Category:Letter
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnold'S Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) NG-22-0021, Registration of Independent Spent Fuel Installation Storage Casks2022-02-24024 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22007A2722022-02-11011 February 2022 Cover Letter - NRC Duane Arnold Exemption Issuance NG-22-0014, Registration of Independent Spent Fuel Installation Storage Casks2022-02-10010 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22028A2822022-02-0303 February 2022 Defueled Physical Security Plan License Amendment Approval ML22033A0802022-02-0202 February 2022 Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition IR 05000331/20210012022-01-25025 January 2022 NRC Inspection Report Nos. 05000331/2021001(DNMS); 07200032/2021001(DNMS); and 07200032/2021002(DNMS) - Duane Arnold Energy Center ML21172A2172022-01-21021 January 2022 Issuance of License Amendment to Adopt ISFSI-Only Technical Specifications NG-22-0009, Registration of Independent Spent Fuel Installation Storage Casks2022-01-20020 January 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0001, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister2022-01-0606 January 2022 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister NG-21-0038, Registration of Independent Spent Fuel Installation Storage Casks2021-12-22022 December 2021 Registration of Independent Spent Fuel Installation Storage Casks NG-21-0035, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister2021-12-10010 December 2021 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister 2024-01-25
[Table view] Category:Code Relief or Alternative
MONTHYEARML18145A1942018-06-15015 June 2018 Relief Request No. NDE R017 Fourth Inservice Inspection Interval Duane Arnold Energycenter (EPID-L-2017-LLR-0135) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18053A2092018-04-16016 April 2018 Request for Relief No. 03 Proposed Use of Alternative Requirements for Nozzle Inner Radius and Nozzle-to-Shell Weld Inspection for Fifth Inservice Inspection Interval (CAC No. MF9374; EPID L-2017-LLR-0110) ML17353A6822018-01-19019 January 2018 Request for Relief No. RR 01, Regarding Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds for the Renewed Operating License Term ML17272A0182017-12-19019 December 2017 Relief Request No. RR-02- Proposed Alternative to ASME Code Examination Requirements for Buried Piping Related to Fifth Inservice Inspection Interval Program Plan L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML16008A0862016-01-21021 January 2016 Relief Request No. PR-01, PR-02, VR-01, VR-02, and VR-03 Related to the Inservice Testing Program for the Fifth 10-Year Interval ML14144A0022014-06-0909 June 2014 Relief Request No. VR-03 Related to the Inservice Testing Program for the Fourth 10-Year Interval ML14099A3352014-04-29029 April 2014 Relief for 2nd Period Limited Weld Examinations ML12170A4212012-07-11011 July 2012 Evaluation of Relief Request VR-02 Regarding Inservice Testing of Safety/Relief Valves JAFP-11-0112, Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP2011-10-0303 October 2011 Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP ML11235A9352011-09-0606 September 2011 Relief Request NDE-014 Authorized, Alternative Weld Overlay Repair ML11237A1052011-09-0606 September 2011 Alternative Regarding Testing Requirements of Main Steam Safety Relief Valve Psv 4402 ML0824806802008-10-0303 October 2008 Authorization of Relief Request Stock Rotation of Recirculation Pump Seal Assemblies ML0716603252007-06-14014 June 2007 Conference Call Record and Chronology, Duane Arnold Energy Center Relief Request to Use Alternative to ASME Section XI Requirements to Use Code Cases N-504-2 and N-638-1 for Weld Overlay Repairs NG-07-0143, Request for Relief from the ASME Section XI Code to Allow Use of the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment2007-02-14014 February 2007 Request for Relief from the ASME Section XI Code to Allow Use of the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment NG-06-0866, Responses to Requests for Additional Information and Revised Relief Requests NDE-R005 and NDE-R007 - Fourth 10-Year Inservice Inspection Program2006-12-21021 December 2006 Responses to Requests for Additional Information and Revised Relief Requests NDE-R005 and NDE-R007 - Fourth 10-Year Inservice Inspection Program ML0617103642006-07-0303 July 2006 Monticello Nuclear Generating Plant, Palisades Nuclear Plant, Point Beach Nuclear Plant Units 1 and 2, Prairie Island Nuclear Generating Plant, Units 1 and 2 - Use of ASME Code Case N-513-2 ML0612302932006-05-30030 May 2006 Relief, Third 10-Year Interval Service Inspection Program Plan Request for Relief to Extend the Third 10 Year Inservice Inspection Interval for the Examination of Welds VLA-001 VLA-002 ML0604004052006-04-0404 April 2006 Third 10-Year Interval Inservice Inspection Program Plan Request for Relief to Extend the Third 10-Year Inservice Inspection Interval for the Examination of Welds VLA-001 VLA-002 ML0509502282005-04-0707 April 2005 Duane Arnold, Evaluation of Relief Request to Use Code Case N-661 ML0432700512005-01-0606 January 2005 Relief, Alternatives for Examination of Reactor Pressure Vessel Circumferential Shell Welds Relief Request NDE-R047 ML0401607382004-02-26026 February 2004 Prairie, Units 1 and 2, Kewaunee, Point Beach, Units 1 and 2, Palisades, Re Request for Alternatives to ASME Section XI, Appendix Viii, Supplement 10 ML0313902782003-06-0303 June 2003 Third 10-year Interval Inservice Inspection Program Relief Request No. NDE-R045 ML0307804782003-03-26026 March 2003 Relief Request, Third 10-Year Interval Inservice Inspection Program Relief Requests NDE-R028, Revision 2, and NDE-R044 NG-02-0268, License DPR-49 Relief Request NDE-R001 Revision 1 NDE-R028 Revision 2, NDE-R044 and NDE-R0452002-03-29029 March 2002 License DPR-49 Relief Request NDE-R001 Revision 1 NDE-R028 Revision 2, NDE-R044 and NDE-R045 2018-06-15
[Table view] Category:Safety Evaluation
MONTHYEARML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22089A0492022-05-12012 May 2022 Sfmp Review Letter ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval ML22028A2822022-02-0303 February 2022 Defueled Physical Security Plan License Amendment Approval ML21067A6422021-05-13013 May 2021 Cyber Security License Amendment Approval ML21098A1662021-04-28028 April 2021 PDEP and EAL License Amendment Approval ML21097A1412021-04-13013 April 2021 EP Exemption Issuance Letter and SE ML20225A0002020-08-27027 August 2020 Approval of Quality Assurance Topical Report (FPL-3), Revision 0 (EPID-L-2020-LLQ-0002) ML20184A0032020-07-30030 July 2020 Issuance of Amendment No. 312 Removal of License Condition 2.C.(3), Fire Protection Program ML20134J1042020-07-10010 July 2020 Issuance of Amendment No. 311 to Revise Operating License and Technical Specifications for Permanently Defueled Conditions ML20083G0082020-04-29029 April 2020 Issuance of Amendment No. 310 Changes to the Post-Shutdown Emergency Plan for Duane Arnold Energy Center ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19310C2042020-01-0202 January 2020 Issuance of Amendment No. 309 to Align Technical Specifications Staffing and Administrative Requirements ML19204A2872019-08-28028 August 2019 Approval of a Certified Fuel Handler Training and Retraining Program ML19198A0102019-07-23023 July 2019 Approval of Change in the BWRVIP Integrated Surveillance Program Capsule Test Schedule to Accommodate Early Closure ML19168A1302019-06-21021 June 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4391; EPID No. L-2014-JLD-0039) ML18292A5662018-11-30030 November 2018 Issuance of Amendment 308 to Upgrade Emergency Action Level Scheme for Duane Arnold Energy Center (DAEC) ML18241A3832018-10-31031 October 2018 Issuance of Amendment 307 to Revise Technical Specifications to Adopt TSTF-551, Revision 3 ML18179A1842018-08-16016 August 2018 Issuance of Amendment 306 to Revise Technical Specification 3.5.1, ECCS-Operating ML18192C1832018-07-24024 July 2018 Fifth 10-Year Inservice Relief Request RR-05 ML18145A1942018-06-15015 June 2018 Relief Request No. NDE R017 Fourth Inservice Inspection Interval Duane Arnold Energycenter (EPID-L-2017-LLR-0135) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18053A2092018-04-16016 April 2018 Request for Relief No. 03 Proposed Use of Alternative Requirements for Nozzle Inner Radius and Nozzle-to-Shell Weld Inspection for Fifth Inservice Inspection Interval (CAC No. MF9374; EPID L-2017-LLR-0110) ML18016A6272018-03-0909 March 2018 Issuance of License Amendment No. 304 Revision to Technical Specification 3.1.2, Reactor Anomalies ML18011A0592018-03-0707 March 2018 Issuance of License Amendment No. 303 Revision to Technical Specification Table 3.3.2.1-1, Control Rod Block Instrumentation ML17353A6822018-01-19019 January 2018 Request for Relief No. RR 01, Regarding Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds for the Renewed Operating License Term ML17347A1112018-01-17017 January 2018 Safety Evaluation for Request for Relief from Seal Weld Procedure Qualification, Relief Request No. RR-04 ML17272A0182017-12-19019 December 2017 Relief Request No. RR-02- Proposed Alternative to ASME Code Examination Requirements for Buried Piping Related to Fifth Inservice Inspection Interval Program Plan ML17212A6462017-10-18018 October 2017 Issuance of Amendment to Modify the Plume Exposure Pathway Emergency Planning Zone Boundary ML17220A0262017-09-21021 September 2017 Issuance of Amendment 301 to Revise Emergency Plan ML17129A0372017-05-26026 May 2017 Safety Evaluation Regarding Implementation of Mitigation Strategies and Reliable Spent Fuel Pool Instrument Related to Orders EA-12-049 and EA-12-051 ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17072A2322017-03-30030 March 2017 Issuance of Amendment to Revise Technical Specifications Fuel Storage Requirements ML16313A4752016-11-30030 November 2016 Correction of Errors in Safety Evaluation Associated with License Amendment No. 298 ML16263A2452016-10-17017 October 2016 Issuance of Amendment to Technical Specifications Section 5.5.6 for the Inservice Testing Program ML16211A5142016-09-12012 September 2016 Issuance of Amendment to Revise Technical Specifications 2.1.1.2, Safety Limit Minimum Critical Power Ratio ML16210A0082016-08-30030 August 2016 Issuance of Amendment to Extend Containment Leakage Test Frequency ML16153A0912016-08-18018 August 2016 Issuance of Amendment to Revise the Value of Reactor Steam Dome Pressure ML16180A0862016-07-25025 July 2016 Issuance of Amendment to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report ML16174A2812016-07-13013 July 2016 Issuance of Amendment (TSCR-154) to Correct Examples in Technical Specifications Section 1.4, Frequency ML16053A4262016-04-29029 April 2016 Correction of Typographical Errors in Safety Evaluation Associated with License Amendment No. 292 ML16008A0862016-01-21021 January 2016 Relief Request No. PR-01, PR-02, VR-01, VR-02, and VR-03 Related to the Inservice Testing Program for the Fifth 10-Year Interval ML15310A0822015-12-22022 December 2015 Issuance of Amendment to Adopt Technical Specifications Task Force (TSTF)-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML15169A2612015-08-18018 August 2015 Issuance of Amendment Concerning Extension of Cyber Security Plan Milestone 8 Completion Date ML15014A2002015-02-10010 February 2015 Issuance of Amendment to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523 Generic Letter 2008-01, Managing Gas Accumulation (Tac No. MF4358) ML14144A0022014-06-0909 June 2014 Relief Request No. VR-03 Related to the Inservice Testing Program for the Fourth 10-Year Interval ML14099A3352014-04-29029 April 2014 Relief for 2nd Period Limited Weld Examinations ML13301A7052013-11-27027 November 2013 Issuance of Amendment Adopting TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. ML13323B4432013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13192A4232013-10-0707 October 2013 Issuance of Amendment to Change Renewed Facility Operating License Condition C.12 2022-05-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 September 6,2011 Mr. Peter Wells Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
DUANE ARNOLD ENERGY CENTER - RELIEF REQUEST NDE-R014 AUTHORIZED FOR WELD OVERLAY REPAIR (TAC NO. ME4984)
Dear Mr. Wells:
By letter dated November 6,2010, and superseded by letter dated November 10,2010, you requested relief from certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) requirements at Duane Arnold Energy Center (DAEC). As an alternative to the ASME Code requirements, you proposed to implement a weld overlay repair in accordance with the requirements of ASME Code Case N-504-4, "Alternative Rules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping, Section XI, Division 1,I! as modified by your November 10,2010, letter.
