MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times ML23114A3572023-05-10010 May 2023 Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23108A1362023-04-24024 April 2023 Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2024-01-24
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000313/20223012022-06-15015 June 2022 NRC Examination Report 05000313/2022301 IR 05000368/20213012021-05-17017 May 2021 NRC Examination Report 05000368/2021301 IR 05000313/20183012018-04-0404 April 2018 NRC Examination Report 05000313/2018301 IR 05000368/20173012017-03-22022 March 2017 NRC Examination Report 05000368/2017301 ML16011A1792016-01-11011 January 2016 Notification of NRC Initial Operator Licensing Examination 05000313/2016301 IR 05000368/20153012015-09-24024 September 2015 Er 05000368/2015301; 08/24/2015 - 09/15/2015; Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination Report IR 05000368/20143022014-09-0404 September 2014 Er 050003682014302; on 07/30/2014 - 08/21/2014; Arkansas Nuclear One, Unit 2; Initial Operator Licensing Retake Examination Report IR 05000368/20143012014-04-17017 April 2014 Er 05000368-14-301, on February 10 - March 19, 2014, Arkansas Nuclear One, Unit 2, Initial Operator Licensing Examination Report IR 05000313/20133012013-03-29029 March 2013 Er 05000313-13-301; February 22 - March 18, 2013; Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report ML12054A1172012-02-23023 February 2012 Notification of NRC Initial Operator Licensing Examination 05000368/12-301 IR 05000313/20113022011-10-26026 October 2011 Er 05000313-11-302; August 26 to September 19, 2011; Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report IR 05000368/20113012011-03-17017 March 2011 Er 05000368-11-301 on 01/28/2011 - 02/17/2011, Arkansas Nuclear One, Unit 2 IR 05000313/20103012010-04-12012 April 2010 Er 05000313-10-301, on 03/08/2010 to 3/16/2010, Arkansas Nuclear One, Unit 1, Initial Operator Licensing Examination Report IR 05000368/20093022009-10-0505 October 2009 Er 05000368-09-302; on 08/07/2009, Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination Report IR 05000313/20093012009-02-20020 February 2009 Er 50-313/09-301, 50-368/09-301 on 01/26/09 - 02/03/09 for Arkansas Nuclear One, Unit 1 ML0828001112008-10-0606 October 2008 2008 -09 - Examination Report ML0824801592008-09-0303 September 2008 Er 05000313-08-301, on 09/08/2008, Arkansas Nuclear One, Unit 1 - NRC Initial Operator Licensing Examination Approval IR 05000368/20083012008-03-14014 March 2008 Er 05000368-08-301, on February 25-28, 2008; Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination Report IR 05000313/20073012007-04-25025 April 2007 Er 05000313-07-301, on 03/5-8/2007, Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000313/20043012004-02-0909 February 2004 Er 05000313-04-301 on 01/12/2004 - 01/15/2004; Arkansas Nuclear One, Unit 1, Initial Operator Licensing Examination IR 05000368/20033012003-08-27027 August 2003 Er 05000368-03-301, on 07/11/03 - 07/18/03; Entergy Operations, Inc., Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination IR 05000368/20023012002-03-0505 March 2002 IR 05000368/2002-301, on 2/11-15/2002, Entergy Operations, Inc., Arkansas Nuclear One, Unit 2, Initial Examination of Applicants for Operator Licenses. Fifteen of Sixteen Applicants Satisfied the Requirements of 10 CFR Part 55 2022-06-15
[Table view] |
See also: IR 05000313/2016301
Text
January 11, 2016
Mr. Jeremy Browning, Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc.
1448 SR 333
Russellville, AR 72802-0967
SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 1 - NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000313/2016301
Dear Mr. Browning:
In a telephone conversation on January 8, 2016, between Messrs. R. Keele, Operations
Training Superintendent, and T. Farina, Chief Examiner, arrangements were made for the
administration of licensing examinations at Arkansas Nuclear One, Unit 1, during the weeks of
August 22 and 29, 2016.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power
Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your
staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by May 20, 2016. The written examinations, operating tests, and supporting reference
materials identified in Attachment 3 to ES-201 will be due by June 20, 2016. Pursuant to
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
authorized representative of the facility licensee shall approve the outlines, examinations, and
tests before they are submitted to the NRC for review and approval. All materials shall be
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
safeguards information in your response be contained in a separate enclosure and appropriately
marked. Any delay in receiving the required examinations and reference materials, or the
submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled. In addition, your support for on-site validation of the examinations is required
during the week of July 25, 2016.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
J. Browning -2-
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, writing the examinations,
and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of these information collections, including suggestions for
reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of
this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.
Thank you for your cooperation in this matter. Mr. Keele has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Farina at 817-200-1117, or myself
at 817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-313
License No. DPR-51
cc: Electronic Distribution
ML16011A179
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: TJFarina Yes No Non-Publicly Available Sensitive NRC-002
OFFICE SOE:OB C:OB
NAME TFarina VGaddy
SIGNATURE /RA/ /RA/
DATE 1/8/16 1/11/16
Letter to Jeremy Browning from Vincent G. Gaddy, dated January 11, 2016
SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 1 - NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000313/2016301
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Margaret.Tobin@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)
Branch Chief, DRP/E (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/E (John.Dixon@nrc.gov)
Project Engineer, DRP/E (Brian.Correll@nrc.gov)
Project Engineer, DRP/E (Jackson.Choate@nrc.gov)
ANO Administrative Assistant (Mary.Bennett@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Andrea.George@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)