Reactor Decommissioning Inspection Program Robert Krsek, Senior Resident Inspector, Kewaunee Power Station

Objectives of Inspection Program

  • Ensure safety of decommissioning workers, members of the public and the environment throughout the decommissioning process.
  • Ensure licensee implementation of decommissioning activities are conducted in accordance with NRC requirements.
  • Prior to license termination verify residual radioactivity reduced to a level that permits unrestricted release of property.

Focus of Inspection Program

  • Obtain information through direct observation and verification of licensee activities onsite.
  • Verify that licensee documents are implemented, and maintained as required by their NRC license.
  • Verify licensee activities, organization, and controls are effective to provide reasonable assurance that decommissioning is conducted safely and in accordance with our requirements.

Regional Inspections

  • Balanced look at a cross section of licensee activities important to the conduct of safe decommissioning.
  • Schedule and level of inspection effort is based on decommissioning activities planned or performed.
  • Provide flexibility in the application of inspection resources to promptly address any unexpected issues or problems.

Inspection Areas

  • Organization and Management Controls
  • Quality Assurance
  • Spent Fuel Storage and Handling
  • Maintenance and Surveillance
  • Radiation Protection
  • Radiological Effluent and Environmental Monitoring
  • Security
  • Safety Evaluations
  • Fire Protection
  • Radioactive Waste Packaging and Transportation
  • Evaluate a Particular Safety Concern or Aspect of Licensee Performance

Master Inspection Plan

  • Inspection Plan Developed on an Annual Basis, based on:
  • Plant Status / Phase of Decommissioning
  • Licensee Performance, Staffing Plans, Effectiveness of Management Oversight, Timing and Scheduling of Significant Activities
  • Level of Inspection is Pre-Planned, Tailored to Planned Activities and Scheduled

ISFSI Inspection Program

  • ISFSI = Independent Spent Fuel Storage Installation
  • ISFSI inspections continue for as long as there is an ISFSI present at the site.
  • Oversight is designed to protect the material from terrorist threats and to ensure the protection of the public and the environment.
  • Inspectors examine whether licensee performs activities in accordance with licensing and regulatory requirements including radiation safety and quality assurance.