MONTHYEARML17309A9961999-06-30030 June 1999 Rev 35 to HP-90, Emergency Equipment. ML17309A9941999-06-17017 June 1999 Rev 1 to COP-06.06, Guidelines for Collecting Post Accident Samples. ML17241A3541999-06-0101 June 1999 Proposed Tech Specs Section 3.5.2,allowing Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17309A9951999-05-27027 May 1999 Rev 0 to COP-06.11, Establishing Remote Lab for Analyses of Accident Samples. ML17241A3451999-05-24024 May 1999 Proposed Tech Specs 3/4.5.1 Re Safety Injection Tanks ML17229B0711999-03-19019 March 1999 Proposed Tech Specs Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity, Per Soluble Boron Credit ML17229B0441999-03-0202 March 1999 Cycle 11 Reactor Startup Physics Testing Rept. with 990304 Ltr ML17229B0201999-02-23023 February 1999 Proposed Tech Specs 3/4.1.2.9 Re Reactivity Control sys- Boron Dilution ML17229B0361998-12-22022 December 1998 Rev 20 to Procedure C-200, Odcm. ML17229A9551998-12-16016 December 1998 Proposed Tech Specs Pages Revising Administrative Controls & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9161998-11-25025 November 1998 Proposed Tech Specs Pages,Replacing Insert-A,attachment to 971231 Submittal & Revises LCO 3.4.9.11 & Associated Bases ML17229A9251998-11-22022 November 1998 Proposed Tech Specs Revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9131998-11-19019 November 1998 Proposed Tech Specs,Revising Administrative Contols TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML20155C3061998-10-29029 October 1998 Proposed Tech Specs Pages Revising Terminology Used in Notation of TS Tables 2.2-1 & 3.3-1 Re Implementation & Automatic Removal of Certain Reactor Protection Sys Trip Bypasses ML20153G0781998-08-26026 August 1998 Rev 19 to Plstqp, Guard Training & Qualification Plan ML17229A8441998-08-24024 August 1998 Proposed Tech Specs Removing Obsolete License Conditions & Incorporating Revs Which Clarify Component Operations That Must Be Verified in Response to Containment Sump Recirculation Actuation Signal ML17229A7731998-06-15015 June 1998 Proposed Tech Specs Pages 6-20,6-20a & 6-20c,correcting Info Supplied by Fuel Vendor Relative to Titles of Approved TRs That Are Referenced in Proposed TS 6.9.1.11.b ML17229A7601998-06-0303 June 1998 Proposed Marked Up TS Pages Modifying Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 to Provide for Use of Lab Gas Partitioner to Periodically Analyze Concentration of Oxygen in Svc Waste Gas Decay Tank ML17229A7441998-05-27027 May 1998 Proposed Tech Specs Providing for More Efficient Use of on- Site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A7481998-05-27027 May 1998 Proposed Tech Specs Section 3.5.1,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7511998-05-27027 May 1998 Proposed Tech Specs Section 6.2.2.f,revised to Allow for Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A6751998-03-27027 March 1998 Cycle 15 Reactor Startup Physics & Replacement SG Testing Rept. W/980402 Ltr ML17229A6501998-03-0303 March 1998 Proposed Tech Specs 3.4.7 Re RCS Chemistry/Design Features/ Administrative Controls ML17229A6381998-02-12012 February 1998 Rev 19 to C-200, Offsite Dose Calculation Manual. ML17229A6151998-01-12012 January 1998 Rev 0 to ISI-PSL-1, St Lucie Nuclear Plant Unit 1 ISI Plan. ML17229A6141998-01-12012 January 1998 Rev 0 to ISI-PSL-1, Third Interval ISI Program for St Lucie Nuclear Power Plant,Unit 1. ML17229A5691997-12-31031 December 1997 Proposed Tech Specs Pages Modifying TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9131997-12-29029 December 1997 Proposed Tech Specs Modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5851997-12-12012 December 1997 Rev 0 to ADM-29.01, IST Program for Pumps & Valves. ML17229A5491997-12-0101 December 1997 Proposed Tech Specs Revising Units 1 & 2 EPP Section 4, Environ Conditions & Section 5, Administrative Procedures to Incorporate Proposed Terms & Conditions of Incidental Take Statement Included in Biological Opinion ML17309A9171997-11-26026 November 1997 Rev 0 to PSL-ENG-SENS-97-068, Spent Fuel Pool Dilution Analysis. ML17229A5931997-09-26026 September 1997 Rev 4 to Procedure QI-5-PSL-1, Preparation,Rev,Review/ Approval of Procedures. ML17229A5921997-09-18018 September 1997 Rev 0 to Procedure ADM-17.11, 10CFR500.59 Screening. ML20211Q5841997-09-10010 September 1997 Rev 18 to Training & Qualification Plan ML17229A4621997-08-22022 August 1997 Proposed Tech Specs Pages,Revising Specification 4.0.5 Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Control Section 6.8 ML17229A4341997-08-0101 August 1997 Proposed Tech Specs,Extending semi-annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 & Associated SE ML17309A8951997-06-11011 June 1997 Rev 0 to PL-CNSI-97-004, Transportation & Emergency Response Plan for St Lucie Unit 1 SG Project. ML17229A3601997-05-29029 May 1997 Proposed Tech Specs Incorporating Administrative Changes That Improve Consistency Throughout TSs & Related Bases ML17229A2981997-03-0606 March 1997 Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 NPP Using NUREG-0800 Std Review Plan 15.1.5 App A. ML17229A1831996-12-20020 December 1996 Proposed Tech Specs Re Safety Limits & Limiting Safety Sys Settings ML17229A1611996-12-0909 December 1996 Proposed Tech Specs 1.9a Re Core Operating Limits Rept ML17229A1191996-10-31031 October 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML17229A1111996-10-30030 October 1996 Proposed Tech Specs 3/4.9.9 Re Containment Isolation Sys & 3/4.9.10 Re Water level-reactor Vessel ML17229A1061996-10-28028 October 1996 Proposed Tech Specs 1.6 Re Channel Functional test,1.7 Re Containment Vessel integrity,1.8 Re Controlled leakage,1.9 Re Core alteration,3/4.6 Re Containment Systems & 3/4.6.1 Re Containment Vessel ML17229A1091996-10-28028 October 1996 Proposed Tech Specs Rev to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A0951996-10-24024 October 1996 Rev 0 to 00000-OSW-16, In-Situ Pressure Test Results for St Lucie Unit 1 Spring 1996 Outage. ML17229A0861996-10-18018 October 1996 Startup Physics Testing Rept. W/961018 Ltr ML17229A2441996-09-23023 September 1996 Rev 18 to Offsite Dose Calculation Manual (Odcm). ML17228B5641996-07-15015 July 1996 Revised Tech Specs Re Core Alteration Definition ML17229A0961996-06-12012 June 1996 Rev 0 to TR-9419-CSE96-1101, Test Rept - SG Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination. 1999-06-30
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17309A9961999-06-30030 June 1999 Rev 35 to HP-90, Emergency Equipment. ML17309A9941999-06-17017 June 1999 Rev 1 to COP-06.06, Guidelines for Collecting Post Accident Samples. ML17309A9951999-05-27027 May 1999 Rev 0 to COP-06.11, Establishing Remote Lab for Analyses of Accident Samples. ML17229B0361998-12-22022 December 1998 Rev 20 to Procedure C-200, Odcm. ML20153G0781998-08-26026 August 1998 Rev 19 to Plstqp, Guard Training & Qualification Plan ML17229A6381998-02-12012 February 1998 Rev 19 to C-200, Offsite Dose Calculation Manual. ML17229A6151998-01-12012 January 1998 Rev 0 to ISI-PSL-1, St Lucie Nuclear Plant Unit 1 ISI Plan. ML17229A6141998-01-12012 January 1998 Rev 0 to ISI-PSL-1, Third Interval ISI Program for St Lucie Nuclear Power Plant,Unit 1. ML17229A5851997-12-12012 December 1997 Rev 0 to ADM-29.01, IST Program for Pumps & Valves. ML17229A5931997-09-26026 September 1997 Rev 4 to Procedure QI-5-PSL-1, Preparation,Rev,Review/ Approval of Procedures. ML17229A5921997-09-18018 September 1997 Rev 0 to Procedure ADM-17.11, 10CFR500.59 Screening. ML20211Q5841997-09-10010 September 1997 Rev 18 to Training & Qualification Plan ML17309A8951997-06-11011 June 1997 Rev 0 to PL-CNSI-97-004, Transportation & Emergency Response Plan for St Lucie Unit 1 SG Project. ML17229A2981997-03-0606 March 1997 Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 NPP Using NUREG-0800 Std Review Plan 15.1.5 App A. ML17229A2441996-09-23023 September 1996 Rev 18 to Offsite Dose Calculation Manual (Odcm). ML17229A0971996-06-10010 June 1996 Rev 0 to TP-9419-CSE96-2104, Steam Generator Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination. ML20137P3651996-05-20020 May 1996 Rev 5 to Procedure 1-1220055, Calibration of Area Radiation Monitoring Sys (Arms) ML17228B4921996-04-22022 April 1996 FPL St Lucie Unit 1 SG Program. ML20137P3381996-03-0404 March 1996 Rev 0 to Procedure 1-1400207, Calibr of Containment Process Monitor ML20137K6111995-12-0707 December 1995 Auxiliary Feedwater Pump 1C Disassembly Insp & Reassembly Mechanical Maint Procedure for St Lucie Plant,Unit 1 ML17228B3461995-11-16016 November 1995 Rev 0 to Plant Administrative Procedure 2-0010024, Inservice Testing Program for Pumps & Valves. ML20137P3061995-08-31031 August 1995 Rev 2 to Procedure 2-1220057, Functional Testing of RM-80 Power Supply Assemblies ML17228B0491995-02-0303 February 1995 Rev 0 to Subsequent Inservice Exam Plan for Pressurizer Instrument Nozzles. ML17228B0171995-01-0606 January 1995 Rev 5 to Second 10-Yr ISI Interval IST Program for Pumps & Valves St Lucie Nuclear Power Plant Unit 1. ML17228A8811994-09-28028 September 1994 Rev 0 to PSL-200-AOA-94-1, St Lucie Nuclear Plant,Unit 2 ISI Interval Request for Authorization of Alternative Exam. W/Attachment Re Implementation of Reg Guide 1.150 ML20137M1611994-09-15015 September 1994 Rev 2 to Procedure 1-1220053, Calibr of Control Room Outside Air Intake Monitors ML20080M4881994-06-14014 June 1994 Rev 15 to Chemistry Procedure C-200, Odcm ML20080M4791994-01-14014 January 1994 Rev 14 to Chemistry Procedure C-200, Odcm ML17228A4621994-01-14014 January 1994 Rev 4 to Second Ten-Yr ISI Interval IST Program. ML17228A2471993-07-24024 July 1993 Rev 0 of PSL-201, St Lucie Nuclear Power Plant,Unit 2 Second ISI Interval ISI Selected Component Schedule. ML17228A2461993-07-24024 July 1993 Rev 0 of PSL-200, St Lucie Nuclear Power Plant,Unit 2 Second ISI Interval Program Plan & Schedule from 930808- 200808 ML20137P3551993-03-0808 March 1993 Rev 1 to Procedure 1-1220055, Calibration of Area Radiation Monitoring Sys (Arms) ML17227A6011992-08-11011 August 1992 Rev 2 to JNS-PSL-204, First Ten-Year Inservice Inspection Interval Inservice Testing Program for Pumps & Valves, St Lucie Nuclear Power Plant,Unit 2. ML20141M4901992-07-30030 July 1992 Rev 14 to Training & Qualification Plan ML20137P3431992-04-10010 April 1992 Rev 1 to Procedure 1-1220053, Calibration of Control Room Putside Air Intake Monitors ML17223B2931991-10-10010 October 1991 Rev 3 to JNS-PSL-203, Second 10-Yr Inservice Insp Interval Inservice Testing Program for Pumps & Valves,St Lucie Nuclear Power Plant,Unit 1. ML20137P2971991-07-0303 July 1991 Rev 1 to Procedure 2-1120070, Containment High Range Radiation Monitor Calibration ML20070T9761991-03-12012 March 1991 Rev 10 to Training & Qualification Plan ML17223A5771990-03-0707 March 1990 Rev 10 to Emergency Procedure 1-0030143, Total Loss of Ac Power. ML17223A4501989-12-15015 December 1989 Rev 2 to JNS-PSL-203, Second 10-Yr Inservice Insp Interval Inservice Testing Program for Pumps & Valves. ML17308A1901988-08-24024 August 1988 Vols 1 & 2 to Rev 0 to JNS-PSL-100, St Lucie Plant Unit 1 Second 10-Yr Insp Plan. ML17221A7041988-04-0404 April 1988 Rev 0 to Pump & Valve Inservice Test Program. ML17342B0641987-12-30030 December 1987 Rev 1 to Independent Mgt Appraisal Program Plan for Florida Power & Light Co. ML17308A1831987-09-0202 September 1987 Rev 0 to Inservice Insp Second 10-yr Summary Program. ML17221A3781987-08-11011 August 1987 Inservice Testing Program,Section I,Valve Test Program & Section Ii,Pump Test Program. ML17221A3961987-01-28028 January 1987 Rev 1 to St Lucie Unit 1,Extraction Steam Piping Insp Program Guidelines. ML17347A2241986-12-22022 December 1986 Emergency Plan Implementing Procedures,Including Procedure 1101, Duties of Emergency Control Officer,Offsite Emergency Organization & Procedure 1102, Duties of Recovery Officer,Offsite Emergency.... W/861222 Ltr ML17216A6651986-06-17017 June 1986 Rev 4 to Maint Procedure 2-0910053, 12-Month Test of Automatic Load Sequence Relays. ML17216A6661986-03-26026 March 1986 Rev 5 to Maint Procedure 2-2200063, 2B Emergency Diesel Electrical Insp. ML17216A6671986-03-26026 March 1986 Rev 4 to Maint Procedure 2-2200062, 2A Emergency Diesel Electrical Insp. 1999-06-30
[Table view] |
Text
Page 1 of 9 FLORIDA POWER 6 LIGHT COMPANY ST. LUCIE UNIT 2 MAINTENANCE PROCEDURE NO. 2-0910053 REVISION 4 Tbs document Es not eontraflad
] .0 TITLE- Bef Enforrnetbn wBh a controlled doeurhent, 12 MONTH TEST OF AUTOMATIC LOAD SEQUE 2.0 REVIEW AND APPROVAL:
Reviewed by Facility Review Group June 3 1983 Approved by C. M. Weth Plant Manager June 14, 1983 Revision 4 Reviewed by FRG /B-//-F >-4D 19m, Approved by Plant Manager 19+
3.0 PURPOSE
This procedure provides guidelines for periodic testing of Automatic Load Sequencing Relays.
4.0 PRECAUTIONS AND LIMITS:
4.1 Read entire procedure prior to commencing Section 9.0.
4.2 Exercise care as some points may be energized.
4.3 Notify NPS/NWE prior to commencing this procedure. This test will give annunciation in Control Room.
4.4 Remove jumpers/replace O.L. heaters before going to the next piece of equipment.
4.5 Timer calibration check must be done with the timer in same position as it is installed (horizontal or vertical).
S 2 OPS DATE DOCT PROCEDURE DOCN 2-0910053 SYS COMP COMPLETED ITM 4 860 I Dp
~ 9029 P @DOC~ 8608>
050005 0+89',
I'Dp
Egi e
fill Sf V
Page 2 of 9 ST. LUCIE UNIT 2 MAINTENANCE PROCEDURE NO. 2-0910053, REVISION 4 12 MONTH TEST OF AUTOMATIC LOAD SEQUENCE RELAYS 5.0 RELATED SYSTEM STATUS:
None
6.0 REFERENCES
6.1 Tech Spec 3/4.8.1 6.2 Surveillance Requirement 4.8.1.1.2.d 6.3 FUSAR, Chapter 8, Table 8.3-2 7.0 RECORDS REQUIRED:
7.1 Completed sections of this procedure, signed and dated, shall be retained in the plant files.
7.2 All data sheets noted in this procedure shall be maintained with their applicable sections unless otherwise specified.
8.0 MATERIALS AND EQUIPMENT REQUIRED:
8.1 Hand tools 8.2 Jumpers 8.3 Multi-Amp SST-2 Timer or equivalent 8.4 SPST switch connected to two test leads with alligator clips at the ends
Page 3 of 9 ST. LUCIE UNIT 2 MAINTENANCE PROCEDURE NO. 2-0910053, REVISION 4 12 MONTH TEST OP AUTOMATIC LOAD SEQUENCE RELAYS P'.0 DETAILED PROCEDURE:
NOTE Relay timing tolerance is + 1 second. Calibration check must be done with relay in same osition as mounted.
9.1 Annual Inspection of Diesel Load Sequence Relays
- 1. 2A3/2B3 4160 Switchgear A. Connect the start leads of the timer to the switchgear test switches at terminal 5 and 5T. Turn the left timer switch to dry contacts (N.C.) position. /R4 B. Connect the stop leads of the timer, across the center white light, and turn right timer switch to "AC/DC Power Applied".
C. Turn timer power switch "ON", push reset. button, select seconds on Sec/Hz switch and select accuracy range to
.01 seconds.
D. Turn start latch to "ON" and stop latch to "ON" positions.
NOTE To start test, place switchgear test switch for load under test into "Relay" position. Remove all )umpers rior to oin to next iece of e ui ment.
E. 2A3: Perform steps 9.l.l.a through 9.l.l.d on each piece of listed equipment and record test results.
TEST TIME JUMPERS EQUIPMENT CWD SWITCH SET ACTUAL REMOVED INITIAL/DATE 2A LPSI 251 CS2 3 Sec; 2A Containment Spray 287 CS3 12 Sec.
2A Component Cooling Water 201 CS6 6 Sec.
2A Intake Cooling Water 832 CS7 9 Sec.
2A Aux. Peedwater 629 CS12 30 Sec.
Page 4 of 9 ST. LUCIE UNIT 2 MAINTENANCE PROCEDURE NO. 2-0910053, REVISION 4 12 MONTH TEST OF AUTOMATIC LOAD SEQUENCE RELAYS 9.0 DETAILED PROCEDURE: (continued) 9.1 (continued)
- 1. (continued)
F. 2B3: Perform steps 9.l.l.a through 9.l.l.d on each piece of listed equipment and record test results.
TEST TIME JUMPERS EQUIPMENT CWD SWITCH SET ACTUAL REMOVED INITIAL/DATE 2B Component Cooling Water 205 CS4 6 Sec.
2B,LPSI 252 CS6 3 Sec.
2B Containment Spray 290 CS7 12 Sec.
2B Intake Cooling Water 833 CS10 9 Sec.
2B Aux. Feedwater 630 CS12 30 Sec.
- 2. 2AB 4160 SWGR A. Connect timer "Start" leads to terminal 5 and 5T on SWGR test switch and timer "Stop" leads to terminal TL1 & 6 on test light. Place SWGR test switch in "Relay Test" position to start timing sequence. /R4 B. 2AB: Perform step 9.1.2.a on each listed piece of equipment and record test results.
2C Intake Cooling 834 CS3 9 Sec.
2C Component Cooling 289 CS2 6 Sec.
NOTE General Multi"Am Timer 0 era tion.
- 1. Connect start leads of timer to connections specified.
- 2. Turn left timer switch to "AC/DC Applied".
- 3. Connect the "Stop" leads of timer to connections specified.
- 4. Turn right timer switch to applicable selection.
- 5. Turn timer power switch "ON" and push reset button.
- 6. Select seconds on Sec/Hz switch and select accuracy range to .01 seconds.
- 7. Turn start latch and stop latch switch to "ON".
Page 5 of 9 ST. LUCIE UNIT 2 MAINTENANCE PROCEDURE NO. 2-0910053, REVISION 4 12 MONTH TEST OF AUTOMATIC LOAD SEQUENCE RELAYS 9.0 DETAILED PROCEDURE: (continued) 9.1 (continued)
- 3. 480V LC/MCC NOTE 1 Exercise caution when performing test as equipment ma be ener ized.
NOTE 2 Make connections at terainal boards wherever possible (consult CWD's).
2HVS-lA 3 Sec. Jumper 27 fLDPU 1-2 contact.
2HVS-1C 3 Sec. Lift wire to relay coil (Tenn 2HVS-1B 3 Sec. ll) and connect test switch.
2HVS-1D 3 Sec. Connect timer. START across relay coil SIP acmss any terminal other thnn 1-2.
If the fan is not running, liftwire to relay coQ., Term ll, and connect switch. Lift terminal 2 of contact 1-2.
Hook up timer. SGQE acmss coil. SIOP across terminal 1-2 Running 513 6 Sec. For the 2LfiDPU relay, foliar or 516 6 Sec. pmcedure as outlined for Stand 27 fIDPU above.
Running 476 18 Sec. For the 2L/TIPU relay, pmceed 2HVS-5B 477 18 Sec. as in 27 fLDPU above.
2RV-3 Running 1169 21 Sec. For the 2L/TKPU relay, proceed 1163 21 Sec. as in 27flDPU above.
2RV-1 Runnirg 1219 21 Sec. For 2L/TIPU relay, pmceed as 2RV-2 1220 21 Sec. in 27 fIDPU above.
Running 1162 21 Sec. For 2L/TIPU relay, proceed as or 1163 21 Sec. in 27/TDPU above.
Stand B.A. 27 Sec. For 2 PU relay, proceed as Heat Trace in 27/TIPU above.
Transf. 2A B.Ae 147 27 Sec.
Heat Trace Tzansf. 2B 2A Batt 1001 27 Sec. Jumper TB-5 2-3. Lift Tenn 12 2B Batt. 1002 27 Sec. wire of relay 2/TDPU and 2AB Batt. 1003 27 Sec. install test switch fran relay coil tn lifted lead. Connect tiner. SZART across ll and 12 of relay. STOP across 2 and l.
Power relay using the test switch.
/R4
t' Page 6 of 9 ST. LUCIE UNIT 2 MAINTENANCE PROCEDURE NO. 2-0910053, REVISION 4 12 MONTH TEST OP AUTOMATIC LOAD SEQUENCE RELAYS 9.0 DETAILED PROCEDURE: (continued) 9.1 (continued)
- 3. 480V LC/MCC (continued)
JlÃHES DATE EQUIIWINI'32 9 Sec. Perform 9.1.1.A tIxough D MME) 833 9 Sec. Perform 9.1.2&
2AA Batt.. Running 1801 27 Sec. Junper TB5-2 to 3. Lift Term 2BB Batt. 1801 27 Sec. 12 wire and install test switch fran relay coil to lifted lead. Connect ther, SZAItT across relay 2fKPU coil, SIOF contact 1-2. Pmer rela usi test switrh.
Running 177 300 Sec. ll LiftTerm wire at relay 2B ~ or 178 300 Sec. 2L/TGPU. Lift one wire at 2C ~ Stand 179 300 Sec. terminals for contacts 1-2 of 2L/TIPU. Connect test switch at texntinal for lifted Term.
ll wire and a positive feed.
Connect timer SMT acmss 2L coil and SIOP across terminal 1-2. Power the relay using the test switrh.
174 300 Sec. Jumper terminal 1-2 of relay t
2/174TEPU. Lif Term ll wire on relay coil terminal. Hook up test switch bebreen wire and terminal 11 for 120V AC power. Connect timer STAR1 acmss relay coil. SIOP across any terndnal other than 1-2.
175 300 Sec. Omi,t gtmper at 1-2 and pmceed as in 2A other s s.
Page 7 of 9 ST. LUCIE UNIT 2 MAINTENANCE PROCEDURE NO. 2-0910053, REVISION 4 12 MONTH TEST OF AUTOMATIC LOAD SEQUENCE RELAYS 9.0 DETAILED PROCEDURE: (continued) 9.1 (continued)
- 3. 480V LC/MCC (continued)
INITIALDATE 2HVA/A(Zi-3A Standby 492 24 Sec. Have the NPS place unit to be 2HVA/ACC-3B 494 24 Sec. worked on on stazzIby. Lift Tenn ll wire of 2L/IDPU relay.
