2013 Clinton Power Station Mid-Cycle Letter Combined
ML13246A215
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/03/2013
From: Christine Lipa
NRC/RGN-III/DRP/B1
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
IR-13-006
Download: ML13246A215 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 3, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR CLINTON POWER STATION (REPORT 05000461/2013006)

Dear Mr. Pacilio:

On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Clinton Power Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility performance during this period and its plans for future inspections at your facility.

The NRC determined that the performance at Clinton Power Station during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014, including the non-baseline Inspection Procedures (IPs) associated with your plans to construct an Independent Spent Fuel Storage Installation, such as IP 60853, Onsite Fabrication of Components and Construction of an Independent Spent Fuel Storage Installation and IPs 60856/60856.1, Review of 10 CFR 72.212(b) Evaluations. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss any changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

M. Pacilio Please contact me at (630) 829-9703 with any questions you have regarding this letter.

Sincerely,

/RA/

Christine A. Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

Clinton Power Station Inspection Plan/Activity Plan cc w/encl: Distribuiton via ListServTM

M. Pacilio Please contact me at (630) 829-9703 with any questions you have regarding this letter.

Sincerely,

/RA/

Christine A. Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

Clinton Power Station Inspection Plan/Activity Plan cc w/encl: Distribuiton via ListServTM DISTRIBUTION:

See next page DOCUMENT NAME: Clinton Power Station MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP E RIII-DRP RIII RIII NAME CLipa:r/mvtj DATE 09/03/13 OFFICIAL RECORD COPY

Letter to M. Pacilio from C. Lipa dated September 3, 2013

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR CLINTON POWER STATION (REPORT 05000461/2013006)

DISTRIBUTION:

Vivian Campbell RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov

Page 1 of 2 Clinton 08/28/2013 10:32:45 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 09/16/2013 09/20/2013 IP 71124.05 Radiation Monitoring Instrumentation BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 10/07/2013 10/18/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/07/2013 10/18/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 10/07/2013 10/18/2013 IP 71151-BI01 Reactor Coolant System Activity 1 10/07/2013 10/18/2013 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 10/07/2013 10/18/2013 IP 71151-PR01 RETS/ODCM Radiological Effluent BI ISI - ISI BASELINE INSPECTION 1 1 10/07/2013 10/25/2013 IP 7111108G Inservice Inspection Activities - BWR BI FIRE - FIRE PROTECTION INSPECTION AND BAG TRIP 5 1 01/13/2014 02/14/2014 IP 7111105T Fire Protection [Triennial]

BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 03/03/2014 03/07/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/03/2014 03/07/2014 IP 71124.04 Occupational Dose Assessment BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION 1 1 03/24/2014 03/28/2014 IP 7111402 Alert and Notification System Testing 1 03/24/2014 03/28/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 03/24/2014 03/28/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 03/24/2014 03/28/2014 IP 71151 Performance Indicator Verification ISFSI - ISFISI INSPECTION 1 1 05/01/2014 11/29/2014 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI 1 05/01/2014 11/29/2014 IP 60856 Review of 10 CFR 72.212(b) Evaluations ISFSI - REVIEW OF 10 CFR 72.212 EVALUATIONS 1 1 05/01/2014 11/30/2014 IP 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 04/14/2014 04/18/2014 IP 71124.05 Radiation Monitoring Instrumentation BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 07/21/2014 07/25/2014 IP 71124.07 Radiological Environmental Monitoring Program 1 07/21/2014 07/25/2014 IP 71151 Performance Indicator Verification BI ENG - TRIENNIAL HEAT SINK INSPECTION 1 1 09/08/2014 09/12/2014 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Clinton 08/28/2013 10:32:45 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 10/06/2014 10/10/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls STRIKE - STRIKE PREP - OPS/MAINT/RP/CLERKS 3 1 11/03/2014 12/16/2014 IP 92709 Licensee Strike Contingency Plans This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.