Letter Sequence Other |
---|
|
|
MONTHYEARML16022A1072016-02-0101 February 2016 Relief Request Number RR 4-23- Proposed Alternative Concerning ASME Code Depth Sizing Requirement Project stage: Other 2016-02-01
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML21299A0032021-10-28028 October 2021 and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code ML20365A0012021-01-19019 January 2021 Relief Request 5-8 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20282A7642020-10-16016 October 2020 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant - Relief Request 5-8 for Alternate Repair of Reactor Closure Head Penetration Nozzles ML20275A3432020-10-0101 October 2020 Verbal Authorization for Proposed Alternative (RR 5-8) Reactor Vessel Closure Head Penetration Repairs ML20272A1662020-09-30030 September 2020 Attachment 3 - Framatome Document No. ANP-3876, Revision 1Q1NP, Response to NRC Request for Additional Information of Palisades Relief Request Number RR 5-8, Repair of Reactor Pressure Vessel Head Penetration, Inservice Inspection Program, ML20267A3872020-09-23023 September 2020 Relief Request Number RR 5-8, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML20267A3882020-09-23023 September 2020 Attachment 1 - Relief Request Number RR 5-8, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 ML21067A4982017-09-0707 September 2017 Relief Request No. RR 5-4 Proposed Alternative, Weld Reference System ML17194A8072017-08-14014 August 2017 Relief Request No. RR 4-25 Limited Coverage Examinations During the Fourth 10-Year Inservice Inspection Interval ML17137A0282017-06-29029 June 2017 Relief Request Number RR 5; 5 Proposed Alternative, Under-Vessel Leakage Examination ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16022A1072016-02-0101 February 2016 Relief Request Number RR 4-23- Proposed Alternative Concerning ASME Code Depth Sizing Requirement ML15320A2442015-11-25025 November 2015 Relief Request Number 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-Year ISI Interval for ISI Related Activities PNP 2015-073, Forwards Response to Request for Additional Information Regarding Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination2015-09-17017 September 2015 Forwards Response to Request for Additional Information Regarding Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination PNP 2015-075, Submittal of Relief Request Number RR 4-23, Proposed Alternative Concerning ASME Code Depth Sizing Requirement2015-09-16016 September 2015 Submittal of Relief Request Number RR 4-23, Proposed Alternative Concerning ASME Code Depth Sizing Requirement CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division PNP 2015-024, Requests Relief of Proposed Alternatives for the Fifth 10-Year Inservice Test Interval2015-05-19019 May 2015 Requests Relief of Proposed Alternatives for the Fifth 10-Year Inservice Test Interval PNP 2015-022, Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities2015-04-29029 April 2015 Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities ML14199A5572014-08-13013 August 2014 Relief Request Number RR-4-19, Proposed Alternative to the Requirements of ASME Code Case N-638-4 ML12258A3522012-09-26026 September 2012 Relief from Certain Requirements of the ASME Code Case N-77-1 for the Fourth 10-Year Inservice Inspection Interval CNRO-2008-00035, Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 8052008-11-20020 November 2008 Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 805 ML0824801002008-09-19019 September 2008 Acceptance of Requested Licensing Action Relief Request and Supporting Amendment to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examination ML0726304272007-09-21021 September 2007 Relief, Request Relief No. 1 - from Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Requirements for Repair of Pressurizer Nozzle Penetrations ML0719002512007-09-12012 September 2007 Relief Request 1 for the Repair of Reactor Vessel Closure Head Penetrations ML0716201362007-09-12012 September 2007 Relief Request 2 for ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML0716302482007-05-31031 May 2007 Request for Relief from ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Vent Line Penetration ML0709200292007-04-30030 April 2007 Request for Relief from ASME Code Regarding Weld Reference System, Relief Request No. RR 4-11 ML0617103642006-07-0303 July 2006 Monticello Nuclear Generating Plant, Palisades Nuclear Plant, Point Beach Nuclear Plant Units 1 and 2, Prairie Island Nuclear Generating Plant, Units 1 and 2 - Use of ASME Code Case N-513-2 ML0607902512006-04-0303 April 2006 Request for Relief from ASME Code, Section XI, Requirements for Repair of Pressurizer Nozzle Penetrations ML0607900612006-04-0303 April 2006 Request for Authorization to Use Alternatives to ASME Code, Section XI, IWA-3300, IWBb-3142.4, IWB-3420, and IWB-3613 for Reactor Pressure Vessel Head Penetration Repair ML0608003192006-04-0303 April 2006 Request for Authorization to Use Alternatives to ASME Code, Section XI, IWA-4120 for Reactor Pressure Vessel Head Penetration Repair ML0605800602006-03-21021 March 2006 Request for Authorization of Relief Request Number 1 for Certain Requirements in ASME Code, Section XI, Code Case N-638-1 ML0601201042006-01-27027 January 2006 Request for Authorization to Extend the Third 10-Year ISI Interval for Reactor Vessel Visual Examination, MC6546 ML0532002962005-11-29029 November 2005 Request for Authorization to Extend the Third Inservice Inspection Interval for Reactor Vessel Weld Examination ML0520706392005-08-17017 August 2005 Revised Relief Requests 28, 30, and 31 for 3rd 10-year Pump and Valve Inservice Testing ML0436504802005-01-18018 January 2005 Relief Request to Use Code Case N-661, and Safety Evaluation ML0430901912004-11-0808 November 2004 Relief, ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML0430605712004-11-0303 November 2004 Verbal Authorization of Relief from ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML0419103642004-09-14014 September 2004 Relief, Third 10-Year Interval Inservice Inspection Program Plan ML0422402492004-08-0909 August 2004 Request for Relief from ASME Section XI Code Requirements for Repair of Pressurizer Nozzle Penetrations ML0401607382004-02-26026 February 2004 Prairie, Units 1 and 2, Kewaunee, Point Beach, Units 1 and 2, Palisades, Re Request for Alternatives to ASME Section XI, Appendix Viii, Supplement 10 ML0311505002003-05-19019 May 2003 Risk-Informed Inservice Inspection Program TAC No. MB4420 ML0306906292003-03-20020 March 2003 3/20/2003, Palisades, Relief, Re Third Inservice Inspection Interval Program ML0207202292002-03-0101 March 2002 Relief Code, Relief Request for Alternate ASME Code, Section XI, Risk-Informed Inservice Inspection Program ML0207201452002-02-27027 February 2002 Code Relief, Request for Relief from ASME Code Requirements for Inservice Inspection Pressure Test Program (Relief Request PR-07) 2021-10-28
[Table view] Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:Safety Evaluation
MONTHYEARML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22039A1982022-05-13013 May 2022 Issuance of Amendment No. 272 Permanently Defueled Technical Specifications ML21292A1482021-12-13013 December 2021 Safety Evaluation Related to Request for Direct and Indirect Transfers of Control of Facility Operating License DPR-6 for Big Rock Point and Renewed Facility Operating License DPR-20 for Palisades Nuclear Plant and ISFSI (EPID L-2020-LLM-00 ML21292A1472021-12-13013 December 2021 Draft Conforming License Amendments - Palisades Nuclear Plant Renewed Facility Operating License DPR-20 and ISFSI and Big Rock Point Facility Operating License DPR-6 and ISFSI (EPID L-2020-LLM-0003) (Enclosure 2) ML20365A0012021-01-19019 January 2021 Relief Request 5-8 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML19317D8552019-12-30030 December 2019 Issuance of Amendment No. 271 Regarding Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19318E3942019-12-0202 December 2019 Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19198A0802019-08-20020 August 2019 Issuance of Amendments No. 269 Regarding Changes to NFPA 805 Modifications and Change to Full Compliance Implementation Date for the Fire Protection Program (Epids L-2018-LLA-0296 and L-2019-LLA-0049) ML19135A0502019-05-21021 May 2019 Correction to Safety Evaluation for Amendment No.268 Regarding Revision to Diesel Generator Undervoltage Start Surveillance Requirement ML19107A0532019-05-13013 May 2019 Issuance of Amendment No. 268 Regarding Revision to Diesel Generator Undervoltage Start Surveillance Requirement ML19112A3172019-04-26026 April 2019 Approval of Alternative for Repair of Reactor Pressure Vessel Head Penetrations ML18170A2192018-09-24024 September 2018 Issuance of Amendment Changes to the Emergency Plan for Permanently Defueled Condition (CAC No. MG0198; EPID L-2017-LLA-0305) ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18114A4102018-06-0404 June 2018 Issuance of Amendment Regarding Administrative Controls for Permanently Defueled Condition (CAC No. MG0021; EPID L-2017-LLA-0266) ML18135A2632018-05-21021 May 2018 Relief Request No. RR 5-6 Alternate to the Reexamination Frequency for a Relevant Condition ML18039A2442018-02-27027 February 2018 Issuance of Amendment