December 15, 2010, Browns Ferry, Units 1, 2 & 3, Summary of Meeting with Tennessee Valley Authority Extended Power Uprate Plans (TAC Nos. MD5262, MD5263 & MD5264)
ML110190410
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/11/2011
From: Gratton C
Plant Licensing Branch II
To:
Gratton C, NRR, DORL, 415-1055
Shared Package
ML110190403 List:
References
TAC MD5262, TAC MD5263, TAC MD5264
Download: ML110190410 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 February 11, 2011 LICENSEE: Tennessee Valley Authority FACILITY: Browns Ferry Nuclear Plant, Units 1, 2, and 3 SUB~'ECT:

SUMMARY

OF DECEMBER 15, 2010, MEETING WITH TENNESSEE VALLEY AUTHORITY ON EXTENDED POWER UPRATE PLANS FOR BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 (TAC NOS. MD5262, MD5263, AND MD5264)

On December 15, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA, the licensee) at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the resumption of the extended power uprate (EPU) licensing action for Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3, confirm the outstanding scope of the project, and to discuss the licensee's plans to address the outstanding technical issues. A list of attendees is provided in the Enclosure.

The licensee's presentation included a history of the EPU review for the BFN units, a discussion of the plant modifications that have been completed or are planned as part of this project, and a discussion of the open technical issues that need to be addressed before the project can be completed. The licensee closed the presentation with a discussion of the proposed schedule for the important milestones related to the project. The licensee's presentation material can be found at Agencywide Documents Access and Management System Accession No. ML103490867 (this file supersedes a previous version of the presentation material that contained a typographical error).

During the presentation, the licensee stated that it plans to replace the existing steam dryers in each of the BFN units with new dryers through a contract with General Electric Hitachi. TVA also discussed actions they are taking to address containment accident pressure (CAP) issues at the BFN site. The licensee stated that they have performed comprehensive engineering analyses using NRC staff's Draft Guidelines to identify and evaluate strategies to address CAP for all events. The licensee also stated that they are working with the Boiling-Water Reactor Owners Group (BWROG) to formulate implementation strategies for the NRC CAP Guidelines.

The licensee shared its current CAP evaluation results with the NRC staff as they relate to the BFN EPU project, indicating that CAP credit will only be needed for the short-term portion of the loss-of-coolant-accident event. The licensee stated that they plan to submit a letter to the NRC in the first calendar quarter of 2011 with the key assumptions that support the planned strategy to eliminate or mitigate CAP for all events. The NRC staff encouraged the licensee to work with the BWROG to quantify uncertainties associated with CAP analyses.

The staff and the licensee exchanged clarifying questions regarding the licensee's approach to resume the review of the BFN Units 1, 2, and 3 EPU as outlined in the presentation materials, and the efforts by the staff to clarify the crediting of CAP in accident analyses. The licensee indicated that technical basis for addressing CAP for accident analyses will be included in future submittals to the NRC.

-2 Members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1055, or christopher.gratton@nrc.gov.

Christopher Gratton, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296

Enclosure:

List of Attendees cc w/encls: Distribution via Listserv

MEETING WITH TENNESSEE VALLEY AUTHORITY EXTENDED POWER UPRATE, BROWNS FERRY 1, 2, 3 December 15, 2010 9:00 a.m. - 11 :00 a.m.

U.S. Nuclear Regulatory Commission Two White Flint North 10-A1 11555 Rockville Pike Rockville, Maryland Attendees Name orQamzatlon Contact Nurn ber Christopher Gratton NRC/DORL 301-415-1055 William M. Bentley TVA 256-729-7893 Marie Gillman TVA 423-751-4884 Ashok Bhatnagar TVA 423-751-6506 Peter Gaillard TVA 423-751-2088 Gordon Arent TVA 423-751-2233 Rod Krich TVA 423-751-3628 Tom Matthews TVA 423-751-2687 Ray Dennis Westinghouse 724-940-8326 Steven Hammer Xcel-MNGP 763-295-1300 Michael Jesse Exelon 610-765-5528 John Rommel Exelon 630-657-3351 Jigar Patel NRRlDRA X3109 Robert Dennig NRRIDSS X1156 Naeem Iqbal NRR/DRA X3346 Arthur Kevin Heller NRRlDSS X6472 i Muhammad Razzaque NRRlDSS X2882 John Huang NRRlDCI X1417 Audrey Klett NRC X0489 Benjamin Parks NRRlDSS X6472 Charles Norton NRRlDORL X7818 Andrew Proffitt NRRlDSS X1418 Shih-Liang Wu NRRlDSS X3284 Mathew Panicker NRRlDSS X2986 Doug Broaddus NRRlDORL X8124 Chakrapani Basavaraju NRRlDE X1221 I Allen Howe NRRIDORL X1453 Richard Lobel NRRlDSS X2865 I Ahsan Sallman NRRlDSS X2380 Swagata Som NRRlDE X8491 TomAlexion NRRIDPR X1326 Patricia Cambell GE -

  • James Paine GE -

Ed Schrull GE -

Enclosure

- 2 Judy Sneeden GE -

Mike James GE -

Jairo Pinzon Scientech -

John Fields Xcel Energy -

Roger Pedersen NRR/DIRS X3162 Denise Anderson Westinghouse -

Vijay Kumar Westinghouse -

- 2 Members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1055, or christopher.gratton@nrc.gov.

IRA!

Christopher Gratton, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296

Enclosure:

List of Attendees cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDss8cvb MPanici<er, NRR LPL2-2 Rlf Nlqbal, NRR N8anfilippo, EDO RidsAcrsAcnw_MailCTR AHelier, NRR CBasavaraju, NRR RidsNrrDortLpl2-2 MRazzaque, NRR RidsNrrDorl RidsNrrPMBrownsFerry JHuang, NRR RLobel, NRR RidsNrrLABClayton AKlett, NRR A8aliman, NRR RidsOgcRp Resource BParks, NRR 880m, NRR RidsRgn2MailCenter CNorton, NRR TAlexion, NRR C8teger, NRR AProfitt, NRR RPedersen, NRR JPatel, NRR 8Wu, NRR o

ADAMS Accession No. PKG ML110190403 Notice ML103215218 ummary ML110190410 Han d outs ML103490867 OFFICE DORULPL2-2/PM DORULPL2-2/LA DORULPL2-2/BC DORULPL2-21PM NAME ICGratton BClayton DBroaddus (TOrf for) CGratton DATE 101120/11 01120/11 02/11/11 02/11/11 OFFICIAL RECORD COpy