October 5, 2005 Mr. W. L. Berg General Manager Dairyland Power Cooperative 3200 East Avenue S.

P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

LA CROSSE BOILING WATER REACTOR (LACBWR) MASTER INSPECTION PLAN - FISCAL YEAR (FY) 2006

Dear Mr. Berg:

In accordance with NRC Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for LACBWR. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for October 2005 through September 2006 (FY2006). The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.

Because the FY2006 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY2006, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2006 MIP remains current, we request that you keep the Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the LACBWR FY2006 MIP.

We currently project the Region will conduct three inspections at LACBWR during FY2006.

During one of the inspections, we will observe the grouting of the reactor pressure vessel (RPV), based on your current proposed schedule of the LACBWR RPV removal project. If the schedule of grouting the RPV changes, please inform us 30 days prior to conducting the grouting activity. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.

Inspection Procedure Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure

W. Berg Inspection Procedure Inspection Procedure Title IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Dr. Peter Lee of my staff at (630) 829-9870.

Sincerely,

/RA by W. Snell Acting for/

Jamnes L. Cameron, Chief Decommissioning Branch Docket No. 50-409 License No. DPR-45 cc : Roger Christians, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition State Liaison Officer Chief, Radiation Protection Section, WI Department of Health Social Services, Division of Health Distribution:

Docket File PUBLIC IE-01 RIII PRR C. Craig, NMSS K. Banovac, NMSS G. Grant, RIII S. Reynolds, RIII RIII Enf. Coordinator DOCUMENT NAME:E:\Filenet\ML052780522.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME Lee:mb Cameron by WGS DATE 09/29/05 10/05/05 OFFICIAL RECORD COPY