MONTHYEARDCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-19-082, Submittal of Site-Specific Decommissioning Cost Estimate2019-12-0404 December 2019 Submittal of Site-Specific Decommissioning Cost Estimate DCL-18-100, License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology2018-12-26026 December 2018 License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology ML16061A4522016-02-11011 February 2016 Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement DCL-16-020, Diablo Canyon, Units 1 and 2 - Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement2016-02-11011 February 2016 Diablo Canyon, Units 1 and 2 - Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement ML16026A3882016-01-0505 January 2016 Westinghouse Electric Company, LLC, Submittal of Proprietary Version of LTR-DCPPS-15-008 Response to NRC RAI 73 (Open Item 129). ML15090A2752015-03-26026 March 2015 Independent Spent Fuel Storage Installation - Consent and Hearing Waiver Form ML14171A2372014-06-11011 June 2014 Submittal of Supplemental Analysis for Inservice Inspection Program Relief Request SWOL-REP-1 U2 ML14205A0352014-03-12012 March 2014 Affidavit No. 993754-AFF-104T, Dated 03/12/2014, Signed by Mark Herschthal DCL-14-034, Affidavit No. 993754-AFF-104T, Dated 03/12/2014, Signed by Mark Herschthal2014-03-12012 March 2014 Affidavit No. 993754-AFF-104T, Dated 03/12/2014, Signed by Mark Herschthal DCL-13-061, CS Innovations - Application for Witholding Proprietary Information from Public Disclosure, Enclosure, Attachment 22013-04-25025 April 2013 CS Innovations - Application for Witholding Proprietary Information from Public Disclosure, Enclosure, Attachment 2 ML13078A2922013-03-0505 March 2013 Areva Affidavit for Areva Calculations #32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and #32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Noz DCL-12-069, Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T2012-08-0202 August 2012 Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T ML12222A0942012-08-0202 August 2012 Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T ML12137A0242012-05-15015 May 2012 Diablo Canyon - May Hearing File Update ML11297A0562011-10-18018 October 2011 Diablo Canyon - October Hearing File Update ML0715501312007-05-23023 May 2007 SER Compliance with WCAP-16260-P-A the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement DCL-05-121, Correction of Information Contained in License Amendment Request 05-04. Revision to Technical Specification 5.3.1. 'Unit Staff Qualifications.'2005-12-23023 December 2005 Correction of Information Contained in License Amendment Request 05-04. Revision to Technical Specification 5.3.1. 'Unit Staff Qualifications.' DCL-05-018, License Amendment Request 05-01 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program, and 5.6.10, Steam Generator Tube Inspection Report. to Allow Use of the W* Alternate Repair Criteria.2005-03-11011 March 2005 License Amendment Request 05-01 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program, and 5.6.10, Steam Generator Tube Inspection Report. to Allow Use of the W* Alternate Repair Criteria. DCL-04-149, License Amendment Request 04-07, Revision to Technical Specifications 3.7.17 and 4.3 for Cycles 14-16 for a Cask Pit Spent Fuel Storage Rack2004-11-0303 November 2004 License Amendment Request 04-07, Revision to Technical Specifications 3.7.17 and 4.3 for Cycles 14-16 for a Cask Pit Spent Fuel Storage Rack DCL-04-123, License Amendment Request 04-06 Removal of Technical Specifications 5.6.1, Occupational Radiation Exposure Report, and 5.6.4, Monthly Operating Reports2004-11-0101 November 2004 License Amendment Request 04-06 Removal of Technical Specifications 5.6.1, Occupational Radiation Exposure Report, and 5.6.4, Monthly Operating Reports DCL-04-104, Response to NRC Request for Additional Information Regarding License Amendment Request 04-01, 'Revised Steam Generator Voltage-based Repair Criteria Probability of Detection Method for Plant.2004-08-18018 August 2004 Response to NRC Request for Additional Information Regarding License Amendment Request 04-01, 'Revised Steam Generator Voltage-based Repair Criteria Probability of Detection Method for Plant. DCL-04-089, Response to June 14 and July 6, 2004, NRC Request for Additional Information Re License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, 'Steam Generator (SG) Tube Surveillance Program,' & 5.6.10.2004-07-30030 July 2004 Response to June 14 and July 6, 2004, NRC Request for Additional Information Re License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, 'Steam Generator (SG) Tube