Letter Sequence Other |
---|
CAC:MF2400, Control Room Habitability (Approved, Closed) CAC:MF2401, Control Room Habitability (Approved, Closed) CAC:MF2402, Control Room Habitability (Approved, Closed) CAC:MF2403, Control Room Habitability (Approved, Closed) CAC:MF2404, Control Room Habitability (Approved, Closed) CAC:MF2405, Control Room Habitability (Approved, Closed) CAC:MF2406, Control Room Habitability (Approved, Closed) CAC:MF2407, Control Room Habitability (Approved, Closed) CAC:MF2408, Control Room Habitability (Approved, Closed) CAC:MF2409, Control Room Habitability (Approved, Closed) |
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML15274A5992015-10-0101 October 2015 10-01-15 Public Phone Call Project stage: Request ML16011A0612016-02-0202 February 2016 Summary of 10/1/15 Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (CAC MF Project stage: Meeting ML16028A1522016-02-18018 February 2016 1/14/2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Modifications to the Licensee'S Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 Project stage: Meeting ML16088A2432016-04-0101 April 2016 2/18/2016, Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) Project stage: Meeting ML16092A0442016-04-11011 April 2016 Summary of 3/3/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) Project stage: Meeting ML16082A5072016-04-11011 April 2016 Request for Additional Information, Phased Response Requested, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) Project stage: RAI ML16095A0102016-04-13013 April 2016 Summary of November 17-19, 2015 Thermal-Hydraulic Review at Texas A&M University; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC MF2400-MF2409) Project stage: Other ML16092A0852016-04-13013 April 2016 3/17/2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2401-MF2409) Project stage: Meeting ML16096A0652016-04-13013 April 2016 Summary of February 4 and 16, 2016, Regulatory Audit at Westinghouse in Rockville, MD, Boric Acid Precipitation, Exemption and License Amendment Request, Risk-Informed Approach to Resolve Generic Safety Issue 191 Project stage: Other ML16111A0272016-04-18018 April 2016 STP Nuclear Operating Company Slideshow for Public Meeting on April 21, 2016 for GSI-191 Resolution (CAC No. MF2400-01) Project stage: Meeting ML16103A3442016-04-26026 April 2016 Summary of February 24-26, 2016 Audit, Debris Transport Review at Alion Science and Technology Corporation, Albuquerque, Nm; Pilot Submittal and Exemption Request, Risk-Informed Approach to Resolve GSI 191 Project stage: Other ML16032A4032016-04-26026 April 2016 FRN, Draft Environmental Assessment and Finding of No Significant Impact, Revise Licensing Basis as Documented in the UFSAR and Request for Exemptions, Risk-Informed Approach to Address GSI-191 (CAC MF2400-MF2409) Project stage: Draft Other ML16032A3872016-04-26026 April 2016 Draft Environmental Assessment and Finding of No Significant Impact, Revise Licensing Basis as Documented in the UFSAR and Request for Exemptions, Risk-Informed Approach to Address GSI-191 (CAC MF2400-MF2409) Project stage: Draft Other ML16127A4002016-05-11011 May 2016 Audit Summary, Thermal-Hydraulic Review on February 23-25, 2016 at Texas A&M University; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue 191 (CAC MF2400-MF2409) Project stage: Other ML16125A2902016-05-26026 May 2016 Request for Additional Information, Risk Review, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) Project stage: RAI ML16141B0812016-05-31031 May 2016 Audit Summary, Risk Audit on April 12-13, 2016, at Alumni Center at the University of Texas, Austin, Tx; Pilot Generic Safety Issue 191 Submittal and Exemption Request, and Draft Request for Additional Information Project stage: Draft RAI ML16175A1082016-06-24024 June 2016 Summary of 4/21/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 Project stage: Meeting ML16190A0082016-07-13013 July 2016 Summary of 6/22/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) Project stage: Meeting ML16194A2342016-07-21021 July 2016 Request for Withholding Information from Public Disclosure - 5/6/16 Affidavit Executed by D. Munoz and M. Rozboril, Alion Science and Technology, Response to Follow-up RAIs 18, 38, and 44 Project stage: RAI ML16242A0102016-08-23023 August 2016 NRR E-mail Capture - (External_Sender) FW: South Texas Project GSI-191 Draft Risk Responses to Questions for Public Meeting on August 29, 2016 Project stage: Request ML16242A0092016-08-25025 August 2016 NRR E-mail Capture - (External_Sender) South Texas Project GSI-191 Draft thermal-hydraulic Responses to Questions for Public Meeting on August 29, 2016 Project stage: Request ML16238A5272016-09-0101 September 2016 Summary of 7/28/16, Public Meeting with STP Nuclear Operating Company to Discuss the License Amendment and Exemption Requests to Use a Risk-Informed Approach to the Resolution of GSI-191 (CAC Nos. MF2400 - MF2409) Project stage: Meeting ML16258A3672016-09-0606 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution SNPB-3-2, Bullet 4 16 -inch Bounding Break Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A1002016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI APLA-3-2 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A1042016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI SNPB-3-13 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A0962016-09-13013 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI SSIB-3-4 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A0982016-09-13013 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI 33 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A2072016-09-14014 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI 37 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A2082016-09-14014 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI 34 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16246A0222016-10-0505 October 2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items Related to Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400 - MF2409) Project stage: Meeting ML16279A3312016-10-27027 October 2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) Project stage: Meeting ML16302A4532016-12-12012 December 2016 Closeout of Request for Additional Information Questions That Are No Longer Applicable, Resolution of Generic Safety Issue (GSI) 191 (CAC Nos. MF2400-MF2409) Project stage: RAI ML16351A1502016-12-16016 December 2016 Correction Letter Closeout of Request for Information Questions That Are No Longer Applicable Associated with the Resolution of Generic Safety Issue 191 (CAC Nos. MF2400 - MF2409) Project stage: RAI ML16278A5982017-05-0202 May 2017 Letter, Environmental Assessment and Finding of No Significant Impact, Revise Licensing Basis as Documented in the UFSAR and Request for Exemptions, Risk-Informed Approach to Address GSI-191 (CAC MF2400 to MF2409) Project stage: Other ML16278A5992017-05-0202 May 2017 Environmental Assessment and Finding of No Significant Impact, Revise Licensing Basis as Documented in the UFSAR and Request for Exemptions, Risk-Informed Approach to Address GSI-191 (CAC MF2400 to MF2409) Project stage: Other ML17137A3252017-05-17017 May 2017 Safety Evaluation of LAR by South Texas Project Nuclear Operating Company to Adopt a Risk-Informed Resolution of Generic Safety Issue-191 Project stage: Approval ML17151A8432017-06-16016 June 2017 OEDO-17-00326 - EDO Response to ACRS Chairman, Safety Evaluation of License Amendment Request by STP Nuclear Operating Company to Adopt a Risk-Informed Resolution of Generic Safety Issue-191 Project stage: Approval NRC-2016-0092, South Texas Project, Units 1 and 2 - FRN: Exemption from the Requirements of 10 CFR 50.46 and 10 CFR Part 50, Appendix a, General Design Criteria 35, 38, 41 (CAC Nos. MF2402-MF2409)2017-07-11011 July 2017 South Texas Project, Units 1 and 2 - FRN: Exemption from the Requirements of 10 CFR 50.46 and 10 CFR Part 50, Appendix a, General Design Criteria 35, 38, 41 (CAC Nos. MF2402-MF2409) Project stage: Approval ML17037C8712017-07-11011 July 2017 Letter, Exemption from the Requirements of 10 CFR Part 50, Section 50.46 (CAC Nos. MF2402-MF2409) Project stage: Approval ML17037C8762017-07-11011 July 2017 FRN: Exemption from the Requirements of 10 CFR 50.46 and 10 CFR Part 50, Appendix a, General Design Criteria 35, 38, 41 (CAC Nos. MF2402-MF2409) Project stage: Approval ML17055A5002017-07-11011 July 2017 Enclosure 4 to Amendment Nos. 212 and 198, Resolution of Licensee Comments on Safety Evaluation - Risk-Informed Approach to Resolve Generic Safety Issue 191 Project stage: Approval ML17019A0032017-07-11011 July 2017 Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 Project stage: Approval ML17038A2232017-07-11011 July 2017 Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 Project stage: Approval ML17019A0022017-07-11011 July 2017 Safety Evaluation, Enclosure 3 to Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 Project stage: Approval 2016-05-31
[Table View] |
Summary of November 17-19, 2015 Thermal-Hydraulic Review at Texas A&M University; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC MF2400-MF2409)ML16095A010 |
Person / Time |
---|
Site: |
South Texas |
---|
Issue date: |
04/13/2016 |
---|
From: |
Lisa Regner Plant Licensing Branch IV |
---|
To: |
Koehl D South Texas |
---|
Regner L |
References |
---|
CAC MF2400, CAC MF2401, CAC MF2402, CAC MF2403, CAC MF2404, CAC MF2405, CAC MF2406, CAC MF2407, CAC MF2408, CAC MF2409 |
Download: ML16095A010 (6) |
|
|
---|
Category:Audit Report
MONTHYEARML21236A3082021-09-10010 September 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Moderator Temperature Coefficient Surveillance Requirements ML20142A2792020-05-27027 May 2020 Regulatory Audit Summary Regarding Exigent License Amendment Request to Revise the Safety Injection Accumulators Pressures ML17107A3192017-05-16016 May 2017 Aluminum Bronze Selective Leaching Aging Management Program Audit Report Regarding the South Texas Project, Units 1 and 2, License Renewal Application (CAC Nos. ME4936 and ME4937) ML16218A2562016-08-30030 August 2016 Aluminum Bronze Selective Leaching Aging Management Program and PWR Reactor Internals Program Inspection Plan Audit Report Regarding the South Texas Project, Units 1 and 2 ML16214A2912016-08-26026 August 2016 Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, MD, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16141B0812016-05-31031 May 2016 Audit Summary, Risk Audit on April 12-13, 2016, at Alumni Center at the University of Texas, Austin, Tx; Pilot Generic Safety Issue 191 Submittal and Exemption Request, and Draft Request for Additional Information ML16127A4002016-05-11011 May 2016 Audit Summary, Thermal-Hydraulic Review on February 23-25, 2016 at Texas A&M University; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue 191 (CAC MF2400-MF2409) ML16103A3442016-04-26026 April 2016 Summary of February 24-26, 2016 Audit, Debris Transport Review at Alion Science and Technology Corporation, Albuquerque, Nm; Pilot Submittal and Exemption Request, Risk-Informed Approach to Resolve GSI 191 ML16095A0102016-04-13013 April 2016 Summary of November 17-19, 2015 Thermal-Hydraulic Review at Texas A&M University; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC MF2400-MF2409) ML16096A0652016-04-13013 April 2016 Summary of February 4 and 16, 2016, Regulatory Audit at Westinghouse in Rockville, MD, Boric Acid Precipitation, Exemption and License Amendment Request, Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16029A2722016-03-15015 March 2016 12/7-8/2015 Audit Summary, Audit Conducted to Support License Amendment Request to Revise TS 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) ML15175A0242015-07-29029 July 2015 Audit Summary for May 12-14, 2015 Audit of Roverd Methodology Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (TAC Nos. MF2400 Through MF2409) ML15183A0072015-07-15015 July 2015 Audit Summary, 3/31 to 4/2/15 Audit of Systems, Structures and Equipment at STP Facility; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 ML15131A1452015-06-0404 June 2015 Audit Report for the 2015 Supplemental Audit STP License Renewal ML15111A4652015-05-0606 May 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML15183A0092015-04-0202 April 2015 Photos, Audit Summary, 3/31 to 4/2/15 Audit of Systems, Structures and Equipment at STP Facility; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 ML14321A6772015-01-15015 January 2015 Audit Report for 9/16-17/2014 Audit at University of New Mexico Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (TAC MF2400 Through and MF2409) ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML12165A2392012-06-15015 June 2012 Report Regarding the Follow-up Audit of the Selective Leaching of Aluminum Bronze Aging Management Program for the South Texas Project, Units 1 and 2, License Renewal Application (TAC ME4936 and ME4937) ML11224A2652011-09-22022 September 2011 Aging Management Programs Audit Report Regarding the South Texas Project, Units 1 and 2, Station License Renewal Application (TAC Nos. ME4936 and ME4937) ML1122106582011-09-0707 September 2011 Audit of the Licensee Regulatory Commitment Management Program, Audit Performed July 19-20, 2011 ML11230A0032011-09-0606 September 2011 Scoping and Screening Audit Report Regarding the South Texas Project, Units 1 and 2 (TAC Nos. ME4936 and ME4937) ML11173A3042011-07-18018 July 2011 Audit Report Regarding South Texas Project License Renewal Application - Cultural Resource ML11145A0642011-06-21021 June 2011 Plan for the Environmental Related Regulatory Audit Regarding the South Texas Project, Units 1 and 2, License Renewal Application Review (TAC Nos. ME4938 and ME4939) ML0834501622008-12-24024 December 2008 Audit Report of Licensee Regulatory Commitment Management Program for Audit Performed August 19, 2008 ML0721101192007-08-16016 August 2007 Us NRC Audit Report for South Texas Project Combined License Application Review ML0426702502004-09-22022 September 2004 Audit of the Licensees Management of Regulatory Commitments NOC-AE-04001712, Appendix a Cameco Corporation 2003 Consolidated Audited Financial Statements2004-02-27027 February 2004 Appendix a Cameco Corporation 2003 Consolidated Audited Financial Statements 2021-09-10
[Table view] Category:Letter
MONTHYEARML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23222A2792023-08-0909 August 2023 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 ML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML23188A1612023-07-14014 July 2023 the Associated ISFSI - Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing (EPID L-2023-LLM-0004) - Letter ML23193A9932023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML23177A2522023-06-26026 June 2023 Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary ML23166B0802023-06-14014 June 2023 Update Foreign Ownership, Control, or Influence (FOCI) ML23163A1762023-06-12012 June 2023 Application for Order Approving Indirect Transfer of Control of Licenses 2024-01-29
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 13, 2016 Mr. Dennis L. Koehl President and CEO/CNO STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1AND2- NOVEMBER 17-19, 2015, REGULATORY AUDIT REPORT ASSOCIATED VVITH A RISK-INFORMED SOLUTION TO GENERIC SAFETY ISSUE 191 (CAC NOS. MF2400, MF2401, MF2402, MF2403, MF2404, MF2405, MF2406, MF2407, MF2408 AND MF2409)
Dear Mr. Koehl:
By letter dated June 19, 2013 (ADAMS Accession No. ML131750250), as supplemented by letters dated October 3, October 31, November 13, November 21 and December 23, 2013 (two letters); and January 9, February 13, February 27, March 17, March 18, May 15 (two letters),
May 22, June 25, July 15, 2014; and March 10, March 25, and August 20, 2015 (ADAMS Accession Nos. ML13295A222, ML13323A673, ML13323A128, ML13338A165, ML14015A312, ML14015A311, ML14029A533, ML14052A110, ML14072A075, ML14086A383, ML14087A126, ML14149A353, ML14149A354, ML14149A439, ML14178A467, ML14202A045, ML15072A092, ML15091A440, and ML15246A125, respectively), STP Nuclear Operating Company (STPNOC) submitted exemption requests accompanied by license amendment requests for a risk-informed approach to resolve Generic Safety Issue (GSl)-191, "Assessment of Debris Accumulation on PVVR [Pressurized-VVater Reactor] Sump Performance," at South Texas Project, Units 1 and 2 (STP).
The U.S. Nuclear Regulatory Commission (NRC) staff conducted a regulatory audit at Texas A&M University in College Station, Texas, on November 17-19, 2015, in order to gain a better understanding of the licensee's deterministic analysis to ensure long-term core cooling in accordance with paragraph 50.46(b)(5) of Title 10 of the Code of Federal Regulations as part of STPNOC's resolution of GSl-191. Specifically, the staff reviewed the licensee's use of the RELAP5-3D evaluation model for the thermo-hydraulic analysis of in-vessel effects during accidents. RELAP5-3D is used by STP in its GSl-191 resolution approach, but the NRC staff has not generically approved its use by the industry.
Conducting the audit improved the NRC staff's knowledge and understanding of STP's use of RELAP5-3D. The enclosure to this letter describes the observations, questions, and results of the NRC staff's audit.
D. Koehl If you have any questions, please contact me at 301-415-1906 or via e-mail at Lisa. Regner@nrc.gov.
Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosure:
Audit Report cc w/encl: Distribution via Listserv
AUDIT REPORT- NOVEMBER 17-19. 2015 REVIEW OF RELAP5-3D FOR THE THERMAL-HYDRAULIC ANALYSIS REQUEST FOR RISK-INFORMED SOLUTION TO GENERIC SAFETY ISSUE 191 STP NUCLEAR OPERATING COMPANY SOUTH TEXAS PROJECT UNITS 1 AND 2 1.0 SCOPE AND PURPOSE By letter dated June 19, 2013 (ADAMS Accession No. ML131750250), as supplemented by letters dated October 3, October 31, November 13, November 21 and December 23, 2013 (two letters); and January 9, February 13, February 27, March 17, March 18, May 15 (two letters),
May 22, June 25, July 15, 2014; and March 10, March 25, and August 20, 2015 (ADAMS Accession Nos. ML13295A222, ML13323A673, ML13323A128, ML13338A165, ML14015A312, ML14015A311, ML14029A533, ML14052A110, ML14072A075, ML14086A383, ML14087A126, ML14149A353, ML14149A354, ML14149A439, ML14178A467, ML14202A045, ML15072A092, ML15091A440, and ML15246A125, respectively), STP Nuclear Operating Company (STPNOC) submitted exemption requests accompanied by license amendment requests for a risk-informed approach to resolve Generic Safety Issue (GSl)-191 , "Assessment of Debris Accumulation on PWR [Pressurized-Water Reactor] Sump Performance," at South Texas Project, Units 1 and 2 (STP).
The U.S. Nuclear Regulatory Commission (NRC) staff performed an on-site audit on November 17-19, 2015, at the Texas A&M University in College Station, Texas, related to the risk-informed resolution of GSl-191. The purpose of the audit was to gain a better understanding of the licensee's use of the RELAP5-3D evaluation platform referenced in the STPNOC submittals to improve efficiency during the safety review and development of the safety evaluation for STP.
The NRC staff provided the attached draft questions to the licensee by e-mail dated November 3, 2015 (ADAMS Accession No. ML16092A169). The audit was attended by members of the NRC staff and STPNOC staff including:
NRC STP Lisa Regner Michael Murray Jeremy Dean Ernie Kee Josh Kaiser Wayne Harrison Reed Anzalone Drew Richards 2.0 AUDIT ACTIVITIES The STPNOC team provided the NRC audit team an overview of the long-term core cooling modeling platform employed by STP contractors at Texas A&M University to address the plant response to debris expected during several types of loss-of-coolant accidents Enclosure
(e.g., small break on the hot-leg coolant loop piping, large break on the cold-leg coolant loop piping, etc.). The NRC staff was also given an overview of the modeling of the thermal-hydraulic in-core effects of debris.
The NRC staff discussed the RELAP5-3D evaluation model and analysis with STP engineers including:
- The definition boundaries of the RELAP5-3D evaluation model
- The scenarios being simulated in the evaluation model
- The event progression for each scenario
- The verification, validation, and uncertainty performed for the model
- The review standard being applied (NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition" (SRP), Section 15.0.2, "Review of Transient and Accident Analysis Method";
ADAMS Accession No. ML070820123)
- The required level of quality assurance
- The phenomena occurring during the double-ended hot-leg break
- The decision to block the core bypass in light of recent test data
- The documentation required for the evaluation model
3.0 CONCLUSION
S The NRC staff found that the audit helped the staff to better understand the licensee's use of the RELAP5-3D evaluation model for the effects of debris on long-term core cooling and in-core effects of debris. These audit activities helped the audit team members understand better the impacts of debris on long-term core cooling at STP and will inform decisions regarding the risk-informed submittal for GSl-191. The audit also answered several of the NRC staff concerns and questions. There was open communication throughout the audit and it was conducted in accordance with the audit plan with no known deviations.
The NRC staff expects to conduct another audit to answer the remaining open items. These items will be provided to the licensee by e-mail in the first quarter of 2016.
Attachment:
Audit Report Draft Questions
AUDIT REPORT DRAFT QUESTIONS STP NUCLEAR OPERATING COMPANY SOUTH TEXAS PROJECT. UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 Thermal-Hvdrau/ic Analvsis:
Note: these request for additional information (RA/) questions were provided by e-mail from the Division of Operating Reactor Licensing project manager to STP Nuclear Operating Company (STPNOC, the licensee) on December 11, 2015 (Agencywide Documents Access and Management System Accession No. ML16022A176).
New SNPB RA/ 1 - During the November 2015 audit at Texas A&M, STP was considering performing the long term core cooling analysis with the core bypass open to allow flow in the axial direction. Does STP intend to make this change and allow flow axially through the bypass or will STP continue with the bypass completely blocked? If STP is crediting the use of the bypass, they should provide analysis to demonstrate that the bypass will not block during the scenarios. If they are not crediting the bypass, they should inform the NRG that they plan to continue with their current model.
New SNPB RA/ 2 - During the audit, the NRG staff identified a number of sensitivity studies which would be important for the review of the proposed long term core cooling evaluation methodology. STP should perform the following sensitivity studies and submit plots of the relevant figures of merit and important timings for long term core cooling analysis:
a) Appendix K decay heat load with single worst failure and steam generator tube plugging b) Axial power shape c) Small break sensitivity study with appropriate break size resolution Attachment
ML16095A010 *via email OFFICE NRRIDORULPL4-1 /PM NRR/DORULPL4-1 /LA NRR/DSS/SNPB/BC* NRR/DORL/LPL4-1 /BC NRR/DORL/LPL4-1 /PM NAME LRegner JBurkhardt JDean RPascarelli LRegner DATE 04/06/16 04/04/16 04/11/16 04/12/16 04/13/16