MONTHYEARML0929204052009-11-13013 November 2009 Notice of Meeting with Entergy Operations, Inc. to Discuss Results of Arkansas Nuclear One, Unit 1, Steam Generator Tube Inspection During Refueling Outage and Issue of Bowed Tie Rods and Tube Support Project stage: Request ML0935005652009-12-15015 December 2009 NRC Handouts Current Status of Arkansas Nuclear One Unit Steam Generators, December 2009 Project stage: Request ML0935200582010-01-0606 January 2010 Summary of Meeting with Entergy Operations, Inc. to Discuss Results of Arkansas Nuclear One, Unit 1, Steam Generator Tube Inspection During Refueling Outage and Issue of Bowed Tie Rods and Tube Support Plate Wear Project stage: Request ML1001405432010-01-20020 January 2010 Evaluation of Fall 2008 Refueling Outage Steam Generator Tube Inspections Project stage: Other 2009-12-15
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR ML22193A0262022-07-12012 July 2022 (ANO) RICT License Amendment Request TSTF-505 NRC Pre-Submittal Meeting Presentation - July 13, 2022 ML21351A0282021-12-16016 December 2021 Preliminary Information of ANO-1 1R17 (2002) Findings on CRDM Nozzle 56, and Presentation Slides for PT Exam of Nozzle 56 ML21348A1262021-12-14014 December 2021 RCP TS LAR Pre-Submittal Meeting Slides, December 16, 2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21242A2792021-08-30030 August 2021 ANO Slides Presentation for 9-1-21 Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20315A1582020-11-17017 November 2020 Presentation Meeting Slides for the 11/17/20 Teleconference ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20255A0242020-09-11011 September 2020 (Ano), Pre-Submittal Meeting with NRC - Request to Extend Allowable Outage Time (AOT) for the Emergency Cooling Pond (ECP) ML20211L7052020-08-0404 August 2020 (ANO) Units 1 & 2, Pre-Submittal Slide Presentation for August 4, 2020 Public Meeting ML20114E2752020-04-29029 April 2020 (ANO) Carbon Fiber Reinforced Polymer (Cfrp) Relief Request Pre-Submittal Meeting with NRC - April 29, 2020 ML19136A2512019-06-13013 June 2019 Handout for the June 13, 2019 Pre-submittal Public Meeting for Planned License Amendment Request Regarding Fuel Handling Accident Analysis ML18176A1312018-06-21021 June 2018 Summary of Annual Assessment Meeting with Entergy Operations, Inc., Regarding 2017 Performance of Arkansas Nuclear One ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18081A1922018-03-20020 March 2018 Presentation at the PRA Workshop ML17328A3652017-11-30030 November 2017 Workshop on Sharing Operating Experience from Rigging, Lifting and Load Handling Events - Temporary Overhead Crane Failure at Arkansas Nuclear One Presented to IAEA ML16109A3642016-04-18018 April 2016 Summary of Meeting to Discuss Supplemental Inspection Results and Annual Assessment Meeting with Entergy Operations Inc. Regarding 2015 Performance of Arkansas Nuclear One ML16015A0622016-01-20020 January 2016 Briefing Notes for 95003 Inspection at Arkansas Nuclear One ML15132A1752015-05-21021 May 2015 Summary of Annual Assessment Meeting with Entergy Operations Inc., Regarding ANO 2014 Performance ML14356A1852014-12-22022 December 2014 ANO2 Exit ML14329B2092014-11-25025 November 2014 Summary of Regulatory Conference to Discuss Safety Significance of Arkansas Nuclear One Flood Protection Deficiencies ML14259A5972014-09-16016 September 2014 Summary of Annual Performance Assessment Meeting for Arkansas Nuclear One Performance ML14169A0722014-06-19019 June 2014 Entergy Public Meeting Presentation Slides ML12332A1792012-11-26026 November 2012 Power Point Presentation by Entergy at the November 26, 2012 Meeting (TAC No. ME9706.) ML12306A2912012-11-0101 November 2012 Transmittal Email and WCAP-17128-NP, Revision 1, Flaw Evaluation of CE Design RCP Suction and Discharge Nozzle Dissimilar Metal Welds, Phase III Study, May 2010 ML12278A2552012-10-0909 October 2012 Licensee Slide Presentation, ANO-2 NFPA 805 Application, at the October 9, 2012, pre-submittal Meeting to Discuss the NFPA 805 Application ML12278A2532012-10-0909 October 2012 Licensee Handout, Design Input for Fire Risk Evaluation, at the 10/9/2012 Pre-submittal Meeting to Discuss the NFPA 805 Application ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML1218003412012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Item #4 ML1218003192012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Item #3 ML1218003122012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Item #2, Table W-2 ANO-2 Fire Area Risk Summary ML1218003102012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Item #1, Plant Modifications and Items to Be Completed ML1218003062012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Power Point Slides ML12166A5602012-06-12012 June 2012 Licensee Presentation on June 12 & 13, 2012, Meeting License Amendment Request on NFPA 805 Adoption ML1202501112012-01-25025 January 2012 Licensee Slides Arkansas Nuclear One, Unit 1 - Steam Generators Tube to Tube Wear ML1126502692011-09-22022 September 2011 Licensee Handouts for 10/05/2011 Presubmittal Meeting ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1107504262011-03-15015 March 2011 Licensee Slides from 3/15/11 Pre-Sumittal Meeting SWS Room Cooling Required Action ML1107504162011-03-15015 March 2011 Licensee Slides from 3/15/11 Meeting with Entergy Operations on Technical Specification Change - Testing of Idle RCS Cooling Loop ML1016705012010-06-17017 June 2010 Discussion of Screening Criteria - Arkansas Nuclear One (ANO) ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0935005652009-12-15015 December 2009 NRC Handouts Current Status of Arkansas Nuclear One Unit Steam Generators, December 2009 ML0913104172009-05-11011 May 2009 Summary of Meeting with Entergy to Discuss Arkansas Nuclear One 2008 Performance ML0828000612008-10-0101 October 2008 Enclosure 3-Technical Papers 2 - Plant Application of Weld Onlay for Butt Weld Mitigation ML0828300322008-08-31031 August 2008 NRC Presentation Arkansas Nuclear One - Unit One 2023-12-14
[Table view] |
Text
ANO1 Steam Generators NRC Presentation Current Status of the Arkansas Nuclear One Unit One Steam Generators Entergy/AREVA NP December 2009 1
ANO1 Steam Generators Introductions -
Entergy Jaime McCoy - EP&C Manager Frank Philpott - EP&C Supervisor Dan Meatheany - SG Program Owner Areva Jeff Brown - EOTSG Component Design Eng.
Jim Begley - Technical Consultant Dennis Lang - Product Line Manager 2
ANO1 Steam Generators AGENDA Opening Remarks - Jaime McCoy Description of EOTSG - Dan Meatheany Outage Results - Dan Meatheany Proprietary Section Root Cause - Jim Begley Outage Plans for 1R22 - Dan Meatheany Questions Closing Comments - Jaime McCoy 3
ANO1 Steam Generators Opening Comments Jaime McCoy Engineering Programs and Components Manager 4
ANO1 Steam Generators Description of EOTSG - Dan Meatheany Generators Replaced in Fall of 2005 (1R19)
First ISI was Spring 2007 (1R20)
Second ISI was Fall 2008 (1R21)
EOTSG was Manufactured by AREVA NP Design Enhanced from Originals (EOTSG)
First of a Kind Design in Several Areas - This was to Address Original OTSG Degradation Issues 5
ANO1 Steam Generators
- External FW and EFW Rings
- TSP are Trefoil Broach SS
- Aspirating Port in 10th Span
- Orifice Plate in Downcomer
- 52 Tie Rods Concentric Circles 6
ANO1 Steam Generators Design Changes 690TT Tubing with No Tube Ends No Open Lane Full Depth Hydraulic Expansion in Upper and Lower TSP are Stainless Steel not Carbon Steel Use of a Filler Plate on the 1st, 14th and 15th - Original was 1st and 15th Only and was a Wedge Design Attached to TSP Use of TSP Wedges (AREVA NP Design)
First Span Tie Rods Reduced in Diameter and Longest Span - 46 inches Tie Rods Are Different in Design/Material Use of a Main Steam Venturi 7
ANO1 Steam Generators 1R20 and 1R21 Outage Results
ANO1 Steam Generators 9
ANO1 Steam Generators 1R21 Scope
- 100% X-probe of all Wear Indications
- Annulus and First Tube Support Plate
- First Span Inner Bundle of Rods
- 14th and 15th Tube Support Plate 10
ANO1 Steam Generators Bowed Tie Rods 11
ANO1 Steam Generators 1R20 1R21
- of Bowed Tie 9 10 Rods Spans with 1 1 Contact Spans with 1st, 14th and 15th 1st, 2nd, 13th,14th Bowed Tie Rods and 15th Maximum Extent 0.89 1.19 of Bowing Thermal Cycles 3 1 EFW Actuation 1 0 12
ANO1 Steam Generators 13
ANO1 Steam Generators 14
ANO1 Steam Generators 15
ANO1 Steam Generators 16
ANO1 Steam Generators 17
ANO1 Steam Generators 18
ANO1 Steam Generators 19
ANO1 Steam Generators 20
ANO1 Steam Generators 21
ANO1 Steam Generators 22
ANO1 Steam Generators 23
ANO1 Steam Generators 24
ANO1 Steam Generators 25
ANO1 Steam Generators TSP Wear 26
ANO1 Steam Generators 1R20 - SGA 1R21 - SGA 27
ANO1 Steam Generators 1R20 - SGB 1R21 - SGB 28
ANO1 Steam Generators SGA - 1R21 29
ANO1 Steam Generators 30
ANO1 Steam Generators TSP Wear Growth Rate 31
ANO1 Steam Generators 32
ANO1 Steam Generators Growth Rate Data from 1R21 SGA SGB 33
ANO1 Steam Generators Proprietary Section ANO Unit 1 Tie Rod Bowing Review Jim Begley 34
ANO1 Steam Generators Proprietary Section 35
ANO1 Steam Generators Proprietary Section 36
ANO1 Steam Generators Proprietary Section 37
ANO1 Steam Generators Proprietary Section 38
ANO1 Steam Generators Proprietary Section 39
ANO1 Steam Generators Proprietary Section 40
ANO1 Steam Generators Proprietary Section 41
ANO1 Steam Generators Proprietary Section 42
ANO1 Steam Generators Proprietary Section 43
ANO1 Steam Generators Proprietary Section 44
ANO1 Steam Generators Proprietary Section 45
ANO1 Steam Generators Proprietary Section 46
ANO1 Steam Generators Proprietary Section 47
ANO1 Steam Generators Proprietary Section 48
ANO1 Steam Generators Proprietary Section 49
ANO1 Steam Generators Proprietary Section 50
ANO1 Steam Generators Proprietary Section 51
ANO1 Steam Generators Proprietary Section 52
ANO1 Steam Generators Proprietary Section 53
ANO1 Steam Generators Proprietary Section 54
ANO1 Steam Generators Proprietary Section 55
ANO1 Steam Generators Proprietary Section 56
ANO1 Steam Generators Proprietary Section 57
ANO1 Steam Generators Proprietary Section 58
ANO1 Steam Generators ANO Unit 1 1R22 Inspection Plan Dan Meatheany 59
ANO1 Steam Generators 1R22 Inspection Plans Purpose of Inspections Scope of Inspection Contingency Inspection/Repair Plans Acceptance Criteria Definition of Success 60
ANO1 Steam Generators Purpose of Inspections Confirm Apparent Cause and Analysis Inputs Determine magnitude of tie rod bow Determine if free-span wear exists on tubes around tie rods Determine if denting exists on tubes around tie rods 61
ANO1 Steam Generators Current Scope of 1R22 Inspection Plans Bobbin Test of Surrounding Tubes for All 52 Tie Rods in Both Steam Generators 62
Acceptance Criteria for Tie Rod Lateral Bowing Category 1R21 Inspection Value Acceptance Criteria Potential Additional Analysis, Repairs or Inspections Maximum Lateral Extent of 1.19 inch <1.5 inch > 2.0 inch Tie Rod Bowing in First Span, Outermost Ring Maximum Lateral Extent of 0.47 inch < 0.63 inch >0.78 inch Tie Rod Bowing in First Span, Second Outermost Ring Maximum Lateral Extent of 0.19 inch < 0.25 inch >0.32 inch Tie Rod Bowing in 14th and 15th Spans, Outermost Ring Maximum Lateral Extent of No bowing detected < 0.06 inch > 0.06 inch Tie Rod Bowing in 14th and 15th Spans, Second Outermost Ring Bowed Rods in Contact with 0 0 >2 Tubes outside of First Span 63
Acceptance Criteria for Wear/Dents caused by Tie Rod Lateral Bowing Category 1R21 Inspection Value Acceptance Criteria Potential Additional Analysis, Repairs or Inspections Wear on Tube from Tie 0 0 > 5% TW Rod Tube to Tube Wear as a 0 0 > 5% TW Results of Tie Rod Bowing Dents in Tubes Around 0 0 >1 Bowed Tie Rods > 1 volt 64
ANO1 Steam Generator Definition of Success (1R22)
Tie rod bowing magnitude is as predicted No free-span wear found in tubes around tie rods No denting found in tubes adjacent to tie rods Results of inspection will be used to confirm the applicability of the ASME code qualified stress calculation for A steam generator Future Plans (1R23)
Based on Wear will perform 100% Bobbin Re-evaluate Extent of Bowing Plan to Skip 1R24 and Possibly 1R25 65
ANO1 Steam Generators Questions ?
66
ANO1 Steam Generators Closing Comments - Jaime McCoy 67