Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor
ML17223A875
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/09/1990
From: Goldberg J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-291, NUDOCS 9008140504
Download: ML17223A875 (5)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM I (

~

' REGULATORY INFORMATION DISTRIBUTION SYSTEM (R1DS)

ACCESSION NBR:9008140504 DOC.DATE: 90/08/09 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co.

~

,05000335 AUTH. NAME AUTHOR AFFILIATION GOLDBERG,J.H. Florida Power & Light, Co.

RECIP.NAME RECIPIENT AFFIL1ATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to violations noted in Insp Rept 50-335/90-14.

DISTRIBUTION CODE: IEOID TITLE: General (50 COPIES RECEIVED:LTR i ENCL Dkt)-Insp Rept/Notice of VioTation Response j SIZE: D NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 2 2 AEOD 1 1 D AEOD/DEIIB 1 1 AEOD/TPAD 1 1 DEDRO 1 1 NRR MORISSEAU,D 1 1 D NRR SHANKMAN,S 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA DIR 11 1. 1 NRR/DRE P/PE PB9 D 1 1 S NRR/DRIS/DIR 1 1' NRR/DST/DIR 8E2 1 1

. NRR/PMAS/ILRB12 1 NUDOCS-ABSTRACT 1 1 OE .D 1 1 OGC/HDS2 1 1 1 1 RGN2 FILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE O'ASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOiiI Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROiv! DISTRIBUTIOiV LISTS FOR DOCUi>IENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

PO.Box 14000,Juno Beach,FL 33408 0420 AUGUST. 9 1990 L-90-291 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: St. Lucie Unit 1 Docket Nos. 50-335 Response to Notice of Violation Ins ection Re ort 90-14 Florida Power and Light Company has reviewed the subject inspection report and pursuant to 10 CFR 2.201 the response is attached.

Very truly yours,

":.b WX~~:~

J; H. Goldberg President Nuclear Division JHG/GRM Attachment A cc: Stewart D. Ebneter, Regional Administrator, USNRC Region Senior Resident Inspector, USNRC, St. Lucie Plant II 900-:;,40.".;Ot'C>r>80a>

F'1: < AZ>GCc,'- C~i>j>.".:;:

>- D>".

+/

an FPL Grov>> compacv

Re: St. Lucie Units 1 Docket Nos. 50-335 Response to Notice of Violation Ins ection Re ort 90-14 FINDING:

.Unit 1 Technical Specification (TS) 6.8.1.a requires that written procedures shall be established, implemented and maintained covering the activities recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. Appendix A, paragraph 1.d, includes procedures addressing procedure adherence and temporary change method.

Procedure QI 5-PR/PSL-l, Rev 37, Preparation, Revision, Review/Approval of Procedures, section 5.5, implemented TS 6.8.1 and required that procedures be strictly adhered to.

provided the method to obtain approved temporary procedure changes It also and, if appropriate, subsequent permanent changes.

Procedure OP- 1-0120051, Rev 10, RCS Flow Determination by Calorimetric Procedure, steps 8.3 through 8.6, directed certain action sequences involving coordination with the Reactor Control Operator at the control board, control board loop temperature meter function selection using switches, and confirmation that measurements were being made =only on channels that had the meter switched out and isolated.

Cont'rary to the above, on May 14, 1990, During the performance of procedure OP 1-0120051, the licensee's staff did not follow instruction steps 8.3 through 8.6 The test persons instead utilized an unapproved method to isolate all the meters to simultaneously isolate the involved loop temperature meters and complete the data collection without. the described coordination.

RESPONSE

Florida Power and Light Company concurs with the violation.

2 ~ The reason for the violation was failure to follow QI 5-PR/PSL-1. Test personnel failed to process a Procedure Change Request (PCR) prior to,implementing an improved method of collecting the temperature data.

3 ~ The Reactor Coolant System flow determination by calorimetric .

procedure was repeated with the individual's supervisor observing.

4, The following actions have been implemented to avoid further violations:

a. The individual was counselled by his supervisor.'.

A PCR was submitted to clarify and authorize the 'improved method of data collection.

Re: St. Lucie Units 1 Docket Nos. 50-335 Response to Notice of Violation Ins ection Re ort 90-14

c. All individuals in the Test Group were reminded of the importance of following procedures and the need for processing a PCR and/or a Temporary Change (TC) followed by a PCR prior to implementation of the change.
5. All the corrective actions were completed by August 1, 1990.