Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Both Unit-2 emergency busses are de-energized Only Unit-2 is in ECA-0.0 Attempts to re-energize either emergency bus have failed INITIATING CUE You have been requested to perform the "Turbine Building Operations" attachment of 2-ECA-0.0.

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM N1578 TASK Perform local actions in the turbine building in response to a loss of all AC power (2-ECA-0.0, SOER-99-1).

TASK STANDARDS Hydrogen was vented from the main generator, the condenser vacuum breaker was opened, nitrogen was isolated to the LP turbines, and the hotwell makeup valves were isolated K/A

REFERENCE:

05EA1.04 (3.5/3.9)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 10 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS 2016 NRC EXAM Page: 2 of 9 IN PLANT I

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM N1578 READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES Before being evaluated on the task, the trainee must have completed the reactor operator's course checkout during which the objectives listed below would have been addressed.

INITIAL CONDITIONS Both Unit-2 emergency busses are de-energized Only Unit-2 is in ECA-0.0 Attempts to re-energize either emergency bus have failed 2016 NRC EXAM Page: 3 of 9 IN PLANT I

INITIATING CUE You have been requested to perform the "Turbine Building Operations" attachment of 2-ECA-0.0.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT None PERFORMANCE STEPS START TIME __________

1 Open 2-GM-8 to vent hydrogen from the main generator. Procedure Step 1 CRITICAL STEP SAT [ ] UNSAT [ ]

Standard 2-GM-8 is simulated to be turned in the counter-clockwise direction until it is full open Simulation Cue(s) The valve handwheel has stopped turning Notes/Comments 2016 NRC EXAM Page: 4 of 9 IN PLANT I

2 Open 2-AS-MOV-200 to break vacuum on the condenser. Procedure Step 2 CRITICAL STEP SAT [ ] UNSAT [ ]

Standard Applicant simulates engaging the clutch lever on 2-AS-MOV-200 and turning the handwheel in the counter-clockwise direction.

Simulation Cue(s) If applicant does not simulate engaging the clutch say, "The handwheel is turning freely and stem is not rising.

After MOV clutch is engaged and handwheel turned tell applicant -

You hear noise The MOV handwheel has stopped turning and the stem is showing full open Notes/Comments:

3 Close 2-GN-203 to isolate nitrogen injection to the low-pressure Procedure Step 3 turbine exhaust.

SAT [ ] UNSAT [ ]

Standard 2-GN-203 is verified closed by simulating turning in the clockwise direction and checking stem position is down Simulation Cue(s) You are unable to turn the handwheel in the clockwise direction and the stem position is as you see it.

Notes/Comments 2016 NRC EXAM Page: 5 of 9 IN PLANT I

4 Isolate Hotwell Makeup valves by closing the following: Procedure Step

  • 2-CN-151, Inlet to Makeup Valve 2-CN-LCV-209-1 Isol Valve 4&5
  • 2-CN-148, Inlet to 2-CN-LCV-209-2 Isol Valve
  • 2-CN-150, 2-CN-LCV-209-2 Bypass Valve
  • 2-CN-143, 2-CN-LCV-208 Bypass Valve CRITICAL STEP SAT [ ] UNSAT [ ]

Standard Applicant simulates turning 2-CN-151 in the clockwise direction-critical Applicant simulates turning 2-CN-148 in the clockwise direction-critical.

2-CN-150 & 143 are verified in the closed position.

Each valve is closed or verified closed by simulating turning the handwheel in the clockwise direction and checking that the stem is fully in the down position.

Simulation Cue(s) 2-CN-151 - The valve handwheel has stopped turning and the stem is fully in the down position.

2-CN-148 - The valve handwheel has stopped turning and the stem is fully in the down position.

2-CN-150 - You are unable to turn the handwheel in the clockwise direction and the stem position is as you see it.

2-CN-143 - You are unable to turn the handwheel in the clockwise direction and the stem position is as you see it.

Notes/Comments 2016 NRC EXAM Page: 6 of 9 IN PLANT I

5 Close 2-CN-141, Inlet To Hotwell High Level Divert Isol Valve Procedure Step 6 SAT [ ] UNSAT [ ]

Standard 2-CN-141 is verified closed by simulating turning in the clockwise direction and checking stem position is down Simulation Cue(s) You are unable to turn the handwheel in the clockwise direction and the stem position is as you see it.

Notes/Comments 6 Initiate purge of the main generator using CO2 Procedure Step 7 SAT [ ] UNSAT [ ]

Simulation Cue(s) Assume that another operator has initiated purging the generator Notes/Comments 2016 NRC EXAM Page: 7 of 9 IN PLANT I

7 Inform the control room operator that all local turbine building Procedure Step _____

operations are complete.

SAT [ ] UNSAT [ ]

Simulation Cue(s) The control has been notified Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

2016 NRC EXAM Page: 8 of 9 IN PLANT I

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required) 2016 NRC EXAM Page: 9 of 9 IN PLANT I

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Both MG sets are secured.

Unit 1 is in Mode 3 with preparations being made to withdraw the Shutdown Banks for startup.

All applicable Initial conditions of 1-OP-58.1, Section 3.0 are met.

You have a Synchronizing Switch key.

INITIATING CUE You are requested to place the initial rod drive MG set in service and parallel the second MG with the running MG set in accordance with 1-OP-58.1.

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Place both rod control motor generator set in operation with both rod control motor generator sets shut down (1-OP-58.1).

TASK STANDARDS Task was performed as directed by the procedure referenced in the task statement within parentheses (one of the underlined procedures if several are cited)

K/A

REFERENCE:

001A4.08 (3.7/3.4)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 20 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS 2016 NRC EXAM Page: 2 of 14 IN PLANT J

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES Before being evaluated on the task, the trainee must have completed the reactor operator's course checkout during which the objectives listed below would have been addressed.

INITIAL CONDITIONS Both MG sets are secured.

Unit 1 is in Mode 3 with preparations being made to withdraw the Shutdown Banks for startup.

All applicable Initial conditions of 1-OP-58.1, Section 3.0 are met.

You have a Synchronizing Switch key.

2016 NRC EXAM Page: 3 of 14 IN PLANT J

INITIATING CUE You are requested to place the initial rod drive MG set in service and parallel the second MG with the running MG set in accordance with 1-OP-58.1.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT None PERFORMANCE STEPS START TIME __________

1 Check initial conditions and review precautions and limitations Procedure Step 5.1.1 & 5.1.2 SAT [ ] UNSAT [ ]

Standards Initial conditions are checked and precautions and limitations are reviewed Notes/Comments 2016 NRC EXAM Page: 4 of 14 IN PLANT J

2 Ensure all reactor trip breakers and reactor trip bypass breakers Procedure Step 5.1.3 are open.

SAT [ ] UNSAT [ ]

Standards The position is checked on all four breakers Simulation Cue(s) A green OPEN flag is indicating an all of the breakers Notes/Comments 3 Check that both motor generator set output breakers are racked to Procedure Step 5.1.4 CONNECT.

SAT [ ] UNSAT [ ]

Standards Output breakers are verified in the connect position Simulation Cue(s) 1-ED-BKR-01A1 and 01B1 are racked to CONNECT Notes/Comments 2016 NRC EXAM Page: 5 of 14 IN PLANT J

4 Align all switches and devices on the applicable motor generator Procedure Step 5.1.5 set control panel.

SAT [ ] UNSAT [ ]

Simulation Cue(s) Inform the trainee that each switch or device is in the position specified by the procedure as he checks them:

The Generator No. 1 Voltage Adjust potentiometer is set to the mid range position.

The Generator No. 2 Voltage Adjust potentiometer is set to the mid range position.

The Generator No. 1 Synchronize switch, is OFF.

The Generator No. 2 Synchronize switch, is OFF.

The Generator No. 1 Ammeter switch is in position A.

The Generator No. 2 Ammeter switch is in position A.

The Generator No. 1 Voltmeter switch is in position A-B.

The Generator No. 2 Voltmeter switch is in position A-B.

The 1KS grounding switch is in the OPEN position.(This switch is inside the control cabinet, DO NOT allow the cabinet to be opened)

Provide pictures of inside cabinet and 1KS switch.

Notes/Comments: The 1KS grounding switch is inside the control cabinet. DO NOT allow the operator to open the cabinet. Provide pictures of inside cabinet and switch.

5 Check that each MG set output and supply breaker lights and Procedure Step control switch indications are green. 5.1.6.a - d SAT [ ] UNSAT [ ]

Standards Output and supply breaker lights and control switch indications are checked to be GREEN Simulation Cue(s) All breaker lights and control switch indications are green Notes/Comments 2016 NRC EXAM Page: 6 of 14 IN PLANT J

6 Check the applicable relays for red flags. Procedure Step 5.1.6.e SAT [ ] UNSAT [ ]

Standards Relay flags are checked Simulation Cue(s) None of the relays listed in the procedure show red flags (No RED flags should be showing)

Notes/Comments 7 Close the motor input circuit breaker for the motor generator set to Procedure Step 5.1.7 be started.