Based on the review set forth in the enclosed safety evaluation, the Nuclear Regulatory Commission (NRC) staff concludes that the alternative proposed as Relief Request NDE-R014 to perform a weld overlay repair on components RRA-F002A and RRA-J003 would provide an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the NRC staff authorizes Relief Request NDE-R014 for the installation of a weld overlay repair on components RRA-F002A and RRA-J003. This authorized alternative identified as Relief Request NDE-R014 is applicable to the fourth 10-year inservice inspection interval, which began November 1,2006, and will end February 21,2014.
This closes the NRC staff's action on the above submittals. If you have any questions, please feel free to contact the project manager Mr. Karl Feintuch.
Sincerely,
~.
Robert Pascarelli, Chief Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosure:
Safety Evaluation cc w/encl: Distribution via ListServ
\-~p,.~ REG U/ _ UNITED STATES
.;;" ""I;;
",Oil' ~0'J'.L NUCLEAR REGULATORY COMMISSION
/!! 0 WASHINGTON. D.C. 20555"()001
<< 0 I- 3:
'"~ ~
r;;
'f'/. ~
1-') ",0
- 1' SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION INSERVICE INSPECTION PROGRAM RELIEF REQUEST NDE-R014 DUANE ARNOLD ENERGY CENTER NEXTERA ENERGY DUANE ARNOLD, LLC DOCKET NUMBER 50-331
1.0 INTRODUCTION
By letter dated November 6, 2010, and superseded by letter dated November 10, 2010 (Accession Nos. ML103120111 and ML103160155, respectively), NextEra Energy Duane Arnold, LLC (the licensee), requested relief from certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) requirements at Duane Arnold Energy Center (DAEC). As an alternative to the ASME Code requirements, the licensee proposed to implement a weld overlay (WOL) repair in accordance with the requirements of AS ME Code Case N-504-4, "Alternative Rules for Repair of Class 1,2, and 3 Austenitic Stainless Steel Piping, Section XI, Division 1," as modified by the licensee's November 10, 2010, letter. The alternatives proposed in Relief Request NDE-R014 would permit the use of a full structural weld overlay repair for an indication identified in the N2A Recirculation Inlet Safe End to Safe End Extension Dissimilar Metal Weld (RRA-F002A) at DAEC. The Nuclear Regulatory Commission (NRC) staff verbally authorized the licensee's requested alternative in a teleconference on November 15, 2010 (Accession No. ML110240122).
This safety evaluation documents the basis of the NRC staffs verbal authorization.
2.0 REGULATORY EVALUATION
Pursuant to Title 10 of the Code of Federal Regulations (10 CFR), paragraph 50.55a(g}(4),
ASME Code Class 1, 2, and 3 components (including supports) must meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code, Section XI, "Rules for Inservice Inspection (lSI) of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein.
The code of record for the current fourth DAEC lSI interval is the 2001 Edition with 2003 Addenda of the ASME Code, Section XI.
Pursuant to 10 CFR 50.55a(a}(3) alternatives to requirements may be authorized by the NRC if the licensee demonstrates that: (i) the proposed alternatives provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or
- 2 unusual difficulty without a compensating increase in the level of quality and safety. The licensee submitted the subject relief request, pursuant to 10 CFR 50.55a(a)(3)(i), which proposed an alternative to the implementation of the ASME Code, Section XI requirements based on ASME Code Case N-504-4 as modified by the licensee for the deposition of aWOL for the remaining service life of the identified component. Regulatory Guide (RG) 1.147, Revision 16, "Inservice Inspection Code Case Acceptability, ASME Code, Section XI, Division 1," lists the code cases that are acceptable to the NRC for application in licensees' ASME Code, Section XI lSI programs. A licensee may use a code case specified in the RG without prior approval by the NRC if it meets the conditions specified for the code case in the RG.
3.0 TECHNICAL EVALUATION
The licensee's Relief Request NDE-R014 covers the following components: RRA-FOO2A Recirculation Inlet Safe-End to Safe End Extension Weld, and RRA-J003 Recirculation Safe End Extension to Pipe Weld.
3.1 ASME Code Requirements The applicable Code requirement for which relief is requested is ASME Code Section XI, 2001 Edition including Addenda through 2003, IWA-4410 and IWA-4611.
ASME Section XI, IWA-4410 states in part the following: "Welding, brazing, defect removal, metal removal by thermal methods and installation shall be performed in accordance with the requirements of this Subarticle."
ASME Section XI, IWA-4611 (a) states in part the following: "Defects shall be removed in accordance with IWA-4422.1."
3.2 Licensee's Proposed Alternatives and Basis 3.2.1 Reason for the Proposed Alternative Section 4.0 of the licensee's November 10,2010, letter provides the reason for the need for the proposed alternative:
Dissimilar metal welds (DMWs), primarily consisting of Alloy 821182 weld metal are frequently used in boiling water reactor (BWR) construction to connect stainless or Inconel safe ends to vessel and pipe nozzles, generally constructed of carbon or low alloy ferritic steel. These welds have shown a propensity for intergranular stress corrosion cracking (IGSCC) degradation in [bjoiling [wjater
[rjeactor (BWR) environments.
This request is based on restoring the structural integrity of the RRA-F002A weld joint using technically sound welding practices and non-destructive examination (NDE), while limiting repair personnel exposure to the maximum extent practical.
The following cited Code article identifies the actions that would be required if the repair were conducted in accordance with the Code without exception.
-3 IWA-4421(a) requires defect removal in this case. The repair cavity would extend through wall since outer diameter (00) removal would be required.
Internal diameter (10) removal of the indication would be impractical since it would require the removal of the thermal sleeve and jet pump riser from the reactor interior.
3.2.2 The Licensee's Proposed Alternative Section 5.0 of the licensee's November 10, 2010, letter provides the licensee's proposed alternative:
A full structural weld overlay repair is proposed for the safe-end-to-safe-end extension weldment. The safe-end is AI/oy 600 SB-166 austenitic nickel base Inconel forging (ASME Section 1/ SB-166). The safe-end-extension is SA-336 Class F8 austenitic stainless steel forging (304 stainless steel). The full structural weld overlay will be extended beyond the safe end extension to stainless steel pipe weld to aI/ow for ultrasonic examination of both of the welds, see Figure 1.
The weld overlay will be designed consistent with the requirements of NUREG 0313, Revision 2 (which was implemented by Generic Letter (GL) 88-01), the requirements specified in Attachment 1, and IWB-3640, ASME Section XI 2001 Edition, including Addenda through 2003 with Appendix C.
This proposed alternative (Attachment 1) is the result of industry's experience with weld overlay modifications for flaws suspected or confirmed to be caused by stress corrosion cracking and directly applies Alloy 52 or 52M weld material that is primarily being used for these weld overlays.
The ultrasonic examination of the completed overlay will be accomplished with personnel and procedures qualified in accordance with ASME Code, Section XI, 2001 Edition, for Appendix VIII, Supplement 11 (as approved by the NRC in Relief Request NOE-R002 (ML070090357)).
3.2.3 The Licensee's Technical Basis for the Proposed Alternative The licensee's technical basis may be found on pages 2 - 5 of the relief request. On those pages the licensee addressed the issues of structural weld overlay design, welding, and examination, precedents, and duration of the proposed alternative.
3.3 NRC Staff Evaluation 3.3.1 General Requirements Under the rules of ASME Code, Section XI, IWA-4421, repairs shall be performed in accordance with the owner's requirements and the original construction code. Later editions and addenda of the construction code or of ASME Code, Section III, either in their entirety or portions thereof, and ASME code cases may be used. Regulatory Guide (RG) 1.147, Revision 16, "Inservice Inspection code case Acceptability, ASME Code, Section XI, Division 1," lists the code cases that are acceptable to the NRC for application in licensees' AS ME Code, Section XI lSI programs. A licensee may use a code case specified in RG 1.147 without prior approval by the
-4 NRC if it meets the conditions specified for the code case. Revision 16 of RG 1.147 allows the use of ASME Code Case N-504-4 with a condition. This condition requires the use of Nonmandatory ASME Code, Section XI, Appendix a in addition to the nondestructive examination requirements of ASME Code Case N-504-4 and ASME Code, Section XI.
The NRC staff notes that the licensee's use of Alloy 52M material is consistent with weld materials used to perform similar WOLs at other operating boiling water reactor facilities. The NRC staff also notes that the licensee is performing the subject WOL on welds made of Alloy 82/182 and austenitic stainless steel materials. For material compatibility in welding, the NRC staff considers that Alloy 52M is a better choice of filler material than the Alloy 82/182 or austenitic stainless steel material for this weld joint configuration. Alloy 52M contains about 30 percent chromium, which provides excellent resistance to stress corrosion cracking if exposed to the reactor coolant environment. This material is identified as F-No. 43 filler metal and has been previously approved by the NRC staff for similar applications. As for the potential for hot cracking, the NRC staff agrees that the use of an ER308L buffer layer on all stainless steel when depositing an overlay with Alloy 52M filler metal can lessen hot cracking concerns.
Therefore, the licensee's proposed use of Alloy 52M for the WOL as a modification to the requirements of Code Case N-504-4, and ASME Code Section XI, Appendix a, is acceptable as it will provide an acceptable level of quality and safety.
3.3.2 Nondestructive Examination ASME Code Case N-504-4 and ASME Code, Section XI, Appendix a address austenitic stainless steels and they do not specifically apply to the welding in question since the welding involves a full structural overlay over welds (identified as RRA-F002A Recirculation Inlet Safe End-to-Safe-End Extension Weld and RRA-J003 Recirculation Safe End Extension-to-Pipe Weld, which are fabricated from P-No. 8-to-P-No. 43 and P-No. 8-to-P-No. 8 materials, respectively). The overlay will be applied with an F-No. 43 filler metal (high nickel alloy filler metal), specifically, Alloy 52M. The licensee willbe meeting the nondestructive examination requirements of ASME Code Case N-504-4, ASME Code, Section XI, Appendix and ASME a Code, Section XI, as they apply to using an Alloy 52M filler metal. The nondestructive examination to be performed is based on the latest industry experience and consistent with the current practice for the repairs to be performed and, therefore, is acceptable as it will provide an acceptable level of quality and safety.
3.3.3 System Leakage Test The licensee's proposed modification to Paragraph (h) of Code Case N-504-4 is to perform leak testing in accordance with ASME Code, Section XI, IWA-5000. Use of a leak test at normal operating temperature and pressure in lieu of a hydrostatic test has been incorporated in ASME Code, Section XI beginning in the 1998 Edition with the 1999 Addenda. The licensee is currently in its fourth 10-year lSI interval and the lSI Code of record for the fourth 10-year lSI interval is the 2001 Edition with 2003 Addenda of the ASME Code, Section XI. As the licensee's alternative is consistent with the current practice, the NRC staff accepts the licensee's alternative.
- 5
4.0 CONCLUSION
The use of the ASME Code Case N-504-4 requirements as an alternative to the ASME Code repair provisions, as modified by the licensee's alternatives discussed above, is acceptable to the NRC staff, provided that the license complies with all conditions and provisions specified in RG 1.147, Revision 16.
The NRC staff concludes that the alternative proposed in the licensee's Relief Request NDE R014 to perform a WOL on components RRA-F002A and RRA-J003 would provide an acceptable level of quality and safety. Therefore, pursuant to 10 CFR SO.S5a(a)(3)(i), the NRC staff authorizes Relief Request NDE-R014 for the installation of a WOL repair on components RRA-F002A and RRA-J003. This authorized alternative identified as Relief Request NDE-R014 is applicable to the fourth 10-Year lSI interval, which began November 1,2006, and will end February 21 2014.
J All other ASME Code, Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: Edward Andruszkiewicz Dated: September 6, 2011
' ML11235A935 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/CVIB/BC NRR/LPL3-1/BC NAME PTam BTuily MMitchell" RPascarelii DATE 9/2/11 9/2/11 2/15/11 9/6111
- SE transmitted bye-mall of2/15/11 (AccesslonNo.ML110470111).