ML032400152

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan
ML032400152
Person / Time
Site: Harris Duke energy icon.png
Issue date: 08/27/2003
From:
NRC/RGN-II
To:
Shared Package
ML032400140 List:
References
Download: ML032400152 (1)


Text

Page 1 of 1 Harris 08/27/2003 07:07:40 Inspection / Activity Plan Report 22 09/01/2003 - 09/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type DRPB4 SI - SUPPLEMENTAL INSPECTION FOR WHITE PI 2 1 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 09/15/2003 09/19/2003 Supplemental Progra PS-RP - RADIATION PROTECTION 1 1 IP 7112202 Radioactive Material Processing and Transportation 11/17/2003 11/21/2003 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23211 HARRIS/EXAMS AT POWER FACILITIES 02/09/2004 02/13/2004 Not Applicable OL EXAM - INITIAL EXAM 2 1 V23211 HARRIS/EXAMS AT POWER FACILITIES 02/23/2004 02/27/2004 Not Applicable EB1 - PLANT DESIGN - PILOT 5 1 IP 71111.DS Safety System Design and Performance Capability 03/22/2004 03/26/2004 Baseline Inspections 1 IP 71111.DS Safety System Design and Performance Capability 04/05/2004 04/09/2004 Baseline Inspections OL EP - EP INSPECTION 1 1 IP 7111402 Alert and Notification System Testing 04/05/2004 04/09/2004 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 04/05/2004 04/09/2004 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/05/2004 04/09/2004 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/05/2004 04/09/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/05/2004 04/09/2004 Baseline Inspections EB2-MR - MAINTENANCE RULE 1 1 IP 7111112B Maintenance Effectiveness 06/28/2004 07/02/2004 Baseline Inspections EB2-ISI - INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 09/27/2004 10/01/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.