License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications ML17328B0332017-12-15015 December 2017 Issuance of Amendment Cyber Security Plan Implementation Schedule (CAC No. MF9523; EPID L-2017-LLA-0199) ML21067A4982017-09-0707 September 2017 Relief Request No. RR 5-4 Proposed Alternative, Weld Reference System ML17151A3502017-08-21021 August 2017 Approval of Certified Fuel Handler Training and Retraining Program ML17194A8072017-08-14014 August 2017 Relief Request No. RR 4-25 Limited Coverage Examinations During the Fourth 10-Year Inservice Inspection Interval ML17137A0282017-06-29029 June 2017 Relief Request Number RR 5; 5 Proposed Alternative, Under-Vessel Leakage Examination ML17121A5102017-06-0808 June 2017 Issuance of Amendment License Amendment Request for Editorial and Administrative Changes to Technical Specifications ML17082A4652017-05-30030 May 2017 Issuance of Amendment Application to Revise Technical Specifications to Adopt TSTF 545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML16300A0302016-12-19019 December 2016 Issuance of Amendment Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region ML16281A4982016-10-28028 October 2016 Issuance of Amendment No. 260, Revise License Condition 2.C.(4) and Technical Specifications Related to Control Rod Drive Exercise Surveillance ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16014A3182016-08-22022 August 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16078A0682016-05-0202 May 2016 Issuance of Amendment Cyber Security Plan Implementation Schedule ML16043A4852016-03-14014 March 2016 Relief Request Number RR 4-24 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination ML16022A1072016-02-0101 February 2016 Relief Request Number RR 4-23- Proposed Alternative Concerning ASME Code Depth Sizing Requirement ML15334A3072015-12-22022 December 2015 Relief Request Numbers RR 5-2 and 5-3, Proposed Alternative to the Requirements of the ASME OM Code for the Fifth 10-Year Inservice Test Interval ML15320A2442015-11-25025 November 2015 Relief Request Number 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-Year ISI Interval for ISI Related Activities ML15103A0592015-05-18018 May 2015 Issuance of Amendment Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into Limiting Condition for Operation 3.0.3 - RITSTF Initiatives 6B and 6C. ML15055A1062015-04-22022 April 2015 Issuance of Amendment License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times ML15007A1912015-02-27027 February 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML14237A1442014-12-0808 December 2014 Issuance of Amendment Cyber Security Plan Implementation Schedule ML14283A2872014-10-22022 October 2014 Issuance of Amendment Application for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML14223B2262014-09-0404 September 2014 Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination ML14199A5572014-08-13013 August 2014 Relief Request Number RR-4-19, Proposed Alternative to the Requirements of ASME Code Case N-638-4 ML14210A2662014-08-0808 August 2014 Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 & ML13312A4232013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13129A2192013-05-29029 May 2013 Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML13056A5142013-02-28028 February 2013 Non-Proprietary Issuance of Amendment Regarding Replacement of Spent Fuel Pool Region 1 Storage Racks 2023-05-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 1, 2016 Vice President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530
SUBJECT:
PALISADES NUCLEAR PLANT - RELIEF REQUEST NUMBER RR 4 PROPOSED ALTERNATIVE CONCERNING ASME CODE DEPTH SIZING REQUIREMENT (CAC NO. MF6727)
Dear Sir or Madam:
By letter dated September 16, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15260A371 ), Entergy Nuclear Operations, Inc. (ENO, the licensee), submitted Relief Request No. RR 4-23, which proposes to use an alternative inspection procedure to perform inspections required by Title 10 of the Code of Federal Regulations, Part 50 (10 CFR 50) Paragraph 55a(g)(6)(ii)(F) at the Palisades Nuclear Plant (PNP). These inspections are related to the ultrasonic examination of nickel-based Alloy 82/182 dissimilar metal butt welds joining Alloy 600 branch connections to one hot leg and eight cold leg pipes. The proposed alternative inspection procedure does not meet the 0.125 inch root mean square (RMS) error depth sizing requirements of American Society of Mechanical Engineers (ASME) Code Case N-695, "Qualification Requirements for Dissimilar Metal Piping Welds" and ASME Code Section XI, Appendix VIII, Supplement 10, "Qualification Requirements for Dissimilar Metal Piping Welds."
Specifically, pursuant to 10 CFR 50.55a(z)(1 ), the licensee proposes using an inspection procedure with an alternative depth sizing RMS error of 0.242 inches on the basis that the proposed inspection procedure provides an acceptable level of quality and safety.
The NRC staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that the proposed RMS error in the inspection procedure is acceptable, that the proposed alternative provides reasonable assurance that the structural integrity of the branch connections to the hot leg and cold leg piping will be adequately monitored to the end of the fourth ISi interval, and that the proposed alternative provides an acceptable level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1 ). Therefore, during a conference call on September 17, 2015 (ADAMS Accession No. ML15261A039), the NRC staff verbally authorized the use of the licensee's proposed alternative at PNP, effective for the remainder of the fourth 10-year interval, which began on December 13, 2006, and ended on December 12, 2015.
The NRC staff notes that all other ASME Code, Section XI and 10 CFR 55a(g)(6)(ii)(F) requirements for which relief was not specifically requested and approved in the subject request for relief remain applicable, including third party review by the Authorized Nuclear lnservice Inspector.
If you have any questions, please contact the Palisades Project Manager, Jennivine Rankin, at (301) 415-1530.
Sincerely, David J. Wrona, Chief Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosure:
Staff Evaluation of the Fourth 10-Year Interval Relief Request RR 4-23 cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FOR RELIEF REQUEST 4-23 PROPOSED ALTERNATIVE CONCERNING ASME CODE DEPTH SIZING REQUIREMENT PALISADES NUCLEAR PLANT ENTERGY NUCLEAR OPERATIONS. INC DOCKET NO. 50-255
1.0 INTRODUCTION
By letter dated September 16, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15260A371), Entergy Nuclear Operations, Inc. (ENO, the licensee), submitted Relief Request No. RR 4-23, which proposes to use an alternative inspection procedure to perform inspections required by Title 10 of the Code of Federal Regulations, Part 50 (10 CFR 50) Paragraph 55a(g)(6)(ii)(F) at the Palisades Nuclear Plant (PNP). These inspections are related to the ultrasonic examination of nickel-based Alloy 82/182 dissimilar metal butt welds joining Alloy 600 branch connections to one hot leg and eight cold leg pipes. The proposed alternative inspection procedure does not meet the 0.125 inch root mean square (RMS) error depth sizing requirements of American Society of Mechanical Engineers (ASME) Code Case N-695, "Qualification Requirements for Dissimilar Metal Piping Welds" and ASME Code Section XI, Appendix VIII, Supplement 10, "Qualification Requirements for Dissimilar Metal Piping Welds."
Specifically, pursuant to 10 CFR 50.55a(z)(1 ), the licensee proposes using an inspection procedure with an alternative depth sizing RMS error of 0.242 inches on the basis that the proposed inspection procedure provides an acceptable level of quality and safety. During a conference call on September 17, 2015 (ADAMS Accession No. ML15261A039), the U.S.
Nuclear Regulatory Commission (NRC) staff verbally authorized the use of the proposed alternative at PNP, effective for the remainder of the fourth 10-year interval, which began on December 13, 2006, and ended on December 12, 2015.
2.0 REGULATORY EVALUATION
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code, Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. However, 10 CFR 50.55a(z) states, in part, that alternatives to the requirements of paragraph (g) may be Enclosure
used, when authorized by the NRC, if the licensee demonstrates that (1) the proposed alternatives would provide an acceptable level of quality and safety, or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Based on analysis of the regulatory requirements, the NRC staff concludes that regulatory authority exists to authorize the proposed alternative pursuant to 10 CFR 50.55a(z)(1 ).
3.0 TECHNICAL EVALUATION
3.1 The Licensee's Relief Request Components Affected The licensee's request includes nine butt welds joining branch connections to pipes. Table 1 provides additional information regarding the branch connections and welds. The welds are Class 1 Pressurized Water Reactor (PWR) pressure retaining Dissimilar Metal Piping and Vessel Nozzle Butt Welds containing Alloy 82/182. One Hot leg weld is covered under ASME Code Case N-770-1 "Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation Activities Section XI, Division 1," Inspection Item A-2 "Unmitigated butt weld at Hot Leg operating temperature (-2410) s 625°F (329°C)." The eight cold leg welds are covered under ASME Code Case N-770-1, Inspection Item B, "Unmitigated butt weld at Cold Leg operating temperature
(-2410) ~ 525°F (274°C) and< 580°F (304°C)."
Table 1: Branch Connections Covered in RR 4-23 Branch Connection Description Weld Identification Weld Location 2 inch Cold Leo Charging Nozzle PCS-30-RCL-1A-11/2 P-50A Discharge Leg 2 inch Cold Leg Drain Nozzle PCS-30-RCL-1A-5/2 P-50A Suction Leg 3 inch Cold Leg PressOrizer Spray Nozzle PCS-30-RCL-1B-10/3 P-50B Discharoe Leg 2 inch Cold Leo Drain Nozzle PCS-30-RCL-1 B-5/2 P-50B Suction Leo 2 inch Cold Leo Charging Nozzle PCS-30-RCL-2A-11/2 P-50C Discharge Leg 3 inch Cold Leg Pressurizer Spray Nozzle PCS-30-RCL-2A-11/3 P-50C Discharge Leg 2 inch Cold Leg Drain Nozzle PCS-30-RCL-2A-5/2 P-50C Suction Leg 2 inch Cold Leo Drain and Letdown Nozzle PCS-30-RCL-2B-5/2 P-50D Suction Leg 2 inch Hot Leg Drain Nozzle PCS-42-RCL-1 H-3/2 A Hot Leg Code of Record The applicable code is the ASME Section XI, 2001 Edition through 2003 Addenda as amended by 10 CFR 50.55a for the fourth interval.
Code Requirements With the issuance of a revised 10 CFR 50.55a in June 2011, the NRC staff incorporated, by
reference, Code Case N-770-1. Specific implementing requirements are documented in 10 CFR 50.55a(g)(6)(ii)(F).
Reason for Relief Request By letter dated September 16, 2015, the licensee provided the following reason for the proposed alternative:
ENO will be performing volumetric examinations of the subject welds during the current refueling outage, and will implement the requirements of ASME Section XI, Code Case N-695. Code Case N-695, Section 3.3(c), requires that qualified procedures, equipment, and personnel shall demonstrate a flaw depth-sizing error less than or equal to 0.125 inch [RMS].
To date, no known inspection vendor for primary coolant system branch connection configurations has met the RMS error requirement.
The licensee further explained that the examination vendor has achieved RMS error of 0.242 inch instead of the required 0.125 inch RMS error. In addition, the inspection procedure and personnel were qualified for detection and length sizing on the subject welds.
Proposed Alternative and Basis for Use By letter dated September 16, 2015, the licensee proposes to use the following alternative for flaw depth sizing when the subject dissimilar metal welds are examined from the outside surface:
Examinations shall be performed using ultrasonic techniques that are qualified for flaw detection and length sizing using procedures, personnel and equipment qualified by demonstration in all aspects except depth sizing. The 0.242 inch RMSE [root mean square error] will be used for depth sizing, in lieu of the ASME Code required 0.125 inch RMSE, which does not exceed ten percent of the material wall thickness (consistent with EPRI [Electric Power Research Institute]
Policy/Procedure 03-01 ), and as such will provide an acceptable level of quality and safety.
All other ASME Code, Section XI, requirements for which relief has not been specifically requested applies, including the third party review by the Authorized Nuclear lnservice Inspector.
Duration of Proposed Alternative The proposed alternative to the ASME Code is applicable for the remainder of the fourth 10-year interval, which began on December 13, 2006, and ended on December 12, 2015.
3.2 Staff Evaluation The licensee used NRG-approved Code Case N-695 to satisfy the requirements of ASME Code, Section XI, Appendix VIII. Code Cases N-695 requires that procedures used to inspect welds
be qualified by performance demonstration. The acceptance criterion in Code Case N-695 specifies that the RMS error of the examination procedures shall not be greater than 0.125 inches. The licensee's inspection vendor was able to depth size with an RMS error of 0.242 inches. The licensee is requesting relief from the 0.125 inch depth sizing requirement in ASME Code Case N-695 in accordance with 10 CFR 50.55a(z)(1 ).
The specific Code Case N-695 requirement for which relief is requested pertains to the depth sizing qualification requirements for performance demonstration of ultrasonic examination systems for dissimilar metal piping welds. Code Case N-695, Section 3.3, "Depth-Sizing Test,"
states the following: "(c) Examination procedures, equipment, and personnel are qualified for depth-sizing when the RMS error of the flaw depth measurements, as compared to the true flaw depths, do not exceed 0.125 in. (3 mm)."
The EPRI has contended that nondestructive examination inspectors are able to accurately depth size flaws if they can achieve an RMS error of less than 10 percent of the weld wall thickness. The licensee stated that the 0.242 inch RMS error achieved by the proposed inspection procedure is less than 10 percent of the wall thicknesses of each weld (i.e., each weld is greater than 2.42 inches thick).
While the NRC staff has not endorsed the use of the 10 percent wall thickness as an acceptance value, the NRC staff has been working with members of ASME, the Performance Demonstration Initiative, and EPRI to evaluate the appropriate RMS error for the ultrasonic examination of dissimilar metal welds. The collaborative work culminated in the development of ASME Code Case N-695-1 which allows the use of an RMS error of 0.25 inches for inspections from the inner surface of a dissimilar metal weld of 2.1 inches thick or greater.
The NRC staff is currently reviewing ASME Code Case N-695-1 for inclusion in the next revision of Regulatory Guide 1.147. While this review is not complete, the NRC staff has performed sufficient review of the use of a 0.25 inch RMS error or less for depth sizing and finds the use of a 0.25 inch RMS error or less to be acceptable under these circumstances at PNP.
Therefore, the NRC staff finds that the proposed inspection procedure is acceptable because the proposed RMS error is consistent with ASME Code Case N-695-1 given that each of the nine welds is greater than 2.1 inches thick and the proposed RMS error is less than 0.25 inches.
4.0 CONCLUSION
As set forth above, the NRC staff has determined that the proposed RMS error in the inspection procedure is acceptable, that the proposed alternative provides reasonable assurance that the structural integrity of the branch connections to the hot leg and cold leg piping will be adequately monitored to the end of the fourth ISi interval, and that the proposed alternative provides an acceptable level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1 ).
Therefore, effective September 17, 2015, the NRC authorizes the use of RR 4-23 for the remainder of the fourth 10-year interval at PNP, which began on December 13, 2006, and ended on December 12, 2015.
The NRC staff notes that all other ASME Code, Section XI and 10 CFR 55a(g)(6)(ii)(F) requirements for which relief was not specifically requested and approved in the subject request
for relief remain applicable, including third party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: Stephen Cumblidge, NRR/DE Date of Issuance: February 1 , 2O1 6
ML16022A107 *via memo OFFICE DORL/LPL3-1 /PM DORL/LPL3-1 /LA DE/EPNB/BC* DORL/LPL3-1/BC
~
JRankin !MHenderson jDAlley DWrona E 01/28/16 01/26/16 01/15/16 02/1 /16