ML15159B045

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Results Acceptance Review: Accepted MF6249 TS 2.1.1.1 and 5.6.5 DNBR WCAP-14565-P-A, Addendum 2-P-A
ML15159B045
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/08/2015
From: John Klos
Plant Licensing Branch IV
To: Elwood T
AmerenUE
References
TAC MF6249
Download: ML15159B045 (3)


Text

NRR-PMDAPEm Resource From: Klos, John Sent: Monday, June 08, 2015 9:57 AM To: TElwood@ameren.com Cc: SMaglio@ameren.com; Klos, John; Krepel, Scott; Dean, Jeremy; Tilton, Caroline

Subject:

Results acceptance review: ACCEPTED MF6249 TS 2.1.1.1 and 5.6.5 DNBR WCAP-14565-P-A, Addendum 2-P-A Mr. Elwood, By letter dated May 8, 2015, Union Electric Company Ameren Missouri submitted a license amendment for the Callaway Plant, Unit 1. The proposed license amendment is for a proposed change to modify Technical Specification 2.1.1.1 and 5.6.5 to adopt NRC approved methodology described WCAP-14565-P-A Addendum 2-P-A. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

John Klos DORL Callaway Project Manager 1

U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing NRC/NRR/DORL/LPL4-1, O7G1, Washington, DC 20555-0001 301.415.5136, 301.415.3313 (fax)

MS O8B1, John.Klos@NRC.gov 2

Hearing Identifier: NRR_PMDA Email Number: 2142 Mail Envelope Properties (94A2A4408AC65F42AC084527534CF41601C58AEE30FC)

Subject:

Results acceptance review: ACCEPTED MF6249 TS 2.1.1.1 and 5.6.5 DNBR WCAP-14565-P-A, Addendum 2-P-A Sent Date: 6/8/2015 9:56:51 AM Received Date: 6/8/2015 9:56:52 AM From: Klos, John Created By: John.Klos@nrc.gov Recipients:

"SMaglio@ameren.com" <SMaglio@ameren.com>

Tracking Status: None "Klos, John" <John.Klos@nrc.gov>

Tracking Status: None "Krepel, Scott" <Scott.Krepel@nrc.gov>

Tracking Status: None "Dean, Jeremy" <Jeremy.Dean@nrc.gov>

Tracking Status: None "Tilton, Caroline" <Caroline.Tilton@nrc.gov>

Tracking Status: None "TElwood@ameren.com" <TElwood@ameren.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2034 6/8/2015 9:56:52 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: