Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] Category:License-Operator
MONTHYEARML22290A1482022-10-17017 October 2022 Notification of Licensed Operator Initial Examination 05000259/2023301, 05000260/2023301, 05000296/2023301 ML22132A2542022-05-10010 May 2022 Bf 2022-301 Approval Letter ML22077A1142022-03-18018 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21277A1432021-10-0404 October 2021 301, Corporate Notification Letter (210-day Ltr) ML21256A2182021-09-13013 September 2021 301 Exam 2B Administrative Items (Normal Release) ML21256A1852021-09-13013 September 2021 301 Exam Administrative Items (2 Year Delayed Release) ML21256A2932021-09-13013 September 2021 301 Exam Final Items (2 Year Delayed Release) (1) ML21174A0802021-06-23023 June 2021 301 Final SRO Written Exam (2-Year Delayed Release) ML21174A0782021-06-23023 June 2021 301 Final RO Written Exam (2-Year Delayed Release) ML21131A0252021-05-10010 May 2021 301 Examaination Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20274A0982020-09-29029 September 2020 Bf 2021-301 Browns Ferry Nuclear Plant - Notification of Licensed Operator Initial Examination 05000259/2021301, 05000260/2021301, 05000296/2021301 ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18207A2902018-07-26026 July 2018 Updated Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18198A5332018-07-12012 July 2018 Operator Licensing Written Examination Approval 05000259/2018301, 05000260/2018301 and 05000296/2018301 ML18117A1692018-04-27027 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18110A2472018-04-17017 April 2018 March 2018 - Browns Ferry NRC Generic Fundamentals Examination Results ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML17212B1682017-07-31031 July 2017 Exam Admin Items (Immediate Release) - ADAMS 2D ML17212B1492017-07-31031 July 2017 Exam Final Items - ADAMS 2B - Delay Release 2 Yrs ML17212B1602017-07-31031 July 2017 Exam Admin Items - ADAMS 2C - Delay Release 2 Yrs ML17132A1322017-05-12012 May 2017 Senior Reactor Operator Initial License Operating Examination - Post Examination Response ML17131A2002017-05-11011 May 2017 Final Ro/Sro Written Examination 05000259/2017-301, 05000260/2017-301 and 05000296/2017301 - Delay Release Two Years ML17125A1352017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17125A3412017-04-17017 April 2017 Operator Licensing Written Examination Approval 05000259, 260, 296/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16126A3672016-05-0303 May 2016 No Candidates for the Generic Fundamentals Examination Section of the Written Operator Licensing Examination ML16049A0702016-02-18018 February 2016 Initial Exam 2015-302 Draft Simulator Scenarios ML16049A0712016-02-18018 February 2016 Initial Exam 2015-302 Draft Sim In-plant JPMs ML16049A0752016-02-18018 February 2016 Initial Exam 2015-302 Final Administrative Documents ML16049A0722016-02-18018 February 2016 Initial Exam 2015-302 Draft Administrative JPMs ML16049A0822016-02-18018 February 2016 Initial Exam 2015-302 Final Administrative JPMs ML16049A0772016-02-18018 February 2016 Initial Exam 2015-302 Final Simulator Scenarios ML16049A0802016-02-18018 February 2016 Initial Exam 2015-302 Final Sim In-plant JPMs ML16049A0862016-02-18018 February 2016 Initial Exam 2015-302 General Correspondence ML16049A0322016-02-18018 February 2016 Initial Exam 2015-302 Draft Administrative Documents ML15348A0562015-12-14014 December 2015 Forwards Response to Reactor Operator and Senior Reactor Operator Initial License Written Examinations - Post Examination Response ML15351A1182015-12-0808 December 2015 Initial Exam 2015-302 Post Exam Comments ML15342A3732015-12-0707 December 2015 Initial Exam 2015-302 Final SRO Written Exam ML15342A3682015-11-24024 November 2015 Initial Exam 2015-302 Final RO Written Exam ML15280A3432015-10-0505 October 2015 September 2015 NRC Generic Fundamentals Examination Results ML15175A4022015-06-23023 June 2015 Notification of Licensed Operator Initial Examination 05000259/2015302, 05000260/2015302, and 05000296/2015302 ML15079A1252015-03-20020 March 2015 Initial Exam 2015-301 Final Sim_IN-Plant JPMs ML15079A1212015-03-20020 March 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15079A1102015-03-20020 March 2015 Initial Exam 2015-301 Final Administrative Documents ML15079A1062015-03-20020 March 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15079A1042015-03-20020 March 2015 Initial Exam 2015-301 Draft Sim_IN-Plant JPMs ML15079A0982015-03-20020 March 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15079A0932015-03-20020 March 2015 Initial Exam 2015-301 Draft SRO Written Exam 2022-05-10
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22290A1482022-10-17017 October 2022 Notification of Licensed Operator Initial Examination 05000259/2023301, 05000260/2023301, 05000296/2023301 ML22132A2542022-05-10010 May 2022 Bf 2022-301 Approval Letter ML22077A1142022-03-18018 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21277A1432021-10-0404 October 2021 301, Corporate Notification Letter (210-day Ltr) ML21256A1852021-09-13013 September 2021 301 Exam Administrative Items (2 Year Delayed Release) ML21256A2932021-09-13013 September 2021 301 Exam Final Items (2 Year Delayed Release) (1) ML21256A2182021-09-13013 September 2021 301 Exam 2B Administrative Items (Normal Release) ML21174A0802021-06-23023 June 2021 301 Final SRO Written Exam (2-Year Delayed Release) ML21174A0782021-06-23023 June 2021 301 Final RO Written Exam (2-Year Delayed Release) ML21131A0252021-05-10010 May 2021 301 Examaination Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20274A0982020-09-29029 September 2020 Bf 2021-301 Browns Ferry Nuclear Plant - Notification of Licensed Operator Initial Examination 05000259/2021301, 05000260/2021301, 05000296/2021301 ML18207A2902018-07-26026 July 2018 Updated Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18198A5332018-07-12012 July 2018 Operator Licensing Written Examination Approval 05000259/2018301, 05000260/2018301 and 05000296/2018301 ML18117A1692018-04-27027 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18110A2472018-04-17017 April 2018 March 2018 - Browns Ferry NRC Generic Fundamentals Examination Results ML17212B1602017-07-31031 July 2017 Exam Admin Items - ADAMS 2C - Delay Release 2 Yrs ML17212B1492017-07-31031 July 2017 Exam Final Items - ADAMS 2B - Delay Release 2 Yrs ML17212B1682017-07-31031 July 2017 Exam Admin Items (Immediate Release) - ADAMS 2D ML17132A1322017-05-12012 May 2017 Senior Reactor Operator Initial License Operating Examination - Post Examination Response ML17125A1352017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17125A3412017-04-17017 April 2017 Operator Licensing Written Examination Approval 05000259, 260, 296/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16049A0702016-02-18018 February 2016 Initial Exam 2015-302 Draft Simulator Scenarios ML16049A0712016-02-18018 February 2016 Initial Exam 2015-302 Draft Sim In-plant JPMs ML16049A0752016-02-18018 February 2016 Initial Exam 2015-302 Final Administrative Documents ML16049A0772016-02-18018 February 2016 Initial Exam 2015-302 Final Simulator Scenarios ML16049A0822016-02-18018 February 2016 Initial Exam 2015-302 Final Administrative JPMs ML16049A0722016-02-18018 February 2016 Initial Exam 2015-302 Draft Administrative JPMs ML16049A0802016-02-18018 February 2016 Initial Exam 2015-302 Final Sim In-plant JPMs ML16049A0862016-02-18018 February 2016 Initial Exam 2015-302 General Correspondence ML16049A0322016-02-18018 February 2016 Initial Exam 2015-302 Draft Administrative Documents ML15348A0562015-12-14014 December 2015 Forwards Response to Reactor Operator and Senior Reactor Operator Initial License Written Examinations - Post Examination Response ML15351A1182015-12-0808 December 2015 Initial Exam 2015-302 Post Exam Comments ML15342A3732015-12-0707 December 2015 Initial Exam 2015-302 Final SRO Written Exam ML15342A3682015-11-24024 November 2015 Initial Exam 2015-302 Final RO Written Exam ML15280A3432015-10-0505 October 2015 September 2015 NRC Generic Fundamentals Examination Results ML15175A4022015-06-23023 June 2015 Notification of Licensed Operator Initial Examination 05000259/2015302, 05000260/2015302, and 05000296/2015302 ML15079A1062015-03-20020 March 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15079A0742015-03-20020 March 2015 Initial Exam 2015-301 Draft Administrative Documents ML15079A0822015-03-20020 March 2015 Initial Exam 2015-301 Draft RO Written Exam ML15079A0932015-03-20020 March 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15079A0982015-03-20020 March 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15079A1042015-03-20020 March 2015 Initial Exam 2015-301 Draft Sim_IN-Plant JPMs ML15079A1102015-03-20020 March 2015 Initial Exam 2015-301 Final Administrative Documents ML15079A1212015-03-20020 March 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15079A1252015-03-20020 March 2015 Initial Exam 2015-301 Final Sim_IN-Plant JPMs ML15079A1282015-03-20020 March 2015 Initial Exam 2015-301 Final Administrative JPMs ML15079A1332015-03-20020 March 2015 Initial Exam 2015-301 General Correspondence and Miscellaneous Documents ML15040A5812015-02-0909 February 2015 Initial Exam 2015-301 Final SRO Written Exam 2022-05-10
[Table view] |
Text
.1 Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 May 16, 2014 10 CFR 55.5 Mr. Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1257 Attention: Mr. Eugene Guthrie Browns Ferry Nuclear Plant, Units 1, 2, and 3 FaciHty Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Reactor Operator and Senior Reactor Operator Initial License Written Examinations Post Examination Response The Tennessee Valley Authority (WA) administered the final NRC Written Examination for the Browns Ferry Nuclear Plant Reactor Operator and Senior Reactor Operator Initial License Training (ILT) on May 9, 2014. The supporting documentation specified by Section ES-501 of NUREG 1021, Revision 9, Supplement 1, Operator Licensing Examination Standards for Power Reactors, for Post Examination Activities is enclosed. The enclosures content listing is provided at the end of this letter.
Analysis of the preliminary facility graded written examination results indicated that there were no examination written failures. There are no post-operating exam comments.
Victor M. McCree Page 2 May 16, 2014 The NRC Form ES-201-3, will be forwarded to the NRC as soon as it is completed.
The enclosures to this letter are considered by TVA to be of a personal nature and, as such, are requested to be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6).
There are no commitments contained within this letter.
Should you have any questions regarding this matter, please contact Mr. Dan Zieiinski, at (256) 729-2783.
Respectfully, K. J. Poison Vice President
Enclosures:
Enclosure 1 - Form ES-403-1, Written Examination Grading Quality Checklist Enclosure 2 - Graded Written Examinations (Each Applicants Original Answer and Examination Cover Sheets) and a Clean Copy of Each Applicants Answer Sheet Enclosure 3 - Questions Asked By and Answers Given to the Applicants During the Written Examination Enclosure 4 - Examination Seating Chart Enclosure 5 - Results of Written Examination Performance Analysis that was Performed Enclosure 6 - Master Examinations and Answer Keys, Annotated to indicate and Changes Made While Administering and Grading the Examinations
Victor M. McCree Page 3 May 16, 2014 JLP:SWA:CSP Enclosures bcc: (w/o Enclosure)
S. M. Douglas, LP 3R-C D. L. Hughes, POB 2E-BFN D. Laing, BET 3A-BFN M. T. Nabors, BET lA-BEN J. W. Shea, LP 3R-C P. R. Wilson, LP 3R-C C. L. Vaughn, BET lA-BEN EDMS, WT 3B-K
Enclosure I Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response Form ES-403-I, Written Examination Grading Quality Checklist (See Attached)
ii i i Enclosure 2 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response Graded Written Examinations (Each Applicants Original Answer and Examination Cover Sheets) and a Clean Copy of Each Applicants Answer Sheet (See Attached)
nv..
Enclosure 3 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response Questions Asked By and Answers Given to the Applicants During the Written Examination (See Attached)
Enclosure 4 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response Examination Seating Chart (See Attached)
Enclosure 5 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response Results of Any Written Examination Performance Analysis That Was Performed (See Attached)
Enclosure 6 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response Master Examinations and Answer Keys, Annotated to Indicate and Changes Made While Administering and Grading the Examinations (See Attached)
Tennessee Valley Authorfty. Post Office Box 2000, Decatur, Alabama 356092O00 April 10, 2014 10 CFR 55.5 Mr. Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta. Georgia 30303-1257 Attention: Mr. Mark E. Franke Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos, 50-259, 50-260. and 50-296
Subject:
Final Senior Reactor Operator and Reactor Operator Applications
Reference:
- 1. Letter from NRC to WA, Browns Ferry Nuclear Plant Notification of Licensed Operator Retake Initial Examination 0500259/2014301, 0500260/2014301, and 0500296/2014301, dated November 25, 2013
- 2. Letter from TVA to NRC, Reactor Operator Candidate Information Change dated August 16, 2013 in accordance with the above reference 1 letter from the Nuclear Regulatory Commission (NRC) the Tennessee Valley Authority (WA) Is provIding final license applications for the senior Reactor Operator (SRO) and Reactor Operators (ROs) that are to be submitted 14 days prior to the examination date of April 28, 2014.
Enclosed are the final license applications (NRC Form 398) and Medical Certifications (NRC Form 396), for the candidates.
By the reference2V-, WA notified the NRC that Candidate . changed name to i The enclosed documentation for this individual references
Mr. Victor M, McCree Page 2 April 10, 2014 The enclosure to the letter is considered by WA to be of personal nature and as such, is to be withh&d frorflpubhc disclosure in accordance with 10 CFR 2.390(a)(6).
There are no new regulatory comrnitrrtnts in this letter. Should you have any questions regarding this matter please contact Mr Michael D Gibson at (256) 729278S.
S YQ Enclosure Final (Signed) Senior Reactor Operator and Reactor Operator License Applications
Mr. Victor M. McCree Page 3 April 10, 2014 JLP: SWA:CSP boc: cw/o Enclosure)
S. M. Douglas, LP 3R-C D. L. Hughes, POB 2E-BFN C. S. Putnam, SAB 28-BFN J. J. Laffrey, LP 3R-C D. Laing, BFT 3A-BFN M. T. Nabors, BFT 1A-BFN J, W. Shea, LP 3RC C. L. Vaughn BFT IA-BFN EDMS, WT 38-K
r Tennessee Valley Authority, Post Office Bo< 2000, Decatur, Alabama 356092000 March 27, 2014 10 CFR 55.5 Mr. Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1257 Attention: Mr. Eugene F. Guthrie Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Preliminary Senior Reactor Operator and Reactor Operator License Applications
Reference:
- 1. Letter from NRC to WA, Browns Ferry Nuclear Plant Notification of Licensed Operator Initial Examination 05000259/2014301 05000260/2014301, and 05000296/2014301 dated November 25, 2013
- 2. Letter from TVA to NRC, Reactor Operator and Candidate Information Change, dated August 16, 2013 In accordance with the above reference 1 letter, the Tennessee Valley Authority (WA>
is providing preliminary application information that is to be submitted 30 days prior to the Senior Reactor Operator (SRO) and Reactor Operator (RO) examination date of April 28, 2014.
Enclosed are the preliminary (unsigned) SRO and RO license applications (Nuclear Regulatory Commission (NRC) Form 398) and Medical Certifications (NRC Form 396),
for the candidates listed in the enclosure.
By the reference 2 letter, TVA notified the NRC that candidate hanged name to The enclosed documentation for this individual references
Mr. Victor MM.cCree Page 2 March 27, 2014 The enclosure to the letter is considered by WA to be of personal nature and as such, is to be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6).
There are no new regulatory commitments in this letter. Should you have any questions regarding this matter, please contact Mr. Donald C. Binkley, Jr., at (256) 729-3959.
Vice President
Enclosure:
Prehminary Senior Reactor Operator and Reactor Operator License Applications.
/
Mr. Victor M. McCree Page 3 March 27, 2014 JLP:SWA:CSP bcc: (wfo Enclosure)
S. M. Douglas, LP 3R-C D. L. Hughes, P08 2E-BFN J. J. Laffrey, LP 3R-C D. Laing, BFT 3A-BFN M. T. Nabors, BFT 1A-8FN C. S. Putman, SAB 2B-BFN J. W. Shea, LP 3R-C EDMS, WT 38-K
J u_Li- - --, -.--
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 February 20, 2014 10 CFR 55.5 10 CFR 55.49 Mr. Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention: Eugene F. Guthrie Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Submittal of Initial Operator Licensing Examination Operating Tests
Reference:
Letter from the Nuclear Regulatory Commission to the Tennessee Valley Authority Browns Ferry Nuclear Plant Notification of Licensed Operator Initial Examination 05000259/2014301, 05000260/2014301, and 05000296/2014301, dated November 25, 2013 In accordance with the referenced letter and NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, the Tennessee Valley Authority is providing the operating test, and supporting reference materials for the upcoming license examination.
The Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3 Initial Operator Licensing Written Examination is scheduled for the week of April 28, 2014. In order to meet the examination schedule, NRC requested that BFN furnish this examination material by February 24, 2014.
Mr. Victor M. McCree Page 2 February 20, 2014 Enclosed is the operating test, including the supporting reference materials, for the Reactor Operators and Senior Reactor Operators examinations.
In accordance with Title 10 of the Federal Code of Regulations (10 CFR) 55.49, and NUREG-1 021, appropriate measures have been taken to ensure examination integrity and security. Accordingly, it is requested that this letter and the enclosed documents will be withheld from public disclosure until the examinations are completed.
There are no commitments contained in this submittal. Should you have any questions regarding this matter, please contact Mr. Dan Zielinski, at (256) 729-2783.
Respectfully, K. J. Poison Vice President
Enclosure:
Operator Examination and Supporting Reference Materials Operator License Examination Scheduled for the Week of April 28, 2014
Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1, 2, and 3 Operator Examination and Supporting Reference Materials Operator License Examination Scheduled for the Week of April 28, 2014 This enclosure contains the following information:
- 1. A notebook containing the following:
- ES-301-3, Operating Test Quality Checklist;
- ES-301-4, Simulator Scenario Quality checklist
- Operating Examination with References
- 2. Compact Disk containing the examination and references
I1 Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 10, 2014 10 CFR 55.5 10 CFR 55.49 Mr. Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention: Mr. Eugene F. Guthrie Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Submittal of Initial Operator License Examination Outlines
Reference:
Letter from the Nuclear Regulatory Commission (NRC) to the Tennessee Valley Authority dated November 25, 2013, Browns Ferry Nuclear Plant Notification of Licensed Operator Initial Examination 05000259/2014301, 05000260/2014301, and 05000296/2014301 In accordance with the above referenced NRC letter dated November 25, 2013, the Tennessee Valley Authority is providing all appropriate examination outlines and reference material in accordance with NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1, Attachment 3 to ES-201, Reference Materials guidelines for Initial Licensing Examination, for the upcoming Browns Ferry Nuclear Plant Units 1, 2, and 3 Initial Operator License Examination.
Enclosed is the examination information supporting the Initial License Operator Examination scheduled for the week of May 5, 2014. These examination outlines were requested to be submitted by January 13, 2014, in the above referenced letter.
ti
Mr. Victor M. McCree Page 2 January 10, 2013 In accordance with NUREG-1 021, Revision 9, Supplement 1, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are administered.
There are no new regulatory commitments in this letter. Should you have any questions regarding this matter, please contact Mr. Michael D. Gibson, at (256) 729-2783.
Respectfully, K. J. PoIson Vice President
Enclosure:
Examination Outlines Supporting the Initial Operator License for the Examinations Scheduled for the Week of May 5, 2014
Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1,2, and 3 Examination Outlines Supporting the Initial Operator License Examinations Scheduled for the Week of May 5, 2014 (See Attached)
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 31, 2014 10 CFR 55.5 10 CFR 55.49 Mr. Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention: Eugene F. Guthrie Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Submittal of Initial Operator Licensing Examination Written Tests
Reference:
Letter from the Nuclear Regulatory Commission to the Tennessee Valley Authority Browns Ferry Nuclear Plant Notification of Licensed Operator Initial Examination 05000259/2014301, 05000260/2014301, and 05000296/2014301, dated November 25, 2013 In accordance with the referenced letter and NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, the Tennessee Valley Authority is providing the written test, and supporting reference materials for the upcoming license examination.
The Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3 Initial Operator Licensing Written Examination is scheduled for the week of May 5, 2014. In order to meet the examination schedule, NRC requested that BFN furnish this examination material by February 3, 2014.
Enclosed is the written test, including the supporting reference materials, for the Reactor Operators and Senior Reactor Operators examinations.
Mr. Victor M. McCree Page 2 January 31, 2014 In accordance with Title 10 of the Federal Code of Regulations (10 CFR) 55.49, and NUREG-1 021, appropriate measures have been taken to ensure examination integrity and security. Accordingly, it is requested that this letter and the enclosed documents will be withheld from public disclosure until the examinations are completed.
There are no commitments contained in this submittal. Should you have any questions regarding this matter, please contact Mr. Dan Zielinski, at (256) 729-2783.
Respectfully, K. J. Poison Vice President
Enclosure:
Written Examination and Supporting Reference Materials Operator License Examination Scheduled for the Week of May 5, 2014
Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1,2, and 3 Written Examination and Supporting Reference Materials Operator License Examination Scheduled for the Week of May 5, 2014 This enclosure contains the following information:
- 1. A notebook containing the following:
- ES-201-3, Examination Security Agreement
- Written Examination with References
- ES-401-6, Written Examination Quality Checklist
- 2. Compact Disk containing the examination and references