ML053110189

From kanterella
Jump to navigation Jump to search

11/30/2005, Forthcoming Meeting with Firstenergy Nuclear Operating Company (Fenoc), ET Al., Regarding Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2), Extended Power Uprate
ML053110189
Person / Time
Site: Beaver Valley  FirstEnergy icon.png
Issue date: 11/07/2005
From: Colburn T
NRC/NRR/ADRO/DORL/LPLA
To: Richard Laufer
NRC/NRR/ADRO/DORL/LPLA
Colburn, TG,NRR/DLPM,415-1402
References
TAC MC4545, TAC MC4546, TAC MC6725
Download: ML053110189 (5)


Text

November 7, 2005 MEMORANDUM TO: Richard J. Laufer, Chief Licensing Project Branch A Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation (NRR)

FROM: Timothy G. Colburn, Senior Project Manager /RA/

Licensing Project Branch A Division of Operator Reactor Licensing, NRR

SUBJECT:

FORTHCOMING MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC), ET AL., REGARDING BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2),

EXTENDED POWER UPRATE (EPU) AND REPLACEMENT STEAM GENERATOR (RSG) ALTERNATE SOURCE TERM (AST) ACCIDENT DOSE ANALYSES (TAC NOS. MC4545, MC4546 AND MC6725)

DATE & TIME: Tuesday and Wednesday, November 29-30, 2005 12:30 p.m. to 4:30 p.m., Tuesday, 7:30 a.m. to noon, Wednesday LOCATION: Beaver Valley Power Station, Site Engineering Building Route 168 Shippingport, PA 15077 PURPOSE: A working-level meeting to discuss FENOCs adoption of the AST methodology for the RSG and EPU license amendment requests. The second day will consist of an audit of proprietary calculations in support of the AST analyses. The second day of the meeting will be closed to the public.

CATEGORY 1:* This is a Category 1 meeting. The public is invited to observe this meeting (first day) and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. The meeting agenda is enclosed.

Proprietary information will be discussed at certain times during this meeting (second day). This portion of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.

MEETING CONTACT: Timothy G. Colburn, NRR 301-415-1402 tgc@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

R. Laufer PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC/NRR FENOC Westinghouse Stone & Webster T. Colburn J. Maracek J. DeBlasio D. Graves J. Lee M. Manoleras R. Surman S. Ferguson J. Parillo C. Keller M. Testa K. Frederick S. Sarver P. Sena H. Hegrat T. McGourty D. Adams Docket Nos. 50-334 and 50-412

Enclosure:

Meeting Agenda cc w/encl: See next page

ML053110189 NRC-001 OFFICE LPLA/PM LPLA/LA LPLA/BC NAME TColburn SLittle Jboska for RLaufer DATE 11/7/2005 11/7/2005 11/7/2005 MEETING AGENDA NOVEMBER 29-30, 2005, CATEGORY 1 WORKING-LEVEL MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)

EXTENDED POWER UPRATE (EPU) AND REPLACEMENT STEAM GENERATOR (RSG)

ALTERNATE SOURCE TERM (AST) ACCIDENT DOSE ANALYSES FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-334 AND 50-412 C Introductory Remarks/Introductions

  • Current Licensing Basis Application of AST methodology
  • Overview of Unit 1 RSG and Units 1 and 2 EPU License Amendment Requests
  • Overview of AST Methodology Application C Existing Docketed Information o EPU and RSG Licensing Reports o Responses to Requests for Additional Information C Previous Meetings o December 15, 2004 Meeting (EPU Overview) o March 23, 2005 Meeting (EPU/RSG, best-estimate loss-of-cooling accident and AST) o July 11, 2005 Meeting (RSG Overview)
  • Questions/Comments Enclosure

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Mary OReilly, Attorney Director FirstEnergy Nuclear Operating Company Bureau of Radiation Protection FirstEnergy Corporation Pennsylvania Department of 76 South Main Street Environmental Protection Akron, OH 44308 Rachel Carson State Office Building P.O. Box 8469 Larry R. Freeland, Manager Harrisburg, PA 17105-8469 FirstEnergy Nuclear Operating Company Regulatory Affairs/Performance Mayor of the Borough of Shippingport Improvement P.O. Box 3 Beaver Valley Power Station Shippingport, PA 15077 P.O. Box 4, BV-A Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Commissioner James R. Lewis 475 Allendale Road West Virginia Division of Labor King of Prussia, PA 19406 749-B, Building No. 6 Capitol Complex Resident Inspector Charleston, WV 25305 U.S. Nuclear Regulatory Commission P.O. Box 298 Director, Utilities Department Shippingport, PA 15077 Public Utilities Commission 180 East Broad Street FirstEnergy Nuclear Operating Company Columbus, OH 43266-0573 Beaver Valley Power Station ATTN: R. G. Mende, Director Director, Pennsylvania Emergency Work Management (BV-IPAB)

Management Agency P.O. Box 4 2605 Interstate Dr. Shippingport, PA 15077 Harrisburg, PA 17110-9364 FirstEnergy Nuclear Operating Company Ohio EPA-DERR Beaver Valley Power Station ATTN: Zack A. Clayton Mr. B. F. Sepelak P.O. Box 1049 P.O. Box 4, BV-A Columbus, OH 43266-0149 Shippingport, PA 15077 Dr. Judith Johnsrud Mr. L. William Pearce Environmental Coalition on Nuclear Power Vice President Sierra Club FirstEnergy Nuclear Operating Company 433 Orlando Avenue Beaver Valley Power Station State College, PA 16803 P. O. Box 4 Shippingport, PA 15077 J. H. Lash, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077