Response to NRC Regulatory Issue Summary 2013-06
ML13200A006
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 07/15/2013
From: Gerber J
Constellation Energy Nuclear Group, EDF Group, Nine Mile Point
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2013-06
Download: ML13200A006 (5)


Text

CENG.

a joint venture of P.O. Box 63 Lycoming, NY 13093 Conste0* aon eDF Energy,%%

NINE MILE POINT NUCLEAR STATION July 15, 2013 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk

SUBJECT:

Nine Mile Point Nuclear Station Unit Nos. I and 2; Docket Nos. 50-220 and 50-410 Response to NRC Regulatory Issue Summary 2013-06 Enclosed please find the projected operator licensing examination data requested in NRC Regulatory Issue Summary (RIS) 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," for Nine Mile Point Nuclear Station, Units 1 and 2.

The estimated data are being submitted on the enclosed NRC Forms 536 as requested in the RIS.

Should you have any questions regarding the information in this submittal, please contact me at (315) 349-5214.

Very truly yours, Jeffrey W. Gerber Manager - Training JWG/MHS

Enclosure:

NRC Forms 536 D

fL

Document Control Desk July 15, 2013 Page 2 cc: NRC Regional Administrator, Region I D. E. Jackson, NRC Region I NRC Project Manager NRC Resident Inspector

ENCLOSURE NRC FORMS 536 Nine Mile Point Nuclear Station, LLC July 15, 2013

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemat e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Nine Mile Point Nuclear Station Unit 1 Region I Docket No. 50-220 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY 2016 CY 2017 CY 2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 NUMBER OF REACTOR 8 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 9 10 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 03/02/2015 N/A 03/06/2017 N/A ALTERNATE DATE 03/09/2015 N/A 03/13/2017 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED ,

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 18 0 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Nine Mile Point Nuclear Station Unit 2 Region I Docket No. 50-410 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY 2016 CY 2017 CY 2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 NUMBER OF REACTOR 0 7 0 7 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 1 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE N/A 03/07/2016 N/A 03/05/2018 ALTERNATE DATE N/A 03/14/2016 N/A 03/12/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 17 0 CANDIDATES NRC FORM 536 (09-2011)