Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000458/20230402024-01-18018 January 2024 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1432023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23310A0322023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 IR 05000458/20230032023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 ML23278A2402023-10-0606 October 2023 Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 2024-01-31
[Table view] Category:Meeting Summary
MONTHYEARML23257A2412023-09-19019 September 2023 Summary of August 15, 2023, Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss Proposed License Amendment Request Concerning Pressurizer Heaters for Arkansas Nuclear One, Unit 1 ML23193A8412023-07-17017 July 2023 Summary of Entergy Operations, Inc. Regulatory Conference: GGNS, Calibration Failures of Drywell/Containment High Range Radiation Monitors Resulting in White Finding July 6, 2023 ML23125A0752023-05-0808 May 2023 May 3, 2023, Summary of Public Meeting with Entergy Operations, Inc., to Discuss Planned Submittals of 10 CFR 50.69 and TSTF-505 for Grand Gulf Nuclear Station, Unit 1 ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22215A1912022-08-0909 August 2022 Summary of July 13, 2022, Teleconference Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests to Adopt Technical Specifications Task Force (TSTF) Traveler 505, Risk-Informed Extended Completion Times ML22217A0072022-07-29029 July 2022 NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022 ML22167A0882022-06-24024 June 2022 Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22151A1302022-06-0202 June 2022 May 10, 2022, Summary of Teleconference Meeting W/Entergy Operations, Inc. to Discuss a Planned Alternative for a One-Time Schedule Extension for the In-Service Examination of Control Rod Drive Mechanism Penetration No. 1 in the Reactor Ves ML22125A2452022-05-0909 May 2022 May 3, 2022, Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for ANO, Units 1 & 2 Regarding Proposed Revision to Emergency Plan and On-Shift Staff Analysis ML22003A0562022-01-10010 January 2022 Summary of December 16, 2021, Presubmittal Teleconference with Entergy Operations, Inc. to Discuss Proposed Amendment Request Concerning TS 3.4.4, RCS Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1 ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21288A0392021-10-18018 October 2021 September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor ML21285A1352021-10-13013 October 2021 Summary of Regulatory Performance Meeting with Entergy Operations, Inc. to Discuss the Results of the Nrc'S Supplemental 95002 Inspection of Grand Gulf Nuclear Station ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21131A0042021-05-11011 May 2021 May 10, 2021, Summary of Public Meeting with Entergy Operations, Incorporated to Discuss Upcoming Relief Request to Adopt Performance-Based Testing for Pressure Isolation Valves for Grand Gulf Nuclear Station, Unit 1 ML21112A2492021-05-0707 May 2021 Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro ML21117A0262021-05-0505 May 2021 Summary of Teleconference with Entergy Operations, Inc. to Discuss Forthcoming LAR Concerning Reactor Coolant System Primary Activity and Primary-to-Secondary Leak Rate ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non ML21092A1542021-04-0202 April 2021 GG 2020 EOC Public Meeting Summary of Public Meeting with Entergy Operations, Inc ML21075A0322021-04-0202 April 2021 Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes ML21071A2862021-04-0101 April 2021 Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY ML21039A2682021-02-22022 February 2021 Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 ML21032A0132021-02-19019 February 2021 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station ML21027A2312021-02-0909 February 2021 Summary of January 25, 2021 Presubmittal Meeting with Entergy Operations, Inc. Planned LAR to Allow Receipt, Possession, and Use of Byproduct Materials from Other Entergy Stations for River Bend Station, Unit 1 ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A2022021-01-15015 January 2021 Summary of December 15, 2020, Category 1 Public Pre-Application Meeting with Entergy Operations, Inc. Regarding Proposed LAR to Relocate Specific Technical Specifications for Waterford Steam Electric Station, Unit 3 ML20353A4372020-12-18018 December 2020 Regulatory Conference Summary, December 10, 2020 ML20325A3212020-12-17017 December 2020 Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) ML20325A2412020-12-17017 December 2020 Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes ML20315A2672020-12-17017 December 2020 Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) ML20337A1572020-12-0808 December 2020 Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss the Forthcoming Supplemental Response Concerning Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2 ML20317A0372020-11-18018 November 2020 Summary of September 22, 2020, Presubmittal Meeting with Entergy Operations, Inc., a Request for a One-Time Exemption from 10 CFR Part 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise ML20287A4012020-10-26026 October 2020 Summary of September 17, 2020, Meeting with Entergy to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Request to the Extend Allowable Outage Time for the Emergency Cooling Pond ML20288A7422020-10-22022 October 2020 Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version) ML20260G9992020-09-16016 September 2020 Summary of August 4, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Regarding Adoption of 10 CFR 50.69 ML20218A7512020-08-0707 August 2020 Summary of June 25, 2020 Teleconference with Grand Gulf Nuclear Station ML20182A4472020-07-0808 July 2020 Summary of June 11, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Waterford Steam Electric Station, Unit 3 Regarding Adoption of 10 CFR 50.69 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20153A2252020-06-0404 June 2020 April 29, 2020, Summary of Meeting with Entergy Operations, Inc. to Discuss a Proposed Relief Request Use of Carbon Fiber Reinforced Polymer Piping for Underground Service Water Piping at Arkansas Nuclear One, Units 1 and 2 ML20107F7332020-04-27027 April 2020 Summary of April 3, 2020 Meeting with Industry Regarding Changes to Subsequent License Renewal Guidance Documents ML20113E8362020-04-23023 April 2020 Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station ML20106E8882020-04-20020 April 2020 Summary of Public Meeting with Entergy Operations, Inc. Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes ML20059K1562020-03-19019 March 2020 Discussion Topics for March 19, 2020 Fourth Partially Closed Public Meeting Regarding a Planned License Amendment Request to Install a Digital Modification to CPC and Ceac Systems Entergy Operations, Inc ML20013G2592020-02-0707 February 2020 Summary of December 11, 2019 Partially Closed Presubmittal Meeting with Entergy Operations, Inc., to Discuss the Effect of a Planned LAR for Digital Instrumentation and Control Modification on Accident Analyses at Waterford (L-2019-LRM-0079 ML20015A2692020-02-0505 February 2020 December 17, 2019, Summary of Meeting with Entergy Operations, Inc. on Planned License Amendment Request to Incorporate the Tornado Missile Risk Evaluator Methodology at River Bend Station, Unit 1 ML19298B9182019-11-0505 November 2019 Summary of 9/19/19 Presubmittal Meeting with Entergy Operations, Inc. Re Request to Replace Core Protection Calculator and CEA Calculator Systems with Digital Systems in Accordance with DI&C-ISG-06, Revision 2 for Waterford Unit 3 2023-09-19
[Table view] |
Text
UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 April 8, 2010 Jeffrey S. Forbes, Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, Mississippi 39213
SUBJECT:
MEETING
SUMMARY
FOR PUBLIC MEETING WITH ENTERGY OPERATIONS, INC.
Dear Mr. Forbes,
This refers to our meeting conducted at the NRC Region IV office, in Arlington, Texas, on March 31, 2010. At this meeting, NRC and Entergy management discussed the 2009 Nuclear Safety Culture Assessment performed at Arkansas Nuclear One, Grand Gulf Nuclear Station, River Bend Station, and Waterford Steam Electric Station, Unit 3.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Sincerely,
/RA/ Dale A. Powers for Mike Hay Chief, Technical Support Branch Division of Reactor Safety Dockets:
ANO: 50-313; 50-368 GG: 50-416 RBS: 50-458 WAT: 50-382 Licenses:
ANO: DPR-51; NPF-6 GG: NPF-29 RBS: NPF-47 WAT: NPF-38
Enclosures:
- 1. Attendance List
- 2. Presentation Slides
Entergy Operations, Inc. Kevin T. Walsh, Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Senior Vice President
& Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Thomas Palmisano Vice President, Oversight Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 David Bice Acting Manager, Licensing Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802 Joseph A. Aluise Associate General Counsel - Nuclear Entergy Services, Inc 639 Loyola Avenue New Orleans, LA 70113 Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Chief, Radiation Control Section Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Jim E. Gibson County Judge of Pope County 100 West Main Street Russellville, AR 72801
Entergy Operations, Inc. Arkansas Department of Health Radiation Control Section 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 David E. Maxwell, Director Arkansas Department of Emergency Management, Bldg. 9501 Camp Joseph T. Robinson North Little Rock, AR 72199 Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76209 Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and COO Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Chief, Energy and Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 2249 Jackson, MS 39225-2249 Interim County Administrator Claiborne County Board of Supervisors (James Johnston)
Port Gibson, MS 39150 Manager, Licensing Sr. Executive Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Entergy Operations, Inc. Senior Manager, Nuclear Safety & Licensing Licensing /Regulatory Affairs Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 Office of the Governor State of Mississippi Jackson, MS 39201 Attorney General Assistant Attorney General State of Mississippi P.O. Box 220 Jackson, MS 39205 State Health Officer State Health Board P.O. Box 1700 Jackson, MS 39215 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Louisiana Dept. of Environmental Quality Radiological Emergency Planning and Response Division P.O. Box 4312 Baton Rouge, LA 70821-4312 Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P. O. Box 31995 Jackson, MS 39286-1995
Entergy Operations, Inc. Bryan S. Ford Senior Manager, Nuclear Safety and Licensing Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 David N. Lorfing Manager, Licensing Entergy Operations, Inc.
5485 US Highway 61N St. Francisville, LA 70775 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, LA 70775 Mr. Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 Austin, TX 78701-3326 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326 Joseph A. Aluise Associate General Counsel - Nuclear Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA 70113 John T. Herron Entergy Services, Inc.
President and CEO Nuclear Operations/CNO P.O. Box 31995 Jackson, MS 39286-1995
Entergy Operations, Inc. Jeff Forbes Senior Vice President and Chief Operating Officer Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 Bob Murillo Manager, Licensing and Regulatory Affairs Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751 Kenny J. Christian, Director Nuclear Safety Assurance Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751 Charles F. Amone General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751 Manager, Licensing Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751 Chairman Louisiana Public Service Commission P. O. Box 91154 Baton Rouge, LA 70821-9154 Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057 St. Charles Parish Dept. of Emergency Preparedness Emergency Operations Center P.O. Box 302 Hahnville, LA 70057
Entergy Operations, Inc. Director, Nuclear Safety & Licensing Entergy, Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Ji Wiley Environmental Scientist Supervisor Radiological Emergency Planning and Response Louisiana Department of Environmental Quality P. O. Box 4312 Baton Rouge, LA 70821-4312
Entergy Operations, Inc. Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Branch Chief, DRP/C (Vince.Gaddy@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
Senior Resident Inspector (Fred.Sanchez@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
Senior Resident Inspector (Rich.Smith@nrc.gov)
Senior Resident Inspector (Marlone.Davis@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
RA Administrative Assistant (Lucy.Owen@nrc.gov)
DRA Administrative Assistant (Anita.Tannenbaum@nrc.gov)
OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)
Director, DIRS, NRR (Frederick.Brown@nrc.gov)
Director, DORL, NRR (Joseph.Giitter@nrc.gov)
Deputy Director, DORL, NRR (Robert.Nelson@nrc.gov)
Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)
NRR Project Manager (Kaly.Kalyanam@nrc.gov)
RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov Congressional Affairs Officer (Jenny.Weil@nrc.gov) mortensengk@INPO.org File located: R:\_Reactors\ANO.doc R:\_Reactors\GG.doc R:\_Reactors\RB.doc R:\_Reactors\WAT.doc SUNSI Rev Compl. : Yes No ADAMS : Yes No Reviewer Initials DP Publicly Avail : Yes No Sensitive Yes : No Sens. Type Initials DP C:DRS/TSB PAO RSLO MHay VDricks WMaier
/RA/DPowers for /RA/LUselding /RA/
for 4/5/10 4/6/10 4/6/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax