   0>>o>>C       4 SUHHARY EXAHIHATION AREA                      CATGY     HDE       ------OUTAGE------                           IHSTRUCTIOHS NUHBER    IDENTIFICATION                       ITEN NO NETH I 1 2 3             1  2 3      1 2 3              >>*CALIBRATlOH BLOCK>>>>
     +me         Woeei 'eo 'a>> 'wkly   vi 'lhi V4'JQC'As'V "C%l4% ~alod>>WJ>>k'la&'C AiavrC'avV->6 4v     'i I v 'rsrt>>       o's    W   'S'    '   'g'ger>> ~ ~

I.2-SI-107 REF. DMG. NO. 01-083 318000 SI 107 FM-1 C F 1 SUR 3- 6>>X 2" MELDOLET AHD PIPE, SS SOCKOLET-TO-PIPE C5.30 318100 Sl.107.QI.2 C.F.1 SUR 3 X PIPE AHD FITTINGS@ SSf 6000II Pipe to Elbow C5.30 (SM) 318200 S I -107-SM.3 C F1 SUR PIPE AND FITTINGS, SS, 6000II Elbow to Pipe C5.30 (SM) 318300 Sl-107..SM.4 C.F-1 SUR 3- 0 PIPE AND FITTINGS/ SSg 60004 Pipe to Elbow C5.30 (SM) 318400 Sl -107-SM.S C.F.1 SUR 3 X PIPE AHD FITTINGS, SS, 6000II Elbow to Pipe C5.30 (SM) 318500 SI-107-SM.6 CF1 SUR 3- PIPE AHD 2"X2"X2" TEE ~ SSg (SM) Pipe to Tee C5.30 318600 SI.107-S'M-7 C-F.1 SUR 3- 2"X2"X2>> TEE AND 2"X 3/4" Tee to Reducing Insert C5.30 REDUCING INSERT 304, SS (S'M)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 507 RE V I S ION: 0 INSERVICE IHSPECTIOH LOHG TERN PLAH CLASS 2 ALL STATUS COHPOHEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED HP AND AUXILIARY HP HEADERS TO LOOP 1A1 FIRST SECOHD THIRD ZONE HUHBER: 1-083 ASHE PERIOD PERIOD PERIOD '4 ~l,cog 'i'I v; ) aPww i, c ta'h'iA>>

                               ~           . ~. 'ns ~  ~  a  ~ its Sthh ECe  vii r  ~ ~      IQ  S   l dN '   V    a b 4 SUHHARY EXAMINATION AREA                                  CATGY      HDE           - - - - - - 0   U T A G E - - - - --     INSTRUCTIONS HUHBER        IDENTIFICATION                                ITEN NO NETH            1   2   3    1    2  3    1  2  3        **CALIBRATIOHBLOCK**

Ae eA AJb dv'6 A \a4Ck'I ltAt 'i V AAVVQJAWAAf11 I-2-Sl-107 REF. DMG. NO. 01-083 318700 SI-107.SM-10 C-F-1 SUR 3- PIPE AND 2"X2"X2" TEE/ SS Tee to Pipe C5.30 (SM) 318800 S I -107.SM-11 C-F-1 SUR 3- PIPE ~ SS PIPE TO VALVE HCV-3627 C5.30 318900 SI -107.SM-12 C-F-1 SUR 3- PIPE, SS VALVE HCV-3627 TO PIPE C5.30 319000 ' I.107-SM.13 C.F.1 SUR 3- PIPE AND 2"X2"X2" TEE, SS Pipe to Tec C5.30 (SM) 319100 S I -107-SM.14 C-F-1 SUR 3- 2"X2"X2" TEE, 2" X 3/4" Tee to Reducing Insert C5.30 REDUCING INSERT, SS (SM) I-2-SI-272 REF. DMG. NO. 01-083 319200 S I -272 SM-1 C-F-1 SUR PIPE AHD 24X2"X2" TEE, SS Tee to Pipe c5.30 (SM) 319300 Sl.272-SM-2 C.F.1 SUR 3 . PIPE AND FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (S'M)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 508 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR COHBINED HP AND AUXILIARY HP HEADERS TO LOOP 1A1 i FIRST SECOND THIRD ZONE HUHBER: 1 083 ASHE i PERIOD PERIOD PERIOD i')4, 'I ~i4"VJlw '<kl'0 'IA~;. Y 'A. Vi ~ ag 'li lSCt

                                                             ~

ECt"4 Vl< C..sir. ] v e ~A %or SUHHARY EXAHINATION AREA CATGY HDE i ------OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK * ~ 's ~ ~ r em o II 1l 0 SA l PSI'1 I P>> t 1 Mill'All'@VAN 4kA+4 NPJA I 2 SI-272 REF. DMG. NO. 01-083 319400 Sl-272-SM-3 C-F-1 SUR 3- PIPE AND FITTINGS, SS; 6000¹ Elbow to Pipe C5.30 (SM) 319500 S I -272-SM-4 C F 1 SUR 3- PIPE AND 2"X2"X2" TEE, SS Pipe to Tee C5.30 (SM), INTERSECTS LIHE 2"-Sl-132 AT ITEN ¹ 290 I-2-SI-216 REF. DMG. NO. 01.083 319600 SI.216-FM-1 C-F-1 SUR 3- 6"X 2" MELDOLET AND PIPE, SS SOCKOLET-TO-PIPE C5.30 319700 SI.216-SM-2 C.F-1 SUR 3- PIPE AHD FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 319800 Sl -216.SM-3 C F 1 SUR 3- PIPE AND FITTINGS'Sg 6000¹ Elbow to Pipe C5.30 (SM) 319900 SI-216-SM-3A C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 320000 S I -216.SM-4 C-F-1 SUR 3 X PIPE AND FITTINGS ~ SS ~ 6000¹ Elbow to Pipe C5.30 (SM)

DATE: 01/09/98 ST. LUCIE HUCLEAR PLAHT UHIT 1 PAGE: 509 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAH CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED HP AND AUXILIARY HP HEADERS TO LOOP 1A'I FIRST SECOND THIRD ZONE NUHBER: 1-083 ASHE PERIOD PERIOD PERIOD

                                       " '" SEC   "Xl'-

SUHHARY EXAHIHATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- IHSTRUCTIOHS HUNGER IDENTIFICATION ITEH NO NETH 1 2 3 'I 2 3 1 2 3 **CALIBRATIOHBLOCK>>>> I l-2-S1.216 REF. D'MG. NO. 01 083 320100 SI-216-SW-5 C-F-1 SUR 3 X PIPE AND 2"X2"X2" TEE/ SS (SW) Pipe to Tee C5.30 320200 SI-216-SW.6 C F 1 SUR 3- 2"X2"X2" TEE 304 SS (SM), 2" Tee to Reducing Insert C5.30 X 3/4" REDUCING INSERT 304 SS 320300 SI -216-SW-9 C-F-1 SUR 3- 304 SS PIPE, 2"X2"XZ" TEE 304 Tee to Pipe C5.30 SS (SM) 320400 SI.216.SW.10 C.F-1 SUR 3- PIPE AND FITTINGS/ SSg 600 Pipe to Elbow C5.30 (SM) 320500 S I -216-SM-11 C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000 Elbow to Pipe C5.30 (S'W) 320600 S I-216-SW-12 C-F-1 SUR 3 PIPE AND FITTINGS, SSi 6000 PIPE TO VALVE NCV-3626 C5.30 (SW) I-2-SI-132 REF. DWG. NO. 01.083 320700 SI -132-SW-1 C-F.1 SUR 3- PIPE AHD FITTINGS, SS, 6000II VALVE HCV-3626 TO PIPE C5.30 (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR'PLANT UNIT 1 PAGE: 510 REV IS I OH: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED NP AND AUXILIARY NP HEADERS TO LOOP 1A1 FIRST SECOND THIRD ZONE HUHBER: 1-083 Octal,vii.i~. ASHE PERICO PERIOD PERIOD ei ~v, svo

  ~               i r  ~ ',w  " ~ ~.        '   e~~ sw SEC@'X        ~ .'.p SURGERY EXANIHATIOH AREA                              CATGY     HDE                    OUTAGE-                          INSTRUCTIONS NUHBER        IDEHTIFICATIOH                          ITEN HO NETH           1 2  3    1  2  3       1  2  3            **CALIBRATIONBLOCK~*

V'V ' vavVoA4'ae~ eA4VA1 V/owl WJ'J114IAAV 0' ~ Jr h A1( 1I I-2-SI.132 REF. DUG. NO. 01-083 320800 SI.132.SH.2 C-F-1 SUR 3- PIPE AND FITTINGS ~ SSg 6000¹ Pipe to Tee C5.30 (SM) 320900 SI-132-SH.3 C-F-1 SUR 3 . PIPE ANO FITTIHGS, SS, 6000¹ Tee to Pipe C5.30 (SQ) 1-2-SI-143 REF. DUG. NO. 01-083 321000 S I-143.FH-1 C.F.1 SUR 3 PIPE AND FITTINGS/ SSg 6000¹ Pipe to Valve V-3123 C5.30 (SW) I-2-SI-107 REF. DMG. NO. 01-083 321100 SI-32-2271 F-A VT-3 3 RESTRAINT F1.20 I-2-SI-132 REF. OWG. NO. 01-083 321200 S I 231 F-A VT-3 3-RESTRAINT F1.20 I-2-Sl-216 REF. O'. NO. 01-083 321300 S I -31.306 F-A VT-3 3-RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 511 REVISION: 0 IHSERVICE INSPECTIOH LOHG TERN PLAN CLASS 2 ALL STATUS CONPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBIHED HP AHD AUXILIARY HP HEADERS TO LOOP 1A1 [ FIRST SECOHD THIRD ZONE NUHBER: 1-083 ASME PERIOD PERIOD PERIOD

                      ~   ~  zt>> ~  . ~ ~v  ~  ~  ~ ~ 'ot'ScP'~

EC ~ YI"

                                                                      ~ "~

I

                                                                            ')"   Jl; '    " ~ '    " 4'4L 's'~c'"w SUNMARY EXANIHATION AREA                               CATGY     HDE     i
                                                                                - - - -CITAL'4- - 0     U T A G E      - - - - --    INSTRUCTIONS

~ NUHBER Wt <a ' IDENTIFICATION ea's " I' '" 4 'aL" r'~ <<l '4 ITEN 4' NO NETH O'O' 6 i 1

                                                                              '~ J' 2    3
                                                                                                    ~

1 JV 2 3 AFA'V4JgJ 1 2 3 **CALIBRATIOHBLOCK

  • 1-2-SI-216 REF. DUG. NO. 01-083 321400 S I 303 F-A VT-3 3-RIGID RESTRAINT F1.20

DATE: 01/09/98 ST.'LUCIE NUCLEAR PLANT UHIT 1 PAGE: 512 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED HP 8 AUXILIARY HP HEADERS TO LOOP 1A2 i FIRST SECOND THIRD ZONE NUMBER) 1-084 ASHE ) PERIOD PERIOD PER ICO

    ++!'+'48 i I: h:w    t,w  's. I   ~ rvrlw ~

ECe vir Scl n rp d i s SUHNARY EXAHIHAT ION AREA CATGY NDE (

                                                                     - - - - - - 0 U T A G E                IHSTRUCTIOHS HUNBER    IDENTIFICATION                         ITEN NO NETH      i 1  2   3    1  2  3     1 2  3        **CALIBRATIONBLOCK~*

l-2-SI-106 REF. DMG. NO. 01-084 321500 S I-106- FM.1 C-F-1 SUR 3 6"X 2" MELOOLET'HD PIPE/ SS Sockolet to Pipe C5.30 321600 Sl -106.S'M.2 C-F-1 SUR 3- PIPE AND FITTINGS@ SSg 6000¹ Pipe to Elbow C5.30 (SM) 321700 S I -106.SM.3 C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 21800 Sl-106.SM.4 C-F-1 SUR 3- PIPE AND FITTINGS'Si 6000¹ Pipe to Elbow C5.30 (S'M) 321900 S I -106-SM-5 C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 322000 Sl-106-SM-6 C.F.1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 322100 8 I.106. SM-7 C-F-1 SUR 3 PIPE AHD FITTINGS'S 6000¹

                                                                                                                                ~

Elbow to Pipe C5.30 (S'M)

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 513 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBIHED HP B AUXILIARY HP HEADERS TO LOOP 1A2 FIRST SECOHD THIRD 20NE HUNSER: 1-084 ASME PERIOD PERIOD PERIOD ~'4l, q ~ j'@4 O'Jh ",I V'/'P \ Ni '~ ~~"'ECY"XI~"'ATGY SUHHARY EXAHIHATIOH AREA NDE .---.OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOC@'* h t  %%II A4 '%~I. t I-2-SI-106 REF. DMG. NO. 01-084 322200 S I -106-SM.8 C- F-1 SUR 3 PIPE AND 2"X 2"X 2" TEE, SS, Pipe to Tee C5.30 (SM) 322300 SI-106-SM.9 Tee to Recfucing Insert

                                                 '-F          C5.30 1   SUR    3-                                      2"X 2"X 2e  TEE AND  2"X REDUCING INSERT/ SS (SM) 3/4" 322400       SI-106-SM-12                               C.F-1        SUR    3-                                      PIPE AHD 2eX 3/4e REDUCING Tee     to Pipe                             C5.30                                                       IHSERT, SS (SM) 322500      S I -106.SM.13                              C-F-1       SUR     3-                                     PIPE AND FITTIHGS, SS, 600 PIPE TO VALVE NCV-3617                      C5.30                                                       (SM) 322600      SI.106-SM-14                                C-F-1       SUR     3-                                     PIPE AND FITTINGS, SS, 6000II VALVE HCV-3617 TO PIPE                      C5.30                                                      (SM) 322700      SI-106-SM-15                                C F 1       SUR     3-                                     PIPE AHD 2"X 2"X 2" TEE, SS Pipe to Tee                                 C5.30                                                      (SM) 322800       SI-106-SM-16                               C-F-1        SUR     3-                                     2"X 2"X 2"  TEE AND  2"X  3/4" Tee    to Reducing Insert                  C5.30                                                       REDUCING INSERT/ SS (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAN'I UHIT 1 PAGE: 514 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED HP 8 AUXILIARY HP HEADERS TO LOOP 1A FIRST SECOND THIRD ZONE HUHBER: 1-084 ASHE PERIOD PERIOD PERIOD I~ 0 'I\I I '\ 0 .Vh) \ A I+Vp SCr Vl I E

                                                                                  -.---OUTAGE------

q Wp ~ SUHHARY EXAHIHATION AREA CATGY NDE INSTRUCTIOHS NUMBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

                                                                                    ,tP Pfh I>a    'lat%1a~a .t'J i4 5 %@Jilt 0   . pter    p 111'-2-SI-271 REF. DMG. NO. 01-084 r

322900 SI -271-SM.1 C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Tee to Pipe C5.30 (SM) 323000 S I -271-SM-2 C F 1 SUR 3- PIPE AHD FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 323100 Sl-271-SM-3 C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 23200 Sl-271-SM-4 C-F-1 SUR 3- e PIPE AND 2"X 2"X 2" TEE, SS Pipe to Tee C5.30 (SM), IH'fERSECTS LINE 2".Sl-132 AT ITEN ¹290 I.2.SI.215 REF. DMG. HO. 01-084 323300 S I-215- FM-1 C-F-1 SUR 3- 6"X 2" MELOOLET AHD PIPE ~ SS Sockoiet to Pipe C5.30 (SM) 323400 SI.215-SM-2 C.F.1 SUR 3 - - - X PIPE AND 2"X 2"X 2" TEE, SS Pipe to Tee C5.30 (SM) 323500 SI.215-S'M-3 C F 1 SUR 3 - .- 2"X 2"X 2" TEE AND 2"X 3/4" Tee to Reducing Insert C5.30 REDUCING INSERT, SS (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 515 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS IHSPECTIOH IHTERVAL PLAN STATUS PRESERVICE YEAR COHBINED HP & AUXILIARY HP HEADERS TO LOOP 1A2 FIRST SECOND THIRD ZONE HUNGER: 1-084 ASHE PERIOD PERIOD PERIOD h v~ 4v A ~ 4 thtw  % I ~~ ~ I vie Scl ECO SUHHARY EXAHIHAT ION AREA CATGY NDE - - - - - - 0 U T A G E- INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK** 1.2.SI.215 REF. DMG. HO. 01-084 323600 S I-215-SM-6 C-F-1 SUR 3- PIPE AND 2"X 2"X 2" TEE, SS Tee to Pipe C5.30 (SM) 323700 SI-215-SM-7 C-F.1 SUR 3- Inaccessible for exam due to Pipe to Elbow C5.30 pipe clamp on vibration chnper restrainting valve V.3900; PIPE AND FITTINGS'Sg 6000¹ (SM) 323800 SI-215-SM-8 C-F-1 SUR 3- PIPE AND FITTINGS/ SSg 6000¹ Elbow to Pipe C5.30 (SM) 323900 S I -215-SM-9 C F1 SUR 3- PIPE AND FITTIHGS, SS, 6000¹ PIPE TO VALVE HCV-3616 C5.30 (SM) I-2-SI-131 REF. DMG. HO. 01-084 324000 S I-131-SM-1 C.F.1 SUR 3 i - . X PIPE AHD FITTIHGS, SS, 6000¹ Valve KCV-3616 to Pipe C5.30 (SM) 324100 SI.131.SM-2 C-F-1 SUR 3 - . . X PIPE AND 2"X 2"X 2" TEE/ SS Pipe to Tee C5.30 (S'M)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UHIT 1 PAGE: 516 REVISION: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS IHSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR COMBINED HP & AUXILIARY HP HEADERS" TO LOOP 1A2 F IRST SECOND THIRD 20HE NUMBER: 1-084 ASME PERIOD PER I CO PERIOD A. %h fA il V W 'l A 4L ~ ~ I 6 0  % IV SCI VI ECe 'n

SUMMARY

EXAMINATION AREA CATGY NDE -OUTAGE------ INSTRUCTIONS NUMBER IDEHTIFICATIOH ITEM HO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~* I-2-SI-131 REF. DUG. NO. 01.084 324210 SI.131-Fu-2000 3 Tee to Pipe 324220 Sl-131-FN-2001 C-F-1 SUR 3-Tee to Pipe C5.30 I-2-Sl-126 REF. DUG. NO. 01-084 324320 SI-126-FH-2000 3 Pipe to Valve V-3113 324330 SI -126-FU-2002 C.F-1 SUR 3 - - - X Pipe to Valve V-3113 C5.30 I-2-SI-106 REF. DUG. NO. 01.084 324400 SI-34-282 F-A VT-3 3-RESTRAINT F1.20 I-2-SI-131 REF. DUG. NO. 01-084 324500 S I.33-271 F-A VT.3 3-RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 517 REVISIOH: 0 IHSERVICE'NSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CONBINED KP 8 AUXILIARY HP HEADERS TO LOOP 1A FIRST SECOHD THIRD

 ~        a v wi >>,

20NE HUHBER: 1-084 ve sw ~ s ~ ~ ~ s~ s ASHE

                                                        <<Schno 'hlI a     n             Y PERIOD
                                                                                 'r4   J' V 'IIV
                                                                              - - - - - - 0 PERICO 4Abl '1h'0  l J4 PERIOD SUHHARY EXAHIHAT IOH AREA                        CATGY      HDE                         U T A G E                         INSTRUCTIONS HUNBER    IDENTIFICATIOH                         ITEN NO NETH            2   3           2  3             2  3            ~*CALI BRAT IOH BLOCK~*

~ + > ~ 'o e 4 All '4lJ'As@'AdJdt'O'IVIES'4~41 'A VLdl I J+ 1 1 lCBt'N'I'A<6'I 'i'AV 1 4~'VVa4 '4 4r~ I V i 'pss'i >0," '0 'g' ICY l-2-SI-215 REF. DUG. NO. 01.084 324600 S I 269 F-A VT.3 3-RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE! 518 REVI SION: 0 INSERVICE INSPECTION LONG TERN PLAH CLASS 2 ALL STATUS CONPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED HP !L AUXILIARY HP HEADERS TO LOOP 1B1 FIRST SECOND THIRD ZONE NUMBER: 1-085 ASNE PERIOD PERIOD PER I CO 'I e ~ t,l> Neph'why s~"6;tpy yi A.,l

e. ~ li Be Scp'Nvp.r, FC0 sr ~< A ~ V 0 tab V SUHNARY EXAHIHAT ION AREA CATGY NDE OUTAGE------ INSTRUCTIONS HUHBER IDENT IF I CAT IOH ITEN NO NETH )1 2 3 1 2 3 - 1 2 3 **GALI BRAT IOH BLOCK*"

V'WILES ANVw~J'4lbQ404OAA eb ee' O 4 a a u4 Tt 1-2-SI-108 REF. DMG. NO. 01-085 324700 Sl-108-FM-22 C-F-1 SUR 3- 6+X 2" MELDOLET AND PIPE, SS Sockolet to Pipe C5.30 (SM) 324800 S I -108-SM-21 C-F-1 SUR 3 PIPE AHD FITTINGS/ SSg 6000¹ Pipe to Elbow C5.30 (SM) 324900 S I -108-SM-20 C.F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (S'M) 25000 Sl-108-SM-19 C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 325100 SI-108-SM-18 C-F-1 SUR 3 PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 325200 SI-108-SM.17 C.F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Pipe'o Elbow C5.30 (SM) 325300 SI -108-SM-16 C-F-1 SUR 3- PIPE AHD FITTINGS/ SSg 6000¹ Elbow to Pipe C5.30 (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAN'I UNIT 1 PAGE: 519 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED HP & AUXILIARY HP HEADERS TO LOOP 181 FIRST SECOND THIRD ZONE HUNGER: 1-085 ASHE PERIOD PERIOD PERIOD ~

 > s,i,   i'0 .y>> r>>v.i p. >>>>  ag  ...~    r ~~   ~   ~~~w ECfi.vl>>

Scl X i "s~, ~ SUHHARY EXAHIHATION AREA CATGY NDE - - - - - - OUTAGE - - - - -- IHSTRUCTIONS IDENTIFICATION ITEN NO NETH 2 3 2 3 2 3 **CALIBRAT ION

  • q'4')

HUHBER 4 'L" >>>>' I 6'>>l >>A 6 1 1

                                                                   'Y>>"h>>>> AVIV>>'JV4SVI>>AC V Ati      V ~ '1>>>>  J>>>>  '>>>>t BLOCK I-2-SI-108      REF. DMG. NO. 01-085 325400    S I-108-SM-15                            C-F-1      SUR     3-                                           PIPE AND 2"X 2"X  2"  TEE, SS Pipe to Tee                              C5.30                                                           (SM) 325500    Sl 108-SM-12                             C-F-1      SUR     3-                                          2"X 2"X 2"   TEE AND  2"X 3/4" Tee   to Reducing     Insert              C5.30                                                          REDUCING INSERT, SS (SM) 325600   Sl-108-SM-11                              C-F-1     SUR     3-                                           PIPE AHD 2"X 2"X   2"  TEE, SS Tee   to Pipe                             C5.30                                                          (S'M) 325700   S1-108.SM.10                              C.F-1     SUR     3 .                                          PIPE AND FITTINGS ~ SS ~ 6000 PIPE TO VALVE HCV-3637                    C5.30                                                          (SM)

I-2-SI-273 REF. DMG. NO. 01-085 325800 Sl.273-SM-1 C-F-1 SUR 3 X PIPE AND FITTINGS, SS, 6000¹ Valve HCV-3637 to Pipe C5.30 (S'M) 325900 Sl-273-S'M-2 C-F-1 SUR 3- X PIPE AHD 2"X 2"X 2" TEE, SS Pipe to Tee C5.30 (SM) 326000 Sl-273-S'M-3 C-F.1 SUR 3- 2"X 2"X 2" TEE AHD 2"X 3/4" Tee to Reducing Insert C5.30 REDUCING INSERT, SS (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 520 REVISION: 0 IHSERVICE INSPECTIOH LONG TERN PLAH CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED HP 8 AUXILIARY HP HEADERS TO LOOP 181 FIRST SECOND THIRD 2ONE HUNGER: 1 085 ASHE PERIOD PERICO PERIOD

v. q g <<y vqi'.w'w~,w "s gs) ~ .~ % i ~ ~ eris FCi hfli SLP n p, v, SUHHARY EXAHIHAT ION AREA CATGY HDE -----OUTAGE------ INSTRUCTIONS HUNGER IDENTIFICATION ITEM HO NETH I,I 2 3 1 2 3 1 2 3 <<*CALIBRATIOH BLOCK<<<<
  • A 4 \ S~W a ~sVedAHw V4 bW V4 1ICSVAA I AAv ml 444 \ pe IA( s s i i e )i ~ 8 1-2.SI-273 REF. DMG. NO. 01-085 326100 Sl-273-SM-4 C-F.1 SUR 3- PIPE AND 2"X 2"X 2" TEE@ SS Tee to Pipe C5.30 (SM) 326200 Sl-273.FM.S C-F-1 SUR 3- X PIPE AND 2"X 2"X 2" TEE, SS Pipe to Tee C5.30 (SM), INTERSECTS LINE 2"-Sl-133 I 2 Sl 217 REF. DMG. HO. 01-085 326300 S I -217- FM.1 C-F-1 SUR 3- X 6"X 2" MELDOLET AND PIPE/ SSg Sockoiet to Pipe C5.30 (SM) 326400 Sl -217.SM-2 C-F-1 SUR 3- X PIPE AND FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 326500 SI-217-SM-3 C-F-1 SUR 3- X PIPE AND FITTIHGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 326600 S I -217.SM.4 C-F 1 SUR 3- X PIPE AND FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 326700 SI-217.SM-5 C-F.'1 SUR 3- X PIPE AHD FITTIHGS, SS, 6000¹ Elbow to Pipe C5.30 (SM)

DATE: . 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 521 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED HP & AUXILIARY HP HEADERS TO LOOP 181 FIRST SECOND THIRD ZONE NUHBER: 1-085 ASHE PERIOD PERIOD PERIOD t APHI h ) I 'll h[4I IAP tP it4ltp4A 1 I ~ ~~ II% SEC I XII ~ 8 SUNNARY EXAHIHATION AREA CATGY HDE -OUTAGE INSTRUCTIONS NUMBER IDENT IF I CATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK** l-2 Sl 217 REF. DMG. NO. 01-085 326800 Sl-217-SM-6 C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 326900 S I -217-SM-7 ~ C-F-1 SUR 3- PIPE AHD FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 327000 SI.217-SM-8 C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 327100 S I.217-SM-9 C-F-1 SUR 3- PIPE AND FITTINGS@ SSg 600 Elbow to Pipe C5.30 (SM) 327200 Sl-217-SM-10 C.F-1 SUR 3- PIPE AND 2"X 2"X 2" TEE ~ SS Pipe to Tee C5.30 (SM) 327300 SI-217-SM-11 C-F-1 SUR 3 - - - - - - X 2"X 2"X 2" TEE AHD 2"X 3/4" Tee to Reducing Insert C5.30 REDUCING INSERTS SS (SM) 327400 SI.217-SM-14 C-F-1 SUR 3 PIPE AND 2"X 2"X 24 TEE, SS Tee to Pipe C5.30 (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UHIT 1 PAGE: 522 REVISION: 0 INSERVICE INSPECTIOH LOHG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED HP 8 AUXILIARY HP HEADERS TO LOOP 1B1 ) FIRST SECOND THIRD 20NE NUHBER: 1 085 ASME PERIOD PERIOD PERIOD ht) 9 ~ qi 4 V@I 1&%1 1h) ~ 4 i 4 ~ ISA( SEC tXIC SUNHARY EXAHI NATION AREA CATGY NDE I

                                                                         - - - - - -OUTAGE                     INSTRUCTIONS NUHBER         IDEHTIFICATION                        ITEH NO NETH     I 1   2  3    1  2  3      1 2  3       **CALIBRATIONBLOCK**

1-2-SI-217 REF. DMG. NO. 01-085 327500 SI -217.SM-15 C-F-1 SUR 3 - - - - - X PIPE AHD FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 327600 SI-217.SM-16 C.F-1 SUR 3- PIPE AHD FITTINGS/ SSg 6000¹ Elbow to Pipe C5.30 (SM) 327700 Sl-217-SM.17 C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ PIPE TO VALVE HCV.3636 C5.30 (SM) I-2-$ 1-133 REF. DMG. NO. 01.085 327800 S I -133.SM-1 C-F-1 SUR 3- PIPE AND FITTINGS/ SSg 6000¹ VALVE HCV-3636 TO PIPE C5.30 (SM) 327900 S I -133-SM-2 C-F-1 SUR 3- PIPE AND 2"X 2"X 2" TEE@ SS Pipe to Tee C5.30 (SM) 328000 Sl -133-SM-3 C-F-1 SUR 3- PIPE AND 2"X 2"X 2" TEE, SS Tee to Pipe C5.30 (S'M) I 2 SI 145 REF. DMG. NO. 01-085 328100 S I -145. F'M-1 C-F-1 SUR 3- X PIPE AHD FITTINGS, SS, 6000¹ PIPE to VALVE V-3133 C5.30 (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 523 REVISION: 0 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHI'S INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED HP & AUXILIARY HP HEADERS TO LOOP 1B1 FIRST SECOND THIRD ZONE NUHBER: 1-085 ASHE PERIOD PERIOD PERIOD w>> ~ en s i'r+s% vwv r r ow ~ v.wv, ws ~ ~ s SLP%t ~ vI~ ~ '4'1! 1'4 4'll tbj '" jL SUHHARY EXAHINATION AREA

                                                           ~

CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS WA iS HUHBER IDENTIFICATION

                  '~era'i          ~" <<<<Alww<g  '   '+ "BLOCK**
                                                                                                                                               " ""'  <" 'Ivies 1-2-SI-108        REF. DUG. NO, 01-085 328200      S1-28-215                             F A           VT-3   3-RESTRAINT                              F1.20 I-2-SI-133       REF. DHG. NO. 01-085 328300      S I 219                            F-A           VT-3   3-RESTRAINT                              F1.20 I-2-SI-217        REF. DNG. HO. 01-085 328400     S 1.27-2342                             F-A           VT.3  3-RESTRAINT                               F1.20 328500     SI-27.237                               F-A           VT-3  3-RIGID RESTRAINT                          F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 524 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED HP & AUXILIARY HP HEADERS TO v'lentLOOP 1B2 FIRST SECOND THIRD

                                                                                                )

ZONE NU"BER: 1 086 ASHE I PERIOD PERIOD PERIOD 2'I <'4 's Y'tf44 lw ~ Itt t;J't t 6

                                     ~        ~   tf% ~   t 'h$        Ser 4;vl'Co 'X SUHHARY EXAHIHATION AREA                                     CATGY .          NDE       - - - - - -  OUTAGE-                            INSTRUCT IOHS HUHBER      IDENT I F I CATION                               ITEN HO NETH             I 1  2  3      1  2  3       1 2  3              *~CALIBRATION BLOCK~*

I' ~ +l' ' ' lJ ' &4~41'oe4dO ' >LVV lLWJV 4'lQX jhow ALA'I o 4a '44$ e S A4 ~ )0 I 2 SI-109 REF. DMG. NO. 01-086-B 328600 Sl-109-FM-18 C-F 1 SUR .3- X 6"X 2" IIELDOLET AND PIPE, SS, Sockolet to Pipe C5.30 (SM) 328700 S I -109-SM-17 C-F-1 SUR 3- PIPE AHD FITTINGS/ SSg 6000¹ Pipe to Elbow C5.30 (SM) 328800 Sl-109-SM-16 C.F.1 SUR 3- PIPE AND FITTINGS'S 6000¹

                                                                                                                                                                       ~

Elbow to Pipe C5.30 (SM) 328900 SI.109-SM.15 C.F-1 SUR 3- PIPE AND FITTIHGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 329000 SI-109.SM-14 C.F-1 SUR 3- PIPE AND FITTIHGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 329100 S I-109-SM-13 C.F 1 SUR 3- PIPE AHD FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 329200 SI-109.SM-12 C-F-1 SUR 3 PIPE AHD FITTINGS'Sg 6000¹ Elbow to Pipe C5.30 (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE! 525 RE V I S ION! 0 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED HP 8 AUXILIARY HP HEADERS TO LOOP 1B FIRST SECOHD THIRD Jp ZONE NUHBER!

   "I  1 l0     <<4   Ilht SUHHARY EXAHIHATIOH AREA 1.086 h ~~
                                   <<8  e    'sl ~~ 'I  IO ~ ~ ~ \4 ASHE SEC CATGY l X'lt  ~

HDE PERIOD PERIOD

                                                                                         ------OUTAGE------

PERIOD INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO NETH 1 2 3 1 2 3 1 2 3 **CALI BRAT ION BLOCK~* >>V)% ~ Pj 1.2-SI-109 REF. DMG. NO. 01.086-B 329300 Sl-109-SM-11 C-F-1 SUR 3- PIPE AND 2<<X 2<<X 2<<TEE; SS Pipe to Tee C5.30 (SM) 329400 SI.109-SM-21 C-F-1 SUR 3- 2<<X 2<<X 2<< TEE AND 2<<X 3/4<< Tee'to Reducing Insert C5.30 REDUCING INSERT, SS (SM) 329500 SI-109-SM-10 C.F.1 SUR 3- PIPE AND 2<<X 2<<X 2<<TEE@ SS Tee to Pipe C5.30 (SM) 329600 S1-109-SM.9 C.F-1 SUR 3- PIPE AND FITTINGS ~ SS, 6000 PIPE TO VALVE HCV.3647 C5.30 (SM) I-2-Sl-274 REF. DMG. NO. 01-086-B 329700 SI.274.SM.1 C-F-1 SUR 3- PIPE AHD FITTINGS, SS, 6000II VALVE NCV 3647 TO PIPE C5.30 (SM) 329800 SI-274-SM-2 C F-1 SUR .3- PIPE AND 2<<X 2<<X 2<< TEE, SS Pipe to Tee C5.30 (SM) 329900 Sr-274-SM-3 C-F-1 SUR 3- 2<<X 2<<X 2<< TEE AND 2<<X 3/4<< Tee to Reducing Insert C5.30 REDUCING INSERT, SS (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 526 REVISION: 0 INSERVICE INSPECTION LONG'TERH PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED HP & AUXILIARY HP HEADERS TO LOOP 1B2 FIRST SECOND THIRD ZONE NUHBER: 1-086 ASHE PERIOD PERIOD PER ICO U ~ i -p) s~>> <<<<<<>> <<>> v>>)>> ". % ~ ~ ~ a>>~a SEC gf r. SUHHARY EXAHIHATIOH AREA CATGY HDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEN K NETH I 1 2 3 1 2 3 1 2 3 *~CALIBRAT ION BLOCK~* I-2-SI-274 REF. DWG. NO. 01-086-B 330000 Sl-274-SW-4 C-F-1 SUR 3- PIPE AHD 2eX 2"X 2" TEE, SS Tee to Pipe C5.30 (SW) I-2-SI-274 REF. DWG. NO. 01-086-A 330100 SI-274-FW-5 C-F-1 SUR 3- PIPE AHD 2"X 2"X 2" TEE, SS Pipe to Tee C5.30 (SW), INTERSECTS LINE 2"-Sl-134 1-2-SI-218 REF. DWG. NO. 01-086-A 330200 Sl-218-F'W-1 C-F-1 SUR 3- X 6"X 2" WELDOLET AND PIPE, SS, Weldolet C5.30 (SW) 330300 S I-218.SW-2 Pipe to Elbow C-F.1 C5.30 SUR 3 .. - X PIPE AND FITTINGS, SS, 6000¹ (SW) 330400 S I -218- FW-28 C F 1 SUR 3 . PIPE AND FITTINGS/ SSg 6000¹ Elbow to Pipe C5.30 (SW) 330500 SI-218-FW-2C C-F-1 SUR 3- PIPE AND FITTINGS'Sg 6000¹ Pipe to Elbow C5.30 (SW)

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 527 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL *PLAH STATUS PRESERVICE YEAR COHBINED HP 4 AUXILIARY HP HEADERS TO LOOP 102 FIRST SECOND THIRD ZONE HUHBER: 1-086 ASHE PERIOD PERIOD PERIOD rtvylh, 1l Vhf HRI4 1 5 h.(4 4 P ~ tL% ~ <<CCP ECt VI h 'I I I Val A1 A'I le ~ SUHHARY EXAHIHATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS ~ P I )we HUHBER s IDENT I F I CAT I ON t4' v s '0 'A'dd<< '4'&Jhdv ITEH rsvp NO NETH hidA4e'a~

                                                                                   )

1 2 3 1 2 3 AVVCVIN%V11+'1ot owvVs1a 1 Sl ~ l' 2 3

                                                                                                                               %<ED I
                                                                                                                                        *ICALI BRAT I OH BLOCK~*

I we ' wl sswa slA v ~ I 2 SI-218 REF. DMG. NO. 01-086-A 330600 SI -218- FM-2D C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 330700 SI.218-FM-2E C-F-1 SUR 3- PIPE AHD FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 330800 S I -218- FM-2F C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 330900 S 1.218 FM-3A C-F 1 SUR 0 PIPE AHD FITTINGS'Sg 600 Pipe to Elbow C5.30 (SM) 331000 SI-218-FM-3B C.F.1 SUR 3 . PIPE AHD FITTIHGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 331100 SI-218-FM.3C C-F-1 SUR 3- PIPE AND FITTIHGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 331200 S I -218- FM-3D C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM)

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 528 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS INSPECTION IH'IERVAL PLAH STATUS PRESERVICE YEAR COHBINED HP & AUXILIARY HP HEADERS TO LOOP 1B2 FIRST SECOND THIRD ZOHE NUNBER: 1-086 ASHE PERIOD PERIOD PERIOD qe w ~ ~ v,'v ~ e w ~ wv .Scc ECo YI SUHHARY EXANIHATIOH AREA CATGY HDE OUTAGE- INSTRUCTIONS HUHBER IDEHTIFICATIOH ITEN NO HETH I 1 2 3 1 2 3 1 2 3 ~*CALIBRAT ION BLOCK ~ I-2-SI.218 REF. OMG. NO. 01.086.A 331300 SI-218.SM.4 C-F 1 SUR 3 . PIPE AND FITTINGS/ SSg 6000¹ Pipe to Elbow C5.30 (SM) 331400 Sl-218-SM-5 C-F-1 SUR 3- PIPE AHD FITTINGS'Sg 6000¹ Elbow to Pipe C5.30 (SM) 331500 SI-218-SM.6 C.F-1 SUR 3- PIPE AND 2"X 2"X 2" TEE/ SS Pipe to Tee C5.30 (SM) e 331600 SI.218-SM-7 Tee to Reducing Insert C.F.1 C5.30 SUR 3- 2"X 2"X 2" TEE AND 2"X REDUCING INSERT, SS (SM) 3/4" 331700 SI-218.SM.10 C-F-1 SUR 3- PIPE AHD 2"X 2"X 2" TEE, SS Tee to Pipe C5.30 (SM) 331800 S I -218-SM-11 C-F-1 SUR 3- PIPE AHD FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (S'M) 331900 SI -218-SM-11A C-F-1 SUR 3 - X PIPE AHD FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 529 RE V I S ION: 0 INSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS I HSPECT IOH INTERVAL PLAN STATUS PRESERVICE YEAR COMBINED HP & AUXILIARY HP HEADERS TO LOOP 1B FIRST SECOND THIRD

                                                                     'j        'JLilv' rj ZOHE NUMBER:         1-086                       ASME                        PERIOD       PERIOD             PERIOD 4   ScP'~vl "     '       "                         J
                                                                             --- --OUTAGE---..-
                                                                                                 ~     'aj'C0

SUMMARY

EXAMINATION AREA CATGY NDE INSTRUCTIONS 1t ~ I HUMBER ok'~ 7'" IDEHTIFICATIOH

                            '     'C  'ii 'i 4'       ITEM NO METH
                                                       'L44 ~          )   1   2  3 JC44t 1  2   3        1    2
                                                                                          'Ch i6'lb4 J'LAIN 'ol'>~

3 **CALIBRATIONBLOCK~*

                                                                                                                          +FJ'  'jA   'low '1 oVIV oa's* o I 2-SI-218    REF. DUG. NO. 01-086-A L

332000 SI-218-SM.12 C-F-1 SUR 3- PIPE AHD FITTINGS, SS, 6000¹ PIPE TO VALVE HCV-3646 C5.30 (SM) I-2-SI-134 REF. DWG. NO. 01-086-A 332100 SI -134-SW-1 C.F.1 SUR 3 - - - X PIPE AND FITTINGS, SS, 6000¹ VALVE MCV-3646 TO PIPE C5.30 (SH) 332200 SI-134-SN-2 C-F.1 SUR 3 - - - X PIPE AND 2oX 2"X 2" TEE, SS Pipe to Tee C5.30 (SM) 332300 S I -134-SN-3 C-F-1 SUR 3- PIPE AND 2"X 2"X 2" TEE/ SS Tee to Pipe C5.30 (SN) I-2-SI-147 REF. DWG. NO. 01.086-A 332400 SI-147-FH-1 C.F-1 SUR 3 - - - X PIPE AND FITTINGS, SS, 6000¹ PIPE to VALVE V-3143 C5.30 (SW) 1-2-SI-109 REF. DUG. NO. 01-086 B 332500 SI-30-294 F-A VT-3 RESTRAINT F1 ~ 20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 530 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHBINED HP 8 AUXILIARY HP HEADERS TO LOOP 1B2 FIRST SECOND THIRD ZONE NUHBER: 1-086 ASHE PERIOD PERIOD . PERICO vt" vaawalaa th I tf ' twv ~ a. 6 ~ +~ ~ FC ~w vI Iv<<(ct a a a SUHHARY EXAHINATIOH AREA CATGY NDE - - - - - - 0 U T A 0 E - - - - -- INSTRUCTIONS HUNBER IDEHTIFICATIOH ITEN NO NETH 1 2 3 1 2 3 1 2 3 ~~CALIBRATIOH BLOC<** aaa aa a v v a w a a~aaa <<>>V~avraa>>aaar I-2-Sla134 REF. DUG. NO. 01-086-A 332600 S 1.29.262 F-A VT-3 3-RESTRAINT F1.20 I 2-SI-218 REF. DUG. HO. 01-086-A 332700 RESTRAIHI'-A SI-29-260 F1.20 VT.3 3

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANI'HIT 1 PAGE: 531 REVISION: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING PUMPS DISCHARGE TO HPSI PUMP DISCHARGE FIRST SECOHD THIRD ZONE NUMBER: p<<$ I  %<< 1-087 (At <<'l4) EXAMINATION AREA

                                <<1 <<\      '
                                             'I ASME SEC'UMMARY CATGY           NDE, PERIOD
                                                                           - - - - - 0 PERIOD U T A G E PERIOD
                                                                                                 - - - - --      INSTRUCT IOHS NUMBER     IDEHTIFICATION                         ITEM NO METH         I 1  2  3     1  2  3     1  2  3        **CALIBRATIOHBLOCK*~
                                                                                                            <<<<ll I-2-CH-104    REF. DUG. NO. 01-087-A 333800    CH-104.F'LI.16A                                      SUR    3-                                        Piping fs exempt, no COUPLIHG-TO-PIPE                                                                                      examinatfon required, record is active due to previous examinations I-2-CH A74     REF. DNG. NO. 01-087-B 334200     CH-A74-SN-1                                          SUR    3-                                       Piping fs exempt, no PIPE TO.COUPLIHG                                                                                      examinatfon required, record fs active due to prevfous examinations 335100     CH.A74 F'll-9                                        SUR    3-                                       P  iping fs except, no PIPE-TO.COUPLING                                                                                     examination required, record is active due to prevfous examinatfons 335300    CH.A74 %-11                                           SUR   3-                                        Piping is exempt, no PIPE.TO VALVE     (V-02-2122)                                                                         examination required, record is active due to previous examinations 1-2-CH.104     REF. DWG. NO. 01 087-A 335900   CH-104.FII.13A                          C.F.1         SUR    3-                                        PIPE AND FITTINGS, SS, 6000¹ Coupling to Pipe                        C5.30                                                          (SM)

I 2 CH 137 REF. DUG. NO. 01-087 H 346450 Valve V.2340 3 Ho examination required

       'alve

DATE: 01/09/98 ST. LUCIE'NUCLEAR PLANT UNIT 1 PAGE: 532 REVISION: 0 INSERVICE IHSPECTIOI LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING PUHPS DISCHARGE TO HPSI PUHP DISCHARGE FIRST SECOND THIRD ZONE HUNGER: 1-087 ASHE PERIOD PERIOD PERICO <<, <<rd <<<<S l<<PA )A <<N<<> '0,) <<m, n a '~"SEC.""XI'"""':"

                                             ~

SUHHARY EXAHINATION AREA CATGY HDE OUTAGE- - - - IHSTRUCTIOHS HUNGER IDEHT IF ICATION w r K~r ITEH HO NETH sl I 1 2 r <<<<<<r~ rrr<<w 3 1 Jpt 2 r 3 f4. rrr, 1 f, 2 3 ply, *" )<<r

                                                                                                                          **CALIBRATIONBLOCK~*

r pr rrr q t p <<f>p I-2-CH-137 REF. DMG. NO. 01.087.H 346500 CH 137 FM-18A C.F-1 SUR 3- PIPE AHD FITTINGS'Sg 6000¹ Valve V.2340 to Pipe C5.30 (SI}) I-2-Sl-141 REF. DMG. NO. 01-087 H 346600 S I -141- FM-1B C-F-1 SUR 3- PIPE AHD FITTINGS, SS, 6000¹ Pipe to Tee C5.30 (SM) 346700 SI 141-FM-1C C.F.1 SUR 3- PIPE AHD FITTINGS'Sg 6000¹ Tee to Reducing Insert C5.30 (SM) 346750 SI-141-FM-1D C-F 1 SUR 3-Tee to Pipe C5.30 346800 Sl-141-FM-1E C-F-1 SUR 3- PIPE AHD FITTINGS, SS, 6000¹ Pipe to Elbog C5.30 (SM) 346900 S I -141-FM-1A C-F 1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 347000 S1-141- FM.2 'C-F.1 SUR 3- PIPE AND FITTINGS ~ SSg 6000¹ Pipe to Elbow C5.30 (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 533 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPONEHTS INSPECTION INTERVAL FLAII STATUS PRESERVICE YEAR CHARGING PUHPS DISCHARGE TO HPSI PUNP DISCHARGE FIRST SSSDHD THIRD 2ONE HUHBER: 1-087 ASNE PERIOD PERIOD PERIOD 'N F H fi S J UT 'F'FI TAJ 8 RH"F 'RAT'%. 'F. 'F', "~AT -SEC.>>NI"

                                                                ~

SUHMARY EXANIHATION AREA CATGY HDE - - - - - - 0 U T A G E- INSTRUCTIONS'*CALIBRATION HUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 BLOCK~*

'4 II   eTiUaa,      PW4                                                                                             I   ~ hAF I-2-SI-141       REF. DUG. NO. 01-087-H 347100           S I -141- FN-3                         C-F  1     SUR    3-                                         PIPE AND FITTINGS, SS, 6000¹ Pipe to Elbow                          C5.30                                                        (SM) 347200           S I -141- F'N-4                       C-F.1      SUR     3-                                        PIPE AND FITTIHGSH              SSH 6000¹ Pipe to Elbow                         C5.30                                                         (SiJ) 347300           SI-141-Fu-5                           C-F-1      SUR     3-                                        PIPE AND FITTIHGSH SS, 6000¹ Elbow to Pipe                         C5.30                                                         (SW) 347400           SI-141-SN.6                           C-F-1      SUR    3-                                         PIPE AND FITTINGS, SS, 600 Pipe to Elbow                         C5.30                                                        (SQ) 347500           SI -141-Sll-7                         C-F-1      SUR    3-                                         PIPE AHD FITTINGS, SS, 6000¹ Elbow to Pipe                         C5.30                                                        (SN) 347600           SI-141-SW-8                            C  F1     SUR     3-                                        PIPE AHD FITTINGS, SS, 6000¹ Pipe to Elbow                          C5.30                                                        (SN) 347700          SI-141-FW-9                             C-F-1     SUR     3-                                        PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe                           C5.30                                                        (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANI'HIT 1 PAGE: 534 REVI SION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING PUHPS DISCHARGE TO HPSI PUHP DISCHARGE FIRST SECOND THIRD ZONE NUHBER: 1-087 ASKE PER IOD PER IOD PERIOD ) ~ g tJ V'ag lA I ~ f 'kl,% ~ - ~ "- SEC '-.XI"

                                        ~

SUHHARY EXAHIHAT ION AREA CATGY HDE - - -'- - - 0 U T A G E - - - - INSTRUCTIONS NUHBER IDEHT IF ICATION ITEH NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>> I-2-Sl-141 REF. DMG. NO. 01-087-H 347800 SI-141-S'M-10 C F 1 SUR 3- PIPE AHD FITTIHGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 347900 S I-141-SM-11 C F-1 SUR PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 34'8000 Sl.141-SM-12 C-F-1 SUR 3- PIPE AHD FITTINGS, SS, 6000¹ Pipe to Elbow C5.30 (SM) 48100 S I -141- FM-13 C-F-1 SUR 3- PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 348200 Sl 141-F'M-13A C.F.1 SUR 3- FLANGE 1500¹ M.H. AND PIPE, Pipe to Flange C5.30 SS, 6000¹ (SM) 348300 S I -141. FM.138 C-F-1 SUR 3- FLAHGE 1500¹ M.N. AND PIPE, Flange to Pipe C5.30 SS, 6000¹, (S'M) 348400 SI.141. FM.13C C-F-1 SUR 3- FLANGE 1500¹ M.H ~ AND PIPE, Pipe to Flange C5.30 SS, 6000¹ (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 535 REVISION: 0 INSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING PUHPS DISCHARGE TO HPSI PUMP DISCHARGE i FIRST SECOND THIRD ZONE HUHBER: 1-087 ASHE PERIOD PERIOD PERIOD ~ a~ 'E avv (v 'Ilk I 4I 'lp vav a ~ a I ~ 1'I (lCa vXVI

                                                            $F I

a']. ' va'J'ia 9 'v ' ahaa 'I V i' SUHMARY EXAHINATION AREA CATGY NDE )

                                                                                   -     - - - - 0 U T A G E                          INSTRUCTIONS NUHBER       IDENTIFICATION                             !TEN HO METH        I 1 2 3              2 3            2 3              **CALIBRATIOHBLOCK~*

a a a a' vA aa va'avvav aavvvva'lha 1 1 v .aa%1JvVaalAavvav V va'vaa vaav aa avvi aaaaa' 4vv 'aaaa'a aaa'aa 1-2-SI-141 REF. DMG. HO. 01-087-H 348500 SI-141-FMa130 C.F.1 SUR 3- FLANGE 1500¹ M.H. ANO PIPE, Flange to Pipe C5.30 SS, 6000¹, (SM) 348550 S1-15-7 F.A VT-3 3 - - - - - - X - - 94 Restraint F1.20 348600 Sl.141-FM-14 C-F 1 SUR 3- PIPE AHD FITTINGS, SS, 6000¹ Pipe to Coupling C5.30 (S'M) 348700 S 1-141- FM-15 C-F-1 SUR 3- PIPE ANO FITTINGS, SS, 600 Coupling to Pipe C5.30 (SII) 348800 Sl-1C1.FMa16 C F1 SUR 3- PIPE ANO FITTINGS'Sg 6000¹ Pipe to ElboM C5.30 (SM) 348900 S I -141- F M-17 C-F 1 SUR 3- X PIPE AND FITTINGS, SS, 6000¹ Elbow to Pipe C5.30 (SM) 349000 S1-141- FM-18 C-F-1 SUR 3- X PIPE ANO FITTINGS, SS, 6000¹ PIPE-TO-BRANCH CONNECTION C5.30 (SM)

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT'UNIT 1 PAGE: 536 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CHARGING PUMPS DISCHARGE TO MPSI PUMP DISCHARGE F IRST SECOND THIRD ZONE NUMBER: 1-087 ASME PERIOD PERIOD PERIOD (pg~ j (' P'lhP 41 I ~ h' l&pV trtiaa ~ SEC s,HI+ ~-

                                                                    ~    <<.
                                                                               ~

SUMMARY

EXAMINATION AREA CATGY NDE - 0 U T A G E - - - - INSTRUCTIONS NUMBER IDEHT IF I CATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK

  • I-2 CH-141 REF. D'LIG. HO. 01-087-H 351100 S I 25 F A VT-3 3-RESTRAINT F1.20 351200 S1-15-20'I F-A VT-3 3-RESTRAINT F1.20 351300 8 I .15-19 F.A VT-3 RESTRAINT F1.20 51400 S I -15 141 F A VT.3 3-RESTRAINT F1;20 351500 S I-15-12 F-A VT-3 3-RESTRAINT F1.20 351600 S I 102 F.A VT.3 3 RESTRAINT F1.20 351700 S I 701 F A VT-3 3-RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 537 REVISION: 0 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COXPOHEHTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR CHARGING PUXPS DISCHARGE TO HPSI PUXP DISCHARGE FIRST SECOND THIRD 087 PERIOD PERIOD PERIOD ~ ~ ~ ZONE NUXBER: 1

     <<..<<v wt ~<<.   ~ ~-
                       ~ ~   ~ vi  ",  . ~ ~ ~ ~ ~ ~

ASXE

                                                     <<-.SSP EC0  vl   "~  i   ~
                                                                                ..---OUTAGE------

SUXXARY EXAHI NATION AREA CATGY NDE INSTRUCTIONS NUXBER IDENTIFICATIOH ITEN NO NETH I 1 2 3 1 2 3 1 2 3 *~CALIBRATIOH BLOCK~*

                                                                                       'aaahA     <<% a  t& 8%<<    . n <<~ e,%r.<<rre..<<at <<,h O   i   O,\   r ~ ~

I-2-CH 141 REF. DUG. NO. 01-087-H 351900 S I.15.6 F-A VT-3 3 RESTRAINT F1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 538 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAH CLASS 3 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHPONENT COOLING HATER HX 1A 4 1B INLET HEADERS F IRST SECOND THIRD i w., g ZOHE HUHBER:

        -ps 1-100 i~a'~i%i ~"~;cw ~~

SUHHARY EXAHIHAT ION AREA

                                   ~,   ~   -~  '*    ASHE SEC CATGY "XI ~

HDE " PERIOD

                                                                         - - - - - - 0 PERIOD U T A G E PERIOD
                                                                                                     - - - - --    IHSTRUCTIOHS HUHBER    IDENTIFICATION                        ITEN NO NETH   I  1   2   3      1  2  3      1  2  3       **CALIBRATIOHBLOCK*~

1-24-CC-12 REF. DMG. NO. 01-100-B 352600 CC.998-11 F.A VT-3 3 X Rigid Sway Strut F1.308 1-20.CC.3 REF. DLIG. NO. 01-100-B 352700 CC-998-31 F-A VT-3 3-Rigid Sway Strut F1.30A 352800 CC-998-31A F-A VT-3 3-RIGID TIE BAR ASSEHBLY F1.30A I-2C-CC-12 REF. DUG, NO. 01-100-B 352900 CC-998-65 F.A VT-3 3 X Rigid Sway Strut F1.30B 353000 CC-998-65A F-A VT-3 3-Rigid Sway Strut F1.30A I-20.CC.1 REF. DUG. NO. 01-100-A 353100 CC.998-1C5 F-A VT-3 3-Rigid Sway Strut F1.308

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 539 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING 'IJATER HX 1A 8 1B INLET HEADERS FIRST SECOND THIRD ZONE NUMBER: 1-100 ASME PERIOD PERIOD PERIOD

                                        '-""-'SEC ".Xl

SUMMARY

EXAHINATION AREA CATGY NDE OUTAGE"----- IHSI'RUCTIOHS NUMBER IDENT I F ICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 <<<<CAL I BRAT ION BLOCK<<* I 20-CC-1 REF. DWG. NO. 01-100.A 353200 CC-998-145A F-A VT-3 3-Rigid Sway Strut F1.308 I-24-CC 11 REF. DUG. NO. 01 100 A 353300 CC.998-215 F-A VT-3 3-Rigid Sway Strut F1.308 353400 CC-998-215A F-A VT-3 3-Rigid Sway Strut F1.30A 353500 YPH-1 F.A VT-3 3 - - - - - - - - - 93 VARIABLE SPRING HANGER F1.30C 353600 YPH-2 F-A VT.3 3-RCO MANGER F1.30A 1-24.CC.12 REF. DWG. NO. 01-100-B 353700 YPH-3 F-A VT 3 3-VARIBLE SPRING HANGER F1.30C

DATE:'1/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 540 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHPONENT COOLING MATER HX 1A & 1B INLET HEADERS FIRST SECOND THIRD V OI ZONE NUNBER: pi AVI74 4 Nl ~ ~ 'k 1-100

                                               ~ ~ ~

ASHE i av ScP ECow.vI X e ~ PERIOD PERIOD

                                                                                                   ~

PERIOD SUHHARY EXAHIHAT ION AREA CATGY HDE 0 U T A G E IHSTRUCTIOHS NUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3' 2 3 **CALIBRATIONBLOCK~* M 0 L I ~ I.24.CC-12 REF. DMG. NO. 01-100-B 353800 YPH-4 F A VT-3 ROO HANGER F1.30A I-24-CC-11 REF. DMG. NO. 01.100.A 353900 YPH-108 F-A VT.3 3-SLIDING BASE SUPPORT F1.30A I-24-CC-12 REF. DMG. NO. 01 100 B 354000 YPH-109 F-A VT-3 F1.30A 354100 YPH-110 F A VT-3 3-SLIDING BASE SUPPORT F1.30A I-20-CC.1 REF. DMG. NO. 01-100-A 354200 YPH-111 F.A VT-3 3-ROO HANGER F1.30A I 20-CC-2 REF. DMG. NO. 01-100-A 354300 YPH-112 F-A VT-3 ROO HANGER F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 541 REVISION: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING WATER HX 1A 8 1B INLET HEADERS FIRST SECOND THIRD 20HE NUMBER: 1-100 ASHE PERIOD PERIOD PERIOD A>> I l'Y V p 4'I SEL'XI" . SUHHARY EXAHINATION AREA CATGY NDE - - - - -OUTAGE- INSTRUCTIONS HUHBER IDENTIFICATION ITEN HO NETH 23 123 2 3 *ICALI BRAT ION BLOCK** I.20-CC-3 REF. DWG. NO. 01-100.B 354400 YPH.113 F-A VT-3 3-RCO HANGER F1.30A I.20-CC-1 REF. DWG. NO. 01-100-A 354500 YPH.176 F-A VT-3 3 X Spring Support F1.30C 354600 YPH-176 IA D-A VT-1 3-integral Attachment D1.20 1.20-CC-2 REF. DWG. NO. 01-100-A 354700 YPH-177 F A VT-3 3-Spring Support F1.30C 354800 YPH-177 IA 0-A VT-1 3- X Integral Attachment D1.20 I-20-CC-3 REF. DWG. NO. 01 100.B 354900 YPH-178 F-A VT-3 3 93 Spring Support F1.30C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 542 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAH CLASS 3 ALL STATUS COMPONENTS I INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING MATER NX 1A & 1B INLET HEADERS I FIRST SECOHD THIRD ZONE NUMBER: 1.100 ASME I PER100 PERIOD PERIOD

   ) ~ 'ge,e$ 'e.)ae'Jh. eave) 'tai'     )ei '>>e   ~   ~ a tee ~ 'e SEC   Xl /    ~             \  aa
                                           ~

i

SUMMARY

EXAMIHAT IOH AREA CATGY HDE i

                                                                                          - - - - - - 0   U T A  0 E - - - -              IHSTRUCTIOHS NUMBER      IDENT I F I CAT IOH                              ITEM HO METH    i 1  2 3        1  2  3      1  2   3             **CALIBRATIOHBLOCK>>>>

>he a, a r aa e ra . aaa aw aa r 'a a Cr aavr.a eer.a@ra a ra raa r ae a, .+eef r a, a~ . ! . r a aa, e r!l 1-20-CC-3 REF. DMG. NO. 01-100.B 355000 YPH.178 IA D-A VT-1 3-Integral Attachment D1.20

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 543 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS COKPOHEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR COKPONENT COOLING-SHUTDOWN COOLIHG HX 1A INLET FIRST SECOHD THIRD ZONE NUKBER: 1-101 ASKE PERIOD PERIOD PERIOD qi.i>i,iy w~,~v ~~i. vii,Ii. r ~" i ~ ai vi SEC",Xfi" """ s ~ ~ ~ EXAKIHAT ION AREA CATGY 'OE r"'UKKARY

                                                                                  - - - - - - 0 U T A G E - - - -       INSTRUCTIONS NUHBER      IDENTIFICATION                        ITEN  HO NETH             i 1  2  3     1  2  3     1  2  3       **CALIBRATIOHBLOCK**

I-14-CC-20 REF. DWG. NO. 01-101.A l 355100 CC-20-1 F-A VT-3 3 BOX RESTRAINT F1.308 355200 CC-20-1A F.A VT-3 3- X RIGID SWAY STRUT F1.30A 355300 CC-20.2 F-A VT-3 BOX RESTRAINT F1.308 355400 CC-20-3 F-A VT-3 3 BOX RESTRAINT F1.308 355500 CC-20-4 F-A VT-3 3-RESTRAINT F1.308 355600 CC-20.4A F-A VT-3 3-CLAKP RESTRAINT F1.308 I-20 CC 16 REF. DWG. NO. 01-101-A 355700 CC-20-5 F-A VT-3 3-BOX RESTRAINT F1.30A

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 544 REVI SIGH: 0 IHSERVICE INSPECTION LOHG TERK PLAN CLASS 3 ALL STATUS COKPONEHI'S INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COKPONENT COOLING-SHUTDOWN COOLING HX 1A INLET i FIRST SECOND THIRD 1-101 PERIOD PERIOD PERIOD ~ 4 ZONE HUKBER:

   'liiahb,wl v tgs~i'c  $ ~  ~  at,AE. I. ~ ',, ri  v   i sqwl ~~

ASKE FC04 ScP vi. I', i v i;"'i o o <<r <<,q>> SUKKARY EXAKIHATIOH AREA CATGY HDE I 0 U T A G E INSTRUCTIONS 3 **CALIBRATIONBLOCK~* HUNGER IDENTIFICATION

                   *is     w    v~avva        ~v   o   sro~We ITEN NO KETH Ws vaa ssaasv    ~

I 1 2

                                                                                    <<~S <<O)1am 3
                                                                                                    +~

1 2

                                                                                                                ~ ~o 1 2  3 e oo p <<s(yr r  ro<<                    0 ( ~ ~

I 20-CC-16 REF. DUG. HO. 01-101-A 355800 CC-20-6 F-A VT-3 3-BOX RESTRAIHT F1.308 355900 CC-20-7 F-A VT-3 3 BOX RESTRAINT F1.30A 356000 CC-20-8 F.A VT-3 3-BOX RESTRAINT F1.308 56100 CC-20-9 F.A VT-3 3-BOX RES'TRAIHT F1.308 1-10 CC-34 REF. DUG. NO. 01-101-B 356200 CC-14-1 F-A VT-3 3- X Rigid Sway Strut F1.30A I 8 CC-38 REF. DHG. HO. 01 101-8 356300 CC-14-2 F-A VT-3 3-Snubber 1-102 F1.30S

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 545 REVISION: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SNUTDOUN COOLING HX 1A INLET FIRST SECOND THIRD ZONE NUHBER: 1-101 ASME PERIOD PERIOD PER I CO

     'P)w;rw)vl'svJl,vs%  'll %ha 1 ~ 't ~ tow 'e t  w5 I a ~  SEC.h,gl,    v r,',I

SUMMARY

EXAMINATION AREA CATGY NDE -OUTAGE--' INSTRUCTIOHS NUMBER IDENTIFICATION ITEM HO METH I 3 1 2 3 1 2 3 **CALIBRATIONBLOCK* (, r r >>la I-8.CC-37 REF. DUG. NO. 01.101-8 V 356400 CC-14-3 F-A VT-3 3-BOX RESTRAINT F1.30e I 8-CC-38 REF. DUG. NO. 01-101-8 356500 CC.'14-4 F A VT-3 3-BOX RESTRAINT F1.308 356600 CCH.35 F A VT-3 3 . VARIABLE SPRING HANGER F1.30C 356700 CCH.37 F-A VT-3 3-ROO & CLEVIS HANGER F1.30A I-8-CC-37 REF. DUG. NO. 01 101-B 356800 CCH-40 F.A VT-3 3 VARIABLE SPRING HANGER F1.30C 356900 CCH-41 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 546 REVISIOH: 0 INSERVICE INSPECTIOH LOHG TERH PLAN CLASS 3 ALL STATUS COHPOHEHTS INSPECT I OH INTERVAL PLAN STATUS PRESERVICE YEAR COHPONENT COOLING.SHUTDOWN COOL ING HX 1A INLET F IRST SECOND THIRD ZONE NUHBER: 1.101 ASHE PERIOD PERIOD PERIOD gl bl t I PP( f tyV$ $ ~ AA ~ ~ etiam.SEC i.XI~ 1 4 SUHHARY EXAHINATIOH AREA CATGY NDE -----OUTAGE------ INSTRUCTIONS NUHBER IDENTIFICATION ITEN HO NETH 2 3 1 2 3 1 2 3 **CALIBRATIOKBLOCK** 'I ~ w w Sr .t%', + a I-14-CC.20 REF. DUG. NO. 01-101-A 357000 CCH 79 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C I-20-CC-16 REF. DMG. NO. 01-10'I.A 357100 CCH-114 F-A VT-3 3- X ROO HANGER F1.30A 357200 CCH.115 F-A VT-3 3-ROO HANGER F1.30A 357300 CCH.116 F-A VT-3 3-HANGER ASSEHBLY F1.30A 357400 CCH-117 F.A VT-3 3-HANGER ASSEHBLY F1.30A I 14-CC-20 REF. DIJG. NO. 01-101-A 357500 CCH-118 FA VT3 3-HANGER ASSEHBLY F1.30A

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 547 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SNUTDOVN COOLING HX 1A INLET FIRST SECOND THIRD i ~ ZONE NUMBER: 9 t't vote' 1-101 her s

SUMMARY

EXAMINATION AREA Illmaw. ~ .~ ~ w ~ ASME i St( CATGY vl ' NDE

                                                                      )    PERIOD 5"('JI'J      I v
                                                                        - - - - - - 0 bl 'h PERIOD j'ov' U T A G E PERIOD
                                                                                                         'o'C1
                                                                                                      - - - -     --        INSTRUCTIONS i

NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK** ev sri ve6 wsv4reh 4'Alt vAYAAlsosvIp~A 'Avl 8 c also4 i h Arot j J rtl 'C4 441'i4'ed '4 'i'Ae I-14-CC-20 REF. DWG. NO. 01-101-A 357600 CCH-119 F-A VT-3 3-RIGID HANGER ASSEMBLY F1.30A 357700 CCH-120 F-A VT-3 3-RIGID HANGER ASSEMBLY F1.30A 357800 CCH-121 F-A VT-3 3-RIGID HANGER ASSEHBLY F1.30A 357900 CCH.122 F.A VT-3 3-SLIDIHG BASE SUPPORT F1.30A 358000 CCH 122 IA D-A VT-1 3-IHTEGRAL ATTACHMENT D1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 548 REVI SIGH: 0 INSERVICE IHSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SKUTOOMN COOLING NX 1A DISCHARGE FIRST SECOND THIRD I 4q, ~ 20NE NUHBER: yh P)<< tie, i vill 1-102

                          \

SUNHARY EXAMINATION AREA i ii,l*p,<< <<A, 0 ~ lg pt ~ ASHE t'>>8 erma4 Ml, CATGY n (, 8>> NDE PERIOD

                                                                                      - - ~

V '

                                                                                             - - 0 I '4 PERICO 4

U T A G E j PERIOD

                                                                                                                - - - - --         INSTRUCTIONS NUHBER        IDENT I F I CATION                          ITEN  NO NETH       1  2  3      1    2  3      1  2  3           **CALIBRATIONBLOCK>>>>
                 ,  ~     t  ws   w   sos <<ei aw<<'mades'rW         vs  QsL" sarWv   ~eksPAvevio+s    ~ ivan's         r v v ~ 4 ass   s   i ~   wv v v I-10-CC-43         REF. DUG. NO. 01-102-B r

358100 CC-17.1 F.A VT-3 3-Snubber 1-101 F1.30S 358200 CC-17-1A F-A VT-3 3-RIGID TIE BAR F1.30A I-B-CC-42 REF. DUG. NO. 01-102.B 358300 CC-17-2 F.A VT-3 3-BOX RESTRAINT F1.308 I-B-CC.41 REF. DUG. NO. 01.102-8 358400 CC.17-3 F-A VT-3 3-BOX RESTRAINT F1.308 I-14-CC-22 REF. DUG. NO. 01-102-A 358500 CC-22-1 F-A VT-3 3- X BOX RESTRAINT F1.308 358600 CC-22-1A F.A VT-3 3-Rigid Sway Strut F1.308

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 549 REVISION: 0 INSERVICE INSPECTIOH LONG TERN PLAH CLASS 3 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHPOHENT COOLING-SHUTDOWN COOLING HX 1A DISCHARGE FIRST SECOND THIRD ts I I i ZOHE HUHBER:

        .ll trS 0s . ~ Itsy 1-102 h'st     s  s 'tst ~~   ~ ~ ~~ ~ I ASHE
                                                                 'CIss FC 'Vlt
                                                                       ~ n I      '    '

PERICO V 'r I ~ S PERIOD

                                                                                              -.--OUTAGE- ..---

PERIOD SUHMARY EXAHIHAT ION AREA NUHBER IDENT I F I CATION rsl sr I CATGY HDE ITEN HO NETH rr s'rv rrsswr r<<vrvttsstt I 1 2 3 1 vt, svVs'vbslrssrtssrr 2 3 rA r I 2 c ss 3 r s t INSTRUCTIONS trtt r 's

                                                                                                                                      **CALIBRATIONBLOCK~*
                                                                                                                                                'rrs vrs    'r     't I-14-CC-22       REF. DUG. HO. 01 102 A 358700       CC-22-2                                        F-A       VT-3    3-VERTICAL SUPPORT                               F1.30B 358800       CC.22-3                                        FA        VT3     3-BOX RESTRAINT                                  F1.30B I-20-CC-26       REF. DIIG. NO. 01-102 A 358900       CC-22-4                                        F-A       VT-3    3-BOX RESTRAINT                                  F1.30B I-20-CC.26        REF. DWG. NO. 01-102-B 359000       CC-22-5                                        F-A      V-3 3-BOX RESTRAINT                                  F1.308 359100       CC-22-6                                        F.A      VT-3 3 BOX RESTRAINT                                  F1.30B 359200       CC.22.6A                                       F  A     VT-3   3-RIGID RESTRAINT                                F1.308

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: '50 REVISIOH: IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CONPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CONPONENT COOLING-SNUTDOVN COOLING HX 'IA DISCHARGE FIRST SECOND THIRD 20HE NUNBER: Vf tlP 6 viJ)t essa' 1-102

                           'IH i  or'               ASNE FCo n PERIOD     PERIOD       PERICO SUHMARY EXANIHATION AREA                        CATGY   HDE       ------OUTAGE------                    IHSTRUCTIOHS HUNGER    IDENT I F ICATION                     ITEN HO NETH    I 1   2    3   1  2  3      1 2  3      *~CALIBRATIOH BLOCK**

1-20.CC-26 REF. DIIG. NO. 01-102-8 359300 CC-22.7 F-A VT-3 3-BOX RESTRAINT F1.308 359400 CC-22-8 F-A VT-3 3-BOX RESTRAINT F1.308 359500 CC-22-9 F.A VT-3 3-BOX RESTRAINT F1.308 59600 CC-22.10 F-A VT-3 3-BOX RESTRAINT F1.308 I-6 CC 154 REF. DWG. NO. 01-102-C 359700 CC.24.1 F-A VT 3 3 BOX RESTRAINT F1.30A 359800 CC-24.2 F-A VT-3 3-BOX RESTRAINT F1.308 359900 CC-24-3 F-A VT-3 3 - - - X BOX RESTRAINT F1.308

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 55I REVISIOH: 0 IHSERVICE IHSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SHUTDOW COOLING HX 1A DISCHARGE FIRST SECOND THIRD ZONE NUMBER: 1-102 ASME PERIOD PERIOD PER ICO 4a ~ % J W \{ cv'le& 5 v I IA), ~ hi ~ "".SEC." Xl""--"i

SUMMARY

EXAMINATION AREA CATGY HDE -----OUTAGE- INSTRUCTIONS NUMBER IDEHTIFICATION ITEM HO METH 1 2 3 1 2 3 1 2 3 **CALIBRAT ION BLOCK~~ I-6-CC-154 REF. DUG. NO. 01 102-C 360000 CC-24-4 F.A VT-3 3-BOX RESTRAINT F1.308 360100 CC.24-5 F A VT-3 3-BOX RESTRAINT F1.308 360200 CC-24-6 F-A VT-3 3-BOX RESTRAINT F1.308 360300 CC-24-7 F A VT-3 3- - - X BOX RESTRAINT F1.30B 360400 CC-24-8 F.A VT-3 3-BOX RESTRAINT F1.30B 360500 CC-24-9 F-A VT-3 3-RIGID TIE BAR F1.30A 360600 CC-24-9A F-A VT-3 3 X Rigid Sway Strut F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 552 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOL ING-SKUTDOWN COOLING HX 1A DISCHARG FIRST SECOHD THIRD 2ONE NUHBER: 1-102 ASHE PERIOD PERIOD PERIOD

                                    " ""        XI   '

SEC SUMHARY EXAHIHATIOH AREA CATGY HDE OUTAGE - - - - IHSTRUCTIOHS HUMBER IDENTIFICATION ITEH NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK** I-8-CC-42 REF. DWG. NO. 01-102-B 360700 CCH.38 F-A VT-3 3- a VARIABLE SPRING HANGER F1.30C 360800 CCH-39 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C I-8-CC-41 REF. DWG. NO. 01-102-8 360900 CCH-42 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C 361000 CCH-43 F A VT-3 3-VARIABLE SPRING HANGER F1.30C I-6-CC-154 REF. DWG. NO. 01-102-C 361100 CCH-59 F-A VT-3 3 X VARIABLE SPRING HANGER F1.30C I-14-CC-22 REF. DWG. NO. 01-102-A 361200 CCH.106 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C

DATE:" " 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 553 REV I SIGH: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SHUTDSJN COOLIHG HX 1A DISCHARGE FIRST SECOND THIRD ZONE NUMBER: 1-'102 ASME PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE - OU T A G E- INSTRUCTIONS NUMBER IDENTIFICATION . ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* I-14-CC-22 REF. DWG. NO. 01-102-A 361300 CCH-107 F-A VT-3 3-PIPE SADDLE F1.30A 361400 CCH-108 F-A VT-3 3-SADDLE CLAMP F1.30A I-20-CC-26 REF. DN. NO. 01-102-A 361500 CCH-109 F-A VT-3 3-SADDLE CLAMP F1.30A 1.20-CC-26 REF. DUG. NO. 01-102-8 361600 CCH.110 F-A VT.3 3-SADDLE CLAMP F1.30A 361700 CCH-111 F-A VT-3 3-SADDLE CLAMP F1.30A 361800 CCH-112 F-A VT-3 3-SADDLE CLAMP F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 554 REVISION: 0 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECT IOH INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SHUTDOWN COOLING HX 1A DISCHARGE FIRST SECOND THIRD ZOHE NUMBER: 1 102 ASME 'ERIOD PERIOD PERIOD I - ~ * "" "~ SEC

                                               ~

Xl ' "

SUMMARY

EXAMIHATIOH AREA NDE

                                                                    "'ATGY OUTAGE-----             INSTRUCTIONS IDENT IF ICATION                          ITEM HO METH                   2   3          1  2  3     1 2  3      <<*CALIBRATION BLOCK*>>

NUMBER v 'i'll ' 4 I,'.v4 aaA I 4, r ~ I i+kkl ~ ~ i 1 6 Veal'O'SV se~ v A I 20 CC.26 REF. DNG. NO. 01-102-8 361900 CCH-113 F-A VT-3 3 X SADDLE CLAMP F1.30A I-14-CC-22 REF. DWG. NO. 01-102-A 362000 CCH-78 F-A VT-3 3-ROD HANGER F1.30A I-6-CC-154 REF. DMG. HO. 01-102-C 362100 CCH-124 F-A VT-3 3 ROD HANGER F1.30A 362200 CCH.126 F-A VT.3 3-ROO HAHGER F1.30A 362300 CCH-126A F.A VT.3 3 X ROO HANGER F1.30A 362400 CCH-128 F-A VT 3 3-ROD HANGER F1.30A

i DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 555 REVI SION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COMPONENTS INSPECT I OH INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SHUTDOWN COOLING HX 1A DISCHARGE FIRST 'ECOND THIRD ZONE NUHBER: 1-102 ASME PERIOD PERIOD PERIOD
                                  - "" "'" SEC. XI'"

SUMMARY

EXAMINATION AREA CATGY NDE - OUTAGE - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH i 1 2 3 2 3 1 2 3 **CALIBRATIONBLOCK~* 1-6-CC-154 REF. DUG. NO. 01-102-C 362500 CCH-130 F-A VT-3 3-SADDLE CLAMP F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 556 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAH CLASS 3 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR cowpoHEHT cooLIHG-sHUTDouH cooLING Nx 18 INLET FIRST SECOND THIRD 20NE NUNBER: 1-103 ASNE PERIOD PERIOD PERIOD ~ I A" " "~ ~ 'EC: XI' SUNNARY EXANINATION AREA CATGY HDE -OUTAGE-....- INSTRUCTIONS NUHBER IDEHTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~~ I-14-CC-21 REF. DWG. NO. 01-103-A 362600 CC-13-1 F-A VT-3 3-BOX RESTRAINT F1.308 362700 CC-13-1A F.A VT-3 3 X Rigid Sway Strut F1.30A 362800 CC.13-2 F.A VT-3 3-BOX RESTRAINT F1.308 2900 CC-13-3 F-A VT-3 3-BOX RESTRAINT F1.308 363000 CC-13-4 F-A VT-3 3 . BOX RESTRAINT F1.308 363100 CC-13-5 F-A VT-3 3-BOX RESTRAIHT F1.308 363200 CC-13-5A F A VT-3 3-Rigid Sway Strut F1.308

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 557 REV I SION: 0 IHSERVICE INSPECTION LOHG TERH PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING.SHUTDOIJN COOLING HX 1B INLET FIRST SECOND THIRD ZONE NUHBER: 1-103 ASHE PERIOD PERIOD PERIOD SEC.'XI" "" '- SUHHARY EXAHINATIOH AREA CATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFI CAT IOH ITEH HO METH ) 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* I-20-CC-17 REF. DUG. NO. 01-103-A 363300 CC-13-6 F-A VT.3 3- X BOX RESTRAINT F1.30B 363400 . CC-13.7 F-A VT-3 3-BOX RESTRAINT F1.30B 363500 CC-13-8 F-A VT-3 3-BOX RESTRAINT F1.30B 363600 CC-13-9 F-A VT-3 3-BOX RESTRAINT F1.30B 363700 CC-13-10 F A VT-3 3-BOX RESTRAIHT . F1.30B I 10 CC-35 REF. DUG. NO. 01 103-B 363800 CC-21-1 F.A VT-3 3-Snubber 1-104 F1.30S 363900 CC.21-2 F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT WHIT 1 PAGE: 558 RE V I S ION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SHUTDOWN COOLING HX 18 INLET FIRST SECOND THIRD 1-103 PERIOD PERIOD PERIOD ZONE NUMBER: ASNE

                                        'i'~ SEC" Xl      '     '--   i   ' '>>      ~

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - IHSTRUCTIOHS NUMBER IDENTIFICATION ITEH HO METH ) 1 2 3 1 2 3 1 2 3 <<*CALIBRATIOH BLOCK~* I-B.CC.40 REF. DWG. NO. 01-103-B 364000 CC-21-3 F-A VT-3 3 BOX RESTRAINT F1.308 I-B-CC.39 REF. DWG. NO. 01-103-8 364100 CC-21-4 F-A VT-3 3- X BOX RESTRAINT F1.30B I-B CC-40 REF. DWG. NO. 01-103-B 364200 CCH-44 F-A VT 3 3-F1.30C 364300 CCH-45 F-A VT.3 3-VARIABLE SPRING HANGER F1.30C I-B-CC-39 REF. DWG. NO. 01-103-8 364400 CCH-48 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C 364500 CCH-49 F-A VT-3 3-TIE ROO HANGER F1.30A

      .DATE: 01/09/98                                            ST ~ LUCIE NUCLEAR PLANT UNIT 1                                      PAGE: 559 REVISION:        0                                     IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL                     PLAN STATUS             PRESERVICE YEAR COMPONENT COOLING-SHUTOOMN COOLING HX 1B          INLET               FIRST        SECOHD        THIRD ZONE NUMBER:   1-103                           ASME SEC'  Xi' PERIOD PERIOD
                                                                                             'J 4   i'PERIOD

SUMMARY

EXAMIHAT IOH AREA CATGY NDE -OUTAGE INSTRUCTIONS >><<i ~ NUHBER 4 <<>>>> IDENT I F I CAT ION

                               'JJI >>1    4 '     ITEM NO METH 23         123'<<l
                                                             '>>'"<<<<<<%WWjj '>> 'k4<<<<<<1<<VQ<<<<

1 vIA<<1 2 3

                                                                                                          <<<<<<    **CALI BRAT ION BLOCK>>>>

I-14-CC-21 REF. DWG. NO. 01-103-A 364600 CCH-87 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C 364700 CCH.88 F-A VT-3 ROO HANGER F1.30A 364800 CCH-89 F-A VT-3 3-ROO HAHGER F1.30A 364900 CCH-90 F-A VT-3 3- X ROO HANGER F1.30A 365000 CCH-91 F-A VT-3 3-ROO HANGER F1.30A 1-20-CC-17 REF. DIJG. NO. 01-'I03-A 365100 CCH-92 F-A VT 3 3-ROO HANGER F1.30A 365200 CCH-93 F-A VT-3 3-ROO HANGER F1.30A

DATE: 01/09/98 ST ~ LUCIE HUCLEAR PLANT UNIT 1 PAGE 560 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECT IOH INTERVAL PLAH STATUS PRESERVICE YEAR COMPONENT COOLING-SHUTDONN COOLING HX 1B INLET F IRST SECOHD THIRD ZONE NUMBER: 1-103 ASME PERIOD PERIOD PERIOD

      ~                             "'" '" " "SEC       Xl 

SUMMARY

EXAMIHAT IOH AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUMBER IDENT IF I CATION ITEM NO METH 1 2 1 2 3 1 2 3 **CALIBRATIOHBLOCK** 4 ~

   " 4    Vt 'I VJ Vi    'vlA jlh   t I I1 e '+   6'  6<1" L I'+< 8'  'i'j'jV41'J'@%A'Jl   Vt I VS 1-20-CC-17     REF. DUG. HO. 01.103.A 365300   CCH-94                                 F-A       VT 3     3-ROO HANGER                             F1.30A 365400   CCH-95                                 F-A       VT-3 3 ROD HANGER                             F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 561 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COHPOHENT COOLING.SKUTDOMN COOLING HX 18 DISCHARGE FIRST SECOND THIRD ZONE HUNGER: 1-104 ASHE PERIOD PERIOD PERIOD

                                     "~ i~i ~ SEC  i SUHHARY EXAHIHATIOH AREA XI'ATGY NDE          - - - - - 0   U T A G E   - -   --          INSTRUCT IOHS NUMBER  IDEHT IF I CAT ION                     ITEN   HO HETH        I 1    2    3     1  2  3       1   2  3          **CALIBRATION BLOCK**

V 4 '\ r rr 'AP4'Al i\V Y 4 I'1'V4 1jltV V I 1 iA >t ~ 1-14-CC-23 REF. DUG. NO. 01 104-A 365500 CC-16-1 F-A VT-3 3-BOX RESTRAINT F1.308 365600 CC-16-1A F-A VT-3 3-RIGID SHAY STRUT F1.30A 365700 CC-16-2 F-A VT-3 3-BOX HANGER F1.30A 365800 CC-16-3 F-A VT-3 3-BOX RESTRAINT F1.308 365900 CC-16-4 F-A VT-3 3 X BOX RESTRAINT F1.308 I-20-CC-27 REF. DNG. NO. 01-104-A 366000 CC-16-5 F-A VT-3 3-BOX RESTRAINT F1.308 366100 CC-16-6 F-A VT-3 3-BOX RESTRAINT F1.308

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 562 REVISION: 0 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SHUTDOMH COOLING HX 1B DISCHARGE FIRST SECOND THIRD ZONE NUMBER: 1-104 ASME PERIOD PERIOD PERIOD

                                 " " '""SEC XI" '"'

SUMMARY

EXAMINATION AREA NDE 'ATGY

                                                                ------OUTAGE------                   INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEM NO METH           1     2  3   1  2  3     1 2  3      **CALIBRATIONBLOCK**

I-20-CC-27 REF. DUG. NO. 01-104-A 366200 CC-16-7 F-A VT-3 3-BOX RESTRAINT F1.308 366300 CC-16-7A F-A VT-3 3-RIGID CLAMP ASSEMBLY F1.30B 366400 CC-16-8 F-A VT-3 3-BOX RESTRAINT F1.308 500 CC.16.9 F-A VT-3 3-BOX RESTRAINT F1.308 366600 CC.16-10 F.A VT-3 3 BOX RESTRAIHT

                                                              -'1.308 I-2  1  2"-CC-92  REF. DllG. HO. 01-104-A 366700  CC-18-1                           F-A     VT-3   3-RIGID PIPE CLAMP                  F1.308 I-10-CC-46    REF. DUG. NO. 01-104-B 366800  CC-23-1                           F-A     VT-3   3-RIGID SlJAY STRUT                 F1.30A

DATE: '01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 563 REVISIOH: 0 IHSERVICE IHSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SHUTDOWN COOLING HX 18 DISCHARGE FIRST SECOND THIRD ZOHE NUMBER: 1-104 ASME PERIOD PERIOD PERIOD

SUMMARY

EXAMIHATION AREA CATGY NDE - - - - -OUTAGE- INSTRUCTIONS NUMBER IDEHTIFICATIOH ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** 1-8 CC-44 REF. DWG. NO. 01-104-8 366900 CC.23-3 F-A VT.3 3 . BOX RESTRAINT F1.30 I-8-CC-43 REF. DWG. HO. 01-104-B 367000 CC-23-4 F-A VT-3 3-BOX RESTRAINT F1.30 1-8.CC-44 REF. DWG. NO. 01-104-B 367100 CCH-46 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C 367200 CCH-47 F-A VT-3 3 . VARIABLE ROD NAHGER F1.30C I-B-CC-43 REF. OWG. NO. 01-104 B 367300 CCH-50 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C 367400 CCH-51 F-A VT-3 3-VARIABLE ROO HANGER F1.30C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 564 REVI S IOH: 0 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SKUTDOMN COOLING HX 1B DISCHARGE FIRST SECOND THIRD 20HE NUMBER: 1-104 ASME PERIOD PERIOD PERIOD SEC

SUMMARY

EXAMINATION AREA XI'ATGY HDE --.---OUTAGE------ INSTRUCTIOHS NUMBER IDENTIFICATION ITEM HO METH 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK** I-20-CC-27 REF. DUG. NO. 01-104-A 367500 CCH-96 F-A VT-3 3-SADDLE HAHGER F1.30A 367600 CCH-97 F.A VT-3 3-SADDLE HANGER F1.30A 367700 CCH-98 F-A VT-3 3-SADDLE HAHGER F1.30A 7800 CCH-99 F-A VT-3 3-SADDLE HANGER F1.30A 367900 CCH-100 F-A VT-3 3-SADDLE HANGER F1.30A 368000 CCH-101 F-A VT-3 3-SADDLE HANGER F1.30A I-14-CC-23 REF. DUG. NO. 01-104-A 368100 CCH-102 F-A VT-3 3-SADDLE HAHGER F1.30A

. DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 565 REVI SION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING-SHUTDOW COOLIHG HX 1B DISCHARGE FIRST SECOND THIRD 1-104 ZONE NUMBER: ASME SECo'I' " PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 <<*CALI BRAT ION BLOCK*>> I-14-CC-23 REF. DWG. NO. 01-104-A 368200 CCH-103 F-A VT-3 3-SADDLE HANGER F1.30A 368300 CCH-104 F-A VT-3 3- X ROD HANGER F1.30A 368400 CCN-105 F-A VT-3 3- X VARIABLE SPRIHG HANGER F1.30C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 566 REVISION: 0 IHSERVICE IHSPECTIOH LOHG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING WATER PUMPS 1A 1B AHD 1C INLET FIRST SECOND THIRD ZONE NUMBER: 1-105 ASME PERIOD PERIOD PERIOD SIjMMARY EXAMINATION AREA CATGY NDE "....-.OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK** I-20-CC-26 REF. DWG. NO. 01 105 A 368900 CC-28-1 F-A VT-3 3 X RIGID TIE BAR ASSEMBLY F1.30B 369000 CC-28-2 F.A VT-3 3-BOX RESTRAINT F1.30B 369100 CC-28-2A F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.308 9200 CC-28-3 F-A VT-3 3-BOX RESTRAINT F1.308 369300 CC-28-4 F.A VT-3 3-BOX RESTRAINT F1.308 369400 CC-28-5 F-A VT-3 3-BOX RESTRAINT F1.30A 369500 CC-28.6 F-A VT-3 3 . BOX RESTRAINT F1.30B

. DATE 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 567 REVISIOH: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING 'llATER PUMPS 1A 1B AND 1C INLET FIRST SECOND THIRD ZONE NUMBER: 1-105 ASME PERIOD PERIOD PERIOD SEC,XI '

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENT IF ICATION ITEN HO METH I 1 2 3 1 2 3 1 2 3 <<*CALIBRATIOH BLOCK~~ I-24-CC-30 REF. DWG. NO. 01-105-A 369600 CC-28-7 F-A VT-3 3-BOX RESTRAINT F1.30B 369700 CC-28-7A F-A VT.3 3-Rigid Sway Strut F1.30A 369800 CC-28-8 F-A VT-3 3-Rigid Sway Strut F1.30A 369900 CC-28-BA F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30A I-24-CC-32 REF. DWG. NO. 01-105-B 370000 CC-28-88 F-A VT-3 3-BOX RESTRAINT F1.30A I-24-CC-30 REF. 0'iJG. NO. 01-105-8 370100 CC-28-9 F-A VT-3 Rigid Sway Strut F'1.30A

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 568 REVI SION: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING IJATER PUMPS 1A 1B AHD 1C INLET FIRST SECOHD THIRD ZONE NUMBER: 1-105 ASME PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE- - ---- IHSTRUCTIOHS 4 NUMBER 4 4 IDENTIFICATION k OVAL 51 4>> hV V<<V ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-20-CC 27 REF. DUG. NO. 01-105 B 370200 CC-28-10 F-A VT-3 3-Rigid Sway Strut F1.30A 370300 CC-28-11 F-A VT-3 3 X Rigid Sway Strut F1.30A 370400 CC-28.12 F-A VT 3 3 - - - - - - - - - 94 BOX RESTRAINT F1.308 0500 CC-28-13 F-A VT-3 3-BOX RESTRAIHT F1.30A 370600 CC-28-14 F-A VT-3 3-BOX RESTRAINT F1.30B I-20-CC-26 REF. DUG. NO. 01-105-A 370700 YPH-19 F-A VT-3 3-RIGID BASE SUPPORT F1.30A 370800 YPH-20 F-A VT-3 3- 93 RIGID BASE SUPPORT F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 569 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING UATER PUMPS 1A 18 AND 1C INLET FIRST SECOND THIRD 1-105 ASME PERIOD PERIOD PERIOD r,,

                                                                                                                '0NE NUMBER:

~ ~ +,is ~ ~~ ~ pi ~ . ~ ~ ~, ~ i '>> ~ i ~ i,gcP FCe vI ~ ~ q s a i o

SUMMARY

EXAMIHATION AREA ~ CATGY NDE - - - - - - 0 U T A G E- INSTRUCTIONS NUMBER IDENTIFICATION ITEMHOMETH ) 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK*>> 1-20-CC-27 REF. DN. NO. 01-105-B 370900 YPK-29 F-A VT-3 3-SLIDING BASE SUPPORT F1.30A I 20 CC-26 REF. DUG. NO. 01-105-A 371000 YPH-31 F-A VT.3 3-SLIDING BASE SUPPORT F1.30A 1-24-CC-31 REF. DMG. NO. 01-105-A 371500 YPH-118 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C I-20-CC-26 REF. DUG. NO. 01-105-A 371600 YPH-119 F-A VT-3 3-SLIDING BASE SUPPORT F1.30A I-24-CC-30 REF. DUG. NO. 01-105-A 371700 YPH-120 F-A VT-3 3-VARIABLE ROO HANGER F1.30A I-24-CC-30 REF. DUG. NO. 01-105-B 371800 YPH-121 F-A VT-3 3- X Rod Hanger F1.30A

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 570 REVISIOH: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING 'WATER PUMPS 1A 18 AND 1C IHLET FIRST SECOHD THIRD ZONE NUMBER: 1-105 ASHE PERIOD PERIOD PERIOD SEC: XI

SUMMARY

EXAMINATION AREA 'ATGY NDE -OUTAGE------ INSTRUCTIONS NUMBER IDEHTIFICATIOH ITEM HO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~*

          'Iasvi vs we
                    ~     ar    vs   Sa  r    w  aoWas       apt eVre sew I-24-CC-32   REF. DWG. NO. 01-'105-B 371900  YPH-122                             F-A           VT-3    3-VARIABLE SPRING HANGER              F1.30C I-24-CC-33   REF. DWG. NO. 01 105-8 372000  YPH-123                             F-A           VT-3    3-VARIABLE SPRING HANGER              F1.30C 1.20-CC.27   REF ~ DWG. NO. 01-105-B 372100  YPH-124                             F-A           VT-3    3-F1.30A 372200  YPH-125                             F-A           VT-3    3-SLIDING BASE SUPPORT                F1.30A I-24-CC-31   REF. DWG. NO. 01-105-A 372400  YPH-179                             F-A           VT-3    3-                        X SprIng Support                      F1.30C 372500  YPH.179 IA                         D  A           VT-1    3-Integral Attachment                D1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 571 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING HATER PUMPS 1A 1B AND 1C INLET FIRST SECOND THIRD ZONE NUHBER: 1-105 ASME PERIOD PERIOD PERIOD

                                 '"'""'SEC." XI'"

SUMMARY

EXAMIHATIOH AREA

                                                  "'ATGY HDE             -----OUTAGE---'..-                 INSTRUCTIONS HUMBER  IDENTIFICATION                    ITEM NO METH        I 1  2  3     1  2  3      1 2  3      **CALI BRAT I OH BLOCK*~

I.24 ~ CC.32 REF. DWG. NO. 01-105-B 372600 YPH-180 F-A VT-3 3- X Per JPH-PSLP-93-0087, SPRING BASE SUPPORT F1.30C Allowable cold settings High YARD 5874 lbs 11/16" - Low 5314 lbs 7/16" 372700 YPH-180 IA D-A VT-1 3-INTEGRAL ATTACHMENT D1.20 I-22-CC-33 REF. DUG. NO. 01-105.8 372800 YPH.181 F-A VT-3 3-SPRING BASE SUPPORT F1.30C YARD 372900 YPH-181 IA D-A VT-1 3-INTEGRAL ATTACHMENT D1.20 YARD

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE 572 REVISIOH: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING SURGE TANK PIPIHG I FIRST SECOND THIRD ZONE NUHBER: 1-106

SUMMARY

EXAHIHATION AREA ASHE SEC CATGY XI'" "'I HDE I PERIOD

                                                                       'lb
                                                                   - - 0 PERIOD l I ha U T A G E PERIOD
                                                                                     - - - -  --    INSTRUCTIONS NUMBER  IDENTIFICATION                    ITEN NO NETH     1  2  3       1   2   3    1  2  3        **CALIBRAT IOH BLOCK**

I-6.CC-153 REF. DUG. NO. 01.106 373000 CC-19-3 F-A VT-3 3 X BOX RESTRAINT F1.308 373100 CC-19-4 F-A VT-3 3-BOX RESTRAINT F1.308 373200 CC-19-5 F.A VT-3 3-BOX RESTRAINT F1.308 300 CC-19-SA F-A VT-3 3-Rigid Sway Strut F1.30A 373400 CC-'19-6 F-A VT-3 3-BOX RESTRAINT F1.308 373500 CC-19-6A F-A VT-3 3 X Rigid Sway Strut F1.30A 373600 CC-19-7 F-A VT-3 3-BOX RESTRAINT F1.308

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 573 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR COMPONENT COOLING SURGE TANK PIPING FIRST SECOND THIRD ZONE NUMBER: 1-106 ASME PERIOD PERIOD PERIOD

                               -~ --  "  "~SEC. XI"  ~

SUMMARY

EXAMIHATION AREA CATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDEHTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

            ~  I I-6-CC-153     REF. DNG. NO. 01-106 373700  CC-19-8                              F A      VT-3   3-BOX RESTRAINT                        F1.308 373800  CC.19.9                              F-A      VT-3   3-BOX RESTRAINT                        F1.308 373900  CC-19-10                             F-A      VT-3   3-RIGID TIE    BAR                     F1.30A 374000  CC-19-10A                            F-A      VT-3   3-Rigid   Sway  Strut                  F1.30A 374100  CCH-61                               F-A      VT-3 3 VARIABLE SPRING HANGER               F1.30C 374200  CCH-123                              F-A      VT-3   3-ROO HANGER                           F1.30A 374300  CCH-125                              F-A      VT-3   3-ROO HANGER                           F'I.30A

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 574 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CONPONEHTS PLAN STATUS PRESERVICE YEAR CONPONENT COOLING SURGE TANK PIPING FIRST SECOND TNIRD 20NE HUNBER: 1-106 ASKE PERIOD PERIOD PERIOD SUNNARY EXAHINATION AREA CATGY NDE ------OUTAGE- IHSTRUCTIOHS NUNBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK ~ I-6-CC-153 REF. DUG. NO. 01-106 374400 CCH.127 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C 374500 CCH-129 F-A VT-3 3-ROO II SADDLE HANGER F1.30A 374600 CC.19.128 F.A VT-3 3-BOX RESTRAINT F1.30B

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 575 REVISIOH: 0 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 3 ALL STATUS CONPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING MATER-CCM HX A S 8 DISCHARGE TO CANAL I FIRST SECOND THIRD ZONE NUHBER: 1-107 ASHE I PERIOD PERIOD PERIOD

                                                 '        'I SEC  XI SUHHARY EXANIHATION AREA                  CATGY     NDE     I
                                                             - - - - - - OUTAGE      - - - -  --       IHSTRUCT IOHS NUHBER  IDENT IF ICATION                  ITEN NO NETH        1  2  3     'I  2  3    1  2  3           ~~CALIBRATION BLOCK*>>

I I-30-CM-72 REF. DMG. HO. 01-107-8 374700 CM-1000-9 F A VT-3 3-Rigid Sway Strut F1.30A 374800 CM-1000-9A F-A VT-3 3 X Rigid Sway Strut F1.30A 374900 CM-1000-11 FA VT3 3-Rigid Sway Strut F1.30A 375000 CM.1000-11A F-A VT-3 3-RIGID TIE BAR ASSENBLY F1.30A 375100 CM-1000-14 F-A VT-3 3-Rigid Sway Strut F1.30A 375200 CM-1000r14A F-A VT-3 3- 94 Rigid Sway Strut F1.30A 375300 CM-1000-148 F-A VT-3 3-BOX RESTRAINT F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT'UNIT 1 PAGE: 576 REVISION: 0 IHSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 3 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING WATER-CCW HX A & 8-DISCHARGE TO CANAL I FIRST SECOND THIRD ZONE NUNBER: 1 107 ASNE I PERIOD PERIOD PERIOD SEC XI" SUMHARY EXAHINATIOH AREA

                                                  *'"'ATGY NDE             ------OUTAGE------                   INSTRUCTIONS HUHBER  IDENTIFICATION                   ITEN NO METH            1  2  3     1  2  3      1 2  3      **CALIBRATIONBLOCK**

I-30-CW-72 REF. DWG. NO. 01-107-8 375400 CW-1000-71 F-A VT.3 3-BOX RESTRAINT F1.308 375500 CW-1000.90 F-A VT-3 3-SPRING BASE SUPPORT F1.30C I-30-CW-73 REF. DWG. NO. 0'1-107-A 375600 CW-1001-9 F-A VT-3 3-Rigid Sway Strut F1.30A 375700 CW-100'I-9A F-A VT-3 3-Rigid Sway Strut F1.308 r 375800 CW-1001-11 F-A VT-3 3-Rigid Sway Strut F1.30A 375900 CW.1001-11A F-A VT-3 3-RIGID TIE BAR ASSENBLY F1.30A 376000 CW-1001-14 F-A VT-3 3-Rigid Sway Strut F1.30A

DATE: 01/09/98 ST. 'LUCIE NUCLEAR PLANT UNIT 1 PAGE: 577 REVISION: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING HATER-CCIJ HX A B B-DISCHARGE TO CANAL FIRST SECOND THIRD 20NE NUMBER: 1-107 ASME PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - . -- INSTRUCTIONS HUMBER IDENT IF I CAT IOH ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK** I-30-CW-73 REF. DNG. NO. 01.107-A 376100 O'-1001-14A F-A" VT-3 3 . Rigid Sway Strut F1 '0A 376200 C1J-1001-148 F-A VT-3 3-BOX RESTRAINT F1.30A 376300 CW.1001-74 F-A VT-3 3-BOX RESTRAINT F1.308 376400 CN.1001-141 F-A VT 3 3-SPRING BASE SUPPORT ASSEMBLY F1.30C 376500 YPH-101 F-A VT-3 3-SLIOIHG BASE SUPPORT ASSEMBLY F1.30C 376600 YPH-102 F-A VT-3 3-SLIDIHG BASE SUPPORT ASSEMBLY F1.30C I-30-CN-72 REF. DIJG. NO. 01-107-B 376700 YPH-105 F.A VT-3 3 - . - - - - - - - 93 SLIDING BASE SUPPORT ASSEMBLY F1.30C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: '78 REVISION: 0 INSERVICE INSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COMPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING llATER-CCM HX A & B-DISCHARGE TO CANAL FIRST SECOND THIRD 20NENUMBER: 1-107 ASME PERIOD PERIOD PERIOD

                               ~  "'-"" SEC Xl

SUMMARY

EXAMINATION AREA

                                                 "'ATGY HDE                        -OUTAGE------              INSTRUCTIONS NUMBER  IDENTIFICATION                   ITEM HO METH           1   2  3      1  2  3      1 2  3      **CALIBRATIONBLOCK~*

I ~ I.30.CW-72 REF. DWG. HO. 01-107-8 376800 YPN-106 F-A VT-3 3-SLIDING BASE SUPPORT ASSEMBLY F1.30C

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: '579 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING WATER CCW HX A Er 8 DISCHARGE PIPING FIRST SECOND THIRD ZONE NUMBER: 1-108 ASME PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E IHSTRUCT IOHS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK*>>

                                                 >4'Sia  v eVI e aoSV eee4rewo      <<a I-20-CC-16    REF. DWG. NO. 01-108-8 376900  CC-25-1                            F-A     VT-3     3-BOX RESTRAINT                      F1.30B 377000  CC-25-2                            F-A     VT-3     3-BOX RESTRAINT                      F1.30B 377100  CC-25-3                            F-A     VT-3     3-BOX RESTRAINT                      F1.308 377200  CC-25-4                            F-A     VT-3     3-RIGID TIE   BAR ASSEMBLY           F1.30A 377300  CC-25-4A                           F-A     VT-3     3-Rigid  Sway  Strut                 F1.30B 377400  CC-25-5                            F-A     VT-3     3-BOX RESTRAINT                      F1 '08 I-24-CC-13    REF. DWG. NO. 01-108-B 377500  CC-25-6                            F-A     VT-3     3-BOX RESTRAINT                      F1.30B
                                                                                                                                 580 DATE:   01/09/98                                      ST. LUCIE NUCLEAR PLANT UNIT 1                                   PAGE:

REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING WATER-CCW HX A 8 B-DISCHARGE PIPING FIRST SECOND THIRD ZONE NUMBER: 1-108 ASME PERIOD PERICO PERIOD

                                                                     -----OUTAGE-                         INSTRUCTIONS V<<A

SUMMARY

EXAMIHATION AREA CATGY HDE NUMBER IDENTIFICATION ITEM HO METH 2 3 2 3 1 2 3 <<*CALIBRATIOH BLOCK<<>> ~0 q A 4 J'1 hl lb ~ I 1 1

                                                                                                     '2q 1-24-CC-13    REF. DWG. HO. 01-108-B 377600   CC-25.7                            F-A      VT-3   3-            X BOX RESTRAINT                      F1.308 377700   CC-25-7A                           F-A      VT-3 3 Rigid  Sway  Strut                 F1.308 377800   CC 25-8                            F A      VT-3   3-RIGID TIE   BAR ASSEMBLY           F1.30A I-24-CC-15    REF. D'WG. HO. 01.108.A 377900   CC-25-9                            F-A      VT-3 3 RIGID TIE   BAR ASSEMBLY           F1.30A 378000   CC-25-9A                           F-A      VT-3   3-Rigid  Sway  Strut                 F1.30A I-24-CC-14    REF. DWG. NO. 01-108-A 378100   CC-25-10                           F-A      VT-3   3-BOX RESTRAINT                      F1.308

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 581 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING HATER-CCll HX A B B.DISCHARGE PIPING FIRST SECOND THIRD ZONE NUMBER: 1-108 ASME PERIOD PERIOD PERIOD SEC

SUMMARY

EXAMINATION AREA XI'ATGY HDE - - - - - - OU T A G E -'- - - -- INSTRUCTIONS IDENTIFICATION ITEM NO METH 2 3 ' 2 3 1 2 3 **CALIBRATIOHBLOCK** NUMBER

      'V L'ij g'       'blg WiA   V  A    0      '       V4 1

AhW.V~si A'V4 1eA ~ ~ @1' ~ .0 ~, I-24-CC-14 REF. DUG. NO. 01-108-A 378200 CC-25-10A F-A VT-3 3-RIBId Sway Strut F1.30B 378300 CC-25-11 F-A VT-3 3-BOX RESTRAINT F1.308 I-20-CC-17 REF. DUG. NO. 01-108.A 378700 CC.26.4 F.A VT-3 3-BOX RESTRAINT F1.308 378800 CC-26-4A F.A VT-3 3-RIGID CLAMP RESTRAIHT F1.30A 378900 CC-26-5 F-A VT-3 3- X RIGID SHAY SUPPORT F1.30A 1-20-CC-16 REF. DWG. NO. 01-108-B 379300 YPH-15 F-A VT-3 3-ROO 8 CLAMP HANGER ASSEMBLY F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 582 REVISION: 0 INSERVICE INSPECTION LOHG TERH PLAN CLASS 3 ALL STATUS COMPOHENTS IHSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING llATER-CQJ HX A 8 B-DISCHARGE PIPING FIRST SECOND THIRD ZONE NUMBER: 1-108 ASME PERIOD PERIOD PERIOD SEC XI

SUMMARY

EXAHINATION AREA CATGY NDE -----.OUTAGE--.--- INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~>> I-20-CC-16 REF. DUG. NO. 01-108-B 379400 YPH.16 F.A VT-3 3-ROD 8 CLAHP HANGER ASSEHBLY F1.30A 379500 YPH-17 F-A VT-3 3-ROO & CLAMP HANGER ASSEMBLY F1.30A 379600 YPH-18 F-A VT.3 3-ROD 8 CLAMP HANGER ASSEHBLY F1.30A I-20-CC-17 REF. DWG. NO. 01-108-A 379700 YPH-27 F-A VT-3 3-BASE SUPPORT ASSEMBLY F1.308 379800 YPH-28 F-A VT-3 3 - - - - - - X VARIABLE HAHGER ASSEMBLY F1.30A 379900 YPH-28A F-A VT-3 3- 93 ROD & CLAHP HANGER ASSEHBLY F1.30A I.20-CC-16 REF. DNG. NO. 01.108.B 380000 YPH-32 F-A VT-3 3-BASE SUPPORT ASSEHBLY F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 583 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COHPONENTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING WATER-CCW HX A 8 B-DISCHARGE PIPING FIRST SECOND THIRD ZONE NUHBER: 1-108 ASHE PERIOD PERIOD PERIOD

                                        " ""'SEC."

SUHHARY EXAMINATION AREA XI'ATGY NDE ------OUTAGE INSTRUCTIONS NUMBER IDENT I F I CAT I ON ITEH NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK** I-20-CC-16 REF. DWG. NO. 01-108-B 380100 YPH-33 F-A VT-3 3-BASE SUPPORT ASSEHBLY F1.30A I-24-CC-13 REF. DWG. NO. 01-108-B 380500 YPH-127 F-A VT-3 3-BASE SUPPORT ASSEHBLY F1.30A 380600 YPH-128 F-A VT 3 3- X BASE SUPPORT ASSEHBLY F1.30C I-24-CC-15 REF. D'WG. NO. 01-108-B 380700 YPH-129 F-A VT-3 3-BASE SUPPORT ASSEHBLY F1.30A I-24-CC-15 REF. DWG. NO. 01-108-A 380800 YPH- 130 F-A VT-3 3-BASE SUPPORT ASSEMBLY F1.30A I-24-CC-14 REF. D'WG. NO. 01-108-A 380900 YPH-131 F-A VT-3 3- 93 BASE SUPPORT ASSEHBLY F1.30C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 584 REVISION: 0 IHSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 3 ALL STATUS CONPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING HATER-CCW NX A & B-DISCHARGE P P NG i FIRST SECOND THIRD ZONE HUNGER: 1-108 ASHE I PERIOD PERIOD PERIOD St( >> YI'C0 SUHHARY EXAHIHATION AREA CATGY HDE - - - - - '- 0 U T A G E - - - - IHSTRUCTIOHS ( HUNGER IDENT IF I CATION " -"=.

                       >>i         "i "    ITEH NO NETH
                                          ==- " 'd~    -='>>">>i 1

2 3

                                                                  -"---J".i I-"

1 2 3

                                                                                    ."  1 2  3 iw 'I i g1,%>>
                                                                                                              <<<<CALIBRATIOH BLOCK<<<<

r e .o .

                                                                                                                                      >>    i "~ ~i c u I-24-CC-14     REF. DNG. NO. 01-1M-A 381000  YPN-132                            F-A         VT-3   3-BASE SUPPORT ASSENBLY              F1.30A 381100  YPN-132A                           F-A         VT-3   3-VARIABLE HANGER ASSEHBLY           F1.30C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 585 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING IJATER - INLET F IRST SECOND THIRD 20HE NUMBER: 1-109 PER I OO PERIOD PERIOD

                                   '" "'" ASME SEC

SUMMARY

EXAMINATION AREA XI'ATGY NDE - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK** I-30-GI-79 REF. DUG. NO. 01-109-B 381200 CN-999-75 F-A VT-3 3-BOX RESTRAINT F1.308 381300 CM.999-75A F-A VT-3 3-Rigid Sway Strut F1.30A 381400 CM.999-95 F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30A I-30-CM-79 REF. DLIG. NO. 01.109-A 381500 Ql.999-215 F.A VT-3 3-Rigid Sway Strut F1.30A 381600 CH-999-215A F.A VT-3 3-Rigid Sway Strut F1.30A I-30-CM-71 REF. DUG. NO. 01-109-A 381700 CW-999-225 F-A VT-3 3-BOX RESTRAINT F1.308

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 586 REVI SION: 0 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING IJATER - IHLET FIRST SECOND THIRD ZONE NUMBER: 1-109 ASME PERIOD PERIOD PERIOD

                                     """'"SEC

SUMMARY

EXAMINATION AREA XI'ATGY NDE ------OUTAGE INSTRUCTIONS NUMBER IDENT IF I CATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK~* I-30-N-71 REF. DUG. HO. 01-109-A 381800 N-999-225A F-A VT-3 3 X RIGID STRUT F1.30A 381900 CM.999-225A IA D-A VT-1 3 X INTEGRAL ATTACHMENT D1.20 382000 CII-999-235 F-A VT-3 3-BOX RESTRAINT F1.308 I-30-N-78 REF. DUG. NO. 01-109-C 382100 CH.999-351 F-A VT-3 3-RIGID RESTRAINT STRUT F1.30B 382200 CN-999-352 F-A VT-3 3-Rigfd Sway Strut F1.30A 382300 Ql-999-371 F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30A 382400 CN-999-372 F-A VT-3 3 - . - X RIGID TIE BAR ASSEMBLY F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 587 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONEHTS INSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING WATER - INLET FIRST SECOND THIRD ZONE NUHBER: 1-109 ASME PERIOD PERIOD PERIOD ~ '4 ~ ( ( ~ ~ s' ' ' '~ SEC" XI 'I SUMHARY EXAMINATION AREA CATGY NDE - - - - - -OUTAGE- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK*>> I QP ~ 1 el ew ~ P w P 8 F ~ y4 I-30-CW-78 REF. DWG. NO. 01-109-C 382500 CW-999-373 F-A VT-3 3 . RIGID STRUT F1.308 382600 CW.999-374 F-A VT-3 3-BOX RESTRAINT F1.308 382700 CW.999-375 F-A VT-3 3-BOX RESTRAINT F1.30A I-30-CW-76 REF. DWG. NO. 01.109-C 382800 YPH-5 F-A VT 3 3 ROO 8 CLAHP HANGER ASSEMBLY F1.30A 1-20-CW.96 REF. DWG. NO. 01-109-C 382900 YPH-7 F-A VT-3 3 - - - - - - - - - 93 ROD 8 CLAHP HANGER ASSEHBLY F1.30A I-30-CW-78 REF. DWG. NO. 01-109-C 383000 YPH-8 F-A VT-3 3-ROD 8 CLAMP HANGER ASSEMBLY F1.30A

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 588 REVISION: 0 INSERVICE IHSPECTIOH LONG TERH PLAH CLASS 3 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING l!ATER - INLET FIRST SECOND THIRD ZONE HUMBER: 1-109 ASME PERIOD PERIOD PERIOD

                                     ""- "".SEC."

SUMMARY

EXAMIHATIOH AREA XI'ATGY NDE -----'-OUTAGE IHSTRUCTIOHS NUMBER IDENTIFICATION s 'w lwh ' ' 'SSa SVa' S'lo'o ITEH

                                                " s HO METH
                                                    '4      '    '~  I
                                                                       ~

1 2 3 1 2 3 1 4 I'VVaaw6%WoV o o'o Wt+eS 2 3 **CALIBRATIOHBLOCK*~ I-30-CH-78 REF. DUG. NO. 01-109-C r 383100 YPH.9 F-A VT-3 3-ROD tc CLAMP HANGER ASSEMBLY F1.30A 383200 YPH.10 F-A VT-3 3-ROO 8 CLAMP HAHGER ASSEMBLY F1.30A 383300 YPH-11 F-A VT-3 3-ROD 8 CLAMP HANGER ASSEMBLY F1.30A 400 YPH-12 F-A VT-3 3-ROO 8 CLAMP HAHGER ASSEMBLY F1.30A 383500 YPH-13 F-A VT-3 3-ROD 8 CLAMP HANGER ASSEMBLY F1.30A 383600 YPH-14 F-A VT-3 3-ROO 8 CLAMP HANGER ASSEMBLY F1.30A I-20-CII-97 REF. DUG. NO. 01-109-B 383700 YPH.22 F-A VT-3 3- 93 ROO 8 CLAMP HANGER ASSEMBLY F1.30A

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 589 REV I S ION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING WATER - INLET FIRST SECOND THIRD 1-109 ZONE NUMBER: I ""'""SEC: XI'" " ASME PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO METH i 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK*>> wJ vE P I-30-CW-78 REF. DWG. NO. 01.109.C 383800 YPH-144 F-A VT-3 3 ROO 8 CLAMP HANGER ASSEMBLY F1.30A I-30-CW-79 REF. DWG. NO. 01-109-8 383900 YPH-145 F-A VT-3 3 . BOX RESTRAINT F1.308 384000 YPH-146 F-A VT-3 3-BOX RESTRAINT F1.30B I-30-CW-79 REF. DWG. NO. 01-109-A 384100 YPH-148 F-A VT-3 3-RESTRAINT F1.30A I-30-CW-71 REF. DWG. NO. 01-109-A 384200 YPH-149 F-A VT.3 3-ROO 8 CLAHP HANGER ASSEHBLY F1 '0A 384300 YPH-150 F-A VT-3 3- X . - 93 ROO & CLAMP HANGER ASSEMBLY F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 590 REVISION: 0 IHSERVICE INSPECTIOH LONG TERH PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING WATER-INTAKE COOLING WT.PMPS DISCHARGE FIRST SECOND THIRD ZONE NUMBER: 1 110 ASHE PERIOD PERIOD PERIOD

                                                                            '4  '  'I'      I  lia

SUMMARY

EXAMINATION AREA

                                                  ~ ~

CATGY

                                                      ~

NDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 ~*CALIBRATIOH BLOCK~* Js 4 'tC ~ 'ol 's 'AI her s' 'v4o rt'L o 6>>' tete'I 'NAZI ~ lsVVoV 4's la' W ~ 8 4 e s e va CW.11 REF. DWG. NO. 01-110-B

                       ~ ~

384600 ISH-1 F-A VT-3 3 BOX RESTRAINT F1.30B 384700 I SH-1 IA D-A VT-1 3-INTEGRAL ATTACHHENT D1.20 I-30-CW-10 REF. OWG. NO. 01-110-A 384800 ISH-2 FA VT3 3X BOX RESTRAINT F1.30B 384900 I SH-2 IA D-A VT-1 3-INTEGRAL ATTACHMENT D1.20 I-30-CW-11 REF. DWG. NO. 01-110-8 385000 ISH-3 F-A VT-3 3-SADDLE RESTRAINT F1.30B 385100 ISH-3 IA D-A VT-1 3-INTEGRAL ATTACHMENT D1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 591 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONENTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING WATER-INTAKE COOLING WT.PHPS DISCHARGE FIRST SECOND THIRD 20NE NUHBER: 1-110 ASHE PERIOD PERIOD PERIOD SEC SUHHARY EXAMINATION AREA XI'ATGY NDE ------OUTAGE INSTRUCTIONS HUNBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 <<<<CALI BRAT ION BLOCK** I 30-CW.11 REF. DWG. NO. 01-110-B 385200 I SH-4 F-A VT-3 3 SADDLE RESTRAINT F1.308 385300 ISH-4 IA D-A VT.1 3-INTEGRAL ATTACHMENT D1.20 I-36-CW-13 REF. D'WG. NO. 01-110-8 385400 I SH.5 F-A VT-3 3-BOX RESTRAINT F1.308 385500 ISH-5 IA 'D-A VT1 3-INTEGRAL ATTACHHENT D1.20 385600 ISH-6 F-A VT-3 3-TRUNNION F1.308 385700 ISH-6 IA D-A VT.1 3 . INTEGRAL ATTACHHENT 01.20 I-24-CW-74 REF. DWG. NO. 01-110-B 385800 ISH-7 F-A VT-3 3- 94 TRUNNION F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 592 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING MATER INTAKE COOLING MT.PHPS DISCHARGE FIRST SECOND THIRD ZONE NUHBER: 1-110 ASHE PERIOD PERIOD PERIOD A ~ P <<0 g SEC Xl'" SUHHARY EXAHI NATION AREA NDE

                                                               'ATGY OUTAGE------                        INSTRUCTIONS I CAT IOH                                            '1 NUHBER
      'll IDENT
          "'Sk IF Jl   'i  ' 'U j'1 ia '     '~

ITEN NO METH 6 4" 'Y'A4 2 3 1 2 3 Vali s4e'O'O'Ar4' ~ 1 Vi ~ 2 3 s

                                                                                                                          **CALIBRATIONBLOCK~*

e v~ Pwtes  % ~ %l I-30-CM-20 REF. DMG. NO. 01-110-B 386200 I SH-9 F-A VT-3 3-SADDLE RESTRAINT F1.30A 386300 I SH.9 IA D-A VT-1 3-INTEGRAL ATTACHHEHT D1.20 1.30.CM.9 REF. DWG. NO. 01-'110-A 386400 ISH.10 F-A VT-3 3 - - - X 94 BOX RESTRAINT F1.308 386500 I SH-10 IA D-A VT-1 3-INTEGRAL ATTACHHENT D1.20 I-36-CM-16 REF. DMG. NO. 01-110-A 386600 I SH-11 F-A VT-3 3-TRUNNIOH F1.30A 386700 ISH-11 IA D-A VT-1 3 Integral Attachment D1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 593 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING WATER-INTAKE COOLING WT.PNPS DISCHARGE FIRST SECOND THIRD 20NE NUMBER: 1-110 ASME PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - - 0 U T A G E - - - - - . INSTRUCTIONS NUMBER IDENI'IFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 <<*GALI BRAT ION BLOCK>>" I I-30-CW-11 REF. DWG. NO. 01-110-8 h 387200 I SH-14 F-A VT-3 3-TRUNNION F1.308 387300 I SH-14 IA 0-A VT-1 3-Integral Attachment D1.20 I-30-CW-10 REF. DWG. NO. 01-110-A 387400 I SH-15 F-A VT-3 3- X Double Acting Restraint F1.30B 387500 I SH-15 IA 0-A VT-1 3 X Integral Attachment D1.20 I-36-CW-16 REF. DWG. NO. 01-110-A 387600 I SH-16 F-A VT-3 3-BOX RESTRAINT F1 '08 387700 I SH-16 IA D-A VT-1 3-Integral Attachment D1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE:'94 REVISIOH: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING IIATER-INTAKE COOLING 'WT.PMPS DISCHARGE FIRST SECOND THIRD ZONE NUMBER: 1-110 ASME PERIOD PERIOD PERIOD I i " >>>> ~ \ (>> ~ ~ l'EC'l

SUMMARY

EXAMINATION AREA CATGY HDE I

                                                                                 - - - - - - 0  U T A G   E-               INSTRUCTIONS

>> <<4, '0l' NUMBER

                "  '"'     "   -" '>>'i IDENTIFICATION
                                           "   " " " J  6'>>Y ITEM HO METH'
                                                                   -  L  - ",O'6 1

2 3 7" 1 2 3 L' 1

                                                                                                             '>> i'".'

2 3

                                                                                                                  '>> al
                                                                                                                           **CALIBRATIONBLOCK*~
                                                                                                                                 >>>>   ' "'>>    >>4 I 36-CW>>16     REF. DUG'. NO. 01-110-A 387800     ISH-17                                  F-A      VT-3   3-TRUHNIOH                                F1.308 387900     ISN-17 IA                               D-A      VT-1   3-Integral Attachment                     D1.20 388000     I SH.17-1                               F-A      VT-3 3 TRUNNION                                F1.30 100     I SH-17-1 IA                            D-A      VT.1   3-Integral Attachment                     01.20 I-30-Cll-21    REF. DMG. NO. 01-110-A 388200      I SN-19                                 F-A      VT-3   3-BOX RESTRAINT                           F1.30 388300      ISH-19 IA                               D-A      VT-1   3-Integral Attachment                     01.20 I 36.CM>>12     REF. DNG. HO. 01-110-A 388400      ISH.20                                  F A      VT-3 3 TRUNNION                                F1.308

DATE: . 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 595 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CONPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CIRCULATING IJATER-INTAKE COOLING WT.PNPS DISCHARGE FIRST SECOND THIRD ZONE NUHBER: 1-110 ASHE PERIOD PERIOD PERIOD

                                      " '"'EC XI

SUHHARY EXAHIHATION AREA CATGY HDE - - - - - - 0 U T A 0 E - - - -- INSTRUCTIONS NUHBER IDENT IF I CATION ITEH NO NETH i 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK** I-36-CU-12 REF. DUG. NO. 01-110-A 388500 I SH-20 IA D-A VT-1 3-Integral Attachaent D1.20 I-30-CU-21 REF. DUG. NO. 01-110-A 388600 I SH-74 F-A VT-3 3-BASE SUPPORT F1.30A I-30-CW-10 REF. DIJG. NO. 01-110-A 3-388700 RESTRAIHI'-A ISH-78 F1.30A VT-3 94

DATE: 01/09/98 ST. LUCIE,NUCLEAR'PLANT UNIT 1 PAGE: 596 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SPENT FUEL POOL COOLING PUNPS TO HEAT EXCHANGER I" FIRST SECOND THIRD ~ i ZOHE NUHBERt 1-111

   -<<-.~ ~ .i=-. q"  ~      -
                         ., ~, t ~, i ~        ~

ASHE "v -cr -" "il~~StP vl-"

                                                             ~

X I

                                                                       .-["    ..

PERIOD PERIOD

                                                                                                Ce PERIOD i

SUHHARY EXAMIHAT ION AREA CATGY NDE i

                                                                           - - - - - - 0 U T A G E               INSTRUCTIONS NUNBER       IOENTIFICATIOH                       ITEN HO NETH    I  1  2  3     1  2  3       1 2  3      <<*CALI BRAT ION BLOCK~*

I-10-FS-510 REF. DWG. NO. 01-111-A 388800 FSH-1 F-A VT-3 3-PIPE SADDLE F1.30A 388900 FSH.2 F-A VT-3 3-PIPE SADDLE F1.30A 389000 FSH-3 F-A VT-3 3- Inaccessible for examination, RIGID RESTRAINT F1.308 located in spent fuel pool, under water 1-10.FS.508 REF. DUG. NO. 01-111-A 389100 FSH.4 F-A VT-3 3 ROO HANGER F1.30A 389200 FSH-5 F-A VT-3 3-RIGID RESTRAINT F1.30A 389300 FSH-5A F-A VT-3 3-RIGID RESTRAINT F1.30A 389400 FSH-6 F-A VT-3 3- Per JPN-PSLP-93-0087, VARIABLE SPRING HANGER F1.30C Allowable cold settings (High 1256 lbs 1-5/32") - (Low 1028 lbs 19/32")

DATE: 01/09/98 Sl'. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 597 REVISION: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 3 ALL STATUS COHPONEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR ~ 6 SPENT FUEL POOL COOLING PUXPS TO HEAT EXCHANGER ZONE HUHBER: i ~ I ' 1-111 6 SUHHARY EXAHINATION AREA

                              ~    ~ 4 ASHE Jt'4.PP' EC1 CATGY QI'5' HDE

[ I

                                                               ]"

FIRST PERIOD

                                                                    - - - - - 0 SECOHD PERIOD
                                                                                     '   iL' U T A G E THIRD PERIOD INSTRUCTIONS
                              'A i

NUHBER IDENTIFICATION ITEH HO NETH i 1 2 3 1 2 3 1 2 3 <<*CALIBRATIOH BLOCK**

 ~       i'   0  'i                     J    0          2     >Hi       Vil'  O'CA     oV  dilb    ~   >e      dw       aves eJ    '

I-8-FS-507 REF. DNG. NO. 01-111-A 389500 FSH-7 F-A VT-3 3-VARIABLE SPRING HANGER F1.30C I-8-FS-502 REF. DUG. NO. 01-111-B 389600 FSH-8 F-A VT-3 3- X PIPE SADDLE F1.30A I-8-FS-503 REF. DWG. NO. 01-111-B 389700 FSH-9 F-A VT.3 3 . PIPE SADDLE F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANl'NIT 1 PAGE: 598 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COMPONENTS

                                                                       'I INSPECTION INTERVAL                 PLAN STATUS                  PRESERVICE YEAR AUXILIARY FEEDNATER   PUMP 1C TO MAIN FEEDNATER                FIRST      SECOND            THIRD ZONE NUMBER: 1 112                         ASME                PERIOD     PERIOD            PERIOD I               ~       ~4

SUMMARY

EXAHINATION AREA CATGY NDE ------OUTAGE------ IHSTRUCTIONS 3 3 **CALIBRATIONBLOCK~* I + NUMBER IDENTIFICATION

   <<1 I <<<<<<IA<<        ~

ITEH NO METH

                                                     <<VS%

2

                                                             ~ <<IIVV<<

1 1

                                                                         %+I <<<<V 2           1
                                                                                       'l 0 2  3 II&l4 I-4-BF-34    REF. DIJG. NO. 01-112-A 389800  BF-1006.108                        F-A     VT-3   3-RIGID RES'IRA INT                  F1.30B 389900  BF-1006-110                        F-A     VT-3 3 X RIGID RESTRAINT                    F1.30A 1-4.BF-36    REF   DUG. NO. 01-112-B 390000  BF-1006.168                        F-A     VT-3   3-RIGID RESTRAINT                    F1.30A I-6-BF-32    REF. DIIG. NO. 01-112-A 390100  BF-1006-190                        F-A     VT-3   3-RIGID RESTRAINT                    F1.30A I-4-BF-35    REF. DWG. NO. 01-112-B 390200  BF-1006.251                        F-A     VT-3   3-RIGID RESTRAINT                    F1.30B I-4-BF-34    REF. DUG. NO. 01-112-A 390300  BF-3.3                             F-A     VT-3   3-RIgid  Sway  Strut                 F1.30A

DATE:, 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 599 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR AUXILIARY FEEDWATER PUMP 1C TO MAIN FEEDWATER FIRST SECOND THIRD ZONE NUMBER: 1-112 ASME PERIOD PERIOD PERIOD

                                     ~ 'EC;. XI ---

SUMMARY

EXAMINATION AREA NDE 'ATGY - OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK>>>> I-4-BF-33 REF. DWG. NO. 01-112-A 390400 BF-3-4 F-A VT-3 3-Rigid Sway Strut F1.308 390500 BF-3-5 F-A VT-3 3-RIGID RESTRAINT F1.308 390600 BF-3.6 F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30A 390700 BF-3-7 F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30A 390800 BF-3-8 F-A VT-3 3-RIGID RESTRAINT F1.308 I-6-BF-32 REF. DWG. NO. 01-112-A 390900 BF-3-9 F-A VT-3 3-Rigid Sway Strut F'1.30A 391000 BF-3-10 F-A VT-3 3-RIGID RESTRAINT F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UHIT 1 PAGE:. 600 REVISIOH: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR AUXILIARY FEEDNATER PUNP 1C TO HAIN FEED'LIATER FIRST SECOND THIRD ZONE NUNBER: 1.112 ASNE PERIOD PERIOD PERIOD

    ~ i'  I  4    p  i V i I  \~                  FC ~ X                                 h V%    4 SUNHARY EXAMINATION AREA                         CATGY      NDE       - - - - - - 0  U T A G E  - - - -  --    INSTRUCTIONS HUNBER IDENTIFICATION                            ITEH NO NETH i 1 2 3                 2 3           2  3       **CALIBRATIONBLOCK~*

'Jwh s'4 41vAv 'AvJa vs v ~ 'isa " 'wr' v 1

                                                          +I 'VAYnVA'l'ICVltsawob+esv A 1

w se I-6-BF-32 REF. DWG. NO. 01-112-A 391100 BF-3-11 F-A VT-3 3-RIGiD RESTRAINT F1.308 I-4-BF-35 REF. DWG. NO. 01-112-8 391200 BF-4-1 F-A VT-3 3-RIGID RESTRAIHT F1.308 391300 BF-4-2 F-A VT-3 3-RIGID RESTRAINT F1.308 391400 BF-4-3 F-A VT-3 3-RIGID RESTRAINT F1.308 391500 BF-4-4 FA VT3 3-RIGID RESTRAINT F1.308 391600 BF-4-5 F-A - VT-3 3-RIGID RESTRAINT F1.308 391700 BF.4.7 F-A VT-3 3 RIGID RESTRAINT F1.308

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 601 REVISIOH: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR AUXILIARY FEEDUATER PUMP 1C TO MAIN FEEDUATER i FIRST SECOND THIRD 20HE NUMBER: 1 112 ASHE i PERIOD PERIOD PERIOD VC4o

SUMMARY

EXAMINATIOH AREA CATGY HDE I 0 U T A G E INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK*>> I-4-BF-35 REF. DUG. NO. 01-112-B 391800 BF-4.8 F.A VT-3 3 X Rigid Sway Strut F1.30A I-4-BF-35 REF. DWG. HO. 01 112 A 391900 BF.4-9 F-A VT-3 3-Rigid Sway Strut F1.30A I.4-BF-36 REF. DWG. NO. 01-112.B 392000 BF-4-10 F-A VT-3 3-RIGID RESTRAINT F1.308 392100 BF-4.11 F-A VT-3 3-BOX RESTRAINT F1.30A

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 602 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR AUXILIARY FEEDNATER PUMP 1A B 18 TO MAIN FEEDWATER FIRST SECOND THIRD t i ~ h '. l" 20NE NUMBER: 1 113 l1,% t%Vb i Il- '" '" 'SEC.'Xl" ASME PERIOD PERIOD PERIOD

                                                                       ----.-OUTAGE------

SUMMARY

EXAMIHATIOH AREA NUMBER OV IDENT IF I CAT IOH

                                        ~        ~

CATGY wv HDE ITEM NO METH

                                                                   ~ ~ 1
                                                                          'a 2  3 W

1 2

                                                                                        ~

3 W 1 i. 2 3

                                                                                                         ~

IHSTRUCTIOHS

                                                                                                                *~CALIBRATIOH BLOCK**

yVy' . 4

                                                                                                                         '5 q '~ 4tj, ay+K v..

W

                                                                                                                                       ~~        ~ r.  q 4
                                                                                                                                                        ~
                                                                                                                                                           ~v I 4-BF-63      REF. DUG. NO. 01-113-B 392200   BF-1005-307                          F-A       VT-3 RIGID RESTRAINT                      F1.308 392300   BF-1005-319                          F-A       VT-3   3-RIGID RESTRAINT                      F1.30A I-4-BF-28      REF. DUG. NO. 01-113-A 392400    BF-1005-527                          F-A       VT-3 BOX RESTRAINT                        F1.30B 392500    BF-1005-537                         F-A       VT-3   3-RIGID RESTRAINT                      F1.30B 392600   BF-1005-557                          F-A       VT 3   3-            X SLIDING BASE SUPPORT                 F1.30A 392700   BF-1005-557 IA                       D A       VT-1   3-INTEGRAL ATTACHMENT                  D1.20 392800   BF-1005-2400                         F-A      'VT-3   3-RIBId Sony Strut                     F1.308

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UHIT 1 PAGE: 603 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR AUXILIARY FEEDNATER PUMP 1A & 1B TO MAIN FEEDNATER FIRST SECOND THIRD ZONE NUMBER: 1-113 ASME PERIOD PERIOD PERIOD

  • i,, s,vi r ~ @~i gsw>>rim w~ .~ .s,, ~ ~>> SLIbt ~ vI'

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE---.-- INSTRUCTIONS >>i w"

 ~

NUMBER i~ IDENTIFICATION sv '" s"- 'gv ea'wr vent" ~ ITEM NO METH "ass i - t w I 1 t 2 3 1 2 3 svsssew'nasa~ca 1 2 v 3

                                                                                                           .s '
                                                                                                                        ~*CALIBRATION BLOCK~i
                                                                                                                'i~~>>~zgw    gq" ">>~iw"-i~" "g    '  q'v:"v I-4-BF-28     REF. DNG. ND. 01-113-A 392900    BF-1005-5250                             F-A         VT-3   3-RIGID RESTRAINT                          F1.308 393000    BF-1005-5250 IA                          D-A         VT.1   3-Integral Attachment                      D1.20 393100    BF-1005-5260                              F-A        VT-3 3     -'-

Rigid Sway Strut F1.308 I-4.BF-29 REF. DWG. NO. 01-113-A 393200 BF-1-1 F-A VT.3 3-Rigid Sway Strut F1.30A I-4-BF-28 REF. DUG. NO. 01-113 A 393300 BF-1-2 VT-3 3-Rigid Sway Strut F1.30A 393400 BF-1-3 F-A VT-3 3-RIGID RESTRAINT F1.30B

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 604 REVISION: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPONEHTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR AUXILIARY FEEDWATER PUMP 1A 5 18 TO MAIN FEED'MATE FIRST SECOHD THIRD i ZOHE NUMBER: i '1 ) \ i, 1-113

                    %By    @pl ~        '"  '

ASME "SEC; 'XI" PERIOD

                                                                             'O'I  

PERICO

                                                                                         'i' ' i  ~

PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE-.---- INSTRUCTIONS HUMBER IDEN'T IF ICATION ITEN HO METH 2 3 2 3 2 **CALIBRATIOHBLOCK~* soev 'ill 1 1 1 l'Qr'VAVcA's4~ cf441Vth'a'alA'A'>VVF4IV~ '4JQVV44VAVWoV skrA'l1>> Vbv<<isa'4 w'hvW4s~k b'ii Vi 'ar h," Aoi < ~ ) I-4.BF-28 REF. DUG. HO. 01-113.A 393500 BF.1-4 F.A VT-3 3-RIGID RESTRAINT F1.308 393600 BF-1-6 F-A VT-3 3 RIGID RESTRAINT F1.308 393700 BF-1-8 F-A VT-3 3-RIGID RESTRAINT F1.308 393800 BF-1-9 F.A VT-3 3-RIGID RESTRAINT F1.308 393900 BF.1-10 F-A VT-3 3-RIGID RESTRAINT F1.308 394000 BF-1-11 F-A VT-3 3-RIGID RESTRAINT F1.308 I 4.8F-29 REF. DNG. NO. 01-113-A 394100 BF-1-12 F-A VT-3 3-SPRING SUPPORT F1.30C

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UHIT 1 PAGE: 605 REVI 8 IOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CI.ASS 3 ALL STATUS CONPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR AUXILIARY FEED'MATER PUMP 1A 8 18 TO HAIN FEEDMATER FIRST SECOHD THIRD ~ <<<< ~ ~ ~ << . '<<' ZONE HUHBER: 1-113 t)<<'<<<<<<<<\6<<<<<< ~ <<6 ~ << ~ ASHE

                                                         <<<<<<&Seh<<<<<< ~ 'vi PERIOD w      ~

PERIOD

                                                                                                 '<< <<'4' J'      c o PERIOD 4<<<< <<

SUHHARY EXAHIHATION AREA CATGY NDE OUTAGE-"---. INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 1 2 3 <<*CALIBRATION BLOCK

  • Vaah'el<<'I 'AV 'Ã84A<<<<A'l<<l<<V<<'i<<<<'i<<'5'<<'stA+ZA ~ 4'%ClC NN Vi <<<<VA << ~ '<<4<<+"Q<<wl ' ' <<<<>

I-4-BF-28 REF. DMG. NO. 01-113-A 394200 BF-1.14 F-A VT 3 3-ADJUSTABLE ROO NANGER F1.30A I-4-BF 31 REF. DMG. NO. 01 113 8 394300 BF.2.1 F-A VT 3 3 - - - - - - X Rigid Sway Strut F1.308 I-4-BF-30 REF. DMG. NO. 01-113.8 394400 BF-2-2 F A VT-3 3-Rigid Sway Strut F1.308 394500 BF-2-3 F A VT-3 3 X RIGID RESTRAINT F1.308 394600 BF.2-4 F.A VT 3 3-RIGID RESTRAINT F1.308 I-4 BF-31 REF. DMG. NO. 01-113-8 394700 BF-2-5 F-A VT-3 3-SPRING SUPPORT F1.30C

DATE: 01/09/98 ST., LUCIE NUCLEAR PLANT UHIT 1 PAGE: 606 REVISION: 0 INSERVICE IHSPECTION LONG TERN PLAH CLASS 3 ALL STATUS COHPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR AUXILIARY FEEDllATER PUHP 1A & 1B TO HAIN FEEDHATER FIRST SECOND THIRD 20NE NUMBER: 1-113 ~ 'I I<<* A<<',4 i %. ~ %t p'Eg fesk% ) r

                                       ~ ~ .. h <<  a ASNE Scl'I") '

PERIOD o1'"'<<4" j1 PERIOD PERICO o 'r SUHHARY EXANIHATIOH AREA I ~ CATGY

                                                              ~

HDE - - - - - - 0 U T A G E - - - - -- INSTRUCTIOHS HUHBER IDENT IF ICATION ITEHHOHETH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK~*

            ~ <<w  4U<<j<<      'L<< '<<'j<<V<<<<'hCV<< 4<<1%r    .<< '4<<<<<<'<<C j<<V'C1sVV Vk'v<<LION 4'a      ow'   4'<<<<are      '<<<<<<<<l <<v '<<1     4<<<<keel~'v  '<<l 'Ja'se I 4 BF 30        REF. DUG. HO. 01.113.B 394800    BF-2-6 C

F-A VT-3 3-RIGID RESTRAINT F1.308 394900 BF.2.7 F-A VT-3 3-RIGID RESTRAINT F1.30B 395000 BF.2.8 F-A VT.3 3 - - - X RIGID RESTRAINT F1.308 395100 BF.2.9 F-A VT-3 3-RIGID BASE SUPPORT F1.30B

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLANT UNIT 1 PAGE: 607 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR AUX FEEDHATER.CONDENSATE TANK FROM AFII PUMP 1C i FIRST SECOND THIRD 1a114 PERIOD ZOHE NUMBER:

   ~ chal;;iuv l',vw 9(v'abv   ~  v 4,'s  .~ > ~ i 4,':a ASME
                                                         'ccrc  VI'>'>

i

                                                                           '(    'a  '  'i'v'a " PERIOD
                                                                                                    'a'a'v '    L  

PERIOD

                                                                                                                        'aUMMARY EXAMINATION AREA                              CATGY    HDE      I                    0 U T A     G E                           INSTRUCTIONS NUMBER      IDENTIFICATION                                ITEM NO METH      I 1       2  3       1   2 3           1    2          3       **CALIBRATIONBLOCK**
         '      'a'iV>>   "aa'a'V'v4'aV41'v'4wSVCCa'"4'aS'a Jla .aaaa         ) vaJ'aV  a'@VLCC'4    he@    ~'      v v4'aia '      a  <<>   e A'a 'av'Ãa"O'" 'Ia ~

REF. DHG. NO. 01-114

                                                                                                                                                                           '-2-BF-50 395200      BF.3-H14                                      F-A      VTa3    3-RES'IRA INT                                   F1.308 395300     BF-3.H13                                       F-A      VT-3    3-RESTRAINT                                      F1.308 395400      BF-3 H12                                      F-A      VT 3 RESTRAINT                                     F1.308 395500      BF 3 H11                                      F-A      VT-3    3-RESTRAIHT                                     F1.308 395600      BF.3.810                                      F-A      VT-3    3-RESTRAINT                                     F1.308 395700      BF-3-H9                                       F-A      VT.3 3       .

RESTRAINT F1.308 395800 BF-3-HB F-A VT-3 3 X RESTRAIHT F1.308

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 608 REVISION: 0 IHSERVICE IHSPECTIOM LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR AUX FEED'MATER.CONDENSATE TANK FROM AFU PUMP 1C FIRST SECOND THIRD ZONE NUMBER: 1-114 ASME PERIOD PERIOD PERIOD i I i I. 'AcYf ' vi +t(q'i'i" cj i%% ) @i ~ i- ivi;: . '-SEC "XI.""~ t.

SUMMARY

EXANIHAT IOH AREA CATGY MDE - - - - - - 0 U T A G E - - -- INSTRUCTIONS NUMBER 1DEHTIFICATIOM ITEM NO NETH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK~* l4 ' % 'ra.% 4 Via lahb 4A'1Vpaa r<<rl'@Apse ~VAQAVVitoA'Vae tsWet frHWiww tl 0 <<iaC pot rr i i Iii r rt eo rent W",i V. I-2-BF-50 REF. DUG. NO. 01-114 I 395900 BF.3.87 F-A VT-3 3 . RESTRAIN'I F1.308 396000 BF.3.M6 F-A VT-3 3-RESTRAINT F1.308 396100 BF-3-H5 F-A VT-3 3-RESTRAINT F1.308 396200 BF-3-H4 F-A VT 3 3-RESTRAINT F1.308 396300 BF.3.H3 F-A VT-3 3-RESTRAINT F1.308 396400 BF-3-H2 F-A VT-3 3-RESTRAINT F1.308 396500 BF-3-H1 F-A VT-3 3-RESTRAINT F1.308

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 609 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAH CLASS 3 ALL STATUS COMPONEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE 'YEAR AUXILIARY FEEDWATER TO MAIN FEEDNATE FIRST SECOND THIRD ZONE NUMBER: 1-115 ASME PERIOD PERIOD PERIOD

 ~,, -i-.g>> >>rw   .>ma;<<,s.~  >i~>i~ ~ <<1 ~ c> . ~ ~ iw, ~,  SEC  -vis.>   r<<r     ~           <<  ~
                                                                                  '       - - - - - 0              - - - - --

v>>

SUMMARY

EXAHIHAT ION AREA CATGY NDE U T A G E IHSTRUCTIONS ~ NUHBER IDEHT IF ICATION

                               <<J '    'JA >'los      >>>>>AS>t ITEH HO METH
                                                               .Javl  'A<<>>>><<>

( 1 2

                                                                                 ++V>'a>>>>><<o 3

1 2 3 er<< ~r 1 2 3 e <<Al

                                                                                                                                  **CALIBRATIONBLOCK~*

a s<<<<>> .>w ~ I I-2 BF 39 REF. DUG. NO. 01-115 396600 BF.4-H1 F-A VT-3 3-RESTRAIHT F1.308 396700 BF-4.H2 F-A VT-3 3-RESTRAIHT F1.308 396800 BF-4-H3 F A VT-3 RESTRAINT F1.308 396900 BF-4-H4 F-A VT-3 3-RESTRAINT F1.308 I-2-BF-40 REF. DUG. NO. 01-115 397000 BF-4.H5 F-A VT-3 3-RESTRAINT F1.308 397100 BF.4-86 F-A VT-3 3-RESTRAINT F1.308 397200 BF-4-87 F A ~ VT-3 3-RESTRAIHT F1.308

DATE: 01/09/98 ST. LUCIE NUCLEAR'PLANT UNIT 1 PAGE: 610 REVISIOH: 0 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 3 ALL STATUS COMPONENTS INSPECT IOH INTERVAL PLAN. STATUS PRESERVICE YEAR AUXILIARY FEEDNATER TO MAIN FEED'MATER FIRST SECOND THIRD ~ t hatt, ~ 'l itic>>h.i ZOHE NUMBER: 1-115

                                ~  9i 4tt,i ~ tii i rt
                                                   ~   .i .t 4 c,"i ASME St.'I vl' FCi n     ~

PERIOD lr r ' PERICO

                                                                                                       'A wv  t  vaa ra PERIOD rr

SUMMARY

EXAHINATIOH AREA CATGY HDE ------OUTAGE------ INSTRUCT IONS te 6 HUMBER I IDENTIFICATION sr jr vt Lr 'ovvikl'vvl'vttVeer'. ITEM HO METH I 1 v'er 'rv+ tttrp'tet.vitt 2 3 1 2 3 1 2 3 eel vvtvv'veeA'irvittvret4lerv e vtt ~ e*CALIBRAT IOH BLOCK

  • e awtt w ' Vtvtrrvvdl Vvl vveaa'v'-2-BF-40 REF. DWG. NO. 01-115 397300 BF-4-H8 F-A VT-3 3-RESTRAINT F1.308 397400 BF.4.H9 F-A VT-3 RESTRAINT F1.308 397500 BF.4.H10 F-A VT-3 3-RESTRAINT F1.30B

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 611 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR AUXILIARY FEEDHATER TO MAIN FEEDMATER FIRST SECOND THIRD ZONE NUHBER: 1.116 ASHE PERIOD PERIOD PERIOD ~ 5 %t t tt t t (4 ~ \ t, tt,;s t1 ~ t te\\)) t < 'I ~ 'l\ 0 V, ~ 'i. SEC <XIs SUHHARY EXANIHATIOH AREA CATGY HDE - - - - - OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 2 3 **CALIBRATIOHBLOCK~* t t J 1 t p il '4 IAVP J wlAoglolOSV AVt t II t bttVV I-2-BF-38 REF. DUG. NO. 01-116 398300 BF-5-H1 F-A VT.3 3-RESTRAINT F1.30B 3-398400 RESTRAINI'-A BF-S-H2 F1.308 VT-3 398500 BF-5-H3 FA VT3 3- - - X RESTRAIHT , F1.308 I-2-BF 37 REF DIJG. HO. 01-116 398600 BF-5 H4 F.A VT.3 3-RESTRAINT F1.308 398700 BF.S.HS F A VT-3 3-RESTRAINT F1.308

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 612 REVISIOH: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONEHTS INSPECTION IHTERVAL PLAH STATUS PRESERVICE YEAR AUXILIARY FEEDNATER TO HAIN FEED'LIATER FIRST SECOND TKIRD ZONE NUKBER: 1-117 ASHE PERIOD PERIOD PERICO v' fl, i %1ly .Q'I 9 SEC

            '$  ~   L        %p;yi IA  '4  + I               Xl i  ~
                                                                          --.---OUTAGE------

SUKKARY EXAKIHATIOH AREA CATGY NDE IKSTRUCTIOHS IDENTIFICATION 3 3 2 3 **CALI BRAT ION BLOCK~* j 'A I'Iah NUKBER ITEN NO KETK 1 2 1 2 1 i4 J i R i4 V a0444AN+AA'4 Al'4PAWÃA&ll'Vb'lI ~ k A1 eAAgP s a<<p ~w yy ga I-1.5-BF-C3 REF. DMG. NO. 01-117 398800 BF-6-K6 F.A VT-3 3-RESTRAINT F1.308 I-2-BF-38 REF. DOG. NO. 01-117 398900 BF-6.K5 FA VT3 3 RESTRAINT F1.308 399000 BF-6-K4 F.A VT 3 X RESTRAINT F1.308 399100 BF 6-K3 F.A VT.3 3-RESTRAINT F1.308 399200 BF-6-H2 F.A VT 3 3-RESTRAINT F1.308 399300 BF-6-H1 F A VT-3 3-RESTRAINT F1.308

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UHIT 1 PAGE: 613 REV IS ION: 0 IHSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STA'IUS PRESERVICE YEAR CONDENSATE-SUCTION TO AUXILIARY FEEDllAT R PUHPS FIRST SECOND THIRD

                                                                               )

ZONE NUHBER: 1-118 l;. ivy ~" aalu .ava .'a, SUHHARY EXAMIHATIOH AREA p'.'A' v' .~ ~ a ~ ~ ': '.'.<'SEt ASHE Xfw"'" [

                                                                                   'a PERIOD
                                                                                       L'4v ~ '"
                                                                                 - - - - - - 0 PERIOD
                                                                                                    'a'a 'v    a' PERICO
                                                                                                                             'Ca CATGY   NDE    (                   U T A G E                               IHSTRUCTIOHS NUHBER      IDENTIFICATION                                  ITEN NO NETH     1    2   3      1   2   3        1    2    3              **CALIBRATIONBLOCK~*

~ i 'h~ <<'<<'<<"a aa AC1'4' VCOC' a. 'Ciah O'C'1 I

4) 'aVXL v 8'a" v" 'V 'v'is@ ' h <<'av" vv "aM a "" 'rFa'CAVAaA'" 'al'a I-4-C-52 REF. DMG. NO. 01 118 A 400000 CH-101 F.A VT.3 3-ROD HANGER F1.30A I-8-C-68 REF. DlJG. NO. 01.118.A 400300 CH-114 F-A VT-3 3 X Rigid Sway Strut F1.30A a

400500 CH-118 F-A VT-3 3-RIGID RESTRAINT F1.30B 400700 CH-120 F-A VT-3 3-RIGID RESTRAINT F1.30A I-B-C-58 REF. DWG. NO. 01-118 B 400900 CH-123 F-A VT-3 3-BOX RESTRAINT F1.30A 401000 CH-124 F.A VT-3 3-BOX RESTRAINT F1.308

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 614 REVISION: 0 INSERVICE INSPECTION LONG TERN PLAH CLASS 3 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CONDENSATE-SUCTION TO AUXILIARY FEEDHATER PUNPS FIRST SECOND THIRD ZONE NUHBER: 1-118 ASHE PERIOD PERIOD PERIOD

                                      "'"'CEC: XI"' -"

SUHNARY EXAHINAT10H AREA J'aA'@all CATGY NDE ------OUTAGE----.- INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

       \   s           ' 'AOVssw vaAVaVArh       wAYNVvha~+      Vlf I-8-C-58    REF. DUG. NO. 01" 118-B 401100   CH-125                              F-A     VT-3 3 BOX RESTRAIHT                       F1.308 401200    CH-125 IA                          0-A      VT-1                                          4 -  3/4" x 3/4"x3" lg lugs,A-36 INTEGRAL ATTACHHENT               D1.20                                                  mat l.

401300 CH-126 F-A VT-3 3-BOX RESTRAINT F1.308 401400 CH-127 F-A VT-3 BOX RESTRAINT F1.30A 401500 CH.128 F.A VT-3 3-BOX RESTRAINT F1.30A l-6-DU.2 REF. DUG. NO. 01-118.C 401600 CH-145 F-A VT 3 3-SLIDIHG BASS SUPPORT F1.30A 401700 CH-145 IA 0-A VT-1 3- One attachment Integral Attachment 01.20

DATE: 01/09/98 ST. LVCIE NUCLEAR PLANT UNIT 1 PAGE: 615 RE V I S ION: 0 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CONDENSATE SUCTION TO AUXILIARY FEEDNATER PUMPS I FIRST SECOND THIRD ZONE HUHBER: 1-118 ASNE I PERIOD PERIOD PERICO 'I ~ is ' ~ +v <<rc v'w halt ~ w 4 i~ ~ i IP .rSchl ~ vl v" ' s' VC'Lii1

                                                          ~

SUHNARY EXANIHAT ION AREA CATGY NDE I

                                                                             - - - - - - 0      U T A 0 E - - - -       IHSTRUCTIOHS NUHBER       IDENTIFICATION                          ITEH   HO NETH   )  1    2   3      1   2 3      1  2  3       *~CALI BRAT IOH BLOCK**

i 'Sos -SS-Sss~waVXVaiacasas- 'v"Vsa: i~ W ZS s'smvrvaVa~ a>s" "~vs"'"S I-6-DIJ-2 REF. DUG. NO. 01-118-C 401800 CN-146 F-A VT-3 3-SLIDING BASE SUPPORT F1.30A 401900 CH-146 IA D-A VT-1 3-Integral Attachment D1.20

DATE: 01/09/98 ST. LUCIE HUCLEAR PLANT UNIT 1 PAGE: 616 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAH CLASS 3 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR CONDENSATE-SUCTION TO AUXILIARY FEEDNATER PUNPS FIRST SECOND THIRD 'i 1 i ~ 'A IV,I1-119 ZONE HUHBER: h9% IVH 6 6 4 ASHE 4 \lrPSC/ FCe Vl n ~ PERIOD PERICO PERIOD SUHHARY EXAHIHATION AREA CATGY KDE ------OUTAGE------ INSTRUCTIONS NUNBER wv" + IDENI'IFICATIOH

              gz  j<<e,'"gl j'    <<'qqg ITEN
                                         <<gg<<qiig Vjgis'AV'wV HO NETH
                                                                      ~ Jiti<<LNii1'A'a'Wk<< <VNfdttA4a4 <<<<wA I 1   2  3     1   2 3      1 2  3 W4
                                                                                                                     <<<<CALIBRATION BLOCK<<<<
                                                                                                                       '~hi 'i    <e'o' 4 0    'A I-B.C-85 REF.        DMG. NO. 01-119-8 402100       CH.130                                  F-A      VT-3 3 -     - -     X    - -      - - -     93 SLIDING BASE SUPPORT                    F1.30A IH TRENCH 402300      CH-131                                  F-A       VT-3 3 -     -  -     - - -        - - -    93     Replaced per PC/H 077-193 RIGID TIE BAR ASSEHBLY                  F1.30A IN TREHCH 402400       CH-132                                  F-A       VT-3 3 -    - -      - -    -     - - -     93     Replaced per PC/H 077-193 SLIDIHG BASE SUPPORT                    F1.30A 402700       CH.134                                  F.A       VT-3 3 -    - -      -   - -      - - -     93 SLIDIHG BASE SUPPORT 8 TIE BAR F1.30A 402800       CH-135                                  F-A       VT-3   3-SPRING HANGER                           F1.30C I-8-C-87      REF. DOG. NO. 01-119-A 402900       CH-136                                  F-A       VT-3 3 -    - -      -   -        - - -     93    Replaced PC/H 076.193 SLIDIHG BASE SUPPORT                    F1.30A IN TREHCH 403000       CH.137                                  F.A       VT-3 3 SLIDING BASE SUPPORT                    F1.30A

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLAHI'HIT 1 PAGE: 617 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHEH'IS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CONDENSATE-SUCTION TO AUXILIARY FEED'WATER PUMPS FIRST SECOND THIRD ZONE NUMBER: 1-119 ASME PERIOD PERIOD PER I CO f1% I 8 4V, le% 'i 0 i V ' '

                                                    $ ECo'X

SUMMARY

EXAMIHATION AREA CATGY NDE -OUTAGE------ IHSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 2 3 2 3 2 3

                                                            'VIA~1                                     'igSy'qi **CALIBRATIOH
                                                                                                                     ~ 'g BLOCK~~

1 1 1 "+I <<' ' 4A4'&94 ~ I'AVSA~44'AdreAN'EWAil' ~ 1&Vr wa ApwAC .I "4 . + '+ 'g' +

                                                                                                                                             '    "   ' yf
                                                                                                                                                           < y I-8-C-87      REF. DWG. NO. 01 119 A v

403200 CH-138R F-A VT-3 3- 93 NEW SUPPORT INSTALLED PER PC/K HORIZONTAL BOLTED RESTRAINT F1.30 076-193M lk TRENCH 403300 CH-139 F-A VT-3 3- 93 This support relocated to SLIDIHG BASE SUPPORT F1.308 CH-143 I-6-C-90 REF. DWG. NO. 01-119-A 403400 CH-140 F-A VT-3 3- 93 SLIDING BASE SUPPORT F1.30A IH TRENCH 403500 CH-140 IA D A VT-1 3-IHTEGRAL ATTACHMENT 01.20 I-6-C-54 REF. DWG. NO. 01-119-A 403600 CH-141 F-A VT-3 3- 93 SLIDIHG BASE SUPPORT F1.30A IN TREHCH 403700 CH-141 IA D-A VT-1 3-INTEGRAL ATTACHMENT D1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 'PAGE: 618 REVISION: 0 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS CONPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CONDEHSATEaSUCTION TO AUXILIARY FEEDllATER PUNPS FIRST SECOHD THIRD

                                                                                   )

ZONE NUNBER: 1-119 ASHE PERIOD ~, " ~ hate aaaa,a >t;aa$ rp %s'gi NP 1 aa a) ' ScP ECa vl >>

                                                                                   )

(

                                                                                      "'a         aa  PERIOD N

PERIOD

                                                                                                             Aiba L'6  a SUHHARY EXAHINATIOH AREA                           CATGY     HDE    I                 0  U T A G E                      INSTRUCTIONS NUMBER     IDENTIFICATION                          ITEN NO NETH     I  1   2   3      1    2    3    1 2 3                                         BLOCK"*
                                                                                                                                                        "'*CALIBRATION I~   '         '    a  4  a' 'a  'a'aklVJa'aala'44'aa'a, aQI'l44a~JVa    aSa   SalilN41$ 4VNFCV a'a'O'AaNp Vaa'     'av 'aaa~l  '<<Cr aa a a'aA'w'4a'0l a'Baal 'ada I-6-C-90    REF. O'LIG. NO. 01.119.A 404000     CH-143R                                 F-A       VT-3 3    - - -          - - -         -"- -         93 RIGID BOLTED RESTRAINT                  F1.30 IN TRENCH

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 619 REVISION: 0 INSERVICE INSPECTION LOHG TERN PLAN CLASS 3 ALL STATUS COHPONEKTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CONDENSATE-SUCTION TO AUXILIARY FEEDNATER PUHPS FIRST SECOND THIRD I ZONE NUHBER: 1-120 ASKE PERIOD PERIOD PERICO ~ , >

          'I q',, -' D;jj~ I ~ 'I I" > ( '+,)ll +a >*rl w s ~,    caw Scl we
                                                                             ~

vf

                                                                        ~
      ~ 'i4 SUHHARY EXAHIHATION AREA HUHBER    IDENTIFICATION 4l "             '        sI  ~        ..

CATGY ITEN HDE HO NETH

                                                                                      ~VI I

( 1 P

                                                                                                - - - - - 0 2  3 W

1 U T A G E 2 3 a ~ 4 1 2 3

                                                                                                                                 . iiW <<

IHSTRUCTIOHS t'i

                                                                                                                                            **CALIBRATIOHBLOCK~*
                                                                                                                                                 .0 )'L 'VN 6'+Ri 'lt'p KN L   ~ ~ t' 11 I-B-C-168 REF.             DUG. NO. 01-120 404200    C-916-73                                      FA          VT3 3X RIGID STRUT                                   F1.308 404300    C-916-75                                      F-A         VT-3  3-RIGID STRUT                                   F1.30A I-B-C-167 REF.            D'WG. NO. 01-120 404400   C-916-90                                       F-A         VT-3 3 ANCHOR                                         F1.308 I-B-C.168 REF.             DUG. NO. 01-120 404500    C.916-765                                     F-A         VT-3 3    .

RIGID STRUT F1.30B I-B-C-167 REF. ONG. NO. 01.120 404600 C-916-801 F-A VT-3 3 RIGID STRUT F1.30A 404700 C-916-855 F-A VT-3 3-Rigid SMay Strut F1.30A

DATE: 01/09/98 ST ~ LUCIE HUCLEAR PLANT UNIT 1 PAGE: 620 REVISIOH: 0 IHSERVICE IHSPECTIOH LONG TERH PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CCM FROM COHTAINMENT COOLING UNIT 1A TO PEN. 19 FIRST SECOND THIRD ZONE NUMBER: 1-121 ASME PERIOD PERIOD PERIOD AI lr vI'" ~ ~; . i e.r, ' hi A aA,w ~~pqhv,'L iw P r-'s l= A 0"h&th ~ I 'i'0VI'44 "' J'4'

SUMMARY

EXAMINATION AREA CATGY

                                                                    ~

NDE - - - 0 U T A G E - - - - -- INSTRUCTIOHS HUMBER IDENT IF I CAT IOH ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK**

 - ~    >< '           v "wv'owwJ  i sassi   4 ja "Ilcrs '%~%Ac'4'4'tQ\~Ã"acTISQsv2+A4oAwlr I
                                                                                                                 "~ 4 'ewa" + < ~ 84'sa 'ii'al"isis'"cv'r'
                                                                                                                                         's I-8-CC   41    REF. DNG. HO. 01-121-B I

404800 CC.1868-2220 F A VT-3 3 Rigid Sway Strut F1.30 404900 CCH-218 F-A VT-3 3-SPRING HANGER F1.30C 405000 CC.1868-109 F.A VT3 3-Rigid Sway Strut F1.30 405100 CCH-220A F-A VT-3 3-CLEVIS HANGER F1.30 405200 CC-1868.1220 F-A VT-3 3-Rigid Sway Strut F1.30 405300 CCH-220 F-A VT-3 3 . ROO HANGER F1.30 405400 CC-1868.2222 F A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30

DATE: 01/09/98 ST ~ LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 621 REVISION: 0 INSERVICE IHSPECTIOH LOHG TERN PLAN 0 CLASS 3 ALL STATUS COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR CGl . FROM CONTAINMEHT COOLING UNIT 1A TO PEN. 19 FIRST SECOND THIRD ZOHE NUMBER: 1-121 ASHE PERIOD PERIOD PERICO I iw,, 8 t>p p) r. Avast)v<w 4 i ~,

                                      ~   ~s 4 ~ tel*,  SPA,YI.

ECo X wf 4 AAa&vwl use" ~ s Ad 1

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - 0 U T A 0 E - .- - - INSTRUCTIONS NUMBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 ~~CALIBRATIOH BLOCK~* I-8-CC-41 REF. DUG. NO. 01-121-B 405500 CC.1868-6222 F-A VT.3 3-Rigid Sway Strut F1.30 405600 CCH-222 F A VT-3 3-ROD HANGER F1.30 405700 CC-1868-2224 F.A VT-3 3 . F1.30 405800 CC.1868.6224 F-A VT-3 3- X Rigid S~ay Strut F1.30 405900 CC-1868-6226 F A VT-3 3-BOX RESTRAINT F1.30 406000 CC-1868-6228 F-A VT3 3-BOX RESTRAINT F1.30 406100 CC-1868-6230 F.A VT-3 3 - - - X BOX RESTRAINT F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 622 REVISION: 0 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONEHTS INSPECTION IH'TERVAL PLAN STATUS PRESERVICE YEAR CCM - FROH CONTAINNENT COOLING UNIT 1A TO PEN. 19 FIRST SECOND THIRD ZONE HUNBER: 1-121 ASHE PERIOD PERIOD PERIOD ,,r < ~ w i. ~. ~ ~ i4 ~,A vwM .hwsuA ski .k rt .v . ~, i wri'Set FCS~,.vl X p ~ v ~ SUNNARY EXAHINATIOH AREA CATGY NDE - - - - - - OUTAGE - - - - -- INSTRUCTIONS q ~ tJ ' NUNBER IDEHTIFICATIOH es,sa<<a sat v aa ~w es~s ITEN NO NETH eqvs ~ I 1 2 er~vvwes.savrssewwrs~ 3 1 2 3 1 v eezvas 2 3 **CALIBRATIONBLOCK~~ e sr e o see I-B-CC.41 REF. DUG. NO. 01-121-B 406200 CC.1868-29 F-A VT-3 3-BOX RESTRAINT F1.30 1-8-CC-41 REF. DN. NO. 01-121-A 406300 CC.1868.6233 F A VT-3 3-BOX RESTRAINT F1.30 406400 CC-1868-6236 F A VT.3 3-Rigid Sway Strut F1.30 406500 CC-1868-6236A F-A VT-3 3-RESTRAINT F1.30 406600 CC-1868-2238 F A VT-3 3-Rigid Sway Strut F1.30 406700 CC-1868-6238 F-A VT-3 3-Rigid Sgay Strut F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE! 623 REVISION! 0 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CCW - FROH PEH. 18 TO CONTAINMENT COOLING UNIT 1D FIRST SECOND THIRD 1.122 i y i',via v i', is ZONE HUHBER! ASHE PERIOD PERICO PERIOD ~ P ~ ~* its e ew r, w ~ ~ r vÃcl .YI. X ~~ ~ ~ ~~ ~ SUGARY EXAHINATION AREA HAEC ~ CATGY NDE - - - - - 0 U T A G E - - - - -- INSTRUCTIOHS t C HUHBER i IDENI'IF I CATION i vlvA'< i' ITEN HO NETH AoAibve i e~v4v i A'oA ~ 1 2 3 1 2 3 1 2 3 **CALIBRATIONBLOCK*~ I-B-CC.40 REF. DWG. NO. 01-122-A 406800 CC-1865-6186 F-A VT-3 3-Rigid Sway Strut F1.30 406900 CC.1865-9 F-A VT-3 3-Snubber 1-096 F1.30S 407000 CC-1865-6185 F A VT-3 3-Rigid Sway Strut F1.30 407100 CC-1865.1185 F A VT.3 3 . RIGID STRUT F1.30 407200 CCK-185 F-A VT-3 3 . RESTRAINT F1.30 407300 CC-1865.6174 F-A VT-3 3 . BOX RESTRAINT IIELDED F1.30 407400 CC-'1865-6174 IA 0-A VT1 3-IHTEGRAL ATTACHNENT D1.20

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: '24 REVISION: 0 IHSERVICE IHSPECTIOM LONG TERN PLAN CLASS 3 ALL STATUS COHPOMEH'TS INSPECTIOH IHTERVAL PLAN STATUS PRESERVICE TEAR ccu - FRDH pEN. 18 TO CONTAINMENT COOLING UMIT 1D I FIRST SECOND THIRD 1-122

    'I   Iv ')

ZONE NUMBER:

                 ~ )))  ta I  'II) ll))I 4)    )'\ v I ~ v ') ) I   ~

ASHE l$ I>> ji V ~ QP ) b )4 PERIOD 441 PERIOD 4>> ~ 44 44 PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEH HO NETH 1 2 3 1 2 3 1 2 3 *>>CALIBRATION BLOCK*>> ~ ~ 'Ily)' ~ y '"y'vvt y' )' 'vl 'kvl>>v>>4%~ '4>>~vv'4M44ii >>k Is'A4>>>>l'iv))vva 'l)yvvsvyvly'4v" v Iv '

                                                                                                                 ~                        4) j  v ~ " 4 4>> vv>>I) 'ov4 'v'44 4 Iv' I-8-CC-40        REF. DWG. MO. 01-122-A 407500       CCH-170                                          F A         VT-3    3-PIPE SUPPORT                                     F1.30 407600       CC-1865-2199                                     F A         VT3     3-Rigid    SMay    Strut                           F1.30 407700       CC.1865.6199                                     F.A          VT-3    3-Rigid     Sway    Strut                          F1.30 I

I.B.CC-40 REF. DMG. MO. 01-122.B 407800 CC-1865.6201 F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30 407900 CC.1865.2201 F-A VT-3 3-Rigid Sway Strut F1.30 408000 CC-1865-6203 F-A VT-3 3-BOX RESTRAINT F1.30 408100 CC-1865.6205 F-A VT-3 3-BOX RESTRAINT F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 625 REV IS ION: 0 INSERVICE IHSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CCM - FROH PEN. 18 TO CONTAINHENT COOLING UNIT 10 FIRST SECOND THIRD ZONE NUHBER: 1-122 ASHE PERICO PERIOD PERIOD i tP ~,\ I 8 6 wwTt ~ i \ ) e,l%, (I\ Sf' I lr vl

                                                          ~
                                                                         - - - - - - 0             - - - -
                                                                                   ~

SUHHARY EXAHINATION AREA CATGY NDE U T A 0 E INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETH 2 3 2 3 'I 3 J~ I ' " 1 " p ' W I 1 1 4 ~ 2 4 u( 4 0 iqL

                                                                                                                       **CALIBRATIONBLOCK~*

4 C,' E 1h . J' ) tl'Q'9, ~ ~,'j ~ I I-8-CC-40 REF. DUG. NO. Ol 122-8 408200 CC-1865-6207 F-A VT-3 3-BOX RESTRAINT F1.30 408300 CC.1865-2207 F-A VT-3 3-Snubber 1-100 F1.30S 408400 CC-1865-6209 F-A VT-3 3-BOX RESTRAINT F1.30 408500 CCN-211 F-A VT.3 3-CLEVIS HANGER F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 626 REVISION: 0 IHSERVICE INSPECTION LOHG TERN PLAH 0 CCM - FROH PEN. ZONE NUHBER:

         '    \

1-123 INSPECTION INTERVAL 20 TO CONTAINNENT COOLING UNIT 1A ASNE

                                                   \ aavSCI CLASS 3 ALL STATUS COMPONENTS FIRST PERIOD PLAN STATUS SECOND PERIOD
                                                                            'IAAVV A "v Av I           'la THIRD PERIOD PRESERVICE YEAR hffaa          o FCa 'Vi a a               a   w  ta        aaaa   a    a                                                   al a
                                       ~        ~

n SUHHARY EXAHIHAT ION AREA CATGY HDE - - - - - - 0 U T A 0 E - - - - -- IHSTRUCTIOHS HUNBER IDENT IF ICATION ITEN HO NETH I 1 2 3 1 2 3 1 2 3 <<~CALIBRATIOH BLOCK~* o a a o oovAIIIA' ovAvot'o>>ovvoAorIIorrvo A'vaoo4oooIIVI<<vooIl'eor VAAroaoa! r I>> wh'1haJ ' a A ' I' ' " 'rv I-8-Cca37 REF. DUG. NO. 01-123-A 408600 CCa 1848-6235 F-A VT-3 3-Rigid Sway Strut F1.30 408700 CC-1848-6237 F-A VT-3 3-Rigid Sway Strut F1.30 408800 CC.1848.6234 FaA VT-3 3-BOX RESTRAINT F1.30 408900 CC-1848a15 F-A VT-3 3- X BOX RESTRAINT F1.30 409000 CC.1848.21 F-A VT-3 3-BOX RESTRAINT F1.30 409100 CC-1848.6229 F-A VT-3 3-BOX RESTRAINT F1.30 409200 CC.1848-6227 F-A VT-3 3-BOX RESTRAINT F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UNIT 1 PAGE: 627 REVISION: 0 IHSERVICE IHSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CCW - FROM PEN. 20 TO CONTAINMENT COOLING UNIT 1A FIRST SECOND THIRD ZONE NUMBER: 1-123 ASME PERICO PERICO PERICO I V i ~ 0 6 8 ~ '\ e SEC i%XI ~ ~ g'ev v i

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - -- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 2 3 3 +v' o'swvA4I lv vsawvvsi 'a'4INaAa>YAA47LscI Hv 4Ntva'at I 1

                                                                                    'ilaw'i 1   2           1 w v+'irw s 2  3 i   4/.h<
                                                                                                                          **CALIBRATIONBLOCK**

I-8-CC-37 REF. DNG. NO. 01-123-B P 409300 CC-1848-3225 F-A VT-3 BOX RESTRAIHT F1.30 409400 CC-1848-6225 F-A VT-3 3-Rigid Sway Strut F1.30 409500 CC-1848.2225 F-A VT-3 3 . RIGID TIE BAR ASSEMBLY F1.30 409600 CC.1848.6223 F-A VT-3 3-Rigid Sway Strut F1.30 409700 CC-1848-2223 F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30 409800 CC-1848-2221 F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30 409900 CC-1848.6221 F-A VT-3 3-Rigid Sway Strut F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 628 REVISION: 0 INSERVICE IHSPECTIOH LONG TERN PLAH CLASS,3 ALL STATUS CONPOHEHTS I NSPECTION IHTERVAL PLAH STATUS PRESERVICE YEAR CCU - FROH PEN. 20 TO CONTAINMENT COOLING UHIT 1A FIRST SECOND THIRD ZONE NUNBER: 1-123 ASHE PERIOD PERICO PERIOD SUNMARY EXAHIHAT ION AREA CATGY HDE OUTAGE - - - - -- INSTRUCTIONS NUHBER IDENTIFICATION

                    'b>4 ' +A~i, p, pqs  Agcy ITEN   NO NETH "le?'aq '.tag'aprA  . ~rag 1    2  3     1 s'A~'llao~gsow 2  3 wo'ce  1 2  3 s ~  ~
                                                                                                                    *>>CALIBRAT IOH BLOCK>>>>

wr ~ ew e ~ 'a>> ~ r'>> iw w cv>~ I-8-CC-37 REF. DUG. NO. 01-123-B 410000 CC.1848-1221 F-A VT-3 3-Rigid Sway Strut F1.30 410100 CCH-221 F-A VT-3 3-ROD HANGER (2) F1.30 410200 CC.1848.140 F-A VT-3 3- V Rigid Sway Strut F1.30 10300 CC.1848-2219 F A VT-3 3 Rigid Sway Strut F1.30 410400 CC-1848-6219 F-A VT-3 3 Rigid Sway Strut F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 629 REVISION: 0 IHSERVICE IHSPECTION LOHG TERN PLAN CLASS 3 ALL Sl'ATUS COMPONENTS IHSPECTIOH INTERVAL PLAN Sl'ATUS PRESERVICE YEAR CCM - FROH PEH. 16 TO COHTAINNENT COOLING UHIT 1C [ FIRST SECOND THIRD ZONE HUNBER: 1-124 SUNMARY EXANIHATIOH AREA eewuov ~ ~~ e

                                           'CELLS
                                                  ' ~ w6 ASHE ECe Sert CATGY
                                                                 'Lvi >>[

NDE i PERIOD

                                                                                         'i 41'1 0

PERICO

                                                                                                  ~ 4' U T A G E 4w PERIOD ll '4 IHSTRUCTIOHS s<<vade
                    'NIECE'4'o                                               I t'~

NUHBER IDENTIFICATION

           'i'e'44"             l 4NC J' ITEN HO NETH i4'l'L'I'I'4'PCNPV4'NC1  i  1 2   3        2    3 4'AAI+O'4 sltelk ael 1             1     2  3 1v o alV t  l
                                                                                                                               **CALIBRATIOHBLOCK**

s~ s a w I-8-CC-39 REF DlJG. NO. 01-124 410500 CC-1860-405A F-A VT-3 3-Rigid Sway Strut F1.30 410600 CCH-188 F A VT-3 3-Rigid Sway Strut F1.30 410700 CC-1860-6189 F-A VT-3 3-F1.30 410800 CC-1860-16 F A VT.3 3-Rigid Sway Strut F1.30 410900 CC-1860-116 F A VT-3 3-Rigid Sway Strut F1.30 411000 CC-1860-6193 F A VT-3 3-BOX RESTRAINT F1.30 411100 CC-1860-6195 F-A VT-3 3-Rigid Sway Strut F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLAHT UHIT 1 PAGE: 630 REVI SIGH: 0 INSERVICE INSPECTION LOHG TERM PLAH CLASS 3 ALL STATUS COMPONENTS INSPECTION IHTERVAL PLAN STATUS PRESERVICE YEAR CCM - FROM PEH. 16 TO CONTAINMENT COOLING UNIT 1C FIRST SECOND THIRD ZONE NUMBER: 1.124 ASME PERIOD PERICO PERIOD , ~ e ', e r' rw a; t' ';,s ~ w(tv><is~'s ~a, ~ i '4 ~ <

                                                           'i SEC   '}(I                V A   I 1  +A1 tss %4 @~A

SUMMARY

EXAMIHATIOH AREA CATGY NDE ------OUTAGE------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 2 3 2 3 2 3 *~CALIBRATIOH BLOCK ~

                           ~      4 j   '   .LL'oah  1VA     ~A~A,%~            I 1 VA OVIPaWah 1

hvVN seA 'r4 1 iSrr>>t O%" I.B.CC 39 REF. DWG. NO. 01-124 411200 CC-1860.195 F-A VT-3 3 CLEVIS HANGER F1.30 411300 CC.1860.6197 F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR" PLANT UNIT 1 PAGE: 631 REVISIOH: 0 INSERVICE INSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CCu - FROM PEN. 22 TO CONTAINMENT COOLING UNIT 1B FIRST SECOND

                                                                              )                              THIRD 20NE NUMBER:         1-125

~ p;...~ ~c';,', zz ~ ~~a~w;>I; ~ ax~ > r, ~ s ~s a w ASME v'SEC ~ ~ Xf" ~ I PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATGY NDE )

                                                                                - - - - - - 0 U T A   G E - - - - --    INSTRUCTIONS NUMBER       IDEHTIFICATIOH                             ITEM NOMETH       I 1  2  3     1   2  3      1  2  3       **CALIBRAT ION BLOCK**

I-8-CC-38 REF. DNG. NO. 01-125 411400 CC-1852-6241 F A VT-3 3-Snubber 1-099 F1.30S 411500 CC-1852-1241 F-A VT-3 3-Rigid Sway Strut F1.30 411600 CCH.241 F A VT-3 3-ROO HANGER (2) F1.30 411700 CC.1852-6243 F A VT-3 3 BOX RESTRAINT F1.30 411800 CCH-243 F-A VT-3 3-F1.30 411900 CC.1852-1243 F-A VT-3 3-Rigid Sway Strut F1.30 412000 CC-1852.6245 F-A VT-3 3-Rigid Sway Strut F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 632 REVISION: 0 INSERVICE IHSPECTIOH LOHG TERH PLAN CLASS 3 ALL STATUS COHPONEHTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CCM - FROH PEH. 22 TO CONTAINHEHT COOLING UNIT 18 ( FIRST SECOND THIRD ZONE NUMBER: 1-125 r' tbV>A a,'4 L 'h(C ~ %) @fan '> r-' ASNE 1~,'f L q 'SCP Yf 'c <>

                                                                                )
0) yi PERIOD PERIOD J" v'""' V "'li ' PERIOD SUHNARY EXAHINATIOH AREA ECO CATGY NDE (
                                                                                  - - - - - - 0 U T A  G E   - - - -    --       INSTRUCTIONS HUHBER        IDEH'flflCATIOH                                ITEN NO NETH i 1 2 3            1  2  3        1    2   3          **CALIBRATIONBLOCK~*

<v" ' ' oa '"w's 's'rw 'i Vi$44' "+'E'i'(a' o<PZJr>+ J)i" sWa'Vk'V vodka 'aA s 'Joi ' 'rlWPÃ i rv id'l'ease 'WJo'o'o'ho"/

                                                                                                                                                                   '-B CC-38          REF. DUG. NO. 01 125 412100       CC.1852-1245                                    F-A       VT-3    3-F1.30 412200      CCH-249                                          F-A       VT-3    3-SPRING HANGER                                    F1.30C 412300      CC-1852.6249                                    F-A        VT-3   3-Rigid    Sway      Strut                        F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 633 REVISIOH: 0 INSERVICE INSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COKPOHEHTS IHSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CCW FROM CONTAINMENT COOLING UNIT 1D TO PEH. 17 FIRST SECOND THIRD 1> ZONE NUMBER:

  ),%4 rv '%;)t I ~

1.126

                     '; >cipltq'\)I<

SUMMARY

EXAMINATION AREA Lw%t") <v t ~v h, ~ 'i ~ )) ~ ASKE EC0 4F Ser CATGY i NDE s

                                                                                           'PERIOD
                                                                                       .zkAc 4 4 I '"
                                                                                                   ~
                                                                                          - - - - - 0
                                                                                                      'v PERIOD
                                                                                                           'vive@"'

PERIOD I ia U T A G E INSTRUCTIONS NUMBER we r IDENTIFICATION em &ay. vl Ad lVAvs vuws4Ao, ITEM NO METH I 1 2 3 I 1 2 3 1 aes~4v alV 8 wraJ 1 VIVA vssAwes r seh JS46laV s 2 3

                                                                                                                            ~  w  ~    rAA     Adh 'd
                                                                                                                                    *iCALIBRATIOH BLOCK**

v Adair\ I-B-CC 44 REF. DUG. NO. 01-126 8 412400 CCH-212 F-A VT 3 3-CLEVIS HANGER F1.30 412500 CC.1899-6210 F-A VT-3 3-BOX RESTRAIHT F1.30 412600 CC.1899-2208 F-A VT-3 3-Snubber 1-098 F1.30S 412700 CC-1899.6208 F-A VT-3 3-F1.30 412800 CC-1899.6206 F-A VT-3 3 BOX RESTRAIHT F1.30 412900 CC-1899.6204 F-A VT-3 3-BOX RES IRAIHT F1.30 413000 CC-1899.6202 F-A VT-3 3-Rigid Sway Strut F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT 1 PAGE: 634 REVISION: 0 IHSERVICE IHSPECTIOH LONG TERH PLAH CLASS 3 ALL STATUS COMPOHENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CCM FROM CONTAINMENT COOLING UNIT 1D TO PEN. 17 FIRST SECOND 'HIRD 2OHE NUMBER: 1 126 ASME PERICO PERICO PERIOD ~,w ~ ~ ta ~ . rs.v allow .s aygs~nAg sg,gw a,s .o i;, Scf

                                                          ~

EC0 vi', X i w. >.e

                                                            ~

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - 0 U T A G E - - - - INSTRUCTIONS NUMBER IDEHT IF ICATION ITEM HO METH 2 3 2 3 2 3 ~*CALIBRATIOH BLOCK *

h. e i em roe O &O ~a+awe<<~

I 1 1 e ag 1

                                                                                                              ~           ~~+           a~                 tr s a I-8-CC 44      REF. DUG. NO. 01-126-B 413100      CC-1899-29                              F.A       VT-3    3-Rigid   Sway   Strut                    F1.30 I.B-CC-44      REF. DUG. NO. 01.126-A 413200     CC.1899-2200                             F-A      VT-3 Snubber 1.202                            F1.30S 413300     CCH.169                                 F-A       VT-3     3-RESTRAINT                               F1.30 413400      CC-1899.6173                            F-A       VT-3 3 -        - -     X BOX RESTRAINT                           F1.30 413500      CC-1899.6173 I A                        D.A       VT-1   3   - - -        X INTEGRAL ATTACHMENT                     01.20 RCB 413600     CCH-184                                  F-A       VT-3 3     .

RESTRAINT F1.30 413700 CC-1899-2184 F-A ~ VT-3 3-Rigid Sway Strut F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 635 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CCU FROM CONTAINMENT COOLING UNIT 1D TO PEN. 17 FIRST SECOND THIRD ZONE NUMBER: 1-126 ASME PERIOD PERIOD PERICO et'" ~ v . ~ v i>wt'4<<+ >a's v,i'vs~ w s .v ~~ ~, i Scl X Yia'Co

SUMMARY

EXAMINATION AREA CATGY HDE OUTAGE--- INSTRUCTIONS HUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATIOHBLOCK i (a</ 'av a ' es o a<<w'ae i BCC I-B-CC.44 REF. DIIG. NO. 01-126-A 413800 CC-1899.48 F-A VT-3 3-Snubber 1-097 F1.30S 413900 CC-1899-1187 F.A VT-3 3 . Rigid Sway Strut F1.30 414000 CC-1899.6187 F A VT-3 3-Rigid Sway Strut F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UHIT PAGE: 636 REVISION: 0 INSPECTION LONG TERN PLAN 1'HSERVICE CLASS 3 ALL STATUS CONPONEHTS IHSPECTIOH INTERVAL PLAN STATUS PRESERVICE YEAR CCM - PRON COHTAINHEHT COOLING UNIT 1C TO PEH. 15 FIRST SECOND THIRD ZONE NUHBER: 1-127 ASHE PERIOD PERIOD ,PERIOD , ~,rcp;, ~ tsv.s1 .,P ~ qadi wvr; ~ ~,~ P i> . ~ ~>'%'P 'See C lt ~ elf" SUMHARY EXAMINATION AREA CATGY NDE - - - - - - OU'T A G E INSTRUCTIONS NUNBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 1 2 3 ~~CALIBRATIOH BLOCK

  • I-8-CC-43 REF. DWG. NO. 01-127 414100 CCH-250 F-A VT-3 3-SPRIHG HAHGER F1.30C 414200 CC-1869.6250 F-A VT-3 3-Rigid Sway Strut F1.30 414300 CC-1869-1246A F-A VT-3 3-Rigid Sway Strut F1 ~ 30 414400 CC-1869-1246 F.A VT 3 Rigid Sway Strut F1.30 414500 CC.1869.6246 F-A VT-3 3-Rigid Sway Strut F1.30 414600 CC-1869-1244 F-A VT-3 3-Rigid Sway Strut F1.30 414700 CC.1869.6244 F A VT-3 3-BOX RESTRAINT F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 637 REVISION: 0 INSERVICE INSPECTION LOMG TERN PLAN CLASS 3 ALL STATUS COMPONENTS IHSPECTIOM INTERVAL PLAN STATUS PRESERVICE YEAR CCu - FROM CONTAINMENT COOLING UNIT 1C TO PEN. 15 FIRST SECOND THIRD 1-127 (A y l ZONE NUHBER:

        %. 1 Pl/ ~ > I 8  A    vg ~ tl \ 'L     I>>     II K ~, ~

ASHE SPP Clt ~ Qf E PERIOD PERIOD PERIOD

SUMMARY

EXAHIMATIOH AREA CATGY NDE - - - - -OUTAGE--- INSTRUCTIONS

 ~   \h NUHBER A'1A IDENTIFICATION i                                     '5 ITEM NO NETH V       I I

V 1

                                                                                               ~

2 3 V Itt 1 2 3 6 4t 1 8 2 3

                                                                                                                                    '@IV  81 '      %>>    6'A   ~
                                                                                                                                               **CALI BRAT ION BLOCK**

tgp1 '4 It% REF. DWG. MO. 01-127 4'-8-CC-43 414800 CCH-242 F.A VT-3 3-SPRING HANGER F1.30C 414900 CC-1869-6242 F-A VT-3 3-Rigid Sway Strut F1.30 415000 CC-1869-6240 F A VT.3 3-Rigid Sway Strut F1.30 415100 CCH-240 F.A VT-3 3-SPRING HANGER F1.30C

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 638 REVISION: 0 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS I INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR CCM - FROM CONTAINMENT COOLING UNIT 1B TO PEN 21 FIRST SECOHD THIRD ZONE NUMBER: 1-128 ASME PERICO PERIOD PERIOD

 ~ a, s ~    .w sA *(>>s ~    v   ( sot ts s v  .s se   ~ .'a ~ SOP   ~

EC ~ XYi'

SUMMARY

EXAKIHATION AREA CATGY HDE -----OUTAGE------ INSTRUCT IOHS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 1 2 3 **CALI BRAT I OH BLOCK~* I-8-CC-42 REF. DlJG. NO. 01-128 415200 CC-1883-1198 F.A VT 3 3-Rigid Sway Strut F1.30 415300 CC-1883-6198 F-A VT-3 3-RIGID TIE BAR ASSEMBLY F1.30 415400 CCH 196 F-A VT-3 3-ROD HANGER F1.30 415500 CC.1883-6196 F A VT.3 3-Rigid Sway Strut F1.30 415600 CC.1883-6194 F A VT-3 3-BOX RESTRAINT F1.30 415700 CC-1883.6192 F A VT.3 3-Rigid SNay Strut F1.30 415800 CCH-192 F-A VT-3 3 . ROD HANGER F1.30

DATE: 01/09/98 ST. LUCIE NUCLEAR PLANT UNIT 1 PAGE: 639 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS INSPECTION INTERVAL PLAH STATUS PRESERVICE YEAR CCII FROM COHTAINMEHT COOLING UNIT 1B TO PEH. 21 F IRST SECOND THIRD I ~ p ~ 'l ZONE NUMBER:

               <<   Ivh',$

1.128 1gwq 9 9 ~ 0 << ',4 ~ . 4 ASME lko SCI EC\ nI ~ vo w PERICO PERIOD PERICO

SUMMARY

EXAMINATION AREA CATGY NDE ------OUTAGE------ INSTRUCTIONS y' NUMBER I DENT IF ICATION ss a sos a+ v w esv zvv ITEN NO HETK crew avn I 1 2 3 a>~svvavsoe'a~ 1 2 3 vase'v 1 2 3 ov r ' r v < '<< '

                                                                                                                        <<*CALIBRAT ION BLOCK<<<<

I-8-CC-42 REF. DHG. NO. 01-128 415900 CC-1883-6190 F-A VT.3 3-PIPE SUPPORT F1.30 416000 CC.1883-6190 I A 0-A VT-1 3-Integral Attachment D1.20}}