ML11306A031

From kanterella
Jump to navigation Jump to search
Hydroelectric Project Sixth Independent Consultant Safety Inspection Report Implementation Plan and Schedule
ML11306A031
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/09/2011
From: Lane N
Dominion Generation
To: King W
NRC/RGN-II, US Dept of Energy, Federal Energy Regulatory Commission (FERC)
References
F11-009, P-6335-VA
Download: ML11306A031 (1)


Text

Dominion Generation North Anna Power Station, 1022 Haley Drive, Mineral, VA 23117 ODominion Web Address: www.dorn.comn September 9, 2011 Mr. Wayne B. King, P.E. - D2SI Atlanta Regional Engineer Serial No. Fll-009 Federal Energy Regulatory Commission Atlanta Regional Office 3700 Crestwood Parkway, Suite 950 Duluth, Georgia 30096

Dear Mr. King:

PROJECT NO. P-6335-VA / NATDAM NO. VA83005 NORTH ANNA HYDROELECTRIC PROJECT SIXTH INDEPENDENT CONSULTANT SAFETY INSPECTION REPORT IMPLEMENTATION PLAN AND SCHEDULE Pursuant to FERC regulation 18 CFR Part 12.39, enclosed are three copies of the corrective action plan and schedule for implementing recommended measures identified in the Sixth Independent Consultant Safety Inspection Report, June 2011.

Please contact Michael P. Whalen at (540) 894-2572, should you have any questions concerning this submittal.

Sincerely,

( NP' N. Larry Lane Zý1ý \

Site Vice President Commitments: As outlined in Attachment 1 U.S. Nuclear Regulatory Commission (Cover Letter Only)

Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector (Cover Letter Only)

North Anna Power Station

"'-ýe-c-e-joe ?cLLL~

-ýýt~d L,010 ecdovaL