EOC Report 22, Inspection/Activity Plan, 03/01/2011 - 06/30/2012
ML110630459
Person / Time
Site: Harris Duke energy icon.png
Issue date: 03/04/2011
From:
NRC/RGN-II
To:
Progress Energy Carolinas
Shared Package
ML110630451 List:
References
IR-11-001
Download: ML110630459 (2)


Text

Page 1 of 2 Harris 03/04/2011 09:02:47 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site CDBI - COMPONENT DESIGN BASES INSPECTION 7 1 02/28/2011 03/03/2011 IP 7111121 Component Design Bases Inspection 1 03/21/2011 03/25/2011 IP 7111121 Component Design Bases Inspection 1 04/04/2011 04/08/2011 IP 7111121 Component Design Bases Inspection 1 04/18/2011 04/22/2011 IP 7111121 Component Design Bases Inspection OL RQ - REQUAL INSPECTION 3 1 03/21/2011 03/25/2011 IP 7111111B Licensed Operator Requalification Program EB1/DRS - TI-177 GAS ACCUMULATION 3 1 03/28/2011 04/01/2011 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 2 1 04/25/2011 04/29/2011 IP 7111401 Exercise Evaluation 1 04/25/2011 04/29/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 04/25/2011 04/29/2011 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM PREP 4 1 06/20/2011 06/24/2011 V23352 HARRIS/JULY 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 1 07/11/2011 07/15/2011 V23352 HARRIS/JULY 2011 EXAM AT POWER FACILITIES PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 07/11/2011 07/15/2011 IP 71152B Identification and Resolution of Problems 1 07/25/2011 07/29/2011 IP 71152B Identification and Resolution of Problems OL EXAM - INITIAL EXAM - WEEK 2 4 1 07/18/2011 07/22/2011 V23352 HARRIS/JULY 2011 EXAM AT POWER FACILITIES PSB1-RP - RP PUBLIC RADIATION PROTECTION INSP 6 1 08/08/2011 08/12/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/08/2011 08/12/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 08/08/2011 08/12/2011 IP 71124.04 Occupational Dose Assessment 1 08/08/2011 08/12/2011 IP 71124.05 Radiation Monitoring Instrumentation 1 08/08/2011 08/12/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/08/2011 08/12/2011 IP 71124.07 Radiological Environmental Monitoring Program 1 08/08/2011 08/12/2011 IP 71151 Performance Indicator Verification TFPI - 805 TFPI 7 1 08/29/2011 09/02/2011 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial]

1 09/12/2011 09/16/2011 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial]

OL EXAM - INITIAL EXAM PREP 3 1 01/23/2012 01/27/2012 V23367 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Harris 03/04/2011 09:02:47 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM - WEEK 1 3 1 02/13/2012 02/17/2012 V23367 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 1 02/20/2012 02/24/2012 V23367 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES EB3 ISI - UNIT 1 INSERVICE INSPECTION 1 1 04/30/2012 05/04/2012 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP BASELINE WK1 4 1 04/30/2012 05/04/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/30/2012 05/04/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 04/30/2012 05/04/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/30/2012 05/04/2012 IP 71124.04 Occupational Dose Assessment 1 04/30/2012 05/04/2012 IP 71151 Performance Indicator Verification PSB1-RP - OCCUPATIONAL RP BASELINE WK2 4 1 05/14/2012 05/18/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 05/14/2012 05/18/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 05/14/2012 05/18/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/14/2012 05/18/2012 IP 71124.04 Occupational Dose Assessment 1 05/14/2012 05/18/2012 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.