Summary of 3/15/11 (P.M. Session) Meeting with Entergy Operations, Inc. to Discuss Arkansas Nuclear One, Unit 1 Planned License Amendment Request for Technical Specification Change Service Water System Related Support Features
ML111100924
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/29/2011
From: Kalyanam N
Plant Licensing Branch IV
To:
Office of Nuclear Reactor Regulation
Kalyanam N, NRR/DLPM, 415-1480
References
TAC ME5759
Download: ML111100924 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 29, 2011 LICENSEE: Entergy Operations, Inc.

FACILITY: Arkansas Nuclear One, Unit 1

SUBJECT:

SUMMARY

OF MARCH 15, 2011, MEETING WITH ENTERGY OPERATIONS, INC., ON PRE-SUBMITTAL LICENSE AMENDMENT REQUEST (LAR) FOR CHANGES TO TECHNICAL SPECIFICATION 3.7.7, "SERVICE WATER SYSTEM (SWS)," RELATED TO SWS ROOM/AREA COOLING SUBSYSTEMS, ARKANSAS NUCLEAR ONE, UNIT 1 (TAC NO. ME5759)

On March 15, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operations, Inc. (Entergy, the licensee), for Arkansas Nuclear One, Unit 1 (ANO-1) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The meeting notice was issued on March 3, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110620003). The licensee's slide presentation is available at ADAMS Accession No. ML110750426.

Entergy stated that the current guidance related to service water system (SWS) room/area cooling subsystems is not specifically addressed in Technical Specification (TS) 3.7.7, "Service Water System (SWS)," which leads to ambiguity with regard to appropriate actions when SWS room/area cooling subsystems may be degraded or non-functional. Therefore, the licensee proposes to add a new Condition, Required Action, and Completion Time to TS 3.7.7 to address this issue stating that an inoperable SWS room/area cooling subsystem(s) associated with a single SWS loop should be restored within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Additionally, the licensee plans to add information to the associated TS Bases to provide additional clarity with regard to application of the TS under these circumstances.

The NRC staff requested that the licensee submit a formal license amendment request, as per the requirements of Section 50.90, "Application for amendment of license, construction permit, or early site permit," of Title 10 of the Code of Federal Regulations, for the staff to do a detailed review and evaluation of the request. Additionally, adequate consideration of the effect of the TS change on the other major safety-related components and subsystems supported by the SWS must be made, including a Probabilistic Risk Assessment in Risk-Informed Decision on plant-specific changes. Operability assumes that a TS-described structure, system, and component can perform its specified safety function when all necessary support systems are capable of performing their related support functions. Such factors also need be considered in the license amendment request.

Finally, the NRC staff stated that TS amendments that are proposed to relax requirements solely to provide operational flexibility due to shortcomings in system designs have been rejected in the past.

- 2 No members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to Kaly N. Kalyanam at 301-415-1480 or kaly.kalyanam@nrc.gov.

1:

17 t;r.$t- i'l-

)/;JI*

/rIC./1 it'L

/ U f . Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-313

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES MARCH 15, 2011, MEETING WITH ENTERGY OPERATIONS, INC.

PRE-SUBMITTAL LICENSE AMENDMENT REQUEST FOR CHANGES TO TECHNICAL SPECIFICATION 3.7.7, "SERVICE WATER SYSTEM, (SWS)"

RELATED TO SWS ROOM/AREA COOLING SUBSYSTEMS ARKANSAS NUCLEAR ONE, UNIT 1 DOCKET NO. 50-313 Nuclear Regulatory Commission M. Markley, NRR/DORULPL4 S. Sun, NRRIDSS/SRXB A. Howe, NRR/DRAIAPLA M. Hamm, NRR/DIRS/ITSB D. O'Neal, NRRIDRAIAPLA N. Kalyanam, NRRIDORLlLPL4 Entergy Operations, Inc.

Bryan Ford Richard Harris James Keys Stephanie Pyle David Bice Enclosure

-2 No members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to Kaly N. Kalyanam at 301-415-1480 or kaly.kalyanam@nrc.gov.

IRA by James R. Hall fori N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-313

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsOgcRp Resource LPL4 Reading RidsRgn4MailCenter Resource RidsAcrsAcnw_MailCTR Resource CSteger, NRR RidsNrrDirsltsb Resource DO' Neal, NRRIDRA/APLA RidsNrrDorlLpl4 Resource MHamm, NRR/DIRS/ITSB RidsNrrDraApla Resource AHowe, NRR/DRA/APLA RidsNrrDssSrxb Resource SSun, NRRIDSS/SRXB RidsNrrPMWaterford 3 Resource SBush-Goddard, EDO RIV RidsNrrLABurkhardt Resource ADAMS Accession Nos.: Meeting Notice ML110620003, Meeting Summary ML111100924, Handouts IVIL 110750426 B~

OFFICE NRRIDORLlLPL4/PM NRRIDORLlLPL4/LA NRR/DRAIAPLAlBC NRR/DIRS/ITS N. Kalyanam (JRHall NAME for) JBurkhardt DHarrison RElliott DATE 4/29/11 4/20/11 4/26/11 4/28/11 OFFICE NRRIDSS/SRXB/BC NRRIDORLlLPL4/BC NRR/DORLlLPL4/PM NAME DATE AUlses 4/29/11 MMarkley (NKalyanam for) 4/29/11 OFFICIAL RECORD COpy NKalyanam (JRHall for) 4/29/11 I