Letter Sequence Approval |
---|
|
|
MONTHYEARML0707101102007-03-20020 March 2007 Technical Specification Pages Re Administrative Controls Project stage: Other ML0704704862007-03-20020 March 2007 Issuance of Amendment Nos. 134 and 134 Revision to Technical Specification 5.0, Administrative Controls Project stage: Approval 2007-03-20
[Table View] |
|
---|
Category:Letter
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) ML24024A2102024-01-29029 January 2024 Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23159A2082023-12-20020 December 2023 Request for Withholding Information from Public Disclosure ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23291A4382023-11-30030 November 2023 Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica ML23325A0182023-11-30030 November 2023 Schedule Revision for the License Renewal Application Review IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation ML23308A0032023-11-17017 November 2023 Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement ML23308A0022023-11-17017 November 2023 Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement ML23317A3002023-11-13013 November 2023 Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2972023-11-13013 November 2023 Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2872023-11-13013 November 2023 Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2832023-11-13013 November 2023 Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2852023-11-13013 November 2023 Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23306A0302023-11-13013 November 2023 Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2902023-11-13013 November 2023 Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2982023-11-13013 November 2023 Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2842023-11-13013 November 2023 Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2822023-11-13013 November 2023 Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2962023-11-13013 November 2023 Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2812023-11-13013 November 2023 Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2862023-11-13013 November 2023 Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3032023-11-13013 November 2023 Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2882023-11-13013 November 2023 Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3012023-11-13013 November 2023 Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2792023-11-13013 November 2023 Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3022023-11-13013 November 2023 Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2892023-11-13013 November 2023 Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23360A6312023-10-26026 October 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23263A0242023-09-21021 September 2023 Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application 2024-01-31
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23136B2962023-05-31031 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request Regarding General Design Criteria 5 and Regulatory Guide 1.81 ML22329A0332022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000445/2023301 and 05000446/2023301 ML22208A1582022-07-29029 July 2022 Correction to Issuance of Amendment Nos. 156 and 156 Relocation of Surveillance Frequencies from the Technical Specifications to a Licensee-Controlled Document ML21321A3492022-02-24024 February 2022 Issuance of Amendment Nos. 182 and 182 to Revise Technical Specifications to Adopt TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspections ML21132A0892021-06-0909 June 2021 Issuance of Amendment Nos. 181 and 181 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-567, Rev. 1, Add Containment Sump TS to Address GSI - 191 Issues ML21061A2172021-05-19019 May 2021 Issuance of Amendment Nos. 180 and 180 to Authorize Revision of Certain Emergency Action Levels of the Emergency Plan ML21103A0392021-04-23023 April 2021 Issuance of Amendment Nos. 179 and 179 the Adoption of Technical Specifications Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2020-0147) ML21015A2122021-02-12012 February 2021 Issuance of Amendment Nos. 178 and 178 Regarding One-Time Revision to Technical Specifications 3.7.8 Station Service Water System (Ssws) and 3.8.1 AC Sources - Operating ML20346A0192021-02-0101 February 2021 Issuance of Amendment Nos. 177 and 177 Regarding Revision to Technical Specifications 3.8.1, AC Sources - Operating ML20168A9242020-11-16016 November 2020 Issuance of Amendment Nos. 176 and 176 Regarding Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation ML20223A3492020-08-31031 August 2020 Issuance of Amendment Nos. 175 and 175 Regarding One-Time Revision to Technical Specification 3.7.19, Safety Chilled Water ML20167A3182020-07-0606 July 2020 Issuance of Amendment Nos. 174 and 174 Regarding Revision to Technical Specifications to Adopt TSTF-563, Revision 0 ML20108E8782020-04-17017 April 2020 Issuance of Amendment Nos. 173 and 173 Revision to TS 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator (SG) Program (Exigent Circumstances) ML19267A0182019-11-0404 November 2019 Issuance of Amendment Nos. 172 and 172 to Revise Augmentation Times and Emergency Response Organization Staffing for the Emergency Plan ML18304A4872018-11-30030 November 2018 Issuance of Amendments 171 and 171 Regarding Revision to Technical Specifications for Engineered Safety Feature Actuation System Instrumentation ML18267A3842018-10-25025 October 2018 Issuance of Amendment Nos. 170 and 170 Revision to Technical Specification 3.8.4, DC Sources - Operating, Condition B (Exigent Circumstances) ML17129A0242017-06-29029 June 2017 Comanche Peak Nuclear Power Plant, Units 1 and 2 - Issuance of Amendment Nos. 169 and 169 Re: Administrative Change to Licensee Name (CAC Nos. MF8933 and MF8934) ML16266A0052016-10-0303 October 2016 ISFSI - Issuance of Amendment Nos. 167 and 167 Related to Order Approving Direct and Indirect Transfer of Licenses and Conforming License Amendments ML16168A0022016-06-24024 June 2016 Correction of Implementation Date, Issuance of Amendment Nos. 166 and 166, Request to Revise Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Revision 6 ML16137A0562016-06-14014 June 2016 Issuance of Amendment Nos. 166 and 166, Request to Revise Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Revision 6 ML16096A2662016-05-0606 May 2016 Redacted Letter, Order, Safety Evaluation, and Draft Conforming Amendments, Application for Order Approving Direct and Indirect Transfer of Licenses and Conforming License Amendments ML16096A2642016-05-0606 May 2016 Draft Conforming Amendments, Application for Order Approving Direct and Indirect Transfer of Licenses and Conforming License Amendments ML15309A0732015-12-30030 December 2015 Issuance of Amendment Nos. 165 and 165, Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, to Increase ILRT Test Interval from 10 to 15 Years and Type C Tests from 60 to 75 Mos ML15008A1332015-02-24024 February 2015 Issuance of Amendment Nos. 164 and 164, Revise Technical Specification 3.8.1 for a 14-Day Completion Time for Offsite Circuits ML14183A3422014-09-0808 September 2014 Issuance of Amendment Nos. 163 and 163 to Revise License Condition Related to Approval of Revised Cyber Security Plan Implementation Schedule ML14160A0352014-07-0101 July 2014 Redacted, Issuance of Amendment No. 162, Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals ML14042A2232014-02-27027 February 2014 Issuance of Amendment Nos. 161 and 161, Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Consolidated Line Item Improvement Process (TAC MF2651-MF2652) ML13232A1432013-09-18018 September 2013 Issuance of Amendment Nos. 160 and 160, Revise Technical Specification 3.8.1, AC Sources - Operating, for Extension of Two 14-Day Completion Times for Offsite Circuits ML13156A2482013-07-11011 July 2013 Issuance of Amendment Nos. 159 and 159, Revise Technical Specification (TS) 5.7, High Rad Area, and TS Table 3.3.3-1, Post Accident Monitoring Instrumentation ML12263A0362012-10-18018 October 2012 Issuance of Amendment Nos. 158 and 158, Revise Technical Specification (TS) 5.5.9 and TS 5.6.9 for a Permanent Alternate Repair Criteria ML12067A2442012-06-29029 June 2012 Issuance of Amendment Nos. 156 and 156, Adoption of TSTF-425-A, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specifications Task Force (RITSTF) Initiative 5b ML12156A0682012-06-29029 June 2012 Issuance of Amendment Nos. 157 and 157, Adoption of TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications ML1117807452011-07-26026 July 2011 Issuance of Amendment Nos. 155 and 155, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1107703222011-04-0606 April 2011 Issuance of Amendment Nos. 154 and 154, Revise Technical Specifications for U2 Model D5 SG Tube Inspections and Reporting Requirements for Temporary Alternate Repair Criteria ML1000705672010-04-26026 April 2010 Issuance of Amendment Nos. 151 and 151, Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Add Surveillance Requirement 3.3.1.16 to Function 3 of Table 3.3.1-1 ML0927400762009-10-0909 October 2009 Issuance of Amendment Nos. 149 and 149, Modify Technical Specifications to Establish Alternate Repair Criteria (ARC) and Include Reporting Requirements Specific to ARC for Steam Generator Program ML0917506632009-08-0707 August 2009 Issuance of Amendment Nos. 148 and 148, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0818400012008-09-12012 September 2008 Issuance of Amendment Nos. 147 and 147, Revise Technical Specification 3.6.7, Spray Additive System to Comply with GL-2004-02 ML0815101732008-06-27027 June 2008 Issuance of Amendment Nos. 146 and 146, Stretch Power Uprate, Revision to TS 1.0, Use and Application, to Revise Rated Thermal Power from 3458 to 3612 Mwt ML0805800042008-04-0303 April 2008 Issuance of Amendment Nos. 145 and 145 Revise TSs 3.1.4, 3.4.10, and 3.7.1 to Reflect Cycle-Specific Safety Analysis Assumptions Re Adoption of Westinghouse Methodologies ML0805006272008-04-0202 April 2008 Issuance of Amendment Nos. 144 & 144, Changes to Technical Specifications to Allow Use of Westinghouse-developed/NRC-approved Analytical Methods Used to Establish Core Operating Limits ML0802201072008-02-29029 February 2008 Issuance of Amendment Nos. 143 and 143, Technical Requirements Surveillance 13.3.33.2 ML0734000372008-01-25025 January 2008 Issuance of Amendment Nos. 142 & 142, Revision to Technical Specifications 3.7.5, 3.8.1 and 3.8.9 and TS Example 1.3-3 ML0731202522007-12-13013 December 2007 Issuance of Amendment Nos. 141 and 141 Revise TS 5.5.16, Containment Leakage Rate Testing Program for Consistency W/Requirements of 10 CFR 50.55a(g)(4) 2023-09-29
[Table view] Category:Safety Evaluation
MONTHYEARML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23198A3212023-07-27027 July 2023 Authorization and Safety Evaluation for Proposed Alternative RV-1 ML22192A0072022-08-22022 August 2022 Issuance of Amendment Nos. 183 and 183 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22194A0592022-07-14014 July 2022 Correction to Amendment Nos. 182 and 182 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22129A0722022-05-16016 May 2022 Review of Quality Assurance Program Changes ML22077A8412022-03-24024 March 2022 Proposed Alternative SNB-3 for the Snubber Inservice Program Third Interval Extension ML21321A3492022-02-24024 February 2022 Issuance of Amendment Nos. 182 and 182 to Revise Technical Specifications to Adopt TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspections ML21322A1032021-12-0707 December 2021 Proposed Alternative for the Continued Use of a Risk-Informed Process for the Selection of Class 1 and 2 Piping Welds for Inservice Inspection ML21132A0892021-06-0909 June 2021 Issuance of Amendment Nos. 181 and 181 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-567, Rev. 1, Add Containment Sump TS to Address GSI - 191 Issues ML21061A2172021-05-19019 May 2021 Issuance of Amendment Nos. 180 and 180 to Authorize Revision of Certain Emergency Action Levels of the Emergency Plan ML21103A0392021-04-23023 April 2021 Issuance of Amendment Nos. 179 and 179 the Adoption of Technical Specifications Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2020-0147) ML21015A2122021-02-12012 February 2021 Issuance of Amendment Nos. 178 and 178 Regarding One-Time Revision to Technical Specifications 3.7.8 Station Service Water System (Ssws) and 3.8.1 AC Sources - Operating ML21022A1622021-02-0808 February 2021 Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Testing Program Interval for Certain Check and Relief Valves (EPID L-2020-LLR-0096 (COVID-19)) ML20346A0192021-02-0101 February 2021 Issuance of Amendment Nos. 177 and 177 Regarding Revision to Technical Specifications 3.8.1, AC Sources - Operating ML21021A1002021-02-0101 February 2021 Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Testing Program Interval for Certain Snubbers (EPID L-2020-LLR-0095 (Covid 19)) ML21013A1282021-01-28028 January 2021 Approval of Proposed Alternative to the Requirements of the ASME Code to Extend the Third Inservice Inspection Interval (EPID L-2020-LLR-0092 (COVID-19)) ML21021A0022021-01-28028 January 2021 Approval of Proposed Alternatives 1A4-1 and 1A4-2 from Certain Requirements of 10 CFR 50.55a for Inservice Inspection of Nuclear Power Plants ML20282A7092020-11-17017 November 2020 Proposed Alternative to the Requirements of the ASME Omcode to Extend the Inservice Testing Program Interval for Certain Snubbers (EPID L-2020-LLR-0060 (COVID-19)) ML20281A4722020-11-0404 November 2020 Use of Later Code Edition to the Requirements of the ASME OM Code ML20255A1002020-10-0707 October 2020 Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Test Program Interval for Certain Check and Relief Valves (EPID L-2020-LLR-0061 and EPID L-2020-LLR-0062 (COVID-19)) ML20223A3492020-08-31031 August 2020 Issuance of Amendment Nos. 175 and 175 Regarding One-Time Revision to Technical Specification 3.7.19, Safety Chilled Water ML20226A0132020-08-17017 August 2020 Use of Later Code Edition to the Requirements of the ASME Code ML20167A3182020-07-0606 July 2020 Issuance of Amendment Nos. 174 and 174 Regarding Revision to Technical Specifications to Adopt TSTF-563, Revision 0 ML20108E8782020-04-17017 April 2020 Issuance of Amendment Nos. 173 and 173 Revision to TS 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator (SG) Program (Exigent Circumstances) ML20054A2762020-02-27027 February 2020 Approval of Change to the Quality Assurance Program as Described in the Comanche Peak Nuclear Power Plant Final Safety Analysis Report ML19267A0182019-11-0404 November 2019 Issuance of Amendment Nos. 172 and 172 to Revise Augmentation Times and Emergency Response Organization Staffing for the Emergency Plan ML18304A4872018-11-30030 November 2018 Issuance of Amendments 171 and 171 Regarding Revision to Technical Specifications for Engineered Safety Feature Actuation System Instrumentation ML18267A3842018-10-25025 October 2018 Issuance of Amendment Nos. 170 and 170 Revision to Technical Specification 3.8.4, DC Sources - Operating, Condition B (Exigent Circumstances) ML18221A6322018-08-15015 August 2018 Eicb Safety Evaluation - Comanche Peak Nuclear Power Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.2 Engineered Safety Feature Actuation System Instrumentation Docket/Epid 000976/05000446/L-2018-LLA-0 ML17129A0242017-06-29029 June 2017 Comanche Peak Nuclear Power Plant, Units 1 and 2 - Issuance of Amendment Nos. 169 and 169 Re: Administrative Change to Licensee Name (CAC Nos. MF8933 and MF8934) ML17074A4942017-04-13013 April 2017 Issuance of Amendment Nos. 168 and 168 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17095A2512017-04-0707 April 2017 Request for Alternative 2B3-1 Re Examination of Reactor Vessel Closure Head Penetration Nozzles ML16334A1732016-12-14014 December 2016 Comanche Peak Nuclear Power Plant, Units 1 And 2; Safety Evaluation Regarding Implementation Of Mitigating Strategies And Reliable Spent Fuel Pool Instrumentation Related To Orders EA-12-049 And EA-12-051 ML16179A4052016-07-11011 July 2016 Relief Request Nos. B-9, B-3, B-10, and B-11 for Piping Welds, Second 10-year Inservice Inspection Interval ML16137A0562016-06-14014 June 2016 Issuance of Amendment Nos. 166 and 166, Request to Revise Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Revision 6 ML16096A2662016-05-0606 May 2016 Redacted Letter, Order, Safety Evaluation, and Draft Conforming Amendments, Application for Order Approving Direct and Indirect Transfer of Licenses and Conforming License Amendments ML16096A2642016-05-0606 May 2016 Draft Conforming Amendments, Application for Order Approving Direct and Indirect Transfer of Licenses and Conforming License Amendments ML16074A0012016-03-14014 March 2016 Relief Request 1B3-3, Alternative for Reactor Pressure Vessel Cold Leg Weld Inspection Frequency from Not to Exceed 7 Years to 9 Years for the Third 10-Year Inservice Inspection Interval ML16063A0012016-03-11011 March 2016 Relief Request No. B-15, C-2, and C-4 for Welds in the RPV and Containment Spray and Residual Heat Removal Heat Exchanger Shells, Second 10-year Inservice Inspection Interval ML16011A0732016-01-19019 January 2016 Relief Request T-1; Alternative to the ASME OM Code Frequency Specifications for Inservice Testing for the Third 10-Year IST Interval ML15309A0732015-12-30030 December 2015 Issuance of Amendment Nos. 165 and 165, Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, to Increase ILRT Test Interval from 10 to 15 Years and Type C Tests from 60 to 75 Mos ML15259A0042015-10-30030 October 2015 Relief Request 1B3-4, Alternative for Reactor Pressure Vessel Head Penetration Weld Inspection Frequency (from 10 to 15 Years), Third 10-Year Inservice Inspection Interval ML15257A2422015-09-18018 September 2015 Relief Request 2A3-1, from ASME Code Section XI Requirements, Risk-Informed Process for Selection of Class 1 and Class 2 Piping Weld Examinations, Third 10-Year Inservice Inspection Interval ML15257A2402015-09-15015 September 2015 Relief Request 2C3-1, from ASME Code, Section XI Requirements Reactor Pressure Vessel Leak-Off Flange for the Third 10-Year Inservice Inspection Interval ML15090A1042015-04-0303 April 2015 Relief Requests B-7, B-12, and B-13 - Steam Generator Head-to-Tube Sheet Welds for the Second 10-Year Inservice Inspection Interval ML15008A1332015-02-24024 February 2015 Issuance of Amendment Nos. 164 and 164, Revise Technical Specification 3.8.1 for a 14-Day Completion Time for Offsite Circuits ML14183A3422014-09-0808 September 2014 Issuance of Amendment Nos. 163 and 163 to Revise License Condition Related to Approval of Revised Cyber Security Plan Implementation Schedule 2023-09-28
[Table view] |
Text
March 20, 2007 Mr. M. R. Blevins Senior Vice President
& Chief Nuclear Officer TXU Power ATTN: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 -
ISSUANCE OF AMENDMENTS RE: REVISION TO TECHNICAL SPECIFICATION 5.0, ADMINISTRATIVE CONTROLS (TAC NOS. MD1260 AND MD1261)
Dear Mr. Blevins:
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 134 to Facility Operating License No. NPF-87 and Amendment No. 134 to Facility Operating License No. NPF-89 for Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, respectively. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated March 31, 2006.
The amendments would revise TS 5.0 entitled, ADMINISTRATIVE CONTROLS. Specifically, the proposed change would delete the Vice President, Nuclear Operations, as an alternative to the Plant Manager for certain functions. Additionally, the licensee requested that the entire CPSES, Units 1 and 2, TSs be reissued as a result of printing software changes. That request will be reviewed as a separate action, after the later version of TSs is submitted by the licensee.
A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446
Enclosures:
- 1. Amendment No. 134 to NPF-87
- 2. Amendment No. 134 to NPF-89
- 3. Safety Evaluation cc w/encls: See next page
Pkg ML070470549 (Amdt./License Pages ML070470486, TS Pages ML070710110)
OFFICE NRR/LPL2-2/PE NRR/LPL4/PM NRR/LPL4/LA OGC - NLO NRR/LPL4/BC NAME JPaige:sp* MThadani LFeizollahi* AHodgdon* DTerao*
DATE 2/23/07 3/19/07 3/15/07 3/2/07 3/5/07 Comanche Peak Steam Electric Station cc:
Senior Resident Inspector Mr. Richard A. Ratliff, Chief U.S. Nuclear Regulatory Commission Bureau of Radiation Control P.O. Box 2159 Texas Department of Health Glen Rose, TX 76403-2159 1100 West 49th Street Austin, TX 78756-3189 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Mr. Brian Almon 611 Ryan Plaza Drive, Suite 400 Public Utility Commission Arlington, TX 76011 William B. Travis Building P.O. Box 13326 Mr. Fred W. Madden, Director 1701 North Congress Avenue Regulatory Affairs Austin, TX 78701-3326 TXU Generation Company LP P.O. Box 1002 Ms. Susan M. Jablonski Glen Rose, TX 76043 Office of Permitting, Remediation and Registration George L. Edgar, Esq. Texas Commission on Environmental Morgan Lewis Quality 1111 Pennsylvania Avenue, NW MC-122 Washington, DC 20004 P.O. Box 13087 Austin, TX 78711-3087 County Judge P.O. Box 851 Terry Parks, Chief Inspector Glen Rose, TX 76043 Texas Department of Licensing and Regulation Environmental and Natural Boiler Program Resources Policy Director P.O. Box 12157 Office of the Governor Austin, TX 78711 P.O. Box 12428 Austin, TX 78711-3189 December 2004
TXU GENERATION COMPANY LP COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NO. 1 DOCKET NO. 50-445 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 134 License No. NPF-87
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by TXU Generation Company LP dated March 31, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications and paragraph 2.C.(2) of Facility Operating License No. NPF-87 as indicated in the attachment to this license amendment.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
David Terao, Branch Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License and Technical Specifications Date of Issuance: March 20, 2007
TXU GENERATION COMPANY LP COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NO. 2 DOCKET NO. 50-446 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 134 License No. NPF-89
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by TXU Generation Company LP dated March 31, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications and paragraph 2.C.(2) of Facility Operating License No. NPF-89 as indicated in the attachment to this license amendment.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
David Terao, Branch Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License and Technical Specifications Date of Issuance: March 20, 2007
ATTACHMENT TO LICENSE AMENDMENT NO. 134 TO FACILITY OPERATING LICENSE NO. NPF-87 AND AMENDMENT NO. 134 TO FACILITY OPERATING LICENSE NO. NPF-89 DOCKET NOS. 50-445 AND 50-446 Replace the following pages of the Facility Operating Licenses, Nos. NPF-87 and NPF-89, and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Operating License No. NPF-87 REMOVE INSERT Facility Operating License No. NPF-89 REMOVE INSERT Technical Specifications REMOVE INSERT 5.0-1 5.0-1 5.0-2 5.0-2 5.0-4 5.0-4 5.0-7 5.0-7 5.0-28 5.0-28
(3) TXU Generation Company LP, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, and described in the Final Safety Analysis Report, as supplemented and amended; (4) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level TXU Generation Company LP is authorized to operate the facility at reactor core power levels not in excess of 3458 megawatts thermal in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 134 and the Environmental Protection Plan contained in l Appendix B, are hereby incorporated into this license. TXU Generation Company LP shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Amendment No. 134
(3) TXU Generation Company LP, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, and described in the Final Safety Analysis Report, as supplemented and amended; (4) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) TXU Generation Company LP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level TXU Generation Company LP is authorized to operate the facility at reactor core power levels not in excess of 3458 megawatts thermal in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 134 and the Environmental Protection Plan contained in l Appendix B, are hereby incorporated into this license. TXU Generation Company LP shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Antitrust Conditions DELETED Amendment No. 134
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 134 TO FACILITY OPERATING LICENSE NO. NPF-87 AND AMENDMENT NO. 134 TO FACILITY OPERATING LICENSE NO. NPF-89 TXU GENERATION COMPANY LP COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 DOCKET NOS. 50-445 AND 50-446
1.0 INTRODUCTION
By application dated March 31, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML060950650), TXU Generation Company LP (the licensee) requested changes to the Technical Specifications (TSs) for Comanche Peak Steam Electric Station (CPSES), Units 1 and 2. This amendment request was noticed in the Federal Register on September 12, 2006 (71 FR 53722).
The proposed changes would revise TS 5.0 entitled, ADMINISTRATIVE CONTROLS.
Specifically, the proposed change would delete the Vice President, Nuclear Operations, as an alternative to the Plant Manager for certain functions. In addition, the licensee requested that the entire CPSES, Units 1 and 2 TSs be reissued as a result of a change in the software application used by TXU Generation Company LP to produce and maintain the TSs. That request will be reviewed as a separate action, after the licensee submits the revised TSs.
2.0 REGULATORY EVALUATION
Paragraph 50.36(c)(5) of Title 10 of the Code of Federal Regulations (10 CFR), Administrative controls, requires that TSs include ...provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner.
3.0 TECHNICAL EVALUATION
TSs 5.1.1, 5.2.1, 5.2.2.d, 5.5.1.b, and 5.5.17 currently specify that the Plant Manager is responsible for the designated functions described by the respective TS with a note stating these Duties may be performed by the Vice President of Nuclear Operations if that organizational position is assigned. The licensee requests to delete this note from the TSs.
This change would affect neither the prerequisite qualifications for the position, the assigned responsibilities, nor the organizational reporting relationships for the Plant Manager or the Site Vice President, formerly the Vice President, Nuclear Operations.
Based on the above review of the licensees submittal, the Nuclear Regulatory Commission (NRC) staff finds that the licensee has properly addressed the need to revise the TSs to delete the Vice President, Nuclear Operations, as an alternate to the Plant Manager for certain functions. The proposed changes do not affect the standards in 10 CFR 50.92(c), no significant hazards consideration, and were evaluated and accepted by the staff. The NRC staff concludes that the proposed TSs changes are solely administrative in nature and are acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Texas State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments relate to changes in recordkeeping, reporting, or administrative procedures or requirements. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (71 FR 53722; published on September 12, 2006). The amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need to be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: J. Paige Date: March 20, 2007