MONTHYEARML13220A1032013-08-0101 August 2013 Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02) Project stage: Request ML13260A2022013-09-17017 September 2013 Accepted for Review of Application to Modify Watts Bar Nuclear Plant Unit 1 Tech Spec Regarding AC Sources Project stage: Approval ML14056A5252014-02-26026 February 2014 E-mail, Request for Additional Information Regarding Application to Modify Technical Specifications Related to AC Sources-Operating Project stage: RAI CNL-14-015, Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02)2014-04-21021 April 2014 Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02) Project stage: Response to RAI ML14132A2432014-06-16016 June 2014 Summary of 4/24/214, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Request for Additional Information Related to License Amendment to Modify AC Power Source Technical Specifications Project stage: RAI CNL-14-107, Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02)2015-01-29029 January 2015 Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02) Project stage: Response to RAI ML15090A6112015-03-31031 March 2015 NRR E-mail Capture - Watts Bar Unit 1 Draft RAIs for Csst License Amendment Request, TAC MF2549 Project stage: Draft RAI ML15105A5252015-04-15015 April 2015 NRR E-mail Capture - Final Rai'S MF2549 WBN, U1 Csst License Amendment Request Project stage: Other CNL-15-078, Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02)2015-06-12012 June 2015 Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02) Project stage: Response to RAI ML15232A1162015-08-24024 August 2015 FRN Re. Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing Project stage: Other ML15232A1132015-08-24024 August 2015 LTR Re. Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing (TAC No. 2549) Project stage: Other ML15225A0942015-09-29029 September 2015 Issuance of Amendment Regarding Alternating Current Sources Project stage: Approval CNL-19-110, Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10)2019-12-17017 December 2019 Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10) Project stage: Request 2015-01-29
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23265A1512023-09-28028 September 2023 Summary of September 12, 2023, Partially Closed Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML23198A3102023-07-20020 July 2023 July 10, 2023, Summary of Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML23068A1532023-03-16016 March 2023 Summary of February 22, 2023, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request to Increase Allowable Number of Tritium Producing Burnable Absorber Rods at Watts Bar Nuclear Plant, Units 1 and 2 ML23055A4562023-03-0909 March 2023 Summary of February 15, 2023, Public Meeting with Tennessee Valley Authority Regarding Proposed Expedited License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML22329A1382022-12-0505 December 2022 Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22104A2252022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22042B3262022-02-14014 February 2022 Summary of February 8, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed License Amendment Request to Revise the Allowable Value for Trip of Turbine-Driven Main Feedwater Pump at Watts Bar Nuclear Plant, Unit 1 ML22025A3112022-02-0909 February 2022 Summary of January 19, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed Schedule for Development of a License Amendment Request for Increased Tritium Production ML21349A3642022-01-0404 January 2022 Summary of December 14, 2021, Teleconference with Tennessee Valley Authority Regarding a Proposed Change to the Capsule Withdrawal Schedule for Watts Bar Nuclear Plant, Unit 2 ML21279A0902021-11-0303 November 2021 Summary of Conference Calls Regarding the Fall 2021, Mid-Cycle Steam Generator Tube Inspections ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21245A4252021-09-15015 September 2021 Summary of August 19, 2021, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to the Watts Bar Nuclear Plant, Units 1 and 2 ML21253A0872021-09-15015 September 2021 Summary of August 19, 2021, Partially Closed Meeting with Tennessee Valley Authority to Discuss Mid-Cycle Outage Contingencies for Watts Bar Nuclear Plant, Unit 2 ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21120A2192021-05-0404 May 2021 April 28,2021, Summary of Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Remove from Technical Specifications Redundant Units of Measurement for Control ML21099A2072021-04-13013 April 2021 Summary of April 7, 2021, Meeting with Tennessee Valley Authority Related to a Planned Relief Request from ASME Code Testing Requirements ML21060B0532021-03-0303 March 2021 Summary of February 11, 2021, Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2, to Apply a Temperature Adjusted Steam Generator Tube Flaw Growth Rate Methodology ML21033A5952021-02-23023 February 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar Nuclear Plant, Unit 2 Steam Generator Replacement ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20351A4212021-01-19019 January 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar, Unit 2, Steam Generator Replacement ML20351A2192021-01-11011 January 2021 Summary of Conference Calls Regarding the Fall 2020 Steam Generator Tube Inspections ML20337A0402020-12-15015 December 2020 Summary of November 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification 5.9.9, Steam Generator Tube Inspection Report ML20323A0662020-11-27027 November 2020 Summary of October 28, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML20244A1892020-09-11011 September 2020 Summary of Teleconference Call with Tennessee Valley Authority Regarding a Proposed Change to the Containment Leakage Rate Testing Program ML20213C7112020-08-25025 August 2020 Summary of July 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned Alternative Request for Watts Bar Nuclear Plant, Unit 1 ML20233A8352020-08-25025 August 2020 Summary of August 11, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20211L8222020-08-10010 August 2020 Summary of Teleconference Call with the Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20150A4162020-06-24024 June 2020 Summary of May 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20153A3622020-06-22022 June 2020 Summary of May 27, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20143A1692020-05-28028 May 2020 Summary of May 14, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML20135H2702020-05-28028 May 2020 Summary of May 5, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20034F5232020-02-12012 February 2020 Summary of Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML19347D1592020-01-0707 January 2020 Summary of December 12, 2019, Meeting with Northern States Power Co., Doing Business as Xcel Energy, and Tennessee Valley Authority Planned License Amendment Requests for Prairie Island, Units 2 and 2, and Watts Bar, Units 1 and 2 ML19296B6642019-11-0707 November 2019 Summary of Pre-Application Meeting with TVA Regarding a Planned License Amendment Request to Revise Technical Specification 3.6.15 Condition B and Surveillance Requirement 3.6.15.1 at Watts Bar Nuclear Plant ML19301A4762019-11-0707 November 2019 Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request to Remove Technical Specification Requirement to Surveil Automatic Transfer (EPID L-2019-LRM-0038 ML19294A3082019-10-28028 October 2019 Summary of July 18, 2019, Pre-Application Meeting with Tennessee Valley Authority Planned License Amendment Request for Approval to Implement a Measurement Uncertainty Recapture Power Uprate ML19284A3532019-10-28028 October 2019 Summary of October 10, 2019, Meeting with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML19253A6732019-09-17017 September 2019 Summary of Closed Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment for Watts Bar Nuclear Plant, Units 1 and 2 ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19235A2862019-09-0303 September 2019 Summary of Meeting with Tennessee Valley Authority Regarding Request to Adopt Technical Specifications Task Force Traveler TSTF-500 at Watts Bar, Units 1 and 2 ML19218A2282019-08-15015 August 2019 Summary of July 1, 2019, Pre-Application Meeting with TVA Regarding Planned License Amendment Request to Implement Full Spectrum Loss-of-Coolant Accident Evaluation Methodology 2024-01-18
[Table view] |
Text
LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 1
SUBJECT:
SUMMARY
OF APRIL 24,2014, MEETINGWITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 1, REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO MODIFY AC POWER SOURCE TECHNICAL SPECIFICATIONS (TAC NO. MF2549).
On April 24, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of this meeting was for TVA to discuss with NRC recent responses to a request for additional information (RAI) related to a license amendment request (LAR). The response from TVA was submitted on April 21, 2014, which is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML14112A341. Attendees for this meeting are listed in the Enclosure.
By letter dated August 1, 2013 (ADAMS No. ML13220A103), TVA submitted the subject LAR for Watts Bar Nuclear Plant (WBN), Unit 1. The purpose of the LAR was to modify limiting condition for operation for Technical Specification 3.8.1, AC [alternating current] Sources-Operating, to provide additional time to restore an inoperable offsite circuit, modify Surveillance Requirement 3.8.1.8, and modify the current licensing basis, as described in the Updated Final Safety Analysis Report, for the available maintenance feeder for the Common Station Service Transformers (CSSTs A and B). On February 26, 2014, the NRC staff transmitted an RAI by electronic mail to TVA (ADAMS Accession No. ML14056A525).
During the meeting on April 24, the senior electrical reviewer expressed concerns with TVA's proposal to have an electrical circuit for the alternate AC source available but not connected to the safety busses for up to 14 days. This timeframe is discussed in RAI No. 1, but it is not satisfactorily resolved in TVA's submitted response. The staff is concerned that the proposed amendment would deviate from the current license basis because sources would not be immediately connected to safe shutdown busses. Allowing the delayed AC sources to be unconnected for a period of 14 days, as stated in the LAR, would not meet General Design Criterion (GDC) 17. TVA agreed to discuss the issue and come up with an appropriate timeframe.
The NRC staff and TVA discussed RAI No. 4, which states:
The staff is currently reviewing the degraded voltage relay (DVR) setpoint for the shutdown boards when supplied through the normal source using CSST C and D.
Please verify that the DVR setpoint adequacy will be validated for shutdown boards
when supplied through CSST A and B using the same methodology as approved for the normal source.
TVA's submitted response to RAI 4 states:
The WBN 2 DVR setpoints for the shutdown boards is under review by NRC. TVA has requested a meeting with NRC to discuss the DVR setpoints and conformance to NRC requirements and guidance. This meeting is currently scheduled for April 24, 2014. The DVR relays are physically located on the shutdown boards, thus the DVR settings when approved by the NRC, will be valid whether CSSTs C and D or combinations of CSSTs Cor D with CSSTs A orB supplying power to the boards.
The same methodology for validating the DVR setpoints is used for the various combinations of CSSTs supplying the boards described in the LAR.
The NRC staff said that TVA's response should be updated so that it is consistent with future submittals clarifying the DVR setpoint methodology.
On Monday May 19, a clarifying call was held between the NRC staff and TVA to discuss, specifically, what information is needed to show that GDC 17 is met. The NRC staff said additional information should be submitted soon to facilitate the timeliness of the technical review.
RAI Questions 1 and 6 are related to the time delay associated with using CSST A and B as a GDC 17 source. GDC 17 requires two sources of offsite power; one immediate source and one source that can be delayed. The GDC does not define the requirement for allowable delay time in the second source. However, the GDC states that, "The safety function for each system (assuming the other system is not functioning) shall be to provide sufficient capacity and capability to assure that (1) specified acceptable fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences and (2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents."
The LAR proposes CSST A (or CCST B) to be "available" but not connected to the shutdown busses. The staff has noted that CSST A and B have adequate capacity to support safe shutdown of the WBN units. The staff requested information on how this proposed delayed path with CSST A (or B) in 'available mode' is able to support GDC 17 requirements (1) and (2) noted above. The RAI responses in the letter dated April 21, 2014, did not provide a clear answer related to the proposed delay in the second GDC 17 source.
The April 24 meeting concluded with the staff restating that the review of the submitted RAI responses will be delayed until TVA submits additional information as clarified above.
Please direct any inquiries to me at 301-415-2048 or via e-mail at Justin. Poole@nrc.gov Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
MEETING ATTENDANCE LIST Licensee: Tennessee Valley Authority Plant: Watts Bar Nuclear Plant. Unit 1
Subject:
Request for Additional Information Related to AC Power Source License Amendment Request Date: April24, 2014 Location: U.S. Nuclear Regulatory Commission Time: 11:00 a.m. -12:00 p.m.
Headquarters, Room 0-7B4 NAME TITLE ORGANIZATION Senior Project Manager, Justin Poole NRC/NRR/DORL/WBN Watts Bar Unit 2 Project Manager, Watts Bar Siva Lingam NRC/NRR/DORL/WBN Unit 1 Jeanne Dion Project Manager NRC/NRR/DORL/WBN Gurcharan (Singh)
Senior Electrical Engineer NRC/NRR/DE/EEEB Matharu Gordon Arent Director, WBN Licensing TVA Jose R. Dubon Licensing Engineer TVA Watts Bar Unit 2, Electrical Steven Hilmes TVA and I&C Manager Enclosure
PKG ML14133A223 Meeting Notice ML14100A562 Meetmg Surn mary ML14132A243 Han douts ML14112A341 OFFICE DORLILPWB/PMiT DORLILPWB/PM DORLILPWB/LA NAME JDion JPoole BCiayton DATE 6/4/14 6/5/14 6/5/14 OFFICE DE/EEEB/BC DORLILPWB/BC DORLILPWB/PM NAME JZimmerman JQuichocho JPoole DATE 6/10/14 6/16/14 6/16/14