Mid-Cycle Performance Review and Inspection Plan 2010 - Nine Mile Point Nuclear Station
ML102440128
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 09/01/2010
From: Clifford J
Division Reactor Projects I
To: Belcher S
Nine Mile Point
Dentel, G RGN-I/DRP/BR1/610-337-5233
References
Download: ML102440128 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406*1415 September 1, 2010 Mr. Sam Belcher Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - NINE MILE POINT NUCLEAR STATION

Dear Mr. Belcher:

On August 10, 2010, the Nuclear Regulatory Commission (NRC) staff completed its performance review of Nine Mile Point Nuclear Station (NMPNS). Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Nine Mile Point Units 1 and 2 was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

During the first quarter of 2010, the NRC completed a follow-up supplemental inspection. This inspection was conducted based on the results of the initial inspection, completed in the third quarter 2009, during which the NRC concluded that NMPNS Unit 2 had significant weaknesses in the identification and evaluation of root and contributing causal factors that led to the November 4, 2008, service water intrusion events. Based on the results of the follow-up supplemental inspection, the NRC concluded that your overall performance in the areas of problem identification, evaluation, and corrective actions was appropriate. Therefore, NMPNS Unit 2 returned to the Licensee Response Column of the NRC's Action Matrix in the second quarter of 2010.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. In addition to the baseline inspections, we plan on conducting independent spent fuel storage installation inspections. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues

I S. Belcher 2 I

well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). I If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel of my staff at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Ja6Clifford'

~Mj ~~g Director Division of Reactor Projects Docket Nos. 50-220, 50-410 License Nos. DPR-63, NFP-69

Enclosure:

Nine Mile Point Inspection I Activity Plan cc wI encl: Distribution via ListServ

S. Belcher 2 well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel of my staff at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely, IRA!

James W. Clifford, Acting Director Division of Reactor Projects Docket Nos. 50-220, 50-410 License Nos. DPR-63, NFP-69

Enclosure:

Nine Mile Point Inspection I Activity Plan cc wI encl: Distribution via ListServ M. Dapas, Acting RA J. Hawkins, DRP N. Sheehan, PAO D. Lew. Acting DRA K. Kolaczyk, DRP, SRI R. Barkley, ORA J. Clifford, DRP D. Dempsey, DRP, RI N. McNamara, SLO D. Collins, DRP K. Kolek, DRP, OA D. Tifft, SLO D. Roberts, DRS RidsNrrPMNineMilePointRes A. Klett, NRR P. Wilson, DRS RidsNrrDorlLpl1-1 Resource RidsNrrDirslpabResource@nrc.gov L. Trocine, RI OEDO ROPReportsResource@nrc.gov G. Dentel, DRP DRS Branch Chiefs (6)

N. Perry, DRP D. Serend, PAO SUNSI REVIEW COMPLETE: GTD (Reviewer's Initials) ML102440128 DOCUMENT NAME: S:\ROP-11 Mid-Cycle Review\Branch 1\NMP MC LTR.doc After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy o!this document, indicate in the box: "C" =Copy without attachmenUenciosure 'E" =Copy with attachmenUenclosure

'N" = No copy OFFICE mm! RIIDRP I RI/DRP I RIIDRP I NAME NPerryl JRHawkins for GDentel1 GTD JCliffordl JWC DATE 08/30 110 08/30/10 09/01 110 OFFICIAL RECORD COPY

Page 1 of 2 Nine Mile Point 08/30/2010 10:14:59 Inspection 1Activity Plan Report 22 08/01/2010 - 12/31/2011 Planned Dates Start End

+,,' ""iI r"";;;;,,i"iWihJK? IUdAM"";"

11/08EXM - U1 INITIAL OPERATOR LICENSING EXAMS 5 10/11/2010 10/15/2010 U01797 FYll-NINE MILE POINT UllNITIAL OPERATOR LICENSING EXAM 11/15EXM - U2 INITIAL OPERATOR LICENSING EXAM 5 2 10/11/2010 10/15/2010 U01790 FY11- NINE MILE POINT U21NITIAL OPERATOR LICENSING EXAM 11/08EXM - U1 INITIAL OPERATOR LICENSING EXAMS 5 11/08/2010 11/12/2010 U01797 FYll-NINE MILE POINT UllNITIAL OPERATOR LICENSING EXAM 11/15EXM - U2 INITIAL OPERATOR LICENSING EXAM 5 2 11/15/2010 11/19/2010 U01790 FYll - NINE MILE POINT U21NITIAL OPERATOR LICENSING EXAM 71124 -HP 1 1.2 08/09/2010 08/13/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1.2 08/09/2010 08/13/2010 IP 71124.02 Occupational ALARA Planning and Controls 1.2 08/09/2010 08/13/2010 IP 71124.05 Radiation Monitoring Instrumentation 7111111B -U1 REQUALINSPWITH P/F RESULTS 3 1.2 11/15/2010 11/19/2010 IP 7111111 B Licensed Operator Requalification Program MODS - PERMANENT PLANT MODIFICATIONS 4 1.2 09/13/2010 09/17/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1.2 09/27/2010 10/01/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 71124 -HP 1.2 11/15/2010 11/19/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1.2 11/15/2010 11/19/2010 IP 71124.04 Occupational Dose Assessment 1.2 11/15/2010 11/19/2010 IP 71151-0R01 Occupational Exposure Control Effectiveness 1.2 11/15/2010 11/19/2010 IP 71151-PROl RETS/ODCM Radiological Effluent 7111107T - TRIENNIAL HEAT SINK 1 1.2 11/29/2010 12/10/2010 IP 7111107T Heat Sink Performance 71124.08 - RADWASTE 1 1.2 1211312010 12/17/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling. Storage. and Transportation 71124 -RETS 1 1.2 01/31/2011 02/04/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111108G - U1 INSERVICE INSPECTION 03/28/2011 04/01/2011 IP 7111108G Inservice Inspection Activities - BWR 71124 -HP 1 04/04/2011 04/08/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 04/04/2011 04/08/2011 IP 71124.02 Occupational ALARA Planning and Controls 04/04/2011 04/08/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation his report does not include IN PO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

  • "H. ,t .. I.)"'" ",,-"' t,",,,.c;., ,,""k~ ,~."",,,,",,'A IT,,,""',,,,",'" ~Y"k", wJW,,, k, ,;'Yk ~r,,3""~i ; i i dh j

Page 20f2 Nine Mile Point 08/30/2010 10:14:59 Inspection 1Activity Plan Report 22 08/01/2010 - 12/31/2011 Planned Dates 2'~~~,,''~m~'~''MJ 11~~,g~,~!!,?',~"~~!!'~!lXJ' I'"'"U,, "II'

  • I! !II """,,',,? " 'h@@w 5" Title eld" f

,,,;i jih- =_,.,~ __ ;"'. t"", ,A",,,,,,, ,-""I! """,JI,,, "UW EPEX - EP EXERCISE EVALUATION 4 1,2 OS/23/2011 OS/27/2011 IP 7111401 Exercise Evaluation 1,2 OS/23/2011 OS/27/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1,2 OS/23/2011 OS/27/2011 IP 71151-EP01 Drill/Exercise Performance 1,2 OS/23/2011 OS/27/2011 IP 71151-EP02 ERO Drill Participation 1,2 OS/23/2011 OS/27/2011 IP 71151-EP03 Alert & Notification System 71124 -HP 1 1,2 06/27/2011 07/01/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 1,2 06/27/2011 07/01/2011 IP 71124,01 Radiological Hazard Assessment and Exposure Controls 1,2 06/27/2011 07/01/2011 IP 71124,02 Occupational ALARA Planning and Controls 1,2 06/27/2011 07/01/2011 IP 71124,05 Radiation Monitoring Instrumentation 7111121 - COBI 6 1,2 07/11/2011 07/15/2011 IP 7111121 Component Design Bases Inspection 1,2 07/25/2011 07/29/2011 IP 7111121 Component Design Bases Inspection 1,2 08/01/2011 08/05/2011 IP 7111121 Component Design Bases Inspection 71124 - HP 1 1,2 08/29/2011 09/02/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 08/29/2011 09/02/2011 IP 71124,02 Occupational ALARA Planning and Controls 1,2 08/29/2011 09/02/2011 IP 71124,04 Occupational Dose Assessment 1,2 08/29/2011 09/02/2011 IP 71124,05 Radiation Monitoring Instrumentation 7152B -PI&R 1 10/03/2011 10/07/2011 IP 71152B Identification and Resolution of Problems 1,2 10/17/2011 10/21/2011 IP 71152B Identification and Resolution of Problems 711111B - NMP2 REQUAL INSPECTION WI P/F RESULTS 3 1,2 11/28/2011 12/02/2011 IP 7111111B Licensed Operator Requalification Program his report does not include INPO and OUTAGE activities.

This report shows only on*slte and announced inspection procedures.

".J"",<< '''..,,' '''''_ ,I" .1 ',i._',~",",fr=rGiT!FllF ,lh;,riAlJ Hi) (,\iJj;S;R.RH KU""ddh