Critical Step SAT [ ] UNSAT [ ]

Standards MG set supply breaker is closed Simulation Cue(s) There is audible indication that the MG set is accelerating Notes/Comments: Precaution and Limitation Step 4.5 - When placing the first MG Set in operation, then the preferred MG-Set is "B", because all synchronizing circuitry for both MG sets is located in the "A" Cabinet. If a problem exists synchronizing MG sets and "A" is already In-Service, then when the "A" cabinet is open to work on the "B" Circuitry the "A" MG Set could be tripped.

2016 NRC EXAM Page: 7 of 14 IN PLANT J

8 Flash the field for the generator, and adjust the generator's voltage, Procedure Step 5.1.8 as required.

Critical Step SAT [ ] UNSAT [ ]

Standards GEN FIELD FLASH button is depressed and voltage is adjusted to normal Simulation Cue(s) Voltage increased and stabilized at approximately 235 volts Simulation Cue(s) After adjustment, inform the trainee that voltage now reads 260 volts Notes/Comments 9 Close the generator output circuit breaker for the motor generator Procedure Step 5.1.9 being placed in service.

Critical Step SAT [ ] UNSAT [ ]

Standards 1-ED-MG-1A or 1B is closed Simulation Cue(s) The output breaker RED light is lit Notes/Comments 2016 NRC EXAM Page: 8 of 14 IN PLANT J

10 If MG set voltage is not at 260 volts, then adjust the voltage adjust Procedure Step 5.1.10 potentiometer to 260 volts.

SAT [ ] UNSAT [ ]

Standards Voltage is adjusted to approximately 260 volts Simulation Cue(s) Voltage is approximately 260 volts Notes/Comments: The following steps are for paralleling the second MG set IAW section 5.2 of the procedure.

11 Check initial conditions and review precautions and limitations Procedure Step 5.2.1 & 5.2.2 SAT [ ] UNSAT [ ]

Standards Initial conditions are checked and precautions and limitations are reviewed (Previously reviewed in section 5.1 of the procedure)

Simulation Cue(s) Tell applicant - Time compression is being used and Reactor Trip Breakers have been closed IAW Initial Conditions, Step 3.3 Notes/Comments:

2016 NRC EXAM Page: 9 of 14 IN PLANT J

12 Ensure that the voltage potentiometer is in mid-position and the Procedure Step synchronize switch is OFF. 5.2.3.a & b SAT [ ] UNSAT [ ]

Standards Voltage potentiometer is verified in mid-position and the synchronize switch is verified OFF Simulation Cue(s) Switches are in the desired position Notes/Comments 13 Reset relay flags or motor generator set breakers, if required. Procedure Step 5.2.3.c SAT [ ] UNSAT [ ]

Standards Relay flags are checked Simulation Cue(s) No relays have RED flags Notes/Comments 2016 NRC EXAM Page: 10 of 14 IN PLANT J

14 Close the motor input circuit breaker for the motor generator set to Procedure Step 5.2.4 be started.

Critical Step SAT [ ] UNSAT [ ]

Standards MG set supply breaker is closed Simulation Cue(s) There is audible indication that the MG set is accelerating Notes/Comments 15 Flash the field for the generator, and adjust the generator's voltage, Procedure Step 5.2.5 as required.

Critical Step SAT [ ] UNSAT [ ]

Standards GEN FIELD FLASH button is depressed and voltage is adjusted to normal Simulation Cue(s) Voltage increased and stabilized at approximately 235 volts Notes/Comments 2016 NRC EXAM Page: 11 of 14 IN PLANT J

16 Adjust the voltage potentiometer as required, to match the running Procedure Step voltage. 5.2.5.e Critical Step SAT [ ] UNSAT [ ]

Standards Voltage is adjusted to approximately +/- 5 volts of running voltage (running voltage is 260 volts)

Simulation Cue(s) After adjustment, inform the trainee that voltage now reads +/- 5 volts of running voltage Notes/Comments 17 Turn the synchronize switch to the ON position, and verify that the Procedure Step 5.2.5.f applicable motor generator set's generator output breaker closes.

Critical Step SAT [ ] UNSAT [ ]

Standards Applicant inserts Synchronizing Switch Key and Synchronize switch is placed in ON Simulation Cue(s) Inform the trainee that the MG set output breaker has closed Notes/Comments 2016 NRC EXAM Page: 12 of 14 IN PLANT J

18 Turn the synchronize switch to the OFF position. Procedure Step5.2.5.h SAT [ ] UNSAT [ ]

Standards Synchronize switch is placed in OFF Notes/Comments 19 Verify voltage indicates approximately the same on each MG set. If Procedure Step 5.2.5.i not, then notify system engineering.

SAT [ ] UNSAT [ ]

Standards Voltage is checked the same on both MG sets Simulation Cue(s) Voltage indicates approximately the same on each MG set Notes/Comments 20 Red-flag the motor generator set's generator output circuit breaker. Procedure Step 5.2.5.j SAT [ ] UNSAT [ ]

Standards MG set output breaker control switch is placed in CLOSE Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

2016 NRC EXAM Page: 13 of 14 IN PLANT J

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required) 2016 NRC EXAM Page: 14 of 14 IN PLANT J

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Equipment rotation is in progress 1-GW-F-1B is running Equipment status has been reviewed to verify station configuration will support performance of this procedure INITIATING CUE You are requested to shift process vent blowers in accordance with 0-OP-23.3 Section 5.3 Shifting from 1-GW-F-1B, 1B Waste Gas Process Vent Blower, to 1-GW-F-1A, 1A Waste Gas Process Vent Blower

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Shift Process Vent System blowers and isolate the out-of-service blower (0-OP-23.3).

TASK STANDARDS Task was performed as directed by the procedure referenced in the task statement within parentheses (one of the underlined procedures if several are cited)

Work was performed in compliance with the Radiation Work Permit; exposure to surface and airborne contamination was minimized; and ALARA principles were applied Final equipment configuration is as follows:

1-GW-F-1A = Running.

1-GW-F-1B = De-energized and Isolated.

Flow = between 270 and 330 scfm.

K/A

REFERENCE:

071A1.06 (2.5/2.8)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 10 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

2016 NRC EXAM Page: 2 of 10 IN PLANT K

Date EVALUATOR'S COMMENTS 2016 NRC EXAM Page: 3 of 10 IN PLANT K

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES Before being evaluated on the task, the trainee must have completed the reactor operator's course checkout during which the objectives listed below would have been addressed.

INITIAL CONDITIONS Equipment rotation is in progress 1-GW-F-1B is running Equipment status has been reviewed to verify station configuration will support performance of this procedure 2016 NRC EXAM Page: 4 of 10 IN PLANT K

INITIATING CUE You are requested to shift process vent blowers in accordance with 0-OP-23.3 Section 5.3 Shifting from 1-GW-F-1B, 1B Waste Gas Process Vent Blower, to 1-GW-F-1A, 1A Waste Gas Process Vent Blower EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT Administrative key PERFORMANCE STEPS START TIME __________

1 Check initial conditions and review precautions and limitations. Procedure Step 5.3.1 & 5.3.2 SAT [ ] UNSAT [ ]

Standards Initial condition is checked and precautions and limitations are reviewed Notes/Comments 2016 NRC EXAM Page: 5 of 10 IN PLANT K

2 Open the following valves for 1-GW-F-1A: Procedure Step 5.3.3

  • 1-GW-135, 1A Waste Gas Process Vent Blower Suct Isol Valve
  • 1-GW-138, 1A Waste Gas Process Vent Blower Disch Isol Valve Critical Step SAT [ ] UNSAT [ ]

Standards The valves are simulated to be turned in the counter-clockwise direction until the handwheel stops turning Simulation Cue(s) The handwheel has stopped turning and the position indicating stem is full out.

If asked: 1-GW-135 has been independently verified.

Notes/Comments 3 Turn ON 1-EP-BKR-1A2-1 G3, 1A Waste Gas Process Vent Procedure Step 5.3.4 Blower Circuit Breaker 1-GW-F-1A.

Critical Step SAT [ ] UNSAT [ ]

Standards The breaker is simulated to be turned to the ON position Simulation Cue(s) The breaker indicates in the ON position Notes/Comments 2016 NRC EXAM Page: 6 of 10 IN PLANT K

4 Start 1-GW-F-1A, PROCESS VENT BLOWER, at Waste Disposal Procedure Step 5.3.5 Panel in Control Room.

SAT [ ] UNSAT [ ]

Standards The operator simulates calling the control room to start 1-GW-F-1A Simulation Cue(s) 1-GW-F-1A is running Notes/Comments 5 Stop 1-GW-F-1B, PROCESS VENT BLOWER, at Waste Disposal Procedure Step 5.3.6 Panel in Control Room.

SAT [ ] UNSAT [ ]

Standards The operator simulates calling the control room to stop 1-GW-F-1B Simulation Cue(s) 1-GW-F-1B has been stopped Notes/Comments 2016 NRC EXAM Page: 7 of 10 IN PLANT K

6 Verify 1-GW-FI-108, PROCESS VENT FLOW, at Waste Disposal Procedure Step 5.3.7 Panel in Control Room, is reading 270-330 scfm.

SAT [ ] UNSAT [ ]

Standards The operator simulates calling the control room to verify flow Simulation Cue(s) Backboards operator reports flow is 350 scfm Notes/Comments 7 IF flow is >330 scfm, THEN throttle closed l-GW-l38, 1A Waste Gas Procedure Step Process Vent Blower Disch Isol Valve, as required to obtain 270- 5.3.7.b 330 scfm.

Critical Step SAT [ ] UNSAT [ ]

Standards 1-GW-138 is simulated to be turned in the clockwise direction Simulation Cue(s) Once the trainee throttles closed on the discharge valve, state that flow is now 300 scfm Notes/Comments 2016 NRC EXAM Page: 8 of 10 IN PLANT K

8 Turn OFF breaker 1-EP-BKR-1C2-1 D3, 1B Waste Gas Process Procedure Step 5.3.8 Vent Blower Circuit Breaker 1-GW-F-1B.

SAT [ ] UNSAT [ ]

Standards The breaker is simulated to be turned to the OFF position Simulation Cue(s) The breaker indicates in the OFF position Notes/Comments 9 Close the following valves for 1-GW-F-1B, 1B Waste Gas Process Procedure Step 5.3.9 Vent Blower:

  • 1-GW-139, 1B Waste Gas Process Vent Blower Suct Isol Valve
  • 1-GW-142, 1B Waste Gas Process Vent Blower Disch Isol Valve SAT [ ] UNSAT [ ]

Standards The valves are simulated to be turned in the clockwise direction until the handwheel stops turning Simulation Cue(s) The handwheel has stopped turning and the position indicating stem is full in.

Another operator will be assigned to independently verify the procedure.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

2016 NRC EXAM Page: 9 of 10 IN PLANT K

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required) 2016 NRC EXAM Page: 10 of 10 IN PLANT K

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS A LOCA has occurred 1-E-0 has been completed through step 5 INITIATING CUE You are requested to continue performing 1-E-0, at step 6, Verify SI Flow.

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM R730 TASK Verify safety injection flow (1-E-0).

TASK STANDARDS Charging suction was aligned to RWST, and SI flow was established to the reactor K/A

REFERENCE:

011EA1.13 (4.1/4.2)

ALTERNATE PATH:

Boron Injection Tank MOVs fail to open requiring alternate flow path to be used TASK COMPLETION TIMES Validation Time = 10 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2016 NRC EXAM Page: 2 of 8 SIM JPM A

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM R730 READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES The trainee has completed the applicable course knowledge training at the Reactor Operator level.

INITIAL CONDITIONS A LOCA has occurred 1-E-0 has been completed through step 5 INITIATING CUE You are requested to continue performing 1-E-0, at step 6, Verify SI Flow.

NAPS 2016 NRC EXAM Page: 3 of 8 SIM JPM A

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT A copy of 1-E-0 signed off through step 5 is available PERFORMANCE STEPS START TIME __________

1 VERIFY HIGH-HEAD COLD LEG SI FLOW-INDICATED Procedure Step 1-E-0 step 6 & RNO SAT [ ] UNSAT [ ]

Standards Applicant notes that there is no cold leg SI flow indicated and goes to the RNO to check individual flow transmitters Attachment 6 is initiated by the step 6 RNO or using CAP item 2 Cue(s) If the applicants states that another person is required to perform attachment 6 then say You are requested to perform attachment 6 Notes/Comments The applicant is expected to initiate attachment 6 using either the step 6 RNO or the Continuous Action Page item 2. It would be critical if the candidate fails to initiate attachment 6 and restore SI flow prior to transitioning from 1-E-0 to another procedure.

NAPS 2016 NRC EXAM Page: 4 of 8 SIM JPM A

2 Manually align charging pump suction from the refueling water Procedure Step storage tank. 1&2 CRITICAL STEP SAT [ ] UNSAT [ ]

Standards 1-CH-MOV-1115B and/or 1115D is opened 1-CH-MOV-1115C and/or 1115E is closed Notes/Comments 3 Close at least one normal charging isolation valve. Procedure Step _3__

SAT [ ] UNSAT [ ]

Standards Either 1-CH-MOV-1289A or 1-CH-MOV-1289B is closed Simulation Cue(s) 1-CH-MOV-1289A or 1-CH-MOV-1289B have green lights lit and red lights not lit Notes/Comments 4 Close BIT RECIRC valves. Procedure Step __4__

SAT [ ] UNSAT [ ]

Standards 1-SI-TV-1884A, 1884B, and 1884C are closed Notes/Comments NAPS 2016 NRC EXAM Page: 5 of 8 SIM JPM A

5 OPEN AT LEAST ONE BIT OUTLET VALVE - NO. Procedure Step __5__

(alt path)

Standards OPEN push-buttons for 1-SI-MOV-1867C and/or 1867D are depressed Notes/Comments - BIT Outlet MOVs will not OPEN. RNO action taken (1-SI-MOV-1836 will not open) Operator will obtain key #21 and open EITHER 1-SI-MOV-1869A OR 1-SI-MOV-1869B and proceed to Step 7.

6 Turn on control power and open 1-SI-MOV-1836 -NO. Procedure Step (alt path) _5 RNO Standards OPEN push-button for 1-SI-MOV-1836 is depressed Notes/Comments SI-MOV-1836 will not open 7 Turn on control power and open 1-SI-MOV-1869A or 1869B. Procedure Step

_5 RNO CRITICAL STEP SAT [ ] UNSAT [ ]

Standards EITHER 1-SI-MOV-1869A OR 1-SI-MOV-1869B is opened.

Cue(s) IF the operator requests that the key be delivered from the WCC then state: You have permission to use the key from the Appendix R/Vital area key box.

Notes/Comments - Operator will obtain key #21 and open EITHER 1-SI-MOV-1869A OR 1-SI-MOV-1869B and proceed to Step 7.

NAPS 2016 NRC EXAM Page: 6 of 8 SIM JPM A

8 Verify the charging pumps are running. Procedure Step __7__

SAT [ ] UNSAT [ ]

Standards Operator ensures two pumps are running, if available.

Notes/Comments 9 Verify that high-head safety injection flow to the cold-legs is Procedure Step _____

indicated.

SAT [ ] UNSAT [ ]

Standards Adequate cold-leg safety injection flow is indicated Cue(s) Assume that another operator will complete the procedure Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2016 NRC EXAM Page: 7 of 8 SIM JPM A

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE R730 TASK Verify safety injection flow (1-E-0).

CHECKLIST

_______ Recall IC #1 (100% power)

_______ Enter malfunctions SI 108, 0701, 0702 and RC 04 100% degradation

_______ Enter malfunctions for 1-SI-MOV-1836, 1-SI-MOV-1867C, and 1-SI-MOV-1867D

_______ Go to Run

_______ Perform 1st 4 steps of 1-E-0

_______ Place the simulator in FREEZE NAPS 2016 NRC EXAM Page: 8 of 8 SIM JPM A

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Unit 1 has been tripped, and steady-state conditions of 2,235 psig and approximately 548°F exist Both motor-driven auxiliary feedwater pumps are unavailable Turbine-driven auxiliary feedwater pump is running All main feedwater pumps, heater drain pumps, and condensate pumps have been stopped due to a feed-line break in the turbine building An operator is standing by in the AFPH with a copy of 1-AP-22.4 INITIATING CUE You are requested to respond to a Loss of Both Motor-Driven AFW pumps in accordance with 1-AP-22.4.

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM R524 TASK Supply feedwater to all three steam generators using the HCV header (1-AP-22.4).

TASK STANDARDS The HCV header has been aligned to feed all SGs from the Terry Turbine and only one RCP is running.

K/A

REFERENCE:

061-A2.04 (3.4/3.8)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 15 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2016 NRC EXAM Page: 2 of 15 SIM JPM B

NAPS 2016 NRC EXAM Page: 3 of 15 SIM JPM B

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM R524 READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES The trainee has completed the applicable course knowledge training at the Reactor Operator level.

INITIAL CONDITIONS Unit 1 has been tripped, and steady-state conditions of 2,235 psig and approximately 548°F exist Both motor-driven auxiliary feedwater pumps are unavailable Turbine-driven auxiliary feedwater pump is running All main feedwater pumps, heater drain pumps, and condensate pumps have been stopped due to a feed-line break in the turbine building NAPS 2016 NRC EXAM Page: 4 of 15 SIM JPM B

An operator is standing by in the AFPH with a copy of 1-AP-22.4 INITIATING CUE You are requested to respond to a Loss of Both Motor-Driven AFW pumps in accordance with 1-AP-22.4.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT None PERFORMANCE STEPS START TIME __________

1 Determine if the Main Feedwater System is in service. Procedure Step __1__

SAT [ ] UNSAT [ ]

Standards Main feed pumps are verified stopped, or initial conditions are reviewed Simulation Cue(s) Main feedwater pumps have been stopped Notes/Comments NAPS 2016 NRC EXAM Page: 5 of 15 SIM JPM B

2 Stop all but one reactor coolant pump. Procedure Step RNO 1.a Critical Step SAT [ ] UNSAT [ ]

Standards Exactly two reactor coolant pump control switches are placed in AUTO-AFTER-STOP Notes/Comments 3 Place spray valve(s) for any idle RCP(s) in manual and close. Procedure Step RNO 1.a SAT [ ] UNSAT [ ]

Standards Spray valve(s) for idle RCP(s) are placed in manual and verified closed Simulation Cue(s) After placed in manual:

1-RC-PCV-1455A(B) has red light lit for MANUAL and demand is zero Notes/Comments NAPS 2016 NRC EXAM Page: 6 of 15 SIM JPM B

4 Initiate attempts to restore main feedwater. Procedure Step RNO 1.b SAT [ ] UNSAT [ ]

Standards Operator states that he would inform unit supervisor of need to restore main feedwater Performance Assume that another operator will perform this step Cue(s)

Simulation Cue(s) Assume that another operator will perform this step Notes/Comments 5 Verify that the turbine-driven auxiliary feedwater pump is running. Procedure Step 2 SAT [ ] UNSAT [ ]

Standards Verifies that 1-FW-P-2 is running Simulation Cue(s) Turbine-driven auxiliary feedwater pump trip valves have red lights LIT and green light NOT lit. Flow is indicated.

Notes/Comments NAPS 2016 NRC EXAM Page: 7 of 15 SIM JPM B

6 Verify that emergency condensate storage tank level is greater than Procedure Step 3 40%.

SAT [ ] UNSAT [ ]

Standards Operator checks ECST indicators are > 40%

Simulation Cue(s) Emergency condensate storage tank level is 90%

Notes/Comments 7 Perform attachment 5 to align HCV header for feeding all SGs. Procedure Step 4 SAT [ ] UNSAT [ ]

Standards Operator checks with SRO for header to align Performance The SRO directs that the HCV header be used Cue(s)

Notes/Comments NAPS 2016 NRC EXAM Page: 8 of 15 SIM JPM B

8 Open the auxiliary feedwater HCV header to "A" steam generator Procedure Step 1-FW-HCV-100A. Att. 5 step 1 Critical Step SAT [ ] UNSAT [ ]

NOTE TO THE OPERATOR MAY NOT NEED TO OPEN 1-FW-HCV-100A DUE TO EVALUATOR HAVING SUFFICIENT LEVEL IN THE "A" SG. MAY ALSO OPEN AND THEN RECLOSE THE VALVE.

Standards Potentiometer for 1-FW-HCV-100A is turned in the clockwise direction Notes/Comments At some point in the JPM, this valve must be opened - sequence is not critical.

9 Open the auxiliary feedwater HCV header to "B" steam generator Procedure Step 1-FW-HCV-100B. Att. 5 step 1 Critical Step SAT [ ] UNSAT [ ]

Standards Potentiometer for 1-FW-HCV-100B is turned in the clockwise direction Notes/Comments At some point in the JPM, this valve must be opened - sequence is not critical.

NAPS 2016 NRC EXAM Page: 9 of 15 SIM JPM B

10 Open the auxiliary feedwater HCV header to "C" steam generator Procedure Step 1-FW-HCV-100C. Att. 5 step 1 SAT [ ] UNSAT [ ]

Standards Potentiometer for 1-FW-HCV-100C verified at 100%

Notes/Comments This valve should already be fully open (full clockwise position).

11 Close the auxiliary feedwater MOV header to "B" steam generator Procedure Step 1-FW-MOV-100B. Att. 5 step 2 Standards Control switch for 1-FW-MOV-100B is placed in CLOSE and held there until valve indicates closed Simulation Cue(s) 1-FW-MOV-100B has red light LIT and green light NOT lit After switch has been held in CLOSE for some period of time: 1-FW-MOV-100B has green light LIT and red light NOT lit Notes/Comments NAPS 2016 NRC EXAM Page: 10 of 15 SIM JPM B

12 Request the safeguards operator to unlock and close the discharge Procedure Step valve for 1-FW-P-3A to the HCV header, 1-FW-172. Att. 5 step 3.a SAT [ ] UNSAT [ ]

Standards Operator in AFW pump house is contacted to perform step Simulation Cue(s) 1-FW-172 is closed Notes/Comments:

Candidate may instruct Safeguards operator to perform all of step 3.

NAPS 2016 NRC EXAM Page: 11 of 15 SIM JPM B

13 Request the safeguards operator to unlock and open the following Procedure Step valves. Att. 5 step 3.b Turbine-driven auxiliary feedwater pump to the steam generator HCV header outlet isolation valve 1-FW-155 Auxiliary feedwater "A" HCV 1-FW-HCV-100A outlet isolation valve 1-FW-64 Auxiliary feedwater "B" HCV 1-FW-HCV-100B outlet isolation valve 1-FW-96 Critical Step SAT [ ] UNSAT [ ]

Standards Safeguards operator is requested to unlock and open 1-FW-155, 64, and 96 Simulation Cue(s) 1-FW-155, 1-FW-64, and 1-FW-96 are open Notes/Comments There will be a 2 minute delay until manual valves are repositioned. Safeguards operator will call to inform candidate that step 3 is complete.

NAPS 2016 NRC EXAM Page: 12 of 15 SIM JPM B

14 Slowly close the turbine-driven auxiliary feedwater pump to "A" Procedure Step steam generator valve 1-FW-MOV-100D. Att. 5 step 4 Critical Step SAT [ ] UNSAT [ ]

NOTE TO THE OPERATOR MAY HAVE CLOSED THIS VALVE EARLIER TO EVALUATOR CONTROL STEAM GENERATOR LEVEL Standards Control switch for 1-FW-MOV-100D is placed in CLOSE Simulation Cue(s) 1-FW-MOV-100D has red light LIT and green light NOT lit After switch has been held in CLOSE for some period of time: 1-FW-MOV-100D has green light LIT and red light NOT lit Notes/Comments 15 Notify control room that Attachment 5 is complete and return to 1- Procedure Step AP-22.4, step in effect. Att. 5 step 5 SAT [ ] UNSAT [ ]

Standards Operator returns to step 5 of procedure Performance Assume another operator will continue with 1-AP-22.4 Cue(s)

Simulation Cue(s) Assume another operator will continue with 1-AP-22.4 Notes/Comments

>>>>> END OF EVALUATION <<<<<

NAPS 2016 NRC EXAM Page: 13 of 15 SIM JPM B

STOP TIME __________

NAPS 2016 NRC EXAM Page: 14 of 15 SIM JPM B

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE R524 TASK Supply feedwater to all three steam generators using the HCV header (1-AP-22.4).

CHECKLIST

_____ Recall IC #332

_____ Place 1-FW-P-3A in PTL, rack out the breaker, and place sticker on switch

_____ Close 1-FW-172 using ExtremeView

_____ Enter malfunction FW2302; Delay time = 60, Trigger = 1

_____ Enter malfunction FW1301, Delay time = 0, Severity = 50, Trigger = 1

_____ Place the following on triggers:

FW_155, Delay time = 10, Ramp = 20, Trigger 2 FW_64, Delay time = 30, Ramp = 20, Trigger 2 FW_96, Delay time = 50, Ramp = 20, Trigger 2

_____ Go to RUN, insert Trigger 1, manually trip reactor and turbine, and close the reheater FCVs

_____ Place the following pumps in PULL-TO-LOCK: condensate pumps and main feedwater pumps

_____ Establish RCS pressure and temperature per initial conditions and place the simulator in freeze

_____ When called to do local lineup, insert Trigger 2 (Can report that 1-FW-172 is closed and tagged, if necessary)

_____ Once the triggers time out, report that attachment 5 step 3 lineup is complete NAPS 2016 NRC EXAM Page: 15 of 15 SIM JPM B

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Unit is stable at 100% power.

INITIATING CUE You are requested to respond to plant conditions.

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM R724 TASK Respond to a loss of reactor coolant pump seal cooling (1-AP-33.2).

TASK STANDARDS Reactor manually tripped, "C" RCP stopped, seal return isolated, and 1-RC-PCV-1455B is placed in manual and closed.

K/A

REFERENCE:

015-AA1.07 (3.5/3.4)

ALTERNATE PATH:

1-CH-MOV-1381 fails to close requiring use of alternate MOV to isolate TASK COMPLETION TIMES Validation Time = 10 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2016 NRC EXAM Page: 2 of 12 SIM JPM C

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM R724 READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES The trainee has completed the applicable course knowledge training at the reactor operator level.

INITIAL CONDITIONS Unit is stable at 100% power.

NAPS 2016 NRC EXAM Page: 3 of 12 SIM JPM C

INITIATING CUE You are requested to respond to plant conditions.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s)).

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s)).

TOOLS AND EQUIPMENT None NAPS 2016 NRC EXAM Page: 4 of 12 SIM JPM C

PERFORMANCE STEPS START TIME __________

1 Operator responds to annunciators 1C-C4 and 1C-G6 illuminating. AR 1C-C4 The operator will diagnose the event in accordance with the AR 1C-G6 annunciator response and enter 1-AP-33.2, Loss of RCP Seal Cooling.

SAT [ ] UNSAT [ ]

Standards Operator verifies that 1-CC-FI-116C and 1-CH-FI-1124 both indicate 0 gpm. Based on loss of seal cooling to the C RCP, operator enters 1-AP-33.2 Simulation Cue(s)

Notes/Comments 2 Verify that the affected reactor coolant pump(s) stopped. Procedure Step 1 of 1-AP-33.2 SAT [ ] UNSAT [ ]

Standards Operator verifies that all RCPs are running and applies RNO step to trip the reactor.

Simulation Cue(s) All reactor coolant pumps are currently running.

Notes/Comments NAPS 2016 NRC EXAM Page: 5 of 12 SIM JPM C

3 Go to 1-E-0 while continuing with this procedure. Procedure Step 1 RNO a of 1-AP-33.2 RNO Critical Step SAT [ ] UNSAT [ ]

Standards Reactor trip switches on benchboard 1-1 and/or 1-2 momentarily placed in the TRIP position Simulation Cue(s) Reactor trip breakers have green lights LIT and red lights NOT lit.

Notes/Comments 4 Verify reactor tripped. Procedure Step 1 of 1-E-0 SAT [ ] UNSAT [ ]

Standards Operator verifies reactor is tripped (RTBs open, rod bottom lights on, flux decreasing).

Notes/Comments 5 Verify turbine trip Procedure Step 2 of 1-E-0 Standards Operator verifies turbine stop valves closed, resets Reheater FCVs, and verifies G-12 open (30 sec TD).

Notes/Comments NAPS 2016 NRC EXAM Page: 6 of 12 SIM JPM C

6 Verify both ac emergency busses energized - yes. Procedure Step 3 of 1-E-0 SAT [ ] UNSAT [ ]

Standards Verifies 1H and 1J busses both energized by observing volt meters on 1H and 1J EDG control panels.

Notes/Comments 7 Check if SI is actuated Procedure Step 4 of 1-E-0 SAT [ ] UNSAT [ ]

Standards Checks low head pumps running- NO.

Any first out annunciator lit - NO.

Performance Additional crew members will continue with 1-E-0. The Unit Supervisor Cue(s) directs you to continue performance of 1-AP-33.2.

Simulation Cue(s) Additional crew members will continue with 1-E-0. The Unit Supervisor directs you to continue performance of 1-AP-33.2.

Notes/Comments NAPS 2016 NRC EXAM Page: 7 of 12 SIM JPM C

8 Stop the affected reactor coolant pump(s). Procedure Step 1.RNO b of 1-AP-33.2 Critical Step SAT [ ] UNSAT [ ]

Standards Control switch for reactor coolant pump 1C is placed in AUTO-AFTER-STOP or PULL-TO-LOCK.

Simulation Cue(s) Reactor coolant pump 1C indicates stopped.

Notes/Comments 9 Close the affected reactor coolant pump's spray valve. Procedure Step 1.RNO c of 1-AP-33.2 Critical Step SAT [ ] UNSAT [ ]

Controller for 1-RC-PCV-1455B is placed in MANUAL and the lower Standards push-button is momentarily depressed until the controller output indicates zero.

Notes/Comments NAPS 2016 NRC EXAM Page: 8 of 12 SIM JPM C

10 Check A or B RCP affected - NO Procedure Step 2 of 1-AP-33.2 Operator proceeds to step 3.

Standards Notes/Comments 11 Verify RCP seal cooling isolated - Check C RCP affected Procedure Step 3.a of 1-AP-33.2 Operator checks C RCP affected Standards Notes/Comments NAPS 2016 NRC EXAM Page: 9 of 12 SIM JPM C

12 Close 1-CH-MOV-1381 - NO. (alternate path step - valve open Procedure Step and cannot be closed) 3.b of 1-AP-33.2 SAT [ ] UNSAT [ ]

Standards Operator recognizes that 1-CH-MOV-1381 is still open (after momentarily depressing close pushbutton) and applies RNO to close 1-CH-MOV-1380.

Simulation Cue(s) Reactor coolant pump seal water return valve, 1-CH-MOV-1381, is open.

Notes/Comments Valve is open and will not close requiring operator to take action and close alternative valve 1-CH-MOV-1380.

13 Close reactor coolant pump seal water return valve Procedure Step 1-CH-MOV-1380. (alternate path step) 3.b RNO of 1-AP-33.2 Critical Step SAT [ ] UNSAT [ ]

Standards Close push-button for reactor coolant pump seal water return valve, 1-CH-MOV-1380, is momentarily depressed.

Simulation Cue(s) Reactor coolant pump seal water return valve, 1-CH-MOV-1380, is closed.

Notes/Comments NAPS 2016 NRC EXAM Page: 10 of 12 SIM JPM C

14 Affected RCP Seal injection isolation valve is CLOSED Procedure Step 3.c of 1-AP-33.2 Standards Simulation Cue(s) Assume another operator will continue with this procedure.

Notes/Comments END OF EVALUATION STOP TIME __________

NAPS 2016 NRC EXAM Page: 11 of 12 SIM JPM C

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE R724 TASK Respond to a loss of reactor coolant pump seal cooling (1-AP-33.2).

CHECKLIST

_____ Recall IC #333

_____ Do Simspray and check recorders NAPS 2016 NRC EXAM Page: 12 of 12 SIM JPM C

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Unit is stable at 100% power Annunciator window 1-AR-9 (1J-D8) ACCUM 1A-1B-1C HI-LO PRESS is illuminated Pressure in safety injection accumulator 1-SI-TK-1C is < 600 psig The nitrogen system is not aligned to supply the PORV N2 accumulators Equipment status has been reviewed and supports the performance of this procedure The outsides operator has verified an adequate source of nitrogen is available and has started the nitrogen system pump INITIATING CUE You are requested to increase pressure in safety injection accumulator 1-SI-TK-1C to between 630 and 640 psig in accordance with 1-OP-7.3, "Filling, Draining, Pressurizing, and Venting SI Accumulators."

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM R589 TASK Pressurize a safety injection accumulator (1-OP-7.3).

TASK STANDARDS Specified accumulator was pressurized with nitrogen and lineup secured.

Task was performed as directed by the procedure referenced in the task statement within parentheses (one of the underlined procedures if several are cited)

K/A

REFERENCE:

006A4.07 (4.4/4.4)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 15 Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS 2016 NRC EXAM Page: 2 of 9 SIM JPM D

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM R589 READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES The trainee has completed the applicable course knowledge training at the Reactor Operator level.

NOTE - Pre-brief required prior to entering the simulator.

INITIAL CONDITIONS Unit is stable at 100% power Annunciator window 1-AR-9 (1J-D8) ACCUM 1A-1B-1C HI-LO PRESS is illuminated Pressure in safety injection accumulator 1-SI-TK-1C is < 600 psig The nitrogen system is not aligned to supply the PORV N2 accumulators 2016 NRC EXAM Page: 3 of 9 SIM JPM D

Equipment status has been reviewed and supports the performance of this procedure The outsides operator has verified an adequate source of nitrogen is available and has started the nitrogen system pump INITIATING CUE You are requested to increase pressure in safety injection accumulator 1-SI-TK-1C to between 630 and 640 psig in accordance with 1-OP-7.3, "Filling, Draining, Pressurizing, and Venting SI Accumulators."

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT None PERFORMANCE STEPS START TIME __________

2016 NRC EXAM Page: 4 of 9 SIM JPM D

1 Verify that initial conditions are satisfied. Procedure Step 5.4.1 SAT [ ] UNSAT [ ]

Standards Initial conditions are verified to be satisfied Performance If asked: RWST boron concentration is 2700 ppm Cue(s)

Simulation Cue(s) If asked: RWST boron concentration is 2700 ppm Notes/Comments 2 Review precautions and limitations. Procedure Step 5.4.2 SAT [ ] UNSAT [ ]

Standards Precautions and limitations have been reviewed Notes/Comments 3 Place 1-SI-HIC-100 at zero percent output. Procedure Step 5.4.3 SAT [ ] UNSAT [ ]

Standards 1-SI-HIC-100 output is decreased to zero Notes/Comments 2016 NRC EXAM Page: 5 of 9 SIM JPM D

4 Open 1-SI-TV-100. Procedure Step 5.4.4 Critical Step SAT [ ] UNSAT [ ]

NOTE TO THE Must press open buttons on both panels simultaneously for 1-SI-EVALUATOR TV-100 to open Standards 1-SI-TV-100 is opened Performance If asked: The outsides operator reports the nitrogen system pump is Cue(s) running.

Simulation Cue(s) If asked: The outsides operator reports the nitrogen system pump is running.

Must press open buttons on both panels for 1-SI-TV-100 Notes/Comments 2016 NRC EXAM Page: 6 of 9 SIM JPM D

5 Slowly increase the output of 1-SI-HIC-100 to pressurize the Procedure Step 5.4.5 accumulator supply header Critical Step SAT [ ] UNSAT [ ]

Standards Output on 1-SI-HIC-100 is raised above 0%

Performance If asked: The outsides operator reports the nitrogen system pump is Cue(s) running.

If asked: US desires 100% output on 1-SI-HIC-100 Simulation Cue(s) If asked: The outsides operator reports the nitrogen system pump is running.

If asked: US desires 100% output on 1-SI-HIC-100 Notes/Comments 6 Open N2 valve for the desired accumulator SI-HCV-1853C. Procedure Step 5.4.6 Critical Step SAT [ ] UNSAT [ ]

Standards 1-SI-HCV-1853C is opened and pressure in 1-SI-TK-1C is increasing Simulation Cue(s)

Notes/Comments 2016 NRC EXAM Page: 7 of 9 SIM JPM D

7 When the desired pressure has been reached, then do the Procedure Step 5.4.7 following:

Close 1-SI-HCV-1853C, the nitrogen supply valve to accumulator 1-SI-TK-1C.

Close nitrogen supply trip valve 1-SI-TV-100.

Increase the output of 1-SI-HIC-100 to 100%.

Critical Step SAT [ ] UNSAT [ ]

Standards 1-SI-HCV-1853C is closed Standards Pressure in 1-SI-TK-1C has stopped increasing Performance After accumulator pressure has been verified to be increasing:

Cue(s) Use pen to indicate that pressure is between 630 and 640 psig on both "C" accumulator pressure indicators.

(If asked: PCS indication is 635 psig)

If needed: US requires you to return the accumulator nitrogen lineup to normal Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

2016 NRC EXAM Page: 8 of 9 SIM JPM D

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE R589 TASK Pressurize a safety injection accumulator (1-OP-7.3).

CHECKLIST

_____ Recall 100% power IC #334

_____ Slowly reduce pressure in "C" accumulator using tanksnstuff until J-D8 is illuminated

(~1178 LM)

_____ Place simulator in freeze 2016 NRC EXAM Page: 9 of 9 SIM JPM D

Dominion North Anna Power Station LICENSED OPERATOR REQUALIFICATION PROGRAM JOB PERFORMANCE MEASURE INITIAL CONDITIONS The unit is at 100% power INITIATING CUE You are requested to respond to plant conditions.

Dominion North Anna Power Station LICENSED OPERATOR REQUALIFICATION PROGRAM JOB PERFORMANCE MEASURE R675 / 13341 TASK Respond to a failure of main generator voltage regulator high (1-AP-26).

TASK STANDARDS Voltage regulator was turned off, reactor was manually tripped, and both G12 and the Exciter Field Breaker were manually opened.

K/A

REFERENCE:

077AA1.03 (3.8/3.7)

ALTERNATE-PATH TOPIC BASE ADJUST switch fails to operate requiring unit trip G12 Breaker does not open automatically TASK COMPLETION TIMES Validation Time = 4 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS 2016 NRC EXAM Page: 2 of 8 SIM JPM E

Dominion North Anna Power Station LICENSED OPERATOR REQUALIFICATION PROGRAM JOB PERFORMANCE MEASURE R675 / 13341 READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS The unit is at 100% power INITIATING CUE You are requested to respond to plant conditions.

EVALUATION METHOD Perform if conducted in the simulator or in the electrical laboratory (use Performance Cue(s))

Simulate if conducted in the station (use Simulation Cue(s))

TOOLS AND EQUIPMENT None PERFORMANCE STEPS START TIME __________

2016 NRC EXAM Page: 3 of 8 SIM JPM E

1 Operator refers to the following annunciators and determines that Procedure Step 1 entry into 1-AP-26 (immediate operator actions) is required.

SAT [ ] UNSAT [ ]

Standards Operator enters 1-AP-26 to perform immediate operator actions.

Simulation Cue(s) Annunciators received for voltage regulator failure.

Notes/Comments 2 Check the status of the main generator. Procedure Step 1 SAT [ ] UNSAT [ ]

Standards Main generator output voltage and MVARs are verified increasing, and generator MW is verified stable Simulation Cue(s) Main generator voltage is slowly going up Simulation Cue(s) Megawatts are stable Simulation Cue(s) MVARs are slowing going to the outside Notes/Comments 2016 NRC EXAM Page: 4 of 8 SIM JPM E

3 Turn the voltage regulator switch to OFF. Procedure Step 2 SAT [ ] UNSAT [ ]

Standards Voltage regulator control switch is placed in OFF Simulation Cue(s) Main generator output voltage is stable at 22.5 KV, reactive load is 230 MVARSs IN (or use pen to show)

Notes/Comments Will cause damage to main generator components if no action taken.

4 Adjust the main generator's output voltage into the normal range Procedure Step 3 using the base adjust switch.

SAT [ ] UNSAT [ ]

Standards Base adjust switch is placed in the RAISE position and reactive load is verified to remain greater than 200 MVARs IN (alt path - MVARS cannot be raised above 200 MVARS IN)

Simulation Cue(s) Before adjustment: Reactive load is 230 MVARS IN After adjustment: Reactive load has remained 230 MVARS IN Notes/Comments 2016 NRC EXAM Page: 5 of 8 SIM JPM E

5 Go to 1-E-0 Procedure Step 3 RNO a of 1-AP-26 Critical Step SAT [ ] UNSAT [ ]

Standards Reactor trip switches on benchboard 1-1 and/or 1-2 momentarily placed in the TRIP position Simulation Cue(s) Reactor trip breakers have green lights LIT and red lights NOT lit.

Notes/Comments 6 Verify reactor tripped. Procedure Step 1 of 1-E-0 SAT [ ] UNSAT [ ]

Standards Operator verifies reactor is tripped (RTBs open, rod bottom lights on, flux decreasing).

Notes/Comments 7 Verify turbine trip Procedure Step 2 of 1-E-0 Critical Step SAT [ ] UNSAT [ ]

Standards Operator verifies turbine stop valves closed, resets Reheater FCVs, and manually opens both the G12 and Exciter Field Breaker.

Notes/Comments G12 breaker will not open after 30 seconds. 1-E-0 Step 2.a RNO will require the operator to manually open G12 AND the Exciter Field Breaker.

2016 NRC EXAM Page: 6 of 8 SIM JPM E

8 Verify both ac emergency busses energized - yes. Procedure Step 3 of 1-E-0 SAT [ ] UNSAT [ ]

Standards Verifies 1H and 1J busses both energized by observing volt meters on 1H and 1J EDG control panels.

Notes/Comments 9 Check if SI is actuated Procedure Step 4 of 1-E-0 SAT [ ] UNSAT [ ]

Standards Checks low head pumps running- NO.

Any first out annunciator lit - NO.

Performance Additional crew members will continue with 1-E-0. The Unit Supervisor Cue(s) directs you to continue performance of 1-AP-33.2.

Simulation Cue(s) Additional crew members will continue with 1-E-0. The Unit Supervisor directs you to continue performance of 1-AP-33.2.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

2016 NRC EXAM Page: 7 of 8 SIM JPM E

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE R675 / 13341 NORMAL TASK Respond to a failure of main generator voltage regulator high (1-AP-26).

ALTERNATE-PATH TOPIC BASE ADJUST switch fails to operate G12 fails to automatically open CHECKLIST

_____ Recall IC (100% power) (IC 335)

_____ Place simulator in RUN

_____ Do the following to ensure reactive load decreases to greater than 200 MVARs IN when voltage regulator is placed in OFF (ensures step 3 is critical):

Lower voltage using voltage regulator until reactive load is 150 MVARS IN Meter override (GM): Generator MVAR = 0.3, Ramp = 5, Trigger = 2 Set up Trigger 2 on trigger screen as VOLT_REG_OFF ==1

_____ Switch override: V REG_BAS1_OFF = ON, V_REG_BAS1_RAISE = OFF, V_REG_BAS@_LOWER = OFF

_____ Enter malfunction EL09, trigger = 1, delay time = 0, ramp = 70, severity = 35

_____ Enter malfunction g12fail_ovrrelay = true NOTE: Tested to be sure reactor would not trip if operator did not do actions. Will cause damage to main generator components if no action taken.

2016 NRC EXAM Page: 8 of 8 SIM JPM E

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Reactor is at 98% power.

Daily feedwater flow calorimetric heat balance is required to be performed Unit-1 PCS is operable All Nuclear Instruments (NIs) are operable 1-PT-24.1, CALORIMETRIC HEAT BALANCE (COMPUTER CALCULATION), has been completed up to Step 6.2.2.

INITIATING CUE You are requested to adjust the power-range NIs in accordance with 1-PT-24.1.

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM R710 TASK Adjust the power-range NIs (1-PT-24.1).

TASK STANDARDS Task was performed as directed by the procedure referenced in the task statement within parentheses (one of the underlined procedures if several are cited)

K/A

REFERENCE:

015A1.01 (3.5/3.8)

ALTERNATE PATH:

Control rods step uncontrollably when placed in auto requiring operator action TASK COMPLETION TIMES Validation Time = 20 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS 2016 NRC EXAM Page: 2 of 10 SIM JPM F

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM R710 READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES The trainee has completed the applicable course knowledge training at the Reactor Operator level.

NOTE - Pre-brief required prior to entering the simulator.

INITIAL CONDITIONS Reactor is at 98% power.

Daily feedwater flow calorimetric heat balance is required to be performed Unit-1 PCS is operable All Nuclear Instruments (NIs) are operable 2016 NRC EXAM Page: 3 of 10 SIM JPM F

1-PT-24.1, CALORIMETRIC HEAT BALANCE (COMPUTER CALCULATION), has been completed up to Step 6.2.2.

INITIATING CUE You are requested to adjust the power-range NIs in accordance with 1-PT-24.1.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT None PERFORMANCE STEPS START TIME __________

2016 NRC EXAM Page: 4 of 10 SIM JPM F

1 IF the Power Range NI channels are within 2 percent of the Power, Procedure Step 6.2.3 Calorimetric (U0980) AND the SRO has directed that adjustments be made, THEN adjust the channels as directed using Attachment 3.

SAT [ ] UNSAT [ ]

Performance N-44 adjustment is desired Cue(s)

Notes/Comments 2 Review steps 1-9 of attachment 3 Procedure Step Att 3: 1 - 9 SAT [ ] UNSAT [ ]

Standards Steps 1 through 9 are reviewed Notes/Comments Steps 1-6 of Attachment 3 are instructions on how to perform the attachment. Steps 7-9 will be marked N/A due to the conditions of the JPM 2016 NRC EXAM Page: 5 of 10 SIM JPM F

3 Verify that no trip signals are present on the NI power-range Procedure Step channels. Att 3: 10 SAT [ ] UNSAT [ ]

Standards NIs and/or status lights are checked to verify no trip signals Notes/Comments Step 11 will be N/A as noted in initial JPM conditions 4 IF adjusting Channel N44, THEN place the following equipment in Procedure Step MANUAL control: Att 3: 12

  • Rod Control System CRITICAL STEP SAT [ ] UNSAT [ ]

Standards Bypass feedwater regulating valves are verified in manual and the Rod Control System is placed in MANUAL Notes/Comments 2016 NRC EXAM Page: 6 of 10 SIM JPM F

5 Check present NI readings have not changed significantly Procedure Step (Approximately 0.5 %) from the As Found NI readings on Att 3: 13.1 & 13.2 Attachment 2.

SAT [ ] UNSAT [ ]

Standards NIs are verified within 0.5% of the as-found indications Notes/Comments Step 13.2 is N/A Operator may choose to establish a trend graph.

6 IF sufficient adjustments can be made, THEN individually adjust the Procedure Step gain potentiometer on the front panel of each Power Range NI Att 3: 13.3 channel to within 2 percent of the Power, Calorimetric (U0980).

CRITICAL STEP SAT [ ] UNSAT [ ]

Standards Gain potentiometer for N-44 is increased to match the calorimetric within 2% of the Power Calorimetric (U0980)

Notes/Comments Step 13.4 and step 14 are N/A 2016 NRC EXAM Page: 7 of 10 SIM JPM F

7 IF Channel N44 was adjusted, THEN wait at least 1 minute before Procedure Step returning the equipment listed in Step 12 to AUTO control. Att 3: 15 SAT [ ] UNSAT [ ]

Standards Rod Control System is placed in AUTO Performance If asked: It is desired to place rod control in AUTO Cue(s)

Notes/Comments Alt path - Rods will insert when rod control switch is placed in AUTO requiring entry into 1-AP-1.1 8 Put Control Rod Bank Selector switch to MANUAL Procedure Step AP-1.1: 1 SAT [ ] UNSAT [ ]

Standards Rod Control System is placed in MANUAL Notes/Comments 9 Verify Rod motion - STOPPED - NO Procedure Step AP-1.1: 2 SAT [ ] UNSAT [ ]

Standards Rods motion is noted to not be stopped and the operator transitions to 1-E-0 Notes/Comments 2016 NRC EXAM Page: 8 of 10 SIM JPM F

10 Perform Immediate Actions of 1-E-0 Procedure Step 1-E-0 CRITICAL STEP SAT [ ] UNSAT [ ]

Standards Reactor trip switches on benchboard 1-1 and/or 1-2 are momentarily placed in the TRIP position Performance Assume that another operator is continuing with E-0 Cue(s)

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

2016 NRC EXAM Page: 9 of 10 SIM JPM F

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

Recall IC #336 2016 NRC EXAM Page: 10 of 10 SIM JPM F

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Unit 1 is at 100%.

Flooding has occurred in the turbine building.

TURB BLD FLOOD ALARM TROUBLE annunciator (1D-G7) has just alarmed.

Circulating Water System rupture has been reported on Unit 1.

Liquid waste discharge is aligned to the Unit 1 discharge tunnel.

INITIATING CUE You are requested to respond to circulating water flooding in the turbine building in accordance with 0-AP-39.1, Turbine Building Flooding.

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM 13355 TASK Respond to turbine building flooding with Circulating water pump fails to trip (0-AP-39.1).

TASK STANDARDS All waterbox inlets were closed, 15G10 was defeated, 15G1 was opened, all waterbox outlets were closed, and 1-LW-PCV-115 was placed in HAND.

K/A

REFERENCE:

075A2.03 (2.5/2.7)

ALTERNATE PATH:

Waterbox inlet MOVs fail to close requiring additional actions in response to failure TASK COMPLETION TIMES Validation Time = 10 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2016 NRC EXAM Page: 2 of 13 SIM JPM G

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM 13355 READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES The trainee has completed the applicable course knowledge training at the reactor operator level INITIAL CONDITIONS Unit 1 is at 100%.

Flooding has occurred in the turbine building.

TURB BLD FLOOD ALARM TROUBLE annunciator (1D-G7) has just alarmed.

Circulating Water System rupture has been reported on Unit 1.

Liquid waste discharge is aligned to the Unit 1 discharge tunnel.

NAPS 2016 NRC EXAM Page: 3 of 13 SIM JPM G

INITIATING CUE You are requested to respond to circulating water flooding in the turbine building in accordance with 0-AP-39.1, Turbine Building Flooding.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT None PERFORMANCE STEPS START TIME __________

Note: Operator will read the following procedure caution and note:

CAUTION: Auxiliary Building flooding could carry over into the Turbine Building through the Service Water Tunnel into the Turbine Building Valve Pit.

NOTE: If a Reactor trip occurs, then, in order to recover the plant from the flooding, this procedure should be performed in conjunction with Emergency Operating Procedures.

1 Identify source of the flooding Procedure Step 1 of 0-AP-39.1 SAT [ ] UNSAT [ ]

Standards Operator initials step and continues with Step 2.

(source, Unit 1 Circ Water, was provided by initial conditions)

Notes/Comments NAPS 2016 NRC EXAM Page: 4 of 13 SIM JPM G

2 Determine if reactor should be tripped - YES. Procedure Step (based on initial conditions provided - circ water system rupture) 2.a,b, &c of 0-AP-39.1 SAT [ ] UNSAT [ ]

Standards Reactor trip switch on benchboard 1-1 and or 1-2 momentarily placed in TRIP.

Reheater Reset pushbutton momentarily depressed.

Performance After immediate operator actions are done: The remaining crew Cue(s) members will perform 1-E-0, you are directed to continue performance of 0-AP-39.1 Notes/Comments 3 Check if Bearing Cooling System status is abnormal - NO. Procedure Step 3 of 0-AP-39.1 SAT [ ] UNSAT [ ]

Standards Operator goes to RNO column and continues with Step 4.

Notes/Comments This step is intended to initiate additional actions IF the leak were in the bearing cooling (BC) system, based on the initial conditions of the JPM the leak is in the Circ Water System. The candidate may elect to check items such as BC system annunciators, basin level, makeup valve postion, etc. to satisfy themselves, but these actions are not required based on the initial conditions provided.

Note: Operator will read the following procedure note:

NOTE:

  • If a G-Bus is de-energized because of a CW system rupture, then a reduced Bearing Lube flow condition could result on the opposite unit. The de-energized bus should be re-energized as soon as possible.
  • When the waterbox inlet box valves start to close, then the CW pumps for the affected unit should trip.

NAPS 2016 NRC EXAM Page: 5 of 13 SIM JPM G

4 Check CW system abnormal - YES. Procedure Step 4a of 0-AP-39.1 SAT [ ] UNSAT [ ]

Standards Operator continues to substep 4b based on initial conditions provided.

Notes/Comments 5 Place all Unit 1 circulating water motor-operated valve interlock Procedure Step defeat switches in NORMAL. 4.b.1 of 0-AP-39.1 SAT [ ] UNSAT [ ]

Standards Circulating water motor-operated valve switches are verified to be in NORMAL Notes/Comments NAPS 2016 NRC EXAM Page: 6 of 13 SIM JPM G

6 Close the following water box inlet motor-operated valves. Procedure Step 4.b.2 of 0-AP-39.1 1-CW-MOV-101A 1-CW-MOV-101B 1-CW-MOV-101C 1-CW-MOV-101D NOTE TO THE 1-CW-MOV-101C and 1-CW-MOV101D cannot be closed but will close EVALUATOR once the pumps have tripped.

(1-CW MOV-102C and 1-CW MOV-102D will also not close if attempted but will close on subsequent steps)

There is no RNO for this step.

Standards CLOSE push-button is depressed for the following motor-operated valves 1-CW-MOV-101A 1-CW-MOV-101B 1-CW-MOV-101C 1-CW-MOV-101D Notes/Comments NAPS 2016 NRC EXAM Page: 7 of 13 SIM JPM G

7 Verify that the Unit1 Circulating Water pumps are tripped - NO. Procedure Step (Alternate path step) 4.b.3 of 0-AP-39.1 SAT [ ] UNSAT [ ]

Standards Operator determines that Unit 1 CW pumps are NOT tripped (by observing breaker indication on Circ Water panel) and implements step 4.b.3) RNO Notes/Comments 8 De-energize the unit-1 "G" bus. Procedure Step 4.b.3 RNO a,b,&c of 0-AP-39.1 Critical Step SAT [ ] UNSAT [ ]

Standards 1) 15G10 transfer switch is placed in DEFEAT.

2) 15G10 status checked as open.
3) 15G1 is opened.

ONLY elements 1&3 are critical since 15G10 is already open (normal alignment)

Notes/Comments:

1-CW-MOV-101C & D will start to close when 15G1 is opened.

NAPS 2016 NRC EXAM Page: 8 of 13 SIM JPM G

9 Place the unit-1 circulating water pumps in PULL-TO-LOCK. Procedure Step 4.b.3. RNO d of 0-AP-39.1 SAT [ ] UNSAT [ ]

Standards Operator places all four (4) CW pump switches in PTL Notes/Comments 10 Verify that all circulating water pump breakers are open. Procedure Step 4.b.3 RNO e of 0-AP-39.1 SAT [ ] UNSAT [ ]

Standards Operator verifies CW pump breakers open prior to placing switches in pull-to-lock, or locally, or using PCS.

Notes/Comments Control room breaker light indication was available when the previous step was performed (placing pump breakers in pull-to-lock).

11 Re-energize the unit-1 "G" bus.. Procedure Step 4.b.3. RNO f of 0-AP-39.1 SAT [ ] UNSAT [ ]

Standards Operator acknowledges that another operator will re-energize the bus.

Performance Another operator will re-energize the bus Cue(s)

Notes/Comments NAPS 2016 NRC EXAM Page: 9 of 13 SIM JPM G

12 Close the following water box outlet motor-operated valves. Procedure Step 4.b.4 of 0-AP-39.1 1-CW-MOV-102A 1-CW-MOV-102B 1-CW-MOV-102C 1-CW-MOV-102D Critical Step SAT [ ] UNSAT [ ]

Standards CLOSE push-button is momenetarily depressed for the following motor-operated valves 1-CW-MOV-102A 1-CW-MOV-102B 1-CW-MOV-102C 1-CW-MOV-102D Notes/Comments Operator will most likely be waiting on inlet valves to stroke fully closed NAPS 2016 NRC EXAM Page: 10 of 13 SIM JPM G

13 Request the turbine building operator to secure the unit-1 High- Procedure Step capacity Steam Generator Blowdown System. 4.b.5 of 0-AP-39.1 SAT [ ] UNSAT [ ]

Standards Operator calls Turbine bldg. operator to secure HCBD per the OP Notes/Comments When requested, Booth operator will acknowledge operators direction and call back and report action is complete 14 Check if liquid waste releases can be continued -NO. Procedure Step 4.b.6 RNO of 0-AP-39.1 Critical Step SAT [ ] UNSAT [ ]

Standards Operator determines that LW releases cannot be continued. (Loss of the CW pump violates the Liquid QW).

Performance Cue(s)

Notes/Comments If operator calls HP, booth operator will respond that the release permit requires 3 CW pumps to be running on the tunnel that LW is discharging to.

NAPS 2016 NRC EXAM Page: 11 of 13 SIM JPM G

15 Check if liquid waste releases can be continued -NO. Procedure Step 4.b.6 RNO of 0-AP-39.1 Critical Step SAT [ ] UNSAT [ ]

Standards Operator places 1-LW-PCV-115 in HAND and verifies it is closed (status of LW aligned to Unit 1 tunnel provided by initial conditions).

Performance Another operator will complete 0-AP-39.1.

Cue(s) This completes JPM.

Notes/Comments If operator calls HP, booth operator will respond that the release permit requires 3 CW pumps to be running on the tunnel that LW is discharging to.

END OF EVALUATION STOP TIME __________

NAPS 2016 NRC EXAM Page: 12 of 13 SIM JPM G

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE 13355 TASK Respond to turbine building flooding with Circulating water pump fails to trip (0-AP-39.1).

CHECKLIST

_____ Recall IC # 337 (100% power)

_____ Do simspray and check recorders Step 4.b.5) when called acknowledge as turbine operator to secure high capacity blowdown in accordance with 1-OP-32.3 If called as outsides operator report that all 4 Unit 1 CW pump breakers are verified open locally If called as HP report that the release permit requires 3 CW pumps running.

NAPS 2016 NRC EXAM Page: 13 of 13 SIM JPM G

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS The "A" waste gas decay tank (WGDT) is on holdup and is ready for release The "A" WGDT has been sampled and a release permit has been issued by Health Physics The tagout has been cleared on "A" WGDT Purging or venting either units reactor head, pressurizer, or PRT is not in progress The Nitrogen Gas System is operable.

All charts have been marked, and the procedure has been completed up to step 5.3.11 INITIATING CUE You are requested to place waste gas decay tank 1-GW-TK-1A on bleed from the backboards using 0-OP-23.2 Section 5.3, Placing 1-GW-TK-1A on Bleed.

Dominion North Anna Power Station JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM R717 TASK Place a waste gas decay tank on bleed from the backboards (0-OP-23.2).

TASK STANDARDS "A" Waste Gas Decay Tank is discharging per 0-OP-23.2 K/A

REFERENCE:

071A4.27 (3.0/2.7)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 15 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2016 NRC EXAM Page: 2 of 8 SIM JPM H

Dominion North Anna Power Station JOB PERFORMANCE MEASURE (Evaluation)

OPERATOR PROGRAM R717 READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PREREQUISITES The trainee has completed the applicable course knowledge training at the Reactor Operator level.

NOTE - Pre-brief required prior to entering the simulator.

INITIAL CONDITIONS The "A" waste gas decay tank (WGDT) is on holdup and is ready for release The "A" WGDT has been sampled and a release permit has been issued by Health Physics The tagout has been cleared on "A" WGDT Purging or venting either units reactor head, pressurizer, or PRT is not in progress NAPS 2016 NRC EXAM Page: 3 of 8 SIM JPM H

The Nitrogen Gas System is operable.

All charts have been marked, and the procedure has been completed up to step 5.3.11 INITIATING CUE You are requested to place waste gas decay tank 1-GW-TK-1A on bleed from the backboards using 0-OP-23.2 Section 5.3, Placing 1-GW-TK-1A on Bleed.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT None PERFORMANCE STEPS START TIME __________

1 Notify Health Physics that the decay tank release is starting. Procedure Step 5.3.11.a SAT [ ] UNSAT [ ]

Standards Operator notifies the Health Physics Department Notes/Comments NAPS 2016 NRC EXAM Page: 4 of 8 SIM JPM H

2 Ensure 1-GW-FCV-101 controller is at 0% demand. Procedure Step 5.3.11.b SAT [ ] UNSAT [ ]

Standards Operator ensures the demand output of the flow controller associated with 1-GW-FCV-101 is 0%

Notes/Comments 3 Open decay tank outlet valve 1-GW-FCV-101, and adjust the Procedure Step controller to obtain the desired flow. 5.3.11.c & d Critical Step SAT [ ] UNSAT [ ]

Standards MODULATE push-button for 1-GW-FCV-101 is depressed Standards Controller for 1-GW-FCV-101 is adjusted to establish a flow rate that does not exceed the maximum flow rate of 2 scfm for a sustained period of time with no adjustments.

Performance Concur with PEER CHECKS required by procedure Cue(s)

Simulation Cue(s)

Notes/Comments NAPS 2016 NRC EXAM Page: 5 of 8 SIM JPM H

4 Place 1-GW-FCV-101 in AUTO, and check proper operation. Procedure Step 5.3.11.e Critical Step SAT [ ] UNSAT [ ]

Standards Operator places the controller associated with 1-GW-FCV-101 in AUTO and checks for proper operation Performance Concur with PEER CHECKS required by procedure Cue(s)

Notes/Comments 5 Securing lineup of the Waste Gas Decay Tank. Procedure Step 5.3.12 Critical Step SAT [ ] UNSAT [ ]

Performance The SRO has determined that it is desired to secure the Waste Gas Cue(s) Decay Tank release at this time.

Standards Operator calls the local operator to close 1-GW-16 and 1-GW-15.

Performance Local Operator reports that 1-GW-16 and 1-GW-15 have been closed.

Cue(s)

Standards Operator verifies that 1-GW-PI-103 indicates 0 psi, and places 1-GW-FCV-101 controller to Manual and reduces output to 0%

Standards Operator depressed the CLOSED pushbutton for 1-GW-FCV-101, and checks that 1-GW-FCV-101 is closed.

Notes/Comments NAPS 2016 NRC EXAM Page: 6 of 8 SIM JPM H

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2016 NRC EXAM Page: 7 of 8 SIM JPM H

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE R717 TASK Place a waste gas decay tank on bleed from the backboards (0-OP-23.2).

CHECKLIST Set up "A" WGDT level so that it requires discharge NAPS 2016 NRC EXAM Page: 8 of 8 SIM JPM H