|
---|
Category:License-Operator
MONTHYEARML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21281A1202021-10-0808 October 2021 GFE Results, September 2021 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21256A1412021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-5 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A1492021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-9 ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21193A2702021-07-22022 July 2021 Operator Licensing Examination Approval NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations ML20342A1932020-12-0707 December 2020 Confirmation of Initial License Examination ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20091M6252020-03-26026 March 2020 GFE Results, March 2020 ML20077K2022020-03-17017 March 2020 NRC Form 536 Operator Licensing Examination Data ML19276D7052019-10-0303 October 2019 GFE Results, September 2019 IR 05000266/20193012019-09-17017 September 2019 NRC Initial License; Examination Report 05000266/2019301; 05000301/2019301 (DRS-R.Baker) 2023-08-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21256A1412021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-5 ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1492021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-9 ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21193A2702021-07-22022 July 2021 Operator Licensing Examination Approval NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations ML20342A1932020-12-0707 December 2020 Confirmation of Initial License Examination ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20091M6252020-03-26026 March 2020 GFE Results, March 2020 IR 05000266/20193012019-09-17017 September 2019 NRC Initial License; Examination Report 05000266/2019301; 05000301/2019301 (DRS-R.Baker) ML22133A2392019-07-31031 July 2019 Form ES-201-3 ML22133A2442019-07-31031 July 2019 Form ES-401-9 ML22133A2302019-07-31031 July 2019 Form ES-201-1 2023-08-09
[Table view] |
Text
Appendix D Scenario Outline Form ES-D-1 Facility: _Point Beach_____ Scenario No.: _1___________ Op-Test No.: _2017____
Examiners: ___________________________ Operators: _____________________________
Initial Conditions: _Unit 1 is at approximately 100%. Unit 2 is on ice melt. 1PT-950, Loop B Containment Pressure has been removed from service. Repairs are expected to be complete during the upcoming refueling outage. 1W-3B, Control Rod Shroud Fan is OOS due to imminent motor failure. ____
Turnover: Normal Shift routine. Lower power utilizing OP 3A, Power Operation to Hot Standby at _
30%/hr in preparation for refueling outage _______________________________________________
Event Malf. No. Event Event No. Type* Description I-BOP 1 XMT1CNM014A I-SRO 1PT-947, Loop A Containment Pressure Transmitter fails low TS-SRO I-BOP 1PC-2273, Feedwater Heater Emergency Bypass Valve Controller 2 CNH1CFW003F I-SRO oscillates in automatic 3 XMT1AFW005A TS-SRO 0LT-4040, T-24A CST Level Transmitter fails low R-RO 4 ANN-C02D-A09 N-BOP 1X01, Main Transformer loss of cooling (rapid down power)
R-SRO C-RO 5 CNH1PCS004F 1P-2A, Auto Charging Pump controller oscillation failure C-SRO 6 MAL1RCS001 M-ALL Large Break LOCA BKR1RHR001 C-BOP 1P-10A, RHR pump fails to start in Auto 7 MOT1RHR002 1P-10B, RHR pump trips upon starting RLY1PPL020 8 RLY1PPL021 C-BOP Containment Spray fails to actuate, manual alignment required.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: _Point Beach_____ Scenario No.: _2___________ Op-Test No.: _2017____
Examiners: ___________________________ Operators: _____________________________
Initial Conditions: _Unit 1 is in OP 1C, Startup to Power Operation, at approximately 29% post _
chemistry hold coming out of a forced outage. At Chemistrys request B Train of Main Feed and _
Condensate have been running for 5 minutes for iron flushing. 1W-3B, Control Rod Shroud Fan _
is OOS due to imminent motor failure. 1PT-950, Loop B Containment Pressure has been removed _
from service. Repairs are expected to be complete during the upcoming refueling outage.__________
Turnover: Secure 1P-28B, SGFP and 1P-25B, Condensate Pump. Raise power to 50%. _________
Event Malf. No. Event Event No. Type* Description N-BOP 1 Secure SG Feed Pump and Condensate Pump N-SRO R-RO 2 N-BOP Raise power to 50%
R-SRO I-BOP 3 XMT1SGN001A I-SRO 1FI-464, SG Steam Flow fails slowly high TS-SRO I-BOP 4 XMT1MSS009A I-SRO 1PT-486, Turbine First Stage Pressure fails low TS-SRO C-RO 1P-1B, RCP Seal leak develops, which degrades requiring reactor 5 MAL1RCP001B C-SRO trip 6 MAL1RCS003F M-ALL Small Break LOCA from RTD Bypass Line occurs on reactor trip MAL1PPL001A C-RO Reactor fails to trip 7 MAL1PPL001B (CSP-S.1, Response to Nuclear Power Generation/ATWS)
MOT1SIS001 C-BOP 1P-15A, SI Pump trips upon starting 8 BKR1SIS002 1P-15B, SI Pump fails to start in Auto
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: _Point Beach_____ Scenario No.: _3___________ Op-Test No.: _2017____
Examiners: ___________________________ Operators: _____________________________
Initial Conditions: _Unit 1 was lowered to approximately 75% at the request of MISO/ATC due to grid stability issues. Grid stability has been restored and the unit is ready to be returned to full power in__
accordance with OP 1C, Startup to Power Operations. 1P-2B, Charging Pump is OOS and isolated _
per OI 50, Charging Pump Isolation for pump repairs. 1W-3B, Control Rod Shroud Fan is OOS due_
to imminent motor failure. 1PT-950, Loop B Containment Pressure has been removed from service._
Repairs are expected to be complete during the upcoming refueling outage. ____________________
Turnover: Commence raising power to 100% _
Event Malf. No. Event Event No. Type* Description C-BOP C-SRO P-32A, Service Water Pump trip with reduced head capacity on two 1 BKR1SWS001 running SW pumps TS-SRO C-BOP 1RE-219, SG Blowdown Monitor fails high off scale 2 XMT1RMS076A C-SRO 1MS-2083, HX-1A SG Sample Isolation Control Valve fails open R-RO N-BOP 3 MAL1RCS008A SG A Tube Leak approximately 10 gpm (rapid down power)
R-SRO TS-SRO C-BOP C-SRO Running CCW Pump seal leak, lowering surge tank 4 MAL1CCW002A (Pumps need to be shifted)
TS-SRO 5 MAL1GEN006 M-ALL Voltage Regulator Trouble leading to a Main Generator Lockout MALCRF001-B6 MALCRF001-B8 6 MALCRF001-C5 C-RO Multiple (4) Stuck Rods post trip MALCRF001-E11 7 MAL1RCS008A M-ALL SGTL turns into SGTR CNH1PCS007B 8 CNH1PCS008B C-RO Spray valves fail causing use of the PORV for RCS depressurization
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: _Point Beach_____ Scenario No.: _4___________ Op-Test No.: _2017____
Examiners: ___________________________ Operators: _____________________________
Initial Conditions: _Unit 1 is at approximately 100%. 1LT-112 VCT Level Transmitter has failed low, _
I&C expect repairs to be completed within the hour and returned to service by the end of shift. 1W-3B, Control Rod Shroud Fan is OOS due to imminent motor failure._______________________________
Turnover: Start 1P-27A, Heater Drain Tank Pump, and secure 1P-27C Heater Drain Tank Pump____
per OP 2A, Normal Power Operations, Attachment M, in preparations for maintenance. Lower power utilizing OP 3A, Power Operation to Hot Standby, in preparation for TS 3, Main Turbine Stop and Governor Valve with Turbine Trip_(Biannual)
Event Malf. No. Event Event No. Type* Description N-BOP 1 Shift Heater Drain Tank Pumps, start 1P-27A, secure 1P-27C N-SRO R-RO 2 N-BOP Down Power for TS-3 R-SRO I-RO I-SRO NI-43, PR NI fails low fast enough to cause outward rod motion near 3 MAL1NIS007C 12-15 steps/min.
TS-SRO I-BOP I-SRO 1LT-471, SG Level fails low slowly 4 XMT1SGN012A (Manual SG level control)
TS-SRO I-RO 1LT-141, VCT Level Transmitter fails low, causing an auto shift to XMT1CVC020A I-SRO the RWST. (Manual reactor trip required) 5 See SEG The first set of Reactor Trip push buttons fails to cause a reactor trip, TS-SRO but the second set used is successful 6 MAL1SGN003B M-ALL Steam Generator Fault in Containment on Reactor Trip 1P-53, Motor Driven Auxiliary Feedwater Pump sheared shaft and PMP1AFW004 C-BOP 1P-29, Turbine Driven Auxiliary Feedwater Pump trips on over 7 PMP1AFW002 speed (CSP-H.1, Response to Loss of Secondary Heat Sink)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor