ML082980198

From kanterella
Jump to navigation Jump to search
University of Illinois Nuclear Reactor Master Inspection Plan - Fy 2009
ML082980198
Person / Time
Site: University of Illinois
Issue date: 10/20/2008
From: Christine Lipa
Division of Nuclear Materials Safety III
To: Holm R
University of Illinois
References
Download: ML082980198 (2)


Text

October 20, 2008 Mr. Richard L. Holm, Reactor Administrator University of Illinois at Urbana-Champaign Department of Nuclear, Plasma and Radiological Engineering Radiation Science Laboratory 214 Nuclear Engineering Laboratory 103 South Goodwin Avenue Urbana, IL 61081-2984

SUBJECT:

UNIVERSITY OF ILLINOIS NUCLEAR REACTOR MASTER INSPECTION PLAN - FISCAL YEAR (FY) 2009

Dear Mr. Holm:

In accordance with U.S. NRC Inspection Manual Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the University of Illinois Nuclear Reactor.

The plan is based on your current performance and schedule of significant decommissioning activities planned for the site from October 2008 through September 2009 (FY2009). The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.

Because the FY2009 MIP is based, in part, on your proposed schedule of decommissioning activities for FY2009, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2009 MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities.

You will be informed of any significant changes to the University of Illinois Nuclear Reactor FY2009 MIP.

We currently project the Region will conduct one inspection at the Reactor during FY2009. The inspection will be conducted to ensure your facility is being adequately maintained and licensed material controlled until decommissioning activities begin. The following is the inspection procedure we expect to use during our inspection.

Inspection Procedure Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning

R. Holm In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact William Snell of my staff at (630) 829-9871.

Sincerely,

/RA/

Christine Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00151 License No. R-115 cc: C. Settles, IEMA J. Klinger, IEMA DISTRIBUTION:

Docket File R. Tadesse, FSME T. McLaughlin, FSME N. Orlando, FSME S. Reynolds, RIII A. Barker, RIII RIII PRR DOCUMENT NAME: G:\SEC\Work in progress\UofIL FY2009 MIP Draft (2).doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII C RIII RIII RIII NAME WGSnell:mb CLipa DATE 10/16/08 10/20/08 OFFICIAL RECORD COPY