Category:E-Mail
MONTHYEARML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23039A1712023-02-0808 February 2023 NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22342B1472022-12-0808 December 2022 NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162) ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML22032A0962022-02-0101 February 2022 002 Radiation Safety Baseline Inspection Information Request ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22007A2672022-01-0707 January 2022 NRR E-mail Capture - North Anna, Unit 2, ASME Section XI Inservice Inspection Program Relief Request N2-14-LMT-003 Fourth Interval Third Period Limited Examinations (L-2021-LLR-0088) ML21335A0812021-12-0101 December 2021 NRR E-mail Capture - Acceptance Review for OMN-28 Request Alternative to ISTC-3700, Position Verification Testing (L-2021-LLR-0086) ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21312A0082021-11-0404 November 2021 Enclosure 2 - NAPS Draft SER Table A.1-1 Markup ML21312A0112021-11-0404 November 2021 Enclosure 3 - NAPS Draft SER Section 3 Comments ML21312A0012021-11-0404 November 2021 Comments on North Anna Draft SER ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21274A0022021-09-30030 September 2021 NRR E-mail Capture - Acceptance Review for TSTF-577 LAR (L-2021-LLA-0158) ML21312A0022021-09-21021 September 2021 Enclosure 1 - E-mail - NAPS SLR SER Appendix a for Dominion Review ML21312A0072021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure B - NAPS SER App a - Dominion Comments 9-21-2021 ML21312A0032021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure a - Dominion Table A4.4-1 Clean Version ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21152A1722021-09-0707 September 2021 NRC to Fws, NRC Issuance of Draft Environmental Impact Statement for North Anna Subsequent License Renewal, Opportunity for Public Comment, and Endangered Species Act Determinations ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21154A0152021-06-0101 June 2021 NRR E-mail Capture - Acceptance Review for Primary Grade Water LAR (L-2021-LLA-0082) ML21140A3682021-05-20020 May 2021 Response to North Anna Hardship (Temporary Staff Guidance Additional Guidance for FOF Inspections During the PHE) ML21140A3712021-05-19019 May 2021 FOF Discussion ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail ML21091A0022021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21069A3522021-03-10010 March 2021 NRR E-mail Capture - Acceptance Review for Topical Report DOM-NAF-2 VIPRE-D 2024-01-18
[Table view] |
Text
From: Kolcum. Greoorv To: Walker. Shakur Li. Yong; Chakravortv. Manas; Park. Sunwoo Jackson. Rahsean Suggs, LaDonna
Subject:
FYI: North Anna current schedule Date: Thursday, September 08, 2011 9:24:55 AM Attachments: schedule Ul U.1 df Gregory Kolcum Senior Resident Inspector Region II, Division of Reactor Projects U.S. Nuclear Regulatory Commission North Anna Power Station Office: 540-894-5421 P. 0. Box 490 Fax: 540-894-5650 Mineral VA 23117
/
VyNa~me Origkinal Sian PFnih Duration FLAG: Unit I 533.0h 9-3-11 0.00 9-25-11 5:00 rU-Perform Mode 5OD PT's 48.Oh 9-3-11 0:00 9-5411 0:00 Ul Mode 5 Seismic walk downs 72.Oh 9-3-11 0:00 9-6-11 0:00 UI Mode 5 OD prep for review 113.Oh 9-3-11 0:00 9-7-11 17:00 Unit 1 Mode 5OD completed O.0b 9-7-11 17:00" UI Establish Equipment Access 24.Oh 9-7-11 17:00 9-8-11 17:00 U1 RCS C/D I depress - Isolate and drain the "A and "C" 60.Oh 9-7-11 17:00 9-10-11 5:00 Perform A"S/G Eddy current testing and secondary side 192.0h 9-10-11 5:00 9-18-11 5:00 "C' RCP seal replacement 192.Oh 9-10-11 5:00 9-18-11 5:00 Repair 1-RC-MOV-1535 body to bonnet 72.Oh 9-10-11 5:00 9-13-11 5:00 Perform SI I CDA I Functional testing 48.Oh 9-20-11 5:00 9-22-11 5:00 Ul Vacuum fill the "A" and C" loops, go solid, start an RC 48.Oh 9-18-11 5:00 9-20-11 5:00 UI Perform mode 4 seismic testing requiements in contal 33.Oh 9-3-11 0:00 9-17-11 0:00 U1 Decon. dose out containment, establish containment 48.0h 9-20-11 5:00 9-22-11 5:00 U1 Containment closed out ready for Mode 4 0.Oh 9-22-11 5:00 Ul Perform Instrument 18 month calibrations 336.Oh 9-3-11 0:00 9-17.11 0:00 UI Complete secondary system work, establish condensi 329,0h 9-3-11 0:00 9-16-1117:00 UI Regulator requirements met for Mode 4 O,0h 9-22-11 5:00 Unit I Mode 4 O.0h 9-22-11 5:00 Mode 4 to on line 48.Oh 9-22-11 6:00 9-24-11 5:00 Unit I on line 0.Oh 9-24-11 5:00" Ul onlinetol00% U! supplysAS loads 24.Oh 9-24-11 5:00 9-25-11 5:00 FLAG: Unit2 1095.Oh 9-3-110:00 . 10-18-11 15;..
Perform Mode 5OD PT's 48.Oh 9-3-11 0:00 9-5-11 0:00 U2 Mode 5 Seismic walk downs 72.0h 9-3-11 0:00 9-6-11 0:00 U2 Mode 50D prep for review 113.Oh 9-3-11 0!00 9-7-11 17:00 Unit 2 Mode 50D completed O.Oh 9-7-11 17:00° U2 Establish Equipment Access 24.Oh 9-8-11 17:00 9-9-1117:00 U2 RCS C/D I depress - Isolate and drain the "A' and "C* 60.Oh 9-10-11 5:00 9-12-11 17:00 Activities required for the Mode B00 233.Oh 9-3-11 0:00 9-12-1117:00 Unit 2 Mode 6 0D completed 0.Oh 9-12-11 17:00° U2 'A' and 'C' Pnmary and Secondary work 288.0h 9-18-11 5:00 9-30-11 5.600 Drain RCS to 74" Rx disassembly, head lilt. fill, unlatch r 72.Oh 9-12-1117:00 9-15-1117:00 Complete required preps I Inspections in SFP ETE-NAFW. 240.Oh 9-3-11 0:00 9-13-11 0.00 U2 Core off-load to SFP 40.Oh 9-15-1117:00 9-17-11 9:00 U2 Defueled window - JOG 122Jbus (orig sch 212 + 120 c 332.Oh 9-17-119:00 10-1-11 5:00 U2 Core on-4oad 40,h 10-1-11 5:00 10-2-11 21:00 U2 Rx re-assembly, Mode 5, and filled into the PZR 90.Oh 10-2-11 21:00 10-6-11 15:00 U2 Mode 5 to Mode 4 (additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of functional to 168.Oh 10-6-1115:00 10-13-11 15:...
U2 Perform mode 4 seismic testing requirements in conta 336.Oh 9-17-11 0:00 10-1-11 0:00 U2 Perform 18 month calibrations 336.0h 9-17-11 0;00 10-1-11 0:00 U2 secondary bulk work 600.Oh 9-3-11 0:00 9-28-11 0:0 Generator Fast Gen 504.Oh 9-3-11 0:00 9-24-11 0:00 CW tunnel 408.0h 9-3-11 0:00 9-20-11 0:00 U2 Secondary side work completed Condenser vaccum 0.Oh 9-28-11 0:00 U2 Regulatory requirements met for Mode 4 0.Oh 10-13-1115:00 Unit 2 Mode 4 0.Oh 10-13-11 15:00 U2 Mode 4 to on line (includes AVR testing) 60.Oh 10-13-11 15:00 10-16-11 3:00 U2 on Oine 0.0h 10-16-11 3:00 U2 on line to 100% 60.Oh 10-16-113:00 10-18-11 15....