|
---|
Category:License-Operator
MONTHYEARML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21281A1202021-10-0808 October 2021 GFE Results, September 2021 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21256A1412021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-5 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A1492021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-9 ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21193A2702021-07-22022 July 2021 Operator Licensing Examination Approval NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations ML20342A1932020-12-0707 December 2020 Confirmation of Initial License Examination ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20091M6252020-03-26026 March 2020 GFE Results, March 2020 ML20077K2022020-03-17017 March 2020 NRC Form 536 Operator Licensing Examination Data ML19276D7052019-10-0303 October 2019 GFE Results, September 2019 IR 05000266/20193012019-09-17017 September 2019 NRC Initial License; Examination Report 05000266/2019301; 05000301/2019301 (DRS-R.Baker) 2023-08-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21256A1412021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-5 ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1492021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-9 ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21193A2702021-07-22022 July 2021 Operator Licensing Examination Approval NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations ML20342A1932020-12-0707 December 2020 Confirmation of Initial License Examination ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20091M6252020-03-26026 March 2020 GFE Results, March 2020 IR 05000266/20193012019-09-17017 September 2019 NRC Initial License; Examination Report 05000266/2019301; 05000301/2019301 (DRS-R.Baker) ML22133A2392019-07-31031 July 2019 Form ES-201-3 ML22133A2442019-07-31031 July 2019 Form ES-401-9 ML22133A2302019-07-31031 July 2019 Form ES-201-1 2023-08-09
[Table view] |
Text
ES-401 Record of Rejected K/As Form ES-401-4 Randomly Tier / Group Reason for Rejection Selected K/A RO Tier 1 / APE 022AK1.04 Loss of Reactor Coolant Makeup Group 1 Reason for changing from manual to automatic control of charging flow valve controller PBNP does not have a Charging Flow Valve Controller which has an automatic feature Reselected 022AK1.03 RO Tier 1 / EPE 038EK1.04 Steam Generator Tube Rupture (SGTR)
Group 1 Reflux boiling Reflux boiling is not used as a mitigation strategy for SGTR at PBNP Reselected 038EK1.01 RO Tier 1 / APE 054K2.* Loss of Main Feedwater (MFW)
Group 1 No K2.* K/A with an RO Importance Rating 2.5 Reselected 054G2.2.36 RO Tier 1 / EPE 055EK2.* Loss of Offsite and Onsite Power (Station Blackout)
Group 1 No K2.* K/A with an RO Importance Rating 2.5 Reselected 055G2.4.8 RO Tier 1 / W/E04EA2.1 LOCA Outside Containment Group 1 Facility conditions and selection of appropriate procedures during abnormal and emergency operations Determined to be an SRO level question due to selection of procedures while within the EOP network Reselected W/E04EA2.2 RO Tier 1 / APE 059AK1.05 Accidental Liquid Radioactive-Waste Release Group 2 The calculation of offsite doses due to a release from the power plant This is not an RO responsibility/job at PBNP Reselected 059AK1.01 RO Tier 1 / W/E13EA2.1 Steam Generator Overpressure Group 2 Facility conditions and selection of appropriate procedures during abnormal and emergency operations This is not an RO responsibility at PBNP due to being a Yellow Critical Safety Function Path.
Reselected W/E13EA2.2 RO Tier 2 / SYS 010A3.01 Pressurizer Pressure Control System (PZR PCS)
Group 1 PRT temperature and pressure during PORV testing No PORV testing is performed at PBNP which causes a temperature change in the PRT Reselected 010A3.02 RO Tier 2 / SYS 078K5.* Instrument Air System (IAS)
Group 1 No K5.* K/A with an RO Importance Rating 2.5 Reselected 078K1.04, see explanation below (061K1.*)
Randomly Tier / Group Reason for Rejection Selected K/A RO Tier 2 / SYS 061K1.* Auxiliary / Emergency Feedwater (AFW) System Group 1 Was not used due to no 078K5.* K/A with an RO Importance Rating 2.5, randomly selected the available K/As within 078 (Instrument Air) which had a K/A 2.5, and then randomly exchanged it with an already selected K/A (i.e., 061K1.*)
Reselected 061K5.05 RO Tier 2 / SYS103K5.* Containment System Group 1 No K5.* K/A with an RO Importance Rating 2.5 Reselected 103K3.01, see explanation below (073K3.*)
RO Tier 2 / SYS 073K3.* Process Radiation Monitoring (PRM) System Group 1 Was not used due to no 103K5.* K/A with an RO Importance Rating 2.5, randomly selected the available K/As within 103 (Containment) which had a K/A 2.5, and then exchanged it with an already selected K/A (i.e., 073K3.*)
Reselected 073K5.01 RO Tier 2 / SYS 076K4.01 Service Water System (SWS)
Group 1 Conditions initiating automatic closure of closed cooling water auxiliary building header supply and return valves The Auxiliary Building at PBNP does not have header supply and return valves with an automatic closure Reselected 076K4.06 RO Tier 2 / SYS 076K4.06 Service Water System (SWS)
Group 1 Service water train separation Train separation is only achieved by Service Water Pump power supplies at PBNP Reselected 076K4.02 RO Tier 2 / SYS 029A4.04 Containment Purge System (CPS)
Group 2 Containment evacuation signal Unable to construct a question with the required level of difficulty Reselected 029A4.01 RO Tier 2 / SYS 029A4.01 Containment Purge System (CPS)
Group 2 Containment purge flow rate Purge flow rate of the Containment Purge System is not monitored No further A4.* K/A exist with an RO Importance Rating 2.5, selected 029A3.01 due to A3 not being sampled within Tier 2/Group2 RO Tier 2 / SYS 041K1.02 Steam Dump System (SDS) and Turbine Bypass Control Group 2 S/G level Unable to construct a question with the required level of difficulty Reselected 041K1.05 SRO Tier 1 / APE 026G2.2.4 Loss of Component Cooling Water (CCW)
Group 1 (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility No differences between the units which can be leveraged as a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 026G2.2.38
Randomly Tier / Group Reason for Rejection Selected K/A SRO Tier 1 / APE 040AA2.02 Steam Line Rupture Group 1 Conditions requiring a reactor trip Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 040AA2.04 SRO Tier 1 / APE 036G2.1.25 Fuel Handling Incidents Group 2 Ability to interpret reference materials, such as graphs, curves, tables, etc Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 036G2.1.31 SRO Tier 1 / APE 036G2.1.31 Fuel Handling Incidents Group 2 Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup.
Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 036G2.1.23 SRO Tier 2 / SYS 007A2.06 Pressurizer Relief Tank/Quench Tank System (PRTS)
Group 1 Bubble formation in PZR Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 007A2.07 SRO Tier 2 / SYS 007A2.07 Pressurizer Relief Tank/Quench Tank System (PRTS)
Group 1 Recirculating quench tank There are no procedures at PBNP which accomplish this task. Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 007A2.01 SRO Tier 2 / SYS 011G2.1.31 Pressurizer Level Control System (PZR LCS)
Group 2 Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 011G2.1.32 RO Tier 2 / SYS 022G2.2.4 Containment Spray System (CSS)
Group 2 (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility Unable to write a question to meet this K/A due to no major differences between units for this system Reselected 022G2.2.39 RO Tier 2 / SYS 078K1.04 Instrument Air System (IAS)
Group 1 Cooling water to compressor Unable to write a question to meet this K/A due only one station air compressor has cooling water supplied to it, and there is a question focused on this in the test already (SRO Tier 1/Group 1, 065A204 -
Typical conditions which could cause a compressor trip (e.g., high temperature)
Reselected 078K1.05