NRC CY 2005 Annual Assessment Meeting WATTS BAR Spring City, TN April 4, 2006

Purpose of Todays Meeting

  • A public forum for discussion of Watts Bar performance
  • NRC will address Watts Bar performance issues identified in the annual assessment letter
  • Watts Bar management will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

Agenda Introduction Review of Reactor Oversight Process National Summary of Plant Performance Discussion of Watts Bar Plant Performance Results Watts Bar Management Response and Remarks NRC Closing Remarks Break NRC Available to Address Public Questions

William Travers Regional Administrator Loren Plisco Deputy Regional Administrator Charles Casto Victor McCree Director Division of Reactor Projects Director Division of Reactor Safety Joseph Shea Harold Christensen Deputy Director Deputy Director Malcolm Widmann Regional Specialists Branch Chief Watts Bar Project Engineers Resident Inspectors Larry Garner Jonathan Bartley Heather Gepford Michael Pribish

NRC Performance Goals PRIMARY GOALS Ensure protection of the public health and safety and the environment Ensure the secure use and management of radioactive materials OTHER GOALS

  • Ensure openness in NRC regulatory process
  • Ensure that NRC actions are effective, efficient, realistic, and timely
  • Ensure excellence in NRC management to carry out the NRCs strategic objective

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Examples of Baseline Inspections Equipment Alignment ~80 hrs/yr Triennial Fire Protection ~200 hrs every 3 yrs Operator Response ~125 hrs/yr Emergency Preparedness ~80 hrs/yr Rad Release Controls ~110 hrs every 2 yrs Worker Radiation Protection ~90 hrs/yr Corrective Action Program ~250 hrs every 2 yrs Corrective Action Case Reviews ~60 hrs/yr

Performance Thresholds Safety Significance Green: Very low safety issue White: Low-to-moderate safety issue Yellow: Substantial safety issue Red: High safety issue NRC Inspection Efforts Green: Only Baseline Inspections White: May increase NRC oversight Yellow: Increased NRC oversight Red: Increased NRC oversight and other NRC actions

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone ncreasing Safety Significance ncreasing NRC Inspection Efforts ncreasing NRC/Licensee Management Involvement ncreasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2005 icensee Response 84 egulatory Response 12 egraded Cornerstone 4 ultiple/Repetitive Degraded Cornerstone 3 nacceptable 0 Total 103

Watts Bar CY2005 Inspection Activities 2987 hours0.0346 days <br />0.83 hours <br />0.00494 weeks <br />0.00114 months <br /> of inspection related activities

  • Resident inspector daily inspections
  • Problem identification and resolution inspection
  • Maintenance inspections
  • Radiation protection inspections
  • Engineering modifications inspection
  • Safety system design and performance inspection
  • Supplemental Inspection for White Finding

Watts Bar CY 2005 Assessment Results

  • Watts Bar performance at the end of the assessment year was within the Licensee Response Column of the NRCs Action Matrix
  • All finalized inspection findings for CY 2005 were classified as very low safety significance (Green)
  • All performance indicators (PI) for CY 2005 were Green

CY 2005 Assessment Results Contd

  • Watts Bar performance for the first three quarters was in the Regulatory Response Column of the NRCs Action Matrix due a White Finding identified in the fourth quarter of CY 2004
  • White Finding was in the Mitigating Systems Cornerstone and involved silting in the raw water cooling system

CY 2005 Assessment Results Contd

  • Supplemental Inspection conducted in July 2005 determined corrective actions were thorough and appropriate
  • November 22, 2005 Regulatory Performance Meeting reviewed licensee actions
  • White Finding closed after four quarters

CY 2005 Assessment Results Contd

  • Common performance deficiency of failure to implement procedures

CY 2005 Assessment Results Contd

  • Licensee presented corrective actions to Region II management during two meetings
  • Routine daily PI&R reviews and planned annual samples to focus on human performance issues

CY 2005 Assessment Results Contd

  • Inspection activities and reviews determined that the licensee adequately addressed the substantive cross-cutting issue as demonstrated by performance trends, low number of subsequent findings and ongoing corrective actions such as the TVA Human Performance Improvement Plan
  • The substantive cross-cutting issue was closed by NRC letter dated March 2, 2006

Watts Bar Assessment Summary TVA operated Watts Bar in a manner that preserved public health and safety All cornerstone objectives were met NRC plans baseline inspections at Watts Bar for the remainder of CY 2006

Watts Bar CY2006 Scheduled Inspection Activities

  • Resident inspector daily inspections
  • Radiation protection inspections
  • Licensed operator requalification inspection
  • Reactor operator initial exam
  • Maintenance inspections
  • Unit 2 - lay-up and preservation

Contacting the NRC Report an emergency (301) 816-5100 (call collect)

Report a safety concern:

(800) 695-7403 Allegation@nrc.gov General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Public Electronic Reading Room http://www.nrc.gov/reading-rm.html Public Document Room 1-800-397-4209 (Toll Free)

NRC CY 2005 Annual Assessment Meeting WATTS BAR Spring City, TN April 4, 2006

Watts Bar Attendance List April 4, 2006 Licensee Personnel

  • Jay Laughlin, TVA
  • Mike Skaggs, TVA
  • Joe Frisco, TVA
  • Barry Marks, TVA
  • Maureen Brown, TVA NRC Personnel
  • Malcolm Widmann, DRP
  • Jonathan Bartley, DRP
  • Ken Clark, DRP Public Attendees
  • Betty Hamby, EMA
  • Tony Finnell, EMA