Lift one wire from terminals for contact 1-2. Connect test switch between wire lifted fran Term ll, and Tenn ll to power relay. Connect timer SMT Term ll to Tenn 12, SIGP across 1-2 contact of 2L relay 2HVE-ll Running 468 38 Sec. Omit if fan is on standby.
2HVE-12 or 468 38 Sec. Junper 2LflXPU 1-2. Lif t Standby Tezm ll wire and conelet test switch. Hook up timer, SThRZ Tezm ll to Tezm 12, SIOP across a s re contact.
2HVE-13A Standby 490 24 Sec. Lift wize to Tenn ll of 491 24 Sec. 2LfEPU relay. Lift wire to 2 of contact 1-2. Connect test switch between wire fran Term 11 relay. Hook up tbner SZARZ Term ll to Tenn 12 SIOP across contact 1-2.
2HVE-9A Standby 503 24 Sec. Liftwire to Tenn 11 of 2HVEHB 504 24 Sec. 2LfiDPU relay. Lift wire to 2 of contact 1-2. Connect test switch between Tezm 11 lifted wire and relay. Hock up timer SZARZ Tenn ll to Tezm 12, SIGP across contact 1"2.
Running 505 24 Sec. Jumper contacts 1-2 of relay 2HVSHB 506 24 Sec. 2LfZZPU. Liftwire to terminal 12 on 2L/TDPU. Connect test switch between Tenn 12 wire and tennirml. Hook up timer, STAKZ Tezm 11 to Term 12, SIGP across any convenient s ze contact.
/R4
1 Page 8 of 9 h ~ ~ ~ ST. LUCIE UNIT 2 MAINTENANCE PROCEDURE NO. 2-0910053, REVISION 4 12 MONTH TEST OF AUTOMATIC LOAD SEQUENCE RELAYS
~I 9.0 DETAILED PROCEDURE: (continued) 9.1 (continued)
- 3. 480V LC/MCC (continued)
KEMAL OH~1AATION 2A D G F.O. 1126 3 Sec. With pump not running, lift /R4 Trans. Pump wire Ll to relay coil and 2B D/G F.O. 1136 3 Sec. connect test switch fran Ll to Trans+ Pump TBO-9 (in excitation cubicle).
LiftTerminal 5 of contact 1-5. Hook up tissr. Start across coil. Stop across contact 1-5.
18 Sec. Jumper 2Ll/IDPU 1-5 contact.
18 Sec. t Lif wire to relay coil ard 2HVE-3A 18 Sec. t connect tes switrh. Connect 2HVE-3B 18 Sec. timer. STABT across relay coil. SIOP across any terminal other than 1-5.
If the fan is not running, liftwire to relay coil aml connect switch. Lift terminal 5 of contact 1-5.
Hook up timer. STAK1 across coil. SKP across terminal 1-5.
- NOTE These items have been added to satisfy safeguards test requirements. /R4 NOTE If it is more convenient, make hookups at terminal boards rovided the same result is obtained.
NOTES
- 1. Containment cooling fans are not to be cycled. If timer is out of spec, obtain clearance, retime or repair relay. Tech. Spec. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Timers must be calibrated (checked) in the same position as mounted.
- 2. Equipment on MCCs - If timer is out of specs, obtain clearance, remove O.L. heaters, reset/repair relay, t
tes t wi thou 0.L. hea ters. When comple te, res tore O.L. heaters. Timers must be calibrated (checked) in the same osition as mounted.
Page 9 of 9
~ ~ ~ ST. LUCIE UNIT 2 MAINTENANCE PROCEDURE NO. 2-0910053, REVISION 4 12 MONTH TEST OF AUTOMATIC LOAD SEQUENCE RELAYS 9.0 DETAILED PROCEDURE: (continued) 9.1 (continued)
- 3. 480V LC/MCC (continued)
NOTES (continued)
- 3. 2L relay for 2A and 2B charging pumps are in RTGB-205.
All connections are made at the RTGB. 2C charging um 2L rela is in wirin box NS at switch ear.
Completed by Da te Verified by Da te Electrical Supervisor Sat Date Unsa t Comments':