IR 05000400-11-009 on August and September 2011, Shearon Harris - Notification of Conduct of a Triennial Fire Protection Baseline Inspection
ML111510959
Person / Time
Site: Harris Duke energy icon.png
Issue date: 05/31/2011
From: Nease R
NRC/RGN-II/DRS/EB2
To: Burton C
Carolina Power & Light Co
References
Download: ML111510959 (9)


See also: IR 05000400/2011009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 31, 2011

Mr. Christopher L. Burton

Vice President

Carolina Power and Light Company

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Code: Zone 1

New Hill, North Carolina 27562-0165

SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT- NOTIFICATION OF

CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

(NRC INSPECTION REPORT NO. 05000400/2011009)

Dear Mr. Burton:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a triennial fire protection baseline inspection at Shearon Harris

Nuclear Power Plant in August and September 2011. The inspection team will be led by Mr.

Reinaldo Rodriguez, NRC Senior Reactor Inspector, of the Region II Office. The team will be

composed of personnel from the NRC Regional and Headquarters Offices. The inspection will

be conducted in accordance with Inspection Procedure 71111.05XT, the NRCs baseline fire

protection inspection procedure for plants implementing 10 CFR 50.48(c) and National Fire

Protection Association Standard (NFPA) 805.

On February 2, 2011, during a telephone conversation between Mr. John Caves (Harris

Licensing Supervisor) of your staff, and Mr. Rodriguez, our respective staffs confirmed

arrangements for a three-day information gathering onsite visit and a two-week onsite

inspection. The schedule for the inspection is as follows:

  • Information gathering visit: August 9 - 11, 2011
  • Week 1 of onsite inspection: August 29 - September 2, 2011
  • Week 2 of onsite inspection: September 19 - 23, 2011

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the Shearon Harris Nuclear Power

Plant fire protection programs, fire protection features, and post-fire safe shutdown capabilities

and plant layout, mitigating strategies to address Section B.5.b of the Interim Compensatory

Measures Order, EA-02-026, of February 25, 2002/10 CFR 50.54(hh)(2). The types of

documents the team will be interested in reviewing, and possibly obtaining, are listed in

Enclosures 1 and 2. Please contact Mr. Rodriguez prior to preparing copies of the materials

listed in the Enclosures. The inspection team will try to minimize your administrative burden by

specifically identifying those documents required for inspection preparation.

CP&L 2

During the information gathering visit the team will also discuss the following inspection support

administrative details: office space; specific documents to be made available to the team in

their office space; arrangements for unescorted site access (including radiation protection

training, security, safety and fitness for duty requirements); and the availability of knowledgeable

plant engineering and licensing organization personnel to serve as points of contact during the

inspection.

We request that during the inspection weeks you ensure that copies of analyses, evaluations or

documentation regarding the implementation and maintenance of the Harris fire protection

program, including post-fire safe shutdown capability, be readily accessible to the team for their

review. Of specific interest for the fire protection portion of the inspection are those documents

which establish that your fire protection program satisfies NRC regulatory requirements and

conforms to applicable NRC and industry fire protection guidance. For the B.5.b portion of the

inspection, those documents implementing your mitigating strategies and demonstrating the

management of your commitments for the strategies are of specific interest. Also, personnel

should be available at the site during the inspection that are knowledgeable regarding those

plant systems required to achieve and maintain safe shutdown conditions from inside and

outside the control room (including the electrical aspects of the relevant post-fire safe shutdown

analyses), reactor plant fire protection systems and features, and the Harris fire protection

program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Rodriguez at (404) 997-4498, or me at (404) 997-4503.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

CP&L 3

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading

Room).

Sincerely,

/RA by Gerald Wiseman Acting For/

Rebecca L. Nease, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No.: 50-400

License Nos.: NPF-63

Enclosures: 1. Triennial Fire Protection Inspection Support Documentation

2. Mitigating Strategies Support Documentation

cc w/encl. (See page 4)

_ML111510959__________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS RII:DRP

SIGNATURE RRR1 GWiseman for RAM

NAME RRodriguez RNease RMusser

DATE 05/31/2011 05/31/2011 05/31/2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

CP&L 4

cc w/encl: W. Lee Cox, III

Brian C. McCabe Section Chief

Manager, Nuclear Oversight Radiation Protection Section

Shearon Harris Nuclear Power Plant N.C. Department of Environmental

Progress Energy Commerce & Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

Donald L. Griffith Public Service Commission

Training Manager State of South Carolina

Shearon Harris Nuclear Power Plant P.O. Box 11649

Progress Energy Columbia, SC 29211

Electronic Mail Distribution

Chairman

LaQuisha M. Parks North Carolina Utilities Commission

Manager Electronic Mail Distribution

Support Services

Shearon Harris Nuclear Power Plant Robert P. Gruber

Electronic Mail Distribution Executive Director

Public Staff - NCUC

David H. Corlett 4326 Mail Service Center

Supervisor Raleigh, NC 27699-4326

Licensing/Regulatory Programs

Progress Energy Chair

Electronic Mail Distribution Board of County Commissioners of Wake

County

David T. Conley P.O. Box 550

Senior Counsel Raleigh, NC 27602

Legal Department

Progress Energy Ernest J. Kapopoulos Jr.

Electronic Mail Distribution Plant General Manager

Carolina Power and Light Company

Donna B. Alexander Shearon Harris Nuclear Power Plant

Manager, Nuclear Regulatory Affairs Electronic Mail Distribution

(interim)

Progress Energy Chair

Electronic Mail Distribution Board of County Commissioners of

Chatham County

John H. O'Neill, Jr. P.O. Box 1809

Shaw, Pittman, Potts & Trowbridge Pittsboro, NC 27312

2300 N. Street, NW

Washington, DC 20037-1128 Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Joseph W. Donahue Shearon Harris Nuclear Power Plant

Vice President U.S. NRC

Nuclear Oversight 5421 Shearon Harris Rd

Progress Energy New Hill, NC 27562-9998

Electronic Mail Distribution

CP&L 5

Letter to Christopher L. Burton from Rebecca L. Nease dated May 31, 2011.

SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT- NOTIFICATION OF

CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

(NRC INSPECTION REPORT NO. 05000400/2011009)

Distribution w/encl:

C. Evans, RII EICS

L. Douglas, RII EICS

OE Mail

RIDSNRRDIRS

PUBLIC

RidsNrrPMShearonHarris Resource

Triennial Fire Protection Inspection Support Documentation

Note: This is a broad list of the documents the NRC inspection team may be interested

in reviewing, and possibly obtaining, during the information gathering site visit. The

current version of these documents is expected unless specified otherwise. Electronic

media is preferred, if readily available. (The preferred file format on CD-ROM or DVD-

ROM is .pdf). The CD/DVD-ROM should be indexed, hyperlinked, readable, and

searchable to facilitate ease of use. Please provide 5 copies of each CD/DVD-ROM

submitted). Information in lists should contain enough information to be easily

understood by someone who has knowledge of the technology. The lead inspector will

discuss specific information needs with the licensee staff and may request additional

documents or electronic information.

1. The current version of the fire protection program and fire hazards analysis.

2. Current versions of the fire protection program implementing procedures (e.g.,

administrative controls, surveillance testing, and fire brigade).

3. Fire brigade training program and pre-fire plans.

4. Post-fire nuclear safety capability systems and separation analysis.

5. Analysis supporting achieving and maintaining nuclear safety performance criteria,

including those analyses for areas requiring recovery actions.

6. Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain nuclear safety performance criteria for fires outside the control room and

other areas requiring recovery actions at other than primary control stations.

7. Plant layout and equipment drawings that identify the physical plant locations of nuclear

safety capability equipment.

8. Plant layout drawings that identify plant fire area delineation, areas protected by

automatic fire suppression and detection, and the locations of fire protection equipment.

9. Plant layout drawings which identify the general location of the emergency lighting units

required to support achieving and maintaining nuclear safety performance criteria.

10. Plant operating procedures for achieving nuclear safety performance criteria from inside

the control room with a postulated fire occurring in any plant area outside the control

room, procedures for achieving nuclear safety performance criteria in the event of a fire

in either the control or cable spreading room, or any area requiring recovery actions to

achieve control from other than the main control room or primary control stations.

11. Maintenance and surveillance testing procedures for nuclear safety capability systems

and equipment, and fire barriers, detectors, pumps and suppression systems.

12. Maintenance procedures that routinely verify fuse breaker coordination in accordance

with the nuclear safety circuit coordination analysis.

Enclosure 1

13. A sample of significant design change packages and engineering equivalency

evaluations related to fire protection and post-fire nuclear safety capability (e.g.,

Generic Letter 86-10 evaluations).

14. The reactor plant's probabilistic risk assessment (PRA), results of any PRA reviews,

and listings of actions taken or plant modifications conducted in response to PRA

information (including NFPA 805, Section 2.4.3, Fire Risk Evaluations, and NFPA 805,

Section 2.4.4, Plant Change Evaluations).

15. Temporary modification procedures.

16. Organization charts of site personnel, including fire protection staff personnel.

17. If applicable, layout or arrangement drawings of potential reactor coolant/recirculation

pump lube oil system leakage points and associated lube oil collection systems.

18. A listing of the safety evaluations that form the licensing basis for the reactor plant's

post-fire nuclear safety capability.

19. Procedures or instructions that control the configuration of the reactor plant's fire

protection program, features, and post-fire nuclear safety capability methodology and

system design.

20. A list of applicable codes and standards related to the design of plant fire protection

features and evaluations of code deviations, including any safety evaluations issued for

deviations from NFPA 805 fundamental fire protection program and design elements

(NFPA 805, Chapter 3).

21. Procedures or instructions that govern the implementation of plant modifications,

maintenance, and special operations, and their impact on fire protection.

22. The three most recent fire protection quality assurance (QA) audits and/or self-

assessments.

23. Recent QA surveillances of fire protection activities.

24. A listing of open and closed fire protection condition reports (problem reports / nuclear

condition reports (NCRs) / event analysis reports (EARs) / problem identification and

resolution reports).

25. Listing of plant fire protection program and licensing basis documents.

26. A listing of the NFPA code versions committed to (NFPA codes of record).

27. A listing of plant deviations from code commitments.

28. Actual copies of engineering equivalency evaluations (e.g., Generic Letter 86-10

evaluations).

Enclosure 1

Mitigating Strategies Support Documentation

Note: This is a broad list of the documents the NRC inspection team may be interested

in reviewing, and possibly obtaining, during the information gathering visit. The current

version of these documents is expected unless specified otherwise. Electronic media is

preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is

.pdf). The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to

facilitate ease of use. Please provide 5 copies of each CD/DVD-ROM submitted). The

lead inspector will discuss specific information needs with the licensee staff and may

request additional documents or electronic information.

1. A list of all modifications to regulatory commitments made to meet the requirements of

Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently

imposed license conditions, and 10 CFR 50.54(hh)(2).

2. Copies of procedures/guidelines that were revised or generated to implement the

mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs),

severe accident management guidelines (SAMGs), emergency operating procedures

(EOPs), abnormal operating procedures (AOPs), etc.

3. A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are

used to implement each strategy.

4. Engineering evaluations/calculations that were used to verify engineering bases for the

mitigation strategies.

5. Piping and instrumentation diagram (P&ID) or simplified flow diagrams for systems relied

upon in the mitigation strategies. These could be the type used for training.

6. A modification package or simplified drawings/descriptions of modifications that were

made to plant systems to implement the mitigation strategies.

7. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required

to be used to implement the mitigation strategies.

8. A list of B.5.b strategies, if any, which have implementing details that differ from that

documented in the submittals and the safety evaluation report.

9. A copy of site general arrangement drawing(s) that show the majority of buildings/areas

referenced in B.5.b documents.

10. Training records/training matrix/lesson plans related to B.5.b.

11. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)

required to implement any mitigating strategies.

Enclosure 2