Page 1 of 2 Harris 03/03/2010 06:49:42 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1 03/01/2010 03/05/2010 IP 7111402 Alert Notification System Evaluation 1 03/01/2010 03/05/2010 IP 7111403 Emergency Response Organization Augmentation Testing 1 03/01/2010 03/05/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 03/01/2010 03/05/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 03/01/2010 03/05/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP GROUNDWATER PROTECTION 1 1 04/22/2010 04/23/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative EB3 HS - HEAT SINK INSPECTION 1 1 06/14/2010 06/18/2010 IP 7111107T Heat Sink Performance PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 1 1 1 10/04/2010 10/08/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/04/2010 10/08/2010 IP 71124.02 Occupational ALARA Planning and Controls 1 10/04/2010 10/08/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/04/2010 10/08/2010 IP 71124.04 Occupational Dose Assessment EB3ISI - INSERVICE INSPECTION 1 1 10/11/2010 10/15/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RX COOLANT DM BUTT WELDS 1 1 10/11/2010 10/15/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds EB3SGISI - SG INSERVICE INSPECTION 1 1 10/18/2010 10/22/2010 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1 10/25/2010 10/29/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/25/2010 10/29/2010 IP 71124.02 Occupational ALARA Planning and Controls 1 10/25/2010 10/29/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/25/2010 10/29/2010 IP 71124.04 Occupational Dose Assessment 1 10/25/2010 10/29/2010 IP 71151 Performance Indicator Verification EB1-MODS - MODIFICATION - 10 CFR50.59 4 1 11/29/2010 12/03/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 12/13/2010 12/17/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications PSB1-RP - RP OCCUPATIONAL--TRANSPORTATION 1 1 12/06/2010 12/10/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB1/DRS - TI-177 GAS ACCUMULATION 3 1 03/28/2011 04/01/2011 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Harris 03/03/2010 06:49:42 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 4 1 04/25/2011 04/29/2011 IP 7111401 Exercise Evaluation 1 04/25/2011 04/29/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 04/25/2011 04/29/2011 IP 71151-EP01 Drill/Exercise Performance 1 04/25/2011 04/29/2011 IP 71151-EP02 ERO Drill Participation 1 04/25/2011 04/29/2011 IP 71151-EP03 Alert & Notification System OL EXAM - INITIAL EXAM PREP 2 1 06/20/2011 06/24/2011 V23352 HARRIS/JULY 2011 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure