Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML22307A0602022-11-0303 November 2022 EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19053A5002019-02-0101 February 2019 Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML17006A0112016-12-13013 December 2016 Part 21 Notification - Defective Safety-Related Relays Supplied by TE Connectivity ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML15288A1992015-10-0909 October 2015 Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules ML15223B2642015-08-0606 August 2015 Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin ML15211A4962015-07-24024 July 2015 Part 21 - Actuator Shaft Did Not Meet Dimensional Requirements ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14259A3892014-09-0808 September 2014 Part 21 - Failure to Meet Specified Irradiation During Testing of Coated Test Panels ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14139A2592014-05-0808 May 2014 10 CFR Part 21 Report Notification, NUS710DU Trip Units ML14134A0792014-05-0808 May 2014 Part 21 - Potential Defect in NUS-710DU Trip Unit to Produce a Valid Trip Output Signal ML14303A5262014-03-28028 March 2014 Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13127A0122013-05-0303 May 2013 Notification of Potential Interim Part 21 Report of Defect in a Relief Valve Bellows ML13106A0622013-04-15015 April 2013 Part 21 Notification Due to Pump Defect ML13077A3342013-03-15015 March 2013 Part 21 Report - Initial Notification for Flowserve Model 28KXL Pump Impeller Defect ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12258A3992012-09-10010 September 2012 Potential Part 21 Issue Related to Tyco Timing Relay ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld 2023-09-06
[Table view] |
Text
1211312016 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 52427 Rep Org: TE CONNECTIVITY Notification Date I Time: 12/13/2016 16:08 (EST)
Supplier: TE CONNECTIVITY Event Date I Time: 12/09/2016 (EST)
Last Modification: 12/13/2016 Region: 1 Docket#:
City: FAIRVIEW Agreement State: Yes County: License#:
State:* NC NRC Notified by: OSWALDO VARGAS .Notifications: DAN SCHROEDER R1DO HQ Ops Officer: HOWIE CROUCH ERIC MICHEL R2DO Emergency Class: NON EMERGENCY JAMNES CAMERON R3DO 10 CFR Section: RAY KELLAR R4DO 21.21 (a)(2) INTERIM EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL PART 21 NOTIFICATION - DEFEC.TIVE SAFETY-RELATED RELAYS SUPPLIED BY TE CONNECTIVITY The following information is a summary of a letter of nonconformance submitted by TE Connectivity:
Limerick Generating Station reported that four TE Connectivity supplied relays failed power labs analysis. The relays are TE part number 1-1431775, ETR1413D004. The affected relays appear to be those in date code ranges 1604 and 1612.
The preliminary evaluation revealed an incorrect orientation of one capacitor installed on the printed circuit board.
The relays were purchased by Curtiss-Wright (8 relays), Limerick Generating Station (8 relays) and NextEra (2 relays).
An investigation is ongoing.
Point of
Contact:
Oswaldo R Vargas, Quality Manager, TE Connectivity Aerospace, Defense and Marine Division 1396 Charlotte Highway Fairview, NC 28730 E-mail: oswaldo.vargas@te.com Telephone: 828-338-1093 Fax: 828-338-1101
Dec. 13. 2016 4:05PM No. 0132 P. 1 Oswaldo R Vargas Quality Manager TE Connectivity Aerospace, Defense and Marine Division 1396 Charlotte Highway Fairview, NC 28730 1:::-mail: oswaldo.vargas@te.com Telephone: 828-338-1093 Fax: 828-338-1101 Date: 12 December 2016 I
To: Operation Center United States Nuclear Regulatory Commission (NRC)
Fax: (301)816-5151
Subject:
TE Connectivity- Part 21 Transfer of Information - TE"022 The intent of this letter is to inform the NRC of an issue noted with a TE Connectivity relay.
Exelon- Limerick Power Station reported that during normal continuously energized operation, four nuclear relays, TE part number 1-1423177~5, ETR1413D004 failed Exelon Power Labs Analysis. Potential Suspect Date Code Range is1604 and 1612*.
Current investigation is now active under TE reference number 1353162. To help with the investigation, samples of the product were sent to our Manufacturing facility in the original TE assembled condition, including all component parts. The preliminary evaluation revealed an incorrect orientation of one capacitor installed on the printed circuit board (PCB). Attachment 1 contains list of shipments for 2016.
If you have any questions or require any additional information, please contact us by email or at the number listed above.
Sincerely, r/J4w4Yh~
Oswal.do R Vargas Quality Manager 1
Dec. 13. 2016 4:05PM No. 0132 P. 2 Attachment 1 011~a C!Js!olrj~r Part Num~er- Q!!!!crlP,tliin Factory onler ~.oai ~~le.s:enl~f.~. . . .'QlY
. i{20/20~6 CUrtt5s>-Wrlght 1-142fil77-5 ETRl413d004 211294B4S CPDiiiJog~gfi ~i14l6!i9o2i. 8 1/3D/2D16 111U!lon/UmerJck 1-1tl!!i77-5 ErR141;h:IOli4 21:1,70Q;!Sl 9'0080949 M.42563182 .(
~/22pqjs Exelon /Limeriek 1-142il.177-5 ETR14l9d004 212073111 90083110 ~d4iJ3B0101 8 sm{201s Exelqn /l.!01er1cl( l-11123J.779 ETR141ad004 212079111 90Qs3UO 30401lii6101 1*
8/25/lfl~6 Ni!l<W';t 1*14331~7.S ET!t1413d004 21194~MOS 0235112 /~E\1001 3o452f!l6B8 2 2
Dec. 13. 2016 4:05PM No. 0132 P. 3 Attachment 2 Transfer of Information per Part 21.21 (b)
(i) Name and address of the individual providing the information:
Oswaldo R Vargas, Quality Manager, TE Connectivity, Aerospace Defense and Marine Division, 1396 Charlotte Highway, Fairview, NC USA 28730.
(ii) Identification of the facility, the activity, or the basic component supplied for such facility or such activity that contains a deviation or failure to comply;
- Items supplied are TE part number 1-1423177~5, ETR1413D004. Potential Suspect Date Code Range is1604 and 1612_
TE Connectivity sold this safety-related !tern for specified and unspecified applications. See Attachment 1.
(ill) Identification of the firm constructing the facility or supplying the basic component that contains a deviation or a failure to comply:
TE Connectivity, 1396 Charlotte Highway, Fairview NC, USA 28730 (iv) Nature of the defect or safety hazard that could be created by such a deviation or failure to comply:
Intermittent operation of connected equipment under load.
(v) The date on which the inforrnation of such a deviation or failure to comply was obtained TE Connectivity made the determination of the existence of this condition in 9 December 2016_
{vi) In case of a basic component, which contains a deviation or failure to comply, the locations of all such components in use or being supplied?
Customers that purchased affected safety-related items from TE Connectivity for applications are identified in Attachment 1_
(vii) The corrective action which has been, is being, or will be taken; the narne of the individual or organization responsible for the action; and the length of tirne that has been or will be taken to complete the action (note, these are actions specifically associated with the identified deviation or failure to comply:
At this time, product has been put on hold until the investigation is complete.
(viii) Any advice related to the deviation or failure to comply about the facility, activity, or basic component that has been, is being given to purchasers or licensees:
TE Connectivity does not have sufficient information to perform an evaluation for unspecified applications.
3