MONTHYEARML22243A1312022-08-31031 August 2022 STP Nuclear Operating Company August 31, 2022 Presentation - Pre-Submittal Meeting for Updated Main Steam Line Break and Locked Rotor Dose Consequence Analysis to Address Extended Cooldown Timelines ML22214A0972022-08-0202 August 2022 Presentation by South Texas Project ML22153A2942022-06-17017 June 2022 richardsd-hv-th28 ML21203A2702021-07-26026 July 2021 Presentation - 7-26-21 Meeting with STPNOC Proposed South Texas Project Moderator Temperature Coefficient TS Change ML20125A3362020-05-0404 May 2020 STP Presubmittal Meeting Exigent Accumulator LAR 2020-05-05 Presentation L-2020-LRM-0039 ML19326A0072019-11-22022 November 2019 Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan - December 3, 2019 ML16356A0612016-12-21021 December 2016 12/21/2016 South Texas Project Aluminum Bronze Aging Management Request for Additional Information ML16264A3632016-09-20020 September 2016 Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times ML16210A0442016-07-28028 July 2016 STP Nuclear Operating Company Handouts for July 28, 2016 Public Meeting on GSI-191 ML16172A0192016-07-25025 July 2016 STP Aluminum Bronze Selective Leaching Public Meeting - June 21, 2016 ML16202A4872016-07-21021 July 2016 07/21/2016 Talking Points, Supplemental Information for South Texas Project and NRC Public Meeting ML16111A0272016-04-18018 April 2016 STP Nuclear Operating Company Slideshow for Public Meeting on April 21, 2016 for GSI-191 Resolution (CAC No. MF2400-01) ML16062A3042016-03-0202 March 2016 TS 5.3.2 LAR Pre-Submittal Meeting Presentation - March 2, 2016 ML16033A0042016-01-19019 January 2016 Applicant's Slides for STP Meeting on Aluminum Bronze Aging Management ML15274A5992015-10-0101 October 2015 10-01-15 Public Phone Call ML15271A3042015-09-28028 September 2015 Public Phone Call Meeting Description of Supplement 2 to STPNOC Risk-Informed Licensing Application to Address GSI-191 and Respond to GL-2004-02 ML15111A0582015-04-15015 April 2015 Licensee Handouts (2 of 2) for 4/22/2015 Public Meeting Possible Roverd Section on Fixed Filtration (TAC Nos. MF2400-MF2409) ML15111A0562015-04-15015 April 2015 Licensee Handouts (1 of 2) for 4/22/2015 Public Meeting Revised Roverd Section on Large Early Release Frequency Change for Large Break Loss-of-Coolant Accident(Tac Nos. MF2400-MF2409) ML15056A3862015-02-25025 February 2015 NRC Slides for February 25, 2015 Public Meeting with STPNOC Concerning GSI-191 ML15049A4882015-02-18018 February 2015 Slides for February 25, 2015 Public Meeting ML15034A1512015-02-0505 February 2015 Integrated Leak Rate Test (ILRT) from 10 Years to 15 Years. NRC Public Meeting Slides - ILRT License Amendment ML15034A1142015-02-0404 February 2015 STP Risk- Informed Approach to GSI - 191 Roverd 2015 Meeting Blue 1 29 15 ML14192A9842014-08-0404 August 2014 Summary of Pre-Licensing Meeting with STP Nuclear Operating Company to Discuss Future License Amendment Request to Revise TS 6.9.1.6.b.9 to the Leading Edge Flow Meter Technology for Feedwater Flow Measurement ML14120A0112014-04-29029 April 2014 4/29/2014 - South Texas Project Regulatory Approach for Risk-Informed Pilot Submittal Presentation Relating to 10 CFR 50.46c ML13352A1422013-12-16016 December 2013 GSI-191 Licensing Submittal Comparison of Changes Between Rev 1 and Rev 2 ML13352A1242013-12-16016 December 2013 NRC Staff Slides South Texas Project Risk-Informed Generic Safety Issue - 191, December 16, 2013 ML13316B9052013-11-13013 November 2013 Albrz Testing Update for NRR Final ML13150A2162013-05-23023 May 2013 Licensee Slides for 5/23/13 Public Meeting Regarding GSI-191 ML13140A2562013-05-20020 May 2013 Licensee Slides for 5/23/13 Meeting - STP Pilot Submittal for Risk Informed Approach to Resolving GSI-191 ML13023A3342013-02-25025 February 2013 1/15/2013 Summary of Public Meetings Conducted to Discuss Draft Supplemental Environmental Impact Statement Related to Review of South Texas Project, Units 1 & 2, License Renewal Application ML13051A8552013-02-20020 February 2013 Licensee Slides for 3/5/13 Pre-Application Meeting for Proposed Licensing Action to Revise the Fire Protection Program at STP ML13029A4972013-01-15015 January 2013 Slides - Preliminary Site-Specific Results of the Environmental Review for South Texas Project License Renewal ML12297A3312012-11-27027 November 2012 Summary of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2 ML12264A3202012-10-11011 October 2012 Meeting Handout for 10/11/12 Pre-licensing Meeting License Amendment Request to Revise the Fire Protection Program ML12145A4382012-05-18018 May 2012 Licensee Handout on Calibration and Benchmarking of Single and Two-Phase Jet Cfd Models ML1209004042012-03-30030 March 2012 3-27-2012 - STP Public Meeting Handout from Nuclear Innovation North America, LLC on Fukushima Lessons Learned for South Texas Project Units 3 and 4 ML1205407582012-02-22022 February 2012 STP Summary of January Meeting ML1205405572012-02-22022 February 2012 Licensee Slides for 03/1/12 Meeting with STP Nuclear Operating Company Meeting to Discuss GSI-191 ML1205405702012-02-22022 February 2012 Uncertainty Modeling of LOCA Frequencies and Break Size Distributions for the STP GSI-191 Resolution ML1204400652012-02-0909 February 2012 Licensee Slides for 2/9/12 Meeting Regarding GSI-191 ML1133505632011-12-0101 December 2011 Licensee Presentation from 12/1/11 Meeting Via Conference Call to Discuss Risk-Informed GSI-191,Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance ML1130506322011-10-26026 October 2011 Licensee Handouts from November 1, 2011 Meeting with STP Nuclear Operating Company on GSI-191 ML1127702032011-10-0303 October 2011 Licensee Slides from 10/3/11 Meeting LOCA Frequencies, Final Results ML1127701762011-10-0303 October 2011 Licensee Handouts from 10/3/11 Meeting STP LOCA Frequency ML1123508732011-08-22022 August 2011 Models and Methods Used for Casa Grande ML1123508832011-08-22022 August 2011 LOCA Initiating Event Frequencies and Uncertainties Status Report ML1120707072011-07-26026 July 2011 Meeting Notice with South Texas Project, Units 1 and 2 - Licensee Slide Models and Methods Used for Casa Grande ML1120707292011-07-26026 July 2011 Meeting Notice with South Texas Project, Units 1 and 2 - Licensee Slides Computational Fluid Dynamics Validation Plan ML1118903802011-07-0707 July 2011 Licensee Slides, LOCA Initiating Event Frequencies and Uncertainties(Draft) ML1118904082011-07-0606 July 2011 Licensee Handout Loca Frequencie Approach and Example Application 2022-08-31
[Table view] Category:Slides and Viewgraphs
MONTHYEARML22243A1312022-08-31031 August 2022 STP Nuclear Operating Company August 31, 2022 Presentation - Pre-Submittal Meeting for Updated Main Steam Line Break and Locked Rotor Dose Consequence Analysis to Address Extended Cooldown Timelines ML22214A0972022-08-0202 August 2022 Presentation by South Texas Project ML22153A2942022-06-17017 June 2022 richardsd-hv-th28 ML21203A2702021-07-26026 July 2021 Presentation - 7-26-21 Meeting with STPNOC Proposed South Texas Project Moderator Temperature Coefficient TS Change ML20248H5322020-09-0404 September 2020 STP Nuclear Operating Company September 14, 2020, Presentation - Pre-Submittal Meeting for Proposed South Texas Project Moderator Temperature Coefficient Surveillance Requirement Technical Specification Change ML20125A3362020-05-0404 May 2020 STP Presubmittal Meeting Exigent Accumulator LAR 2020-05-05 Presentation L-2020-LRM-0039 ML20034E8192020-02-0606 February 2020 Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML17004A0292017-01-0404 January 2017 Slides for January 4, 2017, Public Meeting on South Texas Project's Resposne to Aluminum Bronze Aging Management Request for Additional Information ML16356A0612016-12-21021 December 2016 12/21/2016 South Texas Project Aluminum Bronze Aging Management Request for Additional Information ML16350A3272016-11-17017 November 2016 Transcript of Advisory Committee on Reactor Safeguards Plant License Renewal Subcommittee Meeting - November 17, 2016 ML16264A3632016-09-20020 September 2016 Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times ML16172A0192016-07-25025 July 2016 STP Aluminum Bronze Selective Leaching Public Meeting - June 21, 2016 ML16188A3682016-07-0606 July 2016 Audit Presentation - Westinghouse Methodology for South Texas Unit 1 LAR: Operation with 56 Control Rods ML16062A3042016-03-0202 March 2016 TS 5.3.2 LAR Pre-Submittal Meeting Presentation - March 2, 2016 ML16033A0042016-01-19019 January 2016 Applicant's Slides for STP Meeting on Aluminum Bronze Aging Management ML15334A3972015-11-30030 November 2015 TS 5 3 2 Emergency LAR Pre-Submittal Meeting Presentation ML15274A5992015-10-0101 October 2015 10-01-15 Public Phone Call ML15034A1512015-02-0505 February 2015 Integrated Leak Rate Test (ILRT) from 10 Years to 15 Years. NRC Public Meeting Slides - ILRT License Amendment ML15034A1142015-02-0404 February 2015 STP Risk- Informed Approach to GSI - 191 Roverd 2015 Meeting Blue 1 29 15 ML14192A9842014-08-0404 August 2014 Summary of Pre-Licensing Meeting with STP Nuclear Operating Company to Discuss Future License Amendment Request to Revise TS 6.9.1.6.b.9 to the Leading Edge Flow Meter Technology for Feedwater Flow Measurement ML14149A0892014-05-21021 May 2014 NRR E-mail Capture - STP-GSI-191 Presentation ML14120A0112014-04-29029 April 2014 4/29/2014 - South Texas Project Regulatory Approach for Risk-Informed Pilot Submittal Presentation Relating to 10 CFR 50.46c ML13352A1242013-12-16016 December 2013 NRC Staff Slides South Texas Project Risk-Informed Generic Safety Issue - 191, December 16, 2013 ML13352A1422013-12-16016 December 2013 GSI-191 Licensing Submittal Comparison of Changes Between Rev 1 and Rev 2 ML13316B9052013-11-13013 November 2013 Albrz Testing Update for NRR Final ML13150A2162013-05-23023 May 2013 Licensee Slides for 5/23/13 Public Meeting Regarding GSI-191 ML13140A2562013-05-20020 May 2013 Licensee Slides for 5/23/13 Meeting - STP Pilot Submittal for Risk Informed Approach to Resolving GSI-191 ML13023A3342013-02-25025 February 2013 1/15/2013 Summary of Public Meetings Conducted to Discuss Draft Supplemental Environmental Impact Statement Related to Review of South Texas Project, Units 1 & 2, License Renewal Application ML13051A8552013-02-20020 February 2013 Licensee Slides for 3/5/13 Pre-Application Meeting for Proposed Licensing Action to Revise the Fire Protection Program at STP ML13029A4972013-01-15015 January 2013 Slides - Preliminary Site-Specific Results of the Environmental Review for South Texas Project License Renewal ML12297A3312012-11-27027 November 2012 Summary of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2 ML12264A3202012-10-11011 October 2012 Meeting Handout for 10/11/12 Pre-licensing Meeting License Amendment Request to Revise the Fire Protection Program ML1209004042012-03-30030 March 2012 3-27-2012 - STP Public Meeting Handout from Nuclear Innovation North America, LLC on Fukushima Lessons Learned for South Texas Project Units 3 and 4 ML1204400652012-02-0909 February 2012 Licensee Slides for 2/9/12 Meeting Regarding GSI-191 ML1133505632011-12-0101 December 2011 Licensee Presentation from 12/1/11 Meeting Via Conference Call to Discuss Risk-Informed GSI-191,Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance ML1130506322011-10-26026 October 2011 Licensee Handouts from November 1, 2011 Meeting with STP Nuclear Operating Company on GSI-191 ML1127701762011-10-0303 October 2011 Licensee Handouts from 10/3/11 Meeting STP LOCA Frequency ML1127702032011-10-0303 October 2011 Licensee Slides from 10/3/11 Meeting LOCA Frequencies, Final Results ML1123508832011-08-22022 August 2011 LOCA Initiating Event Frequencies and Uncertainties Status Report ML1123508732011-08-22022 August 2011 Models and Methods Used for Casa Grande ML1120707292011-07-26026 July 2011 Meeting Notice with South Texas Project, Units 1 and 2 - Licensee Slides Computational Fluid Dynamics Validation Plan ML1120707072011-07-26026 July 2011 Meeting Notice with South Texas Project, Units 1 and 2 - Licensee Slide Models and Methods Used for Casa Grande ML1118903802011-07-0707 July 2011 Licensee Slides, LOCA Initiating Event Frequencies and Uncertainties(Draft) ML1118904202011-07-0606 July 2011 Licensee Slide from 7/7/11 Meeting with STP Nuclear ML11157A0102011-06-0202 June 2011 STP Nuclear Operating Company, Licensee Handouts, 6/2/2011 Meeting Risk-Informed GSI-191 Closure Plan for GSI-191 Resolution ML1114501952011-05-24024 May 2011 Summary of Meeting with South Texas Project Electric Generating Station 2010 Performance ML1105503952011-02-22022 February 2011 Licensee Slides from 2/22/11 Public Meeting with STP Nuclear Operating Company ML1103206432011-01-27027 January 2011 1/27/11 Presentation on Risk-Informed GSI-191 Project Overview ML1021803392010-08-0505 August 2010 Ltr to E. Halpin Re Participation in Commission Meeting on the Resolution of Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Performance on 09/29/10 2022-08-31
[Table view] |
Text
SOUTH TEXAS PROJECT UNITS 3 & 4 Presentation to the NRC October 18, 2006 1
Agenda o Objectives &
Opening Remarks Mark McBurnett o Project Progress &
Licensing Schedule Greg Gibson o Engineering Steve Thomas o Concluding Remarks Greg Gibson 2
Objectives and Opening Remarks Mark McBurnett Vice President Reg ulatory Affairs and Oversig ht I
3
Objectives o Update progress since the July 27 presentation o Provide status of major activities D Identify issues and initiate discussions 4
Project Organization o Since July, STPNOC has developed infrastructure
" GE - COLA contractor
- Bechtel - Site characterization work
" MacTec - Geotechnical (core borings)
- Tetra Tech NUS - Environmental report work
" Baker/Botts - Environmental permits
- Hitachi - Modularization construction consultant
" TEPCO - Operating experience consultant 5
STP Organization Quality Regulatory Affairs 9 Supervisor Manager Marion Smith Greg Gibson PRA i Supervisor Supervisor Bill Stillwell 6
GE Organization 7
Bechtel Organization Quality Services I Raj Jolly 8
Processes o Procedures on COLA section preparation, review, and approval being finalized by GE and STP o Quality Assurance Program
" Operational Quality Assurance Program and Corrective Action Program
" Station Procedure revisions for U 1, 2, 3, 4 o Project Design Review Board (PDRB) - DCWG procedure approved 9¸
Site Work Commencing o Site characterization
- ] Meteorology analysis underway
- Soil and hydrology studies initiated October 9
- ] Core Boring Plan approved
- ] Borings under base mats first
- ] October through January 2007 10
S~ummary o Infrastructure being established o Onsite work initiated 11
Project Progress and Licensing Schedule Greg Gibson Manager I Regulatory Affairs 12
Agenda - Projmect Progress
& Licensing Schedule
" Review
" COLA and Schedule o Licensing Topical Reports o Optimizing the Regulatory Process
" Permits o Anticipated Interactions 13
Review -July 27 Meeting ABWR attributes:
m Design certification approved m FOAKE complete N ABWR Family - Significant Operating Experience o] 4 operating ABWRs o1 3 ABWRs now under construction 0 12 additional ABWRs (including STP Units 3 and 4) planned for operation by 2017 14
Review - July 27 Meeting Strategy:
m Minimize departures from DCD
. Utilize NEI templates m Optimize the application process 15
Maximize Certified Design Percent of FSAR Section Type Sections 25% Match DCD with no changes or additions; 30 % Standard for all ABWR COL applications (identical).
Use NEI templates 13 % Standard with a limited amount of site-specific information 12 %? miiadard withi a mnoderate am110L1ounof site-specific S$>~
20~t% Site Specific; 100%
16
COLA o Submittal of COLA 4Q07 o Critical path is geotechnical analyses
- Probabilistic seismic hazards analysis o Working to Optimize schedule and reduce critical path 17
COLA Schedule c~1~ Eany ORG Total 2MIN 2007 j Acivt ID.
Activiy Deschiptionl Our Elsoy' Otait 1`1111h .I'.ý.fei
._ II A I:
'M I I I f"I II I 11.t 1 I F I LI I I I I ,A I M I IiI I I I I .II Ii I Il I I pI1 1 r,,,,,,,,
GE423D01D~ Pefiahe Comywentaissue F~il 2~ 05F~B~ T EVW GE .57 K~ J7 I,
FS~AR AIn- Doartltitol Enaror~noii(Genr'ttcomom 4R 1I fO~4eia :On~I ~qx rIBI*c9 I GE42DI031 0 F5AJRI.11- Cpera~iOlaIExcorenoe (GmEneiCrmnm C-E-42041140D GE*1* 111501:1 IPrpia Draft
__W__-_
I 15E' [1 SEP06 11f1MMEFr.,
2U109oS&R:7 2-,9D XRN I
,3mAjrl
,2%AIl GE
_-GE1 IA-L 15 l
1,Ž 15 I
r WalIl I 1I I
.1 II II II II II IC-~1542l J0 Raoloa Carnrr,&su IFw I ;23102AFM7 27Afl PRO Iz a - - I-Il - 4-i- - - + - -,--
91mn1~nt + .1e~ueFbi +
+ 4-.--.'- '-, - - - -
FS.t
- oaPVISDAI-TMA~fi T MalkftluI~ II II II I C-E420132fl- JFSARlA -Reepofte to TMII Re-toad Iftefs 155 15SEP06 j 27APR137 GE IB 1-1
~e~T~IF eIa~.dI GE2I2K12-:1 PrepweDraf!e 11 I SEFO-T rO-.2-ARd,7 GE 1 IýO I .t.4 -~oJ
-to-
.5 p ~I II
I
--E4201210- CDL Item 1.8 RR Ilures f RS vafres 25 1VSEF05' mo..TOE GE 109 ~olo II II 35 1S5SEPO5 r,5NOVE6 -GE 9- Ite II T
-E42111211fl COL Item 1.10;- RmtorReac.kVenln Ii II GE42312111: C0L Item 1.11 - Te'-t "-V &-Isr:arge- Pine 35j I1SEP05 E3.NOVt6 C-E42M 12112 C-LItem 1. 12 -.RCICB)p3s .arlSy TE-Et 541 ISEF06" -____
rlEQ.E _i E 5 ,l_________________________I tE2E-E81 It41 .*-t I rd~ a?, ';i , I I E42aI210- C31 Item- 1.5 -IErmrg Pro, & TrItngPi GE GE 57 r CW I7EF 'bq C-E4231210E CCDL fler 1.75-RE'NptMn Pmr foT &R Sng 97 1i5SEF0t' 2EV E107 ci w1 tm 91, 1oPeM~o: oF Y GE42012107 C-OL Iteni 1. - M-pamMc Rad ft S-Il S1t e 97 1SSEFCOS E.ZEE07 GE 3' an R90 A~a?4t ling S G-142T12103 001 Item 1.9 - RcpWt on ECCS- Curag~s 97 11SSEFOS- 02FEWO E Cj trf~R rý.S1 n'-s:
- 1 I I I II G421250M Reviw DraM 2,3Me0 a 20MAR07 ALL I I ~pn RE501-e CaT'rV*e&ItI*&Je FIal 20 IOAPFf7 27APE07 I I 9~n4nI Ia Iu011 1Ftn IGE42312WOfl I I 18
Potential Topical Reports COL Item Closure
" Detailed Design Implementation Process (COL Item 1.1, DCD Section 1.1.11) 1Q07
" Life Cycle Management Program (COL Item 1.1 a, DCD Section 1.2.3) 2Q07
" Onsite Meteorological Measurements Program (COL Item 2.10, DCD Section 2.3.2) TBD
" ABWR Internals Vibration Assessment Program Results (COL Item 3.27, DCD Section 3.9.7) 2Q07
- Fuel Design Stabiit yopliane(COL Item 4.1,in DCD ýSection4.3.5) 2Q07
- Surveillance Program (COL Item 5.5, DCD Section 5.3.4) 2Q07
- Fuel Bundle MAPLHGR, Peak Cladding Temp and Oxidation Fraction (COL Item 6.6, DCD:Section 6.3.6) 4Q06 Fuel Bundle Limiting Break (COL Item 6.7a, DCD SectiOn 6.3.6)
P 4Q06
- APRM OscillafionMonitoriLogic (COL Item 7.2 DCD Section 7.6.3) 2Q07
- Fuel Inspection Stand Installation (COL Item 9.5, DCD Section 9.1.6) 1Q07
- List and Properties of Cranes, Hoists, Elevators (COL Item 9.6, DCD Section 9.1.6) 1Q07
- Spent Fuel Racks Structural Evaluation (COL Item 9.7, DCD Section 9.1.6) 1Q07
- Spent Fuel Rack Thermal-Hydraulic Analysis (COL Item 9.8, DCD Section 9.1.6) 1Q07
- Plant Operating Procedures Development Plan (COL Item 13.3, DCD Section 13.5.3) TBD
- Emergency Procedures Writers Guide (COL Item 13.4, DCD Section 13.5.3) TBD
- Plant Operating Procedures Development Plan Implementation (COL Item 13.5, DCD Section 13.5.3) TBD
- Preoperational Test Specification, Startup Test Specification, and Test Plan (COL Item 14.1, DCD Section 14.2.13) 2Q07
- Operational Reliability Assurance Program (COL Item 17.4, DCD Section 17.4) 2Q07 19
Potential Topical Reports Desi2n Acceptance Criteria
" Safety System Logic and Control/Reactor Trip and Isolation Functions Hardware/Software Specification 2Q07
" DCIS Software Management Plan 1Q07
" DCIS Software Configuration Management Plan 4Q06
" DCIS Software Safety Plan 1Q07
" DCIS Software V&V Plan 1Q07
" DCIS Installation Review Plan 2Q07
" Electromagnetic Compliance Implementation Plan 1Q07
" DCIS Factory Acceptance Test Plan 2Q07
" HFE Design Implementation Plan 2Q07 20
Potential Topical Reports DCD Departures/Site-Specific Design Information
GESTAR TBD
'GE**Fuel Assembly.Mechanical DesignReport4Q6
- GEx Futel Rd Ther~mal-'Mechanical.Design Report 4Q06
" GExx Pressure Drop Chaacteristics 4Q06 2Q07
- GExx Nucledr Desigf Report ax*
GExCritical -Power Correlation, Uiieertaif and OLMCPRDevelopment 2Q07
.Control Rod Nuclear DesignReport 2007
. Con*trolRod Mechanictl Design Repot 2Q07
- Weir-Type RCIC Pumps 4Q06
. Hydrogen Recombiner Deletion 2Q07
- Plant Electrical System 2Q07
- Control Building Annex - Relocation of MG Sets 2Q07
- Shared Common Equipment (e.g., fire pump) 2Q07 21
Optimize Application Process o Identify issues where application process can be optimized o Quality COLA - Level of Detail; Follow DG-1145 &
SRP o] Early discussion on issues o] RAI responses submitted quickly o Discuss issues, options, and resolutions with NRC Staff in public meetings 22
Example Issue: Fuel Selection o GE P8x8R fuel used in certified design (8 x 8)
" No longer manufactured
- No longer supported o GE14 fuel (10x 10) currently available but very likely will not be the actual fuel used (we will use fuel design circa 2011) 23
Example Issue: Fuel Selection o Changing COLA fr om GE P8x8R to GE 14 impacts "8% of FSAR and 12 LTRs o Most work from GE P8x8R to GE14 must be redone when GEx is selected, and license amendments performed circa 2012 o Changing COLA from GE P8x8R to GE14 expends resources with little value 24
Example Issue: Fuel Selection o Potential resolution:
- Use GE P8x8R fuel - no DCD departures for fuel related-issues o1 No departures from DCD Chapters 4, 12, 15, 19 for fuel-related issues at this time o No departures from DCD subsections 1C, 2.3.2.9, 2.3.2.10, 2A, 31, 5.2.2, 6.3, and 11.1 for fuel related issues at this time o] Deferred LTR submittals for fuel-related issues
- Commit in COLA submittal letter to submit standard fuel change amendment o Benefit: No duplicated NRC review and no wasted STPNOC & NRC resources 25
Permits and Authorizations o Developing permit schedules o Meet with applicable agencies in 4Q06 o Begin application process in 1Q07 o Anticipate involvement of 10 agencies, involving 23 permits and authorizations 26
Anticipated Interactions o NRC to observe site boring work o Continue periodic meetings with next meeting early December o Expect NRC public meeting at site in early 2007 27
Engineering Steve Thomas Manager, Engineering 28
Agenda - Engineering o Site Plan o Boring Plan o Site Work Statu S o Design Ce nter Working G roup -
Project Design Review Board 29
30 31 32 Site Plan 1--
I I j*
33
Boring Plan 34
poring Pian Reactor/Turbine Buildings 35
Borings - Detail BORINGS (125 total) 2 to 600 feet 25 to 200 feet 14 to 150 feet 37 to 100 feet' 11 to 75 feet 3 to 50 feet 2 to 40 feet Observation Wells (30 15 to 125 feet total) 15 to 50 feet CPTs (35 total) 13 to 100 feet, including 5 seismic cones 7 to 50 feet 15 to 40 feet Test Pits (20 total) 20 pits 10 feet Downhole Geophysical Perform borehole logging and suspension P-S logging in both the 600 ft holes and in 8 of the 200 ft holes Field Electrical Resistivity 2 tests - each test has 10 electrode "A" spacing up to 300 ft.
36
Site Work o MacTec onsite
" Work October through.January 37
Site Soil Characterization 38
DCWG/ PDRB o Established DCWG
" STPNOC
" Amarillo Power [Pending]
o Established PDRB
- Scheduled to complete review identified Tier 1, Tier 2*,
and significant Tier 2 issues by 12/31/06 39
Potential Design Changes 0 Tier 1 Changes:
" RCIC Weir Turbine Pump [improves reliability]
" STP Flood Level [site requirement]
- Hydrogen Recombiner Removal [Industry standard]
[improves reliability/safety]
- ] 110.% Bypass Capability [improves reliability]
40
Potential Design Changes o Tier 2* Changes:
n Fuel m ACI 349 - 1990 edition m Fiber Optic Links (Not formal ANSI FDDI Standard) o Significant Tier 2 Changes o Other Tier 2 changes will be evaluated using process "similar to 50.59" using the criteria in Appendix A to Part 52 41
PDRB Reviewed Changes o Removal of SCRAM and MSIV automatic closure on MSLRM alarm o Weir-type turbine RCIC pump in lieu of Terry turbine pump o 110% Bypass Capability o Provide two 2% RWCU pumps instead of two 1%/
RWCU pumps o Medium voltage electrical distribution 0 Control building addition 42
Concluding Remarks Greg Gibson Manager f Regulatory Affairs 43
Next Meeting o Propose meeting early Dece muber o Possible topics m COLA and LTR schedules
" Resolution of DAC items
" Creating-a quality COLA
" Units 3 & 4 Quality Assu rance n Site characterization work status n Engineering and design- status/schedule m Emerging issues 44
Projmect -overview o Key contracts in place. Major component contracts in 2Q07 to lock in forging slots o Begin site preparations in 2008 D Unit 3 start-up in 2014/2015 o Infrastructure in place o Site characterization work proceeding o COLA 4Q07 and permit applications 1Q07 o DCWG established and PDRB active 45