Category:E-Mail
MONTHYEARML23339A0882023-12-0404 December 2023 NRR E-mail Capture - NRC Acceptance Review Re Dresden, Units 2 and 3 Request for Relief I5R-22 ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference ML23328A0092023-11-22022 November 2023 Supplement - Dresden Security Rule Exemption Request ISFSI Docket No. Reference (EPID L-2023-LLE-0031) (Email) ML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23304A0172023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Dresden 1, 2 & 3 - Exemption from Security Rule (L-2023-LLE-0031) ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23263A9932023-09-20020 September 2023 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - Acceptance of Licensing Action Submittal Re Amendment to Adopt TSTF-564 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23052A0652023-02-21021 February 2023 NRR E-mail Capture - Dresden Units 2 and 3 - Request for Additional Information for Alternative Request RV-23H ML23026A0172023-01-23023 January 2023 NRR E-mail Capture - (External_Sender) IEMA Response Action - Request for Comments on the Proposed Issuance of Amendment to Technical Specification 4.3.1 for Dresden Nuclear Power Station, Units 2 and 3 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML23019A0132023-01-12012 January 2023 NRR E-mail Capture - Final RAI Dresden 2 and 3 - License Amendment Pertaining to GNF3 Fuel Transition ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A1212022-11-21021 November 2022 NRR E-mail Capture - NRC Acceptance Review Re Dresden, Units 2 and 3 Request for Relief RV-02D (EPID L-2022-LLR-0075), RV-03 (EPID L-2022-LLR-0076), and RV-23H ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22290A0842022-10-13013 October 2022 NRR E-mail Capture - Dresden 2 and 3 - RAI License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) ML22258A1882022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review: Dresden 2 and 3 License Amendment Request to Revise Technical Specification 3.1.4, ML22258A1872022-09-13013 September 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3, Amendment Request - Transition to GNF3 Fuel NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22229A0752022-08-16016 August 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief 16R-09 ML22229A0762022-08-16016 August 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief 16R-10 ML22203A0442022-07-21021 July 2022 Request for Additional Information (RAI) ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22199A2412022-07-18018 July 2022 NRR E-mail Capture - Acceptance Review: Dresden Units 2 and 3 - License Amendment Request New Fuel Vault Storage and SFP Criticality Safety Analysis Methodology ML22199A2422022-07-13013 July 2022 NRR E-mail Capture - Draft RAI Dresden 2 and 3 Proposed Alternative Related to Sblc Nozzle Inspection for the Sixth Inservice Inspection Interval ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22103A2112022-04-12012 April 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief (16R-01) - EPID L-2022-LLR-0037 ML22103A2132022-04-12012 April 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief (16R-02) - EPID L-2022-LLR-0038 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) 2023-09-29
[Table view] |
Text
Fnne Boland - Braidwood article FYI Page 1 From: Raeann Shane To: Anne Boland Date: 2/17/06 4:04PM
Subject:
Braidwood article FYI By Hal Dardick Tribune staff reporter February 15, 2006, 9:42 PM CST Radioactive tritium leaks have been found at two more nuclear power plant sites, Exelon Nuclear announced Wednesday, only weeks after the company disclosed a series of spills at a Will County plant.
The leaks were discovered in recent weeks at Dresden Generating Station in Grundy County and Byron Nuclear Generating Station, about 25 miles southwest of Rockford.
So far, no tritium has been detected in groundwater off Exelon property near those plants, and the leaks "pose no health or safety threat,"
Exelon stated in its announcement.
But Rick Cobb, a hydrogeologist who is deputy manager of the Division of Water Supplies for the Illinois Environmental Protection Agency, said it is too early in his agency's investigation to confirm that assessment.
The disclosures come weeks after Exelon publicly revealed water containing tritium spilled fourltimes between 1996 and 2003 from vacuum breakers on an underground pipe at Braidwood Generating Station in far southwest Will County.
Exelon detected groundwater tritium above levels permitted by the U.S.
Environmental Protection Agency at two spots outside the plant.
Though tritium levels found in drinking wells near the Braidwood plant don't exceed those limits, tritium in one well was well above the normal "background" level. That's a violation of state "non-degradation standards," Cobb said.
Reacting to the disclosures Wednesday, U.S. Rep. Jerry Weller (R-l1l.),
whose district includes the Braidwood and Dresden plants, wrote a letter to the chairman of the U.S. Nuclear Regulatory Commission.
Weller asked that the NRC conduct "an independent audit of all of the nuclear power facilities in Illinois with a strong emphasis on system components dealing with tritium."
A Washington-based anti-nuclear group also responded to the new disclosures.
"The way this information is leaking out is as disturbing as the radiation leaks themselves," said Paul Gunter, director of the Reactor Watchdog Project at the Nuclear Information and Resource Service.
Gunter's group joined 22 organizations and six individuals last month in petitioning the NRC to demand more information about alleged radioactive n',
N OAne Boland - Braidwood article FYI AnneBo.and.-.Braidwood.articleFY Page,2 leaks at Braidwood, Dresden and five other nuclear facilities. The disclosed leaks are "just the tip of a tritium iceberg," he said.
Tritium, a byproduct of nuclear generation, can enter the body through ingestion, absorption or inhalation. Exposure can increase the risk of cancer, birth defects and genetic damage.
The EPA considers tritium to be among the least dangerous radioactive substances, in part because it leaves the body relatively quickly. But anti-nuclear activists have expressed concerns about the effects of chronic exposure.
The leak at Dresden is the second discovered there in recent years.
Exelon officials discovered tritium contamination in fall 2004, when up to 650,000 gallons of water containing tritium leaked from underground pipes near the center of Exelon's 1,782-acre site. One test that year found tritium in the groundwater at levels more than 500 times the federal limit, according to Illinois EPA documents.
Tritium was measured in three off-site private wells south of the Dresden plant at levels higher than normal background after the 2004 leak, Cobb said.
In response to that leak, Exelon replaced a portion of underground pipe and installed more monitoring wells.
On Monday, a monitoring well showed tritium at levels 34 times higher than the federal limit, according to a NRC document.
Exelon said it suspects the new leak occurred in a portion of the underground pipe that was not replaced, the report states.
During the leak, water with tritium leaked at a rate of about one-half cup per minute, Exelon officials said.
It was discovered "within a few weeks after it began," according to the company's announcement.
After confirming the leak, Exelon stopped sending water with tritium through the pipe, said Bob Osgood, Exelon's spokesman at that facility.
The pipe carries the water from a storage tank to an emergency cooling system, he said.
Meanwhile, Exelon recently began assessing systems that handle tritium at its 10 nuclear plants, seven of which are in Illinois.
At Byron, the assessment led to the discovery of water with tritium in five of six vaults that house vacuum breakers along an underground pipe that runs about 3 miles from the plant to the Rock River. Exelon is trying to determine if the tritium entered the ground outside the vaults.
Up to 300 gallons of water was found in one vault, and the highest tritium level was more than four times the federal limit, said Bob Kartheiser, spokesman for that plant.
M ads
=..D,: 'lex" 'I
,>WEfia.
M 'im As In oad-Badwo ril Y AnneBoladraidoodrtice FY
- Pag 3 The pipes at Byron and Braidwood carry water with tritium and other effluent to waterways, where the effluent is dumped with tritium at levels below federal limits, Exelon officials said.
New standards would be set for inspections, responses and remediation related to tritium leaks that could affect the environment or public, Exelon announced.
Also, Exelon scientists are looking for ways to reduce the amount of tritium produced at and released from the plants, the company announced.
"We recognize that inadvertent releases are unacceptable, and we are committed to eliminating them," said Exelon Nuclear Chief Operating Officer Charles Pardee.
hdardick(ctribune.com Copyright (c) 2006, Chicago <http:/Iwww.chicaaotribune.com/> Tribune