ML072120545

From kanterella
Jump to navigation Jump to search

Revised Pages of Facility Operating License Nos. DPR-31 and DPR-41
ML072120545
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/02/2007
From: Collins S
Office of Nuclear Reactor Regulation
To:
Florida Power & Light Co
Mozafari B, NRR/ADRO/DORL, 415-2020
Shared Package
ML072120141 List:
References
TAC MD4560, TAC MD4561
Download: ML072120545 (3)


Text

ENCLOSURE 1 REVISED PAGE OF RENEWED FACILITY OPERATING LICENSE NO. DPR-31 REVISED PAGE OF RENEWED FACILITY OPERATING LICENSE NO. DPR-41 TURKEY POINT NUCLEAR GENERATING UNITS 3 AND 4 DOCKET NOS. 50-250 AND 50-251 Replace the following pages of the Facility Operating Licenses. The revised pages identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.

REMOVE INSERT PAGE License DPR-31 License DPR-31 Page 5 Page 5 License DPR-41 License DPR-41 Page 5 Page 5

5 G. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders
4. This renewed license is effective as of the date of issuance, and shall expire at midnight July 19, 2032.

FOR THE NUCLEAR REGULATORY COMMISSION Signed by Samuel J. Collins, Director Office of Nuclear Reactor Regulation Attachments:

Appendix A - Technical Specifications for Unit 3 Appendix B - Environmental Protection Plan Date of Issuance: June 6, 2002 Renewed License No. DPR-31 Revised by letter dated August 2, 2007

5 G. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders
4. This renewed license is effective as of the date of issuance, and shall expire at midnight April 10, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Signed by Samuel J. Collins, Director Office of Nuclear Reactor Regulation Attachments:

Appendix A - Technical Specifications for Unit 4 Appendix B - Environmental Protection Plan Date of Issuance: June 6, 2002 Renewed License No. DPR-41 Revised by letter dated August 2, 2007