Letter Sequence Other |
---|
TAC:MC3743, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:MC3744, (Approved, Closed) TAC:MC3812, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML041980222, ML042370100, ML050590036, ML051150191, ML051160036, ML051320148, ML051430036, ML051570381, ML051660602, ML052290397, ML060530185, ML060670304, ML060680586, ML060680590, ML060680596, ML060680599, ML060720253, ML060720272, ML060720273, ML060720281, ML060720293, ML060720295, ML060720298, ML060720303, ML060720354, ML060880464, ML060880469, ML061040217, ML061660002, ML061770163, ML061840027, ML061910705, ML062050056, ML062090482, ML062090555, ML062120411, ML062130163, ML062130343, ML062200277, ML062210102, ML062220647, ML062270240, ML062360160, ML062400472, ML062510022, ML062510371, ML062510374, ML062510382, ML062510385, ML062620064... further results
|
MONTHYEARML0607202531975-05-23023 May 1975 May 23, 1975 - Final Summary Report Unit 2 Startup Project stage: Other ML0606805861975-05-23023 May 1975 May 23, 1975 - Final Summary Report Startup, Enclosure 4 Project stage: Other ML0607202721977-05-0909 May 1977 May 9, 1977 - Final Summary Report Unit 3 Startup Project stage: Other ML0606805901977-05-0909 May 1977 May 9, 1977 - Final Summary Report Startup, Enclosure 5 Project stage: Other ML0607202731992-11-30030 November 1992 a Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities Project stage: Other ML0607202982001-03-13013 March 2001 Environmental Assessment Bear Creek Reservoirs Land Management Plan Project stage: Other ML0607202952001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan, Resource Stewardship Bear Creek Watershed Project stage: Other ML0606805992001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan Project stage: Other ML0419802222004-07-0909 July 2004 Technical Specification 436 - Increased Main Steam Isolation Valve Leakage Rate Limits and Exemption from 10CFR50, Appendix J Project stage: Other ML0423701002004-08-23023 August 2004 Browns Ferry, Ltr, Framatome Proprietary Review Project stage: Other ML0423708492004-08-23023 August 2004 (BFN) - Unit 1- Proposed Technical, Specifications (TS) Change TS - 431 - Request for License Amendment - Extended Power Uprate (EPU) Operation Probabilistic Safety Assessment (PSA) Update Project stage: Request ML0429202832004-11-18018 November 2004 Ltr, Results of Acceptance Review for Extended Power Uprate Project stage: Acceptance Review ML0431004762004-11-18018 November 2004 Ltr, Results of Acceptance Review for EPU Project stage: Acceptance Review ML0433701792004-12-29029 December 2004 RAI Re Extended Power Uprate Project stage: RAI ML0434400452004-12-30030 December 2004 RAI, Extended Power Uprate Project stage: RAI ML0500303612005-01-0606 January 2005 Ltr, Request for Information for Status of Amendment (Tac No. MC1330, MC1427, MC2305, MC3812, MC4070, MC4071, MC4072, MC4161, MC3743, MC3744) Project stage: RAI ML0505900362005-02-16016 February 2005 Enclosure 2, 02/01/2005 Conference Call with TVA Presentation Slides on TS Changes Using Method 3 for Interim Solution Project stage: Other ML0505601502005-02-23023 February 2005 Response to NRC Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0505603372005-02-23023 February 2005 (BFN) - Response to Nrc'S Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-418 - Request for Extended Power Uprate Operation (Tac Nos MC3743 and MC3744) Project stage: Request ML0607202932005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0606805962005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0511501912005-04-19019 April 2005 Enclosure 3, Ltr, Licensing Action Status and Interdependencies Project stage: Other ML0511702442005-04-25025 April 2005 (BFN) - Unit 1 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0511702422005-04-25025 April 2005 (BFN) - Units 2, and 3 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-418 - Request for Extended Power Uprate Operation Project stage: Request ML0514300362005-05-20020 May 2005 Response to Nrc'S Letter on Licensing Action Status and Interdependencies, Project stage: Other ML0513201462005-05-27027 May 2005 EPU Acceptance Review Results to Increase Maximum Authorized Power Level (TAC No. MC3743, MC3744) (TS-418) Project stage: Acceptance Review ML0515802492005-06-0606 June 2005 Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS - 431 - Request for License Amendment Extended Power Uprate (EPU) Operation Project stage: Request ML0516403912005-06-0606 June 2005 Response to Technical Specifications (TS) Change No. TS-418 - Request for License Amendment - Extended Power Uprate (EPU) Operation Project stage: Request ML0517902372005-06-24024 June 2005 Part 21 Notification - Critical Power Determination for G314 and GE12 Fuel with Zircaloy Spacers, 06/24/2005 Project stage: Request ML0513201482005-06-29029 June 2005 Ltr., Ind FRN Facility Operating License for EPU and Opportunity for a Hearing Project stage: Other ML0515703812005-06-29029 June 2005 Fanp, Withholding Information from Public (TACs MC3743, MC3744) Project stage: Other ML0516606022005-06-29029 June 2005 Ltr., Withholding Public Disclosure for GE Company (TACs MC3743, MC3744) Project stage: Other ML0511600362005-07-0101 July 2005 Notice of Consideration of Issuance of Amendment and Notice of Opportunity for a Hearing Regarding Extended Power Uprate (Tac No. MC3743, MC3744) Project stage: Other ML0518703902005-07-0707 July 2005 06/08/05, Meeting Summary with TVA and Framatome Regarding Fuel Analysis Methodology, Enclosure 2, Framatome Presentation Project stage: Meeting ML0520706042005-07-26026 July 2005 Notice of Meeting with Tennessee Valley Authority (TVA) BFN Units 1, 2, and 3, and Sequoyah Units 1 and 2 on Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0524204912005-08-23023 August 2005 Ltr., GE Request for Withholding Information from Public on Steam Dryer Analysis for EPU Conditions Project stage: Withholding Request Acceptance ML0522901442005-09-0202 September 2005 Summary of Meeting with the Tennessee Valley Authority Regarding Plant-Specific Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0522903972005-09-0202 September 2005 TVA Handout Method 3 Issue BFN Proposed Resolution Project stage: Other ML0524303412005-10-0303 October 2005 RAI, Extended Power Uprate (TS-431) (Tac No. MC3812) Project stage: RAI ML0525104462005-10-0303 October 2005 Request for Additional Information Regarding Extended Power Uprate Project stage: RAI ML0535601862005-12-19019 December 2005 Response to NRC Round 2 Request for Additional Information Related to Technical Specifications Change No. TS-418-Request for Extended Power Uprate Operation Project stage: Request ML0535601942005-12-19019 December 2005 Response to NRC Round 2 Requests for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0535601202005-12-22022 December 2005 Request for Additional Information, Information Concerning Extended Power Uprate Project stage: RAI ML0535601772005-12-22022 December 2005 Request for Additional Information, Concerning Extended Power Uprate Project stage: RAI ML0535703412006-01-19019 January 2006 Revised Schedule for Response to Extended Power Uprate Requests for Additional Information Project stage: RAI ML0614502612006-02-0101 February 2006 Response to NRC Request EMEB-B.6 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-431- Request for Extended Power Uprate. Project stage: Request ML0603207332006-02-0101 February 2006 Response to NRC Request EMEB-B.7 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-418 - Request for Extended Power Uprate Project stage: Request ML0603901352006-02-0808 February 2006 Forthcoming Meeting with Tennessee Valley Authority, to Discuss Various Topics Regarding Tva'S Extended Power Uprate Amendment Request for the Browns Ferry Nuclear Plant, Units 1 and 2 and 3 Project stage: Meeting ML0607202812006-02-28028 February 2006 NEDO-33173, Applicability of GE Methods to Expanded Operating Domains. Project stage: Other ML0606203072006-02-28028 February 2006 Technical Specifications Change TS-418 - Response to Request for Additional Information SPSB-A.11 Regarding Extended Power Uprate - Credit for Net Positive Suction Head Project stage: Response to RAI 2005-02-28
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24032A2752024-02-0707 February 2024 Pre-Pre-Submittal Meeting for Proposed License Amendment Regarding Hydrologic Analysis Updates (Slides) ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML23130A0912023-05-11011 May 2023 TVA Browns Ferry Nuclear Plant Safety Pre-Application Public Meeting Slides 05/11/2023 ML23130A0922023-05-11011 May 2023 NRC Browns Ferry Nuclear Plant, Units 1, 2, and 3, Subsequent License Renewal Application, Public Meeting Slides ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23025A0472023-01-25025 January 2023 Pre-Submittal Meeting for Proposed License Amendment Request Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves - January 25, 2023 ML22285A1902022-10-13013 October 2022 October 13, 2022 Public Meeting on 5th Interval Alternative Planned Requests - Licensee Slides ML22279A8992022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October 6, 2022-TVA Slides ML22277A6562022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October, 2022 (TVA Slides) ML22264A2332022-09-22022 September 2022 Slides for Pre-Submittal Meeting for Request to Use a Later Edition of the ASME OM Code for the Fifth Inservice Testing (IST) 10-Year Interval ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21270A0322021-09-27027 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting September 27, 2021 ML21265A0422021-09-21021 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting 09/22/2021 ML21250A3012021-09-0707 September 2021 TVA Slides for September 7, 2021, Presubmittal Meeting to Discuss Planned Browns Ferry TSTF-505 License Amendment Request ML21152A1872021-06-0101 June 2021 TVA Slides for June 1, 2021, Presubmittal Meeting to Discuss Planned Control Bay Chiller Cross-Tie License Amendment Request ML24019A1322020-11-0909 November 2020 ANP-3874NP, Revision 1, Browns Ferry Atrium 11 Control Rod Drop Accident Analysis with the AURORA-B CRDA ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20156A2812020-06-0808 June 2020 TVA Slides for June 8, 2020, ATRIUM-11 Presubmittal Meeting ML20092F5742020-04-0202 April 2020 TVA Slides for Browns Ferry 50.69 License Amendment Request Presubmittal Meeting ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML24019A1482019-01-28028 January 2019 Surveillance Procedure 2-SR-3.1.6.1, BPWS Compliance Verification, Revision 006 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML18239A2522018-08-27027 August 2018 Proposed Changes to NFPA 805 License Conditions ML18158A2862018-06-0707 June 2018 May 30, 2018 Summary of Public Meeting with Browns Ferry Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status ML17212A8432017-08-0101 August 2017 Meeting Slides for Pre-submittal Meeting with Tennessee Valley Authority on Unbalanced Voltage License Amendment Request for TVA Nuclear Plants ML17034A3322017-02-0303 February 2017 Presentation Slides for Public Meeting Regarding Browns Ferry Extended Power Uprate License Amendment Request Transmission System Update Supplements ML16356A0342017-01-0404 January 2017 Pre-app Meeting Mellla+ LAR Final ML16341A7422017-01-0404 January 2017 Presentation Slides for Browns Ferry Pre-application Meeting Regarding Mellla+ ML16350A2962016-12-14014 December 2016 Enclosure 3- Reactor Oversight Process Task Force FAQ Log- November 16, 2016 ML16279A2332016-10-0505 October 2016 Summary of Closed Pre-Decisional Enforcement Conference with Tennessee Valley Authority Regarding Browns Ferry Nuclear Plant ML16200A2592016-07-19019 July 2016 July 19, 2016: NRC Public Meeting on Browns Ferry Nuclear Plant Extended Power Uprate License Amendment Request ML16189A3482016-07-19019 July 2016 Presentation Slides for July 19, 2016, Public Meeting ML16028A0962016-02-0101 February 2016 Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal Logic, and Unit Priority Re-Trip Logic License Amendment Request ML15308A1002015-11-10010 November 2015 Public Meeting Presentation Slides Extended Power Uprate License Amendment Request NRC Public Meeting ML15195A1252015-07-14014 July 2015 July 14, 2015 - Public Meeting Slides on Browns Ferry Seismic Risk Insights ML15293A4582015-07-14014 July 2015 Slides for July 14, 2015 Public Meeting on Browns Ferry Seismic Risk Evaluations (MF3764 Through MF3766) CNL-15-122, Presentation Slides for Closed Meeting Extended Power Uprate (EPU) License Amendment Request2015-07-0808 July 2015 Presentation Slides for Closed Meeting Extended Power Uprate (EPU) License Amendment Request ML15146A2792015-05-21021 May 2015 Bf EOC Meeting Summary 2015 ML15099A2912015-04-22022 April 2015 4/22/2015, Enclosure 2, Slides for TVA Presentation to the NRC in Support of Steam Dryer Replacement ML14147A3222014-05-27027 May 2014 Public Meeting Summary 05/21/2014 to Present Annual Assessment ML14101A1522014-04-11011 April 2014 Summary of Public and Closed Meeting for Tennessee Valley Authority 2013 Synergy Safety Culture Survey Results ML14090A4582014-03-31031 March 2014 Public Meeting Summary TVA Synergy Safety Culture Survey Results ML14036A3872014-02-0505 February 2014 Summary of Meeting with Public to Discuss the Results of the Follow-up Inspection of the Items Identified in Confirmatory Action Letter (ML13232A105) of August 22, 2013, and the Status of Nrc'S Performance Assessment of Browns Ferry Unit 1 IR 05000260/20132012013-07-30030 July 2013 07/24/2013 Summary of Public Conference Meeting With Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater Than Green Finding Associated with One Apparent Violation Documented in NRC Inspection Report 05000260 ML13212A0842013-07-30030 July 2013 Summary of Public Conference Meeting with Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater than Green Finding Associated with One Apparent Violation Documented in NRC Inspection Report 05000260/20132012 ML13199A4522013-07-17017 July 2013 Summary of Meeting with Browns Ferry 2024-02-07
[Table view] |
Text
-' I'
Agenda
- Introduction/Meeting Objective Brian O'Grady
- Steam Dryer Analysis Joe Valente e Containment Overpressure Credit J. D. Wolcott for ECCS Net Positive Suction Head (NPSH)
- GE Fuel Methods im D. Wnlrntt
- BFN Responses to NRC Requests J. D. Wolcott for Information e BFN Unit 1 Testing Bob Moll
- Logistics to Support Timely Bill Crouch Resolution of Questions
-sa Steam Dryer Analysis
- Report drafted and in review
- Report to be issued by March 1, 2006
- Unit 1 testing completed February 3, 2006
- Tess t,'pu t inprepa-ration
- Final test report to be issued April 7, 2006
- Units 2 and 3 Similarity Assessment to be completed March 8, 2006 a Stress Analysis with Load Cases
- Structural finite element model developed by March 1, 2006
- Load cases to be completed by April 5, 2006
- Final report by April 24, 2006
- Limit Curves for Steam Line Monitoring During Power Ascension
- Conceptual Modifications Joe Valente 2
Containment Overpressure Credit for ECCS NPSH
- Credit for Containment Overpressure Increased for Units 2 and 3
- Credit for Containment Overpressure Requested for the First Time for Unit 1
- Same approach as Vermont Yankee
- Incorporates insights from ACRS
- Submittal date March 1,2006 J. D. Wolcott 3
GE Fuel Methods
- December 22, 2005 RAI has the same GE Fuel Methods Questions as Initial Vermont Yankee (VY) RAI of December 21, 2004
- BFN Response to December 22, 2005 RAI Scheduled March 7, 2006
- Reference GE LTR or attach GE LTR
- Reference to LTR or sections to answer questions
- BFN approval not dependent on generic approval of LTR
- Interim VY Resolution Using .02 MCPR Penalty J. D.Wolcott 4
- w BFN Responses to NRC Requests for Information
- Unit 1 and Units 2/3 RAIs Separate Correspondence
- RAIs Dated October 3, 2005
- 97 separate questions
- 82 Unit 1 and 77 Units 2/3
- Response December 19, 2005
- Additional information on vibration monitoring provided February 1, 2006
- Additional information to be provided for containment overpressure and steam dryer analysis
- Meeting with reviewers March 1, 2006
- RAIs Dated December 22, 2005
- 157 separate questions
- 100 Unit 1 and 121 Units 2/3
- Response scheduled March 7, 2006 J. D. Wolcott 5
BFN Unit 1 Testing
'System Pre-operability Checklist Testing
- Restart Test Program
- Component testing (example GL 89-10 MOV testing)
- Post.JL mdifJUicdationJ testing
- Technical specification surveillance testing
- Technical specification surveillance testing
- Restart Test Program Bob Moll 6
Logistics to Support Timely Resolution of Questions Bill Crouch 7
Closing Brian O'Grady 8