MONTHYEARML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML21299A0032021-10-28028 October 2021 and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19135A4442019-06-21021 June 2019 Issuance of Relief Request I4R-22 Relief from the Requirements of the ASME Code ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds JAFP-18-0076, End of Interval Relief Request Associated with the Fourth Ten-Year Lnservice Inspection (ISI) Interval2018-07-26026 July 2018 End of Interval Relief Request Associated with the Fourth Ten-Year Lnservice Inspection (ISI) Interval ML18039A8542018-05-30030 May 2018 Relief Requests I5R-02, I5R-03, I5R-04 from ASME Code Requirements for Reactor Vessel Internals, Ferretic Piping Repair/Replacement, and RPV Flange Welds, 5th 10-Year Inservice Inspection Interval (MG0116-MG0118; L-2017-LLR-0083 to 0085) JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 ML18044A9932018-04-13013 April 2018 Request for Alternatives PRR-01, PRR-02, PRR-04, VRR-02, VRR-03, and VRR-04 from ASME OM Code Requirements for Various Pumps and Valves, Fifth 10-Year Inservice Testing Interval (CAC MG0052-MG0061; EPID L-2017-LLR-0067 to L-2017-LLR-0074) ML17289A0752017-12-12012 December 2017 Issuance of Relief Request for Proposed Alternative to Use ASME Code Case N-789-1 (CAC No. MF9692; EPID L-2017-LLR-0027) Note Correction Safety Evaluation See ML18003B382 ML17219A4282017-12-11011 December 2017 Issuance of Relief Request-Alternative to Certain Requirements of the ASME Code Regarding Use of ASME Code Case N-513-4 (CAC No. MF9641; EPID L-2017-LLR-0023) ML17223A2802017-08-10010 August 2017 Submittal of Relief Requests Associated with the Fifth Lnservice Inspection (ISI) Interval ML17090A1682017-04-12012 April 2017 Alternative to ASME Code Requirements for Weld Overlay Repair ML16355A4292017-01-0606 January 2017 Relief Request for Proposed Alternative for the Implementation of BWRVIP-05 ML16334A4402016-12-0606 December 2016 Relief from the Requirements of the ASME Code Case N-702 and BWRVIP-241 for Plant Nozzle-to-Vessel Welds and Nozzle Inner Radii ML16270A0462016-10-0303 October 2016 Acceptance of Requested Licensing Action Relief Request for Proposed Alternative for the Implementation of BWRVIP-05 ML16253A3412016-09-14014 September 2016 Acceptance of Requested Licensing Action Relief Request for Plant Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241 ML16180A2892016-06-29029 June 2016 Inservice Inspection Program Alternative for Safety Relief Valves ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16077A3522016-03-22022 March 2016 Withdrawal of Relief Request No. 19 from the Fourth Inservice Inspection Interval JAFP-15-0122, Withdrawal of Application for Alternative Examination Requirements for James A. FitzPatrick Nuclear Power Plant Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-2412015-11-20020 November 2015 Withdrawal of Application for Alternative Examination Requirements for James A. FitzPatrick Nuclear Power Plant Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241 ML15230A3502015-08-18018 August 2015 J.A Fitzpatrick Nuclear Power Plant - Requests Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Implementation of BWRVIP-05 (GL 98-05) CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division ML12279A2482012-10-17017 October 2012 Issuance of Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code JAFP-11-0112, Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP2011-10-0303 October 2011 Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP ML0803902232008-03-13013 March 2008 Relief Request No. 5, Use of Performance Demonstration Initiative in Lieu of ASME Code Section XI, Appendix Viii, Supplement 11 Requirement ML0803003072008-02-28028 February 2008 Relief Request No. RR-6, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals Components Inspection ML0803700802008-02-25025 February 2008 Relief Request No. 2 (RR-2) from the Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Appendix Viii, Supplement 10 ML0804204272008-02-22022 February 2008 Relief Request No. 3 (RR-3) Risk-Informed Inservice Inservice Inspection Program ML0520700472005-08-0909 August 2005 Relief Request for Temporary Non-Code Repair of a Shutdown Cooling Pipe JAFP-05-0105, Request for Approval of Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii)2005-07-0909 July 2005 Request for Approval of Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii) ML0427406642004-10-14014 October 2004 Relief Request Nos. R-33, R-71, R 3-40(A) and R-41, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Unit Nos. 2 and No. 3 and Pilgrim Nuclear Power Station ML0420301572004-07-20020 July 2004 Relief, Relief Request No. 30 for Third 10-Year Inservice Inspection (ISI) Program Interval ML0410700882004-07-0606 July 2004 Relief Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case N-600 ML0417401842004-07-0606 July 2004 Relief Request, Nos. RR-34 and PRR for the Third 10-Year Inservice Inspection (ISI) Interval, MC1999 and MC2006 ML0405406932004-04-12012 April 2004 Relief Request Review, Relief Request VRR-08 Related to the Third 10-Year Inservice Testing (IST) Ubtervak JPN-03-020, Indian Point Nuclear Generating Station, Units 2 & 3, Pilgrim Nuclear Power Station, Vermont Yankee Nuclear Power Station, Relief, Relief Request to Use ASME Code Case N-6002003-08-11011 August 2003 Indian Point Nuclear Generating Station, Units 2 & 3, Pilgrim Nuclear Power Station, Vermont Yankee Nuclear Power Station, Relief, Relief Request to Use ASME Code Case N-600 JAFP-03-0111, Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds Pursuant to 10 CFR 50.55a (g)(6)(i)2003-08-0404 August 2003 Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds Pursuant to 10 CFR 50.55a (g)(6)(i) ML0306502552003-04-0101 April 2003 Relief Request Review, Third 10-Year Pump and Valve Inservice Testing Program, Revision of Relief Request VRR-04 ML0231804962002-11-14014 November 2002 Relief, Request for Relief No. RR-28 for the Third 10-Year Inservice Inspection Interval Program Plan for the FitzPatrick Power Plant JAFP-02-0194, Proposed Revision of Relief Request VRR-06 for In-Service Testing Program2002-09-30030 September 2002 Proposed Revision of Relief Request VRR-06 for In-Service Testing Program JPN-02-011, Request for Relief RR-29, Third 10-Year Inservice Inspection Interval Program Plan2002-05-0808 May 2002 Request for Relief RR-29, Third 10-Year Inservice Inspection Interval Program Plan JPN-02-010, Relief Request RR-28, Revision 1 for the Third 10-Year Inservice Inspection Interval Program Plan2002-05-0808 May 2002 Relief Request RR-28, Revision 1 for the Third 10-Year Inservice Inspection Interval Program Plan 2023-12-14
[Table view] Category:Letter
MONTHYEARIR 05000333/20230042024-02-0707 February 2024 Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001 ML24037A0102024-02-0606 February 2024 Requalification Program Inspection ML24018A0012024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for Information ML24004A2302024-01-0808 January 2024 Project Manager Reassignment ML23356A0832024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0058 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20234012023-12-0808 December 2023 Cybersecurity Inspection Report 05000333/2023401 (Cover Letter Only) RS-23-126, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use IR 05000333/20230032023-11-13013 November 2023 Integrated Inspection Report 05000333/2023003 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000333/20230102023-10-26026 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000333/2023010 JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use IR 05000333/20233012023-10-19019 October 2023 Initial Operator Licensing Examination Report 05000333/2023301 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis IR 05000333/20230052023-08-31031 August 2023 Updated Inspection Plan for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023005) JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report ML23228A1342023-08-16016 August 2023 Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20230022023-08-0707 August 2023 Integrated Inspection Report 05000333/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance ML23208A1622023-07-27027 July 2023 Operator Licensing Examination Approval IR 05000333/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000333/2023402 IR 05000333/20230112023-07-25025 July 2023 Post-Approval Site Inspection for License Renewal - Phase 4 Inspection Report 05000333/2023011 IR 05000333/20235012023-07-20020 July 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000333/2023501 JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation IR 05000333/20234202023-06-26026 June 2023 Security Baseline Inspection Report 05000333 2023420 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23164A0322023-06-13013 June 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000333/2023010 ML23152A0042023-06-0101 June 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000333/2023401 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report IR 05000333/20230012023-05-0303 May 2023 Integrated Inspection Report 05000333/2023001 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report IR 05000333/20230122023-04-13013 April 2023 Quadrennial Fire Protection Inspection Report 05000333/2023012 ML23095A3722023-04-0505 April 2023 2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations IR 05000333/20220042023-03-20020 March 2023 Integrated Inspection Report 05000333/2022004 JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 2024-02-07
[Table view] Category:Safety Evaluation
MONTHYEARML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML22223A1412022-09-0101 September 2022 Issuance of Amendment No. 353 Adoption of TSTF - 505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22196A0612022-08-23023 August 2022 Issuance of Amendment No. 352 Adoption of 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22166A4302022-07-15015 July 2022 Issuance of Amendment No. 351 Removal of Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation ML22126A1962022-05-27027 May 2022 Issuance of Amendment No. 350 Adoption of TSTF-264, Revision 0 ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML21364A0432022-02-28028 February 2022 Issuance of Amendment No. 348 Revising Surveillance Requirement 3.5.1.6 Involving Recirculation Pump Discharge Valves ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21300A3552021-11-16016 November 2021 Issuance of Amendment No. 345 Adoption of TSTF-582 ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21131A1272021-08-0909 August 2021 Issuance of Amendment No. 343 Modifications to Technical Specification 3.6.1.3, Primary Containment Isolation Valves (Pcivs) ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21162A0422021-06-14014 June 2021 Issuance of Amendment No. 342, One Time Extension of Completion Times to Support Residual Heat Removal Pump Motor Replacement (Emergency Circumstances) ML21049A3552021-04-28028 April 2021 Issuance of Amendment No. 341 Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20169A5102020-08-20020 August 2020 Issuance of Amendment No. 339 Changes to Technical Specifications Related to Primary Containment Hydrodynamic Loads ML20140A0702020-07-21021 July 2020 Issuance of Amendment No. 338 Application of Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20094G9032020-06-0202 June 2020 Issuance of Amendment No. 335 Adoption of TSTF-372, Addition of LCO 3.0.8, 'Inoperability of Snubbers' ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20024C6612020-03-0202 March 2020 Issuance of Amendment No. 332 Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line Item Improvement Process ML19295G7832019-12-19019 December 2019 Issuance of Amendment No. 331 Regarding Change to Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19189A0842019-08-19019 August 2019 Issuance of Amendment No. 326 Adoption of TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19157A2032019-07-11011 July 2019 Issuance of Amendment No. 325 Reactivity Anomalies Surveillance ML19135A4442019-06-21021 June 2019 Issuance of Relief Request I4R-22 Relief from the Requirements of the ASME Code ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML18360A6352019-02-25025 February 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4464; EPID No. L-2014-JLD-0049) ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18289A4322018-11-28028 November 2018 Issuance of Amendment No. 323 Revision to the Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 ML18214A7062018-09-19019 September 2018 Issuance of Amendment No. 322, Revise Technical Specification 2.1.1, Reactor Core Sls, to Change Cycle 24 Safety Limit Minimum Critical Power Ratio Numeric Values ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18180A3722018-07-19019 July 2018 Issuance of Amendment No. 319, Revise Technical Specification Surveillance Requirement 3.6.4.1.3 to Allow Opening of Inner and Outer Secondary Containment Access Openings (CAC MG0239; EPID L-2017-LLA-0298) ML18039A8542018-05-30030 May 2018 Relief Requests I5R-02, I5R-03, I5R-04 from ASME Code Requirements for Reactor Vessel Internals, Ferretic Piping Repair/Replacement, and RPV Flange Welds, 5th 10-Year Inservice Inspection Interval (MG0116-MG0118; L-2017-LLR-0083 to 0085) ML18044A9932018-04-13013 April 2018 Request for Alternatives PRR-01, PRR-02, PRR-04, VRR-02, VRR-03, and VRR-04 from ASME OM Code Requirements for Various Pumps and Valves, Fifth 10-Year Inservice Testing Interval (CAC MG0052-MG0061; EPID L-2017-LLR-0067 to L-2017-LLR-0074) ML17289A1752018-03-26026 March 2018 Issuance of Amendment No. 318, Revise Emergency Plan for Emergency Response Organization Requalification Training Frequency Consistent with Exelon Fleet (CAC MG0026; EPID L-2017-LLA-0273) ML18003B3822018-01-0303 January 2018 Correction to the Safety Evaluation to James A. Fitzpatrick Nuclear Power Plant Issuance of Relief Request for Proposed Alternative to Use ASME Code Case N-789-1 (CAC No. MF9692; EPID L-2017-LLR-0027) (Original Safety Evaluation: ML17289A07 ML17342A0062017-12-18018 December 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17289A0752017-12-12012 December 2017 Issuance of Relief Request for Proposed Alternative to Use ASME Code Case N-789-1 (CAC No. MF9692; EPID L-2017-LLR-0027) Note Correction Safety Evaluation See ML18003B382 2023-05-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 6, 2016 Site Vice President Entergy Nuclear Operations, Inc.
James A FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093
SUBJECT:
JAMES A FITZPATRICK NUCLEAR POWER PLANT- RELIEF FROM THE REQUIREMENTS OF THE ASME CODE CASE N-702 AND BWRVIP-241 FOR PLANT NOZZLE-TO-VESSEL WELDS AND NOZZLE INNER RADII (CAC NO. MF8301)
Dear Sir or Madam:
By application dated August 24, 2016, Entergy Nuclear Operations, Inc. (Entergy, the licensee) submitted a request to the Nuclear Regulatory Commission (NRC) requesting alternative examination requirements for the American Society of Mechanical Engineers (ASME) Code Case N-702 and Boiling Water Reactor Vessel Inspection Program (BWRVIP)-241 regarding the lnservice Inspection (ISi) Program for the fourth 10-year inspection interval for James A Fitzpatrick Nuclear Power Plant (Fitzpatrick).
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1 ),
Entergy requested to use the proposed alternative on the basis that the alternative provides an acceptable level of quality and safety.
The staff has reviewed the submittal regarding Entergy's evaluation of the first three of the five plant-specific criteria specified in the Safety Evaluation (SE) for the BWRVIP-241 report, dated April 19, 2013. The BWRVIP-241 report provides technical bases for use of ASME Code Case N-702 to examine reactor pressure vessel (RPV) N2 recirculation inlet nozzle-to-vessel welds and nozzle inner radii at Fitzpatrick. Based on the evaluation in Section 4.2 of this SE, the NRC staff determined that Entergy's proposed alternative provides an acceptable level of quality and safety and applies to the requested Fitzpatrick N2 recirculation inlet nozzles. The similar approval for other RPV nozzles is documented in the SE for Relief Request No. 08, dated October 17, 2012.
Accordingly, the NRC staff concludes that Entergy has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1) and is in compliance with the requirements of the ASME Code. Therefore, the NRC authorizes Entergy's proposed alternative for inspection of nozzle-to-vessel shell welds and nozzle inner radii sections of RPV N2 recirculation inlet nozzles for the Fitzpatrick's remaining fourth 10-year ISi interval.
All other ASME Code, Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
If you have any questions, please contact the Fitzpatrick Project Manager, Diane Render, Ph.D.,
at (301) 415-3629.
Sincerely, Richard Guzman, Acting Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333
Enclosure:
As stated cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST NO. 18 ENTERGY NUCLEAR FITZPATRICK, LLC AND ENTERGY NUCLEAR OPERATIONS. INC.
DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT
1.0 INTRODUCTION
By application dated August 24, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16238A004), Entergy Nuclear Operations, Inc. (Entergy, the licensee) submitted a request to the Nuclear Regulatory Commission (NRC) requesting alternative examination requirements for the American Society of Mechanical Engineers (ASME) Code Case N-702 and Boiling Water Reactor Vessel Inspection Program (BWRVIP)-241 regarding the lnservice Inspection (ISi) Program for the fourth 10-year inspection interval for James A. Fitzpatrick Nuclear Power Plant (Fitzpatrick).
2.0 REGULATORY REQUIREMENTS lnservice Inspection of the ASME Code Class 1, 2, and 3 components is performed in accordance with Section XI of the ASME Code and applicable addenda as a way to detect anomaly and degradation indications so that structural integrity of these components can be maintained. This is required by Title 1O of the Code of Federal Regulations (1 O CFR) 50.55a(g),
except where specific relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). Section 50.55a(z) of 10 CFR states that alternatives to the requirements of paragraphs (b) through (h) of 10 CFR 50.55a or portions thereof may be used, when authorized by the Director, Office of Nuclear Reactor Regulation. A proposed alternative must be submitted and authorized prior to implementation. The applicant or licensee must demonstrate that: (1) the proposed alternative would provide an acceptable level of quality and safety; or (2) compliance with the specified requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Enclosure
For all reactor pressure vessel (RPV) nozzle-to-vessel shell welds and nozzle inner radii, Section XI of the ASME Code requires inspection of 100 percent of the nozzles during each 10-year ISi interval. However, ASME Code Case N-702 proposes an alternative which reduces the inspection of RPV nozzle-to-vessel shell welds and nozzle inner radius areas from 100 percent to 25 percent of the nozzles for each nozzle type during each 10-year interval. The NRC has approved the BWRVIP-108 report, "BWRVIP-108: BWR Vessel and Internals Project, Technical Basis for the Reduction of Inspection Requirements for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Inner Radii" and the BWRVIP-241 report, "BWRVIP-241: BWR Vessel and Internals Project, Probabilistic Fracture Mechanics [PFM] Evaluation for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii," which contain the technical basis supporting ASME Code Case N-702. The BWRVIP-241 report contains additional PFM results supporting revision of the evaluation criteria in the BWRVIP-108 report.
Hence, the conditions and limitations specified in the safety evaluation (SE) for the BWRVIP-241 report, dated April 19, 2013 (ADAMS Accession No. ML13071A240), supersede those in the SE for the BWRVIP-108 report, dated December 19, 2007 (ADAMS Accession No. ML073600374).
The ASME Code of record for FitzPatrick for the fourth 120-month interval ISi program is the 2001 Edition of the ASME Code, Section XI, through the 2003 Addenda.
3.0 LICENSEE'S PROPOSED ALTERNATIVE The SE for the BWRVIP-241 report specified plant-specific requirements which must be met for applicants proposing to use this alternative of ASME Code Case N-702. These plant-specific requirements are reproduced from the SE for the BWRVIP-241 report, which are the following:
(1) The maximum RPV heatup/cooldown rate is limited to less than 115 °F/hour; For recirculation inlet nozzles (2) (pr/t)/CRPV S 1.15 p = RPV normal operating pressure (psi),
r = RPV inner radius (inch),
t =RPV wall thickness (inch), and CRPV = 19332; (3) [p(ro 2 + r?)/ (ro 2 - r?)]/CNOZZLE::; 1.47 p =RPV normal operating pressure (psi),
r0 = nozzle outer radius (inch),
=
n nozzle inner radius (inch), and
=
CNOZZLE 1637;
For recirculation outlet nozzles (4) (pr/t)/CRPV ::;; 1.15 p = RPV normal operating pressure (psi),
r = RPV inner radius (inch),
t = RPV wall thickness (inch), and CRPv= 16171; and (5) (p(ro 2 + n2 )/ (ro2 - r?)]/CNOZZLE::;; 1.59 p = RPV normal operating pressure (psi),
ro =nozzle outer radius (inch),
ri =nozzle inner radius (inch), and CNOZZLE = 1977.
The NRC staff requires that the above five criteria using plant-specific information must be met in order to ensure that the PFM analysis documented in the 8WRVIP-241 report applies to the RPV of the applicant's plant.
4.0 TECHNICAL EVALUATION
4.1 Licensee Evaluation Component for Requested Alternative (ASME Code Class 1): N2, Reactor Recirculation Inlet Nozzles Examination Category: 8-0, "Full Penetration Welded Nozzles in Vessels" Examination Item Number: 83.90, "Nozzle-to-Vessel Welds" and 83.100, "Nozzle Inside Radius Section" ASME Code Requirement for Requested Alternative ASME Section XI, 2001 Edition with the 2003 Addenda, Table IW8-2500-1, Examination Category 8-0, Inspection Program 8 requires a volumetric examination of all nozzles with full penetration welds to the vessel shell (or head) and integrally cast nozzles each 10-year interval.
Additionally, for ultrasonic test examinations, Appendix VIII, "Performed Demonstration for Ultrasonic Examination Systems" in ASME Section XI, is implemented; as required and modified by 10 CFR 50.55a(b)(2)(xv).
Proposed Alternative to the ASME Code Pursuant to 10 CFR 50.55a(z)(1 ), an alternative is requested from performing the required examinations on 100 percent of the N2 recirculation inlet nozzles. This alternative, incorporation of Code Case N-702, would require examination of a minimum of 25 percent of the nozzle-to-vessel welds and nozzle inner radius sections via inspection of three N2
recirculation inlet nozzle assemblies. Five of the N2 recirculation inlet nozzle assemblies or 50 percent have been inspected during the current interval, with no recordable indications identified.
The NRC SE, dated October 17, 2012 (ADAMS Accession No. ML12279A248), approved the utilization of ASME Code Case N-702 for the fourth 10-year ISi interval for FitzPatrick. The N2 recirculation inlet nozzles were excluded from the alternative because they did not meet the third criterion specified in Section 5.0 of the staff's SE for the BWRVIP-108 report. On April 19, 2013, the NRC approved the use of BWRVIP-241, which documents additional PFM analyses to support the revised five evaluation criteria in the BWRVIP SE. Therefore, FitzPatrick is requesting NRC approval to apply ASME Code Case N-702 based on BWRVIP-241 to the N2 recirculation inlet nozzles for the remainder of the fourth 10-year ISi interval (ending February 3, 2017).
Bases for Requested Alternative (as stated)
The applicability of the criteria in Section 5.0 of the NRC SE regarding BWRVIP-241 to the recirculation inlet nozzles at FitzPatrick is demonstrated as shown below:
(1) Max RPV Heatup I Cooldown Rate First criterion - the maximum RPV heatup/cooldown rate is limited to < 115°F/hr. In accordance with Technical Specification 3.4.9, RCS Pressure and Temperature Limits, the maximum RPV heatup/cooldown rate is limited to s 100°F when averaged over any one hour period.
FitzPatrick meets this criterion.
(2) Recirculation Inlet (N2) Nozzles Second criterion - Equation: (pr/t)/CLRPv < 1.15
=
[(1040)(110.375)/6.875]/19332 0.864 < 1.15 FitzPatrick's result is 0.864, which meets the requirement of this criterion.
(3) Recirculation Inlet (N2) Nozzles Third criterion - Equation: [p(roNz2+nNz2)/(roNz2-nNz2)]/Ci-NozzLE < 1.47
[1040 (10.22 2 + 6.19 2 )/(10.22 2 -6.19 2)]/1637 = 1.371<1.47 FitzPatrick's result is 1.371, which meets the requirement of this criterion.
Criteria four and five relate solely to recirculation outlet (N 1) nozzles that were granted as an alternative to utilize Code Case N-702 as part of Relief Request No. 08 (RR-08) on October 17, 2012.
The NRC SE Section Criteria are met for all nozzles listed in Attachment 1. Therefore, the basis for using Code Case N-702 is demonstrated for the FitzPatrick N2 Recirculation Inlet nozzles.
Period of application (as stated)
Upon approval by the NRC staff, this alternative will be utilized through the remainder of FitzPatrick's fourth inspection interval (March 1, 2007 - February 3, 2017) for the N2 Recirculation Inlet nozzle assemblies.
4.2 Staff Evaluation Additional PFM results supporting revision of the five evaluation criteria in the SE for the BWRVIP-108 report is documented in the BWRVIP-241 report. The objective of the BWRVIP-241 report is limited, i.e., revision of the limitations and conditions specified in the SE for the BWRVIP-108 report; therefore, it is considered as a supplement to the BWRVIP-108 report, not a replacement. Nonetheless, the conditions and limitations specified in the SE for the BWRVI P-241 report supersede those in the SE for the BWRVI P-108 report. Applicants requesting relief from the inspection requirements on the subject RPV nozzles in Section XI of the ASME Code must demonstrate that the five plant-specific criteria are satisfied, so that BWRVI P-241 report results apply to their plants.
The SE on the BWRVIP-108, established that (1) the fracture toughness-related reference temperature (RT NoT) used in the PFM analyses were based on data from the entire fleet of BWR RPVs, making the PFM analyses bounding with respect to fracture resistance and leaving the driving force of the underlying PFM analyses the only item to be evaluated, and (2) except for the RPV heatup/cooldown rate, the plant-specific criteria are for the recirculation inlet and outlet nozzles only because the probabilities of failure, P(FIE)s, for other nozzles are an order of magnitude lower. Based on the above, the BWRVIP-241 report documents additional PFM analyses on the recirculation inlet and outlet nozzles having the highest driving force among the BWR fleet to demonstrate that the associated vessel failure probability for the normal operation is still consistent with the NRC safety goal, thus supporting the proposed revision of the five evaluation criteria. The SE for the BWRVIP-241 report accepted the proposed revision of the five evaluation criteria in the BWRVI P-108 report.
Entergy provided FitzPatrick's plant-specific RPV and N2 recirculation inlet nozzle data and an evaluation of the first three of the five driving force factors, or ratios, against the criteria established in the SE for BWRVI P-241. Entergy did not address the last two criteria regarding recirculation outlet nozzles because they were previously evaluated and approved in RR-08 for the same fourth ISi interval in an SE dated October 17, 2012. Relief Request No. 08 excluded N2 recirculation inlet nozzles because they failed to meet Criterion 3. Relief Request No. 18 is intended to re-address the applicability of ASME Code Case N-702 to N2 recirculation inlet nozzles by applying the new plant-specific criteria specified in the SE for BWRVIP-241.
Therefore, the SE dated October 17, 2012, is still valid, and the current SE only supplements it by extending the application of ASME Code Case N-702 to N2 recirculation inlet nozzles.
The NRC staff examined Entergy's calculations and verified that the evaluation, using the plant-specific RPV and N2 recirculation inlet nozzle data, has demonstrated that Criteria 2 and 3 are satisfied. Although there is a minor revision of the N2 recirculation inlet nozzle dimensions (RR-18 versus RR-08), this revision is not significant and does not change the above NRC staff conclusion. As a result, the reduced inspection requirements in accordance with ASME Code
Case N-702 apply to N2 recirculation inlet nozzles, and the licensee's proposed alternative provides an acceptable level of quality and safety because the plant-specific results have met the revised criteria in BWRVIP-241, which is consistent with the NRC safety goal on PFM results. For other RPV nozzles approved for the same reduced inspection requirements, please see the SE dated October 17, 2012. FitzPatrick has already inspected 50 percent of the N2 recirculation inlet nozzle assemblies during the current fourth ISi interval; therefore, no additional inspection is required for the N2 recirculation inlet nozzle assembly to the end of this interval, per Code Case N-702 requirements.
5.0 CONCLUSION
The staff has reviewed the submittal regarding Entergy's evaluation of the first three of the five plant-specific criteria specified in the SE for the BWRVIP-241 report, dated April 19, 2013. The BWRVIP-241 report provides technical bases for use of ASME Code Case N-702 to examine RPV N2 recirculation inlet nozzle-to-vessel welds and nozzle inner radii at Fitzpatrick. Based on the evaluation in Section 4.2 of this SE, the NRC staff determined that Entergy's proposed alternative provides an acceptable level of quality and safety and applies to the requested Fitzpatrick N2 recirculation inlet nozzles. The similar approval for other RPV nozzles is documented in the SE for RR-08, dated October 17, 2012.
Accordingly, the NRC staff concludes that Entergy has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1) and is in compliance with the requirements of the ASME Code. Therefore, the NRC authorizes Entergy's proposed alternative for inspection of nozzle-to-vessel shell welds and nozzle inner radii sections of RPV N2 recirculation inlet nozzles for the Fitzpatrick's remaining fourth 10-year ISi interval.
All other ASME Code, Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributors: Simon Sheng Date: December 6, 2016
Accordingly, the NRC staff concludes that Entergy has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1) and is in compliance with the requirements of the ASME Code. Therefore, the NRC authorizes Entergy's proposed alternative for inspection of nozzle-to-vessel shell welds and nozzle inner radii sections of RPV N2 recirculation inlet nozzles for the Fitzpatrick's remaining fourth 10-year ISi interval.
All other ASME Code, Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
If you have any questions, please contact the Fitzpatrick Project Manager, Diane Render, Ph.D.,
at (301) 415-3629.
Sincerely, IRA/
Richard Guzman, Acting Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorllpll-1 RidsNrrPMFitzPatrick LPLl-1 Reading File RidsNrrLAKGoldstein RidsACRS_MailCTR RidsNrrDorlDpr RidsRgn1 MailCenter SSheng ADAMS Access1on No.: ML16334A440 *b1ymemo OFFICE LPLl-1/PM LPLl-1/LA DE/EVIB/BC LPLl-1/BC(A) LPLl-1/PM NAME DRender KGoldstein DRudland* RGuzman DRender DATE 11/28/2016 11/29/2016 11/16/2016 12/06/2016 12/06/2016 OFFICIAL RECORD COPY