Surveillance Program,' & 5.6.10. DCL-04-095, 60-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors2004-07-27027 July 2004 60-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors DCL-04-066, Response to NRC Request for Additional Information Regarding License Amendment Request 03-12, Revision to Technical Specifications 3.3.1, 'Rts Instrumentation,' and 3.3.2, 'Esfas Instrumentation.'2004-06-0404 June 2004 Response to NRC Request for Additional Information Regarding License Amendment Request 03-12, Revision to Technical Specifications 3.3.1, 'Rts Instrumentation,' and 3.3.2, 'Esfas Instrumentation.' ML0412804352004-04-30030 April 2004 Notice of Change of Address ML0409704212004-03-31031 March 2004 Saybrook Capital, LLC Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for February 1 Through February 29, 2004 ML0409805912004-03-18018 March 2004 Public Policy Advocates Llc'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expense for February 1, 2004 Through February 29, 2004 ML0406204532004-02-23023 February 2004 Declaration of Sandip Sen in Support of Debtor'S Motion for Authority to Establish Cash-collateralized Letter of Credit Program and Facility to Secure Gas Purchases, and to Incur Secured Debt Related Thereto (the Motion)' ML0403706042004-01-29029 January 2004 Declaration of Michael J. Donnelly in Support for Authority to Establish Cash-Collaterized Letter of Program and Facility to Secure Gas Purchases, and to Incur Secured Debt Related Thereto ML0403706012004-01-29029 January 2004 Declaration of Raymond X. Welch in Support of Motion for Authority to Establish Cash-Collateralized Letter of Credit Program and Facility to Secure Gas Purchases, and to Incur Secured Debt Related Thereto ML0400700982003-12-30030 December 2003 Howard, Rice Nemerovski, Canady, Falk & Rabkin Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for November, 2003 ML0400200602003-12-22022 December 2003 Declaration of Grant Guerra in Support of Motion for Order Authorizing the Debtor to Settle Claim No. 13377 Filed by the Presidio Trust ML0333810452003-11-26026 November 2003 Cooley Godward Llp'S Twenty-Ninth Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period October 1, 2003 - October 31, 2003 ML0331800932003-11-0606 November 2003 Proof of Service ML0331701792003-10-31031 October 2003 Declaration of Michael J. Donnelly in Support of Pg&E'S Application for Authority to Incur Plan Implementation Expenses in Connection with Certain Financings DCL-03-133, Full Compliance with Order for Compensatory Measures Related to Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel, Dated 04/29/03 (EA-03-038)2003-10-28028 October 2003 Full Compliance with Order for Compensatory Measures Related to Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel, Dated 04/29/03 (EA-03-038) ML0331800862003-10-23023 October 2003 Relief from Stay Cover Sheet ML0331800902003-10-23023 October 2003 Declaration of Jennifer A. Becker in Support of City of Oakland and Port of Oakland'S Motion for Relief from Automatic Stay ML0328703662003-09-29029 September 2003 Skadden, Arps, Slate, Meagher & Flom Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period August 1, 2003 Through August 31, 2003 ML0327312982003-09-24024 September 2003 (Reorganized) California Power Exchange Corporation'S Limited Objection to Motion for Order Authorizing Pacific Gas and Electric Company to Compromise Claims Against El Paso Natural Gas Company Et Alia and to Enter Into Agreements Resolving ML0327314402003-09-23023 September 2003 Fact Witness Disclosure of Satellite Senior Income Fund, Satellite Senior Income Fund II and Deutsche Bank Trust Company Americas to Objection to Confirmation of Plan of Reorganization Under Chapter 11 of the Bankruptcy Code for Pacific Gas ML0327313322003-09-22022 September 2003 Notice of Hearing on Interim Compensation Applications of Professionals and Final Expense Application of Creditors' Committee Members ML0326810702003-09-16016 September 2003 Declaration of Michael J. Donnelly in Support of Debtor'S Notice of Motion and Motion for Order Approving Debtor'S Execution and Performance Under the Amendment to First Amended and Restated Summary of Terms with Respect to Forbearance and ML0325412082003-09-11011 September 2003 Order Re Ex Parte Application of Pacific Gas and Electric Company Authorizing Settlement and Withdrawal of Claim of Laguna Irrigation District ML0325911092003-09-0505 September 2003 Declaration of Joshua Bar-Lev in Support of Debtor'S Motion for Order Authorizing Pacific Gas and Electric Company to Compromise Claims Against El Paso Natural Gas Company Et Alla and to Enter Into Agreements Resolving the Claims ML0325411442003-09-0404 September 2003 Relief from Stay Cover Sheet - Motion & Notice of Motion of Smud for Relief from Automatic Stay in Litigation ML0325213432003-08-29029 August 2003 Declaration of Joseph Sauvage in Support of Motion for Authority to Enter Into Certain Hedging Transactions in Connection with Financing Under Proposed Plan of Reorganization, and to Incur Secured Debt Related Thereto ML0325213452003-08-29029 August 2003 Declaration of Walter Hulse in Support of Motion for Authority to Enter Into Certain Hedging Transactions in Connection with Financing Under Proposed Plan of Reorganization, and to Incur Secured Debt Related Thereto ML0325213412003-08-29029 August 2003 Howard, Rice, Nemerovski, Canady, Falk & Rabkin Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for July, 2003 2023-03-29
[Table view] Category:Letter
MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] |
Text
Attachments 1 and 2 to the Enclosure contain Proprietary Information
-Pacific Gas and Withhold Under 10 CFR 2.390 Electric Company'Barry S. Allen Diablo Canyon Power Plant Site Vice President Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 June 11, 2014 805.545.4888
' Internal:
691.4888 Fax: 805.545.6445 PG&E Letter DCL-14-051 U.S. Nuclear Regulatory Commission 10 CFR 50.55a ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-323, OL-DPR-82 Diablo Canyon Unit 2 Submittal of Supplemental Analysis for Inservice Inspection Program Relief Request SWOL-REP-1 U2
Reference:
- 1. PG&E Letter DCL-14-028, "Inservice Inspection Program Relief Request SWOL-REP-1 U2 for Approval of an Alternative to the ASME Code, Section Xl, for Preemptive Full Structural Weld Overlays," dated April 7, 2014 (ML14101A246)
Dear Commissioners and Staff: In Reference 1, Pacific Gas and Electric Company (PG&E) submitted Relief Request SWOL-REP-1 U2 for approval of an alternative to the ASME Code, Section Xl, Repair/Replacement rules as applied to the Diablo Canyon Power Plant Unit 2 pressurizer structural weld overlays.
PG&E committed to submit the supplemental analysis that evaluated the reported flaw sizes with additional margin to account for possible flaw sizing variations that are associated with the repeatability of manual ultrasonic examination results.Attachments 1 and 2 to the Enclosure contain AREVA calculations associated with the supplemental analysis, which are proprietary to AREVA. Attachment 3 includes AREVA's affidavit for the calculations mentioned above. The affidavit is signed by AREVA, the owner of the information.
The affidavit sets forth the basis on which the AREVA proprietary information contained in Attachments 1 and 2 may be withheld from public disclosure by the Commission, and it addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.390 of the Commission's regulations.
PG&E requests that the AREVA proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390. Correspondence with respect to the AREVA affidavit or the AREVA proprietary information provided in Attachments 1 and 2 should reference the AREVA Affidavit and be addressed to Gayle F. Elliott, Product Licensing Manager, AREVA NP, 3315 Old Forest Road, Lynchburg, VA 24501.Attachments 1 and 2 to the Enclosure contain Proprietary Information When separated from Attachments 1 and 2, this document is decontrolled.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Caltaway -Comanche Peak
- Wolf Creek Attachments 1 and 2 to the Enclosure contain Proprietary Information
-Withhold Under 10 CFR 2.390 Document Control Desk June 11,2014 Page 2 PG&E Letter DCL-14-051 Attachments 4 and 5 to the Enclosure contain AREVA calculations that are non-proprietary versions of AREVA calculations in Attachments 1 and 2.This letter satisfies commitment number 1 listed in Attachment 16 to the Enclosure of Reference
- 1. This communication does not contain regulatory commitments (as defined by NEI 99-04).If you have any questions, or require additional information, please contact Tom Baldwin at (805) 545-4720.Sincerely, Barry S. Allen Site Vice President RNTT/4231/50033145 Enclosure cc: Diablo Distribution cc/enc: Peter J. Bamford, NRC Project Manager Marc L. Dapas, NRC Region IV Administrator Thomas R. Hipschman, NRC Senior Resident Inspector Gonzalo L. Perez, Branch Chief, California Department of Public Health State of California, Pressure Vessel Unit Attachments 1 and 2 to the Enclosure contain Proprietary Information When separated from Attachments 1 and 2, this document is decontrolled.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Catlaway
- Wolf Creek Attachments 1 and 2 to the Enclosure contain Proprietary Information
-Withhold Under 10 CFR 2.390 Enclosure PG&E Letter DCL-14-051 Submittal of Supplemental Analysis for Inservice Inspection Program Relief Request SWOL-REP-1 U2 In Pacific Gas and Electric (PG&E) Letter DCL-14-028, "Inservice Inspection Program Relief Request SWOL-REP-1 U2 for Approval of an Alternative to the ASME Code, Section Xl, for Preemptive Full Structural Weld Overlays," dated April 7, 2014, PG&E submitted a Relief Request SWOL-REP-1 U2 for NRC approval.This letter submits supplemental AREVA calculations that consider postulated flaw sizing variations of the previously reported and analyzed laminar flaws in the Diablo Canyon Power Plant (DCPP) Unit 2 pressurizer structural weld overlays (SWOLs). The attached calculations establish a revised axial length size criteria for the previously identified flaws that may be used by PG&E to accept findings in future inservice inspections (ISIs) and allow for possible flaw sizing variations that are associated with the repeatability of manual ultrasonic examination results.This supplemental analysis evaluated an additional postulated 0.125 inch of axial length on either side (0.25 inch total additional length) beyond the boundaries of the laminar flaws previously reported and analyzed.
The supplemental laminar flaw growth evaluations were performed considering the design transients for the 38-year design life of the SWOLs.PG&E intends to use the revised axial lengths of the laminar indications analyzed herein as the acceptance criteria for the previously identified flaws in future ISI examinations of the DCPP Unit 2 pressurizer SWOLs. Flaw sizes that exceed the revised axial lengths will not be accepted without further analysis and review by the NRC.Safety/Relief Nozzles A, B and C: Laminar Flaw Evaluations Attachment 1 to the Enclosure contains AREVA Proprietary Calculation No. 32-9215965-002, "Diablo Canyon Unit 2 Pressurizer Safety/Relief Nozzles Laminar/Planar Flaw Analysis." In this revision, Appendices A, B, and C are included to present the analysis associated with the postulated larger flaw sizes in the safety relief nozzles. Thermal and pressure stress transient results along the representative path lines of the laminar flaws, used in the fracture mechanics evaluation, are summarized in Appendix A. Similarly, weld residual stresses to support flaw evaluations with the postulated larger laminar indication sizes are summarized in Appendix B. Finally, the flaw evaluation results from this analysis that considers the larger flaw sizes are summarized in Appendix C.1 Attachments 1 and 2 to the Enclosure contain Proprietary Information When separated from Attachments 1 and 2, this document is decontrolled.
Attachments 1 and 2 to the Enclosure contain Proprietary Information
-Withhold Under 10 CFR 2.390 Enclosure PG&E Letter DCL-14-051 The results of the flaw growth analysis and the final flaw area calculations after a 38-year design life are tabulated in Table C-1 and Table C-2 respectively in Appendix C of the document.
The results of the minimum required overlay length evaluation are summarized in Table C-3 in Appendix C. The supplemental analysis results presented in Tables C-1, C-2, and C-3, confirm that the SWOLs installed on the three safety relief nozzles continue to meet the overlay length requirement of NB-3227.2 when the larger laminar flaws sizes described previously are considered.
The analysis concluded that the postulated larger flaw sizes will not impact the integrity of the safety relief SWOLs for 38 years of plant operation.
Spray Nozzle: Laminar Flaw Evaluations Attachment 2 to the Enclosure contains AREVA Proprietary Calculation No. 32-9213780-002, "Diablo Canyon Unit 2 Pressurizer Spray Nozzle Laminar Flaw Analysis." In this revision, Appendix A is included to present the analysis associated with the postulated larger flaw sizes in the spray nozzle.The results of the flaw growth analysis and the final flaw area calculations after a 38-year design life are tabulated in Table A-1 and Table A-2 respectively in Appendix A of the document.
The results of the minimum required overlay length evaluation are summarized in Table A-3 in Appendix A.The supplemental analysis results presented in Tables A-i, A-2, and A-3 confirm that the SWOL installed on the spray nozzle continues to meet the overlay length requirement of NB-3227.2 when the larger laminar flaw sizes described previously are considered.
The analysis concluded that the postulated larger flaw sizes will not impact the integrity of the spray nozzle SWOL for 38 years of plant operation.
ATTACHMENTS Attachment 1: AREVA Calculation No. 32-9215965-002:
Diablo Canyon Unit 2 Pressurizer Safety/Relief Nozzles Laminar/Planar Flaw Analysis (Proprietary)
Attachment 2: AREVA Calculation No. 32-9213780-002:
Diablo Canyon Unit 2 Pressurizer Spray Nozzle Laminar Flaw Analysis (Proprietary)
Attachment 3: AREVA Affidavit for AREVA Calculations (Proprietary)
Attachment 4: AREVA Calculation No. 32-9221080-001:
Diablo Canyon Unit 2 Pressurizer Safety/Relief Nozzles Laminar/Planar Flaw Analysis-Non Proprietary 2 Attachments 1 and 2 to the Enclosure contain Proprietary Information When separated from Attachments 1 and 2, this document is decontrolled.
Attachments 1 and 2 to the Enclosure contain Proprietary Information
-Withhold Under 10 CFR 2.390 Enclosure PG&E Letter DCL-14-051 Attachment 5: AREVA Calculation No. 32-9221082-001:
Diablo Canyon Unit 2 Pressurizer Spray Nozzle Laminar Flaw Analysis -Non Proprietary 3 Attachments 1 and 2 to the Enclosure contain Proprietary Information When separated from Attachments 1 and 2, this document is decontrolled.
Attachments 1 and 2 to the Enclosure contain Proprietary Information
-Withhold Under 10 CFR 2.390 Attachment 3 PG&E Letter DCL-14-051 AREVA Affidavit for AREVA Calculations (Proprietary)
Attachments 1 and 2 to the Enclosure contain Proprietary Information When separated from Attachments 1 and 2, this document is decontrolled.
AFFIDAVIT COMMONWEALTH OF VIRGINIA )) ss.CITY OF LYNCHBURG
)1. My name is Gayle F. Elliott. I am Manager, Product Licensing, for AREVA Inc. (AREVA) and as such I am authorized to execute this Affidavit.
- 2. I am familiar with the criteria applied by AREVA to determine whether certain AREVA information is proprietary.
I am familiar with the policies established by AREVA to ensure the proper application of these criteria.3. I am familiar with the AREVA information contained in Calculation Summary Sheet 32-9215965-002, entitled, "Diablo Canyon Unit 2 Pressurizer Safety/Relief Nozzles Laminar/Planar Flaw Analysis," dated May 2014, and Calculation Summary Sheet 32-9213780-002, entitled, "Diablo Canyon Unit 2 Pressurizer Spray Nozzle Laminar Flaw Analysis," dated May 2014, and referred to herein as "Documents." Information contained in these Documents has been classified by AREVA as proprietary in accordance with the policies established by AREVA for the control and protection of proprietary and confidential information.
- 4. These Documents contain information of a proprietary and confidential nature and is of the type customarily held in confidence by AREVA and not made available to the public. Based on my experience, I am aware that other companies regard information of the kind contained in these Documents as proprietary and confidential.
- 5. These Documents have been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in these Documents be withheld from public disclosure.
The request for withholding of proprietary information is made in accordance with 10 CFR 2.390. The information for which withholding from disclosure is requested qualifies under 10 CFR 2.390(a)(4) "Trade secrets and commercial or financial information." 6. The following criteria are customarily applied by AREVA to determine whether information should be classified as proprietary: (a) The information reveals details of AREVA's research and development plans and programs or their results.(b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.(c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA.(d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.(e) The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA.The information in these Documents is considered proprietary for the reasons set forth in paragraphs 6(c) and 6(d) above.7. In accordance with AREVA's policies governing the protection and control of information, proprietary information contained in these Documents has been made available, on a limited basis, to others outside AREVA only as required and under suitable agreement providing for nondisclosure and limited use of the information.
- 8. AREVA policy requires that proprietary information be kept in a secured file or area and distributed on a need-to-know basis.9. The foregoing statements are true and correct to the best of my knowledge, information, and belief.SUBSCRIBED before me this_____day of __ ,2014.Sherry L. McFaden NOTARY PUBLIC, COMMONWEALTH OF VIRGINIA MY COMMISSION EXPIRES: 10/31/14 Reg. # 7079129 SERRY L. MCFADEPJ Notary Public " Commonwealth of Virginia 7079129 My Commission Expires Oct 3t, 2014