MONTHYEARML22348A0322022-11-30030 November 2022 NRR E-mail Capture - Request to Resume Endangered Species Act Section 7 Consultation for Decommissioning of San Onofre Nuclear Generating Station, Units 2 and 3 ML22348A0532022-11-30030 November 2022 NRC to National Marine Fisheries Service (Nmfs), Request to Resume Endangered Species Act Consultation for Decommissioning of San Onofre Nuclear Generating Station, Units 2 and 3 ML22278A0182022-10-0404 October 2022 (SONGS) Unit 2 Reactor Head and Closure of Commitments Related to Peaceful Use of Foreign Technology- Acknowledge Receipt ML22265A2122022-09-22022 September 2022 Request for Additional Information for Exemption Request from 100m 72.106(B) Requirement, Docket Nos 50-206, 50-361, and 50-362 ML22119A2422022-04-29029 April 2022 Riv FOLLOW-UP Response: Question About April 11 San Onofre Event ML22034A9962022-02-0202 February 2022 S. Morris Response to C. Langley-Questions About Moving Snf at San Onfre ML21280A1022021-12-0606 December 2021 NRC to NMFS, Supplement to Request to Reinitiate Endangered Species Act Consultation for San Onofre Decommissioning ML21277A2342021-09-30030 September 2021 NMFS to NRC, Receipt of Request to Reinitiate Endangered Species Act Consultation for San Onofre Decommissioning ML21242A0602021-09-30030 September 2021 NRC to NMFS, Request to Initiate Consultation for SONGS Decommissioning ML21117A3492021-03-30030 March 2021 March 30, 2021, Email from Public Watchdogs on Providing New Information to Its October 13, 2020, 2.206 Petition ML21069A2482021-03-10010 March 2021 Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSI ML21068A2712021-03-0909 March 2021 Request for Additional Information Regarding Biological Opinion - SONGS- EPID L-2021-LLL-0006 ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20302A3252020-10-21021 October 2020 E-Mail: Acknowledgement of Receipt to the Petitioner Regarding SCE Use of Hi-Storm at SONGS ML20233A7342020-08-18018 August 2020 LTR-20-0313 David Victor, San Onofre Nuclear Generating Station (SONGS) Community Engagement Panel, Chair, Et Al., Letter Independent Spent Fuel Storage Installation Security at SONGS and Recent SONGS Community Engagement Panel Meeting on O ML20224A0172020-08-0707 August 2020 8-7-20 Corrected Hearing Time - Intervenor SCEs Acknowledgement of Oral Argument Notice (9th Cir.)(Case No. 20-70899) ML20224A0182020-08-0707 August 2020 8-7-20 Intervenor SCEs Acknowledgement of Oral Argument Notice (9th Cir.)(Case No. 20-70899) ML20204B0782020-07-22022 July 2020 Donna Gilmore Email Holtec Umax Materials (07200054, 05000361, 05000362) ML20198M4522020-07-15015 July 2020 Supplement to Public Watchdogs 2.206 Petition ML20163A3402020-05-0505 May 2020 Email Transmission - Peaceful Use Commitments State Dept for SONGS Rx Heads and Steam Generators ML20120A0282020-04-28028 April 2020 4-28-20 Notice of Addition of James Adler as Attorney for NRC (9th Cir.)(Case No. 20-70899) ML20076A5742020-03-11011 March 2020 Response to A.Mcnally San Onofre Canisters (LTR-20-0003) ML20062F5762020-02-28028 February 2020 Public Watchdogs 10 CFR 2.206 Petition - NRC E-mail to Petitioner Regarding Petition Screening Results February 28, 2020 ML20063M3092020-02-28028 February 2020 Public Watchdogs 10 CFR 2.206 Petition - Response from Petitioner to NRC E-mail Regarding Petition Screening Results, February 28, 2020 ML20059M2292020-02-25025 February 2020 OEDO-20-00053 2.206 Petition - Flooding Likely to Create Radioactive Geysers at SONGS ML20049A0802020-02-14014 February 2020 Public Watchdogs 10 CFR 2.206 Petition - E-mail to Petitioner on Immediate Actions Request Determination February 14, 2020 ML20007E5342020-01-0606 January 2020 Oceansiders Initial Assessment & Public Meeting Response E-Mail ML20006D7012019-12-23023 December 2019 Public Watchdogs 10 CFR 2.206 Petition SONGS - Petitioner Request for Public Meeting and NRC Response - December 23, 2019 ML19354B6762019-12-20020 December 2019 2.206 Petition Initial Assessment Notification E-Mail ML19325C5902019-11-20020 November 2019 2.206 Petition Status Notification Email ML19326B2392019-11-18018 November 2019 Public Watchdogs 10 CFR 2.206 Petition SONGS - Screened-in and PRB November 18, 2019 ML19319B6262019-11-0808 November 2019 Oceansiders 2.206 Petition Immediate Action Response E-Mail ML19326A7122019-10-30030 October 2019 Public Watchdogs 10 CFR 2.206 Petition - SONGS Receipt of Exhibits October 30, 2019 ML19326A9692019-10-25025 October 2019 Public Watchdogs 10 CFR 2.206 Petition - SONGS Immediate Action Determination October 25, 2019 ML19326A3602019-10-23023 October 2019 Public Watchdogs 10 CFR 2.206 Petition - SONGS First E-mail to Petitioner October 23, 2019 ML19284B3232019-10-0808 October 2019 Response LTR-19-0351 Kalene Walker, E-mail Concerns About Critical Safety Problems with Holtec Nuclear Waste Storage System at San Onofre ML19344C7842019-09-0303 September 2019 Response from NEIMA Local Community Advisory Board Questionnaire 09-03-2019 RSCS ML19344C7212019-08-30030 August 2019 Response from NEIMA Local Community Advisory Board Questionnaire 08-30-2019 J Steinmetz ML19217A1862019-08-0202 August 2019 E-Mail from M. Layton/Nrc to K. Walker/Public San Onofre - SONGS Special Inspection - Damaged Canisters ML19214A1362019-08-0202 August 2019 Riv Pao Response to Mr. Langley Response to Inquiry ML19221B4122019-07-30030 July 2019 Southern California Edison Company, Southern California Nuclear Generating Station, E-mail from Charles Langley to Scott Morris, NRC, Redundant Drop Protection Features at SONGS ML19213A1072019-07-29029 July 2019 Reply to Mr. Langley Re. Redundant Drop Protection Feature at SONGS ML19210D4292019-07-29029 July 2019 E-Mail from M. Layton/Nrc to D. Gilmore/Public Reply to E-Mail Questions ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19165A1102019-06-11011 June 2019 SONGS Webinar (6-3-2019) Message - Sarah Akerson ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19158A4432019-06-0404 June 2019 Southern California Edison Company; Scratches on Nuclear Storage Canisters at San Onofre Pose No Problems, NRC Says After Its Own Analysis - Orange County Register ML19156A1422019-06-0404 June 2019 LTR-19-0218 Donna Gilmore, Sanonofresafety.Org, E-mail Scratches on Nuclear Storage Canisters at San Onofre ML19158A1312019-05-31031 May 2019 Paragon Energy Systems LLC -10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners 2022-09-22
[Table view] |
Text
°.'*
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Apr 05, 2013 11:50 PAPER NUMBER: 130295 LOGGING DATE: 04/05/20 13 ACTION OFFICE:
Bill Hawkins (IV AUTHOR:
AFFILIATION:
ADDRESSEE: Chairman Resource
SUBJECT:
Concerns San Onofre Nuclear Generating Station restart ACTION: Appropriate DISTRIBUTION: RF, SECY to Ack.
LETTER DATE: 04/04/2013 ACKNOWLEDGED Yes SPECIAL HANDLING: Lead office to publicly release 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after SECY's assignment, via SECY/EDOIDPC.
NOTES:
FILE LOCATION: ADAMS DATE DUE: DATE SIGNED:
Remsburg, Kristy From: Bill Hawkins pQmail.com
Sent: Thursday, April 04, 2013 6:50 PM To: CHAIRMAN Resource; Borchardt, Bill; Leeds, Eric; Howell, Art; Dorman, Dan; Benney, Brian; Hall, Randy
Subject:
Thought of thee day - Personal Observations based on review of audits, work activities and conversations with Anonymous Insiders, SONGS Sad Saga, but True Statistics Life is a unique opportunity to serve the society. Society needs Energy, which is safe, economical and reliable. Every form of Energy has drawbacks and risks. SCE is responsible for safety, economics and reliability of Unit 2.
These factors will be measured on a scale of 0 to 10, 10 being the best and 0 being the worst rating.
Definitions and Ranking
- High Base-Load Reliability - 24/7 uninterrupted 2100 MWt supply to grid with voltage support -
10
- No Base Load Reliability - 730 MWt with frequent shutdown and interrupted supply to grid with only 30% of the time voltage support - 0
- Best Economics - Nuclear plants are the lowest-cost producer of base- load electricity. The average production cost of 2.19 cents per kilowatt-hour includes the costs of operating and maintaining the plant, purchasing fuel and paying for the management of used fuel. (www.nei.orcq))
-10
- Worst Economics - With SONGS Restart, cost is unknown, but will be highest in the nation - 0 SONGS Unit 2 Restart Statistics
- INPO Rating - 4 (Worst Operating Record of A Nuclear Power Plant)
- General Safety Record - Worst in the USA according to NRC Data
0 Fire Safety Record - Unit 3 shutdown for 5 months in 2001, $100 Million Loss, falsification of fire watch records for 5 years, 250 ignition sources/welding/grinding/procedure violations between 2010-2012
- Emergelncy Preparedness Record - Lowest in the nation between 2006-2012, Some of the best Shift Managers, Station Emergency Directors, Corporate Emergency Directors and Plant Operators have resigned, retired or Laid Off
- Cyber Security Initial Awareness Training - Audit found 1300 site workers, Cyber Security Program Manager, Chief Nuclear Officer and several other Directors out of SONGS not EIX procedure compliance
- Management Record - Several of the Chief nuclear Officers have retired or resigned, Some of Present Senior Leadership Directors are inefficient, few are inefficient and retaliating, some are inactive and complacent, and the whole team is production/profit oriented rather than safety oriented
- Steam Generators - 8 Steam generators destroyed by flawed design and mis-operations at a cost of Several Billion Dollars to Rate Payers, Arrangements are on the way to destroy the remaining 2.
- Future - Depends upon NRC, affects the safety of 8,4 Million Californians
- Steam Generator Repair/replacement Project - Estimated Duration - 5 Years - Cost -
Unknown - NRC Report: The U.S. Nuclear Regulatory Commission (NRC) inspection team observed various activities associated with the mock-up tests of a portion of the upper tube bundle. The activities being done by Mitsubishi Heavy Industries, Ltd. (MHI) were conducted to determine if a design modification to repair the San Onofre Nuclear Generating Station (SONGS) steam generators was feasible. The design modification testing consisted of anti-vibration bar insertion tests using three different designs. The three different anti-vibration bar designs were:
(1) Thicker - inserted between and parallel to existing anti-vibration bars (2) 30 Degree - inserted at a 30 degree angle to existing anti-vibration bars, forming intersections with existing anti-vibration bars (3) Comb - shaped like a comb and will be inserted into the bundle on every other row and then rotated 90 degrees, locking tubes into place between the "teeth" of the comb.
In discussions with MHI personnel, they indicated that the thicker anti-vibration bar will likely be the least difficult to insert and the comb anti-vibration bar the most difficult to insert due to slight differences in the gaps and arrangement of the tubes.
The last option (3) is beneficial for fluid elastic stability (FEI), but also increases significantly the risk of cascading tube ruptures tube rupture @ 100%, 1729 MWt per RSG @ MSLB Conditions. The first two options (1) (2) are not beneficial for fluid elastic stability. MHI has does not have the tools, technology or skills to repair/replace these flawed and degraded generators. SCE is only left with only two options, which were recommended a year ago, but were ignored, unless MHI signs a one-time contract with Westinghouse to repair/replace the replacement Steam Generators:
Option 1 - Give a turnkey contract to repair/replace the replacement Steam Generators to Westinghouse/Bechtel, Fire/Retire/Lay Of the Inefficient and retaliating Leaders, and Hire Capable and Human Managers, or Option 2 - Dismantle and Decommission San Onofre Units 2 & 3.