Letter Sequence Acceptance Review |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement
|
MONTHYEARML0725500632007-08-30030 August 2007 NFPA 805 Transition Pilot Plant FAQ 06-0019, Revision 2 Project stage: Request ML0730605502007-09-0707 September 2007 NFPA 805 Transition Pilot Plant FAQ 07-0040 Project stage: Request ML0727402622007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0038 Project stage: Request ML0727402482007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0011, Revision 2 Project stage: Request ML0727402682007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0039 Project stage: Request ML0727402552007-09-28028 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0019, Revision 3 Project stage: Request ML0735500232007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 07-0033, Revision 1 Project stage: Request ML0735100822007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 (Corrected Version) Project stage: Request ML0733200282007-11-26026 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0012, Revision 5, Determining Manual Actions That Require a Change Evaluation During Transition. Project stage: Request ML0733700252007-12-0303 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0008, Revision 8, Alternative Method for Fire Protection Engineering Analyses Project stage: Request ML0734001472007-12-0606 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 Project stage: Request ML0735500252007-12-20020 December 2007 NFPA 805 Transition Pilot Plant FAQ 07-0036, Revision 1 Project stage: Request ML0735402622007-12-20020 December 2007 Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 0 Project stage: Request ML0807004112008-03-10010 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 1, Clarification of 10 CFR 50.48(c), 50.48(a), and GDC 3. Project stage: Request ML0809101362008-03-28028 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 1, Lessons Learned - NEI 04-02 B-2 and B-3 Tables Project stage: Request ML0814300412008-05-22022 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0040, Revision 2 Project stage: Request HNP-08-061, Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-05-29029 May 2008 Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request ML0820410142008-05-30030 May 2008 Public Version of Enclosures 2 Through 6 of License Amendment Request to Adopt NFPA-805 Project stage: Request ML0816901212008-06-17017 June 2008 Forthcoming Closed Meeting with Progress Energy Carolinas, Inc., to Discuss the May 29, 2008, License Amendment Request (LAR) to Transition the Shearon Harris Nuclear Plant, Unit 1 (Harris) to National Fire Protection Association (Nfpa).. Project stage: Meeting ML0818406962008-07-0707 July 2008 Meeting with Progress Energy Carolinas, Inc. and Duke Energy Carolinas, LLC, to Discuss the 05/29&30/2008, License Amendment Requests to Transition Shearon Harris, Unit 1, and Oconee, Units 1, 2, & 3 to NFPA Standard 805 Project stage: Meeting ML0818905292008-07-11011 July 2008 Summary of Closed Meeting with Progress Energy Carolinas Regarding May 29, 2008, License Amendment Request to Transition the Shearon Harris Nuclear Plant Unit 1, to National Fire Protection Association Standard 805, Performance-Based.... Project stage: Meeting ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 Project stage: Meeting ML0820605362008-08-0707 August 2008 Summary of Mtg. with Progress Energy Carolinas, and Duke Energy Carolinas to Discuss the LARs to Transition the Shearon Harris and Oconee Nuclear Plants to National Fire Protection Association Standard NFPA-805 Project stage: Acceptance Review ML0828700162008-09-26026 September 2008 Nc Warn'S Response to Board Notification - Enclosure P-1 - Shearon Harris Nuclear Power Plant, Unit 1 - Acceptance Review NFPA-805 License Amendment Request, September 26, 2008 Project stage: Request ML0827011582008-09-26026 September 2008 Acceptance Review Regarding the License Amendment Request to Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. Project stage: Acceptance Review ML0830900742008-11-12012 November 2008 Summary of Category 2 Public Meeting Held to Discuss National Fire Protection Association Standard 805 Pilot Plant Process: Current Lessons Learned from the Pilot License Amendment Request Reviews (TAC Nos. MD8807, MD8832, MD8833, & MD8834) Project stage: Meeting HNP-08-113, Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-11-14014 November 2008 Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request Project stage: Meeting HNP-08-121, Supplement 2 to Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-12-11011 December 2008 Supplement 2 to Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML0903000302009-01-30030 January 2009 Acceptance Review Regarding Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Acceptance Review ML0902903272009-03-10010 March 2009 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program as Allowed by Title 10 of the Code of Federal Regulations, Paragraph 50.48(c) Fire Protection Project stage: Other ML0909900182009-04-10010 April 2009 04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3 Project stage: Meeting ML0916002812009-06-11011 June 2009 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0921707152009-08-0606 August 2009 Request for Additional Information Regarding Amendment to Adopt National Fire Protection Association Standard 805 (NFPA 805), Performance-Based Standard for Fire Protection for Light Water Reactor ... Project stage: RAI HNP-09-084, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants.2009-08-13013 August 2009 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants. Project stage: Response to RAI HNP-09-086, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor...2009-08-28028 August 2009 Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor... Project stage: Response to RAI HNP-09-094, Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor....2009-10-0909 October 2009 Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor.... Project stage: Response to RAI HNP-09-096, Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2009-12-16016 December 2009 Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML1001302542010-01-14014 January 2010 Second Request for Additional Information Regarding the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plant Project stage: RAI HNP-10-008, Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants.2010-02-0404 February 2010 Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. Project stage: Request ML1006009872010-03-0909 March 2010 Discussion of Clarification Questions Related to the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance - Based Standard for Fire Protection for Light ... Project stage: Other HNP-10-040, Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants.2010-04-0505 April 2010 Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. Project stage: Request HNP-10-064, Additional Items Related to License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants.2010-06-0909 June 2010 Additional Items Related to License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants. Project stage: Request ML1017506042010-06-28028 June 2010 Redacted - Regarding Adoption of National Fire Protection Association Standard 805 Project stage: Acceptance Review ML1017506022010-06-28028 June 2010 Issuance of Amendment Regarding Adoption of National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants.. Project stage: Approval ML1025108522010-12-28028 December 2010 Corrections of Typographical and Formatting Errors Regarding Amendment No. 133 and the Associated Safety Evaluation Project stage: Approval 2008-07-11
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20157A1062020-06-24024 June 2020 Review of the Fall 2019 Steam Generator Tube Inspections During Refueling Outage No. 22 ML20133K0722020-05-12012 May 2020 Acceptance of Requested Licensing Action Technical Specifications Related to Reducing the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core Operating Limits ML19311C3412019-11-0707 November 2019 Acceptance Review: Shearon Harris License Amendment Request for TSTF-505 ML18270A1292018-10-0404 October 2018 Acceptance of Requested Licensing Action ML17319A5012017-11-21021 November 2017 Acceptance Review Letter, License Amendment Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML17261A7272017-09-20020 September 2017 Shearon Harris Nuclear Power Plant, Unit 1 - Acceptance of Requested Licensing Action Regarding Spent Fuel Storage Pool Criticality Analyses (CAC No. MF9996) ML16308A3702016-11-0707 November 2016 Results of Acceptance Review of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422-MF8429) ML16152A5962016-06-0303 June 2016 NRC Acceptance of Requested Licensing Action Amendment Request ML15309A7282015-12-0101 December 2015 Acceptance of Requested Licensing Action Regarding Duke Energy Progress, Inc. Application to Revise Technical Specifications to Adopt Methodology Report ML14157A0552014-06-13013 June 2014 Acceptance of Requested Relief Request I3R-14-Deferral of Reactor Vessel Inspections Inservice Inspection Program-Third 10-Year Interval ML13329A4572013-11-25025 November 2013 Accepted for Review Shearon Harris--Acceptance Review for Relief Request I3R-13 Reactor Vessel Closure Head Nozzle 37 ML13324B0812013-11-20020 November 2013 E-mail Re. Acceptance Review for Relief Request I3R-12 Repair of Accumulator Fill Valve Piping Weld ML11181A0162011-07-0101 July 2011 Acceptance for Review of Measurement Uncertainty Recapture Power Uprate License Amendment Request ML1105300792011-02-18018 February 2011 E-mail, Acceptance Review of ME5410, Application for Exemption for M5 Cladding: 1/19/11 ML1018707202010-07-0909 July 2010 Acceptance Review Regarding a Relief Request for Approval of an Alternative Inservice Inspection Method for Six Pressure Retaining Dissimilar Metal Welds in the Reactor Pressure Vessel Nozzles ML0935801382009-12-30030 December 2009 Acceptance Review Regarding Request for Exemption from the Requirements of 10 CFR Part 73, Section 73.55 ML0912705692009-05-15015 May 2009 Acceptance Review Re Amendment to Adopt Tech Spec Task Force (TSTF) Standard Tech Spec Change Traveler, TSTF-447, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors ML0903603132009-02-0606 February 2009 Acceptance Review Regarding Amendment to Remove Credit for Boraflex in Boiling Water Reactor Spent Fuel Pool Storage Racks ML0903000302009-01-30030 January 2009 Acceptance Review Regarding Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition ML0902100672009-01-29029 January 2009 Acceptance Review Regarding Relief Request to Defer an ASME Code Repair of an Emergency Service Water System Weld Until the Next Refueling Outage ML0902100112009-01-27027 January 2009 Acceptance Review Regarding Amendment to Remove Credit for Boraflex in BWR Spent Fuel Pool Storage Racks ML0827011582008-09-26026 September 2008 Acceptance Review Regarding the License Amendment Request to Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. 2023-03-13
[Table view] Category:Letter
MONTHYEARIR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter IR 05000400/20243012023-05-15015 May 2023 Notification of Licensed Operator Initial Examination 05000400/2024301 IR 05000400/20230012023-05-10010 May 2023 Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000400/20220032022-11-10010 November 2022 Integrated Inspection Report 05000400/2022003 IR 05000400/20223012022-11-0202 November 2022 NRC Operator License Examination Report 05000400/2022301 ML22271A6202022-09-29029 September 2022 Notification of Shearon Harris Nuclear Power Plant Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2023010 ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22227A0682022-09-0202 September 2022 Alternative to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Code for Operation and Maintenance for Certain Target Rock Solenoid Valves IR 05000400/20220052022-08-24024 August 2022 Updated Inspection Plan for Shearon Harris Nuclear Power Plant (Report 05000400/2022005) IR 05000400/20224032022-08-23023 August 2022 Security Baseline Inspection Report 05000400/2022403 ML22126A0082022-08-0909 August 2022 Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7 IR 05000400/20220022022-08-0505 August 2022 Integrated Inspection Report 05000400/2022002 ML22161B0332022-07-28028 July 2022 Issuance of Amendment No. 193 Regarding Revision of Surveillance Requirements to Remove Shutdown Limitation IR 05000400/20220112022-07-20020 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000400 2022011 IR 05000400/20224022022-06-30030 June 2022 Material Control and Accounting Program Inspection Report 05000400/2022402 (OUO Removed) IR 05000400/20220102022-06-13013 June 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000400/2022010 ML22138A4012022-05-26026 May 2022 Project Manager Reassignment ML22101A2822022-05-0606 May 2022 Regulatory Audit Summary Related to the Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme IR 05000400/20220012022-05-0404 May 2022 Integrated Inspection Report 05000400/2022001 IR 05000400/20224012022-03-24024 March 2022 Security Baseline Inspection Report 05000400/2022401 ML22020A0072022-03-10010 March 2022 Issuance of Amendment No. 192 Regarding Removal of Extraneous Content and Requirements from the Renewed Facility Operating License and Technical Specifications ML22010A2812022-03-0404 March 2022 Issuance of Amendments to Adopt TSTF-577, Rev. 1 Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0161 IR 05000400/20210062022-03-0202 March 2022 Annual Assessment Letter for Shearon Harris Nuclear Power Plant (Report No. 05000400/2021006) ML21351A4722022-02-10010 February 2022 Issuance of Amendment No. 190 Regarding Revision to Containment Spray Nozzle Test Frequency IR 05000400/20210042022-02-0404 February 2022 Integrated Inspection Report 05000400/2021004 ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 2024-01-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 30, 2009 Chris L Burton, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - ACCEPTANCE REVIEW REGARDING AMENDMENT TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION 805, "PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS," 2001 EDITION (TAC NO. MD8807)
Dear Mr. Burton:
By letter dated May 29, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081560639), Carolina Power & Light Company (the licensee), now doing business as Progress Energy Carolinas, Inc. (PEC), submitted a proposed amendment for the Shearon Harris Nuclear Power Plant, Unit 1 (HNP). The proposed changes would enable HNP to adopt a new fire protection licensing basis that complies with the requirements in Title 10 of the Code of Federal Regulations (10 CFR) Sections 50.48 (a) and (c).
Consistent with 10 CFR 50.90, an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The purpose of this letter is to provide the final results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The Fire Protection Branch and Probabilistic Risk Assessment Licensing Branch performed an acceptance review of the license amendment request (LAR) in accordance with Revision 0 of the Office of Nuclear Reactor Regulation (NRR) Office Instruction L1C-109, "Acceptance Review Procedures" (ADAMS Accession No. ML081200811). The results of the acceptance review were transmitted to PEC in a letter on September 26, 2008 (ADAMS Accession No. ML082701158). In this letter the NRC staff informed the licensee that further information was necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.
C.Burton -2 Specifically, the NRC's staff review identified eight technical acceptance issues involving missing or incomplete information that present significant challenges to commencing and completing a comprehensive review of the LAR on an acceptable schedule. Three additional important clarifications were also identified in the staff review that had to be corrected.
The LAR requesting that HNP adopt a risk-informed, performance-based fire protection program in accordance with National Fire Protection Association Standard 805 for HNP was supplemented on November 14, 2008 (ADAMS Accession No. ML083240593), and December 11,2008 (ADAMS Accession No. ML083510191), to address the issues identified in the staff acceptance review. The PEC supplemental submittals state that the eight technical acceptance issues and the three additional important clarifications identified by the staff have been addressed. The staff reviewed the supplemental information and found that the information provided is responsive to the identified issues.
The NRC staff has reviewed the HNP application as supplemented, and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. Should you have any questions regarding this review, please contact me at (301) 415-3178.
Marlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via ListServ
ML083240593), and December 11, 2008 (ADAMS Accession No. ML083510191), to address the issues identified in the staff acceptance review. The PEC supplemental submittals state that the eight technical acceptance issues and the three additional important clarifications identified by the staff have been addressed. The staff reviewed the supplemental information and found that the information provided is responsive to the identified issues.
The NRC staff has reviewed the HNP application as supplemented, and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. Should you have any questions regarding this review, please contact me at (301) 415-3178.
Sincerely, IRA!
Marlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via ListServ DISTRIBUTION: