Category:Letter
MONTHYEARIR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 2024-02-01
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML22194A8172022-08-10010 August 2022 Issuance of Amendment No. 232 Revise Surveillance Requirements for Electric Power Monitor Channels for Reactor Protection System and Power Range Neutron Monitoring System ML21348A7132022-03-14014 March 2022 Issuance of Amendment No. 231 Revision of Technical Specification Limits for Ultimate Heat Sink ML22056A0102022-03-0404 March 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Correction Letter of Amendment Nos. 230, 342, and 323 Deletion of Specified Definitions and Figures ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML21341B4262021-12-0808 December 2021 Correction Letter of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part 21 Safety Communication SC05-03 ML21181A0562021-08-17017 August 2021 Issuance of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-03 (EPID L 2020 Lla 0210) (Non-Proprietary) ML21098A0872021-04-26026 April 2021 Issuance of Amendment No. 228 Adopt Technical Specifications Task Force TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML21050A0022021-03-12012 March 2021 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21047A3132021-03-10010 March 2021 Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary) ML20281A6132020-11-0909 November 2020 Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool Cooling ML20231A6322020-09-29029 September 2020 Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19289A8862019-11-0707 November 2019 Issuance of Amendment No. 220 Regarding Revise Technical Specifications to Adopt TSTF-546, Revise APRM (Average Power Range Monitor) Channel Adjustment Surveillance Requirement ML19218A3052019-09-19019 September 2019 Issuance of Amendment No. 219 Regarding Revise Technical Specifications to Adopt TSFF-564, Safety Limit MCPR ML19205A3062019-09-0606 September 2019 Issuance of Amendment No. 218 Regarding Revised Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements ML19186A2052019-08-0606 August 2019 Issuance of Amendment No. 217 Remote Shutdown System ML19073A0732019-04-30030 April 2019 Issuance of Amendment No. 216 Revise Technical Specification 3/4.8.1, A.C. Sources - Operating, Action for Inoperable Diesel Generator ML19065A1562019-03-27027 March 2019 Issuance of Amendment No. 215 Inverter Allowed Outage Time Extension ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML18260A2032018-10-30030 October 2018 Issuance of Amendment No. 213 Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18096A5422018-04-24024 April 2018 Hope Creek Generating Station - Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) ML18081A0442018-04-11011 April 2018 Issuance of Amendment No. 211 Safety Limit Minimum Critical Power Ratio Change ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17324A8402017-12-14014 December 2017 Issuance of Amendment to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (CAC No. MF9502; EPID L-2017-LLA-0204) ML17317A6052017-12-13013 December 2017 Issuance of Amendment, License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-535 ML17291A2092017-11-0808 November 2017 Issuance of Amendment Technical Specification Change for Permanent Extension to Type a and Type C Containment Leak Rate Test Frequencies (CAC No. MF8462; EPID L-2016-JLD-0011) ML17216A0222017-08-0404 August 2017 Nonproprietary Issuance of Amendment Regarding Digital Power Range Neutron Monitoring System Upgrade ML17164A3552017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17047A0202017-03-21021 March 2017 Issuance of Amendment to Delete Technical Specification Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML17053A1782017-03-15015 March 2017 Issuance of Amendment to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16270A0382016-10-13013 October 2016 Issuance of Amendment No. 200 Safety Limit Minimum Critical Power Ratio Change ML15286A0912015-11-30030 November 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Traveler-522 ML15141A2712015-06-17017 June 2015 and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating Licenses ML14323A9742014-12-23023 December 2014 and Salem Nuclear Generating Station, Units 1 and 2, Issuance of Amendments Revision to Cyber Security Plan Implemenation Schedule and Conditions ML14108A3992014-12-18018 December 2014 Issuance of Amendment Request to Relocate Flood Protection Technical Specification to the Technical Requirements Manual ML14108A3122014-07-29029 July 2014 Issuance of Amendment Request to Relocate Safety Relief Valve Position Instrumentation to Technical Requirements Manual ML13114A0782013-06-26026 June 2013 Issuance of Amendment Request for Technical Specification Change to Average Power Range Monitoring System Operability Requirements in Operating Condition 5 ML12335A2212012-12-10010 December 2012 and Salem Nuclear Generating Station, Units 1 and 2 - Issuance of Amendments Approval of Change to Implementation Milestone 6 of Cyber Security Plan LR-N12-0107, License Amendment Request - APRM Operability Requirements in Opcon 52012-06-0606 June 2012 License Amendment Request - APRM Operability Requirements in Opcon 5 ML1201800782012-02-0808 February 2012 Issuance of Amendment 191 Control Room Emergency Filtration System and Control Room Air Conditioning System ML1123806182011-09-14014 September 2011 Issuance of Amendment Operation with Final Feedwater Temperature Reduction and Feedwater Heaters Out of Service ML1118615602011-07-28028 July 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan 2024-01-16
[Table view] Category:Safety Evaluation
MONTHYEARML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML22194A8172022-08-10010 August 2022 Issuance of Amendment No. 232 Revise Surveillance Requirements for Electric Power Monitor Channels for Reactor Protection System and Power Range Neutron Monitoring System ML22194A8402022-07-15015 July 2022 Correction Letter of Relief Request No. HR-I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs ML22181A1252022-07-0505 July 2022 Issuance of Relief Request No. HR I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs ML21348A7132022-03-14014 March 2022 Issuance of Amendment No. 231 Revision of Technical Specification Limits for Ultimate Heat Sink ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML21181A0562021-08-17017 August 2021 Issuance of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-03 (EPID L 2020 Lla 0210) (Non-Proprietary) ML21098A0872021-04-26026 April 2021 Issuance of Amendment No. 228 Adopt Technical Specifications Task Force TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML21050A0022021-03-12012 March 2021 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21047A3132021-03-10010 March 2021 Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary) ML20281A6132020-11-0909 November 2020 Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool Cooling ML20231A6322020-09-29029 September 2020 Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors ML20224A2982020-08-20020 August 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20091L9992020-04-13013 April 2020 Issuance of Relief Request HC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19289A8862019-11-0707 November 2019 Issuance of Amendment No. 220 Regarding Revise Technical Specifications to Adopt TSTF-546, Revise APRM (Average Power Range Monitor) Channel Adjustment Surveillance Requirement ML19218A3052019-09-19019 September 2019 Issuance of Amendment No. 219 Regarding Revise Technical Specifications to Adopt TSFF-564, Safety Limit MCPR ML19220A1022019-09-0606 September 2019 Alternative Request VR-03 to Use ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valve for the Fourth 10-Year Inservice Test Interval ML19205A3062019-09-0606 September 2019 Issuance of Amendment No. 218 Regarding Revised Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements ML19186A2052019-08-0606 August 2019 Issuance of Amendment No. 217 Remote Shutdown System ML19136A0262019-07-11011 July 2019 Issuance of Relief Request No. HC-I3R-08, Revision 0, Use of the ASME Code ML19073A0732019-04-30030 April 2019 Issuance of Amendment No. 216 Revise Technical Specification 3/4.8.1, A.C. Sources - Operating, Action for Inoperable Diesel Generator ML19065A1562019-03-27027 March 2019 Issuance of Amendment No. 215 Inverter Allowed Outage Time Extension ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML18290A8762018-12-0606 December 2018 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4458; EPID No. L-2014-JLD-0040) ML18260A2032018-10-30030 October 2018 Issuance of Amendment No. 213 Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18096A5422018-04-24024 April 2018 Hope Creek Generating Station - Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) ML18081A0442018-04-11011 April 2018 Issuance of Amendment No. 211 Safety Limit Minimum Critical Power Ratio Change ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17324A8402017-12-14014 December 2017 Issuance of Amendment to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (CAC No. MF9502; EPID L-2017-LLA-0204) ML17317A6052017-12-13013 December 2017 Issuance of Amendment, License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-535 ML17321B1062017-11-28028 November 2017 Request to Use Later Edition of American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (CAC No. MG0124; EPID L-2017-LLR-0087) ML17291A2092017-11-0808 November 2017 Issuance of Amendment Technical Specification Change for Permanent Extension to Type a and Type C Containment Leak Rate Test Frequencies (CAC No. MF8462; EPID L-2016-JLD-0011) ML17223A4832017-08-17017 August 2017 Relief from the Requirements of the ASME Code for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations ML17216A0222017-08-0404 August 2017 Nonproprietary Issuance of Amendment Regarding Digital Power Range Neutron Monitoring System Upgrade ML17125A2662017-06-30030 June 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17164A3552017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17047A0202017-03-21021 March 2017 Issuance of Amendment to Delete Technical Specification Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML17053A1782017-03-15015 March 2017 Issuance of Amendment to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16343A0572016-12-20020 December 2016 Requests for Relief GR-01, PR-01, PR-02, VR-01, and VR-02, for the Fourth Inservice Testing Interval ML16270A0382016-10-13013 October 2016 Issuance of Amendment No. 200 Safety Limit Minimum Critical Power Ratio Change ML16256A6552016-09-30030 September 2016 Hope Creek Generating Station - Request for Relaxation of the Release Point Height Requirement of NRC Order EA-13-109,Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML16259A2042016-09-20020 September 2016 Hope Creek Generating Station - Safety Evaluation - Request to revise technical specifications - safety limit minimum critical power ratio.(TAC NO. MF7793) ML15286A0912015-11-30030 November 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Traveler-522 2024-01-16
[Table view] Category:Technical Specifications
MONTHYEARML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML21050A0022021-03-12012 March 2021 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21047A3132021-03-10010 March 2021 Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary) ML20281A6132020-11-0909 November 2020 Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool Cooling ML20231A6322020-09-29029 September 2020 Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19186A2052019-08-0606 August 2019 Issuance of Amendment No. 217 Remote Shutdown System ML19065A1562019-03-27027 March 2019 Issuance of Amendment No. 215 Inverter Allowed Outage Time Extension ML17317A6052017-12-13013 December 2017 Issuance of Amendment, License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-535 ML17047A0202017-03-21021 March 2017 Issuance of Amendment to Delete Technical Specification Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML17053A1782017-03-15015 March 2017 Issuance of Amendment to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML16270A0382016-10-13013 October 2016 Issuance of Amendment No. 200 Safety Limit Minimum Critical Power Ratio Change ML15286A0912015-11-30030 November 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Traveler-522 ML15141A2712015-06-17017 June 2015 and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating Licenses ML14108A3992014-12-18018 December 2014 Issuance of Amendment Request to Relocate Flood Protection Technical Specification to the Technical Requirements Manual LR-N14-0189, License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process2014-11-25025 November 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process ML14108A3122014-07-29029 July 2014 Issuance of Amendment Request to Relocate Safety Relief Valve Position Instrumentation to Technical Requirements Manual LR-N13-0155, License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual2013-09-0505 September 2013 License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual LR-N13-0143, License Amendment Request to Relocate Safety/Relief Valve Position Instrumentation to the Technical Requirements Manual2013-07-30030 July 2013 License Amendment Request to Relocate Safety/Relief Valve Position Instrumentation to the Technical Requirements Manual LR-N12-0067, License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items2012-03-0101 March 2012 License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items LR-N12-0028, Supplement to Application for Tech Spec Change TSTF-477 Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Tech Specs Using Consolidated Line Item Improvement Process2012-01-26026 January 2012 Supplement to Application for Tech Spec Change TSTF-477 Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Tech Specs Using Consolidated Line Item Improvement Process ML0527202982011-07-20020 July 2011 Current Facility Operating License NPF-57, Tech Specs, Revised 12/18/2017 ML11116A1482011-07-20020 July 2011 Issuance of Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station LR-N11-0208, Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal2011-07-0606 July 2011 Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal ML1109801512011-04-19019 April 2011 Correction to Amendment No. 187 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425 LR-N11-0098, Format and Editorial Corrections to Technical Specification Pages Issued with Amendment 1872011-04-0404 April 2011 Format and Editorial Corrections to Technical Specification Pages Issued with Amendment 187 LR-N11-0068, Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process2011-02-28028 February 2011 Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process LR-N10-0310, Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Rev. 0, Control Rod Scram Times.2010-08-19019 August 2010 Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Rev. 0, Control Rod Scram Times. ML1015907132010-07-21021 July 2010 Issuance of Amendment Control Rod Notch Testing Frequency LR-N10-0097, License Amendment Request: Emergency Diesel Generators a and B Allowed Outage Time Extension2010-03-29029 March 2010 License Amendment Request: Emergency Diesel Generators a and B Allowed Outage Time Extension LR-N10-0015, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2010-03-19019 March 2010 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML0932700232009-12-0808 December 2009 Issuance of Amendment Mode Change Limitations ML0934302422009-12-0101 December 2009 License Amendment Request to Adopt TSTF-460, Revision 0, Control Rod Scram Times. ML0916006832009-07-15015 July 2009 Issuance of Amendment Technical Specification Requirements Related to Snubbers LR-N09-0001, License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications2009-01-0505 January 2009 License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications LR-N08-0150, Relief Request for Third Interval Inservice Inspection Program for Examinations and Tests of Snubbers and Associated License Amendment Request2008-07-30030 July 2008 Relief Request for Third Interval Inservice Inspection Program for Examinations and Tests of Snubbers and Associated License Amendment Request LR-N08-0071, License Amendment Request - Hydrogen Water Chemistry Low Power Restriction2008-04-25025 April 2008 License Amendment Request - Hydrogen Water Chemistry Low Power Restriction ML0734500402008-01-24024 January 2008 Tech Spec Pages for Amendment 173 Control Room Habitability LR-N08-0003, Supplement to License Amendment Request for Extended Power Uprate2008-01-16016 January 2008 Supplement to License Amendment Request for Extended Power Uprate ML0728500372007-10-16016 October 2007 Technical Specifications, Issuance of Amendment Removal of Turbine First Stage Pressure Values from Technical Specifications ML0724003042007-08-27027 August 2007 Tech Spec Pages for Amendment 171 Relocate Component Lists for Primary Containment Isolation Valves from Technical Specifications LR-N07-0215, Supplement to License Amendment Request for Extended Power Uprate2007-08-27027 August 2007 Supplement to License Amendment Request for Extended Power Uprate ML0724805722007-06-15015 June 2007 Gnf S-0000-0068-2643, Gnf Additional Information Regarding the Requested Changes to the Technical Specification Slmcpr. Hope Creek (KT1) Cycle 15 LR-N07-0061, Application to Revise Technical Specifications (LCR H07-01) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-17017 April 2007 Application to Revise Technical Specifications (LCR H07-01) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0630704822006-10-31031 October 2006 Tech Spec Pages for Amendment 170 Regarding Clarification of Requirements During Handling of Irradiated Fuel Core Alterations, and Operations with the Potential for Draining the Reactor Vessel ML0624101882006-08-28028 August 2006 Technical Specifications - Fuel Storage and Handling ML0621403972006-08-0101 August 2006 Technical Specifications, Issuance of Amendment Ultimate Heat Sink, MC8054 LR-N06-0259, Supplement to Request for License Amendment Ultimate Heat Sink2006-07-18018 July 2006 Supplement to Request for License Amendment Ultimate Heat Sink ML0610105472006-04-10010 April 2006 Technical Specifications Pages Re Relocation of the Component Identification from the Overcurrent Protective Device Lists in TS 3/4.8.4.1, Primary Containment Penetration Conductor Overcurrent Protective Devices, and TS 3/4.8.4.5 2024-01-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 18, 2014 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236, N09 Hancocks Bridge, NJ 08038
SUBJECT:
HOPE CREEK GENERATING STATION -ISSUANCE OF AMENDMENT RE:
REQUEST TO RELOCATE FLOOD PROTECTION TECHNICAL SPECIFICATION TO THE TECHNICAL REQUIREMENTS MANUAL (TAC NO. MF2738)
Dear Mr. Joyce:
The Commission has issued the enclosed Amendment No. 196 to Renewed Facility Operating License No. NPF-57 for the Hope Creek Generating Station (Hope Creek). This amendment consists of changes to the technical specifications (TSs) in response to your application dated September 5, 2013.
The amendment relocates the operability and surveillance requirements (SRs) for flood protection from the Hope Creek TSs to the Hope Creek Technical Requirements Manual (TRM).
The affected TSs are: Flood Protection, TS 3.7.3 and SR 4.7.3. As part of the amendment, the operability and SRs for the flood protection will be relocated verbatim into the Hope Creek TRM.
A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely~
CJ .y~
Carleen ~ Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosures:
- 1. Amendment No. 196 to Renewed License No. NPF-57
- 2. Safety Evaluation cc w/encls: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PSEG NUCLEAR LLC DOCKET NO. 50-354 HOPE CREEK GENERATING STATION AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 196 Renewed License No. NPF-57
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by PSEG Nuclear LLC dated September 5, 2013, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No.
NPF-57 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 196, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULA TORY COMMISSION
'-y/_Y_'\ V\.../*~~-~ .. _____ )
Meena K. Khanna, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the License and the Technical Specifications Date of Issuance: becember 18, 2014
ATTACHMENT TO LICENSE AMENDMENT NO. 196 RENEWED FACILITY OPERATING LICENSE NO. NPF-57 DOCKET NO. 50-354 Replace the following page of the Renewed Facility Operating License with the revised page.
The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Remove Insert Page 3 Page 3 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert xiii xiii XX XX 3/4 7-9 3/4 7-9 3/4 7-10 3/4 7-10
reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. Mechanical disassembly of the GE 14i isotope test assemblies containing Cobalt-60 is not considered separation.
(7) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Part 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at reactor core power levels not in excess of 3840 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 196, and the Environmental Protection Plan contained in Appendix 8, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Renewed License No. NPF-57 Amendment No. 196
INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.7.3 DELETED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 7-9 3/4.7.4 REACTOR CORE ISOLATION COOLING SYSTEM . . . . . . . . . . . . . . . . . 3/4 7-11 3/4.7.5 DELETED 3/4.7.6 SEALED SOURCE CONTAMINATION . . . . . . . . . . . . . . . . . . . . * . . . . . . 3/4 7-19 3/4.7.7 MAIN TURBINE BYPASS SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 7-21 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES A.C. Sources-Operating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 8-1 Table 4.8.1.1.2-1 Diesel Generator Test Schedule .... 3/4 8-10 A.C. Sources-Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 8-11 3/4.8.2 D.C. SOURCES D.C. Sources-Operating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 8-12 Table 4.8.2.1-1 Battery Surveillance Requirements ... 3/4 8-15 D.C. Sources Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 8-17 3/4.8.3 ONSITE POWER DISTRIBUTION SYSTEMS Distribution- Operating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 8-18 Distribution- Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 8-21 3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES Primary Containment Penetration Conductor Overcurrent Protective Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 8-24 Table 3.8.4.1-1 Primary Containment Penetration Conductor Overcurrent Protective Devices...... 3/4 8-26 Motor Operated Valve Thermal Overload Protection (Bypassed) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 8-30 HOPE CREEK xiii Amendment No. 196
INDEX BASES SECTION PAGE 3/4.7 PLANT SYSTEMS 3/4.7.1 SERVICE WATER SYSTEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 7-1 3/4.7.2 CONTROL ROOM SYSTEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 7-1 3/4.7.3 DELETED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 7-1b 3/4.7.4 REACTOR CORE ISOLATION COOLING SYSTEM ........... . B 3/4 7-1c 3/4.7.5 DELETED 3/4.7.6 SEALED SOURCE CONTAMINATION . . . . . . . . . . . . . . . . . . . . . . B 3/4 7-4 3/4.7.7 MAIN TURBINE BYPASS SYSTEM . . . . . . . . . . . . . . . . . . . . . . . B 3/4 7-4 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1, 3/4.8.2 and 3/4.8.3 A.C. SOURCES, D.C. SOURCES and ONSITE POWER DISTRIBUTION SYSTEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 8-1 3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES ......... . B 3/4 8-3 3/4.9 REFUELING OPERATIONS 3/4.9.1 REACTOR MODE SWITCH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 9-1 3/4.9.2 INSTRUMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 9-1 3/4.9.3 CONTROL ROD POSITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 9-1 3/4.9.4 DELETED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 9-1 3/4.9.5 DELETED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 9-1 3/4.9.6 DELETED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 9-2 3/4.9.7 DELETED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 9-2 3/4.9.8 and 3/4.9.9 WATER LEVEL -REACTOR VESSEL and WATER LEVEL- SPENT FUEL STORAGE POOL ....... . B 3/4 9-2 3/4 . 9. 10 CONTROL ROD REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 9-2 3/4.9.11 RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION .... B 3/4 9-2 HOPE CREEK XX Amendment No. 196
PLANT SYSTEMS 314.7.3 DELETED HOPE CREEK 3/4 7-9 Amendment No. 196
THIS PAGE INTENTIONALLY BLANK HOPE CREEK 3/4 7-10 Amendment No. 196
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 196 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-57 PSEG NUCLEAR LLC HOPE CREEK GENERATING STATION DOCKET NO. 50-354
1.0 INTRODUCTION
By letter dated September 5, 2013, 1 PSEG Nuclear LLC (PSEG or the licensee) submitted a request for changes to the Hope Creek Generating Station (Hope Creek) technical specifications (TSs).
The amendment removes the operability and surveillance requirements (SRs) for flood protection from the Hope Creek TSs and places them in the Hope Creek Technical Requirements Manual (TRM).
The affected TSs are: Flood Protection, TS 3.7.3 and SR 4.7.3. As part of the amendment, the operability and SRs for the flood protection will be relocated into the Hope Creek TRM.
2.0 REGULATORY EVALUATION
The U.S. Nuclear Regulatory Commission (NRC) staff used the following regulatory basis for its evaluation of the licensee's amendment request:
- The regulations in Title 10 of the Code of Federal Regulations (1 0 CFR) 50.36(c)(2) state, in part, that "[w]hen a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met ... "
- The regulations in 10 CFR 50.36(c)(2)(ii) state, "[a] technical specification limiting condition for operation of a nuclear reactor must be established for each item meeting one or more of the following criteria:
(A) Criterion 1. Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML13249A242.
(B) Criterion 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
(C) Criterion 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
(D) Criterion 4. A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety."
- The regulations in 10 CFR 50.36(c)(3) state, "surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met."
- Regulatory Guide (RG) 1.97, "Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident," Revision 2, issued December 1980, lists five types (Types A-E) of variables to help designers select the accident monitoring instrumentation and applicable criteria. Categories 1, 2, and 3 separate the type criteria into groups for a graded approach to requirements, depending on the importance to safety or the measurement of a specific variable.
- The NRC Staff's Review of Nuclear Steam Supply System Vendor Owners Groups' Application of the Commission's Interim Policy statement Criteria to Standard Technical Specifications, dated, May 9, 1988.
On July 22, 1993, the Commission issued its final policy statement indicating that satisfying the guidance in the policy statement also satisfies Section 182a of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.36, "Technical Specifications" (58 FR 39132; July 22, 1993). The final policy statement described the safety benefits of the improved Standard Technical Specifications (STS) and encouraged licensees to use the improved STS as the basis for plant-specific TS amendments and for complete conversions to the improved STS. Further, the final policy statement gave guidance for evaluating the required scope of the licensee's improved TS and defined the guidance criteria for determining which of the limiting condition for operations (LCOs) and associated surveillances should remain in its improved TS. Using this approach, licensees should keep existing LCO requirements that fall within or satisfy any of the final policy statement criteria in the TS. Those LCO requirements that do not fall within or satisfy any of these criteria may be relocated to licensee-controlled documents. The Commission codified the four criteria in 10 CFR 50.36(c)(2)(ii) (60 FR 36953; July 19, 1995). NUREG-1443, "Standard Technical Specifications General Electric BWR/4 Plants," dated April2012, (ADAMS Accession
No. ML12104A192) was developed based on the criteria in the Final Policy Statement.
The proposed amendment would relocate TS 3.7.3 and SR 4.7.3 to the Hope Creek TRM. The TRM is described in Section 13.5, "Plant Procedures," of the Hope Creek Updated Final Safety Analysis Report (UFSAR). Specifically, UFSAR Section 13.5.4 reads as follows:
13.5.4 Technical Requirements Manual (TRM)
The Technical Requirements Manual (TRM[)] contains technical requirements and/or supporting information (e.g., tables and component lists) which were once contained in the HCGS [Hope Creek] Technical Specifications (TS) (i.e.,
Appendix A of the HCGS Facility Operating License). Removal of the TS and information is approved by the NRC through individual TS amendments. The TRM is intended to provide operational guidance and requirements for various plant conditions, actions, and testing similar to TS, however, these requirements are in accordance with licensing commitments. These changes add the TRM into the scope of procedures to be processed through the Station Qualified Reviewer (SQR) process and reviewed by PORC [Plant Operations Review Committee]. Future changes to the relocated requirements and supporting information are processed in accordance with the Quality Assurance Topical Report (QATR), and are subject to 10CFR50.59 review. All non-editorial changes are reviewed by PORC.
The TRM is comprised of an index, the individual specification[s] and bases. The manual is intended to provide a single location for the relocated TS items as a convenience for operations and other station personnel. The individual sections of the TRM contain the relocated licensing commitments, which are subject to the provisions of 10CFR50.59 described above, and are controlled in accordance with the applicable established procedure process.
Nuclear Energy Institute (NEI) guidance document NEI 98-03, Revision 1, "Guidelines for Updating Final Safety Analysis Reports" (ADAMS Accession No. ML003779028) lists the following methods of controlling the TRM on page 7 of Appendix A:
The TRM or other licensee controlled document is explicitly "incorporated by reference" into the UFSAR. Under this approach, the referenced document is subject to the change control requirements of 10 CFR 50.59 and the update/reporting requirements of 10 CFR 50.71(e), e.g., periodic submittal of change pages, etc.
The TRM or other licensee controlled document is treated in a manner consistent with procedures fully or partially described in the UFSAR. Under this approach, the referenced document is maintained on-site in accordance with licensee administrative processes, and changes are evaluated using 10 CFR 50.59.
Regulatory Guide (RG) 1.181, "Content of the Updated Final Safety Analysis Report in Accordance with 10 CFR 50.71(e)" dated September 1999 (ADAMS Accession No. ML992930009), states that Revision 1 of NEI 98-03 provides methods that are acceptable to the
NRC staff for complying with the provisions of 10 CFR 50.71 (e).
Based on the description in Hope Creek UFSAR Section 13.5.4, the Hope Creek TRM is treated in a manner consistent with procedures fully or partially described in the UFSAR. After the information in TS 3. 7.3 and SR 4. 7.3 is relocated to the TRM, any future changes to the flooding protection would be controlled by the provisions in 10 CFR 50.59.
3.0 TECHNICAL EVALUATION
3.1 Background The requirement for flood protection ensures that facility protection features are in place in the event of flood conditions. The limit of elevation 10.5 feet Mean Sea Level (MSL) [99.5 feet PSEG datum] is based on the elevation at which facility flood protection features provide protection to safety-related equipment.
3.2 Description of Proposed TS Change The proposed license amendment would remove the following items from the TS and relocate them to the TRM:
- 1. TS 3.7.3 on page 3/4 7-9. This specification reads:
Flood protection shall be provided for all safety related systems, components, and structures when the water level of the Delaware River reaches 6.0 feet Mean Sea Level (MSL) USGS datum (95.0 feet PSE&G datum) at the Service Water Intake Structure.
The associated APPLICABILITY is: "At all times."
The associated Actions follow:
- a. With severe storm warnings from the National Weather Service which may impact Artificial Island in effect or with the water level at the service water intake structure above elevation 6.0 feet MSL USGS [United States Geological Survey] datum (95.0 feet PSE&G datum), initiate and complete:
- 1. The closing of all service water intake structure watertight perimeter flood doors identified in Table 3. 7. 3- 1 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, or declare affected service water system components inoperable and take the actions required by LCO 3. 7 .1.2;
-and-
- 2. The closing of all power block watertight perimeter flood doors identified in Table 3.7.3-1 within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.
Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Once closed, all access through the doors shall be administratively controlled.
- b. With the water level at the service water intake structure above elevation 10.5 feet MSL USGS datum (99.5 feet PSE&G datum), be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUT DOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 2. SR 4.7.3 on page 3/4 7-9. This specification reads:
The water level at the service water intake structure shall be determined to be within the limit by:
- a. Measurement in accordance with the Surveillance Frequency Control Program when the water level is below elevation 6.0 MSL USGS datum (95.0 feet PSE&G datum), and
- b. Measurement at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> when severe storm warnings from the National Weather Service which may impact Artificial Island are in effect.
- c. Measurement in accordance with the Surveillance Frequency Control Program when the water level is equal to or above elevation 6.0 MSL USGS datum (95.0 feet PSE&G datum).
- 3. Table 3.7.3-1, "Perimeter Flood Doors" on page 3/4 7-10.
Upon approval of the proposed changes, the operability and SRs for flood protection will be incorporated into the Hope Creek TRM.
The following associated changes will also be made to support relocation of TS 3/4.7.3:
- 1. The TS Index will be revised to delete the reference toTS 3/4.7.3 and Bases 3/4. 7.3.
- 2. TS Bases page B 3/4 7-1b will be changed to delete the description for 3/4.7.3, Flood Protection. This bases definition will also be incorporated verbatim into the Hope Creek TRM.
3.3 Evaluation of Proposed TS Changes While flood protection is important to ensure safety-related equipment is protected, it is not a detector or indicator of reactor coolant pressure boundary (RCPB) degradation. The TS for Leakage Detection Systems is an example of a requirement provided to monitor degradation of the RCPB. Therefore, flood protection does not meet Criterion 1 for inclusion in the TS.
Flood protection is not a process variable, design feature, or operating restriction that is an initial condition of a Design Basis Accident (DBA) or Transient analysis. This is consistent with the NRC Final Policy Statement, which provided that Criterion 2 analyses are contained in Chapters 6 and 15 of the Final Safety Analysis Report (FSAR). Flood events are contained in Chapters 2 and 3 of the Hope Creek Updated FSAR (UFSAR). Therefore, flood protection does not meet Criterion 2 for inclusion in the TS.
Flood protection is not part of the primary success path in the mitigation of a DBA or transient.
Therefore, flood protection does not meet Criterion 3 for inclusion in the TS.
Hope Creek operating experience has shown that site flooding (i.e., flooding above plant grade elevation) is a highly unlikely event. Hope Creek has never initiated a plant shutdown due to a high water level of 99.5 feet (PSEG Datum). Additionally, .the Hope Creek UFSAR highest historical high water was 97.5 feet (PSEG Datum), recorded in November 1950, which is 4 feet below plant grade.
The Hope Creek response dated July 31, 1997, to Generic Letter 88-20, "Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities- 10 CFR 50.54(f),"
Supplement 4, provided the IPEEE for severe accident vulnerabilities. The IPEEE found that the evaluation of "other" external events [i.e., high winds, floods, etc.] were screened out by compliance with Standard Review Plan (SRP) criteria or by demonstration that their predicted core damage frequency fell below the IPEEE screening criteria. In addition, the IPEEE found no known plant-unique external event that poses a significant threat of severe accidents. The NRC staff evaluation report, dated July 26, 1999, on the IPEEE submittal concluded that the IPEEE results are reasonable given the Hope Creek design, operation, and history. Based upon this risk data, flood protection is not a structure, system, or component which operating experience or probabilistic safety assessment has shown to be significant to public health and safety.
Therefore, flood protection does not meet Criterion 4 for inclusion in the TS.
Flood protection does not meet any of the four screening criteria in the Final Policy Statement and 10 CFR 50.36. This conclusion is supported by the absence of operability and SRs for flood protection in the improved standard technical specifications (ISTS) presented in NUREG-1433. Accordingly, this proposed change conforms to theISTS, and flood protection requirements can be established in a licensee-controlled document, the Hope Creek TRM.
Future changes to flood protection requirements in the TRM will be subject to the controls of 10 CFR 50.59.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New Jersey State official was notified of the proposed issuance of the amendments. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR Part 20, and changes surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that
may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (79 FR 21299, dated April15, 2014). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Matt Hamm Date: becernber 18, 2014.
ML14108A399 OFFICE LPL 1-2/PM LPL 1-2/LA SBPB/BC STSB/BC OGC LPL 1-2/BC LPL 1-2/PM REIIiot BHarris NLO NAME Jlamb A Baxter GCasto MKhanna CParker w/comments DATE 06/06/14 05/21/14 6/25/14 06/23/14 12/04/14 12/15/14 12/18/14