Letter Sequence Other |
---|
CAC:MF7537, TS Inservice Testing (IST) Program Removal (Open) CAC:MF7538, TS Inservice Testing (IST) Program Removal (Open) |
|
MONTHYEAR2CAN031602, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme..2016-03-25025 March 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme.. Project stage: Request 1CAN031604, Arkansas, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Co2016-03-25025 March 2016 Arkansas, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code Project stage: Request ML16130A4712016-12-0909 December 2016 Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (CAC Nos. MF7537 and MF7538) Project stage: Other 2016-12-09
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML23142A1062023-05-24024 May 2023 Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-035 ML22073A0952022-04-0707 April 2022 Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (EPID L-2021-LLR-0084) (NON-PROPRIETARY) ML21299A0032021-10-28028 October 2021 and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code ML21293A0962021-10-28028 October 2021 Relief ANO2-R&R-012 Concerning Proposed Alternative for Repair of Reactor Vessel Closure Head Penetration 46 ML21168A0562021-07-0909 July 2021 Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML21118B0392021-05-19019 May 2021 Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) ML20121A1932020-05-0606 May 2020 Alternative Requests for the Fifth 10 Year Interval Inservice Testing of Low Pressure Safety Injection Pumps and Service Water Valves ML20119A0732020-04-29029 April 2020 Withdrawal of Requested Alternatives for the Fifth 10-Year Interval Inservice Testing of Service Water Pumps and Visual Examination of Snubbers ML20083J9682020-03-26026 March 2020 Approval of Request for Alternative ANO 2-PT-002 End-of-Internal System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 2CAN071902, Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping2019-07-25025 July 2019 Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping ML19184A5542019-07-15015 July 2019 Request for Relief ANO1-ISI-032 from the ASME Code Section XI Visual Examination Requirements for the Fourth 10-Year Inservice Inspection Interval ML19156A4002019-06-11011 June 2019 Request for Alternative ANO2-ISI-021 to Permit Continued Application of the 2007 Edition Through the 2008 Addenda of ASME Code CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 1CAN041801, Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third Period2018-04-23023 April 2018 Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third Period CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 ML17174B1442017-07-12012 July 2017 Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME Code ML16130A4712016-12-0909 December 2016 Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (CAC Nos. MF7537 and MF7538) ML16237A0822016-08-29029 August 2016 Relief Request No. ANO1-ISI-025, Relief from American Society of Mechanical Engineers Section XI Table IWB-2500-1 Requirements ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division ML15070A4282015-03-16016 March 2015 Relief Request ANO2-ISI-017, Alternative to Utilize ASME Code Case N-513-4 for the Fourth 10-Year Inservice Inspection Interval ML15030A2392015-02-0909 February 2015 Correction to Relief Request ANO1-ISI-024 Issued December 23, 2014; Revises 10 CFR 50.55a Citations as a Result of Changes from Final Rule Effective December 5, 2014 ML14330A2072014-12-23023 December 2014 Relief Request ANO1-ISI-024, Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-1, Fourth 10-year Inservice Inspection Interval ML14282A4792014-10-29029 October 2014 Relief Request ANO1-ISI-023, Volumetric Examination Frequency Requirements, for the Fourth 10-Year Inservice Inspection Interval ML14150A1632014-06-0606 June 2014 Relief Request ANO2-ISI-004 - Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations ML14099A4522014-04-15015 April 2014 Relief Request ANO2-ISI-016, from ASME Code Case N-770-1 Successive Examination, for the Fourth 10-Year Inservice Inspection Interval ML13179A1162013-07-24024 July 2013 Request for Relief ANO1-ISI-022 from ASME Code Examination Requirements for Pressure-Retaining Welds in Piping; Fourth 10-Year Inservice Inspection Interval ML13179A1102013-07-16016 July 2013 Request for Relief No. ANO1-ISI-021, from ASME Volumetric Requirements for Full Penetration Welded Nozzles in Vessels - Inspection Program B; Fourth 10-Year ISI Interval ML13161A2412013-06-27027 June 2013 Relief Request ANO2-ISI-015, from Pressure Testing Requirements for Reactor Vessel Flange Seal Leak Detection Piping for the Fourth 10-Year Inservice Inspection Interval ML13071A6342013-03-22022 March 2013 Relief Request ANO2-ISI-014, from Volumetric and Surface Exam Requirements for Pressure Retaining Welds in Austenitic Stainless Steel, Third 10-Year Inservice Inspection Interval ML13071A6632013-03-21021 March 2013 Relief Request ANO2-ISI-010, from Volumetric and Surface Exam Requirements for Pressure Retaining Welds in Piping, Third 10-Year Inservice Inspection Interval ML13032A5732013-02-21021 February 2013 Relief Request Nos. ANO2-ISI-009, ANO2-ISI-011, and ANO2-ISI-012, ASME Code Volumetric and Surface Exam Requirements for Integral Attachment and Pressure-Retaining Welds, Third 10-Year Inservice Inspection Interval ML12319A3672012-11-27027 November 2012 Relief Request ANO2-ISI-007, Alternative to Use ASME Code Case N-770-1 Baseline Examination, Fourth 10-Year Inservice Inspection Interval 1CAN071202, Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements, Fourth 10-Year Interval, First Period2012-07-25025 July 2012 Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements, Fourth 10-Year Interval, First Period 2CAN111101, Use of Alternate ASME Code Case N-770-1 Baseline Examination Request for Alternative ANO2-ISI-0072011-11-30030 November 2011 Use of Alternate ASME Code Case N-770-1 Baseline Examination Request for Alternative ANO2-ISI-007 ML1117107982011-08-10010 August 2011 Relief, ANO1-R&R-016, Request for Use of Non-ASME Code Repair to Service Water Piping in Accordance with Generic Letter 90-05, Fourth 10-Year Interval. ME6107 ML1034301562011-01-10010 January 2011 Relief Request ANO1-R&R-013, Proposed Alternative to Requirements Associated with Repair of Components, for Duration of ANO-1 Spring 2010 Refueling Outage 1R22 ML1035005322011-01-0505 January 2011 Request for Alternative ANO2-ISI-006, Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 for the Fourth 10-Year ISI Interval ML1025001282010-09-23023 September 2010 Relief Request ANO2-ISI-005 to Extend the Inservice Inspection Interval for the Visual Examination of Accessible Interior to Reactor Vessel Attachment Weld, for Fourth 10-Year Interval ML1024506542010-09-21021 September 2010 Relief Request ANO2-ISI-004 to Extend Third Inservice Inspection Interval from 10 to 20 Years for Reactor Vessel Weld Examinations ML1009103502010-08-19019 August 2010 Request for Relief PRR-ANO2-2010-1, Relief from the Requirements of Operation and Maintenance Code Section ISTB-5221 and ITSB-5223 for the Service Water Pumps ML1011701272010-06-0202 June 2010 Request for Alternative ANO1-ISI-014, to Implement a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 ML1011701192010-05-0505 May 2010 Request for Relief Nos. ANO1-ISI-015, ANO1-ISI-016, ANO1-ISI-017, ANO1-ISI-018, ANO1-ISI-019, and ANO1-ISI-020, Relief from Requirements of the ASME Code, Section XI ML1009706592010-04-26026 April 2010 Request for Alternative ANO2-ISI-003 to Use 2001 Edition Through 2003 Addenda in Lieu of the 2004 Edition for Fourth 10-Year Inservice Inspection Interval 2CAN021002, Request for Relief PRR-ANO2-2010-1 from the Requirements of OM Code Section ISTB-5221 and ISTB-5223 for the Service Water Pumps2010-02-17017 February 2010 Request for Relief PRR-ANO2-2010-1 from the Requirements of OM Code Section ISTB-5221 and ISTB-5223 for the Service Water Pumps 2CAN011005, Supplement to Request for Alternative Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-7162010-01-28028 January 2010 Supplement to Request for Alternative Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 ML0923005512009-08-27027 August 2009 Request for Alternative ANO2-ISI-002 to 10 CFR 50.55a(g)(6)(ii)(D) Examination Requirements, for Remainder of Current 10-Year Inservice Inspection Interval and Fourth ISI Interval Until the Head Is Replaced 2023-05-24
[Table view] Category:Letter
MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times ML23114A3572023-05-10010 May 2023 Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23108A1362023-04-24024 April 2023 Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2024-01-24
[Table view] Category:Safety Evaluation
MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23142A1062023-05-24024 May 2023 Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-035 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22342B1602023-01-10010 January 2023 Requests for Relief ANO2-ISI-023, -024, -025, -026, -027, and -028 to Permit Reduction of Inspection Area Due to Interference (EPIDs L-2022-LLR-0022,-0023, -0024, -0025, -0026, and -0027) ML22263A1912022-12-0909 December 2022 Issuance of Amendment No. 278 Revision to Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations (EPID L-2021-LLA-0181) - Non-Proprietary ML22236A5452022-08-26026 August 2022 Correction to Issuance of Amendment No. 331 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22138A4312022-06-23023 June 2022 Issuance of Amendment No. 277 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22039A2822022-03-15015 March 2022 Issuance of Amendment Nos. 274 and 328 One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply Piping ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21225A0552021-12-17017 December 2021 Issuance of Amendment No. 327 Addition of Technical Specification Limiting Condition for Operation 3.0.6 and Adoption of Safety Function Determination Program ML21341B2262021-12-13013 December 2021 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21208A4492021-09-20020 September 2021 Issuance of Amendment No. 325 Revise Loss of Voltage Relay Allowable Values and Number of Degraded Voltage Channels ML21132A2792021-05-19019 May 2021 Request for Approval of Change to the Entergy Quality Assurance Program Manual ML21088A4332021-04-14014 April 2021 Issuance of Amendment No. 324 Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21027A4282021-03-23023 March 2021 Issuance of Amendment No. 272 Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent ML21040A5132021-03-10010 March 2021 Issuance of Amendment No. 271 Revision to Loss of Voltage Relay Allowable Values ML20351A1532021-02-0808 February 2021 Issuance of Amendment No. 323 Technical Specification Deletions, Additions, and Relocations ML20288A8242020-11-16016 November 2020 Regulatory Audit Summary Concerning License Amendment Request to Replace the Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent NUREG-1432, Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-14322020-10-30030 October 2020 Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-1432 ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20160A1472020-06-30030 June 2020 Issuance of Amendment No. 270 to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20135H1412020-06-30030 June 2020 Issuance of Amendment Nos. 269 and 321 Request to Incorporate the Tornado Missile Risk Evaluator Into the Licensing Basis ML20121A1932020-05-0606 May 2020 Alternative Requests for the Fifth 10 Year Interval Inservice Testing of Low Pressure Safety Injection Pumps and Service Water Valves ML20107J3172020-04-23023 April 2020 Relief Request ANO1-ISI-033 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20087L8032020-04-0808 April 2020 Issuance of Amendment No. 320 to Revise Control Element Assembly Drop Times ML20083J9682020-03-26026 March 2020 Approval of Request for Alternative ANO 2-PT-002 End-of-Internal System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping ML19231A2972020-01-29029 January 2020 Issuance of Amendment No. 318 Addition of Technical Specification Actions to Address Inoperability of the Containment Building Sump ML19220A9382019-09-27027 September 2019 Issuance of Amendment No. 266 Adoption of Technical Specifications Task Force Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19184A5542019-07-15015 July 2019 Request for Relief ANO1-ISI-032 from the ASME Code Section XI Visual Examination Requirements for the Fourth 10-Year Inservice Inspection Interval ML19156A4002019-06-11011 June 2019 Request for Alternative ANO2-ISI-021 to Permit Continued Application of the 2007 Edition Through the 2008 Addenda of ASME Code ML19098A9552019-05-22022 May 2019 Issuance of Amendment No. 264 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3 ML19063B9482019-04-23023 April 2019 Issuance of Amendment No. 315 Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18337A2472019-01-17017 January 2019 Issuance of Amendment Nos. 263 and 314 Revision to Emergency Action Level Scheme ML18346A3142019-01-0707 January 2019 Relief Nos. ANO1-ISI-027, -028, -029, -030, and -031 from ASME Code, Section XI, Examination Requirements for Fourth 10-Year Inservice Inspection Interval (EPID L-2018-LLR-0063, -0064, -0065, -0066, -0067) ML18317A3822018-12-19019 December 2018 Issuance of Amendment No. 313, Revise Technical Specification 3.3.3.6, Post-Accident Instrumentation ML18298A0122018-11-27027 November 2018 Issuance of Amendment No. 311 Updating the Reactor Coolant System Pressure Temperature Limits ML18260A3392018-10-24024 October 2018 Issuance of Amendment No. 261 Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves ML18192A1042018-08-15015 August 2018 Alternative to Examination of Reactor Pressure Vessel Flange Threads ML18173A0192018-06-27027 June 2018 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule (CAC MG0244; EPID L-2017-LLL-0020) ML18115A2822018-06-19019 June 2018 Issuance of Amendment No. 260 Technical Specification Changes Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-412 Revision 3 (CAC No. MG0009; EPID L-2017-LLA-0267) ML18134A2532018-06-19019 June 2018 Issuance of Amendment No. 310 Technical Specification Changes to Provide Actions for Emergency Feedwater Pump Inoperability Consistent with NUREG-1432, Revision 4 (CAC No. MG0016; EPID L-2017-LLA-0268) ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 2024-01-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 9, 2016 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802
SUBJECT:
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - REQUEST FOR ALTERNATIVE TEST PLAN TO THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS CODE FOR OPERATION AND MAINTENANCE OF NUCLEAR POWER PLANTS (CAC NOS. MF7537 AND MF7538)
Dear Sir or Madam:
By separate letters dated March 25, 2016 (Agencywide Documents Access and Management System Accession Nos. ML16088A181 and ML16088A186), Entergy Operations, Inc. (Entergy, the licensee), submitted for approval to the U.S. Nuclear Regulatory Commission (NRC) alternative test plans in lieu of certain inservice testing (IST) requirements (1) of the 2001 Edition through 2003 Addenda of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) for the IST program for Arkansas Nuclear One (ANO), Unit 1; and (2) of the 2004 Edition of ASME OM Code and no Addenda for the IST program for ANO Unit 2. Specifically, the licensee requested to adopt approved Code Case OMN-20, "lnservice Test Frequency," at ANO Unit 1 during the fourth 10-year IST program interval and at ANO Unit 2 during the fourth 10-year IST program interval.
In addition, in the letters dated March 25, 2016, Entergy requested to adopt Technical Specification Task Force (TSTF) Traveler TSTF-545, Revision 3, "TS [Technical Specification]
lnservice Testing Program Removal & Clarify SR [Surveillance Requirement] Usage Rule Application to Section 5.5 Testing," for both ANO Units 1 and 2. The license amendment requests are being reviewed separately from this request for alternative. The adoption of TSTF-545 would, among other things, result in the deletion of TS 5.5.8.b from TS 5.5.8, "lnservice Testing Program." TS 5.5.8.b, provides an allowance to apply SR 3.0.2 to certain IST requirements as specified in the ASME OM Code and with test frequencies of 2 years or less.
The NRC regulations and ASME OM Code do not make available test allowances similar to SR 3.0.2. In January 2013, the ASME announced the availability of Code Case OMN-20, "lnservice Test Frequency," which provides allowances similar to SR 3.0.2 for IST frequencies.
Therefore, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Section 50.55a(z)(2), the licensee requested to use the proposed alternatives of Code Case OMN-20 on the basis that complying with the current ASME OM Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The NRC staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that Entergy has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2) for this alternative. Therefore, pursuant to 10 CFR 50.55a(z)(2),
the NRC staff authorizes the proposed alternative requests for the remainder of the fourth
10-year IST interval at ANO Unit 1, which is currently scheduled to end November 30, 2017, and the remainder of the fourth 10-Year IST interval at ANO Unit 2, which is currently scheduled to end March 25, 2020, or until Code Case OMN-20 is incorporated into a future revision of Regulatory* Guide 1.192, referenced by a future revision of 10 CFR 50.55a, whichever comes first.
All other ASME OM Code requirements for which relief was not specifically requested and approved in the subject requests for relief remain applicable.
If you have any questions, please contact Thomas Wengert at (301) 415-4037 or by e-mail at Thomas.Wengert@nrc.gov.
Sincerely, Douglas A. Broaddus, Acting Chief Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ALTERNATIVE RELATED TO THE INSERVICE TESTING PROGRAM FOURTH 10-YEAR INTERVAL ENTERGY OPERATIONS. INC ARKANSAS NUCLEAR ONE. UNITS 1 AND 2 DOCKET NOS. 50-313 AND 50-368
1.0 INTRODUCTION
By separate letters dated March 25, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML16088A181 and ML16088A186), Entergy Operations, Inc.
(Entergy, the licensee}, submitted alternative requests to the U.S. Nuclear Regulatory Commission (NRC) for Arkansas Nuclear One (ANO), Units 1 and 2, respectively. The licensee requested an alternative test plan in lieu of certain inservice testing (IST) requirements of the 2001 Edition through 2003 Addenda of the American Society of Mechanical Engineers (ASME)
Code for Operation and Maintenance of Nuclear Power Plants (OM Code) for the IST program at ANO Unit 1 during the fourth 10-year IST program interval, which is currently scheduled to end November 30, 2017. Also, the licensee requested an alternative test plan in lieu of certain IST requirements of the 2004 Edition of ASME OM Code for the IST program at ANO Unit 2 during the fourth 10-year IST program interval, which is currently scheduled to end March 25, 2020.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Section 50.55a(z)(2), the licensee requested to use proposed alternatives on the basis that complying with the current ASME OM Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The proposed alternative is Code Case OMN-20, "lnservice Test Frequency," which addresses testing periods for pumps and valves specified in ASME OM Division 1, Section IST, 2009 Edition through OMa-2011 Addenda, and all earlier editions and addenda of ASME OM Code. The licensee proposes to adopt Code Case OMN-20.
2.0 REGULATORY EVALUATION
The regulation in 10 CFR 50.55a{f}, "lnservice Testing Requirements," requires, in part, that IST of certain ASME Code Class 1, 2, and 3 components must meet the requirements of the ASME OM Code and applicable addenda, except where alternatives have been authorized by the NRC.
In proposing an alternative pursuant to 10 CFR 50.55a(z)(2), a licensee must demonstrate that compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the licensee to request and the Commission to authorize the alternatives requested by the licensee.
3.0 TECHNICAL EVALUATION
3.1 Licensee's Alternative Requests The proposed alternatives relate to the test frequency requirements for all pumps and valves applicable to ASME OM Division 1, Section IST. For ANO Unit 1, the IST program is based on the 2001 Edition through 2003 Addenda of the ASME OM Code, and the current interval is the fourth 10-year program interval ending November 30, 2017. For ANO Unit 2, the IST program is based on the 2004 Edition of ASME OM Code and the current interval is the fourth 10-year interval ending March 25, 2020.
The licensee proposes to adopt ASME OM Code Case OMN-20, which was published in conjunction with ASME OM Code, 2012 Edition. The purpose of this code case is to prescribe a methodology for determining acceptable tolerances for pump and valve test frequencies. This proposed alternative will be utilized for the remainder of the ANO Unit 1 and ANO Unit 2, fourth 10-year IST program intervals or until Code Case OMN-20 is incorporated into a future revision of Regulatory Guide 1.192, referenced by a future revision of 10 CFR 50.55a, whichever occurs first.
3.2 NRC Staff Evaluation Historically, licensees have applied and the NRC staff has accepted the standard technical specification (TS) definitions for IST intervals (including allowable interval extensions) to ASME OM Code-required testing (see Section 3.1.3 of NUREG-1482, Revision 2, "Guidelines for lnservice Testing at Nuclear Power Plants: lnservice Testing of Pumps and Valves and lnservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants,"
October 2013 (ADAMS Accession No. ML13295A020). Recently, the staff reconsidered the allowance of using TS testing intervals and interval extensions for IST not associated with TS surveillance requirements (SRs). As noted in Regulatory Issue Summary (RIS) 2012-10, "NRC Staff Position on Applying Surveillance Requirements 3.0.2 and 3.0.3 to Administrative Controls Program Tests," dated August 23, 2012 (ADAMS Accession No. ML12079A393), the NRC determined that programmatic test frequencies cannot be extended in accordance with the TS SR 3.0.2. This includes all IST described in the ASME OM Code not specifically required by the TS SRs.
Following this development, the NRC staff sponsored and co-authored an ASME OM Code inquiry and Code Case to modify the ASME OM Code to include TS like test interval definitions and interval extension criteria. The resultant Code Case OMN-20 was approved by the ASME Operation and Maintenance Standards Committee on February 15, 2012, with the NRC
representative voting in the affirmative. Code Case OMN-20 was subsequently published in conjunction with the ASME OM Code, 2012 Edition. The licensee has proposed to adopt Code Case OMN-20 at ANO Units 1 and 2.
The NRC staff has determined that requiring the licensee to meet the ASME OM Code requirements and applicable adopted ASME OM Code Cases, without an allowance for defined frequency and frequency extensions for IST of pumps and valves, would cause a loss of operational flexibility for meeting ASME OM Code requirements and result in a hardship without a compensating increase in the level of quality and safety. In addition, allowing the usage of Code Case OMN-20 provides reasonable assurance of operational readiness of pumps and valves subject to the ASME OM Code IST. Based on the above and the prior acceptance by the NRC staff of similar TS test interval definitions and interval extension criteria, the NRC staff concludes that implementation of the test interval definitions and interval extension criteria contained in ASME OM Code Case OMN-20 is acceptable.
The NRC staff notes that the proposed alternative to the ASME OM Code, by adoption of approved Code Case OMN-20, is part of Technical Specification Task Force (TSTF) Traveler TSTF-545. Entergy included these requests for these alternatives as part of its submittals to revise its technical specifications and adopt TSTF-545, Revision 3, "TS lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing."
4.0 CONCLUSION
As set forth above, the NRC staff has determined that complying with the current ASME OM Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety and that the proposed alternatives to adopt Code Case OMN-20 provides reasonable assurance that the affected components at ANO Units 1 and 2 are operationally ready. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(z)(2) for this alternative. Therefore, pursuant to 10 CFR 50.55a(z)(2), the NRC staff authorizes the proposed alternative requests for the remainder of the fourth 10-Year IST interval at ANO Unit 1, which is currently scheduled to end November 30, 2017, and the remainder of the fourth 10-Year IST interval at ANO Unit 2, which is currently scheduled to end March 25, 2020, or until Code Case OMN-20 is incorporated into a future revision of Regulatory Guide 1.192, referenced by a future revision of 10 CFR 50.55a, whichever comes first.
All other ASME OM Code requirements for which relief was not specifically requested and approved in the subject requests for relief remain applicable.
Principal Contributor: Michael Farnan Date: December 9, 2016
ML16130A471 *concurrence via OFFICE NRR/DORL/LPL4-2/PM NRR/DORL/LPL4-2/PM NRR/DORL/LPL4-2/LA NAME AWang TWengert PBlechman DATE 6/11/16 12/8/16 8/2/16 OFFICE NRR/DE/EPNB/BC* NRR/DORL/LPL4-2/BC(A)
NAME DAiiey DBroaddus (SKoenick) for DATE 5/3/2016 12/9/16