Category:Letter type:LIC
MONTHYEARLIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release LIC-18-0027, Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2018-10-0303 October 2018 Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update LIC-18-0003, License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool2018-09-28028 September 2018 License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool LIC-18-0025, Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 20192018-07-19019 July 2018 Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 2019 LIC-18-0023, Fort Calhoun Station, Unit 1 Request for Partial Site Release2018-06-29029 June 2018 Fort Calhoun Station, Unit 1 Request for Partial Site Release LIC-18-0021, Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan)2018-06-0606 June 2018 Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan) LIC-18-0017, Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy2018-04-26026 April 2018 Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy 2023-08-24
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARLIC-15-0027, Reply to a Notice of Violation (EA-15-020)2015-04-23023 April 2015 Reply to a Notice of Violation (EA-15-020) IR 05000285/20130132014-05-0202 May 2014 Reply to a Notice of Violation 05000285-13-013 LIC-14-0055, Reply to a Notice of Violation 05000285-13-0132014-05-0202 May 2014 Reply to a Notice of Violation 05000285-13-013 IR 05000285/20140022014-04-18018 April 2014 Reply to Notices of Violations 05000285/2014002 LIC-14-0053, Reply to Notices of Violations 05000285/20140022014-04-18018 April 2014 Reply to Notices of Violations 05000285/2014002 IR 05000285/20130112013-04-24024 April 2013 OPPD, Reply to a Notice of Violation, NRC Inspection Report 05000285-13-011, EA-13-043 LIC-13-0028, OPPD, Reply to a Notice of Violation, NRC Inspection Report 05000285-13-011, EA-13-0432013-04-24024 April 2013 OPPD, Reply to a Notice of Violation, NRC Inspection Report 05000285-13-011, EA-13-043 LIC-12-0180, Omaha Public Power District, Reply to a Notice of Violation IR 05000285-12-005, EA-12-1742012-12-13013 December 2012 Omaha Public Power District, Reply to a Notice of Violation IR 05000285-12-005, EA-12-174 LIC-12-0181, NRC Inspection Report 05000285/2012010, Supplemental Response to the Reply to a Notice of Violation (Nov); EA-12-0232012-12-0303 December 2012 NRC Inspection Report 05000285/2012010, Supplemental Response to the Reply to a Notice of Violation (Nov); EA-12-023 LIC-12-0152, Response to Denial of Violation in NRC Inspection Report 05000285/20120022012-11-0606 November 2012 Response to Denial of Violation in NRC Inspection Report 05000285/2012002 LIC-12-0080, Response to NRC Inspection Report 05000285/2012002, EA-2012-0952012-06-11011 June 2012 Response to NRC Inspection Report 05000285/2012002, EA-2012-095 IR 05000285/20120102012-05-24024 May 2012 NRC Inspection Report 05000285/2012010, Reply to a Notice of Violation (Nov); EA-12-023 LIC-12-0051, NRC Inspection Report 05000285/2012010, Reply to a Notice of Violation (Nov); EA-12-0232012-05-24024 May 2012 NRC Inspection Report 05000285/2012010, Reply to a Notice of Violation (Nov); EA-12-023 LIC-12-0041, NRC Inspection Report 05000285/2011006, Reply to a Notice of Violation; EA-12-035 (Revision 0)2012-04-13013 April 2012 NRC Inspection Report 05000285/2011006, Reply to a Notice of Violation; EA-12-035 (Revision 0) LIC-11-0084, Omaha Public Power District - NRC Inspection Report 05000285/2011007, Reply to a Notice of Violation (Nov); EA-11-0252011-08-17017 August 2011 Omaha Public Power District - NRC Inspection Report 05000285/2011007, Reply to a Notice of Violation (Nov); EA-11-025 IR 05000285/20110072011-08-17017 August 2011 Omaha Public Power District - NRC Inspection Report 05000285/2011007, Reply to a Notice of Violation (Nov); EA-11-025 LIC-11-0011, NRC Inspection Report 05000285/2010008, Reply to a Notice of Violation (Nov); EA-10-084 (Revision 1)2011-06-0707 June 2011 NRC Inspection Report 05000285/2010008, Reply to a Notice of Violation (Nov); EA-10-084 (Revision 1) LIC-10-0098, NRC Inspection Report 05000285-10-008, Reply to a Notice of Violation; EA-10-0842010-11-0505 November 2010 NRC Inspection Report 05000285-10-008, Reply to a Notice of Violation; EA-10-084 LIC-09-0066, Ltr. NRC Inspection Report 05000285-09-003, Reply to a Notice of Violation (NOV) EA-09-1742009-09-0202 September 2009 Ltr. NRC Inspection Report 05000285-09-003, Reply to a Notice of Violation (NOV) EA-09-174 LIC-08-0009, NRC Inspection Report 05000285/2007011, Reply to Notice of Violation (NOV) EA-07-194 (Revision 1)2008-02-15015 February 2008 NRC Inspection Report 05000285/2007011, Reply to Notice of Violation (NOV) EA-07-194 (Revision 1) LIC-07-0089, NRC Inspection Report 05000285/2007007, Reply to a Notice of Deviation2007-10-0505 October 2007 NRC Inspection Report 05000285/2007007, Reply to a Notice of Deviation LIC-07-0062, NRC Inspection Report 05000285-06-018, Reply to a Notice of Violation (NOV) EA-07-0472007-06-28028 June 2007 NRC Inspection Report 05000285-06-018, Reply to a Notice of Violation (NOV) EA-07-047 IR 05000285/20070092007-06-15015 June 2007 NRC Inspection Report 05000285/07009, Reply to Notice of Violation (NOV) EA-07-056 LIC-07-0057, NRC Inspection Report 05000285/07009, Reply to Notice of Violation (NOV) EA-07-0562007-06-15015 June 2007 NRC Inspection Report 05000285/07009, Reply to Notice of Violation (NOV) EA-07-056 IR 05000285/20060152006-09-22022 September 2006 NRC Inspection Report 05000285-06-015, Reply to Notice of Violation LIC-06-0107, NRC Inspection Report 05000285-06-015, Reply to Notice of Violation2006-09-22022 September 2006 NRC Inspection Report 05000285-06-015, Reply to Notice of Violation LIC-05-0055, NRC Inspection Report 05000285-05-010, Reply to a Notice of Violation2005-05-12012 May 2005 NRC Inspection Report 05000285-05-010, Reply to a Notice of Violation LIC-04-0109, Status of Actions Regarding NRC IR 05000285-00-001 for the Fort Calhoun Station2004-10-14014 October 2004 Status of Actions Regarding NRC IR 05000285-00-001 for the Fort Calhoun Station LIC-04-0070, Reply to Notice of Violation to Inspection Report 050000285/20040022004-06-11011 June 2004 Reply to Notice of Violation to Inspection Report 050000285/2004002 LIC-03-0076, NRC Inspection Report 50-285/03-09, Reply to a Notice of Violation (NOV)2003-05-20020 May 2003 NRC Inspection Report 50-285/03-09, Reply to a Notice of Violation (NOV) ML0225408832002-08-26026 August 2002 NRC IR 05000285-02-008, Reply to Notice of Violation 2015-04-23
[Table view] |
Text
444 South 16th Street Mall Omaha, NE 68102-2247 LIC-13-0028 April 24, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
References:
- 1. Docket Number 50-285
- 2. Letter from NRC (J. A. Clark) to OPPD (D. J. Bannister), Fort Calhoun
- NRC Integrated Inspection Report Number 05000285/2012002, dated May 11, 2012 (NRC-12-0049) (EA-2012-095) (ML12132A395)
- 3. Letter from OPPD (D. J. Bannister) to NRC (Document Control Desk),
Response to NRC Inspection Report 05000285/2012002, EA-2012-095, dated June 11, 2012 (LIC-12-0080) (ML12164A431)
- 4. Letter from NRC (T. M. Blount) to OPPD (Lou Cortopassi), Denial of Violation in NRC Inspection Report 05000285/2012002, dated September 14, 2012 (NRC-12-0088) (EA-2012-095) (ML12258A293)
- 5. Letter from OPPD (Lou Cortopassi), "Response to Denial of Violation in NRC Inspection Report 05000285/2012002,' dated November 6, 2012 (LIC-12-0152) (ML12312A109)
- 6. Letter from NRC (M. Hay) to OPPD (Lou Cortopassi), Fort Calhoun -
NRC Inspection Report Number 05000285/2013011 and Notice of Violation," Dated March 11, 2013 (NRC-13-0029) (EA-13-043)
(ML13070A399)
SUBJECT:
NRC Inspection Report 05000285/2013011, Reply to a Notice of Violation (NOV); EA-13-043 On March 11, 2013, the Nuclear Regulatory Commission (NRC) transmitted Notice of Violation 05000285/2013011-01, Continued Failure to Classify Intake Structure Sluice Gates as Safety Class 3, (EA-13-043) (Reference 6).
Pursuant to 10 CFR 2.201, OPPD acknowledges the violation occurred and a response to the NOV is provided in the enclosure to this letter. The regulatory commitment identified in Reference 5 above, is restated on the last page of the enclosure.
U. S. Nuclear Regulatory Commission LlC-13-0028 April 24, 2013 Page 2 If you should have any questions, please contact Terrence W. Simpkin, Manager, Site Regulatory Assurance, at (402) 533-6263.
~~p~
MId Louis P. Cortopassi Site Vice President and CNO Enclosure LPC/rjr c: A. T. Howell, NRC Regional Administrator, Region IV L. E. Wilkins, NRC Project Manager J. M. Sebrosky, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector
LIC-13-0028 Enclosure Page 1 REPLY TO A NOTICE OF VIOLATION Omaha Public Power District (OPPD) Docket No. 50-285 Fort Calhoun Station (FCS) License No. DPR-40 EA-13-043 During a Nuclear Regulatory Commission (NRC) inspection conducted from November 18, 2012 to February 28, 2013, a violation of NRC requirements was identified. The violation is restated below:
Title 10 CFR 50, Appendix B, Criterion III, Design Control, requires, in part that measures shall be established to assure that applicable regulatory requirements and the design basis, as defined in 10 CFR 50.2, for those structures, systems, and components are correctly translated into specifications, drawings, procedures, and instructions.
Contrary to the above, the licensee failed to establish measures to assure that applicable regulatory requirements and the design basis for those components were correctly translated into specifications, drawings, procedures, and instructions.
Specifically, the licensee failed to classify the six intake structure exterior sluice gates and their motor operators as Safety Class 3 as defined in the Updated Safety Analysis Report, Appendix N.
Background Information As described in the vendor manual, the intake structure sluice gates were designed and manufactured to result in a nearly watertight enclosure. The sluice gates are incorporated barriers that:
- 1. When open, allow river water to fill the wet cells of the intake structure providing a source of water to the circulation and raw water pumps [they are not part of either system], and
- 2. When closed they are part of the Fort Calhoun Station's passive flood control system.
Sluice Gate Licensing Basis Draft Description provided to District in response to an Atomic Energy Commission (AEC) question in 1970:
For any water levels above 1007.5, the water level inside the intake structure is controlled by positioning the exterior sluice gates to severely restrict the inflow into the wet wells, along with pumping out at a rate equal to the inflow. Because of the wide head variation available, sluice gate and pump settings are self-balancing with reasonable limits Preliminary Safety Analysis Report (PSAR) and Final Safety Analysis Report (FSAR)
Section 9.8:
LIC-13-0028 Enclosure Page 2 For water levels above 1007.5 feet, the water level inside the intake structure is controlled by positioning the exterior sluice gates to restrict the inflow in to the wet wells to match the rate of pumped outflow. Because of the wide head variations possible, the sluice gate and pump settings are automatic self-balancing within reasonable limits. - The underlined language was removed during the USAR Verification Project in late 1999.
Updated Safety Analysis Report (USAR) Section 9.8 (Current):
The water level inside the intake cells can be controlled by pre-positioning the exterior sluice gates (i.e., before floodwater reaches the elevation that prevents access to the sluice gate actuators) to severely restrict the inflow into the cells.
Intake cell level is then controlled by varying the raw water pump output to remove the inlet flow.
OPPD Response
- 1. Reason for the Violation OPPD initially denied the original violation in Reference 1 and in Reference 2 the NRC stated its reasons why the violation was valid. As a result, OPPD attempted to reclassify the sluice gates as Safety Class 3 (SC3). However, they were never designed, procured, or maintained as a SC3 component. Once it was ascertained that reclassification was not possible, OPPD determined that an alternate means for providing cell level control, during times of high river level, was needed in order to provide flood protection for the raw water pumps. This method of controlling intake cell level was identified to the NRC in Reference 3 and in the public meeting held on March 27, 2013 (U.S. NRC Accession No.ML13101A223). The planned modification was discussed in the public meeting held on April 22, 2013 (U.S. NRC Accession No.ML13093A473). Additionally, the proposed modification would eliminate the need to reclassify the sluice gates as SC3.
Difficulties in the development of the modification lead to significant delays and the eventual issuance of violation EA-13-043.
- 2. Corrective Steps Taken and the Results Achieved The sluice gates were inspected during the spring of 2012 and are being cycled monthly to verify closure.
- 3. Corrective Steps That Will be Taken A modification will be installed that will eliminate the need to re-position the intake structure sluice gates during flood levels between 1,010 and 1,014 feet MSL.
OPPD will submit an amendment request in accordance with the requirements of 10 CFR50.59(c)(2) for the modification. The amendment request is on track to be submitted at the end of May 2013.
LIC-13-0028 Enclosure Page 3
- 4. Date When Full Compliance Will be Achieved Full compliance will be achieved upon final installation of the trash rack blowdown backflow modification which will eliminate the need to reclassify the sluice gates as SC3.
References:
- 1. Letter from OPPD (D. J. Bannister) to NRC (Document Control Desk), Response to NRC Inspection Report 05000285/2012002, EA-2012-095, dated June 11, 2012 (LIC-12-0080) (ML12164A431)
- 2. Letter from NRC (T. M. Blount) to OPPD (Lou Cortopassi), Denial of Violation in NRC Inspection Report 05000285/2012002, dated September 14, 2012 (NRC 0088) (EA-2012-095) (ML12258A293)
- 3. Letter from OPPD (Lou Cortopassi), "Response to Denial of Violation in NRC Inspection Report 05000285/2012002,' dated November 6, 2012 (LIC-12-0152)
(ML12312A109)
LIC-13-0028 Enclosure Page 4 Regulatory Commitments Commitment Date AR Number A modification will be installed that will eliminate the need to re-position the intake structure sluice gates during flood June 1, 2013 AR 55733 levels between 1,010 and 1,014 feet